HomeMy WebLinkAbout2003-04-01-9:00AM-Regular.
„n 7-1 7 Zr
BRAZOS COUNTY
BRYAN. TEXAS i
NOTICE OF MEETING
AND AGENDA
BRAZOS COUNTY COMMISSIONERS COURT
THE COMMISSIONERS COURT WILL MEET IN REGULAR SESSION ON
TUESDAY, APRIL 1, 2003 AT 9:00 A.M. IN THE COMMISSIONERS COURTROOM
OF THE BRAZOS COUNTY COURTHOUSE, 300 EAST 26TH STREET, SUITE 115,
BRYAN, TEXAS.
I. Invocation and Pledge of Allegiance - Commissioner Peters.
2. Call for citizen input and/or concerns.
3. Presentation by Rabon Metcalf Engineering regarding the intent, requirements and
processes of the Storm Water Management Plan.
Consider and take action on agenda items 4 - 17:
4. Budget Amendment 02/03-20.
5. Payment of Claims.
6. Personnel Changes of Status.
7. Interagency Agreement with the County of Madison for the filing of a joint grant
application with the Criminal Justice Division of the Office of the Governor for
funding for the Brazos Valley Narcotics Task Force.
8. Appointment of individuals to serve on the Brazos Valley Council of Governments'
Homeland Security Advisory Committee.
9. Request by the Jail Administrator for authorization for out-of-state travel for two
people to travel to Caldwell, Idaho on April 7-8, 2003 to extradite a prisoner.
Commissioners Court Meeting Agenda
April 1, 2003
Page Two
10. Request by the Purchasing Department to use without charge a room at the Brazos
Center for a meeting with local vendors.
11. Application for Service with Verizon to maintain the T-1 line from the Sandy Point
Jail to the Courthouse.
12. Requisition for Bid #2003-027 - Seal Coat Project.
13. Maintenance Agreement with Ikon for the copy machine at the Juvenile Boot Camp.
14. Declaring certain county property as "salvage" and authorizing the destruction or
disposal of this property.
15. Request from Wickson Creek Special Utility District to construct a road bore for
water line installation in the right-of-way of Wallis Road. Site is located in Precinct
2.
16. Request from Patterson Petroleum LP to construct a road bore to install a natural gas
gathering pipeline in the right-of-way of Oak Lake Road. Site is located in Precinct
2.
17. The Final Plat of North 974 Estates, 9.984 acres, one block, 4 tracts, Colbert Baker
League. Site is located in Precinct 2.
18. Presentation by the County Auditor of the Comprehensive Annual Financial Report.
19. Announcement of interest items and possible future agenda topics.
20. Agency/Board/Committee reports by Court members.
21. Call for citizen input and/or concerns.
22. Adjourn.
The Courthouse is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive
services must be made two business days before the meeting. To make arrangements, call (979) 361-4102.
COMMISSIONERS' COURT
REGULAR MEETING
APRIL 1, 2003
A regular meeting of the Commissioners' Court of Brazos
County, Texas was held in the Brazos County Commissioners
Courtroom in the Courthouse in Bryan, Brazos County, Texas,
beginning at 9:00 a.m. on Tuesday, April 1, 2003 with the
following members of the Court present:
Randy Sims, County Judge, Presiding;
Tony Jones, Commissioner of Precinct 1;
Duane Peters, Commissioner of Precinct 2;
Kenny Mallard, Commissioner of Precinct 3;
Carey Cauley, Jr., Commissioner of Precinct 4, Absent;
Karen McQueen, County Clerk.
The attached sheet contains the names of the citizens and
officials that were in attendance.
Commissioner Peters gave the invocation and led the
pledge of allegiance.
There was no citizen input/and or concerns
The Court first heard a presentation by Rabon Metcalf
Engineering concerning the intent, requirements and processes
of the Storm Water Management Plan. A Public Meeting will
need to be held to hear input from county residents. There is
a website and there will be information packets put together
for the public.
VOL PAGE 55
Commissioners Court meeting April I, 2003 2
The Court next considered Budget Amendment #02/03-20.1
through 20.2, which would reallocate funds for the Brazos
Center, and transfer funds from Contingency to County Welfare.
On motion by Commissioner Jones, seconded by Commissioner
Peters, the Court voted unanimously to approve the budget
amendment as submitted, a copy of which is attached.
The Court next considered the following Claims as
submitted by the County Treasurer for payment:
20040691 through 20040911
On motion by Commissioner Jones, seconded by Commissioner
Mallard, the Court voted unanimously to approve the Claims as
submitted.
The Court proceeded to consider the change of status of
employees as submitted on the attached Personnel Act!
Requests. On motion by Commissioner Jones, seconded hti
Commissioner Peters, the Court voted unanimously to apps ;e-
the changes as submitted.
The next matter for consideration was approval of an
Interagency Agreement with the County of Madison for the
filing of a joint grant application with the Criminal Justice
Division of the Office of the Governor for funding for the
Brazos Valley Narcotics Task Force. On motion by Commissioner
Mallard, seconded by Commissioner Peters, the Court voted
VOL `F PAGE 56
Commissioners' Court meeting April 1, 2003
3
unanimously to approve the Interagency Agreement with the
County of Madison and authorize the County Judge to accept
such grant funds as may be awarded.
The Court next considered appointment of individuals to
serve on the Brazos Valley Council of Governments' Homeland
Security Advisory Committee. On motion by the County Judge,
seconded by Commissioner Peters, the Court voted unanimously
to appoint the individuals named on the attached list.
The next matter for consideration by the Court was a
request submitted by the Jail Administrator seeking approval
for out of state travel for Lt. David Drosche and Sgt. Jayson
Lyday to travel to Caldwell, Idaho to extradite David Montoya
Orta To Brazos County. The deputies will be gone April 7-8,
2003. On motion by commissioner Peters, seconded by
Commissioner Jones, the Court voted unanimously to grant the
request from the Jail Administrator and approved payment of out
of state travel expense for the two deputies.
The Court next considered a request from the Purchasing
Department to use a room at the Brazos Center without charge
for a meeting with local vendors. On motion by Commissioner
Jones, seconded by Commissioner Peters, the Court voted
unanimously to approve the request.
The next matter for consideration was an application for
VOL PAGE Z7
Commissioners' Court meeting April 1, 2003 4
service with Verizon to maintain the T-1 line from the Sandy
Point Jail to the Courthouse. The basic fee is $694.00 per
month. On motion by Commissioner Jones, seconded by
Commissioner Peters, the Court voted unanimously to approve the
application.
The Court next considered approval of a requisition for
Bid #2003-027 - Seal Coat Project. On motion by Commissione-
Jones, seconded by Commissioner Mallard, the Coart enter
unanimously to approve the requisition and stipulated t at i,.
not exceed $415,000.00.
The next matter for consideration was approval of a
Maintenance Agreement with Ikon for the copy machine at the
Juvenile Boot Camp. On motion by Commissioner Peters, seconded
by Commissioner Mallard, the Court voted unanimously to approve
the agreement. Cost will be $298.03.
The Court proceeded to consider declaring certain county
property as "salvage" and authorizing the destruction or
disposal of this property. On motion by Commissioner Jones,
seconded by Commissioner Peters, the Court voted unanimously to
declare the attached list of property as "salvage" and
authorized the destruction of disposal of the property.
The Court next considered the request from Wickson Creek
Special Utility District to construct a road bore for
VOL q,~Z- PAGE 6-'9
Commissioners' Court meeting April 1, 2003 5
waterline installation in the right-of-way of Wallis Prairie
Road approximately 100 feet from its intersection with
Barnhill Lane. The site is located in Precinct 2. The County
Engineer stated that all appeared to be in order and
recommended approval. On motion by Commissioner Peters,
seconded by Commissioner Jones, the Court voted unanimously to
approve the request from Wickson Creek Special Utility
District and authorized the installation. A copy of the
request is attached hereto.
The Court next considered the request from Patterson LP
to construct a road bore for natural gas gathering pipeline
installation in the right-of-way of Oak Lake Road
approximately 6,700 feet east of FM 2038. The site is located
in Precinct 2. Included with the request was a company check
No. 1419 in the amount of $500.00. The County Engineer stated
that all appeared to be in order and recommended approval. On
motion by Commissioner Peters, seconded by Commissioner
Mallard, the Court voted unanimously to approve the request by
Patterson LP and authorized the installation. A copy of the
request is attached hereto.
The Court next considered approval of the Final Plat of
North 974 Estates 9.984 Acres one block, 4 tracts in Precinct
2. Richard Vance, County Engineer, stated that he had
VOL 4,~L PAGE 67
Commissioners' Court meeting April 1, 2003 6
reviewed the plat and all appeared to be in order. On motion
by commissioner Peters, seconded by Commissioner Jones, the
Court voted unanimously to approve the final plat of the
North 974 Estates as submitted.
The Next matter before the Court was a presentation by
the County Auditor of the Comprehensive Annual Financial
Report. Demetrios Basdekas asked if this would be available
on the county website. Katie Connor, Assistant Auditor said
it would be on the site soon. Mr. Basdekas then asked the
County Judge for information on the "state of the county''
Under announcement of interest items and possible future
agenda topics the following spoke:
Commissioner Jones
a) Said that the Court needed to discuss why it
would want to have a public hearing on Storm
Water separate from the night meeting. The
Court needs to decide on scheduling.
County Judge
a) On Tuesday, April 8th, the Extension Service
will have a reception in the Commons Area of
the Courthouse from 8:00 a.m. until 9:00
a.m.
Susan Gandy
a) Informed the Court that the new Director of
Juvenile Services, Rhonda Gilchrist, was in
the Courtroom. The County Judge welcomed
her.
VOL 4 PAGE &0
Commissioners' Court meeting April 1, 2003 7
Under Agency/Board/Committee reports by Court
members, Commissioner Mallard said that he forwarded the
newsletter on the High Speed Rail to the Court members.
There was no citizen input and/or concerns.
There being no further business to come before the Court,
the meeting was adjourned.
VOL 4~- PAGE 61
The foregoing minutes of the Commissioners Court meeting held
April 1, 2003 have been examined and are approved in open
Court this the a 74L." day of 2003, in Bryan,
Brazos County, Texas.
i
andy S' s
County Judge
"ae4i'~
Tony Jones
Commissioner, Precinct 1
Duane Peters Kenny Mallar
Commissioner, Precinct 2 Commissioner, Precinct 3
arey C u ey, Jr.
Commis inner, Preci c 9
'
Karen McQueen
County Clerk
VOL 4~- PAGE ba
i V~ i
BRAZOS COUNTY COMMISSIONERS COURT
MEETING ON 1 200 3 AT
NAME ORGANIZATION/DEPARTMENT
Olds' ,`iT
C. a5
Cr~
u~.
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENT(Sj.^OR THE 2002-2003 BUDGET YEAR
NO. 02/03-20..L to 20.2
On this the 1st day of April 2003 at a regular meeting of the
Commissioners' Court, the following members were present:
Randy Sims, County Judge, Presiding
Tony Jones, Commissioner, Precinct 1;
E. Duane Peters, Commissioner, Precinct 2;
G. Kenny Mallard, Commissioner, Precinct 3;
Carey Cauley, Jr., Commissioner, Precinct 4;
Karen McQueen, County Clerk.
The following proceedings were held:
THAT WHEREAS, on April 1, 2003 the Court heard and approved a budget
amendment for the 2002-2003 budget year for Brazos County, Texas.
WHEREAS, an expenditure is necessary due to the necessity to meet
unusual and unforeseen conditions which could not be reasonably included
in the original budget adopted August 23, 2002 the following amendment (s)
to the original are hereby authorized, as described on the attached
page(s).
ADOPTED AND APPROVED this the 1st day of April, 2003.
THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS.
By: Randy Sims, County Judge
Original: County Clerk's Office and attached to the original
budget
Copies: County Auditor
County Treasurer
Commissioners' Court Minutes
~rC
w_ ,1 CP
BRAZOS COUNTY, Ttil*kS
BUDGET AMENDMENTS
No. 02/03-20.1
_ 4/2/2003
ED DID ACCT PROJ DR/CR ACCOUNT NAME Increase Decrease
01 365001 5t .200 Dr Hourly-Overtime $ 1,660.00
01 365001 516100 Cr Hourly-Staff $ 1,660.00
BRAZOSCENTER
To reallocate budget to fund an overtime position for training of an em to ee
for the Pavilion Operations Manage r Position.
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 02/03-20.2
4/2/2003
FD DIV ACCT PROJ DR/U, ACCOUNT NAME Increase Decrease
Ol 110040 619500 Dr. Court:✓ Welfare $ 3,000.00
01 110015 611300 Cr. Contineencv $ 3,000.00
County Welfare
To reallocate budget per Commissioner's Court request 3/26/03.
PERSONNEL CHANGE OF STATUS
page 1 of I
COURT DATE: April 1, 2003
DEPARTMENT: Personnel
PURPOSE: Approve Personnel Change of Status
•
DEPARTMENT NAME EMPLOYEE NAME ACTION REQUESTED
INFORMATION
TECHNOLOGY
JUNEK, DWAYNE A.
NEW HIRE - FULL TIME
COUNTY ATTORNEY
MILLHOLLON, MINDI
JADLOWSKI, MELISSA
WALKER, CURTIS
RESIGNATION
TRANSFER WITHIN DEPT
NEW HIRE - PART TIME
JUVENILE SERVICES COUNCIL, EDDIE M. MCDADE NEW HIRE - FULL TIME
JJAEP
Approved in Commissioners' Court: April 1. 2
County Judge's or Commissioner's Signature:
(This copy to be attached to minutes)
INTERAGENCY AGREEMENT
STATE OF TEXAS
County of Brazos
This Agreement is entered into by and between the County of Brazos, a political subdivision of
the state of Texas, hereinafter referred to as "Brazos County", and the County of Madison, a
political subdivision of the state of Texas, hereinafter referred to as "Madison County", pursuant
to chapter 791 of the Texas Government Code, concerning inter-local cooperation contracts.
WITNESSETH
WHEREAS, Brazos County and Madison County wish to file a joint grant application with the
Criminal Justice Division of the Office of the Governor, State of Texas, for funding in the
amount of $650,000 for the Brazos Valley Narcotics Task Force, and
WHEREAS, Brazos County and Madison County have agreed to contribute the total of
$110,651 in matching funds if said joint application is approved; and
WHEREAS, the source of funds would not normally be used for this purpose; and
WHEREAS, Brazos County and Madison County believe it to be in their best interests to join in
the application to develop a Narcotics Task Force; and
WHEREAS, Brazos County and Madison County agree to each accept the responsibility to
adhere to all pertinent federal state and local laws or regulations.
NOW THEREFORE, IT IS HEREBY AGREED AS FOLLOWS:
ARTICLE I
PURPOSE
1.01 The purpose of this Agreement is to allow Brazos County and Madison County to file a
joint application for a grant with the Criminal Justice Division, which continues the
Brazos Valley Narcotics Task Force.
ARTICLE II
TERM
2.01 The term of this Agreement is to commence on June 1, 2003, and to end May 31, 2004.
9 Page 43
INTERAGENCY AG 'UMENT (Continued)
ARTICLE III
CONSIDERATION
3.01 As consideration for this agreement, Brazos County and Madison County agree to
contribute a total of $110,651 in matching funds for the enhancement of the Brazos
Valley Narcotics Task Force in the amounts as follows:
Brazos County: $110,651,
Madison County: $0
ARTICLE IV
ALLOCATION OF FUNDS
4.01 The specific allocation of Brazos County and Madison County funds is set out in the
attached Grant Budget, marked as Exhibit "A", and made a part hereof for all purposes.
ARTICLE V
OWNERSHIP OF EQUIPMENT
5.01 Upon termination of this agreement, ownership of equipment, hardware, and other non-
expendable items will revert to the applicant for which it was acquired, subject to the
approval of the Criminal Justice Division of the Governor's Office.
ARTICLE VI
AMENDMENTS
6.01 This agreement may be amended by the mutual agreement of the parties hereto in writing
to be attached to and incorporated into this agreement.
ARTICLE VII
LEGAL CONSTRUCTION
7.01 In case any one or more of the provisions contained in this agreement shall be held to be
invalid, illegal, or unenforceable in any respect such an invalidity, illegality, or
unenforceability shall not affect any other provision thereof, and this agreement shall be
construed as if such invalid, illegal, or unenforceable provision had never been contained
herein.
Page 4
INTERAGENCY AGREEMENT (Continued)
ARTICLE VIII
ENTIRE; GREEMENT
8.01 This agreement supersedes any and all other agreements, either oral or in writing,
between the parties hereto with respect to the subject matter hereof, and no other
agreement, statement, or promise relating to the subject matter of this agreement which is
not contained herein shall be valid or binding.
EXECUTED IN DUPLICATE ORIGINALS, EACH OF WHICH SHALL HAVE THE FULL
FORCE ~Nm EFFECT OF AN ORIGINAL, ON THIS THE DAY OF
/~i,o., / .2003.
Randy Sio, County Judge
Brazos ounty
EXECUTED IN DUPLICATE ORIGINALS, EACH OF WHICH SHALL HAVE THE FULL
FORCE AND EFFECT OF AN ORIGINAL, ON THIS THE 10 DAY OF
M1t e e 12003.
Ceci y, County Judge
Madison County
Page 45
70
Page 1 of 2
Budget
Page 2 of 2
-f t- Y Budget
Cash. Match and Program Income Form
Cash Match Program Income
APPLICATION FOR SERVICE
(State Tariff)
Customer Name: Brazos County
300 E. 260 St.
Bryan, TX 77803
Tel. No: 979-DHO-0701
C;: Comer applies for and agrees to purchase from the undersigned Verizon operating telephone comf; nv the services identified below
and as fut@ter described in Verizon's applicable tariffs (the "Services"), for a minimum period of TWET j7F - (L2_) consecutive
months following execution of this Application and commencement of Services hereunder (the "Service Period"). The Services will
be provided subject to the terms and conditions of Verizon's applicable tariffs in effect during the Service Period (the "Tariffs"), which
are incorporated by this reference, and subject to the availability of suitable facilities.
If Customer terminates this Application or any Services prior to expiration of the Service Period, Customer will promptly pay to
Verizon any temmination and cancellation charges specified in the Tariffs. The rates for the Services shall be as set forth in the Tariffs.
Customer shall also pay all applicable charges, fees, taxes and tariff surcharges, including federal End User Common Line Charges,
charged pursuant to applicable law, regulations or Tariffs.
Quanti
Service
1
Point to Point DSI, Circuit 43.DHDA.070152
(Cost basic fee of 5694.00 per month)
i
- - - -
-
The Services will be provided at the following Customer locations:
300 E. 26" St.
Bryan, TX 77803
The provision of any additional locations and/or quantities of Services will be subject to Verizon's applicable Tariffs. Verizon may
assign or transfer part or all of this Application to any of its affiliates. Upon reasonable prior written notice to Verizon and consistent
with applicable Tariff supersedure or other regulatory requirements, Customer may assign or transfer this Application to any company
that is the successor to substantially all of its assets. All other attempted assignments shall be void without the prior written consent of
the other party.
Upon signature below by both parties, this Application and the Tariffs constitute the entire agreement between Customer and Verizon
regarding the Services, and supersede all prior oral or written quotations, communications, understandings or agreements. In the event
of a conflict between the Tariffs and this Application, the Tariffs shall control. Each party represents that its execution of this
Application is based solely on its independent assessment of the rights and obligations set forth herein and not on any other oral or
written quotations, communications, understandings or agreements.
AGREED AND ACCEPTED
Brazos County
=By
Name/title Randy/Sims Count Judge
Date April J., 2003
VERIZON Southwest
By I~
Name/title WrwOL''N- r=Z~X 5~~~(,/O t~QL -rleer 4E
Date ~71- z0a
it
(Generic-S[aleTf---022702) Page / of! ESC # 0115
-71
.o
H
z
w
w
w
P4
W
U
W
H
z
H
9
a
i
0
U,
0
z
v
0
Brazos County
Purchasing Department
300 E. 26" Street, Ste. 117 * Bryan, Texas 77803
Phone (979) 3614290 Fax (979) 3614293
Pat Howard, Purchasing Agent Marcia Mann, Buyer
Becky Stephens, Senior Buyer Jeanine Murphy, Admin. Assist.
MEMORANDUM
To: Commissioners Court
From: Marcia Mann, Buyer
Re: Salvage Property
Date: April 1, 2003
Attached is a list. of surplus property which has been advertised for sale and
received no bids. In accordance with Local Government Code Section 263.152 -
Disposition, Purchasing requests Commissioners' Court to declare this property
"salvage" and authorize either destruction or other disposal as worthless.
Thank you.
REQUEST FOR SALVAGE DESIGNATION
1. IBM Wheelwriter 1:I typewriter (not working)
2. Plastic stack trays - 5 (cracked and broken)
3. Wood stack trays - 2
4. Manual invoice tray system
5. Blue secretarial chairs - 2 (both with broken legs)
6. BP Jet Direct Print servers - 3 (no longer working)
7. Cellular One mobile mount cell phone (very old and not working)
8. Black single pedestal 3-drawer desk (very poor condition, one leg completely
broken off)
9. Brown double pedestal 6-drawer desk (very poor condition, both back legs
completely broken off)
10. Dark brown single pedestal 6-drawer desk (very poor condition, right front leg
completely broken off)
11. Wood veneer desk, 5-drawer (very poor condition, cracked and broken veneer)
12. Round orange laminate top pedestal table (poor condition, top broken at pedestal)
13. Canon typewriter, model AP9017 (not working)
14. Canon typewriter, model U210D (not working)
This property has been advertised and no bids were received. Due to age and condition
of property, repairs would not be cost-efficient.
BRAZOS COUNTY
COMMISSIONERS' COURT ACTION FORM
DEPARTMENT Road and Bridge NUMBER 560010
DATE OF COURT MEETING: April 1. 2003
ITEM: Request from Wickson Creek Special Utility District to construct a road bore for
water line installation in the right of way of Wallis Road approximately 100 feet from its
intersection with Barnhill Lane. Site is located in Precinct 2
SOURCE OF FUNDS: N/A
PRESENTATION:
A) No work will be permitted between front slope and/or back slope.
B) All installations shall be constructed in designated utility easements, if applicable. If no utility
easement exists, the installation(s) shall be 1) within 3-5' of and parallel to the right-of-way line
and/or 2) in the case of a road bore, perpendicular to the right-of-way line.
C) If clearing of brush, trees and other obstruction is necessary, it shall be the Applicant's
responsibility to do so and to remove all cleared brush, trees etc, from county right-of-way.
D) Ditch line shall be compacted to 90% standard density ASTM-Test Method No. D-698; test
shall be conducted by an independent geotechnical testing firm; copies of all test results shall be
furnished to the office of the Brazos County Engineer.
E) Construction shall be in strict conformance to the latest Texas Manual of Uniform Traffic
Control Devices for Streets and Highways published by the Texas Department of Transportation,
and all other State and Federal laws governing utility construction.
ACTION REQUESTED OR ALTERNATIVES:
SUBMITTED BY:
~9~/ ~
Richard F. Vance, P.E.
County Engineer
0003-027
Approved LJ / Di
Date: A112
Randy
77:
Commissioner Duane Peters
Precinct 2
❑ by Commissioners Court
County Judge
HX
y a'
w:
REQUEST FOR PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY
TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN, TEXAS 77803
Formal notice is hereby given that (applicant) Wickson Creek Special Utility District
proposes to place a (type) waterline within- across x the right-of-way of
(road) Wallis Rd. in Brazos County, Texas as follows:
The location or description of the proposed installation is more fully shown by 3
copies of the drawings attached to this notice.
I understand and agree that:
1. The County Engineer must be notified 72 hours prior to the beginning
of construction in order that he, or his designated inspector, may
inspect the actual installation.
2. All damage to the roadways and rights-of-way will be repaired to their
original condition to the satisfaction of the County Engineer.
3. Brazos County reserves the right to require Applicant to relocate or
lower any such line at no cost to Brazos County, should same
become necessary due to widening or lowering, or other alteration of
the roadway or right-of-way.
4. Brazos County will in no way be responsible for any damage which
might occur to any existing utility lines in the right-of-way.
5. The line will be constructed and maintained on the County right-of-way in
accordance with the Utility Accommodation Policy which was adopted by the
Texas Department of Transportation on May 29, 1989.
6. The line or lines will be constructed no less than twenty-four inches (24")
lower than the lowest part of the drainage or bar ditch and the drainage is to
be considered at least two feet (2') below the center of the roadway.
7. All sites will be barricaded during the construction period.
Construction of this line will begin on or after the 2naday of April 20 03.
*Highway 21 Ext. Project
Firm: Wic on Cree Special Utility District
By: - Title: General Manager
Address: P. 0. Box 4756
Texas 77805
Phone: 979-589-3030
APPROVED BY COMMISSIONERS'
COURT ON:
Date
Rec r 2 03-z v -03
Randy S' s, County Judge K /t✓OTeI>
~/C ~4L O WJ
t
Drawing for a Request to Cross County R.O.W.
Existing 6"Waterline
B
A
R
N
H
I
100 Ft. L
L
Proposed 45'-
Road Bore
12" Line Ext. Project
Existing 12" Waterline
Drawing for proposed 45 ft. Road
Bore across Wallis Rd. to tie in a 6"
PVC Waterline using 10" encasement
pipe.
By: Ann Young-Wickson Creek SUD
March 21, 2003
Coulter Field
x_
GTE
To Bryan
WALLIS ROAD
100 ft. ROW
H;
W1
Y
2
i
i
1'.
BRAZOS COUNTY
COMMISSIONERS' COURT ACTION FORM
DEPARTMENT Road and Bridge
DATE OF COURT MEETING: April 1, 2003
ITEM: Request from Patterson Petroleum LP to construct a road bore to install a
natural gas gathering pipeline in the right-of-way of Oak Lake Road approximately
6,700 feet east of FM 2038 Company Check No 1419 in the amount of $500.00
accompanies this request. Site is located in Precinct 2
(Deposit to account no. 01-460650)
SOURCE OF FUNDS:
REQUIREMENTS:
A) No work will be permitted between front slope and/or back slope.
B) All installations shall be constructed in designated utility easements, if applicable. If no utility
easement exists, the installation(s) shall be 1) within 3-5' of, and parallel to the right-of-way line
and/or 2) in the case of a road bore, perpendicular to the right-of-way line.
C) If clearing of brush, trees and other obstruction is necessary, it shall be the Applicant's
responsibility to do so and to remove all cleared brush, trees, etc. from county right-of-way.
D) Ditch line shall be compacted to 90% standard density ASTM-Test Method No. D-698; test
shall be conducted by an independent geotechnical testing firm; copies of all test results shall be
fumished to the office of the Brazos County Engineer.
E) Construction shall be in strict conformance to the latest Texas Manual of Uniform Traffic
Control Devices for Streets and Hiahwavs published by the Texas Department of Transportation,
and all other State and Federal laws governing utility construction.
ACTION REQUESTED OR ALTERNATIVES:
SUBMITTED BY:
/ //G
Richard F. Vance, P.E.
County Engineer
0003-028
Approved 0 / De
Date: 1450
DROVED BY:
Commissloner Duane Peters
Precinct 2
❑ by Commissioners Court
OAK LAKE ROAD CROSSING
R/W
I
Warning Sign
65'
Oak Lake Road
2'- 0" Min.
4'- 0" Min.
Warning Sign
4'- 0" Min.
/ Pipeline - 6 1/2" 0.280 Wall API 5LX42
MEASURED WIDTH OF COUNTY
ROAD RIGHT OF WAY 10
PROFILE
Patterson Petroleum LP
Oak Lake Road Crossing
Prepared By: HD Smith
March 18, 2003 Brazos County, Texas
I
1
Pi,.
0 k~ ~ r
, y
Fridei f
Cem
f
1 711
P
Z,
e,
1 sj
L
Crossing'i
ry
1
\ 5
. O
1I
iryo~►t
rrCemS
.11
Pipeline will cross Oak Lake Road approximately 6700' East of FM 2038. Easement is 30'.
Patterson Petroleum LP
Prepared By: HD Smith Oak Lake Road Crossing
March 18, 2003 Brazos County, Texas
y~ y`, 8 3
o
$0
V
/ice
y3/B
i•
.5Km 0,...
1
Pipeline will cross Oak Lake Road approximately 6700' East of FM 2038. Easement is 30'.
Patterson Petroleum LP
Prepared By: HO Smtth Oak Lake Road Crossing
March 18, 2003 Brazos County, Texas
,
'IKrr U .514,
REQUEST FOR PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY
TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN, TEXAS 77803
FROM: REF:
Patterson Petroletun LP Crossing 22[ and/or Parallel Installation _
C54 N Sam Houston Elmaj, F $'4Z0 Road: cak Tatia Rrvarl
Houston, Texas 77060 Precinct Number: 2
Formal notice is hereby given that (applicant) Patterson Petrole n proposes to
place a (type) Natural Gas Gathering pipeline within the right-of-way of (road)-
Oak Lake Road in Brazos County, Texas as follows: 6700' front FM 2038, a bored
road crossing with 6.5" OD, 0.280" wall API 5LX42,pipeline wrapped with TGF-3.
The location or description of the proposed installation is more fully shown by three
copies of the drawings attached to this notice.
I understand and agree:
1. The County Engineer must be notified prior to the beginning of construction in order that a
designated inspector may inspect the actual installation.
2. That all damage to the roadways and right-of-ways will be repaired to their original condition
to the satisfaction of the County Engineer.
3. That Brazos County reserves the right to require Applicant to relocate or lower any such line
at no cost to Brazos County, should same become necessary due to widening or lowering, or
other alteration of the roadway or right-of-way.
4. That Brazos County will in no way be responsible for any damage which may occur to any
existing utility lines in the right-of-way.
5. That the line will be constructed and maintained on the County right-of-way in accordance with the
Utility Accommodation Policy which was adopted by the Texas Department of Transportation on May
29, 1989.
6. That the line or lines will be constructed no less than forty-eight inches (48") lower than the lowest part
of the drainage or bar ditch and the drainage is to be considered at least two feet (2) below the center
of the roadway.
7. That all roads shall be bored in accordance with the Utility Accommodation Policy of the Texas
Department of Transportation dated 1989.
8. That all sites will be barricaded during the construction period.
9. That the normal charge is $500.00 per crossing and/or $40.00 per rod when paralleling the roadway
established by the Commissioners Court on January 28, 1985.
10. Ditch line shall be compacted to 90% standard density ASTM-Test Method No. D-698; test shall be
conducted by an independent Geotechnical testing firm; copies of all test results shall be furnished to
the office of the Brazos County Engineer.
11. Construction shall be in strict conformance to the latest Texas Manual on Uniform Traffic Control
Devices for Streets and Highways, published by the Texas Department of Transportation, and all other
State and Federal laws governing utility construction.
Construction of this line will begin on or after the 26 day of march 2003
APPLICANT:
Patterson Petroleum LP
Company Names-„
Harrold Smith Engineer
Company Representativerntle
281-591-1381
Telephone Number
ell 2 03'?O -03
4 ,~fJi f
474, '05 Alw-eq
APPROVED BY COMMISSIONERS'
rnl IRT nM-