JULY 25, 1983
A special meeting of the Commissioners' Court of Brazos
County, Texas, was held in the Lecture Rehearsal Room of the
Brazos Center, 3232 Briarcrest Drive, Bryan, Brazos County,
Texas, beginning at 10 00 A M on Monday, July 25, 1983, with
the following members of the Court present
R J Holmgreen, County Judge, presiding
Bill J Cooley, Commissioner of Precinct 1,
Walter Wilcox, Commissioner of Precinct 2,
Billy E Beard, Commissioner of Precinct 3,
Milton Turner, Commissioner of Precinct 4
The first matter to come before the Court was the approval
of the Minutes of the Commissioners Court meetings held June 24,
1983 and July 11, 1983 On motion by Commissioner Cooley, second-
ed by Commissioner Beard the Court voted unanimously to approve
the Minutes as submitted
The next matter to come before the Court was the consideration
of the following bids
1 Relocation of fencing along FM 2818
Bidder Labor Material Time
a Billy F Adams 5 wire- 62 ft 883 50 -0- 30
Farm & Ranch 8 wire-t 72 ft t2,865 00 -0- 30
b Construction
Specialists,Inc.
c. Corgey & Sons
V0 AC IE 21af
SPECIAL MEETING
5 wire-1 66 ft $2,365 50
8 wire-1 94 ft $7,721 20
5 wire-$ 45 ft. 641 25
8 wire-$.50 ft ,1,990 00
I)
i
t,
1,050 35 55
2,925 44 55
1,000.00 10
2,900.00 10
a f ,
r
l
t
i
Ir _
1
d Associated Fence 5 wire-$ 75 ft $1,068 75 $1,100 00 30
8 wire-$ 95 ft $3,781 00 $3,518 40 30
i
e Bobby Hicks 5 wire $ 80 ft $1,140 00 $1,068 00 60
8 wire 1 00 ft $3,980 00 $3,075 00 60
1
' On motion by Commissioner Cooley, seconded by Commissioner Beard
the Court voted unanimously to accept the low bid of Corgey &
Sons in the amount of $641 25 for labor and $1,000 00 for materials
2 Priming or Seal Coating for County Roads
Bidder Priming Seal Coat
1 3 gal sq yd 3 gal sq yd - 4 gal sq yd
a Cox Paving $ 32 $ 75 $ 80
b Dean & King Paving $ 27 $ 55 $ 62
Company, Inc
On motion by Commissioner Beard,-seconded by Commissioner Cooley,
the Court voted to accept the low bid of Dean and King Paving Co-
pany, Inc The materials to be used by any Precinct
Next to be discussed was the Master Plan, Preliminary and
Final Plat of the Bryan Industrial Park, Phase I and Water Line
Construction Plans After discussion regarding the shaded area,
Commissioner Beard moved to approve the plat subject to the desi-
gnation of the shaded area as a road dedication and that the County
would be out no expense for relocation of utilities in the future
The motion was seconded by Commissioner Turner and carried unani-
mously
The Court next considered plans for the replacement of the
bridge across Wickson Creek on Dilly Shaw Tap Road in Precinct 2
On motion by Commissioner Wilcox, seconded by Commissioner Cooley
the Court voted unanimously to authorize the payment of funds at
such time as needed
On motion by Commissioner Cooley, seconded by Commissioner
A
Beard, the Court voted unanimously to approve an amendment to the
I 1983 Budget for the Health Department for car allowances, such
amendment not to exceed $4,300 A copy of the amendment is attached
I
i
I
VO~p~~~ a
t
The Court next considered a request from Ferguson Crossing
Pipeline for authorization to install a gas pipeline within the
following rights-of-way.
1. Scott Lane in Precinct 4.
2. Harris Road in Precinct 2.
On motion by Commissioner Wilcox, seconded by Commissioner Beard,
the Court voted unanimously to approve the request and to authorize
'the installation, subject to ascertaining that the fee for cross-
ing Harris Lane had been received. -
The Court next considered Change of Status for the following
employees:
Donald Wayne Ward
Stacy Scofield
Ronald Gene Huddleston
Rebecca Jean McPherson
Wanda Doloress Price
Valerie Ann Kent
Wilburn Harmon
Barbara Courser
Dana Lynn Horton
County Judge
Juvenile Services
Sheriff's Department
District Attorney's Office
District Attorney's Office
District Attorney's Office
85th. District Court
Tax Office
Tax Office
On motion by Commissioner Cooley, seconded by Commissioner Turner
the Court voted unanimously to approve the Change of Status as
submitted.
The Court next considered the following Claims as submitted
by the County Treasurer for payment:
General Fund
Revenue Sharing Fund
Community Resources Officer
Juvenile Commission Grant
Health Department
Capital Projects & Improvement Fund:
Prop. I
Road and Bridge - Shop
Road and Bridge - Precinct 1
Road and Bridge - Precinct 2
Road and Bridge - Precinct 3
Road and Bridge - Precinct 4
Adult Probation
County Attorney, Hot Check Fund
District Attorney, Hot Check Fund
Claims 6109 thru 6415
Claims 6417 thru 6422
Claims 6446
Claims 6447 thru 6448
Claims 6439 thru 6445
Claims 6416
Claims 6450 thru 6479
Claims 6480 thru 6515
Claims 6516 thru 6570
Claims 6571 thru 6618
Claims 6619 thru 6655
Claims 6423 thru 6431
Claims 6432 thru 6436
Claims 6437 thru 6438
The meeting was closed for executive session at 11:30 A.M. to
discuss personnel and reopened to the public at 11:55 A.M. with no
action taken.
There being no further business the meeting adjourned.
e
VO PAGE.
s
I'
9
I~
,
I~
I,
I~
~I
,mil-~<•. r- r.
~i ~
. ~t
+ ~ i
r
C
i
i
The foregoing minutes have been examined and approved in
i open Court this the -day of
19 13 , in Bryan, Brazos County, Texas
1
R o mgree
County Judge '
B o ey
Co ioner, P cinct 1
7 ~
1 `
~~'z a22~2/~~
Palter Wilcox 'BillyZj ear
Commissioner, Precinct 2 Commi ioner, Precinct •
Pt '
l' a
`I
Miltcfrf urnFran Borisk-Ed
j Commissioner, Precinct 4 County Clerk
1 ,
P
i
~I
P r
{
9
1
i
~f
4
i
oL PACK
earv • t n 'na'ir ~~r nr • k'
1 P ' Z
1 '
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENT FOR THE 1983 BUDGET YEAR
e '
J
#19 2
a
On this the 25th ay of July , 1983 , at a Regular
session of Commissioners Court th-e- o owing members were present:
R. J. Holmgreen - , County Judge
Bill J. Cooley , Commissioner, Precinct 1
Walter Wilcox
Billy E. Beard
Commissioner, Precinct a
1
, Commissioner, Precinct 3
Milton Turner , Commissioner, Precinct 4
E
The following proceedings were held:
THAT WHEREAS, on July 25, , 19 83 the Court heard and approved
a budget amendment or the egg, Bu get year for Brazos County, Texas. i
i±
WHEREAS, an emergency expenditure is necessary, due to grave public
necessity to meet unusual and unforseen conditions whtitch could not be
reasonably included in the original budget adopted November 30, 1983
the following amendement(s) to the original are hereby aut orized:
r;
Increase
Account No. DeEartment Reason Amount (Decrease)
E 10-47-8110 (Health Dept.) Adj. Car Allow. $4,300.00
I
1
a
. ~i
}
THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS
BY: C~
COUNTY JUDGE
PMW
X .71
.1
m r~ .,~~r, .v„ ~•r~-c Sri' r~r~ '
I
I
NOTICE OF PROPOSED INSTALLATION IN COUNTY R CH Wy
I
To the Commissioners' Court of BRAZOS County, Texas
Brazos County Courthouse
Bryan, Texas 77801
Formal notice is hereby given that FERGUSON CROSSING PIPE LINE COMPANY ,
Applicant, proposes to place a 4" Gas Line within the right-
of-way of Scott Lane and Collette Road in Brazos County, Texas as follows
The location or description of the proposed installation is more fully shown
by three (3) copies of the drawings attached to this notice
I understand and agree that
1 The Commissioner of the Precinct in which the right-of-way lies
must be notified prior to the beginning of construction in order,
that the Commissioner might be on hand to designate the actual
location of the installation
2 That all damage to the roadways and rights-of-way will be repaired
to their original condition to the satisfaction of the Commissioner
in which the roadway or right-of-way lies
3 That BRAZOS COUNTY reserves the right to require Applicant to relo-
cate or lower any such line at no cost to BRAZOS COUNTY, should
same become necessary due to widening or lowering, or other alter-
ation of the roadway or right-of-way
4 That BRAZOS COU14TY is in no way responsible for any damage that
might occur to any existing utility lines in the right-of-way
5 That the line will be constructed and maintained on the county right-
of-way in accordance with governing laws
6 That the line or lines will be constructed no less that forty-eight
inches (4$") lower than the lowest part of the drainage or bar ditch
and the drainage is to be considered at least two feet (2') below
the center of the roadway
7. That all roads be bored to forty feet (401) on either side of the
right-of-way or cased for such distance
8. That all sites will be barracaded during the construction period.
Construction of this line will begin on or after the 21 day of July
1983
Firm FERGUSON CROSSING PIPE LINE COMPANY
By: 4:
i
Title Belton Hightower, Senior Landman
II~~ I
Address P 0 Box 1166, Brenham, Texas 77833
1 Phone 409/836-6685
APPROVED BY COMMISSIONERS' COURT
Date:
T
~ r
VOCCPAGQS'
x. '
i
I
~ J
1
F.C.P.L.
`1371-BZ-P
SCOTT LANE b COLLETTE ROAD
RIGHT-OF-WAY
1
srt 1. )
PROPERTY DESCRIPTION
Part of the Abner Lee, Jr. Survey, A-31, of Brazos County, Texas, being
situated across a portion of the Scott Lane and Collette Road Right-of-
Way.
PIPELINE EASEMENT
The Pipeline Easement across the above described property having a
Centerline description as follows;
BEGINNING of reroute Survey Station 42 + 85.0 on a Ferguson Crossing
Pipeline going to the Bright Sky 11 Well 11311 in the Right-of-Way of Scott
Lane;
THENCE leaving said BEGINNING POINT N 14°55' W, 90.00 feet to Survey
Station 43 + 75.0 for an angle point;
THENCE N 23°10' W, 525.00 feet to Survey Station 49 + 00.0 for an angle
point;
THENCE N 46°15' E. 375.00 feet to Survey Station 52 + 75.0 for an angle
point;
THENCE N 07°26' E, 81.00 feet to Survey Station 53 + 56.0 being on the1
Northwest line of the said Collette Road Right-of-Way tract, for the
terminal point of this Easement, being 5.00 feet Northeast along said
Northwest Right-of-Way line of Collette Road from a 518" Iron Rod set
for a property corner at the intersection of F.M. 974 and the said
- ' Collette Road:
Covering 64.91 Lineal Rods
EXHIBIT "A"
July 20, 1983
f
VOj=PAGE&C~__r_
Q
AF 20027c BRAZOS COUNTY, TEXAS
a
ABIVER LEE- JR SURVEY A-31 a.
EQUATION C
STA 56 t 69- L
STA 55t 14--►
/ 155'T0 PIPELINE
/ STA53t~SR~Lne / '
r ~
' ~ r NO7°~ N09`~7 f 1 /
820~AGE- Y~ 5 1
~ STA 55,04P 0!d ST4 551!4 End Serve
AO,Ll m gonFrele Monamrnl, R 460
Sm49t00P/d-69°25 R1
ro, _ STA 54 t34Rd-01 41 Rl- i
N46°15 f ` STA 52,- 75RIA 38°49 U _
Jr / to Hw,c Mbnumenl
N2301OW
/ - - i - - -
/ X2221 ROOD40E 1897
STA 431_ 75PlAz08015L1_ / / f
42t85 0!°57 If B /17 A 14053 N - - -
c,,,, yRsrada !o Brvonl Std ~ `
Well-01- 1371 j / - - - - 4
/ o
- - - - - - - - - - - m - FD?WSbN QTC65ING RJPE'LIAE CO -
3 McM/rrey Petroleum
BRIGHT SKY RAN0Y WELL #1371
n n , ~E F a BRAZOS COUN rY TFXAS PCT# 4
J
y Q ae 6cl v ; Qq^VN8Y TLM DATE 718 83
d ~ d goo g 8 ` CNECWEO By o°r[
K' Ph
R4- u °rEli7/ BI P sue ! 307 SWEET
CAR-0MAC1U0 SU,-w , Inc
yy g~n(n hVhh h
NOTICE OFIPROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY
To the Commissioners' Court of BRAZOS County, Texas
Brazos County Courthouse
Bryan, Texas 778011
Formal notice is hereby given that FERGUSON CROSSING PIPE LINE COMPANY ,
Applicant, proposes!to place a r Gas Line within the right-
of-way of Harris Road in Brazos County, Texas as follows=
The location or description of the proposed installation is more fully shown
by three (3) copies of the drawings attached to this notice.
I
I understand and agree that:
1. The Commissioner of the Precinct in which the right-of-way lies
must be notified prior to the beginning of construction in order
that the Commissioner might be on hand to designate the actual
location of the installation.
2. That all damage to the roadways and rights-of-way will be repaired
to their original condition to the satisfaction of the Commissioner
in which the roadway or right-of=way lies.
I i
3. That BRAZOS COUNTY reserves the right to require Applicant to relo-
cate or lower any such line at no cost to BRAZOS COUNTY, should
same become necessary due to widening or lowering, or other alter-
ation of the roadway or right-of7way.
4. That BRAZOS COUNTY is in• no way responsible for any damage that
might occui to any existing utility lines in the right-of-way.
5. That the line will be constructed and maintained on the county right-
of-way in,accordance with governing laws.
6. That the line or lines will be constructed no less that forty-eight
inches (481') lower than the lowest part of the drainage or bar ditch
and the drainage is to be considered at least two feet (2') below
the center of the roadway.
7. That all roads be bored to forty feet (401) on either side of the
right-of-wi y or cased for such distance.
8. That all s tes will be barracadeld during the construction period.
i
Construction of this line will begin on or after the 12th day of July
1983 i
I
firm= FERGUSON CROSSING PIPE LINE COMPANY
By:
i tle: Belton Hightower. SeniQX Landman
ddresss P.O.
Box 1166
s
' i
Brenham, Texas 77833
Phone = 409/836-6685 `
APPROVED Y COMMISSIONERS' COURT
Da e: ~Iz
I
r
,
I
~ i
i~
i}
• I I~
VOIMPAGE p I `
• • j•' • 4• I• f \1 • C. I I r • • C r
1, Vu. r
• t I f I♦ • , • 1 I
y • • A
THE FOLLOWING
DOCUMENT
IS THE BEST IMAGE
POSSIBLE
DUE TO
THE POOR QUALITY
OF ORIGINAL
I~
I~
I ~
NJ 9
J
- 7
yF
M
t