HomeMy WebLinkAbout2002-07-23-0900AM-RegularBRAZOS COUNTY
BRYAN, TEXAS
FILED
M1 JUL 19 A 8:3b
cos
ET?hZD~ C3tr~+TY. BOAN.7EX11S
0
DEYISiY
NOTICE OF MEETING
AND AGENDA
BRAZOS COUNTY COMMISSIONERS COURT
THE COMMISSIONERS COURT WILL MEET IN REGULAR SESSION ON
TUESDAY, JULY 23, 2002 AT 9:00 A.M. IN THE COMMISSIONERS COURTROOM
OF THE BRAZOS COUNTY COURTHOUSE, 300 EAST 26' STREET, SUITE 115,
BRYAN, TEXAS.
1. Invocation and Pledge of Allegiance - Commissioner Thornton.
2. Call for citizen input and/or concerns.
Consider and take action on agenda items 3 -19:
3. Request by the Information Technology Department to purchase a laser printer for
the Purchasing Department and a laser printer for the 361" District Court office
utilizing Contingency - Printer Replacement funds.
4. Budget Amendment 01/02-33.
5. Payment of Claims.
6. Personnel Changes of Status.
7. Request by Constable, Precinct 1, to add one non-paid, reserve deputy.
8. Resolution regarding Unclaimed Property Credits for Brazos County received by the
State Comptroller's Office.
9. Lease Agreement with the Bryan Independent School District for a portable
classroom for Juvenile Services. -
10. Allowing the Community Supervision and Corrections Department to pay severance
for eliminated FY03 positions.
Commissioners Court Meeting Agenda
July 23, 2002
Page Two
11. Application by County employee for Qualified Military Service Credit.
12. Blanket Purchase Orders.
13. Authorizing the Purchasing Department to advertise RFP #2002-056, Legal
representation for Indigent Juveniles.
14. Extension of the Contract for carpet cleaning with Steamatic.
15. Request from Verizon to construct 780 feet of buried cable installation in the right-
of-way of Democrat Road to accommodate road improvements project. Site is
located in Precinct 2.
16. The Replat of Ravenwood, Lots 15A, 16 and 17, 8.7575 acres, Thomas M. Splane
League. Site is located in Precinct 2.
17. Permission for the Road & Bridge Department to enter E. Duane Peters' property
located off Democrat Road for the purpose of dumping excess dirt excavated from
drainage channel on same property. Site is located in Precinct 2.
18. Request from Wickson Creek Special Utility District to construct a road bore for
water line installation in the right-of-way of Steep Hollow Road. Site is located in
Precinct 2.
19. Approving the minutes from the following Commissioners Court meetings:
a. Regular meetings conducted on April 2, April 9, April 16, April 23 and April
30, 2002;
b. Workshop session conducted on April 9, 2002.
20. Announcement of interest items and possible future agenda topics.
21. Call for citizen input and/or concerns.
22. Convene into Executive Session pursuant to §551.072 of the Texas Government
Code to discuss the acquisition of real property.
23. Consider and take action on Executive Session.
24. Adjourn.
The Courthouse is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive
services must be made two business days before the meeting. To make arrangements, call (979) 361-4102.
34
0
COMMISSIONERS' COURT
REGULAR MEETING
JULY 23, 2002
A regular meeting of the Commissioners' Court of Brazos
County, Texas was held in the Commissioners' Courtroom in the
Courthouse in Bryan, Brazos County, Texas, beginning at 9:00
a.m. on Tuesday, July 23, 2002, with the following members of
the Court present:
Alvin W. Jones, County Judge, Presiding;
Tony Jones, Commissioner of Precinct 1;
Wm.S. Thornton, Commissioner of Precinct 2;
C. B. Jones, Commissioner of Precinct 3;
Carey Cauley, Jr., Commissioner of Precinct 4;
Karen McQueen, County Clerk, Absent.
The attached sheet contains the names of the citizens and
officials that were in attendance.
Commissioner Jones gave the invocation and led the pledge
of allegiance.
Under citizen input and/or concerns, the following people
spoke in support of attorney Patrick Gendron and his
associates and the quality of representation they provide to
juvenile offenders.:
Patrick Munoz April Tamez
Kenneth Payne Randy Michel
Tommy Ramirez
Lane Thibodeaux
The following spoke in support of advertising the RFP:
Margaret Lalk Reva Corbett
Vol 34 Page 9
C7
Commissioners' Court meeting July 23, 2002
2
The County Judge explained the conditions of the contract that
allows for a one year renewal and that the year has nearly
ended. A law suit could be filed against the county if we do
not go out for RFP's.
The Court proceeded to consider a request by the
information Technology Department to purchase a laser printer
for the Purchasing Department and the 3615t District Court
•
office utilizing Contingency - Printer Replacement funds. On
motion by Commissioner Cauley, seconded by Commissioner
Thornton, the Court voted unanimously to approve the request.
The Court next considered Budget Amendment #01/02-33.1
through 33.4, which would transfer funds to 361" District and
Purchasing from Contingency, and reallocate funds for
Constable, Precinct 1 and the District Attorney's office. On
motion by Commissioner Cauley, seconded by Commissioner
Thornton, the Court voted unanimously to approve the budget
amendment as submitted, a copy of which is attached hereto.
The Court next considered the following Claims as
submitted by the County Treasurer for payment:
20032761 through 20033048
On motion by Commissioner Tony Jones, seconded by Commissioner
Thornton, the Court voted unanimously to approve the Claims as
submitted.
Vol 3q Page
0
Commissioners' Court meeting July 23, 2002
3
The Court proceeded to consider the change of status of
employees as submitted on the attached Personnel Action
Requests. On motion by Commissioner Cauley, seconded by
Commissioner Tony Jones, the Court voted unanimously to
approve the changes as submitted.
The Court next considered a request from Constable
Precinct 1, James Marrow, to appoint Michael R. Bewley as
unpaid Reserve Deputy Constable. On motion by Commissioner
Tony Jones, seconded by Commissioner Cauley, the Court voted
unanimously to approve the request from Constable Marrow to
appoint Michael R. Bewley as unpaid Reserve Deputy Constable
subject to appointment being within the allotted number of
deputies.
The next matter for consideration was the adoption of a
Resolution concerning Unclaimed Property Credits for Brazos
County received by the State Comptroller's Office. on motion
by Commissioner Thornton, seconded by Commissioner Tony Jones,
the Court voted unanimously to adopt the Resolution claiming
the County's portion of unclaimed funds under Texas Property
Code 74.602 and requested the State Comptroller forward the
funds to the Commissioners Court of Brazos County.
The Court next considered approval of a lease agreement
between Brazos County and Bryan Independent School District
for rental of a portable classroom building for use by the
Vol 3 Page IO
•
Commissioners' Court meeting July 23, 2002
4
juvenile justice program. Term of the lease is for the period
of one year commencing on May 31, 2002 and ending on June 30,
2003. The County agrees to pay to Bryan Independent School
District the amount of one dollar ($1.00). On motion by
Commissioner C. B Jones, seconded by Commissioner Cauley, the
Court voted unanimously to approve the lease agreement between
Brazos County and Bryan Independent School District for the
period stated above. A copy of the Lease Agreement is
attached.
The next matter before the Court was a request from the
Community Supervision and Corrections Department to pay
severance for eliminated FY03 positions. On motion by the
County Judge, seconded by Commissioner Cauley, the Court voted
unanimously to remove this item from the agenda.
The next matter for consideration was an application made
by Richard F. Vance for military service credit with the Texas
County & District Retirement System. On motion by
Commissioner Tony Jones, seconded by Commissioner Thornton,
• the Court voted unanimously to forward the application of
Richard F. Vance to the Texas County and District Retirement
System.
Vol 34 Page U
Commissioners' Court meeting July 23, 2002
5
The Court proceeded to consider the following blanket
Purchase Orders:
Wilton Off. Works
Mansel's Wheel Alg
Scarmardo Produce
Alliant Food
Sysco Food Systems
Performance
Ben E. Keith
Cain's Coffee
Glazier
Butterkrust
Lilly Dairy
Team Systems
Brazos Wholesale
Ray Criswell
Lilly Dairy
District Clerk
$4,000
Constable, Pct 2
$ 500
Jail
$2,150
Jail
$6,200
Jail
$6,200
Jail
$8,000
Jail
$1,250
Jail
$ 600
Jail
$1,000
Jail
$1,600
Jail
$3,800
Jail
$ 900
Jail
$ 500
Jail
$1,000
Jail
$1,000
On motion by Commissioner Cauley, seconded by Commissioner Toy
Jones, the Court voted unanimously to approve the Blanket
Purchase Orders as submitted.
The Court next considered authorizing the Purchasing
Department to advertise RFP #2002-056, Legal Representation
for Indigent Juveniles. Commissioner Thornton moved to renew
the contract through December then go out for RFP's.
Commissioner Tony Jones seconded the motion. After some
discussion, Commissioners Thornton and Tony Jones withdrew
their motion and second. Then Commissioner Tony Jones moved
to table consideration. Commissioner Cauley seconded the
motion. Commissioners Tony Jones, Thornton and Cauley voted
"Aye". Commissioner C. B. Jones voted "No". The County Judge
abstained. The motion carried.
Vol 3 Page 1
•
Commissioners' Court meeting July 23, 2002
6
The Court next considered an Extension of Contract for
carpet cleaning with Steamatic. This is being done in
response to a request by the Maintenance Department that the
contract run concurrent with our fiscal year. On motion by
Commissioner Cauley, seconded by Commissioner Tony Jones, the
Court voted unanimously to extend the contract with Steamatic
through September 30, 2002.
•
The Court next considered the request from Verizon to
construct 780 feet of buried cable installation in the right-
of-way of Democrat Road to accommodate road improvements
project. The site is located in Precinct 2. The County
Engineer stated that all appeared to be in order and
recommended approval. On motion by Commissioner Thornton,
seconded by Commissioner Tony Jones, the Court voted
unanimously to approve the request from Verizon and authorized
the installation. A copy of the request is attached hereto.
The Court next considered approval of the Re-Plat of
Ravenwood Subdivision Lots 15A, 16 and 17, 8.7575 Acres in
•
Precinct 2. Richard Vance, County Engineer, stated that he
had reviewed the plat and all appeared to be in order. On
motion by Commissioner Thornton, seconded by Commissioner
Cauley, the Court voted unanimously to approve the re-plat of
Ravenwood Subdivision Lots 15A, 16 and 17, 8.7575 Acres as
submitted
Vol 34 Page 13
Commissioners' Court meeting July 23, 2002
7
The Court next considered authorizing work outside of
county rights-of-way for the health, safety and welfare of the
general public. The Road and Bridge Department requested
permission to enter the private property of Duane Peters on
Democrat Road in Precinct 2 to dump excess dirt excavated from
drainage channel on same property. On motion by Commissioner
Thornton, seconded by Commissioner Tony Jones, the Court voted
unanimously to authorize the work.
The Court next considered the request from Wickson Creek
Special Utility District to construct a road bore for water
line installation in the right-of-way of Steep Hollow Road.
The site is located in Precinct 2. The County Engineer
stated that all appeared to be in order and recommended
approval. On motion by Commissioner Thornton, seconded by
Commissioner Tony Jones, the Court voted unanimously to
approve the request from Wickson Creek Special Utility
District and authorized the installation. A copy of the
request is attached hereto.
The Court next considered approval of the minutes of the
Commissioners' Court meetings held in April, 2002 on the
following dates:
Regular Meeting April 2nd, 9th, 16th, 23:d, 30th
Workshop Session April 9th
Vol 34, Page l
•
Commissioners' Court meeting July 23, 2002
8
On motion by Commissioner Cauley, seconded by Commissioner
Thornton, the Court voted unanimously to approve the minutes
as submitted.
Under announcement of interest items and possible future
agenda topics the County Judge made the following comments:
a)
He said there was a need to look into
options concerning utility providers to
see if there could be any savings.
•
b)
The Court may need to write a letter to
Verizon to complain about the delay in
service.
c)
The Commissioners Court meeting scheduled
for September 17th will be canceled
because of an out of town Commissioners,
Conference. The September 3rd meeting
might also be canceled.
d)
He will schedule a workshop to discuss
requirements for on site sewage
facilities.
e)
Kerbow Engineering has applied for a
grant for the installation of a sewage
system on West 28th Street. The City of
Bryan will assist them.
f)
He received a memo from the County Clerk
in reference to the voting machine
demonstrations. He will post this as a
workshop so that all the Commissioners
•
may attend.
The
re was no citizen input and/or concerns.
At 9:58 a.m. the County Judge announced the meeting
closed to the public so that the Court could meet in Closed
Executive Session to discuss the acquisition of real property
Vol 34 Page )S
0
Commissioners' Court meeting July 23, 2002 9
as.allowed under Section 551.072 Texas Government Code.
At 10:20 a.m. the County Judge announced the meeting open
to the public and that no action would be taken.
The County Judge announced that Spartacus Caldwell,
formerly of WTAW radio station, would be joining the Emergency
Management team. He welcomed him.
There being no further business to come before the Court,
the meeting was adjourned.
Vol 3(- Page !(Q
•
The foregoing minutes of the Commissioners Court meeting
held July 23, 2002 have been examined and are approved in open
Court this the IA,~-_ day of 2002, in
Bryan, Brazos County, Texas.
Alvin W. Jones To Jon s
County Judge Commissio r, Precinct 1
• Thornton C. B. Jone
Commissioner, Precinct 2 Commission v, Precinct 3
~~dCiC~G
rey C'u ey, Jr. a en McQueen
Commissoner, Precin t 4 County Clerk
U
Vol 34 Page I ~
0
BRAZOS COUNTY `COMMISSIONERS COURT
MEETING ON z 200 ?--AT 9 : o o a..,,
NAME ORGANIZATION/DEPARTMENT
c .c.r4
87 U/U
1
Vim'` n
&lm
\
cam.
to, A
~~'r c ~
{'SAS S U7'9'l CQ..
A &amok
f4d Q,
e, A167-X
e-
D Qs
Log' 6c.-#-
rf
r n I-e e!p 1. 14-
Ti)
W->
OL .
•
r]
•
BRAZOS COUNTY'COMMISSIONERS COURT
MEETING ON Sky ~3 200 AT 9:oe .4m
NAME ORGANIZATION/DEPARTMENT
F(zi
1
J,-,
&
IV
6
Co ~
GL a LC.,I
10
CPS a-
•
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENT (S) FOR THE 2001-2002 BUDGET YEAR
NO. 01/02-33.1 through 33.4
On this the 23rd day of July 2002 at a regular meeting of the
Commissioners' Court, the following members were present:
Alvin W. Jones, County Judge, Presiding
Tony Jones, Commissioner, Precinct 1;
Wm. S. Thornton, Commissioner, Precinct 2;
C. B. Jones, Commissioner, Precinct 3;
Carey Cauley, Jr., Commissioner, Precinct 4;
Karen McQueen, County Clerk.
The following proceedings were held:
THAT WHEREAS, on July 23, 2002 the Court heard and approved a budget
amendment for the 2001-2002 budget year for Brazos County, Texas.
WHEREAS, an expenditure is necessary due to the necessity to meet
unusual and unforeseen conditions which could not be reasonably included
in the original budget adopted September 4, 2001 the following
amendment(s) to the original are hereby authorized, as described on the
attached page(s).
ADOPTED AND APPROVED this the 23rd day of July 2002.
THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS.
By: Alvin W. Jones, County Judge
Original: County Clerk's Office and attached to the original
budget
Copies: County Auditor
County Treasurer
Commissioners' Court Minutes
34
•
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 01/02 - 33.1
7/23/02
•
E
FD
DIV
ACCT
PROJ
DR/CR
ACCOUNT NAME
Increase
Decrease
01
301011
600800
Dr.
Uniforms
$ 100.00
01
301011
653500
Cr.
Gasoline
75.00
01
301011
672870
Cr.
Equipment - Radios
25.00
Constable
Precinct 1
To reallocate budget to allow the urchase of a uniform for the new reserve deputy constable.
a a r <e' aim
.27
0
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 01/02 - 33.2
7/23/02
FD DIV ACCT PROJ DR/CR ACCOUNT NAME Increase Decrease
01 222001 676700 Dr. Printers $ 550.00
Of 110015 611300 Cr. Contingency 550.00
361st District Court
Request from IT to purchase arelacement Laser Printer from the Non-De artmentsl Budget
a e;
-&Aft 3(4
C7
u
•
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 01/02 - 333
7/23/02
FD DIV ACCT PROJ DR/CR ACCOUNT NAME Increase Decrease
01 165001 676700 Dr. Printers $ 830.00
01 110015 611300 Cr. Contingency 830.00
,Purchasing Division
Re uest from IT to urchase arelacement Laser Printer from the Non-De artmentsl Bud et
r 0
4 . e.:
air
0
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 01/02 - 33.4
7/23/02
FD DIV ACCT PROJ DR/CR ACCOUNT NAME Increase Decrease
01 190001 673420 Dr. Furniture Minor $ 1,100.00
01 190001 606000 Cr. Office Supplies 1,100.00
District Attorney
To reclassi budget er the attached request.
T
a- WOMEN
31
•
•
PERSONNEL CHANGE OF STATUS
COURT DATE: July 23, 2002
DEPARTMENT: Personnel
page I of 1
PURPOSE: Approve Personnel Change of Status
DEPARTMENT NAME EMPLOYEE NAME ACTION REQUESTED
COUNTY AUDITOR RODRIGUEZ, MARIA TRANSFER WITHIN DEPT
SODOLAK, CHARLES LOWERING GROUP LEVEL
HARTSTACK, BROOKE NEW HIRE - FULL TIME
SHERIFF'S OFFICE/JAIL EDMUNDSON, JEAN M. NEW HIRE - FULL TIME
EMERGENCY MNGT. FORSTHOFF, FRED RESIGNATION
CALDWELL, SPARTACUS NEW HIRE - PART TIME
AGRICULTURE EXTN. CANNON, HILLARY RESIGNATION
ROAD AND BRIDGE WOODS, BOBBY J. NEW HIRE - FULL TIME
Approved in Commissioners' Court: July 23, 2002
County Judge's or Comrrussioner's Signature.
(This copy to be attached to minutes)
fig, 3 a w_ -~v.0 a~
DEPUTATION
THE STATE OF TEXAS
county of__..-BRAZOS James P. marrow
Conetable~ Precinct I BRAZOS
the County o* State of Texas, having
full confidence in Michael Ross Bewley of said County and State, do hereby,
with the consent of the Honorable Commissioners' Court oL___SRA208_. - ..County, nominate
and appoint__him the said Michael Ross Bewley ~y true and
lawful deputy, In my name, place and stead, to do and perform any and all acts and things pertaining to the
office of satCL._.... Deputy Constable _ ------of said County and State, hereby
ratifying and confirming any and all such acts and things lawfully done in the premises by virtue hereof.
WITNESS my hand, this lee _-day of_.-August-_Y _-x_200
Pct.I
of.._-__.BRnzOS _..._....County, Texas.
THB STATE OF TEXAS )
County of_-bZ4Z4S-_.- BEFORE ~grJud a Charles H_Ellis, Jr.
-.Ex-officio Notary Public - in and fon_-__ BRAZOS _..__-_.Coanty, Texas,
on this day personally appeared - Constable James P. Marrow
4nown to me to be
the person whose name Is subscribed to the foregoing deputation, and aclmowledged to me that he executed
the same for the purposes and consideration therein expressed.
GIVEN under any hand and seal of office at-..-._. Brazos County-.-..-___-,
of ...-__August 2002
Judg7edKai1ee- H. Sf1is, Jr.,
Ex-officio Notary Public, Brazos County; Texas
OATH OF OFFICE
I Michael Rosa Bewley .do solemnly
swear (or affirm) that I will faithfully execute the duties of the office of -__D@PutY _ _ ___.__._.......----._-...._..of the State of Texas,
and will to the best of my ability preserve, protect, and defend the Constitution and Laws of the United
States and of this State; and I furthermore solemnly swear (or affirm) that I have not, directly nor
indirectly, paid, offered or promised to pay, contributed nor promised to contribute, any money or valuable
thing, or promised any public office or employment, as a reward to secure my appointment, or the confirma-
tion thereof. So help me God.
Subscribed and sworn to before me, this 1st -_.._day of-August -M2002
Judge Charles H. Ellie, Jr.
EX-off; {sue xnrary pn151ic,...9razns..raun2y ..Texas
3-~-4, ~ 1 Q
,if
r~
BRAZOS COUNTY
BRYAN. TEXAS
RESOLUTION OF COMMISSIONERS COURT
WHEREAS, the Commissioners Court of Brazos County respectfully requests that its
portion of unclaimed funds received from electric cooperatives be allocated to Brazos County
• under Texas Property Code Section 74.602; and
WHEREAS, Brazos County is desirous of having the funds transferred to Brazos County
to be used to stimulate commercial activity in Brazos County as authorized by Section 381.004
of the Local Government Code;
NOW, THEREFORE, BE IT RESOLVED that the Commissioners Court of Brazos
County hereby claims its portion of unclaimed funds under Texas Property Code 74.602 and
requests the State Comptroller forward the funds to the Commissioners Court of Brazos County,
Texas.
Adopted this 23`d day of July, 2002 by the Commissioners Court of Brazos County,
Texas.
Alv W. Jones, • ty Judge
•
T66 Jonaf 06mmissi
m. S')'`liornton, Commissioner, Precinct 2
ATTES
aren McQueen, County erk
Charles B. Jones, ommissioner, Precinct 3
arey Cauley, r., Commissioner, P cin ,4
INTERGOVERNMENTAL AGREEMENT
The Bryan Independent School District (the "District'), for the amount of $1.00, agrees to
lease to Brazos County (the "County"), one double portable classroom building for the
purpose of providing academic programs to juveniles. This lease will become effective
when adopted by the Brazos County Commissioners Court and extends through June
30, 2003. Terms of the lease are as follows:
1. The District will provide to the County a double portable classroom building of the
District's choice, complete with AC units, skirting, access ramp, and blocks. The
District will be responsible for all utility disconnects. The County agrees to accept the
building as is, with all faults.
2. The County is responsible for moving the portable classroom building, by July 1,
2002, from its current location at 1918 N. Earl Rudder Freeway to the County site.
The County is responsible for all fees, permits, licenses, and labor to move, set up
and install.
3. Before the end of this lease, the County agrees to move the portable classroom
building from the County site to a site to be determined by the District. The County
will be responsible for all fees, permits, licenses, and labor to move, set up and
install.
4. The County agrees to return the portable classroom building to the District in the
same condition as was received, normal wear and tear excepted.
5. This lease may be renewed for a period of one-year with approval by the District and
County.
Approved:
Al ones, County ge Susan McKneely, President
Brazos County Bryan Independent School 's ict
7 -Z3-o2,
Date
7- /S- O -;t-
Date
`a
TCDRS Qualified Military Service Credit ' FRAY*ed
9,
Application Pagel oft
(Use when military service was preformed prior to county/district employment)
Member Information
Member's First Name Middle Initial Last Name Social Secunty Number
R t -C Y1 A 0-0 ~ . \//:N N C F- 5A4 $ 6o -Z 71-5
Mailing Address County/Drstnct Employer Name
5ZT. 3 t3 ox t_-23 X3,er4Zo$ Co•so-ry
City state Zip Code Daytime Phone Number
~R~e-a~ K WnJ 7-X ?785'4- (979) G-22-211211
u
I certify that I was on military duty for the period(s) listed below and that I am eligible for this service credit. I understand
that my account will be credited with the appropriate number of months for my military service performed.
Members signs ure ( sig ng this form, t that I have read the above information) Date
X 9- '71 oZ
Eligibility:
• County/distnct employer must have authorized qualified military service credit.
• Member must have earned 10 years (8 years if authorized) of total TCDRS service credit.
• Military service was performed prior to county/district employment.
• Military service must have been performed in the uniformed services and can be voluntary/involuntary.
• Member cannot have received credit for the same service under TCDRS or any other Texas public retirement
system.
• Member cannot be receiving nor be eligible to receive federal retirement based on 20 or more years of active
federal military duty or its equivalent.
• Deposits are not allowed and the maximum service credit that can be awarded is 5 years.
Instructions:
• Member should complete the "Member Information" section above and sign the form.
• Authorized county/district representative should review official military documents and complete the "Employer
Certification" section below.
• Submittal of a DD214 to verify service periods and type of duty (active or reserve) is required.
For active duty, you will receive a month of service credit for each calendar month of duty regardless of the
number of days worked in that month.
For reserve duty, you will receive one month of service credit for each year or fraction of a year of reserve time.
• Active and reserve duty should be differentiated on the application in the service period section.
• The military duty service periods provided in the section below should be consistent with the 'Total Number of
Months." If there are any discrepancies, military service will be credited using the service provided on the DD214.
Employer Certification
Type of Military First Month/Year of Military Last Month/Year of Military Total Number of Months
Service Service Service
Active or Reserve
C-r% VV- SePrr. vi foi 2cµ 1962,
~o
aRVjr f" jAAc1} 19&2 {~v 1 q!o? S. S
I certify that the periods of military service and total months of service listed above are correct. I further certify that I
have reviewed the appropriate military documents and that to the best of my knowledge the member qualifies for
"Qualified Military Service Credit" under Section 843.601(c) of the TCDRS governing statute.
X Gam.- - 40"N ~ 1 7- n-o
Any corrections or whiteouts must be initialed.
TCDRS • PO Box 2034 Austin, TX 78768-2034 • (512) 328-8889 or 800-823-7782 • Fax: (512) 328-8887 • www.tcdrs.org
3 ` ~ ~ , 0-i .
i:FSt'~ljri, i ~x'".,SlfE6UARD' t^~~r<< ;
- r:~s;- LADATmt Aeoe rv:A 1. a a.a sue: teAfd o+ r „ant~iw'
i
I
1 -
I
1
1
.T
'
L LAST, NAME %flRST. NAPE • MIDOLE MAME C,
2.+SERVCE NUMBER -
-
3 0. GRADE, RITE OR RANK
A DATE OF RANK (lkO; M&014-
- : •F'.-d' - -
DANCE: RICHARD -lINCiS
~k.
86'240 6
=86'24036
'A 3C E-2
Year)
Nov 61
'4
L DEPARTMENT. COMPONENT AND BRANCH OR I
S. PLACE OF BIRTH or
e. GATE
OAT
NTH
MO
rEAR ,
RCE
Bryan, Texas 1
WIN
28
un
7 a. RACE
A SEX
t: COLOR HAIR
Q COLOR EYES
t. NOGf1T
t WEIGHT
a U.S. CITIZEN
9. MARITAL STATUS
v
1
61
l
75
12- 0-
11 Single
RI a. HIGHEST MILJAR EDUCATION LEVEL
& MAJOR COURSE OR FIELD
-
ATTAINED
Engineeririg
II o. TYPE OF TRANSFER OR DISCHARGE
A STATION OR INSTALLATION AT WHICH EFFECTED
00
Release -k,m Active Duty
Ar Fo
rce Base.
tl
c. REASON AND AUTHORITY ^_~ey~ OII of !L/ cLi~3S DISC +.0
LLL
Service
IL C-
VVE
DAY
MONTH
YEAR
r _
, .
I
DATE
U-1
+
g
62-
12. LAST D ASSIGNMENT AND MAJOR COi1M,6tID 1
E
ERKSE
A TYPE 65UOF CERTIFICATE
ED
3510 USAF Q
"4~TY.
14, SELECTIVE SERVICE NUM RC~FhI
I& DATE LN6ucTEb
J
1
I-
7
~
•f'
^ `
DAT
MONTH
YEAR,'
13
37
T _4
Rm 6 1
a~oc~B
B en r
o's ~r
NIA
~a
.
-
~j
T7. DISTRICT OR AREA y~ IST % D
M
1
•
i r
A. 3E
-
-
IB. MIN AL DA ERY 19.. IlL'F YE CE THER TAN fINDU
O LK; ON O j(
DAY
r
V
TE ,t 9 ~9E. 1
b
3~ DATE OF ENTRY
NONTH YEAR :
S D ❑tEllll$iED Serf orJ
S
T
'
Y
M
4
'67
~
OTHER rd s r. 6
6, An
o
-
A
A, .
20. PRI R G111AR 21 GRADE. TE OR RANK AT TWE, of i - It PLA OF f;NTRY INJip'tURR SERYI~E tCSp~,IdSta7iJ
EN~ ! 4n
i ENTRY CJIRRE
NT ACTIVE S£RYItE (
f
.
i
/
~ 1 ~C
g
~'y
1
n
+
r
,
i;
21 HOMR yi{E AT TUf T INTO A
CE II RFD , d0'. " 24. Si
/ATEW SERVICE F"i
`{A ~ LotF[HS
DAYS
k Zn os~ r . cREO1T to
~ e rtrl~: uDO -7
r~. W(
"y
O 6l
0t) I
rw
}FOR c2
:
r~ ' BEN' Y C'~".
'
'
68
_
•
.
i
` PA
"
-
.
tL7
1
25 eER AND
P K) A D
{
W
-
Ilne fD)
m • C
lffiW
j
t
`
c
.
,
it Y
rb SEA' SERVICE-,
I „
q
`
COYMERDATKMi9. C17 D
26
EQA
I1
-ORI2ED
t
e
T
l
`
E"y(
27. ED A3 A RFS OF ACTION' WITH, f 'd
I
AE
~
26. S G GE,7
ESSFLLLY CO -
TH R CE TRAINING
~•.--;DATES 'A=r
WNW J7
AJOR CO /
~S UCCE53FULLT
Gtante omp e edA962 Meci
S e
N/A
AE~90
AK
30 a. GOVERNMENT LIFEi1
.,r, mr. - _
a MONTH ALLOTMENT
Dt50D,fiK,,UED::/A
iK .
31 a, VA BENEFITS PREYIOI15LY4
7
A VA CLAIM NUMBER
:mss
r7
c N/A
:
e, • ;
~ISJ S
Non
e 1: . SIVJ~7 yv Y r1
Elect G
9 `95, en 65
~
Blood Group APos_;`y; `RF•A -1
tLL/'.. ;
;
1~T` 7 . it '•e.R P.,.~t4' n ~ - ~ -
HO • f.73R@ 10 St;1 : ;~%cr ''~Ilvv,~i'~' ~ : • `f %'k' • A' •
°lOP
;Nqt=: a i
ible
j
g
Pain •for 15 dayer aecr edUbixire.
=
`
S cial Security':No
6, 613=2 68 - _
-
<
'
3•.I. PERMANENT ADDRESS FOR MAILUIG PURTOSES;APTER,T SFER OR DISCHARGE= - 34CS"TURE OF PERSON BEING TRANSFERRED OR DISCHARGED ,
;E
<l
'
'
m
m
fe
^
'
Sa
e
as .
23
I
'
a`
ter,.
35 s TYPED NA* - GRADE•AND F"T :QF A~ t~'
xZW~G'O~TTCER . .rt•'•
''r, =
0
R
S
;DY
oTzS
•b, BIC~T4lTUFE
;z
, 0 _ SN,YI
. -
.
I
i.:
~tSArz*
Xg z- 4 ~`:wY • •.ra ~ 71 47r 5-OF. TILE UNITED _STATES
` k`• ;REPORT OF_;7R!_iTtSFER'-OR D15CHAR E
w-I ;~rE,;?4=!•,4.tih;~' n!1•a~
- , ,>t`•`';,i ,r ,ti E , • -,h-uv ..Jr'~^:I:±L.
Mim" ..W",
•
BRAZOS COUNTY
COMMISSIONERS' COURT ACTION FORM
t
DEPARTMENT Road and Bridge NUMBER 560010
DATE OF COURT MEETING: July 23. 2002
ITEM: Reauest from Verizon to construct 780 feet of buried cable installation in the
right of way of Democrat Road to accommodate road improvements project. Site is
located in Precinct 2.
SOURCE OF FUNDS: N/A
REQUIREMENTS:
1) No work will be permitted between front slope and/or back slope.
2) All installation(s) shall be constructed in designated utility easements, if applicable. If no utility
easement exists, the installation(s) shall be 1) within 3-5' of and parallel to the right-of-way line
and/or 2) in the case of a road bore, perpendicular to the right-of-way line.
3) If clearing of brush, trees and other obstruction is necessary, it shall be the Applicant's
responsibility to do so and to remove all cleared brush, trees etc. from county right-of-way.
4) Ditch line shall be compacted to 90% standard density ASTM-Test Method No. D-698; test shall
be conducted by an independent geotechnical testing firm; copies of all test results shall be
furnished to the office of the Brazos County Engineer.
5) Construction shall be in strict conformance to the latest Texas Manual of Uniform Traffic Control
Devices for Streets and Highways, published by the Texas Department of Transportation, and all
other State and Federal laws governing utility construction.
NOTESIEXCEPTIONS:
•
SUBML,TWD BYE APPROVED BY:
Richard F. Vance, P.E. Commissioner William S. Thornton
County Engineer Precinct 2
cca2-o72
Approved 91-1/Denied ❑ by Commissioners Court
Date: 7 • 206 -oz
Alvin . Jones, C my Judge
-j I u~
3 ct.!..P
is
veriLon
ACCESS DESIGN
301 INDUSTRIAL BLVD.
BRYAN, TX 77803
JULY 12, 2002
RICHARD VANCE
BRAZOS COUNTY ENGINEERING OFFICE
COUNTY ENGINEER
2617 W. HWY. 21
BRYAN, TX 77803
DEAR MR. VANCE:
SUBJECT: AGRMNTS 24 BURIED CABLE
ENCLOSED ARE FROM ED-135 AND A WORK LOCATION SKETCH SHOWING THE LOCATION OF
OUR PROPOSED COMMUNICATION CABLE LINE ON COUNTY ROADS IN BRAZOS COUNTY AT
BRYAN, TEXAS.
THIS WORK IS TO BE COMPLETED ON WORK ORDER 5435 - 3P001 FP WHICH IS SCHEDULED
FOR JULY 15, 2002. IF YOU HAVE ANY QUESTIONS CONCERNING THIS WORK, PLEASE
CONTACT JOE YOUNG AT OUR OFFICE IN BRYAN, TELEPHONE 979-821=1303 WITHIN 15 DAYS
SO THAT WE MAY EXPLAIN OF MODIFY OUR PROPOSAL, OTHERWISE, IT IS UNDERSTOOD THAT
THIS PROPOSAL IS APPROVED.
SINCERELY,
J HN ARNOLD \
SUPERVISOR - ACCESS DESIGN
JA:EC k-1, '46 'Vgi-z:4
ATTACHMENT 7-17 _ 4pZ
J2. C`oppo
vew
•
VERIZON COMMUNICATION Notice of
Line Installation
July 12, 2002
•
To The Commissioner's Court of Brazos County
ATTENTION COUNTY JUDGE:
Formal notice is hereby given that VERIZON COMMUNICATIONS will
construct a communication line within the right-of-way of a County Road in
Brazos County, Texas as follows:
Verizon Communications will place 780 feet of buried cable along I'ap
Democrat Road at a minimum depth of 30 inches. This cable will
laced 2 feet outside the new fence line that was constructed tU_"
be
p
lZv'a
for the road mover by Brazos County Road and Bridge crew across
G
jb*
from 13955 Democrat Rd.
,IZ.pZ
a,
The location and description of this line and associated appurtenances is
more fully shown by two (2) copies of drawings attached to this notice. The line
will be constructed and maintained on the County Road right-of-way in
accordance with governing laws.
Notwithstanding any other provision contained herein, it is expressly
understood that the tender of this notice by the Verizon Southwest"Incorporated
does not constitute a waiver, surrender, abandonment or impairment of any
property rights, franchise, easement, license, authority, permission, privilege or
right now granted by law or may be granted in the future and any provision or
provisions so construed shall be null and void.
Construction of this line will begin on or after July 10, 2002.
RIZON C MMUNICATIONS 5435-3P001 FP
John Arnold
Supervisor-Access Design
301 Industrial Blvd.
Bryan, TX 77803
3 k t.kgg-It 3
is
'co1FP
4
3 <<
' DIG UP CABLE WHERE NEW
N
FENCE MEETS EXISTING FENCE
OIG UP EXISTING CABLE
m s
AT START OF NEW FENCE + s v
a
~ m T { ~ \22412 !
A2e)g8$) fPPJ o, co 2423 \ !
er'~ ~qSP
25 Z 40_ 52
x60 j ~P~~~ + _ <~P091fP) N•12 ]]1 . - r_1.p 3.A 36
~O~ X~D - _6g~> F 12.2 8-''~-'/ - X1.836 656
Q 3-~ <Pp?
C 1000.1 1 -P1U A C\,65
C% 6 x'836 f> ~_~~t~pp]"~~ g Q e X00 59 659
X0457.;656 <pp> c\ \p-\2
L ' O C l-6-8 ss9 P> to ~0 ] 7 (pPY> GO p X
G,0 411.10,6 <PP) ti CI.63R•659 <PPx) ~^Y
° X
O 18'1? CPPx> ;y,
Op.13.2$ <PP)
rG, op Tn
ti 9%S ~ ,~+aaaan^^n
4.On xt~aNa4c;c Vlpl~(o ~r1
~p O h ~ ; 4: 1n
! ° e`A `+o ~`Oo h06` ,gym • a u` v~ v $ c oio•,ES7S WARNING I
TO "wr6kK: DIN OUIP .SHOLLO 8EE LI INialIFCO TO CE TIWKTE~ u1,00V5
W U a t
' a J ~a A0C Oet11E TAmesmssIO<, %"mT Lt,.•em•e15lIW
24 HOURS PER DRY / DRYS PEA WEEK
Kro;tE sTAAinc MR w~t.ASR ranglr THESE OXSnP,s
T L 010 I REVIEW IIECOTERT PROCEQIEST
2. HAVE I IDEWTIFIEO SERVICES AAO USERS IRNCTT W ~ t 0
i
yj g HAVE 1 FILEO A I"OI RISK ACTIVIty ft m?
nN m sND L 1 VE THE I A LIVERS BEEN REMSSION TEST ST FLAIR ~ m
'VC R0.VE 1 C E0QE0 TO SEE IF NOTIFIED OF IK
THE VM > T
Dom
O OE
MAKE A BURIED SPLICE ON 3 PAIR DROP AT P017 FEISORNEO CLO410 THE 14WW7 dfcY ?T d
Y,i Jmvie-~ Y. 00 1 RAVE A IETR00 OF FOCEOWET
V O. W 11OOW V HO TO CALL I" CASE OF AN OUTAGET
3; by b pa N0 AND EXTEND DROP TO NEW P017 FIXED COUNT TERMINAL. L MI 1 COFIOEWF 1GW KItdM THE WM COMCTLY AO SAFELY?
h YOU A11SIEIEG WO TO MAY Or THESE OiESTI0R54A FEEL TIWI TOO
yt~~bti 06~^l D A IF
nL~. 0hg0o0 s DROP AT P017 HAS 3 WORKING LINES FOR 13955 DEMOCRAT RD CAHOT COWLETE THE JW SAFELY?
v ;g)p589-3029 589-3714 589-3213
+44~, STDP W NOT ATTEMPT THE JOeI CALL ,0U" SUKftlSOR 110EOIATELY,
VER[ZON 511
NOTE AREA- OBSERVE ALL SAFETY RULES. AREA srarE: rx
DIVISION.- sourMWESr ExcK,SUS REM.cD., ees
W.C - 8890 WO NO.: 3P001FP CONTROL NUMBER:
' LOCATE ALL TELEPHONE CABLES. DROPS. AND BURIED UTILITIES. TTTLEIROAO NOTE DEMOCRAT RD TAX DST.:
TWP: RNG.: SEC.: SAL:
cALE: I•I00
PLACE CABLE 2 FEET OUTSIDE NEW FENCE LINE BUILT FOR ROAD MOVE. DATE: e].ea.e2 EV. DAM
FILE: WP 1 DAWN ENG APRYO •PRINT
BRAZOS COUNTY
COMMISSIONERS' COURT ACTION FORM
DEPARTMENT Road and Bridge NUMBER 560010
DATE OF COURT MEETING: July 23. 2002
ITEM: Request from Wickson Creek Special Utility District to construct a road bore for
water line installation in the right of way of Steep Hollow Road approximately 150 ft.
from its intersection with C-6 Ranch Road. Site is located in Precinct 2.
SOURCE OF FUNDS: N/A
PRESENTATION:
A) No work will be permitted between front slope and/or back slope.
B) All installations shall be constructed in designated utility easements, if applicable. If no utility
easement exists, the installation(s) shall be 1) within 3-5' of and parallel to the right-of-way line
and/or 2) in the case of a road bore, perpendicular to the right-of-way line.
C) If clearing of brush, trees and other obstruction is necessary, it shall be the Applicant's
responsibility to do so and to remove all cleared brash, trees etc. from county right-of-way.
D) Ditch line shall be compacted to 90% standard density ASTM-Test Method No. D-698, test
shall be conducted by an independent geotechnical testing firm; copies of all test results shall be
f imished to the office of the Brazos County Engineer.
E) Construction shall be in strict conformance to the latest Texas Manual of Uniform Traffic
Control Devices for Streets and Highways. published by the Texas Department of Transportation,
and all other State and Federal laws governing utility construction.
ACTION REQUESTED OR ALTERNATIVES:
SUBMITTED BY: APPROVED BY:
Richard F. Vance, P.E. .,--~omm-is-! linerlllliarn S. Thornton
County Engineer Precinct 2
0002-071
Approved E/ Denied ❑ by Commissioners' Court
Date: '7 - 23 - oTi
Alvin W. Jones, C unty Judge
•
BRAZOS COUNTY •
COMMISSIONERS' COURT ACTION FORM
r,
u
DEPARTMENT Road and Bridge NUMBER 560010
DATE OF COURT MEETING: July 23, 2002
ITEM: Permission to enter E. Duane Peters' property located off Democrat Road for the
purpose of dumping excess dirt excavated from drainage channel on same property.
Site is located in Precinct 2
SOURCE OF FUNDS: N/A
REQUIREMENTS:
NOTES/EXCEPTIONS:
SUBMITTED BY:
Richard F. Vance, P.E.
County Engineer
0002-070
APPROVED BY:
ommissioner W iam S. Thornton
Precinct 2
Approve&/Denied❑ by Commissioners Court
Date: A - 7- 7 -ej7
Alvin W. Jones, County Judge
4~ . r
0
BRAZOS COUNTY '
PRIVATE PROPERTY ACCESS PERMISSION FORM
AMn W Jones
County Judge
Tony Jones
Commissioner Pet I
Willaun & Thomton
ComndssWw Pd 2
i C.S.Jones
Commissioner Pd 9
Carey Gainey
Commussloner Pct 4
Date
I. J. LAND OWNER AND ADDRESS I y U Z- v-^-o
If.' LOCATION OF WORK
III. DESCRIPTION OF WORK TO BE DONE i'tt-:~ ~ .P.~.[a., Z
J r
IV. MAINTENANCE YES ~ NOX
T
IF YES, ESTIMATE FREQUENCY OF MAINTENANCE
(Owner will
b tified prior to maintenance)
eE11A AL-1a,
Richard F. Vance, P.E
County Engineer
Owner's Signature: _
DATE - (O O ~Z/
u
REQUEST FOR PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY
TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN, TEXAS 77803
Formal notice is hereby given that (applicant) Wickson Creek SUD proposes to
place a (type) waterline 1901sthe right-of-way of (road) 6teevhollow Rd.
In Brazos County, Texas as follows:
The location or description of the proposed installation is more fully shown by 3
copies of the drawings attached to this notice.
• I understand and agree that:
1. The County Engineer must by notified 72 hours prior to the beginning of
construction in order that he or his designated inspector may inspect the
actual Installation.
2. That all damage to the roadways and rights-of-way will be repaired to
their original condition to the satisfaction of the County Engineer.
3. That Brazos County reserves the right to require Applicant to relocate or
lower any such line at no cost to Brazos County, should same become
necessary due to widening or lowering, or other alteration of the
roadway or tight-of-way.
4. That Brazos County will in no way be responsible for any damage which
might occur to any existing utility lines in the right-of-way.
5 That the line will be constructed and maintained on the County right-of-way in
accordance with the Utility Accommodation Policy which was adopted by the
Texas Department of Transportation on May 29, 1989.
6. That the line or lines will be constructed no less than twenty-four inches (24")
lower than the lowest part of the drainage or bar ditch and the drainage is to
• be considered at least two feet (2') below the center of the roadway.
7. That all sites will be barricaded during the construction period.
Construction of this line will begin on or after the 22nday of July , 20 02
Firm', Utility District
By: 4 6. Kent Watson
j itle: General Manager
Add ss' P_ n. Rmc 4756
77805
Phone: 979-589-3030
APPROVED BY COMMISSIONERS'
COURT ON: yyO ;2-
Z3- O'12G
Date %
e2 k d5 AVOTxro
Alvin .!ones, Coun Judge ` o (►gq
Rewind U23107 yt~88 f~ pp
~C pve
r~