A special meeting of the Commissioners' Court of,Brazos
County, Texas, was held in the Commissioners' Courtroom in the
Courthouse in Bryan, Brazos County, Texas, beginning at 10:00
A.M. on Monday, December 27, 1982, with the following members
of the Court present:
R. J. Holmgreen, County Judge, presiding:
Bill J. Cooley, Commissioner of Precinct 1;
Walter Wilcox, Commissioner of Precinct 2;
W. A. Stasny, Commissioner of Precinct'4;
Frank Boriskie, County Clerk
The following citizens and officials were in attendance:
Mike O'Brian KAGC
Del Warren KAMU
Larry Baggs KAMU
Jann Snell Eagle
Van Kinerd Auditor
Greg Moses KTAM/KORA
Sharon Fairchild Auditor's Office
Arnold Dittfurth Auditor's Office
B. V. Elkins County Treasurer
The first matter to come before the Court was the considera-
tion of requests to install pipelines in County rights-of-way as
follows:
1. Ferguson Crossing Pipeline Company proposed to install
a 6 inch natural gas piepline across the right-of-way
of Thurmond Road in Precinct 4.
2. Bryan Pipeline Company proposed to install a 6 inch oil
pipeline across the right-of-way of Thurmond Road in
Precinct 4.
3. Bryan Pipeline Company proposed to install an oil line
across the right-of-way of Boatcallie Road in Precinct 2,
On motion by,Commissioner Wilcox, seconded by Commissioner Stasny,
the Court voted unanimously to grant the request and authorized
the installaion. A copy of all requests are attached.
The Court next considered adoption of a Resolution concerning
"Texas Good Roads/Transportation for Brazos County and the State of
Texas. After discussion and on motion by Commissioner Stasny, sec-
onded by Commissioner Cooley, the Court voted unanimously to adopt
roc. P PAGE
~ t ~
S
,
.r
I ~
the Resolution. A copy of such Resolution is attached to and
made a part of these minutes.
The Court next considered authorization for accrued vacation
time for certain employees within the following offices:
1. Treasurer°s Office
2. Data Processing
3. Justice of Peace, Precinct 4, Place 2
On motion by Commissioner Cooley, seconded by Commissioner Wilcox
the Court voted unanimously to approve the payments as requested.
The Court next considered the authorization to utilize the
Road and Bridge Number II funds by all four Commissioner Precincts
as needed. On motion by Commissioner Wilcox, seconded by Commissio-
ner Stasny the Court voted unanimously to approve the utilization
of the funds.
The Court next considered the following claims as submitted
by the Treasurer for payment:
General Fund - Claims 5848 through 5950
On motion by Commissioner Cooley, seconded by Commissioner Wilcox
the Court voted unanimously to approve the claims as submitted.
Next to be considered were Change of Status for the follow-
ing employees:
Douglas Graves Brazos Center
Jeffrey Kuhl Brazos Center
Mrs. Wanda Pope Extension Office
Susan L. Breedlove J. P. Pct. 7, Place 2
On motion by Commissioner Cooley, seconded by Commissioner Stasny
the Court voted unanimously to approve the Change of Status as
submitted.
Under other business the County Judge requested each Commissio-
ner to think about requesting the State Legislature to create an
additional County Court at Law for Brazos County.
f l There being no further business to come before the Court, the
meeting was recessed until Thursday, December 30 at 1:30 P.M.
I
VOLP PAGE 11 S
i
I
l •
t
5 ~
~JJ
J'J
V
n
f~
(Y "
i
77
.T~-~J"„-a.{..*yP,n,~„•ti„L•._Y"`!•~V V.i .a l_-_„_ ~ ~ ,
b, THURSDAY, DECEMBER 30, 1982 - 1:30 P. M.
i~
•i
tpp~
i~
f+
}
1
t ~
~i
5
I ~
f
The Court reconvened at 1:30 P. M. with all members present
and,due to lack of business to conduct, the meeting was adjourned,
I
f ~
t'
7 +
1 L
r f ■ '
i
}
i
h
k '
• ~ j
F
4
VOM' PAGE.
i
Z:-r--•-w n• F r ^ -w-'^ - r, ` . "y""~ ~x -n^i 'h-. ( . +4 Y
•t a.r a _ / - - i1 •t.,? a 7 J ~J ~4' I .,..fl YS }a T`t-• ( ,•f rr'' ^f
A
~ G 4
ill t ,
The foregoing minutes have been examined and approved in
open Court this the qn4 day of _~(f ~Z
19_g3, in Bryan, Brazos County, Texas.
I
D
X/QZI
ey
J~FHolmgreerV"- Bill J.
Coun y Judge Commissi her, Precinct
Walter Wilcox
Billy ear
Commissioner, Precinct 2 ; 'Commis ner, Precinct 3
asny , ran or s
Commissioner, Pre inct 4' ' County Clerk
a
~r I ' r 4 `1 I
.y .
a • I
r
t
VOL P PAGE
S~v
A
1
i
it
!t
i
~r
r
za
wit
,
NOTICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY
To the Commissioners' Court of BRAZOS County, Texas
Brazos County Courthouse
Bryan, Texas 77801
Formal notice is hereby given that FERGUSON CROSSING PIPE LINE
COMPANY , Applicant,
proposes to place a 6" Natural Gas Pipeline within
the right-of-way of Thurmand Road___ in Brazos
County, Texas as follows:
The location or description of the proposed installation is
more fully shown by ek*ea...43,1(Z2- copies of the drawings attached
to this notice.
I understand and agree that:
1. The Commissioner of the Precinct in which the right-of-
way lies must be notified prior to the beginning of con-
struction in order that the Commissioner might be on
hand to designate the actual location of the installation,
2. That all damage to the roadways and rights-of-way will be
repaired to their original condition to the satisfaction
of the Commissioner in which the roadway or right-of-way
lies.
f
I
e
3. That BRAZOS COUNTY reserves the right to require Applicant
to relocate or lower any such line at no cost to BRAZOS
COUNTY, should same become necessary due to widening or
lowering, or other alteration of the roadway or right-of-
way.
4. That BRAZOS COUNTY is in no way responsible for any damage
that might occur to any existing utility lines in the
right-of-way,
5, That the line will be constructed and maintained on the
county right-of-way an accordance with governing laws.
6. That the line or lines will be constructed no less than
forty-eight inches (48") lower than the lowest part of the
drainage or bar ditch and the drainage is to be considered
at least two feet (2') below the center of the roadway.
7. That all roads be bored to forty feet (40') on either side
of the right-of-way or cased for such distance.
t
i
it
I
r
i
i`
I
~u
i~
r
i
i
i
8. That all sites w
ill be barricaded during the
construction
q
period.
'
Construction of this
line will begin on or after
the 13th day
`
4
of December
,
1982
I~f
FIRM: Ferguson Crossing Pipe Line Company
r
BY: Belton Hightower
r~l
TITLE: Senior Landman
r
ADDRESS: P. 0. Box 1166
Brenham, Texas
77833
I
TELEPHONE- 713-836-6685
s
~I
APPROVED DY COMMISSIONERS'
COURT
rc
[!I
Da to :
. '
v0l.PAGE ~a
r, ,
c l Jl~ I ~vrt 1
` O d I 1
E m\ - -
i a4J
°3°10'W „ SM25t47P/d=45°09'!1 SL7.6-t,'lo+^-/'?=7%01
44'° ' % 1 ISM 9t15P/d=01°.'0
04FG=47°h3Ll I y!
E • " ) I ~ ~ 11 4;
I
- ' I Sore Grove •145°4;'W
oI veer 5T4 /4±E9P ?3°
I I ; i S4005 'w
S 40 ,Qf
Sra 29 t/6qd = l7°QSR~ Bobby G. Duke, of !!X
N,
,
sr~Pla=°a'R1. 128.20Ac
\ 4 ~p578007'w Vol. 423 Page 173 lit
Q
n r~ I
OfPrbe-At I
'
. ; t r
' o Sr Sy'Q~+^n S+rrltiv / 57.54'43 i '
7 kl
Harry S. L lpscomb, ei ux
RemoInder of l0/ 89 Ac I;
Vol 327 PqX 511 r ; -
n ~ i DP
J
_ •t , i 1„~y'v s!a ~Y ! = ' ' 'f ' M,'s..:J i',,•~.._~-,.~i-.a~• S,c_xJ`,._r_Tc 1.:~t : +u
o -L
Sr' pup v`4 - 1 yt, l~ •`i'+.~ ~r; ~ j "~•h
~I lrfl-. ,
` - uv { . ) 11n~~r r," at
°~YlY•+ r •~7 `t~ icy 1 'o~°' Ix'' Rf
,r ~Mp,n` g F,{rr517 CO.v 120 y~srs 1pr1 Wa'ils' :i ~ if dpi P C+' i-~-to i-
st, pot N.
Pci
v+• • .1
06 I Lr,r{ r• 4t j1 v ~i~n Yv w ry sr 1
I.:r.
t1♦aT1 ~Na' ' v c,'`~~1 -5110
p C){ C 51
7 p F' ,r yr¢%~~{• tr y I
a'+• r+ / a v`r A C p'SyH'E' x`'61 - 11._ S+• ILA r~ Iii' I
y,s,d• 1 {{G a. •'11- _ y r to rT' i, { I,
c• p,v v c''ysi I r 1,
% i
5 6, p,nsbv b'=1' } iF (,D rE ~p~~ f B ►y~° 1=;r r r=te i~ 1: y d + y~.~' 1L~ ~d y- --A
Y f:~~' 11I i
1y1'vc NLIn \ S,1 • , ar ~r ep I a.4 il'
i 4 tJ tr i t} t: f t v< ~c+ T. ~r Nrv r,., L ; {
,p113 L009 r6' }Srg1 tq,ti Srl as~r 4 • 4,'•5.`. Et.~ 1
! KIEL s,cMV` It
v try Gr-EI* ifM , Cady
(TSb
s - R' rp~rM' prr cY't
:-Ty 6 so F ~ F''~1
I'~;ti na sl 04 y,.•°' j•f , i0 B^R'{ + I~ W~ 15 p,v ~ 1691* jY 1 {{S / fa° 1.~ r 1•,~ k
'GZ
Cp,r ~Q-- ho A ~tAr65{~ Ify ,j tom... I
41 ps"~ f K ► Sr,1l vL-
~Ift.
PP -1cE oil nc
I: W 9 f 9 ~ r~ i r ry
i ;I~' ~'YIg ~p!''~ r5S i N ptN~ 11.11 Srti JF"••"rz--+ ' .
18 ~v,Mr 1~tR ~rRnSC f -C
5"J' 1 cav td 5~ '.4 pd ti ~17 tiS0 kl yra SYt c Sr 11 sa r c- (d r
rJ fps w,^~ iy {'"~%~20 ►t 'u t`1° B c`'~ pfco"
S ~F
CIA
~ • ' v r ° : is d ~yi ~ E Eva1v { f '.r L
L. L, { : i ' • n111i Y
wo
S ^ PSjp1~ ~v •r.r~0°¢L* SSA{{ u A + v a act
, . ` r: .J
I p 4SSS c•y~cs, Sr z tr-° rs C +
ti ate' k = sue' ►}-~1 g , t~
'yC 16~ RfF 1 Sr t9 d 'S fptat~6 Jr ®Q ~y'~ ~~t'• ix., <
1*46 ~
nrr MO S'} a= X Std' t'.
1 t1 1 11
• Rr Sr. ti r
F1 Sr ` It SLBM1
fiB 1~' * t.',~s Z i A •~5~ '+tY't_~'f i ,
I! ` ~sS ILK K A
1{ 30 'p f 0% % ~ Y
Kt p w* a 6+r . 1. {
• •1
i HEZf ktm ~B J^ r r• sr'w'' rt•j6• tr ,v. ` S~' '.a '~r'1''~ ri
II' } ~ Grpty6~ r G~>~ F ,~j0 a ►1 B S ~ ~ ~ O * nr0 ~ r' f 1~~ 1,.:;' 1
c on. IL Jac S ~ x G+? ti~ 7~ c Frd~ sl s^~ w o ln Mry ` { t `r
B 6
r
~
k~, s}, ~ ~ ~tiM1 ~
II[[
. E tl 6r
0.Ky+~• tr i1} F116 • tf.
~1 1
ln
I
rt
W, ti c.
_ trr y. S~ 1 ~0 ug10 ii
- •I J)
E ft 61 ~ it
e
vtuctv a-
tcxl
JOG
I
R r K*t,ay'"
R r't%
1'1
d
IN'
i
'
A
to
~
erp
~
d 1
r*a f ~
Sri
M
M. -
-
of pry 0311
;.r I
U8D
V4 N W"
~r y u~u:
y «1
. ~I
- z~
f
NOTICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY
To the Commissioners' Court of BRAZOS County, Texas
Brazos County Courthouse
Bryan, Texas 77801
Formal notice is hereby given that BRYAN PIPELINE COMPANY
r Applicant,
proposes to place a 6" Oil Pipeline within
the right-of-way of Thurmand Road in Brazos
County, Texas as follows:
The location or description of the proposed installation is
more fully shown by Warwas Z) copies of the drawings attached
to this notice.
I understand and agree that:
1. The Commissioner of the Precinct in which the right-of-
way lies must be notified prior to the beginning of con-
struction in order that the Commissioner might be on
hand to designate the actual location of the installation.
2. That all damage to the roadways and rights-of-way will be
ji repaired to their original condition to the satisfaction
of the Commissioner in which the roadway or right-of-way
lies.
3. That BRAZOS COUNTY reserves the right to require Applicant
to relocate or lower any such line at no cost to BRAZOS
COUNTY, should same become necessary due to widening or
lowering, or other alteration of the roadway or right-of-
way.
4. That BRAZOS COUNTY is•in no way responsible for any damage
that might occur to any existing utility lines in the
right-of-way.
5. That the line will be constructed and maintained on the
county right-of-way in accordance with governing laws.
6. That the line or lines will be constructed no less than
forty-eight inches (48") lower than the lowest part of the
drainage or bar ditch and the drainage is to be considered
at least two feet (2') below the center of the roadway.
r 7. That all roads be bored to forty feet (40') on either side
' of the right-of-way or cased for such distance.
8. That all sites will be barricaded during the construction
period.
_f
Construction of this line will bc,lin on or after the 13th day
of December
FIRM: Bryan Pipeline Company
BY: Belton Hightower dA
r TITLE: Senior Landman Q
i
r
ADDRESS: 1801 Houston Club Building
A Houston. Texas 77002
' TELEPHONE: 713-228-9561
APPROVED BY COMM SSIONERS' COURT
Date:
VOLP PAGE'qay -
- - t
L
.r
i
i~
i
r
si
,
{
a.
i
i
~r
J~
t
s~
~j
~I!
I
,
I
i
i r I
V
i ^
i, • •-3+,.v'?.d
IAV
i t'e
SUR MOSES SAIME
I
^ 5M 25 t47 PIA : 45°Q9 'U 57A //Pld =02°0% U
88°!0'W 5M 9tl6P/d=01°lOLJ I ,
N 460 t04F1d=47°19LJ N44049'W
-
► T
5~qt~0~1'60 in r
N 1w
I Save Grove
i`
S40°51'W I of NO 57A 14t®PY =03° f II
s', ~ STA 29 r16 d ° 0-6 Bobby G. Duke, Of ux K ~
9~ srA t epld=c't9 A7 RJ. I26. 20 Ac.
4 P0S7aro7W Vol. 423 Page 173
e N Harry S. Ll,oscomb, e/ ux ,
of A&
l
1
` femamder of /0/. 69 Ac.
e !
< I Vol 327 P096 511
O ly r i
t
A u . - III
M 4
,n,at fit M Orn~. - HwKNr / ~r t~• reM9"e nL _ 1 1y 1~+A~~ +i'`P r~ r otrt~
d tr 9 ' I 7 , c"1 I ~ dr ~•r1 M• r. y tr r ~r' rte/ '-s
1
pd •s •11 o ~t, ( ffop 1
+1 H ts++ 11
rr W 11+n` i
! 1 N
crr.N' c pRS k ~'Al . sl a 1
IN 1635 L
,2 t:•
*to ;jq di
LASS %
96
~rf"Wt• /r1 A 4~j(L tr Ire
31 a 1 W+DV TY
M
N t pyt, c p tph f IE.~D rb Npyt ,~r Rt1(,1r2C ,
at i1i + E ;
tf,ell i 'a'`r 8 + T tt rta+' t,3 trit ~j'~ + ° r Rf`~ > C I K
Kt-' war c {sN
r raa t~>s Cs t• ' y t► a ~ ra ~ ~.'..~-+t
tr v
cor*
Tea a+: 1 s('"~ cp.t+.1a ~ r `It~ af' 'k +t ~ - .u'-`~pr•Y ~
n MI d ~~,e ~
<y t + 1paYt 1•Nt ,a•t 6r! ys ~w Tt tr,~
try -,;,s d'hd~ 6o'e c"' e~ !6y~ ~ c•,"" s t F .'Y
J. i I
•A rk ~jM w+•' ti
~pryy t• • '~*ti+•r ►R/~ t _1>~~.t~a`~y +ki i
T - Y1 1
51E'Npa ~OIdr~ G yCPO VOL
tir • 1~~ ~I`?i
k~ ~Dd#,sbt' fir, ltv i
1 Z C~ T pGi a
+L I.t i y,,~•S 1p1K£ t.1T/ Tr t9 -;i _~4 t j1
R
t `
. r tw~
` w'! ~.N rd°~~t bo S SL Q it ~a5lodrh k yr+j1 SYeeO" 11 i
a :t: T~ ° 6jt`~ 10 N PC V
ts c~j1 E t~
t> ^ OKEg • • $ ` • d it" co
E~P ri/a ! c1 L L fsr w jti trlaf y +4
dt6~ off T~a9 p~ yrsMtr to " 1 yii 1 IF tom. fi~;T T ao~tcA~a r
, fs a r
A Ts1~ I .
` 1J T' + t ►a1t 11. pll
prr•' t~'lola-
Rt +taAt. I StBM1 E
ES i1°C •4 r y,d r~ aTa~ .
30N a ass for
ps.
S 1 .1~ aye ~i saawl6 Tr Q 'y r.
J ml-my ^
t D' - M Lf~'r} R~rr` n it .e y It
of d 1 T c t Iys• ~,dr,+,o~ i t Y.10
nr 1~►~s
C
3t R t. •t•T IL t nssr N -400 Z. , r
t, 2 , t si mac . 1T t +t t1 tt+a ntr. n.1 i 1 '3$ g , is, WM E ?
w c! _
N r 0910 j F-L-P M Stet ~,~a n yQ 1
,y a` ~ / t o ~ tt ~ ~661~~"~o•rt o3 tl.~s C> ~r tP d•~' '
i. > rd 12
+ tr. BD e + rn 7S `ai +
+.v~ ~g6 :=i o t~' tr + 'e,°" Yr►~ 85I L NDpC$ $V b I oa
" d
M{E ~ r• F`N,O+•" /t• Y`` M! r tOts• t y~ f,,
Aar ' ; •Lirt~+t it rc•'r.• V°1r-T it
vv Ot
•..6.0 .
1
s
i
w
i
Q
}
r
1Y
+ r
1
NOTICE OF PROPOSED-INSTALLATION IN COUNTY
RIGHT-OF-WAY
To the Commissioners' Court of BRAZOS County,
Texas
s {
Brazos County Courthouse
Bryan, Texas 77801
I
ty 4
t"
Formal notice is hereby given that BRYAN
PIPELINE COMPANY
Applicant,
4
proposes to place a Oil line
within I~{
the right-of-way of Boatcallie Road
in Brazos
County, Texas as follows:
The location or description of the proposed installation is
more fully shown by C2>_ copies of the drawings attached
to this notice.
I understand and agree that:
1. The Commissioner of the Precinct in which the right-of-
way lies must be notified prior to the beginning of con-
struction in order that the Commissioner might be on
hand to designate the actual location of the installation.
2. That all damage to the roadways and rights-of-way will be
repaired to their original condition to the satisfaction
of the Commissioner in which the roadway or right-of-way
lies.
3. That BRAZOS COUNTY reserves the right to require Applicant
to relocate or lower any such line at no cost to BRAZOS
COUNTY, should same become necessary due to widening or
lowering, or other alteration of the roadway or right-of-
way.
4. That BRAZOS COUNTY is in no way responsible for any damage
that might occur to any existing utility lines in the
right-of-way.
5. That the line will be constructed and maintained on the
county right-of-way in accordance with governing laws.
6. That the line or lines will be constructed no less than
forty-eight inches (48") lower than the lowest part of the
drainage or bar ditch and the drainage is to be considered
at least two feet (2') below the center of the roadway.
a
7. That all roads be bored to forty feet (40') on either side
of the right-of-way or cased for such distance.
8. That all sites will be barracaded during the construction
period.
Construction of this line will begin on or after the 14th day
of December • 19 82
I '
1
~t
,I
FIRM: BRYAN PIPELINE COMPANY
BY: TITLE: Joe Mauch, Jr. Senior Landman
ADDRESS: 1801 Houston Club Building
Houston, Texas 77002
TELEPHONE : 713/228-9561
APPROVED BY CO ISSI NERS' COURT
Date: a' a ? Y
VoLf_wE
9
1,
.lr tt Aa i boy f
• F 1011'•• AN f9 M h of + 1•.~ f ,y 06-C r
IV aYtll Y•- oe 00040+ fly tQi t
'All
S.FAUS
4-1
1 + 91 •
r •
m is
f w vA" dg.
As COV
I ~ Q1 S ! .J ~ rT'• +~.i ~ { h t t , i+ y,4
j / ! a VVV • 'I i / .P 1' iI i•~ 'f d ~~R"`''~~l \ / .1r1.
~j t. as + r . • j r / ~a t\~•' ~i1~• ; : ~ ~Y'
x 1. `ot +,'7' 4 24 - c• le r w• ~J ld+ t. • / 0 ~f~• . ° • w {
t /i• p.° i•~f~l' °t; ;•y j~ t: f .•~:'T,, ♦ 11
+ ~ ~ ,e{ ti , 00w N4 t ~
' , Il I y~pr~ ~ °we tw ~ ~t.w r y ti t~ • ~ !
Oct
p 616&%,s -as" CO 4. 0
/ •
- ~{{r'!~'`f}` tb-' .7+ " • r• •Yi1. ' ° to N. 727501 ~ i ° i
.M •y re •M S q1 / «tit\f•i wlLU •i;.°:° f4 h
C . 'j' JJ1 1 /4, , Bosom Fl • • , . i° ? \ •I°. •Cw F St aM ICEJ / \ .
bus*
Be$ 4L
~ ~1
c?
V .GU r4~ . , \
~7m'i.4`.°~'~t.~•s.".ascyy^,1:}~~i ~A-, ~ - ~41.~~Z-i•3L~-a'~,.
- r+.•.,,.-. ...,...,..__..c - __,.l_ ..{yam .
Remornder
}b
1899 Ac {
F 7 I
667
Vo1374 Fa
Sron1 Deed
,
r + ~ STAC"-Gq
,7a rrsoP;d= "41 L!~- - I '
VI
' _5 43 °57 N ~ _ -
I
S 2504E W
57A St 41P1d-2G°24_R' j
Sr.: >r:= +rcerry!rneFence
S44°1J W- Proposed 0 10 ) I "
~ I
4 -
°
II'$TA C1,.0 yeprn Lo/6rc1 on A7poscl kvr-!CA Or, L-?e '
6
)
r
STAIOtCDHd'Ol °31 'La V
d
r Jy,~o!e
S 44-3
W
l E
14 1U !
III
i
'
47°2r~f
At
1030
ings, el ux
STApj t,7rPrg'er L^2 F~« -
wo/1~ Tubbs, et ux
ores Sutd
ill
- - -
p, 1246 Ac.
e,X
C9 ,
Aock
p
447 Poge 240
Vol
435
CrdLoremlal Rxe--b c 40
- - -
a'
.
o q -
m
Julio hkConn
34 Ac.
12
S4i°~17 _ I
IA/Bf~P1aL~ J
~SlAl4t72Prd=5L°Lb Rp
.
(bl IR26 Poge 49
I
g
---54"~=-'-~-
STA 15t5L) !14zOO°29 RI
°
STA ,41B2~ ry erne fence
I _
(
61fr1
'
.39 W
^ S 42
I
(
i
36
I
4
I~
- - -
t O
t
M
e
~r
~T
t
_ II
i
I
I
' f
1 ~
t
i
State Highway Funding
• D
The 72,000-mile Texas highway system, once recognized as the best in the
nation, is deteriorating. According to studies of the Federal Highway Administra-
tion, Texas has 17,200 deficient bridges and 7,740 miles of highway rated in
poor condition. Motorists in all parts of the state are suffering a continuing loss
of mobility. Major problems have been observed on Farm to Market roads,
rural primary highways, Interstate routes, and urban freeways.
Current funding sources available to the State Department of Highways
and Public Transportation are inadequate to maintain the existing highway
{ system and to improve the system to keep up with the growth of the state. It is
+ I estimated that the state's population will increase 50% by the year 2000. This
I i anticipated growth will place substantially higher demands on the state's trans-
portation facilities and services.
We urge the 68th Texas Legislature to act expeditiously to provide addi-
tional funding for highway construction and maintenance. We recommend that
the level of state funding for highways be at least equivalent to defined state
highway user fees and taxes. We further recommend that the state highway user
{ fees be increased if necessary to meet the highway funding needs documented
in the revised 20-Year Plan of the State Department of Highways and Public
'Ikansportation.
r
I { f r ~
Adopted December 27. 1982
(date)
r; Hy Brazos County Commissioners Court ,
{ (orgamration)
Attested 1
r .
I,
I ~ 41
VOL p PAGE ~a
` .'y[~'^... . 4s'~71Fr'x' 4 .1,i~i •i7 . Q-_= - _ ' - _ _ t r _ ; _ _ ~"•.1 - - --%°i.~.
-v i
Rf l I_xr7I: .t7 F `II'
? t"ok, :ter{ ; ; 'r ; ={J I f
~ I
I
i
1 ,
~'1
y
~D ~
i
i
, n,~ -
~ o~
J ~ z
I
r.
i
a
i e
- -