Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2007-01-23-9:00AM-REGULAR
i BRAZOS COUNTY BRYAN,TEXAS NOTICE OF MEETING AND AGENDA BRAZOS COUNTY COMMISSIONERS COURT THE COMMISSIONERS COURT OF BRAZOS COUNTY WILL MEET IN REGULAR SESSION ON 23 JANUARY 2007 AT 9:00 A.M. IN THE COMMISSIONERS COURTROOM OF THE BRAZOS COUNTY COURTHOUSE, 300 E. 26TH STREET, SUITE 115, BRYAN, TEXAS. .Si M" 1. Invocation and Pledge of Allegiance — Commissioner Pers. 2. Call for citizen's input and/or concerns. 3. Presentation by the Brazos County Health Authority and the Brazos County Health Department on Preparations for a Possible Pandemic Influenza Event. Consider and take action on agenda items 4 —16: 4. Budget Amendment 06/07 -14.1. 5. Personnel Change of Status. 6. Payment of Claims. 7. Request from Tommy Munoz, Justice of the Peace, Precinct 2 Place 2, to purchase a printer (Laser Jet 2605dn) from the JP Technology Fund (minor computer hardware). 8. Permission to advertise RFQ 2007 -022, Architect for Jail Addition. 9. Permission to advertise RFP 2007 -023, Actuarial Services, to evaluate and advertise Brazos County on Governmental Accounting Standards Board 45 pertaining to other post employment benefits. 10. Change Order #0002 in the amount of $7,000.00 to provide and install Card access system provided by A -1 Fire & Security Equipment for the Information Technology Building. Office of the County Judge • 300 East 261" St. • Suite 114 • Bryan, Texas 77803 • Fax: (979) 361 -4503 R0 -_1.19 11 12 Commissioners Court Agenda 23 January 2007 Page 2 Change Order #0003 in the amount of $28,756.00 for various revisions to the Information Technology Building. Change Order #0004 in the amount of $1,398,053.00 for the Exposition Center. 13. Proposal from Wharry Engineering for services as a roof consultant for the Sheriff's Administration Building. 14. Request from Wickson Creek Special Utility District to construct a road bore for water line installation in the right of way of Zweilfel Road. Site is located in Precinct 2. 15. Request for permission to enter Mrs. C. M. Burton's property located off Leonard Road for the purpose of clearing the existing creek channel to drain water from roadway for the health, safety and welfare of the general public. Site is located in Precinct 4. 16. Payment Authorization in the amount of $456.94 to Patricia J. Moore, D.O. for her testimony and mileage. A purchase order was not obtained prior to her Grand Jury testimony. 17. Announcement of interest items and possible future agenda topics. 18. Call for citizen input and/or concerns. 19. Agency / Board / Committee reports by Court members. 20. Adjourn The Brazos County Courthouse is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive services must be made two business days before the meeting. To make arrangements, call (979) 361 -4102. qo Cao COMMISSIONERS' COURT REGULAR MEETING JANUARY 23, 2007 A regular meeting of the Commissioners' Court of Brazos County, Texas was held in the Brazos County Commissioners Courtroom in the Courthouse in Bryan, Brazos County, Texas, beginning at 9:00 a.m. on Tuesday, January 23, 2007 with the following members of the Court present: Randy Sims, County Judge, Presiding; Lloyd Wassermann, Commissioner of Precinct 1; Duane Peters, Commissioner of Precinct 2, Absent; Kenny Mallard, Commissioner of Precinct 3; Carey Cauley, Jr., Commissioner of Precinct 4; Karen McQueen, County Clerk. The attached sheet contains the names of the citizens and officials that were in attendance. The County Judge gave the invocation and led the pledge of allegiance. There was no citizen input /and or concerns. The Court listened to a presentation by Mike Paulus, Emergency Preparedness Coordinator with the Health Authority. Mr. Paulus discussed the County's plan and Dr. Charles Williams discussed preparations for a possible pandemic influenza event. The Court next considered Budget Amendment #06/07 -14.1 that would reallocate funds for HAVA - General Compliance. On Vol 01D Page 1011. Commissioners Court meeting January 23, 2007 2 motion by Commissioner Cauley, seconded by Commissioner Wassermann, the Court voted unanimously to approve the budget amendment as submitted, a copy of which is attached hereto. The Court proceeded to consider the change of status of employees as submitted on the attached Personnel Action Requests. On motion by Commissioner Wassermann, seconded by Commissioner Cauley, the Court voted unanimously to approve the changes as submitted. The Court next considered the following Claims as submitted by the County Treasurer for payment: 7027327 through 7027518 On motion by Commissioner Cauley, seconded by Commissioner Mallard, the Court voted unanimously to approve the Claims as submitted. The next matter for the Court's consideration was a request from Justice of the Peace, Precinct 2, Place 2, Tommy Munoz for the Court's approval of the purchase of one Laser Jet 2605DN printer for his office. Funds will come from the JP Technology Fund, Minor Computer Hardware. On motion by Commissioner Cauley, seconded by Commissioner Mallard, the Court voted unanimously to approve the request. The next matter for consideration was approval for the Purchasing Agent to advertise a Request for Qualifications Vol CI D Page l a a Commissioners Court meeting January 23, 2007 3 2007 -022, Architect for Jail Addition. The Sheriff reported that there had been 559 inmates last night thus making us noncompliant. On motion by Commissioner Cauley, seconded by Commissioner Mallard, the Court voted unanimously to authorize the Purchasing Agent to advertise for a Request for Qualifications. The next matter for consideration was approval for the Purchasing Agent to advertise Request for Proposal 2007 -023, Actuarial Services. On motion by Commissioner Mallard, seconded by Commissioner Cauley, the Court voted unanimously to authorize the Purchasing Agent to advertise for proposals for Actuarial Services. The Court next considered Change Order #0002 to the contract for the Information Technology Building. It is for providing and installing a Card Access System, provided by A -1 Fire and Security Equipment Company. This Change Order increases the contract amount by $7,000.00 increasing the contract amount from $897,587.00 to the revised contract amount of $904,597.00. On motion by Commissioner Cauley, seconded by Commissioner Wassermann, the Court voted unanimously to approve Change Order #0002 in the amount of $7,000.00. A copy is attached. Vol q 0 Page 1 a3 Commissioners Court meeting January 23, 2007 4 The Court next considered Change Order #0003 to the contract for the Information Technology Building. It is for fiber installation and rework provided by Unisys Corporation. This Change Order increases the contract amount by $28,756.00 increasing the contract amount from $904,597.00 to the revised contract amount of $921,590.00. On motion by Commissioner Cauley, seconded by the County Judge, the Court voted unanimously to approve Change Order #0003 in the amount of $28,756.00. A copy is attached. The Court next considered Change Order #0004 to the contract for the Exposition Center. It is for fiber installation and rework provided by Unisys Corporation. This Change Order increases the contract amount by $1,398,053.00 increasing the contract amount to $24,347.133.00. On motion by the County Judge, seconded by Commissioner Cauley, the Court voted unanimously to approve Change Order #0004 in the amount of $1,398,053.00. A copy is attached. The next matter before the Court was approval of a Contractual Agreement between Brazos County and Wharry Engineering as a roof consultant for the Sheriff's Administration Building. The cost to Brazos County will be no more that $10,400.00. The work is expected to be completed in 4 weeks. On motion by Commissioner Cauley, seconded by Vol lb Page 124 Commissioners Court meeting January 23, 2007 5 Commissioner Wassermann, the Court voted unanimously to enter into contractual agreement with Wharry Engineering. A copy of the contractual agreement is attached. The Court next considered the request from Wickson Special Utility District to construct a road bore for water line installation in the right -of -way of Zweifel Road located in Precinct 2. The County Engineer said all appeared to be in order. On motion by Commissioner Wassermann, seconded by Commissioner Cauley, the Court voted unanimously to approve the request from Wickson Special Utility District and authorized the installation. A copy of the request is attached hereto. The Court next considered authorizing work outside of county rights -of -way for the health, safety and welfare of the general public. The Road and Bridge Department requested permission to enter the private property of Mrs. C. M. Burton on Leonard Road in Precinct 4 to clear the existing creek channel to drain water from the roadway. On motion by Commissioner Cauley, seconded by Commissioner Mallard, the Court voted unanimously to authorize the work. The next matter before the Court was consideration of a payment authorization in the amount of $456.94 to Patricia J. Moore, D.O. for her testimony and mileage. No purchase order Vol 90 Page I a5 Commissioners Court meeting January 23, 2007 6 was requested. On motion by the County Judge, seconded by Commissioner Cauley, the Court voted unanimously to approve the payment authorization. Under announcement of interest items and possible future agenda topics the following spoke: Commissioner Mallard a) We should have an agreement on the inter - operability radios on the next agenda. There was no citizen input and /or concerns. There were no Agency /Board /Committee reports by Court members. There being no further business to come before the Court, the meeting was adjourned. Vol 96 Page I ;_� The foregoing minutes of the Commissioners Court meeting held January 23, 2007 have been examined and are approved in open Court this the cQDf' day of 2007, in Bryan, Rr�or�c (`r.n n1-.. Tovoc LloydIWassermann Commissioner, Precinct 1 Duane Peters Kenny Ma11a Commissioner, Precinct 2 Commissioner, Precinct 3 ().%r�'-nf Carey Cauley, Jr. Commissioner, Precinct 4 Attest: G aren McQueen County Clerk Vol a D Page l a7 Pg I of Z- BRAZOSCOUNTY COMMISSIONER'S COURT 0134 DAY OF AT Name .. ,. 20Q Organization (PLEASE 3;) ac #rq4 /-7/ -1 .l ell- Pg Z of .Z BRAZOSCOUNTY COMMISSIONER'S COURT z34YDAY OF ?"ov M Name (PLEASE PRINT) 20 0 7 Organization (PLEASE PRINT) iii r�R1 sa Y� v BRAZOS COUNTY, TEXAS BUDGET AMENDMENT(S) FOR THE 2006 -2007 BUDGET YEAR NO. 06/07 -14.1 On this the 23rd day of January 2007 at a regular meeting of the Commissioners' Court, the following members were present: Randy Sims, County Judge, Presiding Lloyd Wassermann, Commissioner, Precinct 1 E. Duane Peters, Commissioner, Precinct 2 G. Kenny Mallard, Commissioner, Precinct 3 Carey Cauley, Jr., Commissioner, Precinct 4 Karen McQueen, County Clerk The following proceedings were held: THAT WHEREAS, on 23 January 2007 the Court heard and approved a budget amendment for the 2005 -2006 budget year for Brazos County, Texas; and WHEREAS, an expenditure is necessary due to the necessity to meet unusual and unforeseen conditions which could not be reasonably included in the original budget adopted 12 September 2006, the following amendment(s) to the original budget are hereby authorized, as described on the attached page(s). ADOPTED AND APPROVED this the 23`d day of January 2007. THE COMMISSIONERS COURT OF BRAZOS COUNTY, TEXAS. Original: County Clerk's Office and attached to the original budget Copies: County Auditor County Treasurer Commissioners' Court Minutes 9a „r�Uc 13D BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 06/07 -14.1 v2ai2nm PERSONNEL CHANGE OF STATUS REQUESTS Commissioner Court Date: January 23, 2007 Department Submitting Information: Human Resources Purnose of Submissions: Consider and Take Action on Department Submitting Employee Request Action Requested Request(s) Applies To Brazos Center Building Maintenance I.T. S.O. /Admin. Beasley, Prentis Resignation Ledezma, Raul Step Increase Ramsey, Timothy Resignation Cook, Helen S.O. /Jail Contreras, Joseluis Friedrich, Ben Lamb, Ryan Lindley, Doug Pickett, Emily Wood, Joshua Approved in Commissioners' Court: County Judge's or Commissioner's S (This Copy to be attached to minutes, Completed Probation Transfer within Dept. New Hire New Hire New Hire Transfer within Dept. New Hire °1 D L 3a Unisys Corporation Design/Build'Relocations Western Region CHANGE ORDER Date: November 14, 2006 Job: Fiber installation and rework Change Order#: 0003 The Purchase Order /Contract No. 05120016 dated 07/27/06 between Unisys Corporation and Brazos Countv is hereby modified and amended by the following deviations from original plans and specifications: 1. Remove concrete & wood form playground area after the church removed the playground equipment. 2. Raise drinking fountain to meet ADA requirements. 3. Make floor leveling repairs. 4. Demo of plaster walls in room 101 & 104 due to water damage. 5. Modify restroom countertops to meet ADA requirements. 6. Repair plaster in rooms 105 & 108 due to water damage. 7 Repair plaster in rooms 117 & 119 due to water damage. 8. Provide parking lot striping and ADA signage. 9. Rework finishes in men and women's rooms. 10. Additional cost for change in lock sets required by the county. 11. Underground conduit for Verizon copper connection. 12. Underground conduit under generator pad for phones. 13. Up grade UPS to 30 kVA It is mutually agreed that for such change, the contract price is increased by $28,756.00 payable with the payment becoming due under the original Contract. Time for completion of the above cited contract work is hereby extended by 15 days beyond any completion date set forth in the original Contract for such work. All such provisions of the original Contract and agreement shall remain in full force and effect, without change because of the above deviations. Time Price Original Contract Total Previous Change Orders 0001 & 0002 Total Before this Change Order Effect of this Change Order 0003 Remove concrete & wood from playground area after the church $759,825.00 $144,772.00 $904,597.00 28756.00 removed the playground equipment: $2,022.00 Raise drinking fountain to meet current ADA requirements: $418.00 Make floor leveling repairs: $5,180.00 Demo of plaster walls in rooms 101 & 104 due to water damage: $1,758.00 Modify restroom countertops to meet current ADA requirements: $137.00 Repair plaster in rooms 105 & 108 due to water damage: $1,339.00 Repair plaster in rooms 117 & 119 due to water damage: $1,463.00 Provide parking lot striping and ADA signage: $759.00 Rework finishes in men and women's rooms: $4,863.00 Cost to change lock sets to BEST as requested: $5,263.00 Underground conduit for Verizon: $2,678.00 Underground conduit under generator pad to phone: $876.00 Up grade Ups to 30 kVA: $3,700.00 Credit for data cabinets: $- 6,000.00 Revised Contract to Date (l arlea o . l jreea Unisys Corporation January 16, 2007 Date $921,590.00 90r, -3' Date Unisys Corporation Design/Build/Relocations Western Region CHANGE ORDER 0 Date: November 14, 2006 Job: Fiber installation and rework Change Order#: 0002 The Purchase Order /Contract No. 05120016 dated 07/27/06 between Unisys Corporation and Brazos County is hereby modified and amended by the following deviations from original plans and specifications: 1. Provide and install Card access system, provided by A -1 Fire Security Equipment Company. It is mutually agreed that for such change, the contract price is increased by 137 772.00 payable with the payment becoming due under the original Contract. Time for completion of the above cited contract work is hereby extended by 15 days beyond any completion date set forth in the original Contract for such work. All such provisions of the original Contract and agreement shall remain in full force and effect, without change because of the above deviations. Time Price Original Contract $759,825.00 Total Previous Change Orders 0001 Total Before this Change Order Effect of this Change Order 0002 Revised Contract to Date (thanes d. Teen Unisys Corporation $137,772.00 $897.587.00 $ 7,000.00 $904,597.00 January 10, 2007 1 /2�)/0 -1 Date Date 9 D 1 35 7 d N N 0 V yy�� ipd�OlU> W0W001J000(0(JJ0 �N�OINO p 0 ONNOOONOOOOOOOO V O�NA c W N�OIO d�INN O O O Nmo� ,Q ,Q,Q ,Q OOy A pnD p2Tm0 ]IAA T�mm2m0 DNTD v o m @3 _O 'o m 8 m S goo v m g5 b S O� m m m rni 2D3Aif pq3 �' pLmx TO m= o '06 Nrm m m V] n] C J C1 f a g m m` m4 ij�g =v gw0_'wJ�ni � ffi o �8m� M ems n�Cq � p_ qt w�J<'mm d 3 � mwm iST $�� ] $niam2N 3 r�N � v f Six n _ � ffi N y� 3 V?� 09p9Vg9 Cm qV OOO VO a O ggggg O O $W 0 0 a N S OG J S smN x s m ^x i e y O d N W 0 d> N 'J ] s� NNW JAN Sgp�O G yp �p 0 N yy N41 S N app NLmI ap1ppp JN ypa (yN AqNq O g N+JN OOfOJ d WN W OJ > p SAO 100 +�O .m., �A ffi 3 m 00 C 20 w 8 m NNN ly w 2 n c u Im Nmo� 0 �` ZES god o^ m 0 m� n m #_eA1ADocument A121'"CMc — 2003 Amendment No. 4 AMENDMENT N0. 4 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pursuant to Section 2.2 of the Agreement, dated October 31, 2005 between Brazos County, Texas (Owner) and Hunt Construction Group, Inc. (the Construction Manager), for Brazos County (the Project), the Owner and Construction Manager establish a ADDITIONS AND DELETIONS: Guaranteed Maximum Price and Contract Time for the Work as set forth below. The author of this document has added information needed for its ARTICLE I GUARANTEED MAXIMUM PRICE completion. The author may also The Construction Manager's Guaranteed Maximum Price for the Work, including the have revised the text of the original estimated Cost of the Work as defined in Article 6 and the Construction Manager's Fee as AIA standard form. An Additions and defined in Article 5, is Twenty-four Million Three Hundred Forty -seven Thousand One Deletions Reportthat notes added Hundred Thirty -three Dollars and Zero Cents ($24,347,133.00 ). This Price is for the information as well as revisions to performance of the Work in accordance with the Contract Documents listed and attached the standard form text is available to this Amendment and marked Exhibits A through F, as follows: from the author and should be reviewed. A vertical line in the left Exhibit A Costs associated with Scope Revisions, pages 1 through 3 , margin of this document indicates dated 01/19/2007 . where the author has added necessary Information and where (Paragraph deleted) the author has added to or deleted from the original AIA text. Exhibit B Allowance items, pages through , dated NA. This document has important legal consequences. Consultation with an Exhibit C Assumptions and Clarifications made in preparing the attorney is encouraged with respect Guaranteed Maximum Price, pages through , dated NA. to Its completion or modification. Exhibit D Completion Schedule, pages through , dated NA Exhibit E Alternate Prices, pages through , dated NA Exhibit F Unit Prices, pages through , dated NA . AIA Document A121 `aCMc - 2003 Amendtnera No. 1. Copyright © 1991, 1998 and 2003 by The American Institute of Architects and The Associated General Contractors of America. All rights reserved. WARNING: This document Is protected by U.S. Copyright law and International Treaties. Unauthorized reproduction or distribution of this document, or any portion of i4 may result In severe civil and criminal penalties, and will be prosecuted to the maximum axiom possible under the low. This document was produced by AIA software at 12:11:47 on 011182007 under Order No.1o00220654_5 which expires on 2/1512007, and Is not for resale. User Notes: (1024481304) qD J37 ARTICLE Il CONTRACT TIME The date of Substantial Completion established by this Amendment is: Brazos County Exposition Center Covered Arena — June 29, 2007 Stall Barn — June 29, 2007 Exhibit Hall — July 31, 2007 Brazos County Sheriff's Office — July 15, 2007 CON TRUC I I E (Signature) Mark E. LaVoy, Executive Vice President (Printed name anq title) // i.4 /al Date ATTEST AIA Document A121 arCNc —2003 Amendment No. 1. Copyright ®1991,1998 and 2003 by The American Institute of ArCmlaCte arlc I ne Associafsc General Contractors of America. All rights reserved. WARNING: This document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 12:11:47 on 01/18/2007 under Order No.1000220654_5 which expires on 2/15/2007, and is not for resale. (1024481304) User Notes: 90 / 3 g EXHIBIT A January 19, 2007 BRAZOS COUNTY EXPOSITION CENTER & SHERIFF'S OFFICE AMENDMENT NO. 4 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER COSTS ASSOCIATED WITH SCOPE REVISIONS— EXPOSITION CENTER 1. PCO #16 -The cost for the revisions to the Audio system at the Exhibit Hall, Covered Arena and Stall Barn include Sheets AV l .1, AV 1.2.1, AV 1.2.2, AV 1.3, additional notes and specification revisions dated November 27, 2006. Also included is the cost for adding acoustics and sprinkler at the Exhibit Hall. Two Hundred Eighteen Thousand One Hundred Eighteen Dollars $218,118 2. PCO #20 — The cost for additional water connections at the RV Parking and Dump Station. The inclusions of a water truck fill station. Pricing is based on information from RFI 150, RFI 149, RFI 111 and RFI 10 responses. Seventy Five Thousand Eight Hundred Nineteen Dollars $75,819 3. PCO #25 — The inclusion of revised MEP and Architectural drawings dated September 14, 2006 including sheets SHl.l1, SH2.11, E1.2.1, E1.3.1 E1.3, E3, E5.2, E5.3, E6.1 dated 9/7/06 AX201, AX200, A105, E4, E5.2, E5.3 E6.1 dated 9/14/06, M4, M5 DATED 9/27/06 E1.3, E2.2.1, E2.2.2 E2.3, E4, E5.2, E5.3 E6.1, E6.2 dated 11/6/06 RFI 156 response. Three Hundred Five Thousand One Hundred and Fifty Nine Dollars $305,159 4. PCO # 29 — Extend the underground gas line, and include a grease trap at concession room 108 in the Exhibit Hall, per request by owner in OAC meeting and gas line sketch received 11/16/06. Eleven Thousand Three Hundred and Sixteen Dollars $11,316 5. PCO #30 — Revise the restrooms as shown on drawings A200.1, A202.1 dated 11/15/06, SAL 11 dated 11/2/06, Sketch of NW, NE, SW and SE corners Covered Arena plumbing dated 11/15/06 Fourteen Thousand Five Hundred and Fifty Nine Dollars $14,559 Exhibit A, Page 1 of 3 EXHIBIT A BRAZOS COUNTY EXPOSITION CENTER & SHERIFF'S OFFICE AMENDMENT NO. 4 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER January 19, 2007 COSTS ASSOCIATED WITH SCOPE REVISIONS — EXPOSITION CENTER 6. PCO # 31- The cost to add infrastructure and concession areas under the grandstand as shown in revised drawings A200.1, A201.1 dated 11/15/06, SALT I dated 11/2/06, (4) Electrical Power sketches dated 11/15/06, (4) Electrical Lighting sketches dated 11/17/06, Sketch of NW, NE, SW and SE corners Covered Arena plumbing dated 11/15/06 Ninety Eight Thousand Four Hundred and Seventy Seven Dollars $98,477 7. PCO #32 — Add a 25' mow strip and crown the select fill for the open arena drainage. Forty Eight Thousand Six Hundred Fifteen Dollars $48,615 8. PCO #33- Change the CMU, painting and flooring, per the revised finish schedule received 12/7/06 and drawing 100 dated 12/5/05 One Hundred Thirty Seven Thousand Five Hundred Sixty Four Dollars $137.564 9. PCO #37- The mechanical revisions to PCO 25, The inclusion of revised MEP and Architectural drawings dated September 14, 2006 including sheets SH1.11, SH2.11, E1.2.1, E1.3.1 E1.3, E3, E5.2, E5.3, E6.1 dated 9/7/06 AX201, AX200, A105,, E4, E5.2, E5.3 E6.1 dated 9/14/06, M4, M5 DATED 9/27/06 E1.3, E2.2.1, E2.2.2 E2.3, E4, E5.2, E5.3 E6.1, E6.2 dated 11/6/06 RFI 156 response and RFI 146 response. One Hundred Forty Five Thousand Four Hundred Eighteen Dollars $145,418 10. PCO #38 — The addition of (6) Big Ass Fans in the Covered Arena as requested per Brazos County during OAC meeting. Sixty Eight Thousand Three Hundred and Nine Dollars $68,309 11. PCO #39 — Revise ceiling heights in the Exhibit Hall Corridor 109, per RFI 151 response. (One Thousand Seven Hundred Twenty Five Dollars) ($1,725) Exhibit A, Page 2 of 3 �p NO EXHIBIT A BRAZOS COUNTY EXPOSITION CENTER & SHERIFF'S OFFICE AMENDMENT NO. 4 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER January 19, 2007 COSTS ASSOCIATED WITH SCOPE REVISIONS — EXPOSITION CENTER 12. PCO 941- Additional lighting controls for the stall bam, per RFI # 160 response. Two Thousand Three Hundred Forty -Four Dollars $2,344 13. Please see below the break out for Hunt's General Conditions, Bond, Insurance and Fee. An additional month of General Conditions has been included to cover potential schedule impacts related to the changes identified above. a. Bond .......................... ............................... ........................$12,384 b. Insurance ............................................. ............................... $15,121 c. General Conditions ......... ............................... ........................$82,266 d Fee na 3. 7% ........$49,882 Total................................................... ............................... $159,653 14. Distribute funds back into Owner Contingency. Two Hundred Thousand Dollars $200,000 15. The Architectural Sound System Allowance established in the specifications will be utilized to fund a portion of PCO #16 (Revisions to Audio System & Acoustics). The allowance dollar is. Fifty Thousand Dollars ($50,000) 16. The funds currently remaining in Owner Contingency is. Thirty Five Thousand Five Hundred and Seventy Four Dollars ($35,5731 17. The total cost associated with Amendment No. 4 is. One Million Three Hundred and Ninety Eight Thousand Fifty Three Dollars $1,398,053 Exhibit A, Page 3 of 3 UOi_9b PAGE / �� PROPOSAL SCOPE OF WORK Wherry Engineering shall provide the owner the following: Rate / Per Day / Plus Expenses FULL TIME QUALITY MONITORING $520.00 20 $10,400.00 We expect 4 wks to complete roof poject NOT TO EXCEED $10,400.00 OWNERS' RESPONSIBILITIES The OWNER will provide Wherry Engineering full information regarding the requirements of this Project. The OWNER will act on the behalf of Wherry Engineering in assisting Wherry Engineering to obtain access onto the property and within spaces (where necessary) for the benefit of execution of the Work. THE DOCUMENTS The Documents (Drawings, Specifications, Reports, Photographs, Field Notes and other documents prepared by Wherry Engineering for the Project) are instruments of Wherry Engineering for use solely with respect to this Project, unless otherwise provided, Wherry Engineering shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including copyright. The owner shall be permitted (at the owners expense) to retain copies, including reproducible copies, of Wherry Engineering documents for information and reference in connection with the owners use and occupancy of this project. Wherry Engineering's Documents shall not be used by the owner on other projects, for additions to this project, for completion of this project by others, unless Wherry Engineering is adjudge to be in default under this proposal. ADDITIONAL SERVICES (Per Wiginton Hooker Jeffry Architects CONTRACT) Should the owner desire additional services, such as those specifically excluded, increase the scope of work, or request changes to the approved documents, service charges will be invoiced to the owner at the following hourly rates: Roofing Consultants Professional Engineer Architect Drafting Typing Quality Monitoring $100.00 per hour $125.00 per hour $125.00 per hour $45.00 per hour $35.00 per hour $65.00 per hour Additional services will not be performed without written approval from the owner. LIMITATION OF LIABILITY/WARRANTIES Wherry Engineering shall not be liable or responsible for, and it shall be saved and held harmless by client from and against any and all claims and damages of every kind, for inquiry to or death of any person or persons and for any damage to or loss of property, arising out of, or attributed directly or indirectly to the performance of this contact. Brazos County Sheriffs Office WHARRY ENGINEERING Proposal Bryan, Texas 2 January 15, 2007 Client agrees that Wherry Engineering shall provide only the services set out herein. Client agrees to look solely to the warranties made by the contractor and /or manufacturer of said products, including, without limitation, consequential damages arising out of the use of said products. TERMINATION OF THIS PROPOSAL This Proposal may be terminated by either party upon written notice at any time should the other party fail to perform in accordance with the terms described above. In the event this Project is terminated for any reason of no fault of W.E., then such company will be paid Fees for Services performed through the Notice of Termination is received. PAYMENTS 1. Wherry Engineering will invoice at the end of every month. 2. All payments are due and payable ten (10) days from the date of the Invoice. Amounts unpaid ten (10) days after the Invoice. Amount unpaid (10) days after the invoice date will bear interest at a rate of 1.5% per month. 3. If acceptance of work covered by this Proposal has not been completed within one (1) month of the date of the execution of this Proposal, through no fault of Wharry Engineering, the proposal will be terminated. OTHER CONDITIONS 1. Wherry Engineering will perform the Work as expeditiously as is consistent with professional skill and care and orderly progress of the Work. 2. It is Wherry Engineering's sole decision as to the medial used to perform the Work described in the Proposal (i.e., Photographic Reproduction, Computer Aided Drafting, traditional drafting or any combination there of). 3. It is Wharry Engineering's sole decision as to the personnel which are employed to assist in the administration of this Project. 4. The Owner will be advised on the subcontractors and consultants which are employed to assist in the administration of this Project. Submitted with Respect, es O. Wharry Cc. Corbyn Roberts, Hunt Construction Tom Hooker, WHJ Arcitects A_ __._d 1 23 &7 Brazos County Sheriffs Office WHARRY ENGINEERING Proposal Bryan, Texas 3 / (� January 15, 2007 �� / / 7� BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridge NUMBER 560010 DATE OF COURT MEETING: January 23, 2007 �u ITEM: Request from Wickson Creek Special Utility District to construct a road bore for water line installations in the right of way of Zweilfel Road. Site is located in precinct 2. SOURCE OF FUNDS: N/A REQUIREMENTS: 1. No work will be permitted between front slope and /or back slope. 2. All installation(s) shall be constructed in designated utility easements, if applicable. If no utility easement exists, the installation(s) shall be 1) within 3 -5' of and parallel to the right -of- way line and /or 2) in the case of a road bore, perpendicular to the right -of -way line. 3. If clearing of brush, trees and other obstruction is necessary, it shall be the Applicant's responsibility to do so and to remove all cleared brush, trees etc. from county right -of -way. 4. Ditch line shall be compacted to 90% standard density ASTM -Test Method No. D-898; test shall be conducted by an independent geotechnical testing firm; copies of all test results shall be furnished to the office of the Brazos County Engineer. 5. Construction shall be in strict conformance to the latest Texas Manual of Uniform Traffic Control Devices for Streets and Highways, published by the Texas Department of Transportation, and all other State and Federal laws governing utility construction. NOTES /EXCEPTIONS: ACTION REQUESTED OR ALTERNATIVES: SUBMIT BY Richard Vance, P.9- . County Engineer CC07 -002 This F Date: Duane Peters Commissioners' Court 5 c� �y 3 ^�Q � � o 0 LO CIL ir REQUEST FOR PROPOSED INSTALLATION IN COUNTY RIGHT -OF -WAY TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS BRAZOS COUNTY COURTHOUSE BRYAN, TEXAS 77803 Formal notice is hereby given that (applicant) Wickson creek special Utility District proposes to place a (type) waterline within x across_ the right -of -way of (road) 6250 ZWEIFEL ROAD in Brazos County, Texas as follows: The location or description of the proposed installation is more fully shown by 3 copies of the drawings attached to this notice I understand and agree that: 1. The County Engineer must be notified 72 hours prior to the beginning of construction in order that he, or his designated inspector, may inspect the actual installation. 2. All damage to the roadways and rights -of -way will be repaired to their original condition to the satisfaction of the County Engineer. 3. Brazos County reserves the right to require Applicant to relocate or lower any such line at no cost to Brazos County, should same become necessary due to widening or lowering, or other alteration of the roadway or right -of -way. 4. Brazos County will in no way be responsible for any damage which might occur to any existing utility lines in the right -of -way. 5. The line will be constructed and maintained on the County right -of -way in accordance with the Utility Accommodation Policy which was adopted by the Texas Department of Transportation on May 29, 1989. 6. The line or lines will be constructed no less than twenty -four inches (24' ) lower than the lowest part of the drainage or bar ditch and the drainage is to be considered at least two feet (2') below the center of the roadway. 7. All sites will be barricaded during the construction period. Construction of this line will begin on or after the 23 day of jANuARy 20U_. Firm: Wicks n Creek Special ,Utility District By le lice Lry� Title: General Manager Address: B. o. Box 4756 Bryan, Texas P7805 Phone. 979 -589 -3030 APPROVED BY COMMISSIONERS' COURT ON: f Ile /?1C i ,- /- /�4 - } rROM Ckuckie B PHONE NO. : 713 771 5026 Jan. 12 2006 06:20PM P2 J3 ". IL• LU'!I (;ulYiVl /� --_�} —jja�d "[ f / \wU FAx$ ( -aq q -q15 1 111 04-S> 13WOS COUNTY PRIVATE PROPERTY ACCESS PERMISSION FORM p *84n stem. Carry A-a" LIQYd YarranaM eounarwar Camtirr Pa 2 Camrarttw rm 3 &am 0" RWO a Btwoo opt. =1F MW n W441 pro", Tatar 77103 MW979633.21V F0e979-7760M Cow 0 -MY G* MMtWamt Pot A DATE:. January 12, 2007: L LANDOWNER AND ADDRESS: _ Mks, c. x. Burton 6711 Burning Tree Drive Houston, Texas 77036 li. LOCATION OF WORK: Leonard Road 111. DESCRIPTION OF WORK TO BE DONE: Permission to enter Your property on Leonard Road for the purpose of clearing the creek cheaael for drainage pnrpose6. We will enter through'the gap just east of the creek and open up the existing channel for approximataly 50'. The channel haw silted in over the years and does not drain properly. We will haul off the removed silt. IV. MAINTENANCE YES x NO IF YES, ESTIMATE FREQUENCY OF MAINTENANCE: am needed will be notified prior to maintenance.) Richard F. Vance, P,E. County Engineer NRf of Way Agent Owner's Signatureyy Date: H2,92 { _ %� i•; � TSB BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridge NUMBER 56001000 DATE OF COURT MEETING: January 23. 2007 * 15- ITEM: Request for permission to enter Mrs. C. M. Burton's property located off Leonard Road for the purpose of clearing the existing creek channel to drain water from roadway for the health, safety and welfare of the general public. Site is located in Precinct 4. PRESENTATION: SU I D BY: 'Richard F. Vance, P.E. County Engineer CC07 -003 This Request is Approved Date: APPROVED BY: mmissio er Carey Caul / Precinct 4 _li (or) Denied by Commissioners' Court N7