AGENDA
BRAZOS COUNTY COMMISSIONERS' COURT MEETING
THE COMMISSIONERS' COURT WILL MEET IN SPECIAL SESSION ON MONDAY,
APRIL 20, 1992, AT 8:30 A.M. IN THE COMMISSIONERS' COURTROOM OF
THE BRAZOS COUNTY COURTHOUSE, 300 EAST 26TH STREET, SUITE 115,
BRYAN, TEXAS.
1. Invocation.
2. Pledge of Allegiance.
3. Consider and take action on the approval of the minutes of
the meetings held on December 2, 1991, December 9, 1991,
December 16, 1991, and December 30, 1991.
4. Consider and take action on budget amendments.
5. Consider and take action on request from Precinct 4 Constable
in regard to the appointment of Shawn Spencer Zweifel as a
Deputy Constable.
6. Consider and take action on request from Clajon Gas Company,
L.P. to install pipeline in county right-of-way of West 28th.
Street in Precinct 4.
7. Consider and take action on request from Ferguson Burleson
County Gas Gathering System to install pipelines in the
following county rights-of-ways in Precinct 3.
a. Roans Chapel Road
b. Hardy Weedon Road
c. Elmo Weedon Road
d. Nunn Jones Road
8. Consider and take action on personnel change of status.
9. Consider and take action on payment of claims.
•10. Adjourn.
VOL PAGE~~
COMMISSIONERS' COURT
SPECIAL MEETING
APRIL 20, 1992
A special meeting of the Commissioners' Court of Brazos
County, Texas was held in the Commissioners' Courtroom in the
Courthouse in Bryan, Brazos County, Texas, beginning at 8:30
a.m. on Monday, April 20, 1992, with the following members of
the Court present:
R. J. Holmgreen, County Judge, Presiding;
Gary Norton, Commissioner of Precinct 1;
Walter Wilcox, Commissioner of Precinct 2;
Randy Sims, Commissioner of Precinct 3;
Milton Turner, Commissioner of Precinct 4;
Mary Ann Ward, County Clerk.
The following citizens and officials were in attendance:
Ruth McLeod
Carol Palmer
Bea Green
Rosalie Todaro
Cheryl Turney
A. H. Winder
Jim Hiney
Executive Assistant
Admin. Asst. to County Judge
Secretary to Commissioners
Auditor's Office
Auditor's Office
County Engineer
Bryan/College Station Eagle
Commissioner Sims gave the invocation and led the pledge
of allegiance.
The Court next considered approval of the minutes of the
Commissioners' Court meetings held December 2, 1991, December
9, 1991, December 16, 1991 and December 30, 1991. On motion
by Commissioner Norton, seconded by Commissioner Sims, the
Court voted unanimously to approve the minutes as submitted.
The Court next considered Budget Amendment #91/92-14,
which would reallocate funds budgeted for the Maximum Security
Jail, adjust the Sheriff's budget for 1991 encumberances and
transfer money from the Revenue Account to Non-Departmental
and the Sheriff's Department. On motion by Commissioner
Norton, seconded by Commissioner Wilcox, the Court voted
unanimously to approve the budget amendment as submitted, a
copy of which is attached hereto.
The Court next considered a request from Constable Louis
Garcia to appoint Shawn Spencer Zweifel Reserve Deputy
Constable. On motion by Commissioner Wilcox, seconded by
V0 -,-7_
6--
1_1
Commissioners' Court meeting April 20, 1992
Commissioner Norton, the Court voted unanimously to approve
the request from Constable Garcia to appoint Shawn Spencer
Zweifel as Deputy Constable.
The Court next considered the request by Clajon Gas
Company to install a Natural Gas pipeline within the right-of-
way of West 28th Street in Precinct 4. The request is
accompanied by draft no. 0143707 in the amount of $500.00
which represents payment for road crossing only. The County
Engineer stated that all appeared to be in order and
recommended approval. On motion by Commissioner Turner,
seconded by Commissioner Norton, the Court voted unanimously
to approve the request of Clajon Gas Company and authorized
the installation. A copy of the request is attached hereto.
The Court next considered four requests by Ferguson
Burleson County Gas Gathering System. The first to install a
12" steel welded pipeline across the right-of-way of Roans
Chapel Road in Precinct 3. The second to install a 10" steel
welded pipeline across the right-of-way of Hardy Weedon Road
in Precinct 3. The third to install a 10" steel welded
pipeline across the right-of-way of Elmo Weedon Road in
Precinct 3 and the forth, to install a 4" steel welded
pipeline across the right-of-way of Nunn Jones Road in
Precinct 3. Each request was accompanied with a draft in the
amount of $500.00 representing payment for road crossing only.
The County Engineer stated that all appeared to be in order
and recommended approval. On motion by Commissioner Sims,
seconded by Commissioner Wilcox, the Court voted unanimously
to approve the request of Ferguson Burleson County Gas
Gathering System and authorized the installation. A copy of
each request is attached hereto.
Commissioners' Court meeting April 20, 1992
The Court proceeded to consider the change of status of
the following employees.
NAME DEPARTMENT REASON
Ramirez, Paublo Bldg. Maintenance Resignation
Stephen, Jody Juvenile Serv. Resignation
Nichols, Charles Juvenile Serv. Resignation
Hein, Joel Juvenile Serv. Promotion
Murphy, Chris Juvenile Serv. Promotion
Whetstone, Artis Juvenile Serv. Promotion
on motion by Commissioner Turner, seconded by commissioner
Sims, the Court voted unanimously to approve the changes as
submitted.
The Court next considered the following Claims as
submitted by the County Treasurer for payment:
10 General Fund Claims-07144-thru-07336-
20 Road & Bridge Claims-07414-thru-07462-
22 Road & Bridge II----------- Claims--O~thru-------
53 Voter Registration Claims-07341-thru-------
54 Health Department Claims-07342-thru-07363-
60 Payroll Claims-07364-thru-07377-
s 61 Health & Life Ins---------- Claims-07378-thru-07379-
90 Brazos County Grants Claims-07380-thru-07410-
97 Narc. Traf. Task Force Claims-07411-thru-07413-
On motion by Commissioner Sims, seconded by Commissioner
Norton, the Court voted unanimously to approve the Claims as
submitted.
There being no further business to come before the Court,
the meeting was adjourned.
vat 7- PAG E_T a_
I
f
The foregoing minutes have been examined and approved in open
A
Court this the 19 e. day of 19_t~ in Bryan,
Brazos County; Texas.
2 4Z4111 a
. J olmgreen Cary N on
Cou Judge 6yi Wa ter ilcox Randy Si
Commissioner, Precinct 2 Commis oner, Precinct 3
Milton Turner Mary nn Ward
Commissioner, Precinct 4 County Clerk
Commi oner, Precinct 1
V O L PAGE-0--
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENT(S) FOR THE 1991-1992 BUDGET YEAR
NO. 91/92-14
On this the 21st day of October 1992 at a special meeting of the
Commissioners' Court, the following members were present:
R. J. Holmgreen, County Judge, Presiding
Gary Norton, Commissioner, Precinct 1;
Walter Wilcox, Commissioner, Precinct 2;
Randy Sims, Commissioner, Precinct 3;
Milton Turner, Commissioner, Precinct 4;
Mary Ann Ward, County Clerk.
The following proceedings were held:
THAT WHEREAS, on April 20, 1992, the Court heard and approved
a budget amendment for the 1991-1992 budget year for Brazos County,
Texas.
WHEREAS, an expenditure is necessary due to the necessity to
meet unusual and unforeseen conditions which could not be
reasonably included in the original budget adopted September 3,
1991, the following amendment(s) to the original are hereby
authorized, as described on the attached 1 page(s).
ADOPTED AND APPROVED this the 20th day of April 1992
THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS.
By: R. J. Holmgreen, County Judge
Original: County Clerk's office and attached to the original
budget '
Copies: County Auditor
County Treasurer
Commissioners' Court Minutes
Budget Amendment File r
tVOL
Budget Amend. No. 91192-14: April 20,1992
I
- DEPT ACCOUNT #
ACCOUNT NAME
INCREASE (DECREASE)
Max. Sec. 10-61-5911
Prisoner Health Care
Jail 10-61-6215
Computer Software
500
NO INC. TO DEPT BUDGET.`..
Sheriff 10-31-6213
Automotive
28,641
10-31-5640
Special Microfilming
7,663
Non-Depart 10-14-5590 Right of Way Acquisition 58,071
mental
Revenue 10-00-3510 Unreserved Funds
Account
DE4 TO DEPT aumer . 1 ,97s «
"NOIPIC.TOGFSUDIi :k ;:•`ii:
94,375
REASON
Reallocate
funds
Adjust
budget to
acct. fa
91 encumb.
I
v
06
0
i
I
a
I
110TICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAT LAWRENCE it
TO THE CM188IONERS' COURT OF BRAZOS COUNT7, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN,'TZ AS 77803
FROM: REs Type Installation, Road, Precinct
. CLAJON GAS COMPANY, L.P. Crossing XX, parallel Install.
P. O. BOX 2000 Roads 28th Street
GIDDINGS. TEXAS 7 942 precinct Noes
Formal notice is hereby given that (Applicant) Clajon Gas Company, L.P.
proposes to place a t e Natural Gas --2Bth Street
pipeline within the r ght-o -way o Roe
in Brazos County, Texas as follower
I
The location or description of the proposed installation is more fully shown
by three copies of the drawings attached to this notice.
SApplicent) Cla-ion Gas Company, L.P. , understand and agree that:
1. The County Engineer must be notified prior to the beginning of
construction in order that they might be on hand to designate the actual
location of the installation.
2. That all damage to the roadways and rights-of-way will be repaired to
their original condition to the satisfaction of the County Engineer.
3. That BRAZOS COUNTY reserves the right to require Applicant to
relocate or lower any such line at no cost to BRAZOS COUNTY, should same
become necessary due to widening or lowering, or other alteration of the
roadway or right-of-way.
4. That BRAZOS COUNTY is in no way responsible for any damage that might
occur to any sAisting utility lines in the sight-of-way.
5. That the line will be constructed and maintained on the county right-
of way in accordance with governing laws.
6. That the line or lines will be constructed no less than forty-eight
inches (48") lower than the lowest part of the drainage or bar ditch and
the drainage is to be considered at least two feet (2') below the center
of the roadway.
7. That all roads be bored to forty feet (40') on either side of the
centerline of the right-of-way or cased for such distance.
8. That all sites will be barracaded during construction period.
9. That the normal charge is $500 per crossing and/or $40 per rod when
paralleling the roadway established by the Commissioners' Court on
January 28, 1985.
Construction of this line will begin on or after (date) April 12, 1992
APPROVED BY COHkISSIO RS' COURT (Applicant)_ C_laion Gas Company, L.P.
date approved) 33 Y
Brazos n y dge pany Representative
Brazos County, Texas T lephous No. 272-3780
VOL. P.t,.;r:AE
All,
0
T. F. McKI NNEY
A - 33
N 28°0l'20'W
to
BRAZOS COUNTY, TEXAS
I
. ~ o
4xx
a
yj 1 It Z W TELE.
O V V POLE
4 \ 2
'v 'Cu i 4•
!K
f ~ oyN N
NOTE: T B.M IS P.N. NAIL SET IN
Qr. 28 TH STREET AT STA. 20+254
ELEVATION : 100' ASSUMED
105
W cc N Z
100
0
>
95
W
J
W
90
ti
ai
o. a
W w
4 rN +D ti I
+ a + O
t } t
N N N N A K
0
I
N
I x~~
4' MIN.
COVES
Q
y h
Q
~O
Ill W
W
N
J
~ W
~
J
W
ASPHA
T
OWE-
.9 .0
16' j
ll1 , 14' MIN..
PROPOSED PIPELINE
PLAN
SCALE 1"* 20'
105
2"1/ENT PIPES
~i a WARNING
SIGN AT 44
100
NATURAL
GROUND
95'
54' PROPOSED 12 " CASING
PROPOSED B" PIP£L/NE
PROFILE LOOKING NORTHEAST
NOTES.
CONTENTS OF PIPELINE : NATURAL GAS
CROSSING MODE : BORING
MAXIMUM OPERATING PRESSURE : 100 P.S.I.
CASING WILL BE SEALED AT BOTH ENDS
CASING WILL BE CATHODICALLY PROTECTED
90
z
0
F-
W
SCALE HORZ. 1"- 20'
VERT. 1 8• 5'
NOTE: BORE HOLE WILL BE NO GREATER
THAN 2" LARGER THAN O.D. OF PIPE
LAWRENCE NO. I LATERAL A FE 1141 - 609
D,nwn By C. L. M.
a+.
3- 5- 92
Seal. NOTED
Aerial No.
CLAJON GAS COMPANY AS
GIDDINGS , TEXAS
T
fbafam otal 54.0 SPECIFICATIONS
Total 3.27 PIPINfl
R d 8 5/8" O.D. X .188 W.T. STEEL PIPE
Book 803 -
I
Fb9s No. 47,40 CASINO' 12" I.D. X .250 W.T. STEEL CASING
VUL y P GF-
NOTICE Of PROPOSED INSTALLATION IN COUNTY RIGHT-OF-NAY
TO THE COMMISSIONERS' COURT Of BRAZOS COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN, TEXAS 77803
FROHt REI
Ferguson Burleson County
Gas Gathering Y em
formal notice is hereby given that
proposes to place a (type) / 2 "
pipeline within tits right-of-way of
in Brazos County, Texas as follower
Type Installation, Road, Ptecinee
Crossing w-, Parallel Install.
Roads mays Gijeye/
Precinct No.t 3
Applicant) Per uson Burleson Co. Gas Gathering System
Road
The location or description of the proposed installation is more fully shown
by three copies of the drawings attached to this notice.
Ferguson Burleson Co. Gas
Applleant)Gathering System , understand and agree thatt
1. Tits County Engineer must be notified prior to tits beginning of
construction in order that they might be on hand to designate tits actual
location of the installation.
2. That all damage to the roadways and rights-of-way will be repaired to
their original condition to the satisfaction of the County Engineer.
3. That BRAZOS COUNTY reserves tits right to require Applicant to
relocate or lower any euch line at no coot to BRAZOS COUNTY, should sane
become necessary due to widening or lowering, or other alteration of tits
roadway or right-of-way.
4. That BRAZOS COUNTY is in no way responsible for any damage that might
occur to any e4sting utility lines in the right-of-way.
5. That the line will be constructed and maintained on tits county right-
of way in accordance with governing lags.
6. That the line or lines will be constructed no less titan forty-eight
inches (46") lower then tits lowest part of the drainage or bar ditch and
tits drainage is to be considered at least two feet (2') below the center
of tits roadway.
7. Tltat all roads be bored to forty feet (40') on either side of tits
centerline of the right-of-way or cased for such distance.
5. That all sites will be barricaded during construction period.
9. That the normal charge is $500 per crossing and/or $40 per rod when
paralleling the roadway established by the Commissioners' Court on
January 26, 1983.
Construction of title line will begin on or after (date)
APPROVED BY COMMISSIO ERS' COURT (Applicant)- Ferguson Burleson County Gas
(date approved) Gathering System
Brazos ounty Judg Company Reprssentatly
Brazos County, Texas Telephone No. 409-715-3679
y 0A
V0L PAGE-- /
.i
J
BRA ZOS COUNTY, TEXAS
Nwra_
TA'
01
$ 04
. . a. •
. • i '
r
N
PJAIOMOIllO ~NP$~lA1(
+
•
•
MARIA KEOAN$
A 28
NOTIlI : ",lossIIIIi 0f MAIM CHAPtL MD IS
•ot~rHwtur . *or, rItolw THE INTaatcTloN
fc•LS 1* • 80'
OF RCAIG CHAS IIOAV & NW. 30 ~
Alsunrt ffirOff" NOT[ T. lA If 40+ WAIL KT IN
E /c v. to- G t~ EMIL OO,~~ a~. 401
Gelb silt/, ~ ~ ~ .
Ips r 106 04 o o
` : dw me % ~nrac
01
atatnllo
f8 !6
~a►~vsav '
• M 1 HPEr/N~
fo , ' snlnl. ~-~~u..s•aflN,,..i L.4'MIN. fo
PROFILE'
KAU : IiORt. 1" to Ito'
F 8. C. 0. G. S. Ys1•T I" • o
PRaVSED CROSSING OF RA4NS AY4P= /W
MARIA KEGANS, A -20.
SRAZOS C 11NTY , TEXAS
STE&HOLLAW NO.I TO MARY WALKLR
NO. I INTERCONNECT
3-31.91k
o.~.M.
Nm I loth HoLg WLL /t No
sna nN Tram r L#6Mt
THAN 0.0. 0) .14P L.
AFE - G 2039
NOTICE OF PROPOSED INSTALLATION IN COUNTY RICIIT-OF-WAY
_ TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN, TEXAS 71803
FROHI RSt Type Installation, Read, Pteeinet
Ferguson Burleson County Crossing parallel Installs
Gas Gathering System Roads 11W
^ Precinct Host r 3
Formal notice is hereby given that (Applicant) Ferguson Burleson Co. Gas Gathering System
proposes to place a (t e) "
pipeline within the right-of-Kay of Road
944 -
in Brazos County, Texas as followst
The location or description of the proposed installation is more fully shown
by three copies of the drawings attached to this notice.
Ferguson Burleson Co. Gas
(Applicant)Gathering System , understand and agree thatt
1. The County Engineer must be notified prior to tits beginning of
construction in order that they might be on hand to designate the actual
location of the installation.
2. That all damage to the roadways and rights-of-way will be repaired to
their original condition to the satisfaction of the County Engineer.
3. That BRAZOS COUNTY reserves the right to require Applicant to
relocate or lower any such line at no cost to BRAZOS COUNTY, should same
become necessary due to widening or lowering, or other alteration of the
roadway or right-of-way.
4. That BRAZOS COUNTY is in no way responsible for any damage that might
occur to any e4isting utility lines in the right-of-way.
S. That tits line will be constructed and maintained on the county right-
of way in accordance with governing laws.
6. That tits line or lines will be constructed no less than forty-eight
inches (48") lower than tits lowest part of the drainage or bar ditch and
tits drainage is to be considered at least two feet (2') below the center
of the roadway.
7. That all roads be bored to forty feet (40') on either side of the
centerline of the right-of-way or cased for such distance.
6. That all sites will be barraeaded during construction period.
9. That tits normal charge is $500 per crossing and/or $40 per rod when
paralleling the roadway established by tits Commissioners' Court on
January 28, 1985.
Construction of this line will begin on or after (date)
APPROVED BY COHMISB OHERS' COURT (Applicant)_ Ferguson Burleson County Call
(date approved) tj~ /q y Gathering System
Brazos un y Judge Company Representativ
Brazos County, Taxes Telephone No. 409-775-3579
VOL Z PAGE___q-k
4 -
BRAZOS COUNTY, TEXAS
•
AR9rI0m
CONCRell
aRlppC
MARIA KEGANS l
CROSBINO Of HARDY WEEDON ROAD
IS SOUrHVIFST • 230 ?ROM CONO, iRIDOE
AT CREEK CAOSSINO.
NOTE T.• M. Is Sod NAIL SET IN
EDGE OR ASPNQT AT STA. M *09
UEV 100' AWOURD
; ~~REEK
K
PLAN
•cn~i"•. so•
$OfL HOLE Witt 88e
Z~LARd,IrNr~l N ~A
' OrtoJE/t✓. S ~
ae ,t roa
w g
ONVEY VAJr RI MO 100
MAW
i~ IVi1TYIAet
fR01IN0
Avft dl0
n ss
x - PROF/LE
IK
t~go. ac" HORS. 1" s Sao
l~D VERT."•
F. it
PROPOSED CWSSING OF HARDY WEEDON RQ
MARIA X=01At'I! t A-00
DRAIOS COUNTY, 1EXAS
STEEPHOLLOW NO. I TO MARY WALKER
NO. I INTERCONNECT AFE - 0 2039
i•il• ~S 'O.L.Y.
'COL Z PAGE-?I
_
NOTICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAX
To Till COMKISS10NERS' COURT OF BRAZOS COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN, TEXAS 77603
FROM RE, Type Installation, Road, leeeinet
Ferguson Burleson County Crossing Parallel Install.
Gas Gathering ystem Road, E/WO !!/Q a u~aN
=Z I. • Precinct NO.1
3
Formal notice is hereby given that (Applicant)
proposes to place a (type) .S L,-e,
pipeline within tits right-of-way of Roe
in Brazos County, Texas as follows,
The location or description of the proposed installation is more fully shown
by three copies of the drawings attached to this notice.
Ferguson Burleson Co. Gas
SApplicent)Gathering System , understand and agree that:
1. The County Engineer must be notified prior to the beginning of
construction in order that they might be on hand to designate the actual
location of tits installation.
2. That all damage to the roadways and rights-of-way will be repaired to
their original condition to the satisfaction of tits County Engineer.
3. That BRAZOS COUNTY reserves the right to require Applicant to
relocate or lower any such line at no cost to BRAZOS COUNTY, should same
become necessary due to widening or lowering, or other alteration of tits
roadway or right-of-way.
4. That BRAZOS COUNTY is in no way responsible for any damage that might
occur to any existing utility lines in tits right-of-ways
5. That the line will be constructed and maintained on the county right-
of way in accordance with governing laws.
6. That the line or lines will be constructed no less than forty-eight
inches (48") lower than the lowest part of tits drainage or bar ditch and
tits drainage is to be considered at least two feet (2') below tits center
of the roadway.
7. That all roads be bored to forty feet (40') on either side of the
centerline of the right-of-way or cased for such distance.
8. That all sites will be barricaded during construction period.
4. That the normal charge is $500 per crossing and/or $40 per rod when
paralleling the roadway established by tits Commissioners' Court on
January 28, 1905.
Construction of title line will begin on or after (date)
APPROVED BY COMMISZ>to ERS' COURT (Applicant) Ferguson Burleson County Gas
date approved) 7Y Gathering System
Brazot/ unty J ge Company Representat
Brazos County, Texas Telephone No. 409-'T75-3679
VOL. PAGE 1 Y_
on Burleson Co. Gas Gathering System
~n
; , 1
y
TEL No.4095421367 ----QPr . 3.92 8:26 P.02
WEEOON
PAOPOWD
M►if A
CROISINO OR ELM0 wupON ROAD is
NORTMBAIT - 71,04 FROM THE INTER9Ui10N
OF BNMO' WZBDON AND Rli. "WV- 30
NOW
T.N.M. IS 600 NAIL SET IN
T
1
0E OF
P
9496&
T S
g
0
M
NK.
A
TA.
WAV.
100 ASSUAIM
108
O
~
•
!
/14f1I//tAL
100
0
~
•
R~
t8
¢ VNI1L
NOs PERT a r/W4 AI
y "iWeg e,? T NK^l
Bo. 09` 001100.
Audw"e Oaf r{
800% SAO&#.
100
O N IYArWAL
J r► ~vp
ill
100 F
As^iwr
►AIL1• WR pip" Mt
b
0wim 110,1,. 1~.>ld
I . so.LE VEAT. 1 • 6
5 MIN. `O'MIN.
g p 'slut
PLAN A MOF/LE PROFILE
s0vow/MI
R. B. C. G. G. S.
PROPOSED CRasSiNC of aM0 WMPON ROAD
rd. ALCORN, A- 61
BRAZOS COUNTY, ?"ERAS
srmos ILLOW N0. TO _ MARY wwie-R N0. /
tio70-= C.L.M.
BRAZOS COUNTY TEXAS
NOTICE OF PROPOSED INSTALLATION IN COUNTY RICHT-OE-WAY
TO THE COMISSIONERS' COURT of Sum COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN, TEXAS 77803
FROHt RBI Type Instal~►tion, Road, Preeinet
Ferguson Burleson County Crossing Parallel Install.
Gas Gathering System Roadl A141AI TiVf.J ~OA/~
M• • Precinct Hoot _2&2
Formal notice is hereby given that ( ppli lit Ferguson Burleson Co. Gas Gathering System
proposes to place a (t 12e) L.~
pipeline within the right-of-way of Road
in Brazos County, Texas as followst
The location or description of the proposed installation is more fully shown
by three copies of the drawings attached to this notice.
Ferguson Burleson Co. Gas
SApplicent)Gathering System , understand and agree thatt
1. The County Engineer must be notified prior to tits beginning of
construction in order that they might be on hand to designate the actual
location of the installation.
2. That all damage to the roadways and rights-of-way will be repaired to
their original condition to the satisfaction of the County Engineer.
3. That BRAZOS COUNTY reserves the right to require Applicant to
relocate or lower any such line at no cost to BRAZOS COUNTY, should some
become necessary due to widening or lo"ring, or other alteration of the
roadway or right-of-way.
4. That BRAZOS COUNTY is in no way responsible for any damage that might
occur to any existing utility lines in the right-of-way.
5. That the line will be constructed and maintained on the county right-
of way in accordance with governing laws.
6. That the litre or lilies will be constructed no less titan forty-eight
inches (48") lower than tits lowest part of tits drainage or bar ditch and
tits drainage is to be considered at least two feet (2') below the center
of tits roadway.
7. That all roads be bored to forty feet (40') on either side of the
centerline of the right-of-way or cased for such distance.
8. That all sites will be barricaded during construction period.
9. Thtat the normal charge is $500 per crossing and/or $40 per rod when
paralleling the roadway established by the Commissioners' Court on
January 26, 1965.
Construction of this line will begin on or after (date)
APPROVED BY COMISSIO ERS' COURT (Applicant) Ferguson Burleson County Gas
date a roved 3B Gathering System
Brazo C unty J ge Cote ny a ntative
Braz a County, Texas To ep ne o. 409-T1'5-3679
n ~ ,
jj~
/
Ji 192 03:15PM SOUTHWESTERN GAS PL 9173258151 P.2
*
MORGAN RECTOR : MARIA KEGANS
AB-46 AB. - 28
A ~
.
N~ ~ D I
MARY
~'~sr
eEt wE~aE~ ~.,vE ► '
ERTY ON BOTH
JOfVES SIDES Olt J&VESfiV.
} ROAD
N17TE~ P/LOT HOLE WILL BE
NO GREATER THAN 1
2 "LARGER THAN THE
0. D. OF THE PIPELINE
INSTALLED. '
P
SCALE: 1 20
•a
Q
h
*5
ioo loo
1 { ` ~rrr l..p!I %1 ~.%~F1~1.' ♦~~t Niw.~1M i.. 1 1 111 11 1
IN 111 { tl 1 1 {~•11 ,N ,nsll. 1 M MI +♦N /M 1• 11*MI~AI~V.
.{t1~R1 .11•«•~.IY41~ 1 H 1.1 i
95 ` l
f~RDAD EO
1„1,~ ;•~N. ~s ~o
PROFILE
,
SCALE: HORIZ. - 1 20'
VERT. -110'
AN Q PROFILE
SHOWING
F. B.C.G. G. S
PROPOSED PIPELINE X-ING NUN JONES RD. 2.05 MILES S. E. OF ITS
INTERSECTION WITH F. M. 30 OUT OF THE MQRGAN RECTOR A8.- 46 Q
MARIA KEGANS SUR AB. -28 IN GRAMS COUWTY TEXAS S.
tU. P. R. C. JONES CARAWA Y Na / G-2/35J
f}fE - 62~~3s
V0 L PSG Z-o
ORAWWOWEN 31, MARCH 1"2