Loading...
HomeMy WebLinkAbout2006-05-30-9:00AM-REGULARBRAZOSCOUNTY BRYAN, TEXAS NOTICE OF MEETING AND AGENDA BRAZOS COUNTY COMMISSIONERS COURT THE COMMISSIONERS COURT OF BRAZOS COUNTY WILL MEET IN REGULAR SESSION ON 30 MAY 2006 AT 9:00 A.M. IN THE COMMISSIONERS COURTROOM OF THE BRAZOS COUNTY COURTHOUSE, 300 E. 26' STREET, SUITE 115, BRYAN, TEXAS. 1. Invocation and Pledge of Allegiance - Commissioner Peters. 2. Call for citizen's input and/or concerns. 3. Presentation of continuing education certificates by Dr. Alma Fonseca to those who participated in the V. G. Young Institute of County Government's 48th Annual County Judges and Commissioners Continuing Education conference. Consider and take action on agenda items 4 - 20: 4. Budget Amendment 05106-34.1 thru 05106-34.8. 5. Reclassification of the Clerk position in the Precinct 4 Constable's Office (Division 30401100) as follows: from Class 1608, Group 11, Step 12, Clerk to Class 1608, Group 14, Step X, Administrative Secretary. 6. Personnel Change of Status. - 7. Payment of Claims. 8. Brazos County Order 406-003 prohibiting outdoor burning in Brazos County for ninety (90) days, effective immediately. 9. Payment of lodging expenses for Commissioner Mallard while attending Texas High Speed Rail and Transportation meetings on 18-19 May 2006. The rate is above what Brazos County allows. Office of the County Judge . 300 East 2e St. . Suite 114 . Bryan, Texas 77803 . Fax: (979) 3614503 0 t 55 Commissioners Court Agenda 30 May 2006 Page 2 10. Addition of the 9-1-1 District to the County's health insurance plan. 11. Permission to accept the following property donated to the Brazos County Juvenile Services Department: a. Trolley passes from Brazos Transit District; estimated value is $200.00. 12. Tax Refund Applications for the following: a. David Blevins e. Leann Floyd b. Norma Reyes Bragg f. Alan E. & Beatrice F. Minde c. William H. & Monica Bauerschlag g. Curtis & Angela Strong. d. D&S Water Services 13. Declaration of surplus property as "salvage" that was advertised for sale in accordance with Local Government Code §263.152 but received no bids, and authorization for either destruction or other disposal. 14. Formation of a committee with the following membership for the selection of a company/firm as per RFP 2006-032, Collection Services for Delinquent Criminal and Civil Court Costs, Fines, Attorney Fees and Restitution: Lloyd Wassermann, Commissioner, Precinct 1 Duane Peters, Commissioner, Precinct 2 Rod Anderson, First Assistant County Attorney Tanya Skinner, District Clerk Collections George Boyett, Justice of the Peace, Precinct 3 Charles Ellis, Justice of the Peace, Precinct 1 Steve Smith, Judge, 361 st District Court 15. Amendment No. 1 to the Contract for Construction Manager Services between Brazos County and Hunt Construction Group, Inc. 16. Request from Aggieland Builders, LLC to construct a road bore in the right of way of Jones-Butler Road for sanitary sewer line installation. Site is located in Precinct 1 17. Request from B.W.O.C., Inc. to construct two (2) road bores for a natural gas pipeline in the right of way of Opersteny Lane, with payment of $1000.00 (check #28870). Site is located in Precinct 2. 18. Request from Creek Meadow Partners to construct a six (6) inch force main sanitary sewer line in the right of way of Greens Prairie Trail, Woodlake Drive and Greens Prairie Road. Site is located in Precinct 1. 19. Payment authorization in the amount of $570.00 to Traci Thomas for a youth development workshop held on 20 May 2006 for the Juvenile Services Department. A purchase order was not obtained in advance. Commissioners Court Agenda 30 May 2006 Page 3 20. Payment authorization from the Road & Bridge Department in the amount of $12,472.10 to Colorado Materials. P.O. #19100 was closed out by mistake. 21. Announcement of interest items and possible future agenda topics. 22. Call for citizen input and/or concerns. 23. Agency / Board / Committee reports by Court members. 24. Adjourn The Brazos County Courthouse is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive services must be made two business days before the meeting. To make arrangements, call (979) 361-4102. 157 COMMISSIONERS' COURT REGULAR MEETING MAY 30, 2006 A regular meeting of the Commissioners' Court of Brazos County, Texas was held in the Brazos County Commissioners Courtroom in the Courthouse in Bryan, Brazos County, Texas, beginning at 9:00 a.m. on Tuesday, May 30, 2006 with the following members of the Court present: Randy Sims, County Judge, Presiding; Lloyd Wassermann, Commissioner of Precinct 1; Duane Peters, Commissioner of Precinct 2; Kenny Mallard, Commissioner of Precinct 3; Carey Cauley, Jr., Commissioner of Precinct 4; Karen McQueen, County Clerk. The attached sheet contains the names of the citizens and officials that were in attendance. Commissioner Peters gave the invocation and led the pledge of allegiance. There was no citizen input/and or concerns. The first matter before the Court was the presentation of continuing education certificates by Dr. Alma Fonseca to those who participated in the V. G. Young Institute of County Government's 48th Annual County Judges and Commissioners Continuing Education Conference. The Court next considered Budget Amendment #05/06-34.1 through 34.8 that would reallocate funds for the Certificates 5$ Vol ou Page 1 Commissioners Court meeting May 30, 2006 2 of Obligation 2004-Justice of the Peace Building, Juvenile Services, Magistrate, Non-Departmental, Information Technology, Exposition Center; transfer funds from Road and Bridge Contingency to Certificates of Obligation 2003- Sheriff's Administration Building, and from Contingency to Certificates of Obligation 2005. On motion by Commissioner Cauley, seconded by Commissioner Peters, the Court voted unanimously to approve the budget amendment as submitted, a copy of which is attached hereto. The next matter before the Court was the reclassification of the Clerk position in the Constable Precinct 4 Office. Constable Butler made the following request: Class 1608 From: Group 11, Step 12, Clerk To: Group 14, Step 3, Administrative Secretary On motion by Commissioner Cauley, seconded by Commissioner Peters, the Court voted unanimously to approve the reclassification but will increase the Step to 6 rather than a 3. The Court proceeded to consider the change of status of employees as submitted on the attached Personnel Action Requests. Commissioner Cauley moved to approve. Commissioner Wassermann, seconded the motion. Commissioners Wassermann, Vol SD Page 15 9 Commissioners Court meeting May 30, 2006 3 Mallard, Cauley and the County Judge voted "Aye". Commissioner Peters abstained because his daughter's name appears on the change of status list. The Court next considered the following Claims as submitted by the County Treasurer for payment: 7019753 through 7019983 On motion by Commissioner Peters, seconded by Commissioner Cauley, the Court voted unanimously to approve the Claims as submitted. The next matter for consideration by the Court was Brazos County Order #06-003, prohibiting outdoor burning in Brazos County. On motion by the County Judge, seconded by Commissioner Cauley, the Court voted unanimously to remove this item from the agenda. The Court next considered payment of lodging expenses for Commissioner Mallard while attending the Texas High Speed Rail and Transportation meetings. The cost exceeded the maximum paid by the County. The County Judge moved to approve. Commissioner Peters seconded the motion. Commissioners Wassermann, Peters, Cauley and the County Judge voted "Aye". Commissioner Mallard abstained. The motion carried. The next matter before the Court was the addition of the Brazos County 9-1-1 District employees to the County's health Vol D~ Page I &D Commissioners Court meeting May 30, 2006 4 insurance. On motion by Commissioner Mallard, seconded by Commissioner Peters, the Court voted unanimously to approve the addition of the Brazos County 9-1-1 District employees to the County's health insurance. The Court next considered authorizing acceptance of donated property from Brazos Transit District. The District has offered the Juvenile Services department 200 Trolley Passes with an estimated value of $200.00. On motion by Commissioner Cauley, seconded by Commissioner Peters, the Court voted unanimously to accept the donated property. The next matter for consideration was approval of tax refund applications from the following individuals and/or companies: a) David Blevins, Over Payment $242.64 b) Norma Reyes Bragg, Over Payment $335.52 c) William H. & Monica Bauerschlag, Over Payment $32.88 d) D&S Water Services, Over Payment $116.17 e) Leann Floyd, Over Payment $362.90 f) Alan E. & Beatrice F. Minde, Over Payment $33.34 g) Curtis & Angela Strong, Over Payment $825.30 On motion by Commissioner Peters, seconded by Commissioner Wassermann, the Court voted unanimously to approve the tax refund applications. The Court next considered the declaration of surplus property as salvage. This property was advertised for sale in accordance with Local Government Code §263.152 and received no Vol on Page AD/ Commissioners Court meeting May 30, 2006 5 bids. On motion by Commissioner Peters, seconded by Commissioner Cauley, the Court voted unanimously to declare the property as salvage and authorized its destruction or other disposal. A list of the property is attached. The next matter before the Court was the appointment of individuals to serve on the committee to select a company/firm for collection services per RFP 2006-032. On motion by the County Judge, seconded by Commissioner Cauley, the Court voted unanimously to appoint the following individuals to serve on the committee: a) Lloyd Wassermann, Commissioner Precinct 1 b) E. Duane Peters, Commissioner Precinct 2 c) Rod Anderson, Assistant County Attorney d) Tanya Skinner, Collections Supervisor e) George Boyett, Justice of the Peace, Precinct 3 f) Charles Ellis, Justice of the Peace, Precinct 1 g) Steve Smith, 361st District Court Judge The next matter for consideration was consideration of Amendment #1 to the Contract for Construction Manager At Risk Services between Owner and Construction Manager. On motion by the County Judge, seconded by Commissioner Peters, the Court voted unanimously to approve Amendment #1 and authorized the County Judge to execute the document. A copy is attached. The Court next considered the request from Aggieland Builders, LLC to construct a road bore in the right-of-way of Jones Butler Road for sanitary sewer line installation. The Vol 8D Page / 6z2 Commissioners Court meeting May 30, 2006 6 sites are located in Precinct 1. The County Engineer stated that all appeared to be in order and recommended approval. On motion by Commissioner Wassermann, seconded by Commissioner Peters, the Court voted unanimously to approve the request from Aggieland Builders, LLC and authorized the installation. A copy of the request is attached hereto. The Court next considered the request from B.W.O.C., Inc. to construct two (2) road bores for a natural gas pipeline in the right-of-way of Fickey Road and Opersteny Lane. The site is located in Precinct 2. Company Check No. 28870 in the amount of $1,000.00 for the permit accompanies the request. The County Engineer stated that all appeared to be in order and recommended approval. On motion by Commissioner Peters, seconded by Commissioner Cauley, the Court voted unanimously to approve the request from B.W.O.C., Inc. and authorized the installation. A copy of the request is attached hereto. The Court next considered the request from Creek Meadow Partners to construct a 6 inch force main sanitary sewer line in the right-of-way of Greens Prairie Trail, Woodlake Drive and Greens Prairie Road. The site is located in Precinct 1. The County Engineer stated that all appeared to be in order and recommended approval. On motion by Commissioner Wassermann, seconded by Commissioner Peters, the Court voted Vol ou Page 163 Commissioners Court meeting May 30, 2006 7 unanimously to approve the request from Creek Meadow Partners and authorized the installation. A copy of the request is attached hereto. The Court next considered a payment authorization in the amount of $570.00 to Traci Thomas for a youth development workshop for the Juvenile Service Department. No purchase order was obtained in advance. On motion by the County Judge, seconded by Commissioner Cauley, the Court voted unanimously to approve the payment authorization. The next matter before the Court was consideration of a payment authorization in the amount of $12,472.01 to Colorado Materials. The purchase order had been closed out by mistake. On motion by Commissioner Wassermann, seconded by Commissioner Cauley, the Court voted unanimously to approve the payment authorization. Under announcement of interest items and possible future agenda topics the following spoke: County Judge a) Stated the need for an Expo Committee meeting. Kay Hamilton, Treasurer a) The 4th of July falls on a Tuesday. The Court will need to decide soon if they are going to reschedule the Commissioners Court meeting on not. Vol On Page l Commissioners Court meeting May 30, 2006 g There was no citizen input and/or concerns. Under Agency/Board/Committee reports by Court members, the following spoke: County Judge a) He asked Commissioner Mallard about progress on the High Speed Rail. Commissioner Mallard replied that American and Continental Airlines were showing interest in joining the group. There being no further business to come before the Court, the meeting was adjourned. Vol ~D Page I & ~A- The foregoing minutes of the Commissioners Court meeting held May 30, 2006 have been examined and are approved in open Court this the day of T ( 2006, in Bryan, Brazos County, Texas. Randy Si County dge Duane Peters Commissioner, Precinct 2 arey uley, Jr. Commis inner, Pre nc 4I Attes K ren McQueen County Clerk Lloyd Wassermann Commissioner, Precinct 1 Kenny Malla d Commissioner, Precinc 3 Vol g() Page / 65 BRAZOSCOUNTY COMMISSIONERS COURT 3a 20 No Name DAY OF /t-{ , AT A l ~T C L-- - 4 2 z ~ Ll/ Organization G~ TT L~ Lvc/1~ t3 T . vot. P mJE /&(p AQd&-i dAu 4a/' Zot4L~-_ BRAZOSCOUNTY COMMISSIONERS COURT jo -6 DAY OF 20 a~ AT g: Dd A /RM Name Organization ` l/ C2 Com~, Gt. 0 X67 BRAZOS COUNTY, TEXAS BUDGET AMENDMENT(S) FOR THE 2005-2006 BUDGET YEAR NO. 05/06-34.1 thru 05/06-34.8 I On this the 301h day of May 2006 at a regular meeting of the Commissioners' Court, the following members were present: Randy Sims, County Judge, Presiding Lloyd Wassermann, Commissioner, Precinct 1 E. Duane Peters, Commissioner, Precinct 2 G. Kenny Mallard, Commissioner, Precinct 3 Carey Cauley, Jr., Commissioner, Precinct 4 Karen McQueen, County Clerk The following proceedings were held: THAT WHEREAS, on 30 May 2006 the Court heard and approved a budget amendment for the 2005-2006 budget year or Brazos County, Texas; and WHEREAS, an expenditure is necessary due to the necessity to meet unusual and unforeseen conditions which could not be reasonably included in the original budget adopted 20 September 2005, the following amendment(s) to the original budget are hereby authorized, as described on the attached page(s). ADOPTED AND APPROVED this the 30`h day of May 2006. THE COMMISSIONERS COURT OF BRAZOS COUNTY, TEXAS. By Original: County Clerk's Office and attached to the original budget Copies: County Auditor County Treasurer Commissioners' Court Minutes BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 05/06 - 34.1 5/30/2006 FD DIV ACCT PROD DI/7C--R ACCOUNT NAME Increase Decrease 4904 63491004 60360000 DR Furniture 11,565.00 4904 63491004 80294000 DR Telephone System 18,389.00 4904 63491004 80110000 CR Building - J.P. Office 29,954.00 Certificates of Obligation 2004 - Justice of the Peace Building To move funds from the building account for the telephone sstem (including the consultant and for furniture less than $500 each niece. 1 P F"~. _f rK /l0/ C BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 05,106 - 34.2 cizml'nnfi FD DIV ACCT PROJ DR/CR ACCOUNT NAME Increase Decrease 0100 56001000 61130000 CR Contingency - R&B 500,000.00 0100 91110000 DR Transfers to 2003 CO's 500,000.00 4800 63481000 80120000 DR Building - SO Admin 500,000.00 4800 49028000 CR Transfers from Gen. Fund 500,000.00 Certificates of Obligation 2003 - Sheriff's Administration Building To move funds from the Road and Bride Contingency account for the increase in ro'ected costs for the SO Admin. Buildin . dot.. ~v PAGE 170 BRAZOS COUNTY, TEXAS - BUDGET AMENDMENTS No. 05/06 - 34.3 vol U~ Pf=.~r BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 05/06 - 34.4 cnni'vnnc f- ri 11 I i 6 17A BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 05/06 - 34.5 FD DIV ACCT J/JV,wvu PROJ DR/CR ACCOUNT NAME Increase Decreas 0100 11000500 59100000 CR DDEA e 0100 11000500 72590000 CR Professional Fees -Other 200,000.00 0100 11000500 61740000 DR Tel one 12,000.00 0100 11000500 61880000 DR Utilities 12,000.00 0100 11010000 72205000 DR Court A ointed A s - 85th 80,000.00 65 000 00 0100 1101000 72206000 DR Court A ointed A s - 272nd , . 55,000.00 Non-De artmental: uo -twcc„ vanous lme Items based on annualized expenditure calcl ;ss budget in the DDEA line item of Non-D artmental to cover the Costs based on annualized exnenrlifi,re ralr„1o4: "!t ou PAGE ~7 BP,4ZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 05/06 - 34.6 5/30/2006 4205 A ACCT 61130000 91110000 80101000 49028000 PROJ WG T NAME 5 CO's ation Gen. Fund Increase 311,000.00 311,000.00 311,000.00 Decrease 311,000.00 Certificates of Obligation 2005: To mov e funds from the Count s Contingency account for the increase in ro'ected costs for the buildin renovation of Maxwell Center. _ heap 17 BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 05/06 - 34.7 ZMAI~AAI FD DIV ACCT PROJ . DR/CR n ovl Bvvu ACCOUNT NAME Increase Decreas 0100 14000100 51300000 CR e Salarv - Staff 0100 14000100 51640000 DR 9,030.00 Hourl - Tem or 8 320 00 0100 14000100 53100000 DR , . Social Securi 640 00 0100 14000100 53800000 DR . Workers' Corn . 70.00 Information Technolo : To reallocate funds for the creation of two int i i ern os t ons. The request was anoroved by the Cnmm;ec;..P , r,..,., J o _ X75 b BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 05/06 - 34.8 si¢nnnnA FD DIV ACCT PROJ DR/CR ACCOUNT NAME Increase Decrease 4600 4600 634600 634600 80100000 51620000 CR DR Buildin s Hourly- Overtime 9,000.00 28,610.00 4600 634600 53100000 DR Social Security 700.00 4600 634600 53200000 DR Retirement 900.00 4600 634600 53800000 DR Worker's Comp. 200.00 4600 634600 80205000 DR Computer - Networking 17,810.00 Ex osition Center: To reallocate funds to cover the estimated a oll expenditure for the overtime of the IT ersonnel. ..M 8br;I-:GE [0 PERSONNEL CHANGE OF STATUS REQUESTS Uommissioner Court Date: May 30, 2006 Department Submitting Information: Human Resources Purpose of Submissions: Consider and Take Action on Change Requests Department Submitting Employee Request Action Requested Request(s) Applies To Brazos Center Beasley, Prentis New Hire Building Maintenance Ledezma, Raul New Hire County Clerk ktl~ I Peters, Ashlie New Hire District Attorney - Crime Fund Boggus, Christopher Resignation Anderson, Justin New Hire Capps, Kevin New Hire Justice of the Peace Pct. #1 Garcia, Loretta Resignation Juvenile Services McCabe, Molly Resignation Dixon, Brandon New Hire Matlock, Deborah New Hire SO/Jail Mitchell, Cameron New Hire Stultz, James New Hire Tax Office Sawyer, Jeanine Retirement Thorp, Tonya Resignation Saladin, Sherrie Transfer within Dept. Spacek, Sandra Promotion Approved in Commissioners' Court: May 30.2006: County Judge's or Commissioner's Signature: (This Copy to be attached to minutes) / , R VD , 177 AFFIDAVIT TEXAS LOCAL GOVERNMENT CODE, CHAPTER 171 STATE OF TEXAS COUNTY OF BRAZOS BEFORE ME, the undersigned authority, on 14~ plrsonally appeared eu ~Jl 1L(Y)t°J 1 t k' `s , who being duly swom, deposes and says: 1. That he/she has a substantial interest in a business entity or real property. Official action taken by the Commissioners Court of Brazos County, Texas concerning Agenda Item No. y of the Court Agenda dated M" 20, 2 escribed as 7 {~,/S00neJ d h&.-t 6e07-,.5*21/S would have a special economic effect on that business entity or a special economic effect on the value of the real property, that is distinguishable from the effect on the public. 2. That the substantial interest is (check the following as is appropriate): a. Ownership of 10 percent or more of the voting stock or shares of the business entity or either 10 percent or more or $15,000 or more of the fair market value of the business entity; or b. Funds received by me from the business entity exceed 10 percent of my gross income for the previous year; or O c. An equitable or legal ownership in real property with a fair market value of $2,500 or more; or (t~ d. A person related in the first degree by either affinity or consanguinity to me has a substantial interest as defined above; or e. 3. That I will abstain from participation in the matter re to in Item unless autho ' d by law. Signature SWORN TO AND SUBSCRIBED BEFORE ME this the O day of 2006 =1, D. GREEN Notary Public in and for state of Texas The State of Texas ion Expires 2010 Filed: v(~ County Clerk ~Dn^ ~7 AFFIDAVIT TEXAS LOCAL GOVERNMENT CODE, CHAPTER 171 STATE OF TEXAS § COUNTY OF BRAZOS § BEFORE ME, the undersigned authority, on personally appeared n U who being duly sworn, deposes and says: 1. That he/s a has a substantial interest in a business entity or real property. Official action taken by the Commissioners Court of Brazos County, Texas concerning Agenda Item No. r of the Court Agenda dated a described as P/,t t lln6n l- Of::: /QdA l itA in I n/]MM /y/ n~ & d I&fL1 , would have a special economic effect on that business entity or a special economic effect on the value of the real property, that is distinguishable from the effect on the public. 2. That the substantial interest is (check the following as is appropriate): O a. Ownership of 10 percent or more of the voting stock or shares of the business entity or either 10 percent or more or $15,000 or more of the fair market value of the business entity; or b. Funds received by me from the business entity exceed 10 percent of my gross income for the previous year; or c. An equitable or legal ownership in real property with a fair market value of $2,500 or more; or O d. A person related in the first degree by either affinity or consanguinity to me has a substantial interest as defined above; or e. other ~ray;nG ft°im6ursemPnfi ~Dr n1~1~e/~ 3. That I will abstain from participation in the matter referred to in Item 1 unless authorized by law. Signature T~ SWORN TO AND SUBSCRIBED BEFORE ME this the .2-U day of 2(a2. ro ^ °%F,;; BEATRIZ D. GREEN Notary Public in and fo '.Notary Pudic, state of Texas The State of Texas My Commission Expires JUNE 11, 2010 Fited: "..&e-~~ County Clerk 17 REQUEST FOR SALVAGE DESIGNATION 1. Nine office chairs All broken or not usable 2. Box of assorted electrical adapters/chargers Unknown condition 3. Assorted vacuum cleaners/floor cleaners All not working 4. Two IBM Selectric Typewriters Broken 5. Box of extra ribbons for typewriters No one has these typewriters 6. Various TV's & VCR's 7. Luggage tote rack 8. Man's ring 9. Okidata printer 10. Sharp fax machine 11. Casio calculator 12. Desk Lamp 13. Desk Tray 14. Deck sorting rack 15. Concrete/steel table from jail 16. Polaroid camera 17. Small artificial Christmas tree anymore Not working Not sold Poor condition Not working Not working Not working Not working Not sold Not sold Poor condition Unk condition, not usable poor condition This property was offered to Brazos County departments with no response, then advertised at public auction with no bids received. gD t':: I$D AS 11111V IA Document A121'"CMc - 2003 Amendment No.1 AMENDMENT NO.1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pursuant to Section 1,B of the Agreement, dated October 31, 2005 between Brazos County, Texas (Owner) and Hunt Construction Group, Inc. (the Construction Manager), for 1) Brazos County Exhibit Hall; Arena, Stall Bams and 2) Brazos County Sheriffs Office Building (the Project), the Owner and Construction Manager establish a Guaranteed Maximum Price and Contract Time for the Work as set forth below. ARTICLE I GUARANTEED MAXIMUM PRICE The Construction Manager'0 Guaranteed Maximum Price for the Work, including the estimated Cost of the Work as defined in Article 6 and the Construction Manager's Fee as defined in Article 5, is Twenty-Two Million Forty Thousand Four Hundred Fifty-Four Dollars (E22,M,454.00) This Price is for the performance of the Work in accordanoOVAdi tE`eContractDocuments listed and attached to this Amendment and - Exhibit A Drawings, Specifications, addenda and General, Supplementary and otter -CndiUons of the Contract on which the Guaranteed Maximum Price is based, pages l through 16, dated 05/16/2006. Exhibit B Allowance items, pages 1 through 1 , dated 05/l&2006. Exhibit C Assumptions and Clarifications made in preparing the Guaranteed Maximum Price, pages 1 through 3, dated 05/1612006. ExhibitD Completion Schedule, pages 1 through 1 , dated 05116/2006 ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original ALA standard forth. An Additions and Dekdons Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical One in the left margin of this document indicates where the author has added necessaryinfonnalion-and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. ,...q,n,e,.. v ,ore,, .e wa cuw oy r ne r mencan lnslmae of Architects and The Associated General Calbactps of America. All rights reserved, WARNING: This document Is protected by U.S. Copyright Law and International Treaties. Unauthwlxed reproduction or distribution of this document or my portion of It, may result In severs civil and crlminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by ALA software at 0821:54 on 05/1711006 under Order No.1000220654_5 which expires on 7115@007, and Is not for resale. User Notes: (228769129) t EDPi``E r f . ARTICLE II CONTRACT TIME The date of Substantial Completion established by this Amendment is: Brazos County Exhibit Hall; Arenas, Stall Barns - May 14, 2007 Sheriff's Office Byi~ding - Jun e 14, 2007 141 ~ rtr I Gil l E (S' furs) _ l4~iri G • ~ , t/•t>, (Printed name nd f n le) a' 1 7o. v Lb~~~ ATTEST I AIA Doaanart A721^ CUc -2003 Amendment No. I. Copyright 01991, 1998 and 2603 by The American Institute of Architects and The Associated General Contractors of America. All rights reserved. WARNING: This document is protected by U.B. Copyright Law and International Troatles. Unauthorized reproduction or distribution of this document, or my portion of It may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 0821:54 on 05/1 7/2006 under Order No.1000220654.5 which exptres on 2/15/2007, and Is not for resale. User Notes: (228769129) , zb ~ "18-) 2 EXHIBIT A BRAZOS COUNTY EXPOSITION CENTER & SHERIFF'S OFFICE May 16,2006 AMENDMENT NO. 1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER EXPOSITION CENTER SPECIFICATIONS Document Original/Latest Numbers Description Revision Data Division I - General Requirements 01100 Summary l5Dec05 01210 Allowances 15Dec05 01270 Unit Prices 15Dec05 01290 Payment Procedures 15Dec05 01310 Project Management and Coordination 15Dec05 01330 submittal Procedures 15Dec05 01500 Temporary Facilities and Controls 15Dec05 01600 Product Requirements 15Dec05 01770 Closeout Procedures 15Dec05 01781 Project Record-Documents 15Dec05 01782 Operation and Maintenance Data 15Dec05 Division 2 - Site Work 02230 Site Clearing 15Dec05 02240 Dewatering 15Dec05 02260 Excavation Support & Protection 15Dec05 02300 Earthwork 15Dec05 02361 Termite Control 15Dec05 02466 Drilled Piers 15Dec05 02510 Water Distribution 15Dec05 02640 Fire Hydrants 15Dec05 02530 Sanitary Sewer 15Dec05 02630 Storm Drainage 15Dec05 02640 Fire Hydrants 15Dec05 02741 Hot Mix Asphalt Paving 15Dec05 02751 Cement Concrete Paving 15Dec05 02764 Pavement Joint Sealants 15Dec05 02810 Irrigation Systems 15Dec05 Division 3 - Concrete 03300 Cast-in-Place Concrete 15Dec05 03410 Plant Precast Structural Concrete 15Dec05 Division 4 -Masonry 04810 Unit Masonry Assemblies 15Dec05 Exhibit A, Page 1 o VOL $D PAGES SPECIFICATIONS Document Numbers Description Division 5 - Metals 05120 Structural Steel 05210 Steel Joists 05310 Steel Deck 05400 Cold-Formed Metal Framing & Gypsum Sheathing 05511 Metal Stairs 05521 Pipe & Tube Railings 05530 Gratings Division 6 - Wood & Plastics 06100 Rough Carpentry 06402 Millwork Division 7 - Thermal & Moisture Protection 07210- Building Insulation 07411 Metal Roof Panels 07412 Metal Wall Panels 07720 Roof Accessories 07810 Sprayed Fire Resistive Materials 07920 Joint Sealants Division 8-Doors & Windows 08111 Standard Steel Doors & Frames 08331 Overhead Coiling Doors 08411 Aluminum-Framed Entrances, Storefront, & Windows 08510 Steel Windows 08580 Aluminum Bullet Resistant Transaction Windows 087109 Door Hardware 08800 Glazing Division 9 - Finishes 09260 Gypsum Board Assemblies 09511 Acoustical Panel Ceilings 09681 Carpet Tile 09912 Painting (Professional Line Products Division 10-Specialties 10155 Toilet Compartments 10200 Louvers & Vents 10350 Flag Poles 10431 Signs 10655 Operable Wall Partitions 10801 Toilet & Bath Accessories 10811 Electric Hand Dryers Exhibit A, Page 2 of 16 PA'U Original/Latest Revision Data 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 SPECIFICATIONS Document Original/Latest Numbers Descripti on Revision Data Division 11-Equipment 11135 A/V Equipment 15Feb06 Division 12-Furnishines Not Used Division 13 - Special Construction 13124 Permanent Grandstands 15Dec05 13125 Metal Building Systems 08Dec05 13704 Security Access Systems 15Dec05 13851 Fire Alarm Systems 15Dec05 13925 Fire Suppression Sprinklers 15Dec05 Division 14 - Conveying Systems 14240 Hydraulic Elevators 15Dec05 Division 15-Mechanical 15065 Motors for Mechanical Equipment 15Dec05 15072 Vibration Isolation 15Dec05 15075 Mechanical Identification 15Dec05 15082 Piping Insulation 15Dec05 15083 Piping Safety Covers 15Dec05 15128 Gauges & Meters 15Dec05 15131 Vertical In- Line Pumps 15Dec05 15145 Plumbing Piping 15Dec05 15146 Plumbing Specialties 15Dec05 15182 Hydronic Piping 15Dec05 15183 Hydronic Specialties 15Dec05 15188 HVAC Pumps 15Dec05 15189 Chemical Water Treatment 15Dec05 15410 Plumbing Fixtures 15Dec05 15411 Prefabricated Tubs & Showers 15Dec05 15430 Plumbing Fixtures 15Dec05 15514 Finned Water-Tube Boilers 15Dec05 15600 Factory Packages Chilled/Heating Module 15Dec05 15720 Air Handling Units 15Dec05 15735 Packaged Roof Tip Air Conditioning Units 15Dec05 15762 Terminal Heat Transfer Units 15Dec05 15810 Ducts 15Dec05 15820 Duct Accessories 15Dec05 15834 Axial Fans 15Dec05 15840 Power Ventilators 15Dec05 15850 Air Outlets & Inlets 15Dec05 15860 Air Cleaning Devices 15Dec05 Exhibit A, Page 3 of 16 SPECIFICATIONS Document Nmnbers Description 15908 Thermostats 15929 Instruments & Control Elements 15941 Sequences of Operation 15950 Testing, Adjusting and Balancing Division 16-Electrical 16060 Grounding & Bonding 16070 Hangers & Supports 16075 Electrical Identification 16123 Building Wire & Cable 16131 Conduit 16132 Surfaces Nonmetallic Raceways 16138 Boxes 16139 Cabinets & Enclosures 16140 Wiring Devices 16155 Equipment Wiring 16243 Emergency Power Supply 16272 Dry Type Transformers 16412 Enclosed Switches 16414 Remote Control Switching Devices 16424 Motor Control Center 16425 Variable Frequency Controllers 16426 Enclosed Contractors 16442 Switchboards 16443 Panelboards 16510 Interior Luminaires 16520 Exterior Luminaires 16710 Structural Telecommunications Cabling & Enclosures DRAWINGS Civil Original/Latest Revision Data 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 15Dec05 CIA Site Plan 15Dec05 C1.2 Site Plan 15Dec05 C13 Site Plan 15Dec05 CIA Site Plan 15Dec05 C1.5 Site Plan 15Dec05 C1.6 Site Plan 15Dec05 C1.7 Site Plan 15Dec05 C1.8 Site Plan 15Dec05 C2.1 SWP3/Erosion Control Plan - 15Dec05 C2.2 SWP3/Notes & Details 15Dec05 C3.1 Grading Plan 15Dec05 C3.2 Grading Plan 15Dec05 C33 Grading Plan 15Dec05 C3.4 Grading Plan 15Dec05 C3.5 Grading Plan 15Dec05 C3.6 Grading Plan 15Dec05 Exhibit A, Page 4 of I illi_g~ FAGE_]% DRAWINGS Document Original/Latest Numbers Description Revision Data C3.7 Grading Plan 15Dec05 C4.1 Utility Layout Plan 15Dec05 C4.2 Utility Plan Insert 15Dec05 C5.1 Sanitary Sewer Plan/Profile 15Dec05 C5.2 Sanitary Sewer Plan/Profile 15Dec05 C5.3 Sanitary Sewer Plan/Profile 15Dec05 C5.4 Sanitary Sewer Plan/Profile 15Dec05 C5.5 Sanitary Sewer Plan/Profile 15Dec05 C5.6 Sanitary Sewer Plan/Profile 15Dec05 C6.1 Water Line Plan Profile 15Dec05 C6.2 Water Line Plan Profile 15Dec05 C6.3 Water Line Plan Profile 15Dec05 C7.1 Details & Notes 15Dec05 C7.2 Details & Notes 15Dec05 C7.3 Details & Notes 15Dec05 C7.4 Details & Notes 15Dec05 Landscape L100 Landscape Plan 15Dec05 Architectural A100 General Information/Typical Details 15Dec05 A101 Code Review Plan 15Dec05 A102 Site Plan 15Dec05 A103 Millwork 15Dec05 A104 Schedule 15Dec05 A105 Exhibit Hall Schedule 15Dec05 AA200 Covered Arena Floor Plans 15Dec05 AA201 Covered Arena Enlarged Plan & Details 15Dec05 AA202 Covered Arena Roofing Framing Plan 15Dec05 AA400 Covered Arena Elevations 15Dec05 AA402 Covered Arena Framing & Wall Panel Elevation 15Dec05 AA500 Covered Arena Sections 15Dec05 AA501 Covered Arena Sections/Elevations 15Dec05 AA502 Covered Arena Wall Sections & Section Details 15Dec05 AA600 Elevator Plans & Sections 15Dec05 AS200 Stall Barn & Details 15Dec05 AS201 Stall Barn Concession Plan & Details 15Dec05 AS202 Stall Barn Framing Plans 15Dec05 AS400 Stall Barn Elevations 15Dec05 AS401 Stall Barn Framing & Wall Panel Elevations 15Dec05 AS500 Stall Barn Sections 15Dec05 AS501 Stall Barn Steel Frame Sections 15Dec05 AX200 Exhibit Hall Plan 15Dec05 AX201 Exhibit Hall Plan Details 15Dec05 AX202 Exhibit Hall Framing Plans 15Dec05 Exhibit A, Page 5 of 16 DRAWINGS Document Original/Latest Numbers Description Revision Data AX400 Exhibit Hall Elevations 15Dec05 AX401 Exhibit Hall Framing & Wall Panel Elevations 15Dec05 AX500 Exhibit Hall Section 15Dec05 AX501 Exhibit Hall Steel Frame Sections & Sheeting Plan 15Dec05 AX800 Exhibit Hall Reflected Ceiling Plan 15Dec05 DI Bleacher Covered Arena 15Dec05 B2 Bleacher at Covered Arena 15Dec05 B3 Bleacher Covered Arena Sponsor's Deck 15Dec05 B4 Bleacher Section Covered Arena Sponsor's Deck 15Dec05 SS 1.10 Foundation Plan - Stall Barn #1 l5Dec05 SSI.l l Foundation Plan- Stall Barn #1 15Dec05 SS2.10 Foundation Sections & Details - Stall Barn 15Dec05 SS2.11 Foundation Details & Schedules - Stall Barn 15Dec05 SS2.12 Foundation Details & Schedules - Stall Barn l5Dec05 SH1.10 Foundation Plan - Exhibit Hall 15Dec05 SHI.I I Foundation Plan - Exhibit Hall 15Dec05 SH2.10 FounEffon Details 3Dec05 SH2.11 Foundation Details & Schedules - Exhibit Hall 15Dec05 SH3.10 Mechanical Deck Framing Plan & Details - Exhibit Hall 15Dec05 SA1.10 Foundation Plan - Main Covered Arena 15Dec05 SAI.I l Foundation Plan - Main Covered Arena 15Dec05 SA2.10 Foundation Sections & Details - Covered Arena 15Dec05 SA2.11 Foundation Details & Schedules - Covered Arena 15Dec05 Mechanical Ml.l Mechanical Plan- Stall Barn l5Dec05 M I.2.1 Mechanical Plan - Covered Arena, First Floor 15Dec05 M1.2.2 Mechanical Plan - Covered Arena, Upper Floor 15Dec05 M1.2.3 Mechanical Sections - Covered Arena 15Dec05 M1.3 Mechanical Plan Exhibit Hall 15Dec05 M2 Mechanical Loft Plan Exhibit Hall 15Dec05 M3 AHU Control Schematics 15Dec05 M4 Mechanical Hydronic Plan - Exhibit Hall 15Dec05 M5 Mechanical Hydronic Schematic/Details 15Dec05 M6.1 Mechanical Schedules 15Dec05 M6.2 Mechanical Schedules 15Dec05 M7.1 Mechanical Details 15Dec05 M7.2 Mechanical Details 15Dec05 Electrical E1.1 Electrical Power Plan - Stall Barn l5Dec05 E1.2.1 Electrical Power Plan - Covered Arena, First Floor 15Dec05 E1.2.2 Electrical Power Plan - Covered Arena, Second Floor 15Dec05 E1.3 Electrical Power Plan - Exhibit Hall 15Dec05 E2.1 Electrical Lighting Plan - Stall Barn 15DecO5 E2.2.1 Electrical Lighting Plan - Covered Arena, First Floor 15Dec05 E2.2.2 Electrical Lighting Plan - Covered Arena, Second Floor 15Dec05 Exhibit A, Page 6 of 16 or,: 199 DRAWINGS Document Original/Latest Numbers Description Revision Data E2.3 Electrical Lighting Plan - Exhibit Hall 15Dec05 E3 Electrical Power -Mechanical Lofts 15Dec05 E4 Electrical Site Plan 15Dec05 E5.1 Electrical Panels - Stall Barns 15Dec05 E5.2 Electrical Panels - Covered Arena 15Dec05 E5.3 Electrical Panels - Exhibit Hall 15Dec05 E6.1 Electrical Single Line/ Details 15Dec05 E6.2 Lighting Fixtures Schedule 15Dec05 E7 Security Plan 15Dec05 Plumbinr Pl.l Plumbing Waste Plan - Stall Barn 15DecO5 P1.2 Plumbing Waste Plan - Covered Arena 15Dec05 P1.3 Plumbing Waste Plan - Exhibit Hall 15Dec05 P2.2 Plumbing Supply Plan - Covered Arena 15Dec05 P2.3 Plumbing Supply Plan - Exhibit Hall 15Dec05 P3.1 Plumbing Riser Diagram' 15Dec05 P3.2 Plumbing Riser Diagram 15Dec05 P4 Plumbing Details 15Dec05 P5 Plumbing Fixtures Schedule 15Dec05 ECI Energy Code Compliance 15Dec05 Fire Protection FP 1. l Fire Protection Plan - Stall Barn 15Dec05 FP 1.2.1 Fire Protection Plan - Covered Arena First Floor 15Dec05 FP 1.2.2 Fire Protection Plan - Covered Arena Second Floor 15Dec05 FP1.3 Fire Protection Plan - Exhibit Hall 15Dec05 FP2 Fire Protection Matrix 15Dec05 Audio Video Systems AVIA Audio/Video Plan -Stall Barn 15Dec05 AV 1.2 Audio/Video Plan - Covered Arena 15Dec05 AV 1.3 Audio/ Video Plan - Exhibit Hall 15Dec05 Addendums Addendum I 08Feb06 Addendum 2 15Feb06 Addendum 3 23Feb06 Addendum 4 24Feb06 Addendum 5 28Feb06 Post Addendum Post Addendum Number I 13Apr06 - This Post-Addendum covered the following RFI Items: 1-5, 7-19, 22-35. Post Addendum Number 2 21Apr06 - This Post-Addendum covered the following RFI Items: 6, 12, 20, & 21. Exhibit A, Page 7 of 16 11 1 kn PAGE 199 SHERIFF'S OFFICE SPECIFICATIONS Document Original/Latest Number Description Revision Date Introduction Information 00001 Title Page 30JanO6 00003 Seal Page 30JanO6 00004 Table of Contents 30Jan06 00005 Geotechnical Investigation Report 30JanO6 Division I - General Requirements 01100 Summary 30JanO6 01290 Payment Procedures 30JanO6 01310 Project Management and Coordination 30JanO6 01320 Construction Progress Documentation 30Jan06 01330 Submittal Procedures 30JanO6 01400 Quality Requirements 30JanO6 01450 Testing Laboratory Services 30JanO6 01500 Temporary Facilities and Controls 30JanO6 01600 Product Requirements 30JanO6 01700 Execution Requirements 30JanO6 01731 Cutting & Patching 30JanO6 01770 Closeout Procedures 30JanO6 01782 Operation and Maintenance Data 30JanO6 Division 2 -Site Work 02310 Topsoil & Finish Grading 30JanO6 02361 Termite Control 30JanO6 02450 Landscaping Planting 30JanO6 02451 Landscape Sprinklers System 30JanO6 02465 Drilled Concrete Piers 30JanO6 02870 Site Furnishings 30Jan06 02920 Lawns & Grass 30Jan06 Division 3 - Concrete 03100 Concrete Formwork 30JanO6 03200 Concrete Reinforcement 30JanO6 03300 Cast-in-Place Concrete 30JanO6 03350 Concrete Floor Finishing 30JanO6 Division 4-Masonry - 04410 Stone Work 30JanO6 04810 Unit Masonry Assemblies 30JanO6 ExWbittyA, Page 8 of 16 VOL 9a PAGE C7U SPECIFICATIONS Document Origmal/Latest Number Description Revision Date Division 5 - Metals 05100 Structural Steel 30JanO6 05210 Steel Joists 30JanO6 05311 Steel Floor Deck 30JanO6 05313 Steel Roof Deck 30JanO6 05400 Cold-Formed Metal Framing 30JanO6 05500 Metal Fabrications 30JanO6 05511 Metal Stairs 30JanO6 05800 Expansion Joint Control 30JanO6 Division 6 - Wood & Plastics 06100 Rough Carpentry 30JanO6 06402 Interior Architectural Woodwork 30JanO6 Division 7 - Thermal & Moisture Protection 07115 Bituminous Damp-proofing 30JanO6 07120 Below Grade Membrane Waterproofing 30JanO6 07142 Under-slab Vapor-proofing-Waterproofing Membrane 30JanO6 x7210 Building Insulation 30JanO6 07265 Sheet Damp-proofing 30JanO6 07420 Aluminum Composite Panel 30JanO6 07552 SBS Modified Bituminous Membrane Roofng 30JanO6 07610 Sheet Metal Roofing 30JanO6 07620 Sheet Metal Flashing & Trim 30JanO6 07710 Manufactured Roof Specialties 30JanO6 07810 Sprayed Fire Resistive Materials 30JanO6 07811 Roof Accessories 30JanO6 07840 Through-Penetration Fire-Stop System 30JanO6 07920 Joint Sealants 30JanO6 Division 8 --Doors & Windows 08110 Standard Steel Doors & Frames 30JanO6 08125 Interior Aluminum Frames 30JanO6 08210 Wood Doors 30JanO6 08311 Access Doors 30JanO6 08330 Rolling Doors 30JanO6 08410 Aluminun-Framed Entrances & Storefront. 30JanO6 08710 Finish Hardware 30JanO6 08800 Glazing 30JanO6 08920 Glazed Aluminum Curtain Wall 30JanO6 Division 9 - Finishes 09215 Gypsum Veneer Plaster 30JanO6 09225 One Coat Stucco-Direct Applies Finish System (DEFS) for Soffit 30JanO6 09235 One Coat Stucco-Fiber Reinforced Stucco with Elastromeric Finish for walls 30JanO6 Exhibit A, Page 9 of 16 LBDiiW-lt► SPECIFICATIONS Document Number Description 09250 Gypsum Board Assemblies 09270 Gypsum Board Shaft Wall Assemblies 09290 Glass Fiber Reinforced Gypsum 09310 Ceramic Tile 09511 Acoustical Panel Ceilings 09540 Special Surface 09651 Resilient Tile Flooring 09651 Resilient Tile Flooring 09653 Resilient Wall Base & Accessories 09680 Carpet 09771 Fabric Wrapped Panels 09841 Acoustical Wall Panels 09912 Painting 09945 Multi-Color Coating Division 10-Specialties 10101 Visual D-DiCases 10155 Toilet Compartments 10200 Louvers & Vents 10350 Flag Poles 10410 Signage 10506 Plastic Laminate Faced Wood Lockers 10520 Fire Protection Specialties 10670 Mobile Storage Shelving Units (Power Pro) 10671 Multi-tier Metal Evidence Lockers Pass-Thm 10801 Toilet & Bath Accessories Division 11-Eauioment 11106 Display Case 11132 Projection Screens 11150 Parking Control Equipment Division 12 - Furnishines 12484 Entrance Mats 12491 Horizontal Louver Blinds Division 13 - Special Construction Not used Division 14-ConvevineSystems 14240 Hydraulic Elevators 14450 Vehicle Lift Exhibit A, Page 10 of 16 11 R PAC IS Original/Latest Revision Date 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30Jan06 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 30JanO6 SPECIFICATIONS Document Original/Latest Number Descriytion Revision Date Division 15-Mechanical 15010 General Requirements for Mechanical Systems 30Jan06 15060 Pipe Hangers & Equipment Supports 30Jan06 15070 Mechanical Sound, Vibration & Seismic Control 30Jan06 15075 Mechanical Identification 30Jan06 15080 Insulation 30Jan06 15100 Building Service Piping 30Jan06 15130 Pumps 30Jan06 15180 Water Treatment System 30Jan06 15300 Fire Protection System 30Jan06 15400 Plumbing Fixtures 30Jan06 15480 Domestic Water Heaters & Equipment 30Jan06 15510 Heating Boilers & Accessories 30Jan06 15550 Breeching, Chimneys, and Stacks 30Jan06 15682 Air Cooled Water Chillers 30Jan06 15720 Air Handling Units 30Jan06 15800 Air Distribution 30Jan06 15830 Fans 30Jan06 15840 Air Terminal Units 30Jan06 15850 Air Outlets & Inlets 30Jan06 X5885 Variable Frequency Drives/Speed Controllers 30Jan06 15935 Building System Control 30Jan06 15940 Sequences of Operation 30Jan06 15950 Testing, Adjusting and Balancing 30Jan06 Division 16-Electrical 16050 Basic Electrical Materials & Methods 30Jan06 16055 Coordination Study 30Jan06 16060 Grounding & Bonding 30Jan06 16070 Supporting Devices 30Jan06 16075 Electrical Identification 30Jan06 16080 Electrical Testing 30Jan06 16120 Conductors & Cables (600 Volts) 30Jan06 16130 Raceways 30Jan06 16132 Boxes 30Jan06 16134 Cabinets & Enclosures 30Jan06 16140 Wiring Devices 30Jan06 16145 Occupancy Sensors 30Jan06 16231 Package Engine Generator 30Jan06 16289 Transient Voltage Surge Suppression 30Jan06 16410 Electrical Service Entrance 30Jan06 16415 Automatic Transfer Switch 30Jan06 16420 Disconnect Switches 30Jan06 16422 Motor Starters 30Jan06 16441 Switchboards 30Jan06 16442 Panelboards 30Jan06 16461 Dry Type Transformers (600 Volts and Less) 30Jan06 16511 Lighting 30Jan06 Exhibit A, Page I I of 16 SPECIFICATIONS Document Number Descriotion 16570 Lighting Control System 16600 Provisions for Elevators 16670 Lighting Protection 16721 Fire Alarm & Smoke Detection System 16741 Telephone Raceway System 16761 Security System CIVIL ENGINEER'S - Schedule of Materials 01000 Storm Drainage System. 01100 Water Main Construction 01200 Sanitary Sewer System 01500 Excavating, Trenching, and Backfilling 01600 Trench Safety 02050 HDPE Storm Drain Pipe 02100 Reinforced Concrete Headwalls & Endwalls 02200 Water Services 02300 Sewer Services 02400 Concrete for Structures 02410 Concrete Pavement 02420 Concrete Curb & Gutter 02430 Concrete Sidewalks 02500 Concrete Curb & Gutter 02870 Site Furnishings 03000 Polyvinyl Chloride Pipe & Fitting 03100 Hydrants 03200 Main Line Valves 04000 Hydrostatic Test 04050 Disinfection of Water Lines 04100 Temporary Erosion Controls 04200 Seeding for Erosion Control DRAWINGS Civil C1.00 Civil Cover Sheet C1.01 Topographic Survey C1.02 Erosion Control Plan C1.03 Storm Sewer Improvements C1.04 Storm Sewer Improvements C1.05 Trench Safety Details C1.06 Site & Utility Plan C1.07 Stormwater Pollution & Prevention Plan C1.08 Paving Plan C1.09 Dimension Control Plan C1.10 Grading Plan CU I Water Line Improvements C1.12 Trench Safety Details .L On Original/Latest Exhibit A, Page 12 of 16 Revision Date 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06_ 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 30Jan06 DRAWINGS Drawing Original/Latest Number Description Revision Date C1.13 Standard Water Details 30Jan06 C1.14 Pipe Details 30Jan06 C1.10 Grading Plan 30Jan06 C1.11 Water Line Improvements 30Jan06 C1.12 Trench Safety Details 30Jan06 C1.13 Standard Water Details 30Jan06 C1.14 Pipe Details 30Jan06 Landscape L1.0 Landscape Grading 30Jan06 L2.0 Landscape Layout 30Jan06 L3.0 Landscape Details 30Jan06 L4.0 Landscape Details 30Jan06 L5.0 Landscape Irrigation 30Jan06 L5.1 Landscape Irrigation Details 30Jan06 Architectural SP1.01 Site Plan 30Jan06 -A0.00 Abbreviations, General Notes & ADA Requirements 30Jan06 A0.01 First & Second Floor Code Requirements 30Jan06 A1.00 Partition Type Schedule 30Jan06 A1.01 First Floor Plan 30Jan06 A1.02 Second Floor Plan 30Jan06 A1.03 Enlarged Floor Plan 30Jan06 A1.04 First Floor Dimension Plan 30Jan06 A1.05 Second Floor Dimension Plan 30Jan06 A2.01 Finish Materials Legend 30Jan06 A2.02 First Floor Finish Plan 30Jan06 A2.03 Second Floor Finish Plan 30Jan06 A2.04 Door Schedule, Doors & Frames Types 30Jan06 A2.05 Curtain Wall Window Types & Frame Details 30Jan06 A2.06 Frame Details 30Jan06 A2.07 Frame Details 30Jan06 A2.08 Signage 30Jan06 A2.09 Signage 30Jan06 A3.01 Exterior Elevations 30Jan06 A3.02 Exterior Elevations 30Jan06 A4.01 First Floor Reflected Ceiling Plan 30Jan06 A4.02 Second Floor Reflected Ceiling Plan 30Jan06 A5.01 Roof Plan-Low Roof 30Jan06 A5.02 Roof Plan-High Roof - 30Jan06 A6.01 Interior Elevations 30Jan06 A6.02 Interior Elevations 30Jan06 A6.03 Interior Elevations 30Jan06 A6.04 Interior Elevations 30Jan06 A6.05 Interior Elevations 30Jan06 A6.06 Interior Elevations 30Jan06 A6.07 Interior Elevations 30Jan06 Exhibit A, Page 13 of 16 ~Ah~rr ~.f,. ~ DRAWINGS Drawing Original/Latest Number Description Revision Date A6.11 Millwork Sections/Details 30Jan06 A6.12 Millwork Sections/Details 30Jan06 A7.01 Building Sections 30Jan06 A7.02 Building Sections 30Jan06 A7.03 Building Sections 30Jan06 A7.04 Building Sections 30Jan06 A7.05 Building Sections 30Jan06 A7.06 Building Sections 30Jan06 A7.07 Building Sections 30Jan06 A8.01 Wall Sections 30Jan06 A8.02 Wall Sections 30Jan06 A8.03 Wall Sections 30Jan06 A8.04 Wall Sections 30Jan06 A8.05 Wall Sections 30Jan06 A8.06 Wall Sections 30Jan06 A8.07 Wall Sections 30Jan06 A8.11 Stair Enlargements 30Jan06 A8.12 Stair Enlargements 30Jan06 A8.13 Dumpster Details 30Jan06 A8.14 Elevator & Access Ladder Enlargements 30Jan06 A9.01 Plan Details 30Jan06 A9.02 Plan Details 30Jan06 A9.03 Plan Details 30Jan06 A9.04 Plan Details 30Jan06 A9.11 Section Details 30Jan06 A9.12 Section Details 30Jan06 A9.13 Section Details 30Jan06 A9.14 Section Details 30Jan06 A9.15 Roofing Details 30Jan06 Structural S1.01 Structural Notes 30Jan06 51.02 Structural Notes 30Jan06 S2.01 Pier Plan 30Jan06 S2.02 Foundation Plan 30Jan06 52.03 Second Floor & Low Roof Framing Plan 30Jan06 52.04 Roof Framing Plan 30Jan06 52.05 High Roof Framing Plan 30Jan06 53.01 Concrete Beam Schedules & Details 30Jan06 54.01 Typical Concrete Details 30Jan06 54.02 Typical Concrete Details 30Jan06 54.03 Concrete Sections & Details - 30Jan06 S4.04 Concrete Sections & Details 30Jan06 55.01 Typical Steel Details 30Jan06 55.02 Typical Steel Details 30Jan06 55.03 Typical Steel Details 30Jan06 S5.04 Steel Sections & Details 30Jan06 55.05 Steel Sections & Details 30Jan06 55.06 Steel Sections & Details 30Jan06 Exhibit A, Page 14 of 16 VOL 8D PAGE A DRAWINGS Drawing Original/Latest Number Description Revision Date 55.07 Steel Sections & Details 30JanO6 56.01 Wind Brace Elevations & Details 30JanO6 S6.02 Wind Brace Details 30JanO6 Mechanical MP0.00 Legend 30JanO6 M2.11 First Floor Mechanical 30JanO6 M2.21 Second Floor Mechanical 30JanO6 M3.11 First Floor HVAC Piping 30JanO6 M3.21 Second Floor HVAC Piping 30JanO6 M4.10 Roof Plan HVAC 30JanO6 M5.10 Schedules 30JanO6 M6.10 Flow Diagram 30JanO6 M7.10 Details 30JanO6 Electrical E0.00 Legend 30JanO6 E1.00 Site Plan-Electrical 30JanO6 E2.11 First Floor Power Plan 30JanO6 E2.21 Second Floor Power Plan 30JanO6 E3.11 First Floor Lighting plan 30Jan06 E3.21 Second Floor Lighting plan 30JanO6 E4.11 Security Second Floor 30JanO6 E4.21 Security Second Floor 30Jan06 E5.10 On Line Diagram 30Jan06 E5.12 Light Fixture Schedule 30Jan06 E5.13 Panelboard Schedules 30Jan06 E5.14 Panelboard Schedules 30JanO6 E6.10 Electrical Details 30JanO6 E6.11 Electrical Details 30JanO6 E7.11 First Floor Mechanical Power Plan 30JanO6 E7.21 Second Floor Mechanical Power Plan 30JanO6 E8.11 First Floor Fire Alarm Plan 30JanO6 E8.21 Second Floor Fire Alarm Plan 30JanO6 Plumbine P2.01 Under Floor Sanitary plan 30JanO6 P2.11 First Floor Domestic Water Plan 30JanO6 P2.21 Second Floor Domestic Water Plan 30JanO6 P3.11 First Floor Plumbing Plans 30JanO6 P3.21 Second Floor Plumbing plans 30JanO6 P4.10 Schedule/Risers 30JanO6 P5.10 Plumbing Details 30Jan06 P6.10 Roof Plan Plumbing 30JanO6 Exhibit A, Page 15 of 16 VOL90 PAGE IV DRAWINGS Drawing Number Description Fire Protection FP2.11 FP2.21 Addendums Addendum 1 Addendum 2 Addendum 3 Addendum 4 Addendum 5 Post Addendum First Floor Fire Protection Plan Second Floor Fire Protection Plan Post Addendum Number 1 - This Post-Addendum covered the following RFI Items: 1-12, 14, 17-21, 23-24. Exhibit A, Page 16 of 16 Original/Latest Revision Date 30Jan06 30Jan06 08Feb06 22Feb06 24Feb06 24Feb06 28Feb06 13Apr06 EXHIBIT B BRAZOS COUNTY EXPOSITION CENTER & SHERIFF'S OFFICE AMENDMENT NO. 1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER ALLOWANCE ITEMS - EXPOSITION CENTER May 16, 2006 The Guaranteed Maximum Price for the Exposition Center includes the following allowances: 1. Rodeo Equipment $ 204,700 2. Temporary Utility Consumption $ 20,000 3. Building Plaque $ 1,400 4. Hardware $ 55,000 5. Sound System $ 50,000 6. Reprographics $ 9300- 7. Permits $ 34,452 8. Fencing $ 1,656 9. Window Treatment $ 336 ALLOWANCE ITEMS - SHERIFF'S OFFICE The Guaranteed Maximum Price for the Sheriff s includes the following allowances: 1.) Temporary Utility Consumption $ 15,000 2.) Utility Company Service Charges $ 45,000 3.)__ Reprographics 7,500 4.) Permit $ 15,148 Exhibit B, Page 1 of 1 -,0PAO~E l71 EXHIBIT C BRAZOS COUNTY EXPOSITION CENTER & SHERIFF'S OFFICE AMENDMENT NO. 1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER ASSUMPTIONS & CLARIFICATIONS - EXPOSITION CENTER May 16, 2006 1.) The following VE items have been incorporated into the GMP: A. VE #1 - Change the metal roof at the concessions/restrooms to a composite shingle roof at the covered arena. B. VE #14 - Revise the feeders for service from the City transformer to the packaged unit MSB from 2500A to 1200A, 277/480V/3P. C. VE #15 - Relocate panel C4 to hallway of stairway #118, change panel C4 from 100A to 225A, change feeder from 100A to 225A and relocate branch circuits C2-1, 2,3,11,29,31,34 to panel C4. 2.) The Contingency amount has been reduced and separated as follows: A. Construction Contingency ($400A00.00) - To be utilized by Hunt Construction throughout the course of the project to cover coordination and completion of miscellaneous scope items between trades, overtime costs and other items required to complete the work shown on the construction documents. B. Owner Contingency ($100,000.00) -To be utilized by Brazos County to cover owner requested changes or architect clarifications and modifications. 3.) The following RFI's are included in the GMP: RFI's 1-5, 7-19 and 22-35. These RFI's were incorporated into Post Bid Addendum #1. 4.) The electrical subcontractor is only furnishing and installing conduits with pull strings (in-wall & underground) for the Telecommunications, based on the information provided by Bill Holland dated April 4, 2006. All other work associated with the telecommunications will be by Brazos County. 5.) This GMP includes additional cost for storing and handling the pre-engineered metal building. Materials will be stored on a pad prepared by Brazos County. 6.) As discussed during the meeting on April 25, 2006, Brazos County will provide the necessary materials testing for the project. 7.) The GMP amount is based on utilizing the subcontractors listed on the bid analysis included with the April 27, 2006 GMP letter. 8.) The cost for a registered survey is not included in the GMP. 9.) An allowance is not being carried in the GMP to cover utility company service charges. Utility company service charges are not included in the GMP. - 10.) The Guaranteed Maximum Price for the Exposition Center is $15,538,256. Exhibit C, Page 1 of 3 ^z a Oa00 ASSUMPTIONS & CLARIFICATIONS - SHERIFF'S OFFICE The following VE items are included in the GMP: A. VE #7 - Delete solid surface countertop edge per detail 18/A6.12 and replace with hardwood edge. B. VE #9 - Delete Lamni-art plastic laminate and replace with Wilsonart, Pionite, Nevamar or Formica. C. VE #10 -Replace plastic laminate on plywood with melamine on particleboard in the General Supply Room 209, details 3 & 4/A6.06. D. VE #11 - Delete the vehicle lift. E. VE #12 - Utilize PVC for the sanitary and storm underground in lieu of cast steel. F. VE #14- Provide alternate plumbing fixture package. The L-2H and trap primers shall be submitted as scheduled and specked. G. VE #17 - Use 2-3/16, 3/41b. Density insulation sealed w/ 3" FSK tape in lieu of 2" llb. Density sealed w/ fab. & mastic at all ductwork. H. VE #21 - Removal of DDC controls from the unit heaters UH's. Unit to stand alone, w/ electric heat. 1. VE #26 - Supply and install recessed pendent sprinkler heads in lieu of concealed. The public corridors shall have concealed sprinkler heads J. VE #31 - Change minimum size conduit to in lieu of/<" (all homerun to remain Y. K. VE #32 - Provide conduit stub up only for the following: Voice data'/1', Fire Alarm %2", Security %1". L. VE #33 - Provide die cast set screw fittings in lieu of steel compression on electrical piping. M. VE #36 - Use a single Mace DVR-800 with integral DVD burner in lieu of what is specified in section 16761. N. VE #38 - Change MDP (to panel board w/ a molded case thermal magnetic breaker w/o GFI, metering still included.). Delete all field service testing (SCCS is still included). 0. VE #40 - Use similar masonry shapes manufactured by Southwest Products in lieu of the specified brand manufactured by Trenwyth. (The masonry subcontractor is having Southwest match the color samples provided by WHJ and providing drawings of the shapes Southwest can manufacture.) (Pending Approval - we are currently carrying a $50,000.00 savings in the GMP for the masonry special shapes) 2.) The Contingency amount has been reduced and separated as follows: - A. Construction Contingency ($150,000) - To be utilized by Hunt Construction throughout the course of the project to cover coordination and completion of miscellaneous scope items between trades, overtime costs and other items required to complete the work shown on the construction documents. B. Owner Contingency ($50,000.00) - To be utilized by Brazos County to cover owner requested changes or architect clarifications and modifications. Exhibit C, Page 2 oof~~ 3 Ov V";nre- 3.) The following RFI responses are included in the GMP: BFI's 1-12,14, 17-21, 23 and 24. These RFI's were incorporated into post bid addendum 1. Other RFI's not listed are still pending evaluation for potential cost impact. 4.) Currently there is a $17,000.00 allowance being carried with the site utilities contractor to provide underground storm drainage around the building. This cost is based on a proposed modification to the RFI #4 response from Garrett Engineering. (Pending approval) 5.) The following is a cost breakdown for the Metal Evidence Lockers (Multi Tier and Pass Thru) and Mobile Shelving: The above mentioned along with the landscape & irrigation and signage is not currently included in the GMP. 1) DSM Evidence Lockers as specified $19,968.00 2) Mobile Shelving w/ 5 carriages as specified $73,462.00 3) Mobile Shelving w/ 2 carriages $54,865:00 VE #42 - system may be expanded to 5 carriages at a later date when funds are available. 6.) The electrical subcontractor is only furnishing and installing conduits with pull strings (in-wall & underground) for the Telecommunications, based on the information provided by Bill Holland dated March 6, 2006. All other work associated with the telecommunications will be by Brazos County- 7.) The cost for material testing is being provided by the owner. 8.) The GMP amount is based on utilizing the subcontractors listed on the bid analysis included with the April 27, 2006 GMT letter.. 9.) The cost for a registered survey is not included in the GMP. 10.) The 3.7% fee for the items to be re-bid is not carried within the GMP. 11.) The Guaranteed Maximum Price for the Sheriff's Office is $6,502,198. Exhibit C, Page 3 of 3 EXHIBIT D BRAZOS COUNTY EXPOSITION CENTER & SHERIFF'S OFFICE AMENDMENT NO. 1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER COMPETION SCHEDULE - EXPOSITION CENTER The scheduled date for the certificate of occupancy is May 15, 2007. COMPETION SCHEDULE - SHERIFF'S OFFICE The scheduled date for the certificate of occupancy is June 15, 2007. Exhibit D, Page 1 of 1 aa3 81 o PAS E May 16, 2006 BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridge NUMBER 560010 DATE OF COURT MEETING: May 30. 2006 ITEM: Request from Aggieland Builders, LLC to construct a road bore in the right of way of Jones-Butler Road for sanitary sewer line installation. Site is located in precinct 1. SOURCE OF FUNDS: N/A REQUIREMENTS: 1. No work will be permitted between front slope and/or back slope. 2. All installation(s) shall be constructed in designated utility easements, 'd applicable. If no utility easement exists, the installation(s) shall be 1) within 3-5' of and parallel to the dghtof- way line-and/or 2) in the case of a road bore, perpendicular to the rightoPwayiine. 3. If clearing of brush, trees and otherotrstruction is necessary, it shall be the Applicant's responsibility to do so and to remove all cleared brush, trees etc. from county right-of-way. 4. Ditch line shall be compacted to 90% standard density ASTM-Test Method No. D-698; test shall be conducted by aaindepandent geotechnical testing firm; copies of all test results shall be furnished to the office of the Brazos County Engineer. 5. Construction shall be in strict conformance to the latest Texas Manual of Uniform Traffic Control Devices for Streets and Highways, published by the Texas Department of Transportation, and all other State and Federal laws governing utility construction. NOTES/EXCEPTIONS: ACTION REQUESTED OR ALTERNATIVES: SUB,ApIWED BY: APPROVED BY: Richard F. Vance, P.E. Commi loner Lloyd Wassermann County Engineer Precinct 1 0006-038 This Request is AB rove C9'/ Denied ❑ by Commissioners' Court Date: /d 4 Randy SigK, County Judge ~o a14 REQUEST FOR PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS BRAZOS COUNTY COURTHOUSE BRYAN, TEXAS 77 03 kI Formal notice is hereby given that (applica L N ropos s to nt) place a (type).E. within the right-of-way f (road P in Brazos County, Texas as follows: The location or description of the proposed Installation is more fully shown by 3 copies of the drawings attached to this notice. 1 understand and agree that: 1. The County Engineer must be notified 72 hours prior to the beginning of construction in order that he, or his designated inspector, may inspect the actual installation. 2. All damage to the'roadways and rights-of-way. will be repaired to their original condition to the satisfaction of the County Engineer. 3. Brazos County reserves the right to require Applicant to relocate or lower -any such line at no cost to Brazos County, should some become necessary due to widening or lowering, or other alteration of the roadway or right-of-way. 4. Brazos County will in no way be responsible for any damage which might occur to any existing utility lines in the right-of-way. 5. The line will be constru attained on the County-rightof-way in accordance with the Utility Accommodation Policy which was adopted by the Texas Department of Transportation on May 29, 1989. 6. The line or fines will be constructed no less than twenty-four inches (24°) lower than the lowest part of the drainage or bar ditch and the drainage is to be considered at least two feet (2') below the center of the roadway. 7. All sites will be barricaded during the construction period. Construction of this line will begin on or after the 36 day of NAY 2004, Firm: By: _ Address: .14 i Phone: 62J fZ24OW07 Zit JV-61~ G X0.5 APPROVED BY COMMISSIONERS' LVJ I.VUIV I T, VICINITY MAP N.T.S. APRIL, 2006 0190 PAGE C40 0 k CASINO FL J V^ss r ROADWAY BORE UNDER J TO BRAZOS COUNTY ONES-BUTLER ROAD SI411, STANDARD DETAILS AND EC 13E PERPOR FICATIONSMED I/ C e• N 8 / i TOP.31 C' MANHOLE 16 _ FL 12' IN IN.298.44 / \ FL 12' OUi=298.34 N: 10199450.73 E 3551543.48 - - PROPOSED 8'0 SL SANRARy SEWER UNE 4 PROPERTY UNE- IRON / \ aHI3+14.28 CL IND PROPOSED 24'0 MACHINE BORING 8: 24'0 STEEL CASING FL 12'°296.58 PROWDE 54.29 LF. 24'0 MACHINE BORING WITH 54.29 LE 24'0 STEEL CAS EXISTING ING CENTERED ON CASIINNGD ~ VE N~111UM 318' WALL TM M RCAO; PR ALL NESS AND $pEq NSDS COUNTY STANDARD DETAILS ;ISTING R.O.W. UNE MG _PRIVATE 8'0 WAi nu~_ n A 13+00 '11 UP PAC"-: a D3 114+00 15. 310 I G . - - BRAZOS COUNTY / COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridge NUMBER 560010 DATE OF COURT MEETING: MaV 30, 2006 ITEM: Request from B.W.O.C., Inc. to construct two (2) road bores for a natural gas pipeline in the right of waV of FickeV Road and OperstenV Lane. Company Check No. 28870 in the amount of $1,000.00 for the permit accompanies this request. Site is located in Precinct 2. (Deposit to Account No. 01-460650) SOURCE OF FUNDS: N/A REQUIREMENTS: 1) No work will be permitted between front slope and/or back slope. 2) All installation(s) shall be constructed in designated utility easements, if applicable. If no utility easement exists, the installation(s) shall be 1) within 3-5' of and parallel to the right-of-way line-and/or 2) in the case of a road bore, perpendicular to the right-of-way line. 3) If clearing of brush, trees and other obstruction is necessary, it shall be the Applicant's responsibility to do so and to remove all cleared brush, trees etc. from county right-of-way. 4) Ditch line shall be compacted to 90% standard density ASTM-Test Method No. D-698; test shall be conducted by an independent geotechnical testing firm; copies of all test results shall be furnished to the office of the Brazos County Engineer. 5) Construction shall be in strict conformance to the latest Texas Manual of Uniform Traffic Control Devices for Streets and Highways, published by the Texas Department of Transportation, and all other State and Federal laws governing utility construction. NOTES/EXCEPTIONS: ACTION REQUESTED OR ALTERNATIVES: SUB IT BY: AP ED -i'~ ~ Richard F. Vance, P.E. ommissioner E. Dua~ne Peters County Engineer Precinct 2 0006-040 This Request is A pro C~ I Denied ❑ by Commissioners' Court Date: C--f - Randy SjMs, County °")I: Od f AGF 0 B.W.O.C., Inc. Proposed Pipeline Fickey No. I-H Brazos County, Texas B.W.O.C. proposes to lay a 3" pipeline from its recently completed well on the Raymond J. Fickey property located on Fickey School Road. The pipeline will come from the well location and run in a southerly direction and then turn in a westerly direction to the intersection of the Raymond J. Fickey west property line and Fickey School Road. B.W.O.C. will then bore (bore #1) under Fickey School Road to the H. 0. Wilson property located on the west side of Fickey School Road. The proposed pipeline route will then be adjacent to an existing Patterson Petroleum pipeline on the H.O. Wilson property and go in a southerly direction to the intersection of the southern property line of the H. 0. Wilson property with Opersteny Road. B.W.O.C. will then bore (bore #2) under Opersteny Road to the James D. Wilson, Jr. property located on the south side of Opersteny Road. The pipeline will then continue in southerly direction on the James D. Wilson, Jr. property to the ETC main line further south. B.W.O.C. proposed operations: --Both bores will be initiated and compled-on the adjoining landowner's property (as noted above). The bores will a minimum of 2' deep under the bottom of the bar ditches and will be approximately 8' -10' under the base of the county roads. --The pipe to be used is a 0.188" X 3" 5LX42 steel fussion bond coated pipe which will be laid in 6" casing, with insulators, through the bores. 0101 REQUEST FOR PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS BRAZOS COUNTY COURTHOUSE BRYAN, TEXAS 77803 FROM: REF: E.w.O.C. Inc. Crossing x and/or Parallel Installation 100 N. Earl Rudder Freeway Road: Fickev school Rd. and Opere tenv Rd. Bryan, ~TX 77802 Precinct Number: Two Duane Peters, comm. Formal notice is hereby given that (applicant) a. w* o. C.. Inc. proposes to place a (type) natural as pipeline llj.theright-of-way of (road) Fickey School Road . In Brazos County, Texas as follows: under and Opersteny Roads The location or description of the proposed installation is more fully shown by three copies of the drawings attached to this notice. I understand and agree: 1. The County Engineer must be notified prior to the beginning of construction In order that a designated inspector may Inspect the actual Installation. 2. That all damage to the roadways and dghtsof-way will be repaired to their original condition to the satisfaction of the County Engineer. 3. That Brazos County reserves the right to require Applicant to relocate a lower any such line at no cos(to Brazos. County should same become necessary due to widening or lowering, or - other alteration of the roadway or rightof-way. 4. That Brazos County will in no way be responsible for any damage which may occur to any existing utility lines In the right-of-way. 5. That the line will be constructed and maintained on the County dghtof-way In accordance with the Utility Accommodation Policy which was adopted by the Texas Department of Transportation on May 29, 1989. 6. That the line or lines will be constructed no less than forty-eight Inches (48') lower than the lowest part of the drainage or bar ditch and the drainage is to be considered at least two feel (2') below the center of the roadway. 7. That all roads shall be bored in accordance with the Utility Accommodation Policy of the Texas Department of Transportation dated 1989. 8. That all sites will be barricaded during the construction period. 9. That the normal charge is $500.00 per crossing and/or $130.00 per rod when paralleling the roadway established by the Commissioners Court on December 21, 2004. 10. Ditch line shall be compacted to 90% standard density ASTM-Test Method No. 0.698; test shall be conducted by an Independent geotechnlcal testing firth; copies of all test results shall be furnished to the office of the Brazos County Engineer. 11. Construction shall be in strict conformance to the latest Texas Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Texas Department of Transportation, and all other State and Federal laws governing utility construction. Construction of this line will begin on or after the 24thday of may 2006 APPROVED BY COMMISSIONERS' APPLICANT: COURT ON: - R. w.0. C. , Inc. Date Company Name Dennis Engelmaun/Senior Landman Randy Sims, County Judge Representative/Title Company 979-776-0121 Telephone Number Revised 12/21104 - Ok dar•y Afr1o (A - S~ay~pt3 (~rct'• o~- REQUEST FOR PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS BRAZOS COUNTY COURTHOUSE BRYAN, TEXAS 77803 FROM: REF: a.w.o.c. inc. Crossing x alnd/or Parallel Installation 100 wT Earl Rudder Freeway Road: Fickey schoTwo ol Rd. and Oo = y Rd. Bryan, rx 77802 Pred ct Number: ( ) Duane Peters. Comm. Fjormal notice is hereby given that (applicanrd) B.w.o. c. Inc. proposes to place a (type) natural gas pipeline the right-of-way of (road) Fickey School Road I In Brazos County, Texas as follows: under aad Opersteny Roads i The location or description of the proposed instillation is more fully shown by three copies of the drawings attached to this notice. I understand and agree: 1. The County Engineer must be notified prior to the beginning of construction in order that a designated inspector may inspect the actual Installation. 2. That all damage to the roadways and rights-of-way, will be repaired to their original condition to the satisfaction of the County Engineer. 3. That Brazos County reserves the right to require Applicant to relocate or lower any such line at no cost to Brazos County, should some become necessary due to widening or lowering, or other alteration of the roadway or right-of-way. 4. That Brazos County will in no way be responsible for any damage which may occur to any existing utility lines in the right-of-way. t5. That the line will be constructed and maintained on the County right-of-way in accordance with the Utility Accommodation Policy which was adopted by the Texas Department of Transportation on May 29, 1989. 6. That the line or lines will be constructed no less than forty -eight inches (48") lower than the lowest part of the drainage or bar ditch and the drainage is to be considered at least two feet (2) below the center of the roadway. (I/ 7. That all roads shall be bored in accordance with the tility Accommodation Policy of the Texas Department of Transportation dated 1989. 8. That all sites will be barricaded during the constmcton period. 9. That the normal charge Is $500.00 per crossing and/or $130.00 per rod when paralleling the roadway established by the Commissioners Court on December 21, 2004. 10. Ditch line shall be compacted to 90% standard density ASTM-" est Method No. D-698; test shall be conducted by an independent geotechnical testing fine; copies Of all test results shall be furnished to I the office of the Brazos County Engineer. 11. Construction shall be in strict conformance to the latest Texas Manual on Uniform Traffic Control Devices for Streets and Hinhwavs, published by the Texas Department of Transportation, and all other State and Federal laws governing utility constmctionl Construction of this line will begin on or a* the 24thday of May 2006 APPROVED BY COMMISSIONERS' COURT ON- Date Revised 12121104 APPLICANT: i.W.O.C.. Inc. Company Name Dennis Engelmann/Senior Landman Representative/Title Company 979-776-0121 Telephone Number k- Air,,. (A -SI'''T 4 /O ra ~rta ~ oZ-- x..,y ail I :v ~ o- vn-h wl.em as J ( n ~ 3a4 ll ; 1 \ s'D A 33/ lr 0 33 14 - N l / 0 a, ewoc, afaa as lln a I aon . - / n a/A a ~'Cr _.=Y, L it _ ~ l ` \ % \ c u 1 i neanroai uv. ` ~ f i ~ J• r _ l Jos Bit 76 ~Kvrten Allcr, m . . Scale 1:12,000 _ 354 h o o mo I= fmo zfao mm 1'=1,OOD.oA Oala Zoom 141 ....tw..a l_,.~ 1 v • T•I,Ol1L~ OY}ami141 REQUEST FOR PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS BRAZOS COUNTY COURTHOUSE BRYAN, TEXAS 77803 C Reh=k M>=A~~ Formal notice is hereby given that (applicant) S9Z N_R-S proposes to place a (1ype)Lj"§ej,8F ,within the right-of-way of (road) (~R.EF._- s in Brazos County, Texas as follows: fhA~iZi~ T~A~I The location or description of the proposed installation is more fully shown by --:L- copies of Qre drawings attached to this notice. I understand and agree that: 1. The County Engineer must be notified 72 hours prior to the beginning of cort*ucWn in order that he, or his designated inspector, may inspect the actual installation. 2. All damage to the roadways and rights-of-way will be repaired to their original condition to the satisfaction of the County Engineer. 3. Brazos County reserves the right to require Applicant to relocate or lower -any-such line at no cost to Brazos County, should same become necessary due to widening or lowedrig. or other alteration of the roadway or right-of-way. 4. Brazos County will-In-no way be responsible for any damage which might occur to any existing Lffi tq lines in the right olLway. 5. The fare win be constructed and maintained on the County right-of-voy in accordance with the UtiNty Accommodation Policy which was adopted by the Texas Department of Transportation on May 29, 1989. 6. The line or lines will be constructed no less than twenty-four inches (24'I lower than the lowest part of the drainage or bar ditch and the drainage is to be considered at least two feet (21 below the center of the roadway. 7. Ali sites win be barricaded during the construction period. Construction of this fine will begin on or after the day of U14 20 !~A S,.2slc~~. j (c PK-~- L APPROVED BY COMMISSIONERS' COURT ON: 1 _ Date !'4+" r- 1z' Judge Firm: Cfj~y, I~FADOu 1 P TtSt=)P-5 t3y: ~ ~ ~i~1 Care S T[de: Im►SEt~ Address: Z?~M aw rl~l^1F_3T ~FwV, E . Oc hL.e-F_cx ~rP.-thenl, =-Cx Z7eyo Phone: (9-79) (99 3- -z 835 991 913 BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridge NUMBER 560010 DATE OF COURT MEETING: May 30, 2006 ITEM: Request from Creek Meadow Partners to construct a 6 inch force main sanitary sewer line in the right of way of Greens Prairie Trail Woodlake Drive and Greens Prairie Road. Site is located in Precinct 1. SOURCE OF FUNDS: N/A REQUIREMENTS: 1. No work will be permitted between front slope and/or back slope. 2. All installation(s) shall be constructed in designated utility easements, If applicable. If no utility easement exists, the installation(s) shall be 1) within 3-5' of and parallel to the right-of- way line and/or 2) in the case of a road bore, perpendicular to the right-of-way line. 3. If clearing of brush, trees and other obstruction is necessary, it shall be the Applicant's responsibility to do so and to remove all cleared-brush, trees etc. from county right-of-way. 4. Ditch line shall be compacted to 90% standard density ASTM-Test Method No. D-698; test shall be conducted by an independent geotechnical testing fine; copies of all test results shall be fumished to the office of the Brazos County Engineer. 5. Construction shall be in strict conformance to the latest Texas Manual of Uniform Traffic Control Devices for Streets and Highways, published by the Texas Department of Transportation, and all other State and Federal laws governing utility construction. NOTES/EXCEPTIONS: ACTION REQUESTED OR ALTERNATIVES: SUBM T BY: Richard F. Vance, P.E. County Engineer 0006-039 This Request is Date: 644 Randy APPROVED BY: -~-~ut. nc a,K->tiJ Commi ioner Lloyd Wassermann Precinct 1 / Hied 0 by Commissioners' Court Judge rwig