Loading...
HomeMy WebLinkAbout2001-02-27-0900AM-Regulara • BR.AZOS COUNTY BRYAN. TEXAS FILED FOH Hi. )ATE 62 ''3 0 / _ %T 0 • */6 0 C LOCK hl MARY ANN WARU BRAZOS COUNTY CLERK NOTICE OF MEETING AND AGENDA BRAZOS COUNTY COMMISSIONERS COURT THE COMMISSIONERS COtTRT WILL MEET IN REGULAR SESSION ON TUESDAY, FEBRUARY 27, 2001 AT 9:00 A.M. IN THE COMMISSIONERS COURTROOM OF THE BRAZOS COUNTY COURTHOUSE, 300 EAST 26m STREET, SUITE 115, BRYAN, TEXAS. 1. Invocation - Commissioner Cauley. 2. Pledge of Allegiance - Commissioner Cauley. 3. Call for citizen input and/or concerns. • Consider and take action on agenda items 4 - 17: 4. Budget Amendment 00/01-19. 5. Personnel Changes of Status. 6. Payment of Claims. 7. Introduction and approval of candidate for the County Extension Agent - 4-H and Youth Development position. 8. Appointing another member of the Brazos County Historical Commission. 9. Application for Tax Refund to Transamerica Real Estate Tax Service. 10. Establishing date and time for a Public Hearing for an application for a revision of the plat for Creekridge Estates, Section One, located in Precinct 1. 11. Request by Sheriffs Office, Jail Administrator to make a budget adjustment from position 1517-2 to position 1511-50, Detention Officer position. 12. Blanket Purchase Orders. 13. Requisition from Capital Expenditures for a Server for the Network Infrastructure for the Ipformation Technology Department. 14. 'Agreement with Buchanan/Soil Mechanics, Inc. to provide construction materials testing services and quality control. 49~ Commissioners Court Meeting Agenda February 27, 2001 Page Two 15. Award of Bid #2001-037, Second or Additional Seal Coat Project for Precincts 1, 2,3 and 4. 16. Request from Jerry Windham, developer of Ranger Industrial Park located on Marino Road, for a variance of the Subdivision and Development Regulations relative to lot size. Site is located in Precinct 2. 17. The Final Plat of Pounders Subdivision, Lot 1, 4.017 acres, Stephen Jones Survey. Site is located in Precinct 4. 18. Acknowledge receipt of monthly reports from department heads and elected officials. 19. Announcement of interest items and possible future agenda topics. 20. Call for citizen input and/or concerns. 21. Adjourn. The Courthouse is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive services must be made two business days before the meeting. To make arrangements, call (979) 361-4102. . 1111 1 ti .j ,c .tl I • 1 • • COMMISSIONERS' COURT REGULAR MEETING FEBRUARY 27, 2001 A regular meeting of the Commissioners' Court of Brazos County, Texas was held in the Commissioners' Courtroom in the Courthouse in Bryan, Brazos County, Texas, beginning at 9:00 a.m. on Tuesday, February 27, 2001, with the following members of the Court present: Alvin W. Jones, County Judge, Presiding; Tony Jones, Commissioner of Precinct 1; Wm.S. Thornton, Commissioner of Precinct 2; Randy Sims, Commissioner of Precinct 3; Carey Cauley, Jr., Commissioner of Precinct 4; Mary Ann Ward, County Clerk. The attached sheet contains the names of the citizens and officials that were in attendance. Commissioner Cauley gave the invocation and led the pledge of allegiance. There was no citizen input/and or concerns. The Court first considered Budget Amendment #00/01-19.1, which would transfer funds to the General Fund from Capital Improvement Fund for the County Attorney's office. On motion by Commissioner Cauley, seconded by Commissioner Sims, the Court voted unanimously to approve the budget amendment as submitted, a copy of which is attached hereto. The next matter before the Court was a request from the Jail Administrator for a budget adjustment for his department. This is merely a transfer of funds from one position to another and would not result in an increase to the departmental budget. On motion by Commissioner Sims, seconded by Commissioner Cauley, the Court voted unanimously to approve the request for the budget adjustment. The Court proceeded to consider the change of status of employees as submitted on the attached Personnel Action Requests. On motion by Commissioner Cauley, seconded by Vol oZ a` page 500 i 1 Commissioners' Court meeting February 27, 2001 2 Commissioner Sims, the Court voted unanimously to approve the changes as submitted. The Court next considered the following Claims as submitted by the County Treasurer for payment: 20016239 through 20016263 On motion by Commissioner Jones, seconded by Commissioner Thornton, the Court voted unanimously to approve the Claims as submitted. The next matter before the Court was the introduction and approval of the candidate for the County Extension Agent - 4-H and Youth Development position. Dr. Dale Fritz, District Extension Director, introduced Allen "Brant" Poe. On motion by the County Judge, seconded by Commissioners Jones, Thornton, Sims and Cauley, the Court voted unanimously to appoint Brant Poe to the position of County Extension Agent effective March 5, 2001. The Court next considered appointing another member of the Brazos County Historical Commission. On motion by Commissioner Jones, seconded by Commissioner Cauley, the Court voted unanimously to appoint Mrs. Suzanne Gallagher as a member of the Brazos County Historical Commission. The next matter for consideration was a tax refund to Transamerica Real Estate Tax Service. It was discovered that Transamerica had paid on this property in error. On motion by Commissioner Sims, seconded by Commissioner Cauley, the Court voted unanimously to refund $967.03 in county taxes for 1999 to Transamerica Real Estate Tax Service. The Court next considered establishing a date and time for a Public Hearing for an application for a revision of the plat for Creekridge Estates, Section One, located in Precinct 1. On motion by Commissioner Jones, seconded by Commissioner Cauley, the Court voted unanimously to set the Public Hearing Vol o2oZ Page 500 P- i i Commissioners' Court meeting February 27, 2001 3 • • for Tuesday, April 3, 2001, at 10:00 a.m. It will be held in the Brazos County Courthouse, 300 East 26.h Street, Suite 115, Bryan, Texas. The Court proceeded to consider the following blanket Purchase Orders: Scarmardo Produce Jail $2,350 Alliant Food Jail $8,000 Sysco Food Jail $7,500 Performance Jail $7,000 Ben E. Keith Jail $1,350 US Foodservice Jail $ 800 Glazier Jail $1,300 Butterkrust Jail $1,600 Lilly Dairy Jail $2,800 Cain's Coffee Jail $ 600 Acme Soap Co. Jail $ 700 Ray Criswell Dist. Jail $1,000 On motion by Commissioner Sims, seconded by Commissioner Cauley, the Court voted unanimously to approve the Blanket Purchase Orders as submitted. The Court next considered approval of a requisition from the Capital Expenditures for the following purchase: a) Server for the Network Infrastructure for the Information Technology Department, $8,560.00. On motion by Commissioner Cauley, seconded by Commissioner Sims, Court voted unanimously to approve the requisition to be paid from Capital Expenditures. The Court next considered entering into agreement with Buchanan Soil Mechanics, Inc. to provide construction materials testing services and quality control. On motion by Commissioner Sims, seconded by Commissioner Cauley, the Court voted unanimously to enter into agreement with Buchanan Soil Mechanics for testing services. A copy of the Agreement with fee schedule is attached. Vol a a. Page 601 Commissioners' Court meeting February 27, 2001 4 The Court next considered awarding the following bid: Bid No. 2001-037, Second or Additional Seal Coat Project for Precincts 1,2,3&4 Pat Howard, Purchasing Agent, recommended acceptance of the bid submitted by Big Tex Paving. On motion by Commissioner Sims, seconded by Commissioner Cauley, the Court voted unanimously to accept the recommendation of the Purchasing Agent and award the contract to Big Tex Paving. A copy of the bid tabulation is attached. The Court next considered a request.from Jerry Windham, developer of Ranger Industrial Park located on Marino Road, for a variance of the Subdivision and Development Regulations relating to lot size. The site is located in Precinct 2. The Subdivision Regulations state that a lot size be a minimum of one acre. Thornton explained that this request needs some real consideration. It is an older subdivision put in 1980- 1981 with 1% acre lots. With the exception of Lot 2, two buildings each were put on lots 1 & 3, The developer wants to subdivide into 3/4 acre lots to allow for the sale of individual buildings. On motion by Commissioner Thornton, seconded by Commissioner Jones, the Court voted unanimously to approve the variance contingent on the submission of the re- plat. The Court next considered approval of the Final Plat of Pounders Subdivision in Precinct 4. Richard Vance, County Engineer, stated that he had reviewed the plat and all appeared to be in order. On motion by Commissioner Cauley, seconded by Commissioner Sims, the Court voted unanimously to i approve the final plat of the Pounders Subdivision as submitted. The Court acknowledged receipt of the Extension Service reports for January 2001 and acknowledged receipt of reports from the following County and Precinct Offices showing Vol aa` Page f b Commissioners' Court meeting February 27, 2001 revenues collected and remitted to the County Treasurer: • County Clerk District Clerk Justice of the Peace Precinct 2 Justice of the Peace Precinct 3 Justice of the Peace Precinct 4 Justice of the Peace Precinct 5 Justice of the Peace Precinct 6 Constable Precinct 4 Constable Precinct 5 Constable Precinct 6 Brazos County Events Facilities County Attorney Road & Bridge Tax Assessor/Collector S A copy of the Officials' reports can be viewed in the County Auditor's office. Under announcement of interest items and possible future agenda topics the County Judge made the following comments: is a) He attended a CUC meeting in Austin and will be circulating information. b) There will be a Workshop today at 2:00 p.m. Commissioner Sims made the following comment: a) He asked Commissioner Jones the status of the Brazos/Robertson County Water District and what was happening in the Legislature in reference to water. There was no citizen input and/or concerns. There being no further business to come before the Court, the meeting was adjourned. • Vol Page 503 , i 1 The foregoing minutes of the Commissioners Court meeting held February 27, 2001 have been examined and are approved in l open Court this the /S011 day of 2021, in .-1 Bryan, Brazos County, Texas. . QAktz Alvi W. Jones Tony Jones County Judge Commissioner, Precinct 1 ' m. . Thornton Randy ms Commissioner, Precinct 2 Comm' sioner, Precinct 3 Carey Cau y, Jr. aren McQueen Commissio er, Precinc County Clerk i ! 3 Vol aZ Page 504 n ~j , I i This Page has been intentionally left blank ,,OI. _aa taL--~ 61 • ' 1 BRAZOS COUNTY COMMISSIONERS COURT MEETING ON 'e b. 9~-200.L AT -9,',OP NAME OR rirANI7.ATIOWfr)FPARTMRNT !/fts~c.Q/ Al- dt~'o`t• iy l If lz4 . c r r~ tav ~JIS C. ' W IV IC e,44iVa I wu~ 6 Z s #A so _ C7 • 1 4 BRAZOS COUNTY, TEXAS BUDGET AMENDMENT(S) FOR THE 2000-2001 BUDGET YEAR NO. 00/01 - 19.1 I On this the 27th day of February 2001 at a regular meeting of the Commissioners- Court, the following members were present: I Alvin W. Jones, County Judge, Presiding Tony Jones, Commissioner, Precinct 1; Wm. S. Thornton, Commissioner, Precinct 2; Randy Sims, Commissioner, Precinct 3; Carey Cauley, Commissioner, Precinct 4; Mary Ann Ward, County Clerk. The following proceedings were held: THAT WHEREAS, on February 27, 2001 the Court heard and approved a budget amendment for the 2000-2001 budget year for Brazos County, Texas. WHEREAS, an expenditure is necessary due to the necessity to meet unusual and unforeseen conditions which could not be reasonably included in the original budget adopted September 5, 2000 the following amendment(s) to the original are hereby authorized, as described on the attached page(s). ADOPTED AND APPROVED this the 27th day of February 2001. THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS. By: Alvin W. Jones, County Judge Original: County Clerk's Office and attached to the original budget Copies: County Auditor County Treasurer Commissioners' Court Minutes #QL2L=.pjpA&jC=)-7 -s ti BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 00/01-19.1 1rrumt FD DIV ACCT PROD DR/CR ACCOUNT NAME Increase Decrease 45 630005 809500 Dr. Exposition Center 524.00 45 630005 913000 Dr. Transfer to General Fund 576.00 45 630005 803420 180001 Cr. Furniture 1,100.00 Capital Improvement Fund To remove the budgeted amount for the credenza approved for the Coun ty Attorney which was approved 2/20/01 to be transferred to the General Fund. 01 180001 673420 Dr. Minor Furniture 576.00 01 490150 Cr. Transfer Fm Capital Imp. 576.00 General Fund To setup the budget as approved 2/2 0/01 for t he purchase of minor furni ture. r-.- ,-r..-.. . -cr • tte: ed I3y•ate: 2/20/0 7-7 2a. -akl- G:Form2/99Bud Amend Yi~ • 0 . ~1 4 h O O G,r Y Op JAMES M. KUBOVIAK COUNTY ATTORNEY BRAZOS COUNTY, TEXAS BRAZOS COUNTY COURTHOUSE TELEPHONE (4m 7614700 FAX (4010 761-757 700 E 26TH ST. STE 723 BRYAN. TEXAS 7760}S727 MEMO TO: Margie Wedel, Assistant County Auditor FROM: Candy Gallego, County Attorney's Office DATE: February 6, 2001 RE: Budget Amendment Please tran sfer $576.00 from 630005-803420 (capital furniture) to 180001-673420 (minor furniture). The actual cost of the credenza was less than anticipated. Thank you. BRAZOS COUNTY, TEXAS RECOMMENDED BUDGET - MAJOR CAPITAL ASSETS Items To Be Funded From The General Improvement Fund 45 For The Year Ending September 30, 2001 Estimated Description Unit Cost Quantity Total Building & Grounds Maintenance 1700 Building Carpet: Health Dpt S 12,500.00 1 12,500.00 801000 Ag. Ext. S 8,500.00 1 8,500.00 801000 Annex S 19,200.00 1 19,200.00 801000 Road & Bridge S 6,100.00 1 6,100.00 801000 Cargo Van S 18,500.00 1 18,500.00 808900 Total Building & Grounds Maintenance S 64,800.00 County Attorney 1800 Computers S 1,730.00 Credenza4 drawer,5 ft S 1,100.00 Total County Attorney District Attorney 1900 Computers - PC S 1,730.00 Total District Attorney District Clerk 2000 No Request Total District Clerk County Clerk 2100 Computer - PC S 1,730.00 Total County Clerk 5 8,650.00 802030 ti 1,100.00 803420 S 9,750.00 lroow- Ws q10 q,.'.1 2 3,460.00 802030 $ 3,460.00 S - 2 3,460.00 802030 S 3,460.00 County tee io n 210020 No Request Total County Elections $ 0:2001 Budget Approve\ 0/2/00 44 Capital Improvement\ 1 Page 3 of 10 0/2 00 Major Acq. k 1 z • PERSONNEL CHANGE OF STATUS page 1 of l COURT DATE: February 27, 2001 DEPARTMENT: Personnel PURPOSE: Approve Personnel Change of Status tw*##t###*##**##t i##ttti#tii*#tttit#t*******##t#wt##ttitt# tititit***##w***#t*##wtttt DEPARTMENT NAME EMPLOYEE NAME ACTION REQUESTED tttt##t###t*##wtt ttwttttiiwtttitttt#*##****w*t#trttttttttt iiittttt*+#*#*tw*#w**w#tt• BUILDING MAINT. REED, STEPHANIE RESIGNATION COUNTY CLERK WARD, MARY ANN RETIRING MCQUEEN. KAREN APPOINTED COUNTY CLERK DISTRICT CLERK LYON, MONIQUE N NEW HIRE F/T I1 u INFORMATION TECHNOLOGY KUTIPER, TONY TRANSFER W/IN DEPT JESKE, LINDA PROMOTION GLEN, HAYES TRANSFER W/IN DEPT JUVENILE SERVICES WOLF, KEVIN RESIGNATION DEVAULT, TASS NEW HIRE PR ALANIZ, III JOE RESIGNATION LEWIS, MICHAEL NEW HIRE TEMP SHERIFF'S OFF - JAIL DIVISION LEDEZMA 111, RAUL NEW HIRE TWYMAN, MARCIA D NEW HIRE SIGNOR, MOLLIE C NEW HIRE CIRILO, CAROL DISCHARGED SNEED, CHARLES TRANSFER W/IN DEPT Approved in Commissioners' Court: February 7 2001 County Judge's or Commissioner's Signature: . (This copy to be attached to nunutes) • AGREEMENT TO PROVIDE CONSTRUCTION MATERIALS TESTING SERVICES AND QUALITY CONTROL. This agreement is by and between BRAZOS COUNTY. Engineering, Mr. Richard Vance. P.E., 2617 Highway 21 East, Bryan, Texas 77803, hereinafter known as CLIENT, and Buchanan/Soil Mechanics, Inc., hereinafter known as LABORATORY. CLIENT desires to engage LABORATORY to provide Materials Engineering and related construction inspection and materials tc%ting %ervices in connections with CLIENT's project ("THE PROJECT") described as follows: Construction Materials T"ting for various 2001 Projects in Brazos County . LABORATORY has submitted a fee schedule to CLIENT, a copy of which is attached hereto and made a part hereof as EXHIBIT "A" for Materials Engineering and related construction inspection and materials testing services, which fee schedule is acceptable to CLIENT. All testing shall be performed in accordance with applicable AASHTO. ASTM, TxDOT, Corps of Engineers. and/or other standard procedures that may apply, including those specified by the Arch itect/Engineer. Signed this Ad ay of 45mfz,geW.", 2001. By: Duly Authorized Agent f CLIENT (printed name.) And / it for LABORATORY .4/,;-k'_,i (printed"namc) r • r~ d FEE SCHEDULE.. 1 - FIELD STUDIES SOIL BORINGS UNIT PRICE 1.1.01 Drill and obtain Shelby Tube samples in cohesive soils and Standard Penetration Test samples to cohesronless soils- 1. Continuous sampling, 3-inch diameter: 1 000- to 020-ft depths, per ft $1200 2. 020- to 050-ft depths, per ft ...............1600 3. 050- to 100-ft depths. per ft ..............24 25 2. Intermittent sampling, 3-inch diameter (5-ft centers) 1. 000- to I00-ft depths, per ft 9.00 2. 100- to 200-ft depths. per ft 14.50 • 1.1 02 Wash boring, 4 1/2-inch diameter 1. 000- to 100-ft depths, per ft 5 50 2. 100- to 200-ft depths, per ft 8.00 1. 1.03 Wash boring, 7 1/2-inch diameter: 1. 000- to 100-ft depths. per ft .................7 50 2. 100- to 200-ft depth. per ft ..............11 50 1.1.04 Auger bonng, 4-inch diameter- 1. 000- to 012-ft depths. per ft 8.50 2. 012- to 022-ft depths. per ft 11.00 1.1.05 Shelby Tube or Standard Penetration Test samples from wash or auger borings, per sample ...............................I.............. .............22 50 1.1.06 Pitcher barrel sampling in soil or soft rock, 3-inch diameter. 1. 004- to 050-ft depths, per ft 20.75 2. 050- to 100-ft depths. per ft ..............27 50 3. 100- to 200-ft depths, per ft 34.50 ROCK BORINGS 1.1 07 Rock coring with NX size (2 1/8-inch diameter) core barrel: 1. 002- to 050-ft depths, per ft 2200 2. 050- to 100-ft depths, per ft ...................................................................27.50 3. 100- to 200-ft depths, per ft 34 50 1. 1.08 Rock coring, other sizes to 6-inch diameter Quotation 1.1.09 Drilling mud, rock bits and rock core boxes Cost + 15% 1.1.10 Wash boring, 4 1/2-inch diameter item 1.1.07): I' 000-to 100-ft depths, per ft, plus Item 1. 1.09 7.50 2. 100- to 200-ft depths, per ft, plus Item 1. 1.09 11.50 OFFSHORE BORINGS 1.1.11 Rental costs for floating plant Cost + 15% 1.1.12 Above charges, plus additional charge per ft 4.00 Page I of 2 ` July 2000 . FEE SCHEDULE I - FIELD STUDIES I MISCELLANEOUS UNIT PRICE 1.2.01 Mobilization of truck-mounted drilling equipment with crew: Round-trip mileage multiplied by $2.50 (minimum charge of $50.00) 1.2.02 Crew and equipment standby time necessitated by safety or operational requirements of client in excess of one-half hour, per crew hour . 115 00 1.2.03 Grout borings with bentonite grout, per foot . . 3.00 1.2.04 Installation of piezometers for pore pressure measurements. slope indicator casing for measurements of lateral foundation movements, observation wells and bench marks, requiring crew, truck-mounted drill rig and accessories, per crew-hour ......1 15.00 1.2.05 Procurement and preparation of ob`crvation well, bench marks, piezometers or slope indicators: 1. Materials such as pipe, casing, piezometer points. well screen, sand, gravel, cement, drilling mud. bentonite balls and grout . . Cost + 15% 2. Personnel charges per Item 1.2 11 1.2.06 Drill crew per diem, when applicable, on projects in excess of 50 miles from Bryan, Texas, per man-day ..........80.00 (When required, travel time charged at applicable personnel rates). 1.2.07 Casing of boring as required by client or field conditions Quotation 1.2.08 Swamp drill rig and water truck, per day 35000 1.2.09 Transportation of swamp equipment (Item P.2 08) to and from project site Cost + 15% 1.2.10 Rental equipment (such as dozers or wreckers) necessary to gain access to and from boring locations not accessible to our truck-mounted drilling equipment Cost + 15% 1.2.11 Personnel charges for fieldwork: 1. Field Superintendent or Driller a. Regular rate (hourly) 30.00 4 b. Overtime rate.(hourly) 45.00 2. Drillers Helpers or Technicians: a. Regular rate (hourly) 27.50 b. Overtime rate(hourly) 41.25 3. Technician transportation, per mile 0.50 4. Technician per diem, per man-day 8000 5. Instrument or equipment rental Cost + 15% 6. Direct expenses Cost + 1596 Overtime rates at 1 5 times regular rate; before 8:00 a.m. - after 5:00 p.m., weekends and holidays. All samples of soil and rock will be disposed of 60 days after submission of our report unless client i specifies otherwise. Rates for services not listed are available on request. W 51q July 2000 Page 2 of 2 W 1i11=ML"LL=P1er- cs._..-.-._.,~_,.. r.~.c-.-....~,..y_„~~..._.ti..r...~u.._.,..;w.~:..~.~..... :s. .n..a-~.e.a,,; r.~. FEE SCHEDULE 2 - LABORATORY TESTS, SOILS ~J • • STRENGTH AND COMPRFSSIBILITY TESTS UNIT PRICE 2.1.01 Unconfined Compres%ion, maximum sires% . . . . . $2500 2 1 02 Triaxial Shear: 1. Unconsolidated-Undrained 1. Per specimen. 3-inch as sampled (Qc) 3000 2. Per specimen. I 1/2-inch laboratory saturated (Qc) . Quotation 3 Multiple stage. 3-inch as sampled (Qc) 90.00 2 Consolidated-Undrained- I. Per specimen, 1 1/2-inch unsaturated . Quotation 2 Per specimen, I 1/2-mch laboratory saturated R-type . Quotation 3. Per specimen, 11/2-inch laboratory saturated R-type, pore pre<surc measurement Quotation 3. Consolidated-Drained. 1. Per specimen, I I/2-inch laboratory saturated S-type, pore pressure not allowed Quotation 2 1 03 Direct Shear, per point- 1. Cohesionless Soil. 8000 2. Cohesive Soils- 1. Unconsolidated-Undramed 80 W 2. Consolidated-Undramed 100 00 3. Consolidated-Drained ......150 00 4. Consolidated-Drained, Residual Determination ......200 00 2 1.04 Stress-Strain curves when requested, each ........22.00 2.1.05 Mohrs Diagram, when applicable, each ........28 00 2106 Vane Shear. 1. Miniature Vane Shear 12 50 2. Torvane 2.50 2 1 07 Hand Penetrometer 2.50 21.08 Consolidation: 1. 7 loads plus 2 rebound, including Specific Gravity 22000 2. Hysteresis Curve, including Specific Gravity .........................................310 00 3. Time vs. dial reading curves, each 12.00 2.109 Swell on undisturbed or remolded sample: 1. Controlled Swell, per specimen $10/load applied to control swell after initial load) 76.00 2. Free Swell, per specimen: 1. Initial load 70.00 2. Subsequent loads 35.00 2.1.10 Preparation of remolded or compacted specimen 29.00 IDENTIFICATION AND CLASSIFICATION TESTS 2.2.01 Atterberg Liquid and Plastic Limits, Plasticity Index 24.00 2.2.02 Sieve Analysis, through No. 200 sieve, soils 24.00 15 - Page 1 of 2 lo~ a • " - July 2000 r FEE SCHEDULE 2 - LABORATORY TESTS, SOILS UNIT PRICE 2.2.03 Sieve Analysis. soil with plus No 4 size $ 34.00 2.2.04 Hydrometer Analysis. not including sieve analysis 52.00 2.2.05 Percent Passing No. 200 Sieve . 20 50 2.206 Volumetric Shrinkage . 23.00 2.2.07 Bar Linear Shrinkage 12.00 2.208 Preparation of sample for above items (includes prepanng sample containing plus No. 40 or No. 10 material for additional tests. mixing additives and other special proce%%ing).per hour 2900 PHYSICAL TESTS 2.3.01 Moisture Content 400 2.3.02 Density and Moisture Content 11.00 2.3.03 Maximum and Minimum Density 60.00 2.3.04 Specific Gravity 34.00 2.3.05 Permeability- 1. Falling head (specific gravity not included) 75.00 2. Constant head 86.00 2.3.06 Organic Content 17.00 2.3.07 pH determination of soil or soil/lime mixture. per test (does not include 2.3.08) . 9.00 2.3.08 Preparation of sample for above items (includes remolding or compacting specimens, mixing additives and other special processing). per hour 29.00 r \ Page 2 of 2~ a . s July 2000 t , 1 1 ~i • FEE SCHEDULE 3 - CONSTRUCTION MATERIALS TESTING AND INSPECTION This schedule of charges is for testing of samples delivered to our Bryan laboratory, obtaining samples, and field testing services performed at locations within the immediate Bryan/College Station area Personnel and transportation charges will be made for round trips over 30 miles by our personnel for field testing and inspection, and for procurement, preparation and/or delivery of samples to our laboratory A vehicle charge of $12 per trip will be used for round trips less than 30 miles SOILS AND BASE MATERIALS • Compaction and Control Tests UNIT PRICE 3 1.01 Optimum Moisture/Density Relationship, ASTM and AASHTO methods- Using a 4-inch diameter mold (Method A & B) 11500 2 Using a 6-inch diameter mold (Method C) . 130 00 3 1.02 Optimum Moisture/Density Relationship, TXDOT Tex- 113-E method . 14000 3.1 03 Maximum and Minimum Density 6000 3 104 In-place Field Density and Moisture Content (minimum charge of 3 tests per trip): 1. Nuclear Gauge method, per test 25 00 2. Hams Cup method. per test 30.00 3. Sand Cone method, per test 4000 4 Recheck, Nuclear Gauge method, per test . 25 00 3 1 05 California Bearing Ratio (CBR), soils and aggregates, per specimen . 11500 3 1 06 TXDOT Tnaxial Compression Test, Tex-I 17-E Quotation 3 1.07 Soil-cement compressive strength, Tex-120-E, per specimen (does not include Item 3.1.02) ................105.00 3.1 08 Special processing, mixing additives, and/or sample preparation for above items, per hour 2900 Soil. Suberade and Base Material Tests 3.201 Moisture Content, laboratory measured 400 3.2.02 Atterberg Liquid and Plastic Limits, Plasticity Index 24 00 3203 Sieve Analysis: 1. Soils, through No 200 sieve 24.00 2. Soils, with plus No.4 size 3400 3.204 Sieve Analysis, aggregate with binder. 1. Through No. 40 sieve 34 00 2. Through No. 200 sieve 5400 3.2.05 TXDOT Ball Mill, Tex-1 16-E 100.00 3.2.06 Hydrometer Analysis, not including sieve analysis 52.00 3.2.07 Percent Passing No. 200 Sieve 20.50 3.2.08 Gradation of soil-lime mixture, TXDOT Item 260 25 00 32.09 pH determination of soil or soil-lime mixture, per test (Does not include 3.2.12) . 900 3.2.10 Permeability: 1. Falling Head (specific gravity not included) 75.00 2. Constant Head 86.00 3.2 11 Pinhole Dispersion Test 105.00 0 July 2000 • Page I of 4 S Blir~ a.aea 5 1 L , . 1 FEE SCHEDULE 3 - CONSTRUCTION MATERIALS TESTING AND INSPECTION UNIT PRICEi 3212 Preparation of sample for above items (includes splitting base simple. slaking, washing over No. 40 or No. 200 sieve. preparing base binder for additional testing, mixing additives, remolding or compacting specimen, and other special processing). per hour . $2900 . . . 32 13 Lime treated depth tests 5.00 32.14 Crumb test, per test (plus technician time) .500 CONCRETE AND MASONRY TESTS Cvlmders. Beams and Cubes 3.301 Casting cylinders, including slump (I set = 3 cylinders at 3 cylinders per set per trip), per cylinder . 10.00 3302 Air Content determination when casting cylinders or beams . 17.00 3 3.03 Unit Weight, ASTM C 138 (not including personnel time) 18.00 33.04 Compressive Testing of Cylinders: 1. Made by our personnel. per cylinder 11 50 2. Delivered to our laboratory, per cylinder 14.00 3. Hold cylinders, per cylinder 10.50 3.3.05 Casting beams, including slump (minimum charge of 3 beams per trip), per beam 1400 3 306 Flexural Testing of Beams: 1. Made by our personnel, per beam . . 15.00 2. Delivered to our laboratory, per beam . . 16.00 - 3. Hold beams. per beam 11 50 3.307 Molding Mortar Cubes (minimum charge of 6 cubes per trip). per cube 600 3.308 Compressive Testing of Mortar Cubes, per cube ..8.00 Concrete Coring and Tests 3.4.01 Conng machine rental, per day 75.00 3.402 Portable power generator (if required, 5 hour minimum), per hour . 8.00 3.4.03 Coring, 4-inch diameter, per inch of thickness (not including equipment rental. personnel and transportation charges) . 8.50 3.4.04 Compressive testing of concrete cores, per core 16.50 34.05 End preparation of concrete cores for testing, per end . 900 3.4.06 Soiltest Model CT-320 Concrete Test Hammer rental (minimum 3-hour charge). per hour 23.00 5/g Page 2 of 4 M ~ A- July 2000 NOTE: Inspection and/or standby in excess of I hour when in conjunction with casting test specimens will be charged at the applicable personnel rate. Picking up, transporting cylinders back to lab and stnpping from molds are not included in above rates and will be charged at the appropriate personnel rates plus vehicle surcharge. i i a i 1 ~I ~J FEE SCHEDULE 3 - CONSTRUCTION MATERIALS TESTING AND INSPECTION Concrete Mix Designs Mix design includes mixing the trial batch, determining the %lump, air content, and yield; and casting and testing 6 compressive or 3 flexural tests specimens. Te%ts on aggregates and time spent obtaining materials, computing mix proportions, consultation and reporting, will be charged at the appropriate personnel rate. UNIT PRICF 3.501 Mix Design using cement factor method $115.00 AGGREGATE TESTS 3601 Sieve Analysis, aggregate without binder- 1. Washed . . 24 00 2. Dry . 20 00 3602 Specific Gravity . 34.00 3.603 Absorption . . 20.00 3.604 Clay lumps and friable particles, percent . 3500 3605 Unit Weight (loose and rodded) 34.00 36.06 Percent Passing No 200 Sieve . 20 50 3607 Organic impurities in sands for concrete 25.00 3608 Los Angeles Abrasion 10000 36.09 Sulfate Soundness (5 cycle) (coarse or fine, not both) 185.00 3.6.10 Special processing and preparation of aggregate for above items, per hour 29.00 ~J ASPHALTIC MATERIAL TESTS 3.701 Bitumen content and aggregate gradation 110-00 3.7.02 Mixing asphaltic concrete (3 specimens per set). per set 30.00 3.703 Molding lest specimens for Density and/or Stability (3 specimens per set), per set 3000 3.7.04 Density of laboratory molded specimens (3 specimens per set), per set 28 00 3.7.05 Marshall Stability (3 specimens per set), per set 60.00 3.7.06 Marshall Flow Value (3 specimens per set), per set . 900 3.7.07 Hveem Stability (3 specimens per set), per set 70.00 3.7.08 Maximum Specific Gravity of paving mixtures. ASTM D-2041 or Tex-227-F 25.00 3.7.09 Coring 4-inch diameter asphaltic pavement, thickness up to 6 inches (not including personnel and transportation charges): 1. Minimum 3 cores per trip. each 35.00 2. Additional core, same trip. each 30.00 NOTE: Patching pavement will be charged at the appropriate personnel rates 3.7.10 Density of asphaltic pavement cores and blocks, each 20.00 s too% Page 3 of 4 iwjL- t ~ July 2000 FEE SCHEDULE 3 - CONSTRUCTION MATERIALS TESTING AND INSPECTION UNIT PRICE 3.7.11 Thickness determination of asphaltic pavement cores or blocks, each $5.00 3.7.12 Nuclear Gauge Density (minimum charge of 3 tests per trip . 25.00 3.7.13 Index of Retained Strength . Quotation PERSONNEL RATES AND SPECIAL SERVICES Charges for services of engineering technicians will be made at the following rates for sampling, field inspections and tests not otherwise charged on a per-test basis. Overtime rate will be charged after eight (8) hours per day, Saturdays, Sundays and holidays at standard rate x 1.5. Time for weekends and holidays will be a minimum of 2 hours. 3.8.01 Engineering Technician: 1. Regular rate. per hour ........27.50 2. Overtime rate, per hour ........41.25 3.8.02 Certified Engineering Technician: 1. Regular rate. per hour ...........................................................................30.00 2. Overtime rate. per hour ....45.00 3.8.022 Certified Engineering Technician 11 1. Regular rate, per hour ........35 00 2. Overtime rate, per hour 52.50 3.8.03 Senior Engineering Technician: Regular rate, per hour 37.50 2. Overtime rate, per hour .......56.25 3 Laboratory Supervisor .........40 00 3.8.04 Transportation. per mile 0.50 3.8.05 Per diem, per man per day ....................................................................................80.00 3.8.06 Equipment rental Quotation 3.8.07 Reproduction/postage(over 4 reports), per page 0.35 3.8.08 Direct expenses Cost + 15% 1. Concrete Cylinder Molds 1.50 ea 2. Direct Expense (Miscellaneous) Cost + 15% 3. Vehicle Surcharge, per trip 1200 3.9.10 1. Certified Welding Inspector, per hour ............$45 (Does not include materials and bending straps) Rates for tests and services not listed are available upon request. NOTE: All tests taken or performed before 8:00 a.m. and after 5:00 p.m. on regular work days, Saturdays. Sundays and Holidays will be charged at regular fee schedule rate plus applicable personnel overtime rate. Scheduled tests on weekends and holidays will include a minimum 2 hour technician time. aa.5 -50 Page 4 of 4 VIDJuly 2000 .i f I i t FEE SCHEDULE 4 - STAFF SERVICES This schedule is for standard services on an hourly basis for regular hours within the U.S.A., and includes payroll costs, administrative overhead and profit. Authorized overtime will be charged at 1.5 times the regular rate for classifications 4 1.09 through 4.1.13. Insurance certificates will be furnished by insuring agency on request. PERSONNEL CLASSIFICATION UNIT PRICE 4 1 01 Principal Engineer, Consultant $9500 Expert Witness (plus expenses) ....................................................................175.00 4102 4 1 03 Engineer 6 65.00 Expert Witness (plus expenses) 150.00 4,1 04 4105 4 1 06 Engineer 3 65.00 4107 4108 4.109 Stenographer 30.00 4.1.10 Computer Operator/Office Technician 25.00 41.11 Drafter 2 (Location/Boring Plans) 30.00 4.1.12 Drafter I ...............................................................................................................20.00 4.1.15 Laboratory Manager 50.00 The above rates are for services performed in the ordinary course of business on a first-come, first-served and/or time available basis. Services performed on a time preemption basis are available on request at double the above rates. REIMBURSABLE EXPENSES 42-01 Transportation (company-owned vehicle), per mile 0.50 4.2.02 FAX transmission. first page ...................................................................................10.00 4.2.03 FAX transmission, additional pages .75 4.2.05 Professional staff per diem, per man-day Cost + 15% 4.2.06 Reimbursable expenses: Cost + 15% 1. Long distance telephone 2. Transportation (other than company-owned vehicle) 3. Miscellaneous travel expenses 4. Reports/reproduction 5. Subcontract costs 6. Federal Express 7. Direct Expenses RECORDS/RESEARCH -4-1 4.4.03 File Research/Reproduction 1st hour $60.00 (otherwise $25/hr. $60.00 minimum) Page 1 of 1 I July 2000 I. i I BID TABULATION 2001.037 SECOND OR ADDITIONAL SEAL COAT PROJECT FOR PCT 1,2,3 & 4 g1 Now Rates GaVS.Y. Est. Sq. Yd BIG TEX PAVING Johnson City, TX BRANNON PAVING Victoria, TX F.N.PLOCH CONSTRUCTION New Braunfels, TX YOUNG CONTRACTORS Bryan, TX Pct 1 0.34 80,021 0.568 0.664 0.575 0.75 0.38 102,626 0.568 0.706 0.595 0.80 Pd 2 0.34 85,183 0.568 0.664 0.575 0.75 0.38 65,928 0.568 0.706 0.595 0.80 Pct 3 0.34 61,951 0.568 0.664 0.575 0.75 0.38 108,196 0.568 0.706 0.595 0.80 Pct 4 0.34 79,019 0.568 0.664 0.575 0.75 0.38 156,097 0.568 0.706 0.595 0.80 Start-Work June 1-Jun 1-Apr Early May 1 20 days to complete I' I~ 31 4 i I C6_ is C6 L RECOMMENDATION: BIG TEX PAVING AWARD DATE: . i