NOTICE OF MEETING
AND AGENDA
BRAZOS COUNTY COMMISSIONERS COURT
THE COMMISSIONERS COtTRT WILL MEET IN REGULAR SESSION ON TUESDAY,
FEBRUARY 27, 2001 AT 9:00 A.M. IN THE COMMISSIONERS COURTROOM OF THE
BRAZOS COUNTY COURTHOUSE, 300 EAST 26m STREET, SUITE 115, BRYAN,
TEXAS.
1. Invocation - Commissioner Cauley.
2. Pledge of Allegiance - Commissioner Cauley.
3. Call for citizen input and/or concerns.
•
Consider and take action on agenda items 4 - 17:
4. Budget Amendment 00/01-19.
5. Personnel Changes of Status.
6. Payment of Claims.
7. Introduction and approval of candidate for the County Extension Agent - 4-H and Youth
Development position.
8. Appointing another member of the Brazos County Historical Commission.
9. Application for Tax Refund to Transamerica Real Estate Tax Service.
10. Establishing date and time for a Public Hearing for an application for a revision of the
plat for Creekridge Estates, Section One, located in Precinct 1.
11. Request by Sheriffs Office, Jail Administrator to make a budget adjustment from
position 1517-2 to position 1511-50, Detention Officer position.
12. Blanket Purchase Orders.
13. Requisition from Capital Expenditures for a Server for the Network Infrastructure for the
Ipformation Technology Department.
14. 'Agreement with Buchanan/Soil Mechanics, Inc. to provide construction materials testing
services and quality control.
49~
Commissioners Court Meeting Agenda
February 27, 2001
Page Two
15. Award of Bid #2001-037, Second or Additional Seal Coat Project for Precincts 1, 2,3
and 4.
16. Request from Jerry Windham, developer of Ranger Industrial Park located on Marino
Road, for a variance of the Subdivision and Development Regulations relative to lot size.
Site is located in Precinct 2.
17. The Final Plat of Pounders Subdivision, Lot 1, 4.017 acres, Stephen Jones Survey. Site
is located in Precinct 4.
18. Acknowledge receipt of monthly reports from department heads and elected officials.
19. Announcement of interest items and possible future agenda topics.
20. Call for citizen input and/or concerns.
21. Adjourn.
The Courthouse is wheelchair accessible. Handicap parking spaces are available. Any request for
sign interpretive services must be made two business days before the meeting. To make
arrangements, call (979) 361-4102.
.
1111
1
ti
.j
,c
.tl
I
•
1
•
•
COMMISSIONERS' COURT
REGULAR MEETING
FEBRUARY 27, 2001
A regular meeting of the Commissioners' Court of Brazos
County, Texas was held in the Commissioners' Courtroom in the
Courthouse in Bryan, Brazos County, Texas, beginning at 9:00
a.m. on Tuesday, February 27, 2001, with the following members
of the Court present:
Alvin W. Jones, County Judge, Presiding;
Tony Jones, Commissioner of Precinct 1;
Wm.S. Thornton, Commissioner of Precinct 2;
Randy Sims, Commissioner of Precinct 3;
Carey Cauley, Jr., Commissioner of Precinct 4;
Mary Ann Ward, County Clerk.
The attached sheet contains the names of the citizens and
officials that were in attendance.
Commissioner Cauley gave the invocation and led the
pledge of allegiance.
There was no citizen input/and or concerns.
The Court first considered Budget Amendment #00/01-19.1,
which would transfer funds to the General Fund from Capital
Improvement Fund for the County Attorney's office. On motion
by Commissioner Cauley, seconded by Commissioner Sims, the
Court voted unanimously to approve the budget amendment as
submitted, a copy of which is attached hereto.
The next matter before the Court was a request from the
Jail Administrator for a budget adjustment for his department.
This is merely a transfer of funds from one position to
another and would not result in an increase to the
departmental budget. On motion by Commissioner Sims, seconded
by Commissioner Cauley, the Court voted unanimously to approve
the request for the budget adjustment.
The Court proceeded to consider the change of status of
employees as submitted on the attached Personnel Action
Requests. On motion by Commissioner Cauley, seconded by
Vol oZ a` page 500
i
1
Commissioners' Court meeting February 27, 2001
2
Commissioner Sims, the Court voted unanimously to approve the
changes as submitted.
The Court next considered the following Claims as
submitted by the County Treasurer for payment:
20016239 through 20016263
On motion by Commissioner Jones, seconded by Commissioner
Thornton, the Court voted unanimously to approve the Claims as
submitted.
The next matter before the Court was the introduction and
approval of the candidate for the County Extension Agent - 4-H
and Youth Development position. Dr. Dale Fritz, District
Extension Director, introduced Allen "Brant" Poe. On motion
by the County Judge, seconded by Commissioners Jones,
Thornton, Sims and Cauley, the Court voted unanimously to
appoint Brant Poe to the position of County Extension Agent
effective March 5, 2001.
The Court next considered appointing another member of
the Brazos County Historical Commission. On motion by
Commissioner Jones, seconded by Commissioner Cauley, the Court
voted unanimously to appoint Mrs. Suzanne Gallagher as a
member of the Brazos County Historical Commission.
The next matter for consideration was a tax refund to
Transamerica Real Estate Tax Service. It was discovered that
Transamerica had paid on this property in error. On motion by
Commissioner Sims, seconded by Commissioner Cauley, the Court
voted unanimously to refund $967.03 in county taxes for 1999
to Transamerica Real Estate Tax Service.
The Court next considered establishing a date and time
for a Public Hearing for an application for a revision of the
plat for Creekridge Estates, Section One, located in Precinct
1. On motion by Commissioner Jones, seconded by Commissioner
Cauley, the Court voted unanimously to set the Public Hearing
Vol o2oZ Page 500 P-
i
i
Commissioners' Court meeting February 27, 2001 3
•
•
for Tuesday, April 3, 2001, at 10:00 a.m. It will be held in
the Brazos County Courthouse, 300 East 26.h Street, Suite 115,
Bryan, Texas.
The Court proceeded to consider the following blanket
Purchase Orders:
Scarmardo Produce Jail $2,350
Alliant Food Jail $8,000
Sysco Food Jail $7,500
Performance Jail $7,000
Ben E. Keith Jail $1,350
US Foodservice Jail $ 800
Glazier Jail $1,300
Butterkrust Jail $1,600
Lilly Dairy Jail $2,800
Cain's Coffee Jail $ 600
Acme Soap Co. Jail $ 700
Ray Criswell Dist. Jail $1,000
On motion by Commissioner Sims, seconded by Commissioner
Cauley, the Court voted unanimously to approve the Blanket
Purchase Orders as submitted.
The Court next considered approval of a requisition from
the Capital Expenditures for the following purchase:
a) Server for the Network Infrastructure for
the Information Technology Department,
$8,560.00.
On motion by Commissioner Cauley, seconded by Commissioner
Sims, Court voted unanimously to approve the requisition to be
paid from Capital Expenditures.
The Court next considered entering into agreement with
Buchanan Soil Mechanics, Inc. to provide construction
materials testing services and quality control. On motion by
Commissioner Sims, seconded by Commissioner Cauley, the Court
voted unanimously to enter into agreement with Buchanan Soil
Mechanics for testing services. A copy of the Agreement with
fee schedule is attached.
Vol a a. Page 601
Commissioners' Court meeting February 27, 2001
4
The Court next considered awarding the following bid:
Bid No. 2001-037, Second or Additional Seal Coat Project
for Precincts 1,2,3&4
Pat Howard, Purchasing Agent, recommended
acceptance of the bid submitted by Big
Tex Paving. On motion by Commissioner
Sims, seconded by Commissioner Cauley,
the Court voted unanimously to accept the
recommendation of the Purchasing Agent
and award the contract to Big Tex Paving.
A copy of the bid tabulation is attached.
The Court next considered a request.from Jerry Windham,
developer of Ranger Industrial Park located on Marino Road,
for a variance of the Subdivision and Development Regulations
relating to lot size. The site is located in Precinct 2. The
Subdivision Regulations state that a lot size be a minimum of
one acre. Thornton explained that this request needs some
real consideration. It is an older subdivision put in 1980-
1981 with 1% acre lots. With the exception of Lot 2, two
buildings each were put on lots 1 & 3, The developer wants to
subdivide into 3/4 acre lots to allow for the sale of
individual buildings. On motion by Commissioner Thornton,
seconded by Commissioner Jones, the Court voted unanimously to
approve the variance contingent on the submission of the re-
plat.
The Court next considered approval of the Final Plat of
Pounders Subdivision in Precinct 4. Richard Vance, County
Engineer, stated that he had reviewed the plat and all
appeared to be in order. On motion by Commissioner Cauley,
seconded by Commissioner Sims, the Court voted unanimously to
i
approve the final plat of the Pounders Subdivision as
submitted.
The Court acknowledged receipt of the Extension Service
reports for January 2001 and acknowledged receipt of reports
from the following County and Precinct Offices showing
Vol aa` Page f
b
Commissioners' Court meeting February 27, 2001
revenues collected and remitted to the County Treasurer:
•
County Clerk
District Clerk
Justice of the Peace Precinct 2
Justice of the Peace Precinct 3
Justice of the Peace Precinct 4
Justice of the Peace Precinct 5
Justice of the Peace Precinct 6
Constable Precinct 4
Constable Precinct 5
Constable Precinct 6
Brazos County Events Facilities
County Attorney
Road & Bridge
Tax Assessor/Collector
S
A copy of the Officials' reports can be viewed in the County
Auditor's office.
Under announcement of interest items and possible future
agenda topics the County Judge made the following comments:
is
a) He attended a CUC meeting in Austin and
will be circulating information.
b) There will be a Workshop today at 2:00
p.m.
Commissioner Sims made the following comment:
a) He asked Commissioner Jones the status of
the Brazos/Robertson County Water
District and what was happening in the
Legislature in reference to water.
There was no citizen input and/or concerns.
There being no further business to come before the Court,
the meeting was adjourned.
•
Vol
Page
503
, i
1
The foregoing minutes of the Commissioners Court meeting
held February 27, 2001 have been examined and are approved in l
open Court this the /S011 day of 2021, in
.-1
Bryan, Brazos County, Texas.
. QAktz
Alvi W. Jones Tony Jones
County Judge Commissioner, Precinct 1 '
m. . Thornton Randy ms
Commissioner, Precinct 2 Comm' sioner, Precinct 3
Carey Cau y, Jr. aren McQueen
Commissio er, Precinc County Clerk
i
! 3
Vol aZ Page 504
n
~j
,
I
i
This Page
has been
intentionally
left blank
,,OI. _aa taL--~
61
• '
1
BRAZOS COUNTY COMMISSIONERS COURT
MEETING ON 'e b. 9~-200.L AT -9,',OP
NAME
OR rirANI7.ATIOWfr)FPARTMRNT
!/fts~c.Q/
Al-
dt~'o`t• iy
l If
lz4 .
c
r r~ tav
~JIS
C. '
W IV IC e,44iVa I
wu~
6
Z s #A so _
C7
•
1
4
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENT(S) FOR THE 2000-2001 BUDGET YEAR
NO. 00/01 - 19.1
I
On this the 27th day of February 2001 at a regular meeting of
the Commissioners- Court, the following members were present:
I
Alvin W. Jones, County Judge, Presiding
Tony Jones, Commissioner, Precinct 1;
Wm. S. Thornton, Commissioner, Precinct 2;
Randy Sims, Commissioner, Precinct 3;
Carey Cauley, Commissioner, Precinct 4;
Mary Ann Ward, County Clerk.
The following proceedings were held:
THAT WHEREAS, on February 27, 2001 the Court heard and
approved a budget amendment for the 2000-2001 budget year for
Brazos County, Texas.
WHEREAS, an expenditure is necessary due to the necessity to
meet unusual and unforeseen conditions which could not be
reasonably included in the original budget adopted September 5,
2000 the following amendment(s) to the original are hereby
authorized, as described on the attached page(s).
ADOPTED AND APPROVED this the 27th day of February 2001.
THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS.
By: Alvin W. Jones, County Judge
Original: County Clerk's Office and attached to the original
budget
Copies: County Auditor
County Treasurer
Commissioners' Court Minutes
#QL2L=.pjpA&jC=)-7 -s
ti
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 00/01-19.1
1rrumt
FD
DIV
ACCT
PROD
DR/CR
ACCOUNT NAME
Increase
Decrease
45
630005
809500
Dr.
Exposition Center
524.00
45
630005
913000
Dr.
Transfer to General Fund
576.00
45
630005
803420
180001
Cr.
Furniture
1,100.00
Capital Improvement
Fund
To remove the budgeted amount for the credenza approved for the Coun
ty Attorney
which was approved 2/20/01 to be transferred to the General Fund.
01
180001
673420
Dr.
Minor Furniture
576.00
01
490150
Cr.
Transfer Fm Capital Imp.
576.00
General Fund
To setup the budget as approved 2/2
0/01 for t
he purchase of minor furni
ture.
r-.- ,-r..-.. . -cr • tte:
ed I3y•ate: 2/20/0
7-7
2a. -akl-
G:Form2/99Bud Amend
Yi~
•
0
. ~1
4
h
O O
G,r
Y Op
JAMES M. KUBOVIAK
COUNTY ATTORNEY
BRAZOS COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
TELEPHONE (4m 7614700
FAX (4010 761-757
700 E 26TH ST. STE 723
BRYAN. TEXAS 7760}S727
MEMO
TO:
Margie Wedel, Assistant County Auditor
FROM:
Candy Gallego, County Attorney's Office
DATE:
February 6, 2001
RE:
Budget Amendment
Please tran
sfer $576.00 from 630005-803420 (capital furniture) to 180001-673420 (minor
furniture).
The actual cost of the credenza was less than anticipated. Thank you.
BRAZOS COUNTY, TEXAS
RECOMMENDED BUDGET - MAJOR CAPITAL ASSETS
Items To Be Funded From The General Improvement Fund 45
For The Year Ending September 30, 2001
Estimated
Description Unit Cost Quantity Total
Building & Grounds Maintenance 1700
Building Carpet:
Health Dpt S 12,500.00 1 12,500.00 801000
Ag. Ext. S 8,500.00 1 8,500.00 801000
Annex S 19,200.00 1 19,200.00 801000
Road & Bridge S 6,100.00 1 6,100.00 801000
Cargo Van S 18,500.00 1 18,500.00 808900
Total Building & Grounds Maintenance S 64,800.00
County Attorney 1800
Computers S 1,730.00
Credenza4 drawer,5 ft S 1,100.00
Total County Attorney
District Attorney 1900
Computers - PC S 1,730.00
Total District Attorney
District Clerk 2000
No Request
Total District Clerk
County Clerk 2100
Computer - PC S 1,730.00
Total County Clerk
5 8,650.00 802030
ti 1,100.00 803420
S 9,750.00
lroow- Ws q10
q,.'.1
2 3,460.00 802030
$ 3,460.00
S -
2 3,460.00 802030
S 3,460.00
County tee io n 210020
No Request
Total County Elections $
0:2001 Budget Approve\ 0/2/00
44 Capital Improvement\ 1
Page 3 of 10 0/2 00
Major Acq.
k
1
z
•
PERSONNEL CHANGE OF STATUS
page 1 of l
COURT DATE:
February 27, 2001
DEPARTMENT:
Personnel
PURPOSE:
Approve Personnel Change of Status
tw*##t###*##**##t
i##ttti#tii*#tttit#t*******##t#wt##ttitt#
tititit***##w***#t*##wtttt
DEPARTMENT NAME
EMPLOYEE NAME
ACTION REQUESTED
tttt##t###t*##wtt
ttwttttiiwtttitttt#*##****w*t#trttttttttt
iiittttt*+#*#*tw*#w**w#tt•
BUILDING MAINT.
REED, STEPHANIE
RESIGNATION
COUNTY CLERK
WARD, MARY ANN
RETIRING
MCQUEEN. KAREN
APPOINTED COUNTY
CLERK
DISTRICT CLERK
LYON, MONIQUE N
NEW HIRE F/T
I1
u
INFORMATION TECHNOLOGY KUTIPER, TONY
TRANSFER W/IN DEPT
JESKE, LINDA
PROMOTION
GLEN, HAYES
TRANSFER W/IN DEPT
JUVENILE SERVICES WOLF, KEVIN
RESIGNATION
DEVAULT, TASS
NEW HIRE PR
ALANIZ, III JOE
RESIGNATION
LEWIS, MICHAEL
NEW HIRE TEMP
SHERIFF'S OFF - JAIL DIVISION LEDEZMA 111, RAUL
NEW HIRE
TWYMAN, MARCIA D
NEW HIRE
SIGNOR, MOLLIE C
NEW HIRE
CIRILO, CAROL
DISCHARGED
SNEED, CHARLES
TRANSFER W/IN DEPT
Approved in Commissioners' Court: February 7 2001
County Judge's or Commissioner's Signature: .
(This copy to be attached to nunutes)
•
AGREEMENT TO PROVIDE
CONSTRUCTION MATERIALS TESTING SERVICES
AND QUALITY CONTROL.
This agreement is by and between BRAZOS COUNTY. Engineering, Mr. Richard Vance. P.E.,
2617 Highway 21 East, Bryan, Texas 77803, hereinafter known as CLIENT, and Buchanan/Soil
Mechanics, Inc., hereinafter known as LABORATORY.
CLIENT desires to engage LABORATORY to provide Materials Engineering and related construction
inspection and materials tc%ting %ervices in connections with CLIENT's project ("THE PROJECT")
described as follows:
Construction Materials T"ting for various 2001 Projects in Brazos County .
LABORATORY has submitted a fee schedule to CLIENT, a copy of which is attached hereto and
made a part hereof as EXHIBIT "A" for Materials Engineering and related construction inspection and
materials testing services, which fee schedule is acceptable to CLIENT.
All testing shall be performed in accordance with applicable AASHTO. ASTM, TxDOT, Corps of
Engineers. and/or other standard procedures that may apply, including those specified by the
Arch itect/Engineer.
Signed this Ad ay of 45mfz,geW.", 2001.
By:
Duly Authorized Agent f CLIENT
(printed name.)
And /
it for LABORATORY
.4/,;-k'_,i
(printed"namc)
r
•
r~
d
FEE SCHEDULE.. 1 - FIELD STUDIES
SOIL BORINGS
UNIT PRICE
1.1.01
Drill and obtain Shelby Tube samples in cohesive soils
and Standard Penetration Test samples to cohesronless soils-
1. Continuous sampling, 3-inch diameter:
1 000- to 020-ft depths, per ft
$1200
2. 020- to 050-ft depths, per ft
...............1600
3. 050- to 100-ft depths. per ft
..............24 25
2. Intermittent sampling, 3-inch diameter
(5-ft centers)
1. 000- to I00-ft depths, per ft
9.00
2. 100- to 200-ft depths. per ft
14.50
• 1.1 02
Wash boring, 4 1/2-inch diameter
1. 000- to 100-ft depths, per ft
5 50
2. 100- to 200-ft depths, per ft
8.00
1. 1.03
Wash boring, 7 1/2-inch diameter:
1. 000- to 100-ft depths. per ft
.................7 50
2. 100- to 200-ft depth. per ft
..............11 50
1.1.04
Auger bonng, 4-inch diameter-
1. 000- to 012-ft depths. per ft
8.50
2. 012- to 022-ft depths. per ft
11.00
1.1.05
Shelby Tube or Standard Penetration Test samples
from wash or auger borings, per sample ...............................I..............
.............22 50
1.1.06
Pitcher barrel sampling in soil or soft rock,
3-inch diameter.
1. 004- to 050-ft depths, per ft
20.75
2. 050- to 100-ft depths. per ft
..............27 50
3. 100- to 200-ft depths, per ft 34.50
ROCK BORINGS
1.1 07
Rock coring with NX size (2 1/8-inch diameter) core
barrel:
1. 002- to 050-ft depths, per ft 2200
2. 050- to 100-ft depths, per ft ...................................................................27.50
3. 100- to 200-ft depths, per ft 34 50
1. 1.08
Rock coring, other sizes to 6-inch diameter Quotation
1.1.09
Drilling mud, rock bits and rock core boxes
Cost + 15%
1.1.10
Wash boring, 4 1/2-inch diameter item 1.1.07):
I' 000-to 100-ft depths, per ft, plus Item 1. 1.09
7.50
2. 100- to 200-ft depths, per ft, plus Item 1. 1.09
11.50
OFFSHORE BORINGS
1.1.11 Rental costs for floating plant Cost + 15%
1.1.12 Above charges, plus additional charge per ft 4.00
Page I of 2 ` July 2000
.
FEE SCHEDULE I - FIELD STUDIES
I
MISCELLANEOUS
UNIT PRICE
1.2.01
Mobilization of truck-mounted drilling equipment
with crew:
Round-trip mileage multiplied by
$2.50
(minimum charge of $50.00)
1.2.02
Crew and equipment standby time necessitated by
safety or operational requirements of client in
excess of one-half hour, per crew hour
. 115 00
1.2.03
Grout borings with bentonite grout, per foot .
. 3.00
1.2.04
Installation of piezometers for pore pressure
measurements. slope indicator casing for measurements
of lateral foundation movements, observation wells
and bench marks, requiring crew, truck-mounted drill
rig and accessories, per crew-hour
......1 15.00
1.2.05
Procurement and preparation of ob`crvation well, bench
marks, piezometers or slope indicators:
1. Materials such as pipe, casing, piezometer points.
well screen, sand, gravel, cement, drilling mud.
bentonite balls and grout
. . Cost + 15%
2. Personnel charges per Item 1.2 11
1.2.06
Drill crew per diem, when applicable, on projects in
excess of 50 miles from Bryan, Texas, per man-day
..........80.00
(When required, travel time charged at applicable
personnel rates).
1.2.07
Casing of boring as required by client or field
conditions
Quotation
1.2.08
Swamp drill rig and water truck, per day 35000
1.2.09
Transportation of swamp equipment (Item P.2 08) to and
from project site
Cost + 15%
1.2.10
Rental equipment (such as dozers or wreckers) necessary
to gain access to and from boring locations not accessible
to our truck-mounted drilling equipment
Cost + 15%
1.2.11
Personnel charges for fieldwork:
1. Field Superintendent or Driller
a. Regular rate (hourly)
30.00
4
b. Overtime rate.(hourly)
45.00
2. Drillers Helpers or Technicians:
a. Regular rate (hourly)
27.50
b. Overtime rate(hourly)
41.25
3. Technician transportation, per mile
0.50
4. Technician per diem, per man-day
8000
5. Instrument or equipment rental
Cost + 15%
6. Direct expenses
Cost + 1596
Overtime rates at 1 5 times regular rate; before 8:00 a.m. - after 5:00 p.m., weekends and holidays.
All samples of soil and rock will be disposed of 60 days after submission of our report unless client
i specifies otherwise. Rates for services not listed are available on request.
W 51q July 2000
Page 2 of 2
W 1i11=ML"LL=P1er-
cs._..-.-._.,~_,.. r.~.c-.-....~,..y_„~~..._.ti..r...~u.._.,..;w.~:..~.~..... :s. .n..a-~.e.a,,; r.~.
FEE SCHEDULE 2 - LABORATORY TESTS, SOILS
~J
•
•
STRENGTH AND COMPRFSSIBILITY TESTS UNIT PRICE
2.1.01
Unconfined Compres%ion, maximum sires% . . . . .
$2500
2 1 02
Triaxial Shear:
1. Unconsolidated-Undrained
1. Per specimen. 3-inch as sampled (Qc)
3000
2. Per specimen. I 1/2-inch laboratory
saturated (Qc) .
Quotation
3 Multiple stage. 3-inch as sampled (Qc)
90.00
2 Consolidated-Undrained-
I. Per specimen, 1 1/2-inch unsaturated .
Quotation
2 Per specimen, I 1/2-mch laboratory
saturated R-type .
Quotation
3. Per specimen, 11/2-inch laboratory saturated
R-type, pore pre<surc measurement
Quotation
3. Consolidated-Drained.
1. Per specimen, I I/2-inch laboratory saturated
S-type, pore pressure not allowed
Quotation
2 1 03
Direct Shear, per point-
1. Cohesionless Soil. 8000
2. Cohesive Soils-
1. Unconsolidated-Undramed
80 W
2. Consolidated-Undramed
100 00
3. Consolidated-Drained
......150 00
4. Consolidated-Drained, Residual Determination
......200 00
2 1.04
Stress-Strain curves when requested, each
........22.00
2.1.05
Mohrs Diagram, when applicable, each
........28 00
2106
Vane Shear.
1. Miniature Vane Shear
12 50
2. Torvane
2.50
2 1 07
Hand Penetrometer
2.50
21.08
Consolidation:
1. 7 loads plus 2 rebound, including Specific
Gravity 22000
2. Hysteresis Curve, including Specific Gravity .........................................310 00
3. Time vs. dial reading curves, each 12.00
2.109
Swell on undisturbed or remolded sample:
1. Controlled Swell, per specimen $10/load applied to control
swell after initial load)
76.00
2. Free Swell, per specimen:
1. Initial load
70.00
2. Subsequent loads
35.00
2.1.10
Preparation of remolded or compacted specimen
29.00
IDENTIFICATION AND CLASSIFICATION TESTS
2.2.01
Atterberg Liquid and Plastic Limits, Plasticity Index
24.00
2.2.02
Sieve Analysis, through No. 200 sieve, soils
24.00
15 -
Page 1 of 2 lo~ a • " -
July 2000
r
FEE SCHEDULE 2 - LABORATORY TESTS, SOILS
UNIT PRICE
2.2.03
Sieve Analysis. soil with plus No 4 size $
34.00
2.2.04
Hydrometer Analysis. not including sieve analysis
52.00
2.2.05
Percent Passing No. 200 Sieve .
20 50
2.206
Volumetric Shrinkage .
23.00
2.2.07
Bar Linear Shrinkage
12.00
2.208
Preparation of sample for above items (includes
prepanng sample containing plus No. 40 or No. 10
material for additional tests. mixing additives and
other special proce%%ing).per hour
2900
PHYSICAL TESTS
2.3.01
Moisture Content
400
2.3.02
Density and Moisture Content
11.00
2.3.03
Maximum and Minimum Density
60.00
2.3.04
Specific Gravity
34.00
2.3.05
Permeability-
1. Falling head (specific gravity not included)
75.00
2. Constant head
86.00
2.3.06
Organic Content
17.00
2.3.07
pH determination of soil or soil/lime mixture. per
test (does not include 2.3.08)
.
9.00
2.3.08
Preparation of sample for above items (includes
remolding or compacting specimens, mixing additives
and other special processing). per hour
29.00
r \
Page 2 of 2~ a . s
July 2000
t ,
1
1
~i
•
FEE SCHEDULE 3 - CONSTRUCTION MATERIALS TESTING AND INSPECTION
This schedule of charges is for testing of samples delivered to our Bryan laboratory, obtaining samples, and
field testing services performed at locations within the immediate Bryan/College Station area Personnel
and transportation charges will be made for round trips over 30 miles by our personnel for field testing and
inspection, and for procurement, preparation and/or delivery of samples to our laboratory A vehicle charge
of $12 per trip will be used for round trips less than 30 miles
SOILS AND BASE MATERIALS
•
Compaction and Control Tests
UNIT PRICE
3 1.01
Optimum Moisture/Density Relationship, ASTM and
AASHTO methods-
Using a 4-inch diameter mold (Method A & B)
11500
2 Using a 6-inch diameter mold (Method C) .
130 00
3 1.02
Optimum Moisture/Density Relationship, TXDOT
Tex- 113-E method .
14000
3.1 03
Maximum and Minimum Density
6000
3 104
In-place Field Density and Moisture Content (minimum
charge of 3 tests per trip):
1. Nuclear Gauge method, per test
25 00
2. Hams Cup method. per test
30.00
3. Sand Cone method, per test
4000
4 Recheck, Nuclear Gauge method, per test
. 25 00
3 1 05
California Bearing Ratio (CBR), soils and aggregates,
per specimen .
11500
3 1 06
TXDOT Tnaxial Compression Test, Tex-I 17-E
Quotation
3 1.07
Soil-cement compressive strength, Tex-120-E, per
specimen (does not include Item 3.1.02)
................105.00
3.1 08
Special processing, mixing additives, and/or sample
preparation for above items, per hour
2900
Soil. Suberade and Base Material Tests
3.201
Moisture Content, laboratory measured
400
3.2.02
Atterberg Liquid and Plastic Limits, Plasticity Index
24 00
3203
Sieve Analysis:
1. Soils, through No 200 sieve
24.00
2. Soils, with plus No.4 size
3400
3.204
Sieve Analysis, aggregate with binder.
1. Through No. 40 sieve
34 00
2. Through No. 200 sieve
5400
3.2.05
TXDOT Ball Mill, Tex-1 16-E
100.00
3.2.06
Hydrometer Analysis, not including sieve analysis
52.00
3.2.07
Percent Passing No. 200 Sieve
20.50
3.2.08
Gradation of soil-lime mixture, TXDOT Item 260
25 00
32.09
pH determination of soil or soil-lime mixture, per
test (Does not include 3.2.12)
. 900
3.2.10
Permeability:
1. Falling Head (specific gravity not included)
75.00
2. Constant Head
86.00
3.2 11
Pinhole Dispersion Test
105.00
0
July 2000
• Page I of 4 S Blir~ a.aea 5 1
L ,
. 1
FEE SCHEDULE 3 - CONSTRUCTION MATERIALS TESTING AND INSPECTION
UNIT PRICEi
3212 Preparation of sample for above items (includes splitting base simple.
slaking, washing over No. 40 or No. 200 sieve.
preparing base binder for additional testing, mixing
additives, remolding or compacting specimen, and other
special processing). per hour . $2900
. . .
32 13 Lime treated depth tests 5.00
32.14 Crumb test, per test (plus technician time) .500
CONCRETE AND MASONRY TESTS
Cvlmders. Beams and Cubes
3.301
Casting cylinders, including slump (I set = 3 cylinders at 3 cylinders
per set per trip), per cylinder .
10.00
3302
Air Content determination when casting cylinders or
beams .
17.00
3 3.03
Unit Weight, ASTM C 138 (not including personnel time)
18.00
33.04
Compressive Testing of Cylinders:
1. Made by our personnel. per cylinder
11 50
2. Delivered to our laboratory, per cylinder
14.00
3. Hold cylinders, per cylinder
10.50
3.3.05
Casting beams, including slump (minimum charge of 3
beams per trip), per beam
1400
3 306
Flexural Testing of Beams:
1. Made by our personnel, per beam . .
15.00
2. Delivered to our laboratory, per beam . .
16.00
- 3. Hold beams. per beam
11 50
3.307
Molding Mortar Cubes (minimum charge of 6 cubes per
trip). per cube
600
3.308
Compressive Testing of Mortar Cubes, per cube
..8.00
Concrete Coring
and Tests
3.4.01
Conng machine rental, per day
75.00
3.402
Portable power generator (if required, 5 hour minimum),
per hour
. 8.00
3.4.03
Coring, 4-inch diameter, per inch of thickness (not including
equipment rental. personnel and transportation charges)
. 8.50
3.4.04
Compressive testing of concrete cores, per core
16.50
34.05
End preparation of concrete cores for testing, per end
. 900
3.4.06
Soiltest Model CT-320 Concrete Test Hammer rental
(minimum 3-hour charge). per hour
23.00
5/g
Page 2 of 4 M ~ A- July 2000
NOTE: Inspection and/or standby in excess of I hour when in conjunction with casting
test specimens will be charged at the applicable personnel rate. Picking up, transporting
cylinders back to lab and stnpping from molds are not included in above rates and will be
charged at the appropriate personnel rates plus vehicle surcharge.
i
i
a
i
1
~I
~J
FEE SCHEDULE 3 - CONSTRUCTION MATERIALS TESTING AND INSPECTION
Concrete Mix Designs
Mix design includes mixing the trial batch, determining the %lump, air content, and yield; and casting and
testing 6 compressive or 3 flexural tests specimens. Te%ts on aggregates and time spent obtaining materials,
computing mix proportions, consultation and reporting, will be charged at the appropriate personnel rate.
UNIT PRICF
3.501 Mix Design using cement factor method $115.00
AGGREGATE TESTS
3601
Sieve Analysis, aggregate without binder-
1. Washed . .
24 00
2. Dry
.
20 00
3602
Specific Gravity .
34.00
3.603
Absorption . .
20.00
3.604
Clay lumps and friable particles, percent .
3500
3605
Unit Weight (loose and rodded)
34.00
36.06
Percent Passing No 200 Sieve .
20 50
3607
Organic impurities in sands for concrete
25.00
3608
Los Angeles Abrasion
10000
36.09
Sulfate Soundness (5 cycle) (coarse or fine, not both)
185.00
3.6.10
Special processing and preparation of aggregate for
above items, per hour
29.00
~J
ASPHALTIC MATERIAL TESTS
3.701
Bitumen content and aggregate gradation 110-00
3.7.02
Mixing asphaltic concrete (3 specimens per set).
per set
30.00
3.703
Molding lest specimens for Density and/or Stability
(3 specimens per set), per set
3000
3.7.04
Density of laboratory molded specimens (3 specimens
per set), per set
28 00
3.7.05
Marshall Stability (3 specimens per set), per set
60.00
3.7.06
Marshall Flow Value (3 specimens per set), per set
. 900
3.7.07
Hveem Stability (3 specimens per set), per set
70.00
3.7.08
Maximum Specific Gravity of paving mixtures.
ASTM D-2041 or Tex-227-F
25.00
3.7.09
Coring 4-inch diameter asphaltic pavement, thickness
up to 6 inches (not including personnel and transportation
charges):
1. Minimum 3 cores per trip. each
35.00
2. Additional core, same trip. each
30.00
NOTE: Patching pavement will be charged at the appropriate personnel rates
3.7.10
Density of asphaltic pavement cores and blocks, each
20.00
s
too%
Page 3 of 4 iwjL- t ~
July 2000
FEE SCHEDULE 3 - CONSTRUCTION MATERIALS TESTING AND INSPECTION
UNIT PRICE
3.7.11 Thickness determination of asphaltic pavement cores
or blocks, each $5.00
3.7.12 Nuclear Gauge Density (minimum charge of 3 tests per
trip . 25.00
3.7.13 Index of Retained Strength . Quotation
PERSONNEL RATES AND SPECIAL SERVICES
Charges for services of engineering technicians will be made at the following rates for sampling, field
inspections and tests not otherwise charged on a per-test basis. Overtime rate will be charged after eight (8)
hours per day, Saturdays, Sundays and holidays at standard rate x 1.5. Time for weekends and holidays will
be a minimum of 2 hours.
3.8.01
Engineering Technician:
1. Regular rate. per hour
........27.50
2. Overtime rate, per hour
........41.25
3.8.02
Certified Engineering Technician:
1. Regular rate. per hour ...........................................................................30.00
2. Overtime rate. per hour
....45.00
3.8.022
Certified Engineering Technician 11
1. Regular rate, per hour
........35 00
2. Overtime rate, per hour
52.50
3.8.03
Senior Engineering Technician:
Regular rate, per hour
37.50
2. Overtime rate, per hour
.......56.25
3 Laboratory Supervisor
.........40 00
3.8.04
Transportation. per mile 0.50
3.8.05
Per diem, per man per day ....................................................................................80.00
3.8.06
Equipment rental Quotation
3.8.07
Reproduction/postage(over 4 reports), per page 0.35
3.8.08
Direct expenses
Cost + 15%
1. Concrete Cylinder Molds
1.50 ea
2. Direct Expense (Miscellaneous)
Cost + 15%
3. Vehicle Surcharge, per trip
1200
3.9.10
1. Certified Welding Inspector, per hour
............$45
(Does not include materials and bending straps)
Rates for tests and services not listed are available upon request.
NOTE: All tests taken or performed before 8:00 a.m. and after 5:00 p.m. on regular work days,
Saturdays. Sundays and Holidays will be charged at regular fee schedule rate plus applicable
personnel overtime rate. Scheduled tests on weekends and holidays will include a minimum 2 hour
technician time.
aa.5 -50
Page 4 of 4 VIDJuly 2000
.i
f
I
i
t
FEE SCHEDULE 4 - STAFF SERVICES
This schedule is for standard services on an hourly basis for regular hours within the U.S.A., and includes
payroll costs, administrative overhead and profit. Authorized overtime will be charged at 1.5 times the
regular rate for classifications 4 1.09 through 4.1.13. Insurance certificates will be furnished by insuring
agency on request.
PERSONNEL CLASSIFICATION UNIT PRICE
4 1 01 Principal Engineer, Consultant $9500
Expert Witness (plus expenses) ....................................................................175.00
4102
4 1 03 Engineer 6 65.00
Expert Witness (plus expenses) 150.00
4,1 04
4105
4 1 06 Engineer 3 65.00
4107
4108
4.109 Stenographer 30.00
4.1.10 Computer Operator/Office Technician 25.00
41.11 Drafter 2 (Location/Boring Plans) 30.00
4.1.12 Drafter I ...............................................................................................................20.00
4.1.15 Laboratory Manager 50.00
The above rates are for services performed in the ordinary course of business on a first-come, first-served
and/or time available basis. Services performed on a time preemption basis are available on request at
double the above rates.
REIMBURSABLE EXPENSES
42-01 Transportation (company-owned vehicle), per mile 0.50
4.2.02 FAX transmission. first page ...................................................................................10.00
4.2.03 FAX transmission, additional pages .75
4.2.05 Professional staff per diem, per man-day Cost + 15%
4.2.06 Reimbursable expenses: Cost + 15%
1. Long distance telephone
2. Transportation (other than company-owned vehicle)
3. Miscellaneous travel expenses
4. Reports/reproduction
5. Subcontract costs
6. Federal Express
7. Direct Expenses
RECORDS/RESEARCH
-4-1
4.4.03 File Research/Reproduction
1st hour $60.00
(otherwise $25/hr. $60.00 minimum)
Page 1 of 1 I July 2000
I.
i
I
BID TABULATION 2001.037
SECOND OR ADDITIONAL SEAL COAT PROJECT FOR PCT 1,2,3 & 4
g1
Now
Rates
GaVS.Y.
Est. Sq. Yd
BIG TEX
PAVING
Johnson City, TX
BRANNON
PAVING
Victoria, TX
F.N.PLOCH
CONSTRUCTION
New Braunfels, TX
YOUNG
CONTRACTORS
Bryan, TX
Pct 1
0.34
80,021
0.568
0.664
0.575
0.75
0.38
102,626
0.568
0.706
0.595
0.80
Pd 2
0.34
85,183
0.568
0.664
0.575
0.75
0.38
65,928
0.568
0.706
0.595
0.80
Pct 3
0.34
61,951
0.568
0.664
0.575
0.75
0.38
108,196
0.568
0.706
0.595
0.80
Pct 4
0.34
79,019
0.568
0.664
0.575
0.75
0.38
156,097
0.568
0.706
0.595
0.80
Start-Work
June
1-Jun
1-Apr
Early May
1
20 days to complete
I'
I~
31
4
i
I
C6_
is
C6
L
RECOMMENDATION: BIG TEX PAVING
AWARD DATE:
. i