Loading...
HomeMy WebLinkAbout1983-03-28-1000AM-Special•.y.t - .ice 1h,., ..y.._r-., - - .a.....:~~_..~., ..1-:~s.~t...~ _.J -ms~_~ _ _ _ __a....._ _ _ _ f.. J i 5 t COMMISSIONERS' COURT SPECIAL MEETING MARCH 28, 1983 d i 4 i i ~ f , 1 J ~ A special meeting of the Commissioners' Court of Brazos County, Texas, was held in the Lecture Rehearsal Room of the Brazos Center, 3232 Briarcrest Drive, Bryan, Brazos County, Texas, beginning at 10 00 A M on Monday, March 28, 1983, with the following members of the Court present R J Holmgreen, County Judge, presiding Bill J Cooley, Commissioner of Precinct 1, Walter Wilcox, Commissioner of Precinct 2, Billy E Beard, Commissioner of Precinct 3, Milton Turner, Commissioner of Precinct 4, Mary Ann Murphy, County Clerk's Office The following citizens and officials were in attendance John T Ayers Van Kinerd Mary Angela LeBlanc Clara N Hunter Diane Macfarlane Mark Smith Paul Rios Arnold Dittfurth C J Porterfield B V Elkins Greg Moses E A Wentrcek, Jr Jann Snell Mary Ann Ward Boys Club County Auditor TAMU Journalism 203 TAMU Journalism 203 Intern, County Judge's Office KBTX KBTX Auditor's Office Construction County Treasurer KTAM/KORA Juvenile Probation Department The Eagle County Clerk's Office The County Judge advised the Court that he had been requested to proclaim April 10 through April 16, 1983 as Boys Club Week in Brazos County The Proclamation was read aloud and on motion by Commissioner Wilcox, seconded by Commissioner Beard the Court voted unanimously to proclaim April 10 through April 16, 1983 as Boys Club Week in Brazos County The Court next considered the appointment of Dr John E Marsh,Jr as Reserve Deputy Constable for Precinct 4 On motion by Commissioner Beard, seconded by Commissioner Turner, the Court voted unanimously to approve the appointment voL-LY-PAGE~ 1 1 i i The Court next considered the following bids for the purchase of a mower-trimmer for Precinct 3 as follows: 1. Terrain King Corporation $7,500.00 2. Nickell Distributor $7,595.00 3. Export Equipment International $7,801.50 (Less 2% discount is paid on delivery) 4. Nickell Distributor $9,700.00 5. Tom Fairey Company 10,640.00 6. American Lift Truck & Tractor, Inc. 10,656.00 7. Turner International, Ltd. 11,396.00 On motion by Commissioner Beard, seconded by Commissioner Wilcox the Court voted unanimously to accept the bid of Export Equipment International and to authorize the payment on delivery. The Court proceeded to consider the following requests to utilize County rights-of-way- 1. Ferguson Crossing Pipeline Company proposed to install a 4 inch gas line across the right-of-way of Rock Prairie Road in Precinct 1. 2. Gulf Oil Corporation proposed to install a 6 inch gas gathering line in the right-of-way of Old Reliance Road in Precinct 3. They proposed to cross the road- way in two locations and to parallel the right-of-way a distance of 4495 feet. 3. Getty Trading and Transportation Company proposed to install a crude oil pipeline across the right-of-way of Marino Road and Boatcallie Road in Precinct 2. On motion by Commissioner Cooley,seconded by Commissioner Beard the Court voted unanimously to approve all requests as submitted and authorized the installation of all of the pipelines. A copy of all requests are attached. On motion by Commissioner Cooley, seconded by Commissioner Wilcox the Court voted unanimously to approve the Depository Con- tract with the First City National Bank for the 19$3-84 biennium. The Court next discussed a Construction and Maintenance Agree- ment for Bridge Replacement of the Wickson Creek Bridge and Carter's Creek Bridge, Such contract to be with the State Department of Highways and Public Transportation. After discussion and on motion by Commissioner Beard, seconded by Commissioner Turner the Court voted unanimously to authorize the County Judge to enter into con- tract with the Department of Highways and Public Transportation for T5EA:MQ&:bW 1 i , i r , , rF ra 1 the replacement of such bridges A copy of such contracts are attached hereto and made a part of these minutes The Court next considered Change of Status for the follow- ing employees Cathy Lightfoot Lori Fridel Cathy L Schulte Laura L Gray Mary Lynn Smalley Kenny Elwood Elliott Karen Carda Joan Shannon Christopher M Faulkner Elaine Marie Hanus District Attorney's Office Treasurer's Office Health Department Health Department Court Administrator Sheriff's Department Sheriff's Department Tax Assessor-Collector Sheriff's Department Tax Office On motion by Commissioner Cooley, seconded by Commissioner Turner the Court voted unanimously to approve the Change of Status as submitted The Court next considered the following Claims as submitted by the County Treasurer for payment General Fund Claims General Fund Claims Revenue Sharing Fund Claims Foster Care Claims Juvenile Commission Grant Claims Health Department Claims Capital Improvement Debt Service Fun Road and Bridge - Shop Claims Road and Bridge - Precinct 1 Claims Road and Bridge - Precinct 2 Claims Road and Bridge - Precinct 3 Claims Road and Bridge - Precinct 4 Claims 022 through 030 2004 through 2272 2274 through 2278 2292 through 2312 2313 through 2316 2281 through 2291 d - Claims 2273 2317 through 2329 2330 through 2346 2347 through 2371 2372 through 2387 2338 through 2407 On motion by Commissioner Cooley seconded by Commissioner Turner the Court voted unanimously to approve the Claism as submitted " 1 4 r t ry ! c f i i I The Court next considered a request from Richard Fronterhouse, Constable of Precinct 4, to transfer $300 from out of county travel fund i to office supplies On motion by Commissioner Beard, seconded by " Commissioner Turner, the Court voted unanimously to authorize the transfer and amend the budget accordingly A copy of such Budget i Amendment is attached Ernie Wentrcek, Chief Juvenile Probation Officer presented the l i Court with the Annual Report of the Juvenile Probation Department 1 l L~ 1 i I On motion by Commissioner Beard, seconded by Commissioner I Cooley, the Court unanimously approved the Official Bond of Ray I Truelove, as Constable of Precinct 3 and ordered that the Bond be recorded in the Official Bond Records of the County. The Court next considered the Preliminary Plat of Sandy Oaks in Precinct 4. Developer Clyde Porterfield presented the Court with a Right-Of-Way Dedication from Frank B. Stevens, et ex to Brazos County containing 3.27 acres and providing for a 60 foot right-of-way plus 16 foot utility easement for a distance of 1889.06 feet Such right-of-way would provide public access to the subdivision. Mr. Porterfield also agreed to provide a banis- ter for the bridge on the right-of-way, as well as the marking of the bridge. After much discussion Commissioner Wilcox moved to accept the Right-Of-Way Dedication and authorized the record- ing of the Road Dedication, subject to the Developer submitting the appropriate bond for the construction of the road and ap- proval of the Preliminary Plat The motion was seconded by Com- missioner Turner, with Commissioners Wilcox, Beard and Turner and County Judge voting "Aye," Commissioner Cooley abstained. The Court next heard a presentation from Jack Cumpton, Archi- tect on the progress of the Construction and Modification of the Courthouse Mr. Cumpton also submitted the following Change Orders for the Courts consideration 1. Change Order Number 1 upgrading the two air conditioning chillers, electrical efficiency from 0 75 KW/ton speci- fied to 0 61 KW/ton in the amount of $26,651 91 2. Change Order Number 2 for the replacement of the 17 origi- nal air handlers for a total amount of $55,543 41 3. Change Order Number 3 providing 24 over-under bunk walls in originally completed fail cells in the amount of $49,764 00 and to provide and install 24 over-under bunk walls in future expansion fail space in the amount of $65,033, or a total of $114,797 00 for Change Order Num- ber 3 4. Change Order Number 4 adding two, four inch roof drains and lines at new one story Phase lA building in the a- mount of $3,084.00 After much discussion the County Judge moved to approve Change Orders numbered 1, 3 and 4 for a total additional cost of $144,531.91. The I f . c r s I i t f E ti i i i t s9 r motion was seconded by Commissioner Beard with the County Judge, t3 and Commissioners Wilcox, Beard and Turner voting "Aye", Com- missioner Cooley voted "No", whereupon the County Judge announced the motion carried Mr Cumpton was directed to investigate the A replacement of the Air Handlers where the walls would be replaced yr by the remodeling and could be replaced properly A copy of the apptoved Change Orders are attached hereto There being no further business the Court adjourned . 1 I 3y t 1 +i 17 r r y Y ,I S w F~ ~S S r t J i ~7 4 vot IT PACE i i i c The foregoing minutes have been examined and approved in open Court this the 413y day of , 19,a, in Bryan, Brazos County, Texas. y 4 f,± 1. R. J mgreen i J o ey i ~r County Judge Commiss oner, Precinct r, I Walter Wilcox Bi y . Bear Commissioner, Precinct 2 Co sioner, Precinct 3 E I Milton Turner Fran Boris ie Commissioner, Precinct 4 County Clerk r I• f r ~ r r i ~ r • ~ A ~ DACE , . 0 r r i I ` NOTICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY ` To the Commissioners' Court of BRAZOS County, Texas h 5 Brazos County Courthouse A Bryan, Texas 77801 9 COMPANY Formal notice is hereby given thatFERGUSON CROSSING PIPE LING Applicant, i proposes to place a 411 G:js inP within the right-of-way of Rock Prairie Road in Brazos County, Texas as follows: i The location or description of the proposed installation is more fully shown by three (3) copies of the drawings attached to this notice.- ' I understand and agree that: 1, The Commissioner of the Precinct in which the right-of-way lies must be notified prior to the beginning of construction in order that the Commissioner might be on hand to designate the actual location of the installation. 2. That all damage to the roadways and rights-of-way will be repaired to their original condition to the satisfaction of the Commissioner in which the roadway or right-of-way lies. , 3. That BRAZOS COUNTY reserves the right to require applicant to re- locate or lower any such line at no cost to 13It1~'LU5 C'UUt4''Y, should came become necessary due to widening or lowering, or other alter- ation of the roadway or right-of-way. 4. That BRAZOS COUNTY is in no way responsible for any damage that might occur to any existing utility lines in the right-of-way. S. That the line will be constructed and maintained on the county righ \ of-way in accordance with governing laws. 6. That the line or lines will be constructed no less than forty-eight inches (48") lower than the lowest part of the drainage or bar ditc y and the drainage is to be considered at least two feet (2') below t the center of the roadway. 7 , 7. That all roads be bored to forty feet (40') on either side of the right-of-way or cased for such distance. 8. That all sites will be barracaded during the construction period. Construction of this line will begin on or after the _15thday of Marrh 1983 t a t , Firm: By gQ&r Title: Belton H Address: P.O. Box 1166 Brenham- TPxaa 77RRI Phone: 713/836-6685 APPROVED BY COMMISSIONERS' COURT Date: gad~l 2 F 9 &~~z Az C. 1 I' 'i I 4 I' f f~ 7@_a5DAr.E V 1 It 1 ~ ! rf afl 1 ~i~ rtl~i fa r .4 Yv ~t' a iT t~ r~ ~ ~ ' t r ~ ~ ' r lC., A,~ty S _ .~l~w4 1 ~Tf r ; I Si 5 - lk' ~ S a t j~ j AV 1'; r 1 r t µ J5r Y 1 v Y -1 i ~ ~ ; ) t + v \ } 1 f « I , 1 ~ J 4S tt~ ! f ~ f, rt l r l ,11 I n' y ^ j i ;J f trRl 4 1r r 3; 1 ~ ti 11 1 4 r 1} t f Y r 3. Sr r yy J r r 3 t t ~ ' f~ 1 11 r r 3 J ^ r t r ~ t.. r 5 1 t ! J J 1•r v Tr.0.7 Tr,41 Gti7 Gn o Cain soov Tr 13L1{ C1uPOrrr9 5.26.63 1e 7 mal C•14us w Ico f caawm) ` ~ Ctit~+nril a 9 2o•8II r a 2- 1 ~ hfo+PN.o 9 ?o-rII 7.29-61 ea pq 01 i .wm. Pr Co 1/ 9 fJL 1 CDC ~ 12- s,D atalbarfor 1 ~ r9ax f► 1 • Nf5 T Ramfrw I I Drr m fox fire Cgrp► r ] 6 pac Il=9aC ' r 1 Nurn Wang 77 7 r l To l w a... satrotoe 9 1 C1ta t .2G 31ot an SSarvSLO To o~l is-0t fro~oo V ~ c t ~ .:vay °r 0 0 QII Y.LCmsd(,oCd 6o+o•L~ 0 f 1J l • w lafcmen e Ti7 G JTHERS ~ OI D r.2 C1,110% 8e+.+ce {PS.CAT GotfP*tr ?jar 0-1"l 0 76~ A r^ , f, ~84 Gotmad JJ1 H.£,7.rta•orr Winn - " o !7.a L'`1« .z n Cloy rc ♦ AfAAttrrtu o ♦ , ret ` rNl ♦ 45at YQ E. ICafIY T f O4rwwaos • tattcluc a J 1 2-63 J G"Oltcc Tr.4 It0..Qc.pftd p~ 7~ (i!LM r t p - 0 KO, erllJu6 ti { r 4 21 04 rr 'fro 27~ F a atal i 61647 g ' ora 66 1 1 f A OY E G 69ar ~ p t r- Klink r 7 - cyt►w [ayi' 1 ' a a% G 6F Goaw k 7 m Trs^V O ....lrog 1 tCaaVkA Y t 1 ` d • teatteaao G.f Go$* t j -r. ~ r - r• S SBD {ta gtivv sor t> ~,,,c~s~,~cy Orw CwrtBclW • f Tats it r+ ToS f- f ~irlfr► a 1 `~a r - ` To.= G0-sfv..eo ti 'x4 g }~As~o LQ.lonrs o fttt0 G~ G 6- adr- S r tY.6f7 , AA. 9 1A 7x 5tct t C!mG - tJay~-0 ' - t r J a y, ""0- raw voce) ^ ' a +t'r r 1 ~++V r5 ~r«o f' T,~ ft~L>L04 Vw 2 E6'at ' bf 1.64 ` 08VO /2 i1~(,at9 t V Rdr 1 c ►y ryy P.1 Rm-hrYP r ~9 ~rot:rna+ti6[a: ! f O!Q K °I' 4 I 3 a •4:Ss< y~'1 s efc,c D%C.A Whey, aclooox o "Vat- 15 r 0 ~,ffia snr.rs t, 9' F~ ° : + z ~Z tir y 7.7 r 5 f (tlu0 F >r ,;y GyZ7gO-0D ~v `If fl7f tit lr 3> le ~°fi'74 ~v ryu .fit r as sf t r 7.'r o r 0.124 67~J !v 1 LK,'I,ottraJl;. 1 r N r •a'~ t ~y~ r 1` , t+ J ..r i1 I of..iy ~ ~ fJeto.7 F {j t>> ~ ~ ~ ~ ;'a ~ 1 c} 1 r t^T- T rn 1 nrb+ 1 t 1~ T 7.J 7kt t y f ~,5 7~C/3cs Llcrv~~~ ?9oL = o4 c On /4 r G"J r7. Vt. r 'Tr J~ Z• d~ t t - tp~}~ y to r c r * ' 46 1 ►tt+s °.nrtACa 2 +i oo OCCr-oO ,l m 9 , 1 t OOCxL r e S 2701 y ~r Jrt _ 00 ` e d~ sir DO Wao p i4 sa-ze p t.~yp~vs ? 2 r f 1 f h 1' e tL~ r Kiflld ' r' C+ra So..qIf con 7.391-0i G 'c.. N *r{ i lr r Qttt 1 r~ ^ p.f 9 -OI r o f ./R r ,T , 3 w T P o d ! 1 , Calm. C'tOwr, r C *L" servos s 1 r u~ _ ♦ GGCJuoe t 1 crteos Z v- 04 ~ S ~ * ~ ~ 6r Jr._ I a,'r f } _ c r f f r I ~ ~ W - r O0- o yore Tf 10 I P-all 1 w t'~~ ` ! ` 7^~ •r , ir' dnertDt ~~1~ hY ~iGbr-S0, Co R larp i - 1'X/dJ sr 1; y~ t~) 7 A~`b , Y A ~s7 re t 2 Ii104 - r ! r , fr `r'.J r 14 V ! ~1~ r ~ 1 r - ~ c7. L ~ ~ r~4 1IT t71~ ~ ,b.+`` T•. r h~ •l~ r 7..c f x r7. t ` r/lre+.~ r, J x yy04. J17. 7.+j B of aocs rope • O t t+esa.a r r pbif ~G 4, ^ n i l r r t. { M R,?c~h K + aCO~_ asa±be 1 lY, t~irr~'- ► - - - -r , .e . 1C y ,wj _s•lra~. , z V0, ~ VIEJ:W; r l r f1 `S p~ k 1 1 1 s r 1 ~r f~ 1 ti r J 1 I r { NOTICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY To The Commissioners' Court of Brazos County, Texas Brazos County Courthouse } Bryan, Texas 77801 s Formal notice is hereby given that Gulf Oil Corporation Applicant, proposes to place a f, G.is a--ither.ing Line within the right-of-way i lei ,y of ;U-++7rh,-liance Io-id in Bra70S County, Texas as follows Reliance Church Road J- Road crossing only r ' `c Installation parlleling the roadway a distance of 4495 feet { The location or description of the proposed installation is more fully ! shown by two copies of the drawings attached to this notice I understand and agree that , rr5 1, The Commissioner of the Precinct in which the right-of-way lies must r be notified prior to the beginning of construction in order that the Commissioner might be on hand to designate the actual location of the installation 2 That all damage to the roadways and rights-of-way will be repaired t to their original condition to the satisfaction of the Commissioner in which the roadway or right-of-way lies ` r~~ • r r 'x S' r ti 7 0 r 1 l t { 3 That BRAZOS COUNTY reserves the right to require Applicant to re- locate or lower any such line at no cost to BRAZOS COUNTY, should same become necessary due to widening or lowering, or other alter- ation of the roadway or right-of-way 4 That BRAZOS COUNTY is in no way responsible for any damage that migh' occur to any existing utility lines in the right-of-way 5 That the line will be constructed and maintained on the county right of-way in accordance with governing laws 6 That the line or lines will be constructed no less than forty-eight inches (48") lower than the lowest part of the drainage or bar ditch and the drainage is to be considered at least two feet (2') below the center of the roadway 7 That all roads be bored to forty feet (40') on either side of the centerline of the right-of-way or cased for such distance 8 That all sites will be barracaded during construction period 9 That the normal charge established by the Commissioners' Court is $RPO per crossing and/or $25 per rod minimum when paralleling the roadway Construction of this line will begin on or after the day of APPROVED BY COMMISSIONERS' COURT Date 3 Fee Received Date Amount Q Firm Gulf O Co ra on By Title Senior Production Supervisor Address P O Box 17 Kurten, TX 77862 Phone 409-589-2514 or 589-2220 ~OIMPAGE L3t s 7, 41 ` •auo. ~ co ♦ 1, i~ Cw•v~•o•~ iJ / + Ie% d, do op J. % OF i % 41 40' % 1# 0. 4, 1 / ~ ♦ / I. rr•M S ` - i~ wo-f 'y It J# 14 crN tea • p / 11 % ♦ % > ! r ♦ toll . ♦ n V 1 44 4 Av% too N\ Ile 00, % ILI % ` h ~y • fl'1 ~ ~iJ~, _ ~ 'J,~O.~t.-°•` Qow;~l . 1 •4 % % of COLLEGE STATION `~`F. ! j pi'd % Lot* % • ! ``~yl ~•-„c'~, w1 •4 1 ~ 1 r \ tit 4 1 I \ ~,j'~ y f \ JJ ~j ♦ ,r t.... 1,5 00 -ij Co. 00P ELL@CP4 PEACM CAM ' /1 ~ ~ 'tea ~~~%X/1 ri ~ V r ~ ~ - - ~ ~ ~ , L i1 AGE. 1r4 5 S~ 1pi~ r.J11 .r e 1~ Z~rFf 1 J I t tl K~ l f AT-10 oArs s1cMT After March 15 „$3 ~ SHE A OF COMMISSIONERS COURT OF BRAZOS MUM, TEXAS ~ - - - - - Eight thousand Three hundred Ten and 60/100 - ~ 1~a i~- - - $ 8, 310 60 - - - IN FULL PAYMENT FOR execution of a Right-of-Way Agreement dated March 15. 128, covering all of Payee s ° full interest in said right-of-way, consisting of 4495 feet, more or less, also for the right to I extend pipeline right-of-way across four separate Public Roads 4 1 ACCOUNT ANALYSIS FACILIT Y REFERENCE I1 REFERENCE 02 AFU STATE S/A OP t 77 NI 711 12 71 If 71 7f >e~ 71 77 71 If /9 11 17 11 11 17 tt 11 11 If SO $I 77 131 134 11 K 71 U 7f Ia it 11 11 N = Ti 71 n to 11 i 17 If i 11 1 11 11 I At i+ I 1 -1 - ± - _ T ~ - L TO GULF OIL CORPORATION I P O Box 1079 / 1 HOUSTON TEXAS 77291 / COLLECT TE'XASOMMERCERBANK MA 1:1130006091: 18918190►.611' illy k ~~„u1X +IX I a HOUSTON TEXAS J Il r i r J .1 1 a+ t A f f 1 ~ i. ~ 1 1 1 ~ i I S of f 1 L A D a fj• F1 r D As J- t 1 NOTICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY To The Commissioners' Court of Brazos County, Texas Brazos County Courthouse Bryan, Texas 77801 tation Co. • Formal notice is hereby given thatGetty Trading $ Transpor- , Applicant, proposes to place a Crude Oil Pipeline within the right-of-way of Marino Road in Brazos County, Texas as follows: Road crossing only. _ Installation parlleling the roadway a distance of feet.. The location or description of the proposed installation is more fully shown by 2 copies of the drawings attached to this notice. I understand and agree that: 1. The Commissioner of the Precinct in which the right-of-way lies must be notified prior to the beginning of construction in order that the Commissioner might be on hand to designate the actual location of the installation. 2. That all damage to the roadways and rights-of-way will be repaired to their original condition to the satisfaction of the Commissioner in which the roadway or right-of-way lies. 3. That BRAZOS COUNTY reserves the right to require Applicant to re- locate or lower any such line at no cost to BRAZOS COUNTY, should r, same become necessary due to widening or lowering, or other alter- ation of the roadway or right-of-way. 4. That BRAZOS COUNTY is in no way responsible for any damage that might occur to any existing utility lines in the right-of-way, 5. That the line will be constructed and maintained on the county right- of-way in accordance with governing laws. 6. That the line or lines will be constructed no less than forty-eight inches (48") lower than the lowest part of the drainage or bar ditch and the drainage is to be considered at least two feet (21) below the center of the roadway. 7. That all roads be bored to forty feet (40') on either side of the centerline of the right-of-way or cased for such distance. 8. That all sites will be barracaded during construction period. 9. That the normal charge established by the Commissioners' Court is $5.00 per crossing Pnd/or $25 per rod minimum when pazalleling the roadway. Construction of this line will begin on or after the 12thday of _ April . 1983 APPROVED BY COMMISSIONERS' COURT 'i Date: 3 1AP-htl .5 5 Fee Recei ed: , Date* Amount: [ - Firm:GETTY TRADING & TRANSPORTATION CO. By: William A. Decker Title:-Staff Engineer Address:P. 0. Tox 5568 Denver, CO 80217 Phone: 303 866-0305 I~ , t r ~ i , ~ r . T ~ f ~ ~ r. I FL II r ~Y STEPHEN F AUSTIN LEAGUE NO 101 4e ABSTRACT No 63, BRAZOS CO , TEXAS o \ 186' BOO 177 ' a v' to ~064~~ 0 Pfoposed 6" Pipelines Proposed 10" Pwr Pole (TBMI PLAN 1"a20' T9 M - 60d Nall in Pwr Pole 29' Rt of Sto 29f30 Assumed Elev 10000 4 b Or 10 ~ 0 o` 10 O 3 pi o w W ~ W m° .bnt W/Wormnp Sig" (Typ) Natural Ground co ~ 10 60 o m o 1 100 a N 0 a 1 1 ' - 100 vo uv Getty Trading and Transportation Company PO Box 5568 TA N Min (Typ) 4 I ae in in Denver, Colorado 80217 95 - 95 4' Min.(Typ) PROPOSED 6i' PIPELINE CROSSING ` FCOw ® ~--I Min (Typ) MARINO ROAD s o 16 6" Carrier 10 Casi ng Pipe 90 ' A i Insulators at 10 0 Centers - S BRAZOS COUNTY, TEX ATE DW6 NO r I I I~ I~ 1 I I Seal Both Ends PROFILE DWN BY DATE " 4683 CKD BY 0 ' VER 1" 2 10' scAlE i 'a HOR 1" =20' SHOWN } PREPARED BY JEFFRI ES a ASSOC INC TULSA OKLAHOMA l~ Ii t a 0 N34OX'W /-.own FLOW `.•:1.=~u==~L. ` I - EN F. AUSTIN LEAGUE NO. Wa I ABSTRACT NO. 63, BRAZOS CO., TEXAS i r SI 0, ~I F of m~ a 0: a W 0 m m N 9 W. 0 c `o f MI ar FLOW 90 r 10 Cosm Plpe Imutatore of 10*0"Centers Seal Both Ends PROFILE VER I:10' HOR. 1" -20 I I r I~ I Natural Ground t00 \ 95 PLAN 1- OI TB M.- 60d Norl in Pwr Pole 29' RL of Sto 2900 Assumed Elex 100.00 m°I p- Wnt W/Wormnq Signs (Typ.) to 4. N 100 0 4! Min (Typ.) a 195 I' Min (TyR) 90 I I= t i Cou Getty Trading and TronsportotNm Compon~ PO Box 5568 TA. Denver, Colorado 80217 Ur I PROPOSED 6!' PIPELINE CROSSING Q MARINO ROAD BRAZOS COUNTY, TEXAS DwN~a DATE CKD eY DATE D.. vim p 4.6.83 y SCALE SHOWN PREPARED DY JEFFRIES 6 ASSOC.. INC, TULSA, OKLAHOMA - 0 ( 4 1 82 } f NOTICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY r ~ r z , To The Commissioners' Court of Brazos County, Texas Brazos County Courthouse f' Bryan, Texas 77801 J tation Co Formal notice is hereby given thatGett Trading & Trans or-, Applicant, proposes to place a crude oil pipeline within the right-of-way vrr of Roatcall,e Rd, in Brazos County, Texas as follows , , -X Road crossing only _ Installation parlleling the roadway a distance of feet " The location or description of the proposed installation is more fully shown by 2 copies of the drawings attached to this notice f I understand and agree that { 1 The Commissioner of the Precinct in which the right-of-way lies must T' be notified prior to the beginning of construction in order that r the Commissioner might be on hand to designate the actual location of the installation 2 That all damage to the roadways and rights-of-way will be repaired to their original condition to the satisfaction of the Commissioner in which the roadway or right-of-way lies t~ 3 That BRAZOS COUNTY reserves the right to require Applicant to re- locate or lower any such line at no cost to BRAZOS COUNTY, should same become necessary due to widening or lowering, or other alter- ation of the roadway or right-of-way • 4 That BRAZOS COUNTY is in no way responsible for any damage that might occur to any existing utility lines in the right-of-way 5 That the line will be constructed and maintained on the county right- of-way in accordance with governing laws F n a a , { 6 That the line or lines will be constructed no less than forty-eight inches (48") lower than the lowest part of the drainage or bar ditch and the drainage is to be consideredtat least two feet (2') below the center of the roadway 7 That all roads be bored to forty feet (40') on either side of the centerline of the right-of-way or cased for such distance 8. That all sites will be barracaded during construction period If it , 9 That the normal charge established by the Commissioners' Court is $5:00 per crossing and/or $25 per rod minimum when paralleling the roadway Construction of this line will begin on or after the 12th day of April , 1983 f APPROVED BY COMMISSIONERS' COURT 4 Date: YA t q ~3 z , Fee Receive { Firm GETTY TRADING & TRANSPORTATION CO By William A Decker Title Staff Engineer Address P 0 Box 5568 ( Date Amount Phone j Denver, Colorado 80217 303 866-0305 x I li 'Rood x~ STEPHEN F. AUSTIN LEAGUE NO. IOp ABSTRACT NO. 63D BRAZOS CO., TEXAS 0 I/2 I P 3/B 1 P '.1 105 100 95 90- I • f ra 8 _'A 4 to Pole Qty x a~ 0 A+ I 1 1 R Co°tT 5 BSe C1 p/ F p ;r~ Proposed 10 Caste 3~ 6 pipe r u+ ~2a W' N478 a UnB ~ V' pEO0°5ed 85 1N 0 30• +f c ,4 x~gdp o1 1\ 0 tv ,~t !4. A Vin x p' 10 o 1 a A o n w81 1 f V J p 1 PLAN I" • 20 or m « «I O RI Oi 0 M~ co O W W Q Co. aT l N N O W L-0 Natural Ground -T- + W) I m M I M \ 4 Min N M \ -///AV//AX//A\ 3I N' Vent W/ Warning Signs (Typ) a M 4 Min rrA Y/\ \'AI 4 Min (TYp) - FLOW 10" Casing -Pipe -Insulators at 1Q*01, Centers- Seal Both Ends PROFILE VER. I : 10 HOR I° = 20' I' Min (Typ) f~ I TB M - 60d Nail in Pwr Pole 84 Lt of Sto 3142 Assumed Elev 10000 105 IDO GETTY TRADING-& TRANSPORTATION CO. 95 PROPOSED fi" PIPELINE CROSSING 90 BOATCALLIE ROAD BRA20S COUNTY, DWN BY DATE CKD By DATE DWG NO ej 3.15'83 JT 3.15.83 SCALE SHOWN PREPAPED Br JErrwES 8 ASSOC$ INC. TULSA, OPLAN'002 TEXAS I i i ~I @1 n tl ;I I.. ~oaa Sobot ~0 1 1/2 1 P- 3/8 1 P 84 to Pole avto Ppq / m, ~ 0 1 B TBM \ A ° O N ooocel LIP i A $ ( 1 ° C 0+f- Proposed 10 Casing 1~- ~3 5 p,pelit1e . - - - sea 6 J r N w X203 W N47°38 B S 0 t o 910910 IA x/ 'OWp NI ~ 1 0 1; ~ ~ A ~ a v / a0 0 1 N 1 1 ~ n ` n ~1 f 0 m ° . PLAN 1 20 105 Natural Ground 100 Y 95 , FLOW 90 -1. ~ s+~r I ~ Y---~.L.Lt STEPHEN F AUSTIN LEAGUE NO 10, ABSTRACT NO 63, BRAZOS CO, TEXAS 511 ~ u V V O a; V O M O O p C \ M co im 'a LU ~I 9 W CD D N ~r N T O { co _ L-0 N Vent W/Warning Signs (Typ) 1 / F-0 4 M co In ro W) 0 PO r- in N 4 Min 4 Min (Typ ) /LL iv casing Pipe IrlInsulators at 100 Centers Seal Both Ends PROFILE VER 1 10 HOR 1 20 TB M - 60d Noil in Pwr Pole 84 4f of Sto 3142 Assumed Elev 10000 f _ 13 1 a l i F GETTY TRADING F, TRANSPORTATION CO PROPOSED 6 PIPELINE CROSSING BOATCALLIE ROAD BRAZOS COUNTY, TEXAS It DWN By DATE CKD BY DATE OWG NO 3 15 83 JT 3 15 63 SCALE SHOWN I I i t i PREPARED BY JEFFRIES 8 INC_ TULSA OKLAN)4A,^ m„~_r..~-rr. `..y..4,..,~ .,,r_~~ , ' x ~ x ' S ~..n~►..~--c--~'~t~ ^•'^~c f~~„ ~ . n'_' { """r°'~'~'~ ~ a ty 105 100 95 90 r ti { y t ' 1 {I CONSTRUCTION AND MAINTENANCE AGREEMENT FOR BRIDGE REPLACEMENT OR REHABILITATION OFF THE STATE SYSTEM THIS AGREEMENT, made this 7 t/7 day of _X6-7e ` 1983, by and be- tween the State Department of Hig wah ys and Public Transportation, Party of the First Part, hereinafter called the "Department", and Brazos County, a local government, or governmental agency or entity, Party of the Second Part, hereinafter called the "Governmental Agency" acting by and through its County ° Judge and by virtue of the authority shown on Exhibit A attached hereto and made a part hereof. WITNESSETH WHEREAS, the, Governmental Agency is owner of a bridge located on a public road or street within its jurisdiction at Hopes Creek on Co. "Rd. 254 0.5 Mi. West of Co. Rd. 218; and at Carters Creek on Co. Rd. 184 2.2 Mi. South of SH 30; and WHEREAS, under Title 23, United States Code as amended by the Surface Transportation Assistance Act of 1978 and subsequent Federal legislation, a program entitled 1983-84 Federal-Aid Bridge Replacement and Rehabilitation Program has been approved by the State Highway and Public Transportation Commission and said bridge is included in this program; and WHEREAS, it is incumbent 'upon the Department to assure accomplishment of this work. - AGREEMENT d NOW, THEREFORE, in consideration of the premises and of mutual covenants and agreements of the parties hereto to be by them respectively kept and per- formed, as hereinafter set forth, it is agreed as follows: I 1. The Governmental Agency hereby authori;es the Department or its contracted consultant and Department's contractor to enter on the site of said bridge and adjacent right of way or relocation right of way to perform surveys, inspection, construction and other purposes necessary to replace or rehabilitate said bridge and approaches. 2. The Governmental Agency agrees to provide, at its expense, the necessary adjustment of any and all utilities and services, whether publicly or privately owned, as may be necessary to permit the work authorized herein. Existing utilities will be adjusted in respect to location and type of installa- tion in accordance with requirements of the Department. i L F is l . 1,1 ~i f 0 1 - .C~"~..t3•.~Y'"„°""'°+,~,idFW~~~ ,c: "art ~,-~woot ."~'~~:.+.a: a r.4 are_.~,...ai r 5 , ~Y F~ A 1 ~ it Ip {lppp 4 ~ a r~ ,w k r , , V J` I , "i 1 h , ic, _~r qj 1. ii 1 t 1 I - I r 3 The Governmental Agency agrees to provide 20% of the actual construc- tion cost of the bridge replacement or rehabilitation project including prelimi- nary engineering and construction engineering and agrees to acquire at its expense any additional right of way, if required Forty-five days prior to the date scheduled for the contract letting the Governmental Agency agrees to pay to the State, by check made payable to State Treasurer Account of Trust Fund No 927 an escrow amount equal to 20% of the estimated cost of the project including preliminary engineering If, after receipt of bids, or at any time anticipated expenditures exceed the amount on deposit, the Governmental Agency upon request of the State shall promptly remit the requested amount representing tt,rir pro- rata share Any excess funds on deposit will be reimbursed to the Governmental Agency upon project completion 4 If prior to receipt of the escrow payment, the Governmental Agency elects to terminate the project, the Governmental Agency shall reimburse the State for those eligible expenses incurred which are attributable to the pro- ject 5 The Department will prepare or provide for the construction plans, advertise for bids and let the construction contract, or otherwise provide for the construction and will supervise the construction or reconstruction as required by the plans The cost of all services performed by the Department will be borne by others It is mutually agreed that as the project is developed i to the construction stage, both parties shall approve the plans by signature approval thereon, and a copy of such plans will be attached hereto, marked "Exhibit B", and made a part hereof 6 In the event the terms of this agreement are in conflict with the pro- visions of any other existing agreements and/or contracts between the Governmental Agency and the Department, this agreement shall take precedence over the other agreements and/or contracts 7 Upon completion of the project, the Governmental Agency agrees to accept ownership and operate and maintain the facility authorized by this agreement for the benefit of the public without charge 8 The Governmental Agency agrees to indemnify the Department against any and all claims for damages to adjoining, abutting or other property for which the Department is or may be liable arising out of, incident to or in any manner associated with or attributed to the project t 14 -2- s V®L_7Q-PAGE17~(/ t , a i i 1 ti 51 IN TESTIMONY WHEREOF, the parties hereto caused these presents to be exe- cuted in duplicate on the day above stated. PARTY OF THE SECOND PART PARTY OF FIRST PART Certified as being executed for the purpose and effect of activating and/or Brazos Count carrying out the orders, established Name o Governmental Agency policies, or work programs heretofore approved and authorized by the State Highway and Public Transportation Commission: By C' Count Judge Title o Executing Official ATTEST Title t By 7 Q, a _ J 4 ` 7- 83 Executed and approve forVSt~eiFghw"a~ and Public Transportation Commission under authority of Commission Minute Order No. 18501, dated May 20, 1981. RECOMMENDED FOR APPROVAL' District g neer Zt. a, 0. x- ie Engineer, Highway Design .f Br ge g neer ,I } ,a ii r s t Y t~ a -3- V6M A n r tffe, d ' J ~ ~L ~~.....wr-~v~- •,2,•- ~^..+M.".~ro.r-.e,.- , ~ •"~~.o.tioc~..t:. 'r'+ ,.....a-~S' :.a Ste, r~.'^'.."-'..x,'13... _ ,x~~:._~..... 1-.~~1 ~...~.,e-+.~''~ t n: r ~t 11 1- 1 r t F 1 ~ l r! Y •l I G. of ! i RESOLUTION AUTHORIZING COUNTY JUDGE TO SIGN A CONSTRUCTION AND MAINTENANCE AGREEMENT FOR BRIDGE REPLACEMENT THE STATE OF TEXAS § Bryan, Texas COUNTY OF BRAZOS § March 28 1983 MOTION was made by Commissioner Bill Beard and seconded by d Commissioner Mi ton Turner that the Comm-issioner's Court of Brazos County authorize the County Judop to sign the Construction and Maintenance Agreement for the improvement by the State Department of Highways and Public Transportation on the roads described below Replacement of the Hopes Creek Bridge on County Road No 254 0 5 Mi West of Co Rd 218, and Replacement of the Carters Creek Bridge on County Road'No 184, 2 2 Mi South of SH 30 VOTE on the motion was as follows All voted "Aye" h w WHEREUPON the motion was declared carried t THE STATE OF TEXAS § COUNTY OF BRAZOS § I hereby certify that the foregoing is a true and correct copy of order passed bthe Commissioners' Court of Brazos County, Texas on the 28th day of Nta , 1983 1 ~ Clerk of County Court Brazos County, Texas ! i Q 1 ~ i 1 M~ I 1 Fi It r ~ Y V ~ ~ r i rl•,1 r, 7 . ' 1 -,f 1 CONSTRUCTION AND MAINTENANCE AGREEMENT << FOR BRIDGE REPLACEMENT OR REHABILITATION OFF THE STATE SYSTEM THIS AGREEMENT, made this 76 day of 1983, by and be- tween the State Department of Highways and Public Transportation, Party of the r'= First Part, hereinafter called the "Department", and Brazos County, a local government, or governmental agency or entity, Party of the Second Part, hereinafter called the "Governmental Agency" acting by and through its County Judge and by virtue of the authority shown on Exhibit A attached s. hereto and made a part hereof. ' ur W I T N E S S E T H ! WHEREAS, the Governmental Agency is owner of a bridge located on a public road or street within its jurisdiction at Wickson Creek on Co. Rd. 165 4.0 Mi. NE of SH 30; and on Carters Creek on Co. Rd. 1697.6 Mi. SW of FM 2038; and ~ WHEREAS, under Title 23, United States Code as amended by the Surface 1 Transportation Assistance Act of 1978 and subsequent Federal-- legislation, a program entitled 1983-84 Federal-Aid Bridge Replacement" and Rehabilitation Program has been approved by the State Highway and Public Transportation Commission and said bridge is included in this program; and. WHEREAS, it is incumbent upon the Department to assure accomplishment of this work. A G R E E M E N T m NOW, THEREFORE, in consideration of the premises and of mutual covenants and agreements of the parties hereto to be by them respectively kept and per- formed, as hereinafter set forth, it is agreed as follows: 1. The Governmental Agency hereby authorizes the Department or its contracted consultant and Department's contractor to enter on the site of said bridge and adjacent right of way or, relocation right of way to perform surveys, inspection, construction and other purposes necessary-to replace or rehabilitate o said bridge and approaches. b 2. The Governmental Agency agrees to provide, at its expense,, the necessary adjustment of any and all utilities and services, whether publicly or f privately owned, as may be necessary to permit the work authorized herein. Existing utilities will be adjusted in respect to location and type of installa- tion in accordance with requirements of the Department. Ltp VUL-V FA y, k jrN i 1V X {A ryye !f . 'r1 to 4 4 i l 3 The Governmental Agency agrees to provide 20% of the actual construc- k tion cost of the bridge replacement or rehabilitation project including prelimi- nary engineering and construction 'engineering and agrees to acquire at its expense any additional right of way, if required Forty-five days prior to the date scheduled for the contract letting the Governmental Agency agrees to pay to the State, by check made payable to State Treasurer Account of Trust Fund No 927 an escrow amount equal to 20% of the estimated cost of the project including ° preliminary engineering If, after receipt of bids, or at any time anticipated expenditures exceed the amount on deposit, the Governmental Agency upon iequest of the State shall promptly remit the requested amount representing their pro- rata share Any excess funds on deposit will be reimbursed to the Governmental Agency upon project completion 4 If prior to receipt of the escrow payment, the Governmental Agency elects to terminate the project, the Governmental Agency shall reimburse the State for those eligible expenses incurred which are attributable to the pro- f Sect 5 The Department will prepare or provide for the construction plans, advertise for bids and let the construction contract, or otherwise provide for { the construction and will supervise the construction or reconstruction as required by the plans The cost of all services performed by the Department will be borne by others It is mutually agreed that as the project is developed to the construction stage, both parties shall approve the plans by signature approval thereon, and a copy of such plans will be attached hereto, marked "Exhibit B", and made a part hereof , 6 In the event the terms of this agreement are in conflict with the pro- visions of any other existing agreements and/or contracts between the Governmental Agency and the Department, this agreement shall take precedence i over the other agreements and/or contracts 7 Upon completion of the project, the Governmental Agency agrees to accept ownership and operate and maintain the facility authorized by this agreement for the benefit of the public without charge 8 The Governmental Agency agrees to indemnify the Department against any and all claims for damages to adjoining, abutting or other property for which the Department is or may be liable arising out of, incident to or in any manner associated with or attributed to the project n Y J t • ~ t Y f I ~ fi -2- VOLTPACEttE r' r i l a r IN TESTIMONY WHEREOF, the parties hereto caused these presents to be exe- cuted in duplicate on the day above stated. PARTY OF THE SECOND PART PARTY OF FIRST PART Certified as being executed for the purpose and effect of activating and/or Brazos Count carrying out the orders, established I~ Name o overnmenta Agency policies, or work programs heretofore I, approved and authorized by the State Highway and Public Transportation Commission: By: Y 1 , By: r rputq EnSk~s/-Wredol Count Jud ~e Executed and approv or Sta ghway Title o Executing Official and Public Transportation Commission under authority of Commission Minute Order No. 78501, dated May 20, 1981. I ATTEST:" RECOMMENDED FOR APPROVAL: 'I ' 1striclGyt/fF e e r Title Chief' Engineer, Highway DesignL.•0- I Br g Engineer 1 - 1 IP ' I , i r' I 7 \ ' , 1 C r . r , i l x AI LO K FF F h e k r, F r r F! r i i t 9ESOLUTION AUTHORIZING COUNTY JUDGE TO SIGN A CONSTRUCTION AND MAINTENANCE AGREEMENT FOR BRIDGE REPLACEMENT Y VOTE on the motion was as follows All voted "Aye" WHEREUPON the motion was declared carried. THE STATE OF TEXAS § COUNTY OF BRAZOS § I hereby certify that the foregoing is a true and correct copy of order passed the Commissioners' Court of Brazos County, Texas on the 28th day of 1983 Clerk of County Court Brazos County, Texas i E THE STATE 9F TEXAS § Bryan, Texas COUNTY OF BRAZOS § March 28 , 1983 MOTION was made by Commissioner Bill Beard and seconded by Commissioner Milton Turner that the Commissioner's Court of Brazos County .t authorizes the County Judge to sign the Construction and Maintenance Agreement for the upprovement by the State Department of Highways and Public Transportation on the roads described below Replacement of the Wickson Creek Bridge on County Road Ao 165 4 0 Mi NE of SH 30, and Replacement of the Carters Creek Bridge on County Road No 169, " 7 6 Mi SW of FM 2038 4 i r BRAZOS COUNTY, TEXAS BUDGET AMENDMENT FOR THE 1983 BUDGET YEAR Qn ibl.4 'the 28th day of March , `,1183, at a Sp@cial sei6sa.on of 93mm14sioners Court the o owir members were present: H ~ R HOLMQEEN County Judge l u n , , r f , BILL J COOLEY , Commissioner, Precinct 1 WALTER WILCOX , Commissioner, Precinct 2 1 y r, BILLY E BEARD , Commissioner, Precinct 3 MILTON TURNER , Commissioner, Precinct 4 ,The following proceedings were held, THAT WHEREAS, on March 28 1983 the Court heard and approved a budget amendment or t Re 1983 Budget year for Brazos County, T6xas. WHEREAS, an emergency expenditure is nece$sary, due to grave public necessity to meet unusual and unforseen conditions which could not be reasonably included in the original budget adopted the following amendement(s) to the original are hereby authorized Increase Account No Department Reason Amount (De rease)' Constable o Re-allocation 10-55-5529 Precinct 4 of funds (Out of Co. Travel) (inn) 10-55-5210 (Office Supplies) 30n ift ParE THE C ISSIQNF.,~iSt COURT OF BRAZOS COUNTY, TEXA$ BY zG o COUNTY JUDGE _ T ?f - a v - om--~S~ i = 1 m'. r r.--- . ~•T' ~r rte' w.4 JIL r -}n n i ' r t k , /r f 4 Y 11 r I i 1 1 C CHANGE OWNER ARCHITECT NTRACTOR S ORDER CO A/A DOCUMENT 0701 FIELD 0 OTHER , PROJECT Modifications and Additions CHANGE ORDER NUMBER one (1) (name, address) to Brazos County Courthouse TO (Contractor) ARCHITECT'S PROJECT NO 1977-106 Utley James of Texas, Inc '4I Post Office Box 26068 CONTRACT FOR $7,026,090 00 Austin, Texas 78755 L I CONTRACT DATE Novemver 22, 1982 You are directed to make the following changes in this Contract , Upgrade the two (2) air conditioning chillers, electrical efficiency from 0 75 KW/ton specified to 0 61 KW/ton Add . . . . . . . . . .$26,651 91 , r r ! Y ~ ti , r t r f -r'i L ti1, ~h 'f c, i a ~ U , O The original Contract Sum was f 7 , 026 , 090 00 Net change by previous Change Orders $ -0- The Contract Sum prior to this Change Order was $ 7,026,090 00 The Contract Sum will be (increased) (deereex4 (»nehenged) by this Change Order $ 26,651 91 The new Contract Sum including this Change Order will be $ 7,052,741 91 The Contract Time will be (IRQ.FQaG8j (440GAIM061) (unchanged) by ( 0 ) Days The Date of Completion as of the date of this Change Order there rip is March 20, 1984 Jack W Cumpton S Assoc , Inc. Utley James of Texas, Inc Brazos County Texas / 81TEK Texas Ave , 0202 PNTOATox 26068 Yrazoa County Courthouse Address Address Address Br 77 1 Austin, Texas 787SS Bryan. Texas 77801 BY BY 13< rch 29, 1983 DATE DATE March 29, 1983 i AAA DOCUMENT 0701 CHANGE CIRF)FR APRII 197fl FniTicim . AIAdb r dh +e7n TUC L r f ~i , r f i r ~ t CHANGE OWNER ARCHITECT ' ORDER CONTRACTOR FIELD ❑ I. AIA DOCUMENT G701 OTHER PROJECT: Modifications and Additions CHANGE ORDER NUMBER: three (3) (name, address) to Brazos County Courthouse TO (Contractor) ARCHITECT'S PROJECT NO: 1977-106 7 Utley James of Texas, Inc. Post Office Box 26068 CONTRACT FOR: $7,026,090.00 Austin, Texas 78755 R L _j CONTRACT DATE: November 22, 1982 j You are directed to make the following changes in this Contract: Provide 24 over-under bunk walls in originally completed jail cells. 4 Add .................................................................$49,764.00 I,r Provide and install 24 over-under bunk walls in future expansion jail space. Add.................................................................$65,033.00 ttri Total added this change order $114,797.00 II~ The original Contract Sum was $ 7,026,090. 00 1 Net change by previous Change Orders . . . . . . . . . . . . . . . . . $ 82,528. 32 The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . $ 7,108,618. 32 The Contract Sum will be (increased) by this Change Order . . . $ 114, 797. 00 j The new Contract Sum including this Change Order will be . . . . . . . . . . . $ 7,223,415. 32 ` The Contract Time will be (increased) by ( 3 ) Days f The Date of Completion as of the date of this Change Order therefore is April 6, 1984 Jack W. Cumpton & Assoc., Inc. Utley James of Texas, Inc. Brazos County Texas 'f6T SEo Texas Ave., #202 YNTM 0ok 26068 frazos County Courthouse ; + Address Address Address i as 7 i ca 6 Jyan, Bryan. Texas 77801 2 i ) ~ Y i L S BY ! i J TC M.rrh ?q- 1984 nATF 3 .TO 6Ls DATE March 29. 1983 AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1970 EDITION • AIA® • 0 1970 • THE ONE PAGE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D C. 20006 _ r w .-..t n• - - Isl v , r1 CHANGE OWNER ❑ ARCHITECT ORDER CONTRACTOR FIELD ❑ AIA DOCUMENT G701 OTHER PROJECT Modifications and Additions CHANGE ORDER NUMBER four (4) (name, address) to Brazos County Courthouse TO (Contractgr) -1 ARCHITECT'S PROJECT NO 1977-106 Utley James of Texas, Inc Post Office Box 26068 CONTRACT FOR $7,026,090 00 Austin, Texas 78755 i L. CONTRACT DATE November 22, 1982 You are directed to make the following changes in this Contract Add 2 - 4" roof drains and lines at new one story Phase lA building Add $3,084 00 The original Contract Sum was $ 7,026,090 00 Net change by previous Change Orders $ 197,325 32 The Contract Sum prior to this Change Order was $ 7,223,415 32 The Contract Sum will be (Increased) (decreased) (wiehawged) by this Change Order S 3,084 00 The new Contract Sum including this Change Order will be $ 7,226,499 32 The Contract Time will be (unchanged) by ( -0- ) Days The Date of Completion as of the date of this Change Order therefore is April 6, 1984 Jack W Cumpton 6 Assoc . Inc Utley James of Texas, Inc Brazos County Texas ^^RR HIT CT CONTRACTOR 4163 o Texas Ave., #202 P 0 Box 26068 OWNER Brazos County Courthouse Address Address Address AIA DOCUMENT 0701 CHANGE ORDER APRIL 1970 EDITION AIA® 0 1970 THE "EMCM INSTITUTE OF ARCHITECTS 1735 NEW YORK AVE NW WASHINGTON O C 20006_____ 't"-~..... ~...a.~. _ ~-.y--, -~e~.. ~ - ~+r.._ .-ems 1 1 1 ONE