A meeting of the Commissioners' Court of Brazos County, Texas,
was held in the Commissioners' Courtroom in the Courthouse in Bryan,
Brazos County, Texas, beginning at 10:00 a.m., on Monday, July 25,
1977, with the following members of the Court present:
William R. Vance, County Judge, presiding;
Bill J. Cooley, Commissioner of Precinct 1;
Walter Wilcox, Commissioner of Precinct 2;
H. L. Cargill, Commissioner of Precinct 3;
Frank Boriskie, County Clerk.
The following citizens and Officials were in attendance:
Suzanne Black, KBTX-TV
Marla Gammon, KTAM
Jane :Mills Smith, The Eagle
Steve Stites, WTAW
B. G. Bockmon, SDH & PT
John A. Blasienz, SDH & PT
Mary Nichols, County Auditor
Buddy Winn, Tax Assessor-Collector
Representative from Thurmond and Stuart
Lynn Stuart, Thurmond & Stuart
Frank Thurmond, Thurmond & Stuart
H. C. Manning, Bryco, Inc.
David Meier, Jones & Williams
Representative for Bryan Electric
Weldon E. Jordan, Jordan & Woods
Representative for Drew Woods, Inc.
Joel T. Murray, W. E. Kutzschbach Co.
Lindy Dennis, W. E. Kutzschbach Co.
Richard L. Patrick, Consulting Engineer
Tod Vaughn, Jack Cumpton & Associates
Jack W. Cumpton, Jack Cumpton & Associates
The Court heard a presentation. by the Texas Department of
Highways and Public Transportation respecting the installation of
curb and gutter along approximately 450 feet of Metropolitan High-
way 154 (Briarcrest Extension). The State presented a proposed
agreement between the State and Brazos County, a copy of which is
attached to these minutes.
After discussion, Commissioner Cooley moved, seconded by
Commissioner Cargill, to authorize the County Judge to execute such
i
i
r{
J I~
:
agreement with the State, after execution of an agreement with
Dr. R. H. Harrison, the adjoining property owner, whereby Dr.
Harrison would make the initial deposit of funds required and
reimburse Brazos County for all additional funds necessary. All i
present voted Aye. None voted No, and'It is so Ordered.
Next to be considered was the appointment of a member to
the Brazos County Child Welfare Board to fill the vacancy created
by the resignation of Jesse Vivero. On motion by Commissioner
Wilcox, seconded by Commissioner Cooley the Court unanimously
voted to appoint Mrs. Robert Otterstad, she being one of the per-
sons nominated by Reverend Hubert Beck.
The County Judge advised the Court of the resignation of
Travis B. Bryan III from the Board of Trustees of the Brazos Valley
i
Mental Health - Mental Retardation Center and recommended the
appointment of Mrs. Thelma van Overbeek to fill the vacancy.
On motion by Commissioner Wilcox, seconded by Commissioner Cargill,
the Court unanimously voted to appoint Mrs. van Overbeek to the j
Board for a two year period ending March 31, 1979.
Next to be considered was a request by Brazos Valley Utilities
Inc. for authorization to place a water line within the right-
of-way of Briarcrest Drive, perpendicular to Station 22 & 55.
J
After careful review of the drawings submitted and the approval
of the State Department of Highways and Public Transportation,
Commissioner'Cargill moved that authorization be granted to bore
the right-of-way. Motion was seconded by Commissioner Coc•_ey and
carried unanimously. Such authorization is subject to the following
conditions:
1. That Brazos Valley Utilities, Inc. or its contractor
must notify the Commissioner of the Precinct in which
the right-of-way lies prior to the beginning of con-
struction in order that the Commissioner might be on hand
to designate the actual location of the installation.
2. That Brazos Valley Utilities, Inc. or its contractor
will repair all damage to the roadways and rights-of-
way to their original condition to the satisfaction of
the Commission in which the roadway or right-of-way
lies.
-2-
V®L-J-VPAGE2Z
,
VO1L-,6/ PAGE .
3. That Brazos County reserves the right to require Brazos
Valley Utilities, Inc. to relocate or lower any such line
at no cost to Brazos County, should same become neces-
sary due to the widening or lowering, or other alteration
of the roadway or right-of-way.
4. That Brazos County will in no way be responsible for
any damage that might occur to any existing utility lines
in the right-of-way.
The Court, having previously authorized the purchase of a
Type III Ambulance through the Emergency Medical Services of the
Brazos Valley Development Council, proceeded to consider their
Statement for Payment. Commissioner Cargill moved that the sum
of $9,655.00 be paid to the Brazos Valley Development Council
(BVDC) for the vehicle, and to amend the budget to accomdate the
payment. Such amount being the county's share of 50% of the total
cost of the ambulance. Motion was seconded by Commissioner Cooley
i l
and carried unanimously.
Next to be considered were Requests For Change In Status Of
Employees for the following:
Gail Louise Miller - County Treasurer's Office
Barbara Ann Robinson - Janitorial Department
Billy Terrell - Precinct 1
On motion by Commissioner Cooley, seconded by Commissioner Wilcox,
the Court unanimously voted to approve the requests as submitted.
The Court proceeded to the consideration of claims numbered
1423 through 1492 in the General Fund, submitted by the County
Auditor. On motion by Commissioner Wilcox, seconded by Commissioner
Cooley, the Court unanimously voted to approve the payment of such
claims as submitted.
Next to be discussed was
the realignment of
voting
precincts
and Commissioner precincts.
Commissioner Cooley
stated
that due
to the requests of a number of residents and the unequal number of
registered voters in the voting and Commissioners' precincts, he
felt that this matter needed to be considered by the Court. After
discussion, it was the consensus of the Court that this item should
be deferred until such time as Commissioner Stasny could be present.
r
- 11
-3-
I L3
l ~
_ . ata; ~ r rEt ~
~.ir. it ;$'tJt{ `~tiivk t.l`;~"'; zt G
3:00 P.M.
The Court proceeded to the opening and consideration of the
following bids for the purchase of a front-end loader for Precinct
Two.
Mustang Tractor and Equipment Company - $32,304.00
Plains Machinery Company ' - $29,985.00
Commissioner Wilcox moved to accept the bids of Mustang Tractor and
Equipment Company in the amount' of $32,304.00 stating that Plains
Machinery Company did not meet the published specifications, and
that Precinct two (2) be authorized to issue a Time Warrant to
the First National Bank, Bryaci, Texas, in the amount of $21,000. for
ene purchase of the equipment. T"_otion was seconded by Commissioner
Cooley and carried unanimously.
4:00 P.M.
The Commissioners' Court, having advertised for bids for the
construction of a Multi-Use Facility at the Brazos County Park,
received the following bids From Jack Cumpton, Architect for the
project:
Thurmond & Stuart - Base Bid $1,485,000.00
R. B. Butler, Inc.- Base Bid $1,552,148.00 ;
Spaw-Glass, Inc. - Base Bid $1,592,000.00
Jones & Williams - Base Bid $1,630.000.00 '
Marcal, Inc. - Base Bid $1,593.000.00
The County Judge announced that all bids were over budget for the
project, and suggested that they be referred to the Architect for
further study. All members present were in agreement.
There being no further business the Court adjourned,
-4-
Y®L 1PA GE
r
VOL-A/ PAGE
The foregoing Minutes of the Commissioners' Court Meeting held
July 26,, 1977, were examined and approved in open Court this
12th day of September, 1977, in Bryan, Brazos County, Texas.
William R..Vance
County Judge
Walter Wilcox
Commissioner of Precinct 2
W I?
,/L~
W. A. Stasny
Commissioner of Pr cinct 4
veil/
Bill J Cooley
Commissioner of Precinct 1
5;/
H. L. Cargill
Commissioner of Precinct 3
Attee•L:
Flank Boriskfe
County Clerk
i
- L
~{~'fi"r fhfC'~'T~i•at ~lv.lK'Gy dFPii~~'j'1pu .
, ~ _`/gym !.1- ~,L~:-:,~ r+:~s' ~ _ ~rW,ra..j. .ii r_I'~._ b .y-}h. n~ i~ _•S 'y~Y ~'±?+a11c+ 1 ~s...e_~~='C,"fir - ..I
r _
1 .
,Z -
M J018(1)
8018-17-1
Brazos County
STATE OF TEXAS I
COMITY OF I
THIS AGREEMENT, made this 26th day of July, 1977, by and between Brazos
County, Texas, hereinafter called the "County!', Party of the First Part,
acting by and through its Commissioners Court and the State of Texas, here-
inafter called the "State", Party of the Second Part, acting by and through
its State Highway and Public Transportation Commission.
WHEREAS, the County desires the construction of concrete curb and gutter,.
inlets, and incidental items within the limits from Station 29+00 to Station
35+52 on the right on Metropolitan Highway No. 154, which the County has
requested the State to construct or have constructed. The State will con-
struct or have constructed this work for and on behalf of the County and at
the County's'sole expense, excluding preliminary engineering. The estimated
construction cost of this work is Six Thousand Six Hundred and No/100 Dollars
($6,600.00), including contingencies and construction engineering.
N014 THEREFORE, it is understood that this proposed work will be con-
structed by the State and the County will transmit to the State with the
return of this agreement, executed by the County, a warrant or check made
payable to the State Treasurer, Account of Trust Fund No. 927 in the amount
of Six Thousand Six Hundred and No/100 Dollars ($6,600.00), to be used in
paying for the work proposed by Field Change Request No. 1 on project M J018(1).
It is further understood that the State will construct only those items pro-
posed by Field Change Request No. 1, and the 'entire cost of such items,
excluding preliminary engineering, will be borne by the County. If during '
the construction of those items proposed by Field Change Request No. 1 it
is found that this amount is insufficient to pay the County's portion, then
the County upon request of the State will forthwith supplement this amount
by an amount equal to the County's full actual share of the cost of this work
less the amount previously paid into Trust Fund No. 927. In the event the
amount as paid is more than the actual cost, then the excess amount will
be returned to the County. It is further understood that the work to be
done on behalf of the County, as herein proviTed, will include the cost of
contingencies and construction engineering.
-1-
V®a.,~_PAGE8~,
VOL ~ PAOE 29
IN TESTDIONY WHEREOF, the
parties hereto have caused these presents
to be executed in duplicate on
the day above stated.
CODIISSIONERS COURT
STATE OF TEXAS
BRAZOS COUNTY TEXAS
STATE HIaIWAY AND PUBLIC
Party of the First Part
TRANSPORTATION CCt-DIISSION
Party of the Second Part
By:
_ Certified as being executed for the
ounty Judge
purpose and effect of activating and/or.
carrying out the orders, established
policies, or work programs heretofore -
approved and authorized by the State
Highway and Public Transportation
Commission:
ATTEST:
By:
Asst. Engineer -Director under
authority of Commission Minute
No. 70104
County C erk
Recommended for execution: