HomeMy WebLinkAbout1992-11-16-0900AM-Special•
•
~n
h 11 MV 12 PH 3: 21
-r~,YK... far ,(,;.::Lir".A
to0
BRAZOS COUNTY rtp~
r %
Lug
BRYAN. TEXAS
AGENDA
BRAZOS COUNTY COMMISSIONERS' COURT MEETING
THE COMMISSIONERS' COURT WILL MEET IN SPECIAL SESSION ON MONDAY,
NOVEMBER 16, 1992, AT 9:00 A.M. IN THE COMMISSIONERS' COURTROOM
OF THE BRAZOS COUNTY COURTHOUSE, 300 EAST 26TH STREET, SUITE 115,
BRYAN, TEXAS.
•
1. Invocation.
2. Pledge of Allegiance.
3. Consider and take action on the approval of the minutes of
the meetings held on July 27, 1992 and August 3, 1992.
4. Consider and take action on budget amendments.
5. Consider and take action on the sale of various Brazos
County surplus vehicles in the A&M Auction on December 5,
1992. _
6. Consider and take action on an Independent Contractor
Agreement between Junction Five-O-Five and Brazos County
regarding rural citizen collection stations.
7. Consider and take action on exemption from competitive
bidding requirements of Local Government Code, Section
262.024(a)(10) for contract work.
8. Consider and take action on the approval to advertise for
bids for fencing for rural citizen collection stations.
9. Consider and take action on request from Aquila Southwest
Pipeline Corporation to install gaslines in county right-
of-way of Greens Prairie Road in Precinct 1.
10. Consider and take action on request from Wellborn Water
Supply Corporation tc install waterline in county right-
of-way of Ball Circlc in Precinct 1.
11. Consider and take action on request from McClure Engineer-
ing, Inc. to install waterlines in county right-of-way of
Barron Road in Precinct 1.
12. Consider and take action on the following Final Plats in
Precinct 1:
a. Elliott Subdivision
b. Crossroad Woods
13. Consider and take action on work outside county rights-of-
ways for the enhancement of county road projects in Pre-
cinct 1.
14. Consider and take action on request from GTE to install
communication line in county right-of-way of Grassbur Road
in Precinct 3.
VO L-..~ PAG I,__..5_-r_-
Commissioners' Court Meeting - November 16, 1992 continued •
15. Consider and take action on request from Bexco Operating,
Inc. to install waterline in county right-of-way of Steep'
Hollow Road in Precinct 3.
16. Consider and take action on request from Merit Energy
Company to install gasline in county right-of-way of Lloyd
Lane in Precinct 3.
17. Consider and take action on personnel change of status.
18. Consider and take action on payment of claims.
19. Adjourn.
-2-
VO L PAG E,-6:-;__._
COMMISSIONERS' COURT
SPECIAL MEETING
•
•
NOVEMBER 16, 1992
A special meeting of the Commissioners' Court of Brazos
County, Texas was held in the Commissioners' Courtroom in the
Courthouse in Bryan, Brazos County, Texas, beginning at 9:00
a.m. on Monday, November 16, 1992, with the following members
of the Court present:
R. J. Holmgreen, County Judge, Presiding;
Gary Norton, Commissioner of Precinct 1;
Walter Wilcox, Commissioner of Precinct 2;
Randy Sims, Commissioner of Precinct 3;
Milton Turner, Commissioner of Precinct 4;
Mary Ann ward, County Clerk.
The following citizens and officials were in attendance:
•
Ruth McLeod
Carol Palmer
Bea Green
Cheryl Turney
A. H. Winder
Sandie Walker
Jim Kuboviak
Peggy O'Connor
Mike Humphries
Donald Garrett
Edsel G. Jones
Executive Assistant
Admin. Asst. to County Judge
Secretary to Commissioners
Auditor's Office
County Engineer
Treasurer
County Attorney
KBTX-TV
KBTX-TV
Brazos County Resident
Brazos County Resident
Commissioner Sims gave the invocation and led the pledge
of allegiance.
The Court next considered approval of the minutes of the
Commissioners' Court meetings held July 27, 1992 and August 3,
1992. On motion )y Commissioner Sims, seconded by
Commissioner Norton, the Court voted unanimously to approve
the minutes as submitted.
The Court next considered Budget Amendment $91/92-38,
which would reallocate funds budgeted for the County Judge,
Jury Services, County Ittorney, Justice of the Peace Precinct
4 Place 2, Justice of the Peace Precinct 1 and transfer funds
budgeted for the Non-Departmental Department to Buildings and
Yards and Constable Precinct 4 to offset costs. On motion by
Commissioner Norton, seconded by Commissioner Turner, the
Court voted unanimously to approve the budget amendment as
submitted, a copy of winch is attached hereto.
VOI.^ / P P. f%,` E __57Z
V
Commissioners' Court meeting November 16, 1992
The next matter before the Court was the sale of various
County surplus vehicles in the A&M Auction on December 5,
1992. The County Attorney requested that vehicle VINN
1GIBL5166JR133397 be taken out of the sale and transferred to
the County Attorney's department and offered to substitute
vehicle VINA lGlBL5167JR133389 for the sale. The first
vehicle, he explained has only 81,592 miles on it while the
other has 118,000 miles on it. On motion by Commissioner
Sims, seconded by Commissioner Wilcox, the Court voted
unanimously to approve the request of the County Attorney to
take one vehicle out of the auction and transfer it to his
department and substitute a second vehicle with high mileage
for the sale.
The Court next considered entering into an Independent
Contractor Agreement with Junction Five-0-Five to supervise
and manage the citizen collection stations in various
locations throughout the County. The County agrees to pay
Junction Five-0-Five the sum of $1,130.00 per month for the
services to be rendered at each site. On motion by
Commissioner Sims, seconded by Commissioner Norton, the Court
voted unanimously to enter into agreement with Junction Five-
0-Five with the stipulation that the County Judge will not
execute the agreement until the County has in place all of the
facilities which it will need in order to open the recycling
center. A copy of the contract to be executed is attached.
The Court next considered an Exemption from Competitive
Bidding Requirements of Local Government Code, Section
262.024(x)(10). This is to promote and stimulate small and
disadvantaged business development. The Court will grant an
exemption from the competitive bidding requirement for any
work performed under a contract for community and economic
development made by a county under Section 381.004 from
Junction Five-O-Five. On motion by Commissioner Sims,
seconded by Commissioner Norton, the Court voted unanimously
t
Commissioners' Court meeting November 16, 1992
C~
is
•
to approve the Exemption of Competitive Bidding Requirements
and authorized the payment for services from the designated
vendor for the fiscal year 1993.
The next matter for consideration was approval to
advertise for bids for fencing at the rural recycling
stations. On motion by Commissioner Sims, seconded by
Commissioner Norton, the Court voted unanimously to authorize
the Purchasing Agent to advertise for bids for fencing at the
rural recycling stations.
The Court next considered the request by Aquila Southwest
Pipeline Corporation to place two (2) road bores in the right-
of-way of Greens Prairie Road for the purpose of installing
natural gas pipe lines. Included with the request is company
check #016258 in the amount of $1,000.00. The site is in
Precinct 1. The County Engineer stated that all appeared to
be in order and recommended approval. On motion by
Commissioner Norton, seconded by Commissioner Sims, the Court
voted unanimously to approve the request of Aquila Southwest
Pipeline Corporation and authorized the installation as long
as the installation met State Highway Department requirements.
A copy of the request is attached hereto.
The Court next considered the request by Wellborn Water
Supply Corporation to place a road bore in the right-of-way of
Ball Circle Road (Peach Creek Estates) for the purpose of
installing a water line to provide service to County
residents. The site is located in Precinct 1. The County
Engineer stated tha•: all appeared to be in order and
recommended approval, on motion by Commissioner Norton,
seconded by Commissioner Turner, the Court voted unanimously
to approve the request of Wellborn Water Supply Corporation
and authorized the installation. A copy of the request is
attached hereto.
The Court next considered the request by McClure
Engineering, Inc. to construct utilities in the right-of-way
of Barron Road for= (1) installation of an 18" water line= (2)
VOL__Z PAGE.:5:-,2__
Commissioners' Court meeting November 16, 1992
open cut the road to install two (2) 8" water lines
(connecting to a 18" line) to provide service to Springbrook-
Oakgrove Addition, College Station, Texas. The site is
located in Precinct 1. The County Engineer recommended a
variance to the local Subdivision Regulations and a road bore
rather than an open cut across Barron Road. Commissioner
Norton moved to approve the request subject to the road bore
being parallel to the road. The motion was seconded by
Commissioner Sims. Commissioners Norton, Sims and Turner
voted "Aye", Commissioner Wilcox voted "No". The Court
approved the request and authorized the installation. A copy
of the request is attached hereto.
The Court next considered approval of two final plats.
The first was a plat of the Elliott Subdivision in Precinct 1.
Holland Winder, County Engineer, stated that this had been
platted a long time ago and had been considered by the Court
sometime in 1989. Apparently the final plat had never been
filed. Commissioner Wilcox asked if a variance had been
granted originally. Holland Winder, County Engineer, stated
that the plat met with all of the City of College Station
regulations. It was then noted that some of the lots were
smaller than the one (1) acre required for a septic system.
On motion by Commissioner Norton, seconded by commissioner
Wilcox, the Court unanimously approved the final plat of the
Elliott Subdivision and granted a variance to the Subdivision
Regulations on lots that were smaller than one (1) acre in
size. The second final plat discussed was of the Crossroad
Woods Subdivi®lon in Precinct 1. Holland Winder, County
Engineer, stated that he had reviewed the plat and it appeared
to be in order. On motion by Commissioner Norton, seconded by
Commissioner Turner, the Court unanimously approved the final
plat of the Crossroad Woods Subdivision.
The Court next considered authorizing work outside of
county rights-of;way for the enhancement of county road
projects. The Road and Bridge Department requested permission
VO I.- PA G E: -A 6
Commissioners' Court meeting November 16, 1992
•
to enter the private property of H. W. Owens on Ward Road to
remove a tree from the right-of-way for the safety and welfare
of the general public. On motion by Commissioner Norton,
seconded by Commissioner Turner, the Court voted unanimously
to authorize the work.
The Court next considered the request by GTE Southwest to
place a road bore in the right-of-way of Grassbur Road
approximately 0.7 miles southwest of its intersection with
Vicks Lane to install a buried cable to provide service to
county residents. The site is located in Precinct 3. The
County Engineer stated that all appeared to be in order and
recommended approval. On motion by Commissioner Sims,
seconded by Commissioner Norton, the Court voted unanimously
to approve the request of GTE Southwest and authorized the
installation. A copy of the request is attached hereto.
The Court next considered the request by Bexco Operating,
Inc. to place a road tore in the right-of-way of Steep Hollow
Road for the purpose c-f installing a 3.5" high pressure water
line. The site is located in Precinct 3. Included with the
request is company check no. 6171 in the amount of $500.00.
The County Engineer stated that all appeared to be in order
and recommended approval. On motion by Commissioner Sims,
seconded by Commissioler Wilcox, the Court voted unanimously
to approve the request of Bexco Operating, Inc. and authorized
the installation. A :opy of the request is attached hereto.
The Court next considered the request by Merit Energy
Company to place a road bore in the right-of-way of Lloyd Lane
approximately 22 feet. from its intersection with Forsthoff
Road for the purpose of installing a 3.0" low pressure gas
line. Included with the request is company check #0148 in the
amount of $500.00. She site is located in Precinct 3. The
County Engineer stated that all appeared to be in order and
recommended approval. On motion by Commissioner Sims,
seconded by Commissioner Norton, the Court voted unanimously
to approve the reques•: of Merit Energy Company and authorized
Commissioners' Court meeting November 16, 1992
the installation. A copy of the request is attached hereto.
The Court proceeded to consider the change of status of
the following employees.
NAME
Tubbs, Steven
Sanders, Laurie
Zweifel, Shawn
Thompson, Melinda
Adams, Shawna
Allen, James
Campbell, Robert
DEPARTMENT
Sheriff office
District Attorney
Bldg. Maintenance
Juvenile Service
Sheriff Office
Sheriff Office
Data Processing
REASON
Resignation
Resignation
Resignation
New Emp P/T
6 mon Increase
6 mon Increase
Salary Increase
On motion by Commissioner Turner, seconded by Commissioner
Norton, the Court voted unanimously to approve the changes as
submitted.
The Court next considered the following Claims as
submitted by the County Treasurer for payment:
10 General Fund Claims-121941-thru-122132-
20 Road & Bridge Claims-122322-thru-122437-
32 Records Mgn. & Presv------ Claims-122133-thru--------
40 Law Library Claims-122134-thru-122147-
54 Health Department Claims-122156-thru-122185-
60 Payroll Claims-122186-thru-122199-
61 Health & Life Ins--------- Claims-122200-thru--------
72 Bail Bond Board Claims-122201-thru--------
90 Brazos County Grants Claims-122202-thru-122308-
91 MPO----------------------- Claims-122309-thru-122313-
97 Narc. Traf. Task Force Claims-122314-thru-122321-
Commissioner Sims stated that he wanted to look into the
use of credit cards. Specifically he said, the purchase of
gasoline with a credit card. He asked the Auditor's office to
give him a list of departments with credit cards. Commis-
sioner Sims then referenced check number 92371 which was for
two (2) work orders on a vehicle in the Sheriff's Department.
He said he could not find one of the work orders for $115.00.
On motion by Commissioner Norton, seconded by Commissioner
Turner, the Court voted unanimously to approve the Claims as
submitted.
There being no further business to come before the Court,
r
the meeting was adjourned.
A i, . '
Cl
0 i
The foregoing minutes of the Commissioners Court Meeting held
have been examined and approved in open Court
this the 1.2 day of l 191?3, in Bryan,
Brazos County, Texas.
c 1. vZ
R.J. mgr en Gary Nort
Count Judge Commiss nor Prec ct 1
Walter Wilcox Randy S s
Commissioner, Precinct 2 Commis oner, Precinct 3
~m *
Et
on Turner Mary A n War
Commissioner, Precinct 4 County Clerk
I
I* j
i'
f,
VO L- I PAG E _,6 3
•
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENT(S) FOR THE 1991-1992 BUDGET YEAR
NO. 91/92-38
On this the 16th day of November 1992 at a special meeting of the
Commissioners' Court, the following members were present:
R. J. Holmgreen, County Judge, Presiding
Gary Norton, Commissioner, Precinct 1;
Walter Wilcox, Commissioner, Precinct 2;
Randy Sims, Commissioner, Precinct 3;
Milton Turner, Commissioner, Precinct 4;
Mary Ann Ward, County Clerk.
The following proceedings were held:
THAT WHEREAS, on November 16, 1992, the Court heard and
approved a budget amendment for the 1991-1992 budget year for
Brazos County, Texas.
WHEREAS, an expenditure is necessary due to the necessity to
meet unusual and unforeseen conditions which could not be
reasonably included in the original budget adopted September 3,
1991, the following amendment(s) to the original are hereby
authorized, as described on the attached 2 page(s).
ADOPTED AND APPROVED this the 16th day of November 1992
THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS.
By: R. J. Holmgreen, County Judge
Original: County Clerk's office and attached to the original
budget
copies: County Auditor
County Treasurer
Commissioners' Court Minutes
Budget Amendment File
V O' PAG E,-k1
f
4
F
Z
I
,
O
_ r-
I m
i
~i
{
I
Budget Amend. No. 91192-38: Nov. 16. 1M
DEPT
ACCOUNT # ACCOUNT NAME
INCREASE
(DECREASE) R
County
10-10-5111 Administrative Assistants
600
Judge
10-10-5210 Office Supplies
Re
(600) fun
NO INC. TO DEPT BUDGET
$0
Jury
10-18-5123 Workers Compensation
425
Services
10-18-5210 Office Supplies
(425)
"INC. TO DEPT BUDGET
$0
County
10-21-5512 Court Costs
300
Attorney
10-21-5121 Social Security
(300)
DEC. TO DEPT BUDGET
$D
JP
10-36-5115 Secretarial/Clerical
650
Pct. 4-2
10-36-5210 Office Supplies
(650)
' NO INC. TO DEPT BUDGET
$0
JP
10-39-5115 Secretarial/Clerical
400
Pct.1
10-39-5610 Telephone
(400)
NO INC. TO DEPT BUDGET
t0
Const.
10-55-5110 Elected 3 Appointed
425
Tran
Pct. 4
-
from
"INC. TO DEPT BUDGET
7
``$425 • t
Buildings
10-70-5123 Workers Compensation
2,000
Tran:
& Yards
"INC. TO DEPT BUDGET.
=2,000
from
•
i
't
i
Budget Amend. No. 91192-38: Nov. 16, 1992
Personnel 10-78-5115
Secretarial/Clerical
200
10-78-5511
Printing & Filming
"
NO INC. TO DEPT BUDGET .
$0
JP 10-81-5115
Secretarial/Clerical
400
Pct. 2 10-81-6210
Office Furn & Equipment
NO INC. TO DEPT BUDGET
=0
C
JP
10-83-5115
Secretarial/Clerical
325
l°
Pct. 3
10-83-6210
Office Furn & Equipment
" NO INC. TO DEPT BUDGET :
:0
Const.
1044-5123
Workers Compensation
200
Pct. 2
1044-5530
Travel, Meals, Lodging
NO INC. TO DEPT BUDGET
s0 •
Const.
1045-5123
Workers Compensation
200
Pct. 3
10-85-5510
Conference Fees
I
NO INC. TO DEPT BUDGET
I
f
I
I
9
Const. 10-86-5123 Workers Compensation 175
Pct. 5 1046-5511 Printing & Filming
NO INC. TO DEPT BUDGET.., =0
Non Depart 10-14-5124 Unemployment Insurance
mental
• • DEC. TO DEPT BUDGET (=2,425)
"NO INC. TO GF BUDGET". $0
Reallocate
(200) funds
(400)
"
(20%
I
f
(200)
(175)
(2,425) Transfer
to B&Y &
Con. Pct4
•i
•
INDEPENDENT CONTRACTOR AGREEMENT
THIS AGREEMENT, is made and entered this &7 day of 7?10ci2.4,.,k.4j
1992, by and between BRAZOS COUNTY, TEXAS acting by and through its duly elected
Commissioners Court (hereinafter "COUNTY") and JUNCTION FIVE-0-FIVE, a Texas non-
profit corporation (hereinafter "JUNCTION").
WHEREAS COUNTY wishes to establish citizen collection stations in various
locations through the County for the deposit, disposal and recycling of plastic, metal, cans,
glass, yard waste and other non-biodegradable items; and
WHEREAS, JUNCTION is in the business of promoting such recycling and has
sufficient staff to supervise and manage such recycling facilities; and
•
WHEREAS, COUNTY and JUNCTION wish to work together to promote their
common purpose.
IN CONSIDERATION of tht:ir mutual promises made herein, and for other good
and valuable consideration, the part es hereby agree as follows:
1. Scope of Work. COUr TY engages JUNCTION to manage and supervise the
collection and proper storage of rraterials, including but not limited to, glass, plastic,
aluminum, yard waste, and abandoneJ consumer appliances at such recycling centers as are
established by COUNTY and being more particularly described on Exhibit "A" attached
hereto and made a part hereof for al purposes. Additional recycle facilities may be added
over time in which case JUNCTION shall operate and supervise such centers on the same
conditions and terms as herein stated. JUNCTION agrees to establish proper procedures,
including but not limited to a permits ing procedure, to effectively handle the collection and
receipt of waste, as described hereir, from the public; to provide for its organization and
storage in a neat and clean manner ind to work with other county agents to facilitate the
orderly transfer of the waste to othe - sites for ultimate disposal.
2. COUNTY agrees to pay to JUNCTION the sum of $1,130.00 per month for
the services to be rendered hereunde -by JUNCTION on the first of each month, and unless
otherwise agreed to in writing, all payments due to JUNCTION shall be paid in Brazos
County, Texas, at 4410 College Main, Bryan, Texas, 77801. All sums remaining unpaid after
the expiration of thirty (30) days from the first day of each month will bear interest as
provided by Vernon's Revised Civil Statutes, Article 601(f).
•
3. Schedule of Work Thu. hours of operation will be established after the peak
use times of such facilities by the ge feral public can be determined, but in no event shall
COUNTY keep such facilities open l(ss than forty (40) hours per week. Such times will be
established with the aid of oral eomrwnications from the Director of JUNCTION relative
to the high and low volume periods of usage. Such schedule of work hours may change
based upon changes in seasons an J circumstances. JUNCTION agrees to employ a
VO L--1-PAC E ._1.-,7
I
A. ti•-
sufficient number of employees to keep the stations adequately staffed forty (40) hours a
week.
4. Supervision. JUNCTION shall maintain a regular, systematic inspection
routine of each recycling facility by its supervisory employees to the end that the services
contracted for herein shall be performed in a good and workmanlike manner.
5. Independent Contractor Relationship. JUNCTION is an independent
contractor and is not an employee, servant, agent, partner or joint venturer of COUNTY.
COUNTY shall determine the work to be done by JUNCTION, but JUNCTION shall
determine the legal means by which it accomplishes the work specified by COUNTY.
COUNTY is not responsible for withholding, and shall not withhold, FICA or taxes of any
kind from any payments which it owes JUNCTION. Neither JUNCTION nor its employees
shall be entitled to receive any benefits which employees of COUNTY are entitled to receive
and shall not be entitled to worker's compensation, unemployment compensation, medical
insurance, life insurance, paid vacations, paid holidays, pension, or Social Security on
account of their work for COUNTY.
6. Employees of Contractor. JUNCTION shall be solely responsible for paying
its employees and withholding FICA and any and all taxes, workers' compensation,
unemployment compensation, medical insurance, life insurance, paid vacations, paid
holidays, pension, profit sharing and other benefits for JUNCTION and its employees,
servants and agents.
7. Minimum Wage Rate Requirements. JUNCTION hereby covenants and
agrees that it shall pay to each of its employees and contract labor engaged in any way in
work hereunder, a wage not less than what is generally known as the "Federal Minimum
Wage" as set out in 29 U.S.C., paragraph 206, and any amendments hereto. Furthermore,
JUNCTION shall produce proof of compliance with this provision to COUNTY upon
request. COUNTY may withhold payments due to JUNCTION hereunder until JUNCTION
has complied with this provision.
8. Insurance. JUNCTION shall furnish the COUNTY with current certificates
of coverage of JUNCTION, and proof of payment by JUNCTION, for workers'
compensation insurance, general liability insurance, motor vehicle insurance and other
insurance as COUNTY may require from time to time. If JUNCTION is not required by
the Texas Workers' Compensation Law to provide workers' compensation to its employees,
JUNCTION shall waive its exemption or exclusion from that law and shall purchase workers'
compensation insurance and furnish COUNTY with a current certificate of coverage and
proof of payment. JUNCTION shall maintain all such insurance coverage and ,shall furnish
COUN'IY with certificates of rcncwul coverage and proofs of premium payments. If
JUNCTION fails to pay a premium for insurance required by this paragraph before it
becomes due, COUNTY may pay the premium and deduct the amount paid from any
payments due JUNCTION or recover the balance from JUNCTION directly.
w
n~
.
•
9. Compliance With Laws. JUNCTION shall act as an independent contractor
insofar as the performance of services hereunder is concerned. To that end, JUNCTION
shall employ and direct such personnel as it requires to perform said services, shall secure
any and all permits that may be required in order to perform the services herein
contemplated, shall exercise full and complete authority over it-, personnel, shall comply with
all workmen's compensation, employer's liability and other federal, state, county and
municipal laws, ordinances, rules and regulations required of an employer performing
services as herein contemplated, and shall make all reports and remit all withholdings or
other deductions from the compensation paid its personnel as may be required by any
federal, state, county or municipal law, ordinance, rule or regulation.
10. Release and Indemnity. JUNCTION agrees to assume all risk of loss and to
indemnify and hold COUNTY, its officers, agents and employees, harmless from and against
any and all liabilities, demands, claims, suits, losses, damages, causes of action, fines or
judgments, including costs, attorneys' and witnesses' fees and expenses incident thereto, for
injuries to persons (including death) and for loss of, damage to, or destruction of property
(including property of COUNTY) arising out of or in connection with this agreement unless
caused by the gross negligence or willful misconduct of COUNTY, its officers, agents or
employees. In the event that any demand or claim is made or suit is commenced against
COUNTY, COUNTY shall give written notice thereof to JUNCTION within five (5) days of
such demand, claim or suit becoming known to the County utilizing the procedure for notice
set forth in paragraph 16 below. JUNCTION shall have the right to compromise or defend
the same to the extent of its own interest.
11, Payment. COUNTY shall remit to JUNCTION payment for services rendered
within fourteen (14) days after receipt and approval of JUNCTION'S invoices.
12. Assignment. COUNTY may assign any or all of its rights and duties under this
Agreement at any time and from time to time without the consent of JUNCTION.
JUNCTION may not assign any of i•s rights or duties under this Agreement without the
prior written consent of COUNTY.
13. Term. This Agreemer t is effective on the date specified in paragraph 26
below and shall continue in effect t ntil canceled by either parry upon thirty (30) days'
written notice to the other party. ; uch termination shall relieve neither party from its
respective obligations and liabilities incurred up to the date of such termination, including
but not limited to all accrued and ur paid fees.
14. Law. This Agreement shall be governed and construed in accordance with
Texas law.
15. Attorneys' Fees. In t1 a event that legal action is necessary to enforce or
interpret any of the provisions of this Agreement, the prevailing party shall be paid all costs
and reasonable attorneys' fees incuned in connection therewith.
W
.P.. M. -
G
16. Serving of Notice. Any notice, demand or request permitted, required or
desired to be given under this Agreement as between JUNCTION and COUNTY shall be
in writing and shall be deemed effective if hand delivered or if sent by United States
certified or registered mail, return receipt requested, postage prepaid, by facsimile, or if sent
by private receipted carrier guaranteeing same-day or next-day delivery, addressed as
follows:
COUNTY: Brazos County Courthouse
300 East 26th Street
Bryan, Texas 77803
Attn: County Commissioners Court
JUNCTION: 4410 College Main
Bryan, Texas 77801
If sent by U. S. certified mail in accordance with this paragraph, such notice shall be
deemed to be delivered three (3) business days after deposited in the United States Postal
Service. Notice given by any other means shall be deemed given and received only upon
actual receipt at the above described address of the named addressee.
17. Severability. The invalidity of any provision of this Agreement as determined
by a court of competent jurisdiction shall in no way affect the validity of any other provision
hereof.
18. Joint Drafting. This Agreement is to be deemed to have been prepared
jointly by the parties hereto and shall not be interpreted against the party by reason of such
parry, or its counsel, being the drafter.
19. Binding Agreement. This Agreement shall inure to the benefit and be binding
upon the parties hereto and their respective successors and assignees. Nothing in this
Agreement, expressed or implied, is intended to confer on any person, other than the parties
and their respective successors and assignees, any rights or remedies under or by reason of
this Agreement.
20. Further Assurances. Each parry hereto agrees to execute any and all
documents and take such other action as may be necessary or expedient to further the
purposes hereof.
21. Counterparts. This Agreement may be executed in any number of
counterparts, each of which so executed shall be deemed to be an original. Such
counterparts shall together constitute one and the same Agreement.
22. Modifications. This Agreement may be amended or modified only by a
written document signed by COUNTY and JUNCTION.
VOL PAGE. 7
R
~t
ti..
L
23. Entire Agreement. This Agreement represents the entire agreement between
the parties pertaining to the subject n atter hereof. Said document supersedes any and all
prior agreements and conversations I etwcen the parties pertaining to the subject matter
hereof. Each party acknowledges and represents that it is relying on no representations by
the other parry other than those expr;ssly set forth herein.
24. Authority. The parties to this Agreement warrant and represent to one
another that they have the power and authority to enter into and perform their respective
obligations under this Agreement in i he names, titles and capacities herein stated and on
behalf of any entities, persons, estates or firms represented or purported to be represented
by such person, and that all formal requirements necessary or required by any state and/or
federal law or private agreement in order for the parties to enter into and perform their
respective obligations under this Agmement have been fully complied with.
E
25. Acknowledgement. JUr CTION and COUNTY hereby acknowledge that they
have read all of the provisions of the .Agreement, and that they have signed this Agreement
with full knowledge and understandii g of the same.
26. Effective Date of Agreement. The "Effective Date" of this Agreement shall
mean the later of the two dates on which this Agreement is signed by JUNCTION and
COUNTY, as indicated by the dates accompanying their respective signatures below;
provided, however, that if either or both parties fail to date their signatures below (or if
having dated a signature, fail to bring the date current upon any updated signature,
initialling or similar confirmation of s ny change to the form or content of the Agreement),
then the parties shall use the best extrinsic evidence practicable in order to determine the
date of final agreement by the parties and, accordingly, the "Effective Date" of this
Agreement.
IN WITNESS WHEREOF, the parties have executed this Agreement on the dates
shown below.
BRAZOS COUNTY, TEXAS
Dated: -A00. 11. 11 q a-
•
Dated: I 1 11-7 ~ 42
1
By:
Title: N u
JUNCTION FIVE-O-FIVE, a Texas
non-profit corporation
By: - 0 a" 0 - , , -
Tide:
Legpl, Descrlptlon
0.2296 Acre Parcel
Harvey School - C.F. Goen
Maria Kegans Survey -,Abstract 28
Brazos County, Texas
1
BEING a 0.2296 acre tract or parcel of land being situated and lying in the Maria Kegans
Survey, Abstract No. 28, Brazos County, Texas; being a part of that certain 2.27 acre tract
retained by C.F. Goen as described by deed dated March 20, 1948 conveying a tract of
land to J.F. Grant and recorded In Volume 134, Pago 260, Deed Records of Brazos
County, Texas, and more particularly described by metes and bounds as follows:
COMMENCING at the Southeast corner of Lot 8, Block 1, Deerfield Estates Subdivision
set In the southwest right-of-way line of State Highway 30;
THENCE South 49° 15' 52' East along the southwest right-of-way line of State Highway
30 for a distance of 67.1 feet to the POINT OF BEGINNING;
THENCE continuing South 497 15' 52" East along State Highway 30 Southwest right-of-
way line for a distance of 100.00 feet to an Iron rod for corner;
THENCE South 38° 14' 08" West Into the aforementioned 2.27 acre tract for a distance
of 100.00 feet to an iron rod for corner;
THENCE North 49 015' 52" West for a distance of 100.00 feet to an Iron rod for corner;
THENCE North 38 ° 14' 08' East for a distance of 100.00 feet to the PLACE OF
BEGINNING and containing 0.2296 of an acre of land more or less.
,`C• fo ~ s r J
• uw..i-w•n•.e.
Surveyed by:
dJr +~oa~
s u a'+
Winder - No. 3856
istered Professional
d Surveyor
EXHIBIT"A"
I wa. + r ^'r.!'~i~:"'17~'.i.`.u..r7.t"•~i.~:~,~".~''~7~~l~AG[~lt=.ZJr~9c"J:~'R'ti:•
i ;
a
F~F
I.
L
J
F'
+k
It
L
•
t '
MEMO
TO: Sharon Fairchild, County Auditor
FROM: R. J. Holmgreen, Count- Judge
RE: EXEMPTION FROM COMPETITIVE BIDDING REQUIREMENTS OF
LOCAL GOVERNMENT CODE, SECTION 262.024(x)(10).
Please be advised that on this Jj lb day of Novcmber, 1992, at a Regular Session of the
Commissioners' Court on which the following members were present:
County Judge
Commissioner, Pct. 1
Commissioner, Pct. 2
Commissioner, Pct. 3
Commissioner, Pct. 4
•
The Commissioners' Court has determined that to promote and stimulate small and
disadvantaged business development, Commissioners Court will grant an exemption from
the competitive bidding requiremen: for any work performed under a contract for
community and economic development made by a county under Section 381.004, from the
following vendor: Junction Five-O-Five as provided in the Local Government Code, Section
262.024(a)(10). The Court hereby approved all such payments for services from the
designated vendor for the fiscal year 1193.
ake
V a l.`_.,,I PAGE.--7-1-
f
NOTICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY
TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN, TEXAS 77803
FROM: RE: Type Installation - Road, Precinct,
Anui l a Southwest Pipeline Crossing X Parallel Install._
Roy 2000 Road: Greens Prairie
Giddings, Texas 78942 Precinct No.:
Formal notice Is hereby given that (Applicant)c,i 1 a Southwest Pip 1 i ne Corporation
proposes to place a (type) natural gas
pipeline within the right-of-way (road) Greens Prairie _
In Brazos County, Texas as follows:
The location or description of the proposed installation Is more fully shown by
s copies of the drawings attached to this notice.
1. The County Engineer must be notified prior to the beginning of construction In order that
they might be on hand to designate the actual location of the Installation.
2. That all damage to the roadways and right-of-ways will be repaired to their original condition
to the satisfaction of the County Engineer.
3. That Brazos County reserves the right to require Applicant to relocate or lower any such
line at no cost to Brazos County, should same become necessary due to widening or
lowering, or other alteration of the roadway or right-of-way.
4. That Brazos County Is In no way responsible for any damage that might occur to any
existing utility lines In the right-of-way.
5. That the line will be constructed and maintained on the County right-of-way In accordance
with governing laws.
6. That the line or lines will be constructed no less than forty-eight Inches (48-) lower than the
lowest part of the drainage or bar ditch and the drainage is to be considered at least two
feet (7) below the center of the roadway.
7. That all roads shall be bored and cased for such distance, from toe of slope to toe of slope
and In no case shall an open ph be allowed within four feet of the shoulder of the road.
a. That all sties will be barricaded during the construction period.
9. That the normal charge Is $500.00 per crossing and/or $40.00 per rod when paralleling the
roadway established by the Commissioners' Court on January 28, 1985.
10. Ditch line shall be compacted to 90% standard density ASTM•Test method No. D-698; test
shall be conducted by an Independent Geotechnlcal testing firm; copies of all test results
shall be furnished to the office of the Brazos County Engineer.
11. Construction shall be in strict conformance to the latest Texas Manual on Uniform Traffic
Control Devices for Streets and Highways, published by the Texas Department of
Transportation, and all other State and Federal laws governing utility construction.
Construction of this line will begin on or after (date) l i-9- g2
APPROVED BY COMMISSIONERS'
COURT ON:
Z~ 2
Date
t✓
R.J. H green
Brazos County Judge
UU N o~'L
tr`1 OZ,
APPLICANT:
Quila Southwest Pipeline
Name/Title
Vl,, rnet ROW Age t
Company Representative
(409) 272-3780
Telephone No.
VA ell I
VGL / PAGE..--~?.Y-
a
,A - . .
i w
BRAZOS COUNTY, TEXAS
$ 41052'04'W
/0.00' -
W
~ .3
N
ti
m~
v Q
S IJ°/4'?J"W
r /Q 00'
PROPOSED 6' N/ON PRESS(V
1
'
IO
0
PROPOSED 6 LOW PRESSURE
~ Nrl9°? 40
NI bl
N40054'IO•W
A
a►
1
~
0
0
C PROfrISEO
GREENS
'
V R.V. PARTNERS
PRAIRIE
TRA/L
'
loo
V.R.V. PARTNERS
SAMUEL DAVIDSON
PmPIOSEO
#/V
P,~owasEO
A- 13
R/W
PLAN
•
•
p T.B.M. IS 60a NAIL SET IN 6*
i 761
'
FC. COR. 10
AT. OF S
TA. 111
SCALE 1" " 60'
at
m EL. 100,00
ASSUMED
Q
4
tp
pi
~
W
Z
Q
Q
d
y~
ti
~1 h 1~
k1
V
Z
tD
0
100 N
8
100
\
'A rURAL
y
VENT P/PES ORA N frL TO
GROUND
p a PIPELINE
BE 2.0 BELOW
z
PROPOSED ROAD
~ WARN/NG S/ON
o
a I TYP/CAL J
95
~
d N K COVER
4' MIN COVER
g6
W
PR)POSEO RO
AT NATURAL OROIJIdb
-
`
P140POsro
PIPELINE.'T
PIiQRDSEO
OYI S/N@S
L
PROFILE LOOKING
NORTHEAST
9o
9o
NOTES :
SCALE
HORZ. I
1"a 50'
CONTENTS OF PIPELINE:
NATURAL SAS
VERT.:
1" • 6'
CROSSING MODE BORING
MAX. OPER. PRESSURE :
L.P. 60 PSI , HP 1000 PSI
CASINO WILL BE SEALED
AT BOTH ENDS
CASINO WILL BE CATHOD
ICALLY PRO,'ECTED
BORE HOLE WILL BE NO
GREATER THAN
2" LARGER O.D. OF
PIPE
VANCE NO. I
LATERAL
AFE
1141 -
824-
' 14%
AQU ILA
O
SOUTHWEST
Drown By : C. L. M.
Dote 1 10-29-92
Scale I NOTED
Aerial No.
Fool9e--- 100,00'
SPECIFICATION
Tot01
RoeQooo 6.06
LOW PRESSURE: 6POLYPIPE
PIPING' HIGH PRESSURE: 11.0
0
X
IBS W
STEEL
T
.
.
.
.
.
Field Bb. 611
LOW PRESSURE: 10 0
X .166 W
STEE
0
T
page No. IS
.
.
.
.
L
CASING: HIGH PRESSURE: 1000.11 X .lee W.T. STEE
NOTICE OF PROPOSED INSTALLATION III COUNTY RIGHT-Or-MAY
70 711E COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS
BRAZOS. COUNTY COURTHOUSE
BRYAN, TEXAS 77803
Formal notice is hereby given that W f%.%.S0Sh%j
(Applicant), proposes to place a WA'teR_~,~ Z'G
within the right-of-way of '1'~ALA- C¢cLC (name of
road) In Brazos County, Texas as follows:
the location or description of the proposed installation is more fully
shown by 3_ copies of the drawings attached to this notice.
i understand and agree that:
1. The County Engineer must be notified 72 hours prior to the beginning
of construction in order that he or his designated Inspector may
inspect the actual installation.
2. That all damage to the roadways and rights-of-way will be repaired
to their original condition to the satisfaction of the County
Engineer.
3. That Brazos County reserves the right to require Applicant to
relocate or lower any such line at no cost to Brazos County, should
same become nocessar due to widening or lowering, or other
alteration of the roadway or right-of-way.
4. That Brazos County will In no way be responsible for any damage which
might occur to any existing utility lines in the right-of-way.
S. That the line will be constructed and maintained on the County right-
of-way In accordance with governing laws.
6. That the line or lines will be constructed no less than twenty-Four
Inches (24") lower than the lowest part of the drainage or bar ditch
and the drainage is to be considered at least two feet (21) below
the center of the roadway.
1. That all sites will be barricaded during the construction period.
=ctlon of this line will begin on or after the U day of
9 , 19
Firm: A-'tEQ ~uPnL-e Cue~
By l %0 Er
Title: 6EVfit- ~AANAGEfZ
Address:
~JE~-~BoR~J~ 1 k. 71$81
Phone: 4()1 -Gc10-1955
APPROVED BY COMMISSIONERS' COURT
!late: ~/,?/t- !-L--
mgr , ou u ge
/cj:ROWCRSG
~oTeo
~h11od,192
0 VGL PAGE...j.
~
•
TR29
6.000 AC:
n,
N_
0
N
f
w
TR. 27
X116 AG
oI
® ;I
I
I
i
•
A
w
0
P
TR.28
6.000AC.
I"
TR.26 m TR.25 ~I
6.004AC. I 6.004AC, w,
I
~IS'wcE
U
I
I
I
A
TR. 23 m
6.326 AC.
i
dl -
o
0
2 w
' A
TR.22
5.850 AC.
w
TR. 24
6004 AC. "
I
=zu
O. .56
N Z /12 WIFE UTILITY EASEMENT
~Y; TR.17
%
% l
6.595 AC.
,
`
'0%
O~
%
O o
44
a TRJ8
$ 6.000 AC.
O
o t
TR. 16
6.000AC.
N~
L 6677 0
I
w
w
m
A
I
I
TR. I9
6.004 AC.
D-O
L= , L> 78.54' i
•rT. •j' 260.7v 10.00 r %1=78 5t' I
L7 Lr46-v,
a
pv
J ExlSifENClIG '
C ~ Qp0
w ~ ~ w
w ~ w
AtR. A TR21
6.326 AG 5.718 AC.
I
I
3029*
it FROM WO
i
of
0
w
Ip j w
~ o
~I I
3i
cl
~N
,w aTt
W
.j
NOTICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY
TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN, TEXAS 77803
Formal notice is hereby given that /`I C.e,6&ac EN6. /,.c
/ - i8 "W.era c 4~.v.a .oitgccGC
(Applicant), proposes to place a 2 -8 "w.or^,z "og 41,voE4 Ar qp
within the right-of-way of daago.v 20y0 C~ (name of
road) in Brazos County, Texas as follows:
The location or description of the proposed installation is more fully
shown by copies of the drawings attached to this notice.
I understand and agree that:
1. The County Engineer must be notified 72 hours prior to the beginning
of construction in order that he or his designated inspector may
inspect the actual installation.
2. That all damage to the roadways and rights-of-way will be repaired
to their original condition to the satisfaction of the County
Engineer.
3. That Brazos County reserves the right to require Applicant to
relocate or lower any such line at no cost to Brazos County, should
same become necessary due to widening or lowering, or other
alteration of the roadway or right-of-way.
4. That Brazos County will in no way be responsible for any damage which
might occur to any existing utility lines in the right-of-way.
5. That the line will be constructed and maintained on the County right-
of-way in accordance with governing laws.
6. That the line or lines will be constructed no less than twenty-four
inches (24") lower than the lowest part of the drainage or bar ditch
and the drainage is to be considered at least two feet (2') below
the center of the roadway.
7. That all sites will be barricaded during the construction period.
Construction of this line will begin on or after the day of
19 _
Firm: r-11,2 ~
By : f kdtr C I~CGLi 5~ y
Title:
Address: f ,-/ZZ rrb~irur~r Sig i fe 21D
/finoon, A. Imo
Phone: _ ("0 ~-7(n - (o70Q
APPROVED BY COMMISSIONERS' COURT
Date:
I
i
r Z-1144
. o green, oun Judge
/c,) : ROWCRSG
VOL PAGE.__21__..
0---- 0 0
" O
'v
t`o
t ~
I
i
WORK OUTSIDE COUNTY RIGHTS-OF-WAYS
OR THE ENHANCEMENT OF COUNTY ROAD PROJECTS
Name
Addrm 0
of Wo be a
F~~pbon of Work to be Done
Signed
OWENS
Ward Road
Ward Road approx 0.3 mile
Pemission to enter private property
10128192
KW.
College Station, TX
south of Old Hwy 6 an the
for the purpose of removing tree from ROW
east oght-of -way lime.
for the safety and welfare of the general
public- (Tree hit by lightning.)
i
1
i
i
~
'
i
l
l
1
NNW
I
~~I IAIO~t
R.J. Hormpran
counq Judo.
Ouy Norton
Pmdnat 1
wallar wuaol
Pradnd 2
Randy Skn4
PrWrrt 7
AHmn Turrw le
prod= 4
A.H. Wnd•r, P.B.
Counq Erylnaar
He
I
I
III.
BRAZOS COUNTY
PRIVATE PROPERTY ACCESS
PERMISSION FORK
Date 10& gr
LAND OWNER AND ADDRESS 4161 e9g p t, - ,owl.noSe,. 7 9'F"f
LOCATION OF WORK A, ~y~Tp,1 t O f 0/.,fa'
Nun, e., ..s ! , ~~l~cL~ f N a•
-gold
DESCRIPTION OF WORK TO BE DONE ,Foss[✓6' 'T'Ct~ ~roc.~ ~~K~r
IV. MAINTENANCE YES NO
IF YES, ESTIMATED FREQUENCY OF MAINTENANCE
OWNER WILL BE NOTIFIED PRIOR TO MAINTENANCE)
A. K. Holland Winder, P.E., R.P.S.
Brazos County Engineer
OWNER, -
DATE IO i~ 8 L
Iva a- '//1
Engineering Aide
REV 02/89 VO L PAGE, 9'0
/ cj
2617 Highway 21 West Bryan, Texas 77803 J409) 822-2127____
•
•
•
•
A part of GTE Corporation, .
I
RECEIVED OCT
GTE Telephone Operations
Central Area
Engineering Department
P. 0. Box 3158
Bryan, Texas 77805
October 28, 1992 Reply To
Bryan, TX
Brazos County Engineering Office
Mr. Holland Winder, County Engineer
2617 W. Hwy 21
Bryan, Texas 77803
Dear Mr. Winder:
Subject: AGRMNTS 24 BURIED CABLE 5435 3PO01BQ
Enclosed are Form Ed-135 and work location sketch showing the
location of our proposed buried cable line on County roads in
Brazos County at Kurten, Texas.
This work is to be completed on Work Order 3PO01BQ which is
scheduled for November 1992. If you have any questions con-
cerning this work, please contact Brenda Vajdak at our office
in Bryan, telephone 821-4770 within 15 days so that we may
explain or modify our proposal, otherwise, it is understood
that this proposal is approved.
Sincerely,
~~Ujxdo d' V, ' dol...
n Colley
Senior Engineer - OSP
AC:cp
Attachment
l I"
•
® GTE Southwest NOTICE OF COMMUNICATION
Incorporated LINE INSTALLATION
DATE October 28. 1992
TO THE COMMISSIONER'S COURT OF Brazos COUNTY
ATTENTION COUNTY JUDGE:
Formal notice Is hereby given that GTE SOUTHWEST INCORPORATED will construct a communication line
within the right-of-way of a County Road in Brazos County,
Kurten, Texas as follows:
Beginning .7 of a mile Southwest of the intersection of Vicks Lane and Crassburr
Road, we propose to place a buried line under Crassburr Road from the Southeast
R.O.W. to the Northwest R.O.W. by accessing an existing 4" PVC and pulling thru
the proposed cable in a Northwesterly direction a distance of approximately 69'.
The location and description of this line and associated appurtenances Is more fully shown
by four copies of drawings attached to this notice. The line will be constructed and maintained
on the County Road right-of-way in accordance with governing laws.
Notwithstanding any other provision contained herein, it is expressly understood that tender of this notice
by the GTE Southwest Incorporated does not constitute a waiver, surrender, abandonment or impairment of any
property rights, franchise, easement, license, authority, permission, privilege or right now granted by law or may
be granted in the future and any provision or provisions so construed shall be null and void.
Construction of this line will begin on tor after November 15, 19 92
GTE SOUTHWEST INCORPORATED
By _a~AIJ 2WOb & VOIJAIL _67J OtQl2e
Alan Colley
Senior Engineer - OSP
Address P. 0. Box 3158
r
Bryan, Texas 77805
5435 3P001BQ
lr j Neu ~,.L
f
1
R
be
f
9
r
'r
r
Al! ~AMO[11
0
0
\t'4
f /
Z
d~
y
•DZ
z
c
a
M
O
H
' a
~a
~A
M~
I~
r
i
J •
t
_i4mb WD-)2~.3PDD1
1~ IOTL1~. `D CA-T 1 D N ,
i+~f•UAYF . Y ~I~y~{,r y
_ h
1
i
r
~ c
CINM1Y
pAIY!•
GOu"Il
r
7 A M E: ~ M I'C N 7I ~ ZZ'1 - E.N
1 7Z1- ?-7a D -~D 11
a 111- Z : Lo z D O I -313 ; F.V 1 ~L~ • ~ZU A7/!
4101. 3 Z"7 Q ~ "
WcU C 1-e X_
etk Z=o s J
=d=)/. :5 Z to
PH Mom) P E G'T W OR1L SAFCI.Y
A
- /ddb ~~•i ~b ;
pAV10 ~.~SOE.NC~ALE $3$p ~~~'-T LO A
6 zl• tSp • :051 RN►V m0 S 7
PR-DPDSE O
s_P_tZY AL E_CA NO E ft- ~U~\ED DQ
N FP_ V-1 s 89 •31 2 1 w M '1 +Wb rentvR D
Elll • 2:'~ 1e 3Q0/•32H BUSIED OK11F"~ j
X 7u 14% Wrt W5 x
DONNA NOP50N
EI•-5E5-ZOS'7 -
8111• ob: /0 Z001-
3Z2-PAMELA r-1/i r- A
g 94 .SSn . 3:5µ'1 \0 N , k
[.am I LB v
4) -
3001. G'~}O IG13 . ~
ANTHONY NN 5NIOEF_
NP. 1. 52 -31s$ 011 ~ ~°o !
I ■
~s10 _ g I► I. 2:85 _ .3001 3L0 _ _ AT
AL LEONAIZO co 7
i X111-t:9 3001-4~1~•1 UL'F'-Lis -a6A
J. EE1L VAN D IG SZI FF , : , . A-xcpO S-1_5
1 NP-EI. 5S9 •Z' L MC _L92 7-1% Z7
' . ® 1 \ \ • Z'.-7 I (MOO % • 3 Z \ UZ 1 L MF- U27 10 HOC- A 5 L&
m c 5'Z7 O a°D Cs. M 11~~'i
2. 311 5CT CAO 1.0 PEa . Pe.1C)
MC 021938 U Jl_EO6 ,
L PEOSPEI_T OT~ta.Q_W\ jF_ 11JD1GA~ED = MR.. L.E~JNAR
50NO %•GI•LOUND CtDNTAL-T 71 ~L
1.05 - /00•IDO • L`
I 'p~ PR03P LC'T 5NvE up%;L0 W OIZIL AZZA
i . USE WAQNINC6 DEVICES) POTENTIAL. VEH/CULAIZ40
t PEDES'Z• VLIAN 4APkMASZO NTEA ' " ' G QA FSU R t
PM3PE=,r SPL\CeQ.S TPA ALL. CAMLCS
&NO.OPZ TE IZMIIJALf2 AT
AGCESrw%MLC LOCAT 10N9►.
® FiJ~ 1''T 1N(7~ C►1.11E1f' tD ~►1SQ.V 1 GC , . . ~ . ~ .
DKOPP 76 MF JCE F"LAC-t=0
- LU I'T" NEW MUZ1Cfl
At) IND\LA'~ED ~l
NO SPECPA%L GIQlcU%T3
C .
Ic.70 XL
..s. SCIL/T/-/ C~ R~ T V_ A L GENCNAL rcLEPHONg CA)MPA w . .
_ e• J... tlOHJ.+aO. /1091 1
Off. 'y R'- ' / wc.ws fT T~ n l °S ~1 S 5 T'-
wrw ~-w P IPIF' P f rAMLE*
110°7
TO 1ZE'AJTAL HOA-IF. Cr.-4M. I70 • M
~ .w.o.ao w «+w
JON 1. V M L 1 P1 • GE
. ]i ! F'~ .1.t7 . :1,YY '1! 1'I S • Y J,h. ~ , 1. 1 ~ ~ . r • ~
r
A
0
aI lo~sa
L'~RtavC~
J j
J a
9 ; ~s g
V 1
f
4.
n~
k/ '1
/ / yprMAU'!;3 AVM:-
PC~Pp
~U e.\ED C7CDF'S
. F-Q)
~ GGb~
1DD?
i
• I -i
> urv 7-z-aLA
xDD 1-10
1IL4 et) IIZD
In11•~ZL~tXDDZ1-Z'3
T. DyC~AsW 3U01,3
t_ c. 7- 067-H7-'3
3
1= \
'~~=L►r.1L1A ALIEN
ail" 3'~~, 17- t ~•b~-altlo
-•\p~L'~ ~-1 Il\
PTO RMEv
8. A LM- D.GPIDMS
00M G Z OOMS /
R1- 5'•33\~
S\~\-`b' ~t '',D01-3lco'
1 T a`ZO
1007
WA`INF LA FKAIJCE
k c,~yC)"~\2 - L NP IZ1 • 7- 1Z-I
L tt(!11 15 \y 3OM\ - 3 %Ib
y`P_DZ L• t0(n ~Sb
7-MV PG C> -
tn.& kin P20POgE0
104-
SU Q.1Tc.0 DROP'=~
TD \N. Va T ZP%WCQ
ILV M 1 1 1b'l
RMV ~C7
IQ 7.1
~.:9 7
D ~CEF IZ-n
G /013• _ - Op ZKAN PI-C7 03cx71,3i~-~ZN
RENTAL H0lT1E CarnrnUN~ k µ;9O O
U KT 5.]•aN
DWIJ~K- Al LFOhASZD 519•Z.y1 ° F\\... ; Q R P H t 1 N To
roo \•1Ot
2.\y-1~50-Z3Z~ Q 2 IZM~ rED ?001 .S11 • '~t't
NC T1Fy 5 WOV'-Y.1NG DA`5 M u -l X001, 3Zco•~,'Lb~xUDZ.S-'~l~l
ADVANCE PR\3R 5'TAR7 TO u r!;\c_ atiig 50
AN7 CONST RUC? ION _ =I tzzP
• It3g RMV F~f~U QDG~►
j sew ee PTZ•1VATE EASEM~.uT • ; • •
To ANY C0tJ5Ti-VCT10►J 1 toN '
~ ADV 1'~ES t'niS. VAN D1GR\FF ~ :
r Zt)-b?. W\\-\. CAE AT '*AOr.XE AS 1 a My PE_tD
MVL. >`EOuAe-D
~`L O+ l09 ri M V F1 FU D
+41-1
..i"• PULL ZMR\.I
y ~D EX 15T I NCa N" P VC-
PL . DA/ w4or J'oE 1Z 1N PP-MT
• _ PS's\"1
UEF '~5-7-Z TWO
r C zoo 1. Zo/ • 3 Z'z .
j ••AQ 1'7-- 1CD Pcc IT-
:5D01~301-~1Z' ~ _ 0+00 XMI
/D-IZ~ .,:..i. '
' 00l. 30/- ®roo C3C7~D1,3Zt.-3Z.8~XI~D N \Z. • ~ .
• BOG l~~t CA:.c °.05 F Z~ '
'1\ 5V/~►C BE.F[~~'MP,DW " ' CASE ZD/L` TYPZ/OgS L 3C\O!. 3 ~l I7- ' ' ' ~
1 R" • Z =)U85GT.\DLP.S C3~/.3a/ -151 XDD 13 -Z `5 ;
i 3 VNC AFT~L T\14~p'.L XDD 13 •LS
llama co 9 N
IN• •PIs
i ~
y
4
~R.
. i
i~
.i•
NOTICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY
TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN, TEXAS 77803
FROM REs Type Installation, Road, Precinct
BEXCO Operatina. Inc. Crossing _L, Parallel Install.
1001 University Dr. E. Ste. 108 Road: Stppn Hnllnw Rnad
Cnllpgp Ste inn, Tpxac 77R4n Precinct Noss _ Thrpp (31
Formal notice is hereby given that (Applicant)BEXCO Operating- lnc_
proposes to place a (type) 3,511 High Pres;ure Water Ling
pipeline within the right-of-'way of Road
in Brazos County, Texas as follows
The location or description of the proposed installation is more fully shown
by three copies of the drawings attached to this notice.
(Applicant) BEXCO Operating. Inc. , understand and agree that:
1. The County Engineer must be notified prior to the beginning of
construction in order that they might be on hand to designate the actual
location of the installation.
2. That all damage to the roadways and rights-of-way will be repaired to
their original condition to the satisfaction of the County Engineer.
3. That BRAZOS COUNTY reserves the right to require Applicant to
relocate or lower any such line at no cost to BRAZOS COUNTY, should same
become necessary due to widening or lowering, or other alteration of the
roadway or right-of-way.
4. That BRAZOS COUNTY is in no way responsible for any damage that might
occur to any egisting utility lines in the right-of-way.
S. That the line will be constructed and maintained on the county right-
of way in accordance with governing laws.
6. That the line or lines will be constructed no lase than forty-eight
inches (48") lower than the lowest part of the drainage or bar ditch and
the drainage to to be considered at least two feet (2') below the center
of the roadway.
7. That all roads be bored to forty feet (400) on either side of the
eanterlins of the right-of-way or cased for such distance.
8. That all sites will be barracaded during construction period.
9. That the normal charge is $500 per crossing and/or $40 per rod when
paralleling the roadway established by the Commissioners' Court on
January 28, 1985.
Construction of this line will begin on or after (date) November 3. 1992
APPROVED BY COMHISSI HERS' COURT (Applicant) B eratin . Inc.
date a roved
!v
Brez Co my Jud a Company Representative
Hraz • County, Texas Telephone No. 846-4545
r9
0 e
0
VOL PAGE.--h
.
. alt..,- . .Z _,1 ..~u.~/./.. _ l .r +r.-.-~~Z~, t~KF.F•
I
•
/ From FM 1179 to pipeline: 1.5 miles
TONIAf TRACT t R1fIM0[AI T11AC1
A
11/w Tvr--o
r C[IIT[11LIMf MAIL -
!f' /AV[M[MT 1
w/w
•
- 8 r
SECTION A-8
PROPOSED
BEXCO 3.5"
HIGH PRESSURE
WATER PIPELINE
4
O
fCAI[- 1, • 50 FT
11/w
STEEP HOLLOW ROAD
A,
COOK[ TRA
A/w
FL
us[ MAIL AS B M. [L[V. 306.0'
[L[VATIO
- - - 305
SURFACE PROFILE -
rA
- 306
33
8
3 0 1
300
J J a J
h y Y y t
O e w
O O O 0 0 O O O O
r n w n n II n n n
M011120MTAL SCALE ~ 1' • 30 ''T
TOP OF CASED BORE HOLE- ELEV. 299.2
•
M Ol0 (IlL1AMCt 110.
aw l•
a'
ay
Lft M. I l T f Y
0
PROPOSED
BEXCO OPERATING, INC.
3.5" HIGH PRESSURE
WATER PIPELINE CROSSING
STEEP HOLLOW ROAD
BRAZOS COUNTY, TEXAS
ORO{O l{, 1{{{
VOL PACE
. yr -~+w+~+w•..w•~l.w+•w . -
a
W
a
s 0
.V a J
w ~
SUBJECT X•1:M nal
1 fCALtI 1'{ I M1.
NOTICE OF PROPOSED INSTALLATION IN COUNTY RIGHT-OP-WAY
TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS
BRAZOS COUNTY COURTHOUSE
BRYAN, TEXAS 77803
FROM: RE: Type Installation - Road, Precinct,
Merit Fnp rgy (nmpan v Crossing _X_ Parallel Install.`
n _ n _ n^ i in Road:
_ ~C n. Texas Precinct o.: 3
Formal notice Is hereby given that (AppUcant)
proposes to place a (typo) T.nw Pr[+-~-ciirn nAs T_inn ;a w (D" 6 Al51 'j e
pipeline within the right-of-way (road i.ioyd 1
In Brazos County, Texas as follows:
The location or dosoription of the proposed Installation is more fully shown by
re topics of the drawings attached to this notice.
1 The County Engineer must be notified prior to the beginning of construction In order that
they might be on hand to designate the actual location of the Installatlom
2 That all damage to the roadways and rtght-of-ways w1I be repaired to their original condition
to the satisfaction of the County Engineer.
3 That Brazos County reserves the right to require Applicant to relocate or lower any such
line at no cost to Brazos County. should same become necessary due to widening or
lowering, or other alteration of the roadway or right-d-way.
4. That Brazos County is in no way responsible for any damage that might occur to any
existing utility lines In the right-of-way.
6. That the line will be constructed and maintained on the County right-of-way In accordance
with governing laws.
8. That the line or lines will be constructed no leas than forty-eight Inches (481 lower than the
lowest part of the drainage or bar ditch and the drainage Is to be considered at least two
feet (7) below the center of the roadway.
7. That all roads shall be bored and cased for such distance. from toe of slope to too of slope
' and in no case shall an open pit be allowed within four feet of the shoulder of the road.
8. That all sites will be barricaded during the construction period.
9. That the normal charge Is $500.00 per crossing end/or $40.00 per rod when paralleling the
roadway established by the Commissloners' Court on January 28, 1985.
10. Ditch line shall be compacted to 90% standard density ASTM-Test method No. 0.698: test
shall be conducted by an independent Osotechnical testing firm; copies of all test results
shall be fumished to the office of the Brazos County Engineer.
11. Construction shall be in strict conformance to the latent Texas Manual on Unlftym Tref is
Control Devices for Streets and Hiahways, published by the Texas Department of
Transportation, and all other State and Federal laws governing utility oonstruction.
Construction of this line will begin on or after (date),
APPROVED BY COMMISSIONERS
COURT O1
Date
.
- A, R.J. H mg een
Brazos County Judge
APPLICANT:
David Ayers Field Loreman
N e e al j4jj.~
Compan Repr entetlve
(409) 589-2515
A7 ,TOO Telephone No.
A- qL moats, r~Nrnce~
VOL ►
PAGE. is
11-11-92
r,
f
r`.
r
-
THE FOLLOWING
DOCUMENT
IS THE BEST IMAGE
POSSIBLE
DUE TO
THE POOR QUALITY
OF ORIGINAL
I
1
JI .
A
CE&jrr--g, Lopj& 7- .0
Rap p 130Re Moze
PI y
swwwmavw~mm WON It a