Loading...
HomeMy WebLinkAbout2006-11-21-6:00PM-REGULARBRAZOS COUNTY BRYAN, TEXAS NOTICE OF MEETING AND AGENDA BRAZOS COUNTY COMMISSIONERS COURT THE COMMISSIONERS COURT OF BRAZOS COUNTY WILL MEET IN REGULAR SESSION ON 21 NOVEMBER 2006 AT 6:00 P.M. IN ROOM 102 OF THE BRAZOS CENTER, 3232 BRIARCREST DRIVE, BRYAN, TEXAS. Invocation and Pledge of Allegiance - Commissioner Mallard. 2. Call for citizen's input and/or concerns. 1$ Consider and take action on agenda items 3 -}A 3. Budget Amendment 06/07-7.1 thru 06/07-7.5. 4. Personnel Change of Status. 5. Payment of Claims. 6. Reappointment of Wayne Wilson to the Brazos Valley Groundwater Conservation District as the agricultural representative from Brazos County. Appointment term is 1/01/2007 through X31/2010 (previously tabled). 12, 7. Reappointment of Mayor Ron Silvia to the Board of Directors for the Brazos Valley Council of Governments. Appointment term is 1 October 2006 through 30 September 2007. 8. Request from Archie Clark, Precinct 1 Constable, for permission to appoint Jose Gonzales, Jr. as a non-paid Deputy Constable. 9. Proclamation 06-015 establishing County Extension Agent Week in Brazos County. 10. Discussion regarding a Ban on Outdoor Burning, and possible action. Offoe of the County Judge . 300 East 26'" St. . Suite 114 . Bryan, Texas 77803 . Fax: (979) 361-4503 i Commissioners Court Agenda 21 November 2006 Page 2 11. Request from Juvenile Services for permission to pay the following invoices from the FY 2007 budget for contract placement (Div 11010000, Acct 71040000): a. Therapeutic Family Life $ 3,450.00 Residential care for PID 9196, 9/2006; b. Lutheran Social Services 3,546.00 Residential care for PID 8278, 9/2006. 12. Request from Commissioner Mallard for payment of lodging expenses while attending the TEX-21 Statewide Quarterly Meeting in Fort Worth, Texas. 13. Tax Refund Applications for the following: a. First American Real Estate Tax b. Countrywide Home Loans 14. Permission to accept seized property awarded to the Sheriffs Office in the Justice of the Peace, Pct. 2.1 Court, to be sold at public auction. 15. Request from Purchasing for approval of the following Capital Requisitions for the purchase of vehicle equipment: a. Requisition 00011836 Sheriff s Office b. Requisition 00011837 Constable, Pct. 1 c. Requisition 00011838 Constable, Pct. 2 d. Requisition 00011839 Constable, Pct. 3 e. Requisition 00011840 Constable, Pct. 4 16. Change Order No. 0001 between Unisys Corporation and Brazos County, to be added to the original contract, for the installation of fiber optic cable. 17. Requisition 00011827 in the amount of $6,022.86 to John Deere Company, Inc. for the purchase of a Z-Trak Mower for the Brazos Center. 18. Request from Wickson Creek Special Utility District to construct a road bore for water line installation in the right of way of Dilly Shaw Tap Road approximately 0.5 mile from its intersection with FM 2038 North. Site is located in Precinct 2. 19. Announcement of interest items and possible future agenda topics. 20. Call for citizen input and/or concerns. 21. Agency/ Board/ Committee reports by Court members. 22. Adjourn The Brazos Center is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive services must be made two business days before the meeting. To make arrangements, call (979) 361-4102. VU Sq Filiu-~Ec -I[ BRAZOS COUNTY BRYAN, TEXAS NOTICE OF ADDENDUM TO THE AGENDA BRAZOS COUNTY COMMISSIONERS COURT THE COMMISSIONERS COURT OF BRAZOS COUNTY WILL MEET IN REGULAR SESSION ON 21 NOVEMBER AT 6:00 P.M. IN ROOM 102 OF THE BRAZOS CENTER, 3232 BRIARCREST DRIVE, BRYAN, TEXAS. In addition to the regular agenda, the Commissioners Court will consider and take action on the following item(s): 1. Permission to advertise Bid 2007-007 for seal coat projects in Precincts 1, 2, 3 and 4. The Brazos Center is wheelchair accessible. Handicap parking spaces arc available. Any request for sign interpretive services must be made two business days prior to the meeting. To make arrangements, call (979) 361-4102. Office of the County Judge . 300 East 26" St. . Suite 114 . Bryan, Texas 77803 . Fax: (979) 361-4503 VOL 29 PnGEL30 COMMISSIONERS' COURT REGULAR MEETING NOVEMBER 21, 2006 A regular meeting of the Commissioners' Court of Brazos County, Texas was held in the Brazos Center 3232 Briarcrest Drive, in Bryan, Brazos County, Texas, beginning at 6:00 p.m. on Tuesday, November 21, 2006 with the following members of the Court present: Randy Sims, County Judge, Presiding; Lloyd Wassermann, Commissioner of Precinct 1; Duane Peters, Commissioner of Precinct 2; Kenny Mallard, Commissioner of Precinct 3; Carey Cauley, Jr., Commissioner of Precinct 4; Karen McQueen, County Clerk. The attached sheet contains the names of the citizens and officials that were in attendance. Commissioner Mallard gave the invocation and led the pledge of allegiance. There was no citizen input/and or concerns. The Court next considered Budget Amendment #06/07-7.1 through 7.5, which would reallocate funds for Constable, Precinct 1, Information Technology Department (IT), County Clerk, Jail Administration; and correct budget amendment 06/07-6.3 On motion by Commissioner Cauley, seconded by Commissioner Peters, the Court voted unanimously to approve the budget amendment as submitted, a copy of which is Vol 31 Page d-I Commissioners Court meeting November 21, 2006 attached. 2 The Court proceeded to consider the change of status of employees as submitted on the attached Personnel Action Requests. On motion by Commissioner Cauley, seconded by Commissioner Peters, the Court voted unanimously to approve the change of status as submitted. The Court next considered the following Claims as submitted by the County Treasurer for payment: 7025612 through 7025815 On motion by Commissioner Cauley, seconded by Commissioner Peters, the Court voted unanimously to approve the Claims as submitted. The next matter before the Court was consideration of the reappointment of Wayne Wilson to serve as Brazos County's Agricultural Representative on the Brazos Valley Groundwater Conservation District. On motion by the County Judge, seconded by Commissioner Mallard, the Court voted unanimously to approve the reappointment of Wayne Wilson to serve as Brazos County's Agricultural Representative on the Brazos Valley Groundwater Conservation District. The term of the appointment is from January 1, 2007 through December 31, 2010. The Court next considered the reappointment of Mayor Ron Silvia to the Board of Directors for the Brazos Valley Council Vol $°1 Page c2a Commissioners Court meeting November 21, 2006 3 of Governments. On motion by Commissioner Wassermann, seconded by Commissioner Peters, the Court voted unanimously to approve the reappointment of Mayor Ron Silvia to the Board of Directors for the Brazos Valley Council of Governments. The term of the appointment is from October 1, 2006 through September 20, 2007. The Court next considered a request from Constable Precinct 1, Archie Clark, to appoint Jose Gonzales, Jr., as non-paid Deputy Constable. On motion by Commissioner Wassermann, seconded by Commissioner Peters, the Court voted unanimously to approve the request from Constable Clark to appoint Jose Gonzales, Jr. as non-paid Deputy Constable subject to appointment being within the allotted number of deputies. The County Judge read aloud Proclamation #06-015 designating the week of November 12 through 18, 2006 as "County Extension Agent Week". The Court joins with the 254 Texas Counties marking the centennial of the employment of the first Cooperative Extension Agent. This highly successful agency is as vital now as it was 100 years ago. Eric Zimmerman, Cooperative Extension Agent presented each member of the Court with a commemorative paperweight and Dr. Alma Fonseca, Cooperative Extension Agent reminded the Court members of the Elected Officials Luncheon in December. On motion by the County Judge, seconded by Commissioners Wassermann, Peters, Vol 29 Page a3 Commissioners Court meeting November 21, 2006 q Mallard and Cauley the Court moved to proclaim the week of November 12 through 18, 2006 as "County Extension Agent Week" throughout Brazos County. The next matter for consideration by the Court was the institution of a ban on out door burning. There was no recommendation for a ban from the Emergency Management Coordinator. On motion by the County Judge, seconded by Commissioner Peters, the Court voted unanimously to not institute a ban on out door burning. The Court next considered a request from Juvenile Services for permission to pay the following invoices for contract placement from the FY2007 budget. The invoices were received after the deadline for FY 2006 payments. The invoices are as follows: a) Therapeutic Family Life $3,450.00 b) Lutheran Social Services $3,546.00 On motion by Commissioner Peters, seconded by Commissioner Cauley, the Court voted unanimously to approve the payment of the above noted invoices. The next matter before the Court was a request from Commissioner Mallard for payment of lodging expenses while attending the TEX-21 Statewide Quarterly Meeting in Fort Worth, Texas. The billing for one night exceeded the per diem approved by the Commissioners Court. On motion by the County Vol 8 C? Page A4 Commissioners Court meeting November 21, 2006 5 Judge, seconded by Commissioner Cauley, the Court voted unanimously to approve payment of lodging expenses for Commissioner Mallard. The next matter for consideration was approval of tax refund applications from the following individuals and/or companies: a) First American Real Estate Tax, Over Payment $35.01 b) Countrywide Home Loans, Over Payment $10.85 On motion by Commissioner Wassermann, seconded by Commissioner Cauley, the Court voted unanimously to approve the tax refund applications. The Court next considered acceptance of seized property awarded to the Sheriff's Office in the Justice of the Peace, Precinct 2 Place 1 Court. If accepted, the property will be sold at public auction. Property items are as follows: a) Lincoln Welder b) Sony Jam Box c) Band Saw d) RCA Camcorder On motion by Commissioner Cauley, seconded by Commissioner Peters, the Court voted unanimously to accept the seized property named previously and to sell it at public auction. The next matter before the Court was consideration of the following requisitions to purchase equipment for the Sheriff's Office and Constable vehicles: Vol 99 Page d5 Commissioners Court meeting November 21, 2006 6 a. 00011836 Sheriff's office b. 00011837 Constable, Precinct 1 c. 00011838 Constable, Precinct 2 d. 00011839 Constable, Precinct 3 e. 00011840 Constable, Precinct 4 On motion by Commissioner Peters, seconded by Commissioner Mallard, the Court voted unanimously to approve the requisitions. The Court next considered Change Order No. 0001 between Unisys Corporation and Brazos County, to be added to the original contract. This is for the installation of fiber optic cable. The original contract amount was $759,825.00. This Change Order in the amount of $137,772.00 increases the contract amount to $879,597.00. On motion by Commissioner Cauley, seconded by Commissioner Peters, the Court voted unanimously to approve Change Order No. 0001. A copy is attached. The next matter before the Court was consideration of requisition 00011827 to John Deere Company, Inc. in the amount of $6,022.86 for the purchase of a mower for the Brazos Center. On motion by Commissioner Peters, seconded by Commissioner Wassermann, the Court voted unanimously to approve the requisition. The Court next considered the request from Wickson Special Utility District to construct a road bore for water Vol gl -Page a(e Commissioners Court meeting November 21, 2006 7 line installation in the right-of-way of Dilly Shaw Tap Road approximately 0.5 mile from its intersection with FM 2038 North. The site is located in Precinct 2. The County Engineer stated that all appeared to be in order and recommended approval. On motion by Commissioner Peters, seconded by Commissioner Cauley, the Court voted unanimously to approve the request by Wickson Special Utility District and authorized the installation. A copy of the request is attached hereto. The County Judge next considered an Addendum to the Agenda that was a request from the Purchasing Department for permission to advertise Bid 2007-007 for seal coat projects in Precincts 1,2,3 and 4. On motion by Commissioner Cauley, seconded by Commissioner Peters, the Court voted unanimously to approve the request. Under announcement of interest items and possible future agenda topics the following spoke: Chuck Frazier, Emergency Management Coordinator a) Said that there will be a Pandemic Flu exercise to be held on December 6 and 7 at the Emergency Operations Center (EOC). Commissioner Mallard a) Most of the Court will be traveling to Austin on the 7th for a CUC meeting. Vol 9 q Page ~7 Commissioners Court meeting November 21, 2006 Commissioner Wassermann a) He finally received an answer from the Attorney General's office on Millican being a separate city. Commissioner Mallard a) Reminded everyone that there will be no Commissioners Court meeting on November 28, 2006. There was no citizen input and/or concerns. Under Agency/Board/Committee reports by Court members, the following spoke: Commissioner Mallard a) The IGC meeting discussed a grant to help communication between agencies with radios. County Judge a) Asked Chief Deputy, Jim Mann for an update on the south end radio tower. Deputy Mann replied that it would be operational in 2 to 3 weeks Commissioner Mallard a) Thinks it would be report from the pandemic flu. a good idea to get a Health Department on b) He hopes to have a contract on the Community Emergency Operations Center (EOC) by the 14th of December. Patricia Meronoff is currently working on it. Both the cities of Bryan and College Station City Councils have a meeting scheduled on the 14tH There being no further business to come before the Court, the meeting was adjourned. Vol 8 q Page CR 9_ 8 The foregoing minutes of the Commissioners Court meeting held November 21, 2006 have been examined and are approved in open Court this the ( ,~L day of (~C«ra-X , 2006, in Bryan, Lloyd W sermann Commissioner, Precinct 1 Duane Peters Kenny Malta d Commissioner, Precinct 2 Commissioner Precin t 3 Carey a ley, Jr. Commiss' ner, Precinct 4 Attest: aren McQueen County Clerk Vol 27 Page a 9 Brazos County, Texas. BRAZOS COUNTY COMMISSIONERS COURT DAY OF V211 ~ , 20~ AT =~o AMM Name Organization (04w-\. xpo d~ 76-~ CO h VOL 9l PAGE 3D Pit- ~F BRAZOSCOUNTY COMMISSIONERS COURT DAY OF 20 AT AM Name Organization VOL 9'1 PAGE 31 Z~nri~ina✓ l~ _lr\n BRAZOS COUNTY, TEXAS BUDGET AMENDMENT(S) FOR THE 2006-2007 BUDGET YEAR NO. 06/07-7.1 thru 06/07-7.5 On this the 21" day of November 2006 at a regular meeting of the Commissioners' Court, the following members were present: Randy Sims, County Judge, Presiding Lloyd Wassermann, Commissioner, Precinct I E. Duane Peters, Commissioner, Precinct 2 G. Kenny Mallard, Commissioner, Precinct 3 Carey Cauley, Jr., Commissioner, Precinct 4 Karen McQueen, County Clerk The following proceedings were held: THAT WHEREAS, on 21 November 2006 the Court heard and approved a budget amendment for the 2005-2006 budget year for Brazos County, Texas; and WHEREAS, an expenditure is necessary due to the necessity to meet unusual and unforeseen conditions which could not be reasonably included in the original budget adopted 12 September 2006, the following amendment(s) to the original budget are hereby authorized, as described on the attached page(s). ADOPTED AND APPROVED this the 21" day of November 2006. THE COMMISSIONERS COURT OF BRAZOS COUNTY, TEXAS. Original: County Clerk's Office and attached to the original budget Copies: County Auditor County Treasurer Commissioners' Court Minutes VUL Sq PACE OA BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 06/07 - 7.1 Vu-L 8 q u- E 3 3 J BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 06/07 - 7.2 11/21/2006 FD DIV ACCT PROJ DR/CR ACCOUNT NAME Increase Decrease 14500163000501 80101000 1 1 CR IBuilding Renovation 106,6861 145001630005001 65050000 DR Buildine Maintenance 106.686.00 Ca ital Projects - Commissioners' Court: To make a correction on budget amendment No. 06/07 - 6.3 that was approved b the Commissioners' Court on 11/14/2006. The replacement of the roof of a building should have been considered as a maintenance cost instead of capital outlav cost. BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 06/07 - 7.3 VOL 99 PAGE 35 BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 06/07 - 7.4 VOL-nPAOE 3~_ BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 06/07 - 7.5 VOL 97 rrciE 37 PERSONNEL CHANGE OF STATUS REQUESTS Commissioner Court Date: November 21, 2006 Department Submitting Information: Human Resources Purpose of Submissions: Consider and Take Action on Department Submitting Employee Request Action Requested Request(s) Applies To Road & Bridge McCord, Jason New Hire Approved in Commissioners' Court: Novembe County Judge's or Commissioner's Signature: (This Copy to be attached to minutes) VGL 37 Ph', u'[ 39 Unisys Corporation Design/BuiWRelocations Western Region CHANGE ORDER Date: November 14, 2006 Job: Fiber installation and rework Change Order#: 0001 The Purchase Order/Contract No. 05120016 dated 07/27/06 between Unisys Corporation and Brazos County is hereby modified and amended by the following deviations from original plans and specifications: 1. Provide and install Fiber as per attached quote of November 14, 2006. It is mutually agreed that for such change, the contract price is increased by $137,772.00 payable with the payment becoming due under the original Contract. Time for completion of the above cited contract work is hereby extended by days beyond any completion date set forth in the original Contract for such work. All such provisions of the original Contract and agreement shall remain in full force and effect, without change because of the above deviations. Time Price Original Contract $759.825.00 Total Previous Change Orders .00 Total Before this Change Order $759,825.00 Effect of this Change Order $137,772.00 Revised Contract to Date $897,597.00 Canes L. Green Unisys Corporation November 14, 2006 Date VUL 8`~ FE, E S9 ll(ti kip Date Unisys DesigiVlBuild and Relocations November 14, 2006 Mr. Eric V. Caldwell Director of Information Technology Brazos County 202 East 27"' Street, Suite 102 Bryan, TX. 77803 Cost to provide and install Fiber as defined in Scope of work. SCOPE OF WORK ➢ Unisys will provide and install Corning fiber optic cable as listed below. Please note that we have chosen to use an indoor/outdoor plenum rated fiber to eliminate the need for transitions to plenum rated fiber thus eliminating several possible points of failure. Once inside the buildings, the fiber will be run in plenum rated innerduct for protection and ease of identification. The cables will be terminated on each end in a Panduit enclosure using fusion spliced SC pigtails. ➢ Unisys will meet with all concerned parties prior to the start of the project to establish a timeline and sequence of events to ensure problem free project. Fiber F1 192 str. SM fiber from Courthouse 1 to Caldwell F2 24 str. SM fiber from Courthouse 1 to Courthouse 2 F3 24 str. SM fiber from Courthouse 1 to Courthouse 3 F4 24 str. room SM fiber from Courthouse 1 to Basement phone F5 24 str. SM fiber from Courthouse 1 to Health F6 24 str. SM fiber from Courthouse 1 to Tax F7 24 str. SM fiber from Courthouse 1 to Maintenance F8 8 str. SM fiber from Caldwell to Libra F9 24 srt. SM/24 str. 62.5 MM from Caldwell to Annex F10 8 str. SM fiber from Caldwell to BTU F11 24 str. SM fiber from MNS through Libra to Annex ➢ F1 A total of 192 strands will be placed from Caldwell Center to IDF1 in the Courthouse. This will be accomplished by running 4-48 strand single mode fiber cables. We have been told by Corning that a 192-strand cable in not made in an 1/0 Plenum configuration. ➢ F2, F3, and F4 A riser rated 24-strand single mode fiber optic cable will be run from Courthouse IDF1 to the appropriate floor. ➢ F5, F6, and F7 An 1/0 Plenum rated 24-strand single mode fiber optic cable will be run from Courthouse IDF1 to the appropriate building. hr of ~ ce;:?ers for ,ar o n s rep s UV!. Gil ,.,•n VOL q0 Unisys ue,si n'!Bu_lild and Relocations ➢ F8 An 1/0 Plenum rated 48-strand single mode fiber optic cable will be run from Caldwell Center to the Library. The customer will be responsible for the establishment of the underground pathway. ➢ F9 An 1/0 Plenum rated 48-strand single mode and a 24-strand multi mode fiber optic cable will be run from Caldwell Center to the Annex. A hybrid cable was not available in an 1/0 Plenum configuration. The customer will be responsible for the establishment of the underground pathway. ➢ F10 An 1/0 Plenum rated 48-strand single mode fiber optic cable will be run from Caldwell Center to the Bryan Utilities Building. The customer will be responsible for the establishment of the underground pathway. ➢ F11 An existing 24-strand single mode fiber optic cable will be cut and routed to an enclosure to create a junction point. This will be done 12 strands at a time to eliminate any downtime. We have been told that there is slack in the cable to accomplish this, our quote is based on existing slack. ➢ Please see the materials list for quantities and description of materials to be installed. ➢ No tax, bond, or overtime included. MATERIALS LIST TY UM MANF. PART9 DESCRIPTION 11165 It Comin 0 48 Strand SM Fiber Optic Cable 1/0 Plenum 3500 ft Comin 0 24 Strand SM Fiber Optic Cable VO Plenum 640 0 0 0 24MM 62.5u Fiber Optic Cable 1/0 Plenum 320 ft Coming 0 24 Strand SM Fiber Optic Cable Riser Rated 3 ea Panduit FRME2 Fiber tic Enclosure 8 ea Panduit FRME4 Fiber Optic Enclosure 70 ea Panduit FAP12WBUDSCZ SC Coupler Panel SM 4 ea Panduit FAP6WEIDSCZ SC Couplet Panel MM 32 ea Panduit FAPB Blank Panel 4 ea Panduit CCH-CPI2-59 SC Coupler Panel SM 21 ea 0 0 Splice Tube 86 ea Panduit FST6 Splice Tray II ea Panduit FSTHS Tray Holder 4 ea Panduit F96D3-NM2Y 6 SC Connector SM Pigtail 78 ea Panduit F912D3-NM2Y 12 SC Connector SM Pigtail 4 ea Panduit F612D3-NM2Y 12 SC Connector MM Pigtail 2150 ft 0 0 1 1/4" Innerduct Plenum 175 ft 0 0 1 1/4" Innerduct Riser 2100 ft 0 0 1 1/4" Innerduct PE I lot 0 0 10-9900 MISC PROVISIONS Any additional work not specified in this scope of work or any additional work request from customer may result in a change order. kt R S1 PACE '~I Unisys Design/Build and Relocations The primary fiber installation is based on normal working hours, Monday thru Friday, 8am to 5pm. Some of the work is scheduled during off hours to accommodate splicing of fiber cabling and connections to meet the requirements of the County. Project delays outside of Unisys Corporations control, including but not limited to delay by other trades or customer could result in additional cost to customer. This quotation is based on asbestos-free environment. This proposal pricing is good for a period of 15 days. Due to the current volatility of the copper market and other materials, our suppliers will only guarantee materials pricing for two weeks. This quotation assumes that detailed "As-Built" drawings (floor plans), key sheets, cable/jack configuration including all existing inside and outside cable plant will be provided by customer and will be ready prior to cable installations. Schedule: I have scheduled to start the fiber runs on November 27 and completion by December 15. The priority installations will be installed first. The total cost for the fiber installation is: $137,772.00 If you have any questions please contact me via email or 650/ 875-4414. Respectfully, Richard James Morgan Account Executive o(' 9n+"'vg%i cc~i ers frjr ton;orro v;;seeds Vz r!"i Siva, dY 1 i ciSJ: 4: $9 rR^~ ya F BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridge NUMBER 560010 DATE OF COURT MEETING: November 21. 2006 -~17P ITEM: Request from Wickson Creek Special Utility District to construct a road bore for water line installation in the right of way of Dilly Shaw Tap Road approximately 0.5 mile from its intersection with FM 2038 North. Site is located in Precinct 2. SOURCE OF FUNDS: N/A REQUIREMENTS: 1. No work will be permitted between front slope and/or back slope. 2. All installation(s) shall be constructed in designated utility easements, if applicable. If no utility easement exists, the installation(s) shall be 1) within 3-5' of and parallel to the right-of- way line and/or 2) in the case of a road bore, perpendicular to the right-of-way line. 3. If clearing of brush, trees and other obstruction is necessary, it shall be the Applicant's responsibility to do so and to remove all cleared brush, trees etc. from county right-of-way. 4. Ditch line shall be compacted to 90% standard density ASTM-Test Method No. D-698; test shall be conducted by an independent geotechnical testing firm; copies of all test results shall be furnished to the office of the Brazos County Engineer. 5. Construction shall be in strict conformance to the latest Texas Manual of Uniform Traffic Control Devices for Streets and Highways, published by the Texas Department of Transportation, and all other State and Federal laws governing utility construction. NOTES/EXCEPTIONS: ACTION REQUESTED OR ALTERNATIVES: B Y: S7XT ~ I chard F. Vance, P.E. County Engineer 0006-085 APP E 7:! : Commissioner E. Duane Peters Precinct 2 This Request is Approved Denied ❑ by Commissioners' Court Date: I I / Zl L(c / Randy Sirye, County Judge 1?q ~43 REQUEST FOR PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS BRAZOS COUNTY COURTHOUSE BRYAN, TEXAS 77803 Formal notice is hereby given that (applicant) Wickson creek Special Utility District proposes to place a (type) Waterline within y_ across_ the right-of-way of (road) 9365 DILLY SHAW TAP ROAD in Brazos County, Texas as follows: The location or description of the proposed installation is more fully shown by 3 copies of the drawings attached to this notice. I understand and agree that: 1. The County Engineer must be notified 72 hours prior to the beginning of construction in order that he, or his designated inspector, may inspect the actual installation. 2. All damage to the roadways and rights-of-way will be repaired to their original condition to the satisfaction of the County Engineer. 3. Brazos County reserves the right to require Applicant to relocate or lower any such line at no cost to Brazos County, should same become necessary due to widening or lowering, or other alteration of the roadway or right-of-way. 4. Brazos County will in no way be responsible for any damage which might occur to any existing utility lines in the right-of-way. 5. The line will be constructed and maintained on the County right-of-way in accordance with the Utility Accommodation Policy which was adopted by the Texas Department of Transportation on May 29 1989. 6. The line or lines will be constructed no less than twenty-four inches (24") lower than the lowest part of the drainage or bar ditch and the drainage is to be considered at least two feet (2') below the center of the roadway. 7. All sites will be barricaded during the construction period. Construction of this line will begin on or after the 21 day of NOVEMBER , 2006 Firm: Wick n Creek /Special Utility District By: GCRC4y Title. General Manager Address: P. o. Box 4756 Bryan, Texas 17805 APPROVED BY COMMISSIONERS' COURTp~i Date Randy Si County Judge Phone. 979-589-3030 44 o' (fJ 3 Q a x T II II~ III 1 G r- ral a y I M ~ ~ ~ V 3 9