HomeMy WebLinkAbout1998-10-06-0900AM-Regular•
BRAZOS COUNTY
BRYAN. TEXAS
AGENDA
-FILED
98 OCT - I PH 4: 43
i.i:PJTY
BRAZOS COUNTY COMMISSIONERS COURT
THE COMMISSIONERS COURT WILL MEET IN REGULAR SESSION ON TUESDAY,
OCTOBER 6, 1998 AT 9:00 A.M. IN THE COMMISSIONERS COURTROOM OF THE
BRAZOS COUNTY COURTHOUSE, 300 EAST 26TH STREET, SUITE 115, BRYAN,
TEXAS.
1. Invocation - Commissioner Thornton.
11
2. Pledge of Allegiance - Commissioner Thornton.
3. Citizens input and/or concerns. At this time, the Judge will open the floor to citizens
wishing to address the Court on county-related issues not scheduled on the agenda.
Please limit subject matter to five minutes. The Commissioners will receive the
information, conduct research into the matter, and/or place the matter on a future agenda
for discussion. (A recording is made of the meeting; therefore, please give your name
and address for the record.)
Consider and take action on agenda items 4 - 25:
4. Personnel Change of Status.
5. Payment of Claims.
6. Approval and presentation of Proclamation regarding Breast Cancer Awareness Month.
7. Approval and presentation of Proclamation regarding National Arts and Humanities
Month.
8. Approval of an Agreement with the Arts Council of Brazos Valfey.
•
9. Approval of Contractual Agreement with the Brazos County Soil & Water Conservation
District.
10. Approval of Contract for Services with Brazos Beautiful, Inc.
11. Approval of Contract with Texas Voting Systems, Inc. for election services for the
November 3, 1998 election.
12. Approval of Lease Agreement with Fred Keller for office space for the Justice of the
Peace, Precinct 3.
I
f
i
Commissioners Court Meeting Agenda
October 6, 1998
Page Two
13. Request by Constable, Precinct 6, to appoint a non-paid, reserve deputy.
14. Approval of modification to contract with Ravey & Associates for additional architectural
services for the Detention Center Addition.
15. Approval for Recurring Payments for the following:
a. Fred Keller (office space for Justice of the Peace, Precinct 3)
b. Dr. Rany Cherian (medical services for Jail and Juvenile Services)
c. Brazos Maternal & Child Health Clinic, Inc.
d. Star Armored, Inc. (services to Treasurees office, JP, Precinct 6, Juvenile Services)
e. Montgomery Kone (maintenance for elevators)
E Becky Segrest (Juvenile Board member)
g. City of Bryan (housing and maintaining County Law Library)
h. Mike Hensarling (office space for Justice of the Peace and Constable, Precinct 2)
i. College Station ISD (office space for Justice of the Peace and Constable, Precinct 6)
16. Establishing a speed limit for Sweetwater Drive located in Precinct 1.
17. Establishing a date and time for a public hearing to consider establishing a speed limit
on North Dowling Road from Quail Run Drive to Hoppes Creek Road, Precinct 1.
18. Terms for right-of-way acquisition for certain property for the proposed Greens Prairie
Road Extension located in Precinct 3.
19. Acceptance of Warranty Deed from C. M. Anderson Properties, LTD. for 29.52 acres on
Greens Prairie Road located in Precinct 3.
20. Blanket Purchase Orders.
21. Requisition from Capital Projects Fund for a copier replacement for Computer and
Network Services.
22. Award the following bids and approve requisitions for Road & Bridge Department:
a. Bid No. 99-001 Flexible Base
b. Bid No. 99-002 Aggregate for Surface Treatments
C. Bid No. 99-003 Hot Asphaltic Concrete Pavement
d. Bid No. 99-004 Asphalt, Oil & Emulsion Products
C. Bid No. 99-005 Culverts - Various Types - Annual Contract
23. Approval to advertise the following bids and/or RFP's:
a. RFP 99-011 Landscape Maintenaace Service
b. Bid No. 99-012 Cold Mix Limestone - Annual Contract
C. Bid No. 99-013 Fencing Supplies - Annual Contract
d. Bid No. 99-014 Fence Building - Annual Contract
C. Bid No. 99-015 Motor Grader Blades - Annual Contract
24. Approval of Exemption from Competitive Bidding for the following:
a. Texas Commercial Waste
b. Strong Survey
C. Garrett Engineering
d. Carlomagno Surveying, Inc.
C. John Hamilton
1
a
I
1
s
Commissioners Court Meeting Agenda
October 6, 1998
Page Three
•
•
f. Rimstar International
g. Ikon Office Solutions
h. Junction Five-0-Five
i. Bryan Utilities
j. All professional services for counseling of Juveniles
k. Medical & pharmaceutical services for County Indigent Health Care
1. Visiting Judges and Court Reporters for all County & District Judges
M. S.T. Lovett & Associates
n. Ben E. Keith
o. Public Financial Management, Inc.
p. Akin, Gump, Strauss, Hauer & Feld, L.L.P.
q. Buchanan Soil Mechanics
r. Texcon General Contractors
S. Family Psychological Services, BVCAA, Inc. through Thomas H. Edwards, PhD.
t. Rany Cherian, M.D.
U. Lone Star Gas
V. General Telephone Equipment
W. City of Bryan for County Area Emergency Calls
X. City of College Station for County Area Emergency Calls
y. Downtown Pharmacy for medication for indigents
Z. Union Pacific Railroad Company
aa. Bruchez, Goss, Thornton, Memoff, Michel & Hawthorne, Attorneys at Law
bb. AM/PM Clinics for medical services
cc. Scott & White Clinics for medical services
dd. Juvenile Placement Services
ee. Alliant Food Service
ff. Cain's Coffee Company
gg. Standard Coffee
hh. Scarmardo Produce
ii. Lilly Dairy
jj. Sysco Food Service
kk. Butterkrust Bakery
11. Performance Food Group
mm. Hi-Way Equipment
nn. E. L. Lester
oo. Conley Lott Nichols
pp. R. B. Everett
qq. Romco Equipment Company
rr. Waukesha Pearce
ss. Mustang Tractor
tt. Washington County Tractors .
uu. Carruth Doggett
vv. Hogan Truck
ww. Normangee Tractor
xx. Prator Equipment
yY• /J
zz. Ikon/Texas Copy
25. Waiver of County Judge's approval signature:
a. Indigent Health Care
b. Counseling of Juveniles
C. Visiting Judges for County and District Judges
d. Placement of Juveniles
- - _.w...r--........L-r-.mow-..Y..-:...J. o~,..~-ter... i..-. r. n.. ..~r__ - - _ .
Commissioners Court Meeting Agenda _
October 6, 1998
Page Four
e. Court-appointed Attorney fees
E Brushy Water Supply Corporation
g. Bryan Utilities
h. Fairview/Smetana Water Supply Corporation
i. General Telephone Company
j. Lufkin Communications Corporation (formerly TCA)
L Lone Star Gas Company
1. United Telephone
m. Wellborn Water Supply
n. Wickson Creek Special Utility District
26.. Announcement of interest items and possible future agenda topics.
27. Call for citizen input and/or concerns.
28. Convene into Executive Session:
a. Pursuant to 551.071 of the Texas Government Code to discuss privileged matters
with legal counsel regarding economic development
b. Pursuant to 551.072 of the Texas Government Code to deliberate the purchase,
exchange, lease or value of real property.
29. Consider and take action on Executive Session.
30. Adjourn.
The Courthouse is wheelchair accessible. Handicap parking spaces are available. Any request for
sip interpretive services must be made two business days before the mating. To make
arrangements, call (409) 361-4102.
Va
~~Y
COMMISSIONERS' COURT
REGULAR MEETING
OCTOBER 6, 1998
•
A regular meeting of the Commissioners' Court of Brazos
County, Texas was held in the Commissioners' Courtroom in the
Courthouse in Bryan, Brazos County, Texas, beginning at 9:00
a.m. on Tuesday, October 6, 1998, with the following members
of the Court present:
Alvin W. Jones, County Judge, Presiding;
Tony Jones, Commissioner of Precinct 1;
Wm. S. Thornton, Commissioner of Precinct 2;
Randy Sims, Commissioner of Precinct 3;
Carey Cauley, Jr., Commissioner of Precinct 4;
Mary Ann Ward, County Clerk.
Attached is a list of the citizens and officials in
attendance.
Commissioner Thornton gave the invocation and led the
•
•
pledge of allegiance.
There was no citizen input and/or concerns.
The County Judge welcomed new employee, C. Jack Hunter.
Mr. Hunter is the County Extension Agent replacing Dr. Jim
Mazurkiewicz.
The County Judge then deviated from the agenda and
considered agenda item number 6 which was the approval and
presentation of a Proclamation concerning Breast Cancer
Awareness Month. He then read aloud a Proclamation
proclaiming October as "Breast Cancer Awareness Month" and
October 16, 1998 as "National Mammography Day". The Court
joins with the nation in urging all women and their families
3
in Brazos County get the facts about breast cancer and
mammography. On motion by the County Judge, seconded by
i
Commissioner Jones, Thornton, Sims and Cauley the Court voted
to proclaim October as "Breast Cancer Awareness Month" and
October 16, 1998 as "National Mammography Day" throughout
Brazos County. The County Judge then presented the signed
Proclamation to Ms Marcie McDonald, representing the Brazos
County Health Department.
Commissioners Court meeting October 6, 1998
The County Judge read aloud a Proclamation designating
the month of October as "National Arts and Humanities Month".
The Court joins with the local Arts Council to participate in
and celebrate the cultural riches our community has to offer.
On motion by the County Judge, seconded by Commissioners
Jones, Thornton, Sims and Cauley the Court moved to proclaim
the month of October 1998 as "National Arts and Humanities
Month" throughout Brazos County. The County Judge then
presented the signed Proclamation to Ms Julie Angelo,
representing the local Arts Council who introduced Diane
Stropp and Jeanine Wood.
The Court proceeded to consider the change of status of
the following employees.
NAME DEPARTMENT REASON
Charanza, R. L. County Clerk Resignation
Jones, Jon S. Road & Bridge New Employee
Pierce, Orlando Road & Bridge Tran in dept
Heflin, Lisa Juvenile Serv. Termination
Starch, Jason Juvenile Serv. Resignation
Bayer, Linda S/O Administration Promotion
More, Wayne A S/O Administration New Employee
Thompson, Pamela D S/O Administration New Employee
Wiese, William E S/O Administration New Employee
Pool, Shannon R S/O Administration New Employee
Martin, Gregory J S/O Administration New Employee
on motion by Commissioner Sims, seconded by Commissioner
Cauley, the Court voted unanimously to approve the changes as
submitted.
The Court next considered the following Claims as
submitted by the County Treasurer for payment:
99-000001 through 99-000220
On motion by Commissioner Jones, seconded by Commissioner
Cauley, the Court voted unanimously to approve the Claims as
submitted.
The Court next considered entering into agreement with
the Arts Council of Brazos Valley. The Arts Council will
provide assistance to local arts organizations of the County
through funding and support which improves the quality of life
in the County and.in turn assists in attracting industry and
business to the County. Cost to the County is $18,500.00
Imp- A-5.Y. C-& 4P
.,imam cvwmr-A~.%
,
i
i
i
1
Commissioners Court meeting October 6, 1998
annually. Term of the Agreement is for October 1, 1998 and
ending September 30, 1999. On motion by Commissioner Cauley,
seconded by Commissioner Sims, the Court voted unanimously to
enter into agreement with the Arts Council of Brazos Valley
and authorized the County Judge to execute the Agreement on
behalf of Brazos County. A copy of the Agreement is attached
hereto. -
The next matter before the Court was approval of a
Contractual Agreement between Brazos County and the Brazos
County Soil and Water Conservation District #450. The
District will provided soil and water conservation services to
the residents of Brazos County and to the County proper such
as erosion control, water management and rural development.
The cost to Brazos County will be $4,400.00 annually. The
term of the contract will be fiscal year 1999. On motion by
Commissioner Sims, seconded by Commissioner Cauley, the Court
voted unanimously to enter into contractual agreement with the
Brazos County Soil and Water Conservation District #450. A
copy of the contractual agreement is attached hereto.
The next matter before the Court was approval of a
Contractual Agreement between Brazos County and Brazos
Beautiful, Inc.. Brazos Beautiful strives to improve waste
handling practices and improve litter control. The cost to
Brazos County will be $12,000.00 annually. The term of the
contract will be fiscal year 1999. On motion by Commissioner
Thornton, seconded by Commissioner Cauley, the Court voted
unanimously to enter into contractual agreement with Brazos
Beautiful, Inc.. A copy of the contractual agreement is
•
attached hereto.
roval of a
urt was a
C
f
th
tt
b
h
pp
ore
e
o
e next ma
er
e
T
Contractual Agreement between Brazos County and Texas Voting
Systems, Inc. (T.V.S.). T.V.S. will provide election services
and supplies to conduct the General Election and a College
Station Bond Election to be held on November 3, 1998, in
Brazos County, Texas.. The cost to Brazos County will be
•
5
'
4°'
~ o"
~
i
u
.-~s 1'i~i r
• -~6~erytiyfrGOZrLI
Commissioners Court meeting October 6, 1998
t
7
i
r
'F
• it
$25,000.00. On motion by Commissioner Sims, seconded by
Commissioner Cauley, the Court voted unanimously to enter into
contractual agreement with Texas Voting Systems, Inc.. A copy
of the contractual agreement is attached hereto.
The Court next considered renewal of a lease agreement
between Brazos County and Fred Keller of Brazos County for
rental of office space in the building located on 8991 East
Highway 21, in Bryan, Texas, for the use of the Justice of the
Peace for Precinct 3. Term of the lease is for three months
commencing on October 1, 1998 and ending on December 31, 1998.
The County agrees to pay to Mr. Fred Keller the amount of
seven hundred fifty dollars ($750.00) per month. On motion by
Commissioner Jones, seconded by Commissioner Cauley, the Court
voted unanimously to renew the lease agreement between Brazos
County and Mr. Keller for the period stated above. A copy of
the lease agreement is attached.
The court next considered a request from Constable
Precinct 6, Phil Sikes, to appoint Daniel Martinez as a Non-
paid Reserve Deputy Constable. on motion by Commissioner
Jones, seconded by Commissioner Cauley, the Court voted
unanimously to approve the request from Constable Sikes to
appoint Daniel Martinez as a Non-paid Reserve Deputy Constable
subject to appointment being within the allotted number of
deputies.
The Court next considered the approval of a modification
to the contract with Ravey & Associates for additional
architectural services for the Adult Detention Center
Addition. In a letter to the court Rick Ravey, Architect,
indicated that Sheriff Kirk had request changes to the layout
of the isolation cell area. This will constitute additional
services and will have to have approval from the Court. The
estimated cost for the work is $5,000.00 to $6,000.00. On
motion by Commissioner Cauley, seconded by Commissioner Jones,
the Court voted unanimously to approve a modification to the
contract with Ravey & Associates for additional architectural
/_5 A e
h
.
a~
•
0
•
Commissioners Court meeting October 6, 1998
services for the Adutl Detention Center Addition. A copy of
the contract modification is attached.
The Court next considered authorizing the Auditor's
office to process recurring payment requests for the
following:
a) Fred Keller, for lease of building for
Justice of the Peace 3 office, $9,000.00
b) Dr. Rany Cherian for health care of
inmates both adult and juvenile,
$36,000.00
c) Brazos Maternal & Child Health Clinic,
Inc., for prenatal care of poor and
indigent $60,000.00
d) Star Armored, Inc., for transport of
currency, coin, negotiable instruments
and other documents for Treasurer's
office, JP, Precinct 6 & Juvenile
Services $7,200.00
e) Montgomery Kone, for elevator maintenance
$3,878.00
f) Becky Segrest for serving on Juvenile
Board $600.00
g) City of Bryan housing and maintaining
County Law Library $10,956.00
h) Mike Hensarling, office space for Justice
of the Peace and Constable, Precinct 2
$7,200.00
i) College Station ISD for office space for
Justice of the Peace and Constable,
Precinct 6 $12,000.00
On motion by Commissioner Sims, seconded by Commissioner
Cauley, the Court voted unanimously to authorize the Auditor's
office to process all the previously noted recurring payments.
The Court next considered establishing a speed limit for
Sweetwater Drive in Precinct 1. The Court held a Public
Hearing to consider the posting of speed limits on Tuesday,
September 29, 1998 at 10:00 a.m.. The Engineer's office
stated that the 85% was 41 mph. It was then recommended that
the speed limit be set at 40 mph. On motion by Commissioner
Jones, seconded by Commissioner Thornton, the Court voted
unanimously to set the speed limit on Sweetwater Drive at 40
mph.
3
t
c2
x'
ti
f`r
f
r
l
, Commissioners Court meeting October 6, 1998
On motion by Commissioner Jones, seconded by Commissioner
Cauley, the Court voted unanimously to hold a Public Hearing
on Tuesday, October 20, 1998 at 10:00 a.m. to consider
establishing a speed limit on North Dowling Road from Quail
Run Drive to Hoppes Creek Road in Precinct 1.
The Court next considered terms for right-of-way
acquisition for a specific tract of land for the proposed
Greens Prairie Road Extension located in Precinct 3. On
motion by Commissioner Sims, seconded by Commissioner Cauley,
the Court voted unanimously to approve the terms for right-of-
way acquisition. A copy of those terms is attached hereto.
The Court next considered acceptance of a Warranty Deed
for right-of-way on Greens Prairie Road in Precinct 3. On
motion by Commissioner Sims, seconded by Commissioner Cauley,
the Court voted unanimously to authorize the County Judge to
accept on behalf of Brazos County a Warranty Deed from C.M.
Anderson Properties, Ltd., Carol Anderson, General Partner for
the expansion and improvements to Greens Prairie Road.
The Court proceeded to consider the following blanket
Purchase Orders:
Government Records County Clerk $ 10,000
Government Records County Clerk $124,000
Rinko's County Clerk $ 500
B/CS Eagle $ 3,000
R.D. Timmons BVNTTF $ 500
B/CS Eagle MPO $ 1,500
Brazos Office Supp MPO $ 500
Brazos Center MPO $ 500
Labatt Food Juvenile Services $ 6,500
Scarmardo Prod Juvenile Services $ 4,000
Butterkrust Juvenile Services $ 1,000
Mike's Grocery Juvenile Services $ 500
Lilly Dairy Juvenile Services $ 1,600
Advantage Car Rent Juvenile Services $ 1,000
Dr. DeWayne Taylor Juvenile Services $ 1,275
Dr. Carol Brackett Juvenile Services $ 1,275
Art of Living Cntr Juvenile Services $ 2,500
On motion by Commissioner Sims, seconded by Commissioner
Cauley, the Court voted unanimously to approve the Blanket
Purchase Orders as submitted.
The Court next considered approval of a requisition from
Capital Projects Fund for the following purchase:
11gi. /6, A ~ /40
I
Commissioners Court meeting October 6, 1998
a) Copier replacement for Computer &
Networks Services Department $1,170.00
•
On motion by Commissioner Cauley, seconded by Commissioner
Sims, the Court voted unanimously to approve the requisition
to be paid from Capital Projects Fund.
The Court next considered awarding bids and approving
requisitions for the Road and Bridge Department. John
Hachmann, Purchasing Agent made the following recommendations
Bid No. 99-001, Flexible Base
Type A, Grade 1 Loaded Only 58,480 lbs.
Austin Crushed Stone, Primary
Vulcan Materials Co., Secondary
Limestone Screenings Loaded Only 58,420 lbs.
Vulcan Materials, Primary
Austin Crushed Stone, Secondary
Type A, Grade 1 Loaded & Hauled 58,420 lbs.
Young Contractors, Primary
Gifford-Hill Co., Secondary
Gifford Hill Co., Alternate
•
Limestone Screenings Loaded & Hauled 58,420 lbs.
Young Contractors, Primary
Colorado Materials, Secondary
Colorado Materials, Alternate
Type A, Grade 1 Loaded Only 80,000 lbs.
Austin Crushed Stone, Primary
Vulcan Materials Co., Secondary
Limestone Screenings Loaded Only 80,000lbs.
Vulcan Materials Co., Primary
Austin Crushed Stone, Secondary
Type A, Grade 1 Loaded and Hauled 80,000 lbs.
Colorado Materials, Primary
Young Contractors, Secondary
Vulcan Materials, Alternate
Limestone Screenings Loaded and Hauled 80,000lbs.
Vulcan Materials Co., Primary
Brazos Dozer Service, Secondary
Colorado Materials, Alternate
Bid No. 99-002, Aggregate for Surface Treatments
Type B, Grade 3 Loaded Only
Type B, Grade 4 Loaded Only
Type B, Grade 5 Loaded Only
•
Colorado Materials, Primary
Austin Crushed Stone, Secondary
Type B, Grade 3 Loaded & Hauled
Type B, Grade 4 Loaded & Hauled
Type B, Grade 5 Loaded & Hauled
Gifford Hill & Co., Primary
Austin Crushed Stone, Secondary
if Q
...4 Tfa•.. f.. tr1fVM .r TT.Y: Y..
r.. 4~ Ar..r rlw A.I..1 ar .e. w~i.L.fr.~d.. • .•,+.+w .~.._.~L~.S. r._. ~a...~_. .
Commissioners Court meeting October 6, 1998
Bid No. 99-003, Hot Mix Asphaltic Concrete Pavement
Type B, Modified 750 Net Tons
Type D, Modified 1,500 Net Tons
Type B, Modified 3,000 Sq. Yds.
Young Contractors, Primary
Colorado Materials, Secondary
Bid No. 99-004, Asphalt, Oil & Emulsion Products
AE-Prime
Cleveland Asphalt, Primary
Prime Materials, Secondary
CRS-2
Cleveland Asphalt, Primary
Gulf States Asphalt, Secondary
SS-1
Cleveland Asphalt, Primary
Prime Materials, Secondary
HFRS-2
Cleveland Asphalt, Primary
Prime Materials, Secondary
HFRS-2P
Gulf States Asphalt, Primary
Koch Materials, Secondary
Bid No. 99-005 (A) Culverts-Various Types-Annual Contract
Contech Construction-Sloped ends/pair
#1,#2,#3,#4,#5,#6, & #8
Wilson Culverts #7,#9,#10,#11,#12
On motion by Commissioner Sims, seconded by Commissioner
Cauley, the Court voted unanimously to accept the
recommendation of the Purchasing Agent and award the contracts
as noted. Copies of the bid tabulations are attached hereto.
The next matter for consideration was approval for the
Purchasing Agent to advertise for the following bids and/or
RFPIs:
a) RFP No. 99-011, Landscape maintenance service
b) Bid No. 99-012, Cold Mix Limestone, annual contract
c) Bid No. 99-013, Fencing Supplies, annual contract
d) Bid No. 99-014, Fence Building, annual contract
e) Bid No. 99-015, Motor Grader Blades, annual contract
on motion by Commissioner Sims, seconded by Commissioner
Cauley, the Court voted unanimously to authorize the
Purchasing Agent to advertise for the previously noted bids
and RFP.
The Court next considered an Exemption from Competitive
Bidding Requirements of Local Government Code for the
following companies:
a)
b)
c)
d)
e)
f)
g)
h)
i)
Texas Commercial Waste
Strong Survey
Garrett Engineering
Carlomagno Survey, Inc:
John Hamilton
Rimstar International
Ikon Office Solutions
Junction Five-0-Five
Bryan Utilities
Section 262.024(a)(2)
Section 262.024(a)(4)
Section 262.024(a)(4)
Section 262.024(a)(4)
Section 262.024(a)(4)
Section 262.024(a)(7)(A)
Section 262.024(a)(7)(D)
Section 262.024(a)(10)
Section 262.024(a)(7)(C)
.
~I
s
Commissioners Court meeting October 6, 1998
f
J) Professional Counseling
services for Juveniles Section 262.024(a)(4)
k) Medical & pharmaceutical
services for County
Indigent Health Care Section 262.024(a)(2)
1) Visiting Judges
& Court Reporters Section 262.024(a)(4)
m) S.T. Lovett & Associates Section 262.024(a)(4)
n) Ben E. Keith Section 262.024(a)(8)
o) Public Financial
Management, Inc. Section 262.024(a)(4)
P) Akin, Gump, Strauss,
Hauer & Feld, L.L.P. Section 262.024(a)(4)
q) Buchanan Soil Mechanics Section 262.024(a)(4)
r) Texcon General Cont. Section 262.024(a)(7)(C)
s) Family Psychological
Services, BVCAA, Inc.
through Thomas H.
Edwards, PhD. Section 262.024(a)(4)
t) Rany Cherian, M.D. Section 262.024(a)(4)
u) Lone Star Gas Section 262.024(a)(7)(C)
v) General Telephone Equip. Section 262.024(a)(7)(C)
w) City of Bryan for
emergency calls Section 262.024(a)(2)
X) City of College Station
for emergency calls Section 262.024(a)(2)
Y) Downtown Pharmacy Section 262.024(a)(2)
z) Union Pacific
Railroad Company Section 262.024(a)(6)
aa) Bruchez, Goss, Thornton,
• Meronoff, Michel Section 262.024(a)(4)
bb) AM/PM Clinics Section 262.024(a)(4)
cc) Scott & White Clinic Section 262.024(a)(4)
dd) Juvenile Placement Serv. Section 262.024(a)(4)
ee) Alliant Food Service Section 262.024(a)(8)
ff) Cain's Coffee Company Section 262.024(a)(8)
gg) Standard Coffee Section 262.024(a)(8)
hh) Scarmardo Produce Section 262.024(a)(8)
ii) Lilly Dairy Section 262.024(a)(8)
jj) Sysco Food Service Section 262.024(a)(8)
kk) Butterkrust Bakery Section 262.024(a)(8)
11) Performance Food Group Section 262.024(a)(8)
mm) Hi-Way Equipment Section 262.024(a)(7)(D)
nn) E.L. Lester Man. Section 262.024(a)(7)(D)
oo) Conley Lott Nichols Section 262.024(a)(7)(D)
pp) R. B. Everett Section 262.024(a)(7)(D)
qq) Romco Equipment Company Section 262.024(a)(7)(D)
rr) Waukesha Pearce Section 262.024(a)(7)(D)
ss) Mustang Tractor Section 262.024(a)(7)(D)
tt) Washington Co. Tractors Section 262.024(a)(7)(D)
uu) Carruth Doggett Section 262.024(a)(7)(D)
vv) Hogans Trucks Section 262.024(a)(7)(D)
ww) Normangee Tractor Section 262.024(a)(7)(D)
xx) Prater Equipment Section 262.024(a)(7)(D)
yy) Rush Equipment Section 262.024(a)(7)(D)
zz) Ikon/Texas Copy Section 262.024(a)(7)(D)
On motion by Commissioner Sims, seconded by Commissioner
• CauleY, the Court voted unanimously to approve all the
Exemptions of Competitive Bidding Requirements (items A
through ZZ) with the change of item yy from Stewart &
Stevenson to Rush Equipment. Commissioner Thornton abstained
from voting on item A.A.
VO
F
Commissioners Court meeting October 6, 1998
The County Judge announced that he waived his right to
sign pay authorizations for the following:
a) Indigent Health Care
b) Counseling of Juveniles
c) visiting Judges for County and District Judges
d) Placement of Juveniles
e) Court Appointed Attorney Fees
f) Brushy Water Supply Corporation
g) Bryan Utilities
h) Fairview/Smetana Water Supply Corporation
i) General Telephone Company
J) Lufkin Communications Corporation (formerly TCA)
k) Lone Star Gas Company
1) United Telephone
m) Wellborn Water Supply
n) Wickson Creek Special Utility District
On motion by the County Judge, seconded by Commissioner
Cauley, the Court voted unanimously to approve the waivers.
The following announcements were made under interest
items and possible future agenda topics:
1) Tony Jones announced a meeting of the
Regional Water Committee and said there
is a change being proposed to the
regulations.
t
2) Carey Cauley announced that the Software
Group would be here Thursday and Friday
in an effort to arrive at a cost
estimate.
Eric Tanner has completed a portion of
his contract for records preservation.
The County Judge made the following comments:
1) He asked the Court for direction on
sending a letter to our representatives
voicing opposition to the storm water
ruling.
2) He received a letter from a Judge in
Travis County concerning hearings in
Travis County to eliminate the
transportation of mental patients.
3) The Economic Development Corporation is
in the process of entering into contract
for Phase II of the Semi Conductor
report. The total cost is $40,000.00 and
they are asking the County to fund 1/3 of
the cost.
4) He reminded the Court of when it declined
$1800 for EMS Trauma Service. A new
offer has been received increasing the
amount to $3392. He has been encouraged
by both cities to accept the offer.
r, At 9:55 a.m. the County Judge announced the meeting
4
r closed to the public so that the Court could meet in closed
Commissioners Court meeting October 6, 1998
ID
•
0
executive session to discuss privilege matters concerning
economic development as allowed under Section 551.071 of the
Texas Government Code and to deliberate the purchase,
exchange, lease or value of real property as allowed under
Section 551.072 of the Texas Government Code. At 10:37 a.m.
the County Judge announced the meeting open to the public and
announced that there was no action required on the Executive
Session.
There being no further business to come before the Court,
the meeting was adjourned.
The foregoing minutes of the Commissioners Court meeting
held October 6, 1998 have been examined and are approved in
open Court this the 2Ltx. day of
in Bryan, Brazos County, Texas.
Alvi W. ones
County Judge
S. Thornton
Commissioner,
Precinct No. 2
- , - r"',
Carey C ley, Jr.
Commiss.oner,
Precinc No. 4
Precinct No. 1
Z44&10~Randy 'piaid-
CommiAsioner,
Precinct No. 3
)ry&4 /a
Mary A n Ward
County Clerk
•
•
1
BRAZOS COUNTY COMMISSIONERS/ MEETING ON U AT 91 A.M./P!'1S. I
PRINT NAME ORGANIZATION / COMPANY / CITIZEN
b l""RF S 1120 ors C~ UNC~L 0~L1 .V. ,r.
1 aka, AAd L v~ v :
~ascd im [ d:
_T R Ex
t2 c- re 3tq%-,f
6 Ole
-All f
'P- +I"s
Wy
LL rj, ~
(-Aov~
y
j"zd1l" 22in ~ C S ~f FAO
Nui W mpo
ge
VOL. 5
r
r
J
t
J
~r
'I f
i•
II
r I.
r
BRAZOS COUNTY COMMISSIONERS/ MEETING ON AT 9 A.M. IDr*.
•Jwaa.a ...,c.z
vwva•a.a•.naavw , ...,.-ar.aa.. , ..+.i~r,..
IN,
~
J T
z v, U L. c44,:k 1
~K
,t
,J
Y
1
1
I
f
I
•
•
•
VOL 157
AQ
J
t
k
Z
t F
r ~
,r
4
r
t
l;
A,
AGREEMENT
STATE OF TEXAS §
§ KNOW ALL MEN BY THESE PRESENTS
COUNTY OF BRAZOS §
THIS AGREEMENT, made and entered into this L day of ~3ep tuber. 1998, by and
between ARTS COUNCIL OF BRAZOS VALLEY, a private nonprofit corporation chartered
by the State of Texas, acting by and through its duly authorized agent and officer, hereinafter
referred to as ACBV. and the County of Brazos. State of Texas acting by and through its County
Judge, duly authorized to act, hereinafter referred to as County.
WITNESSETH:
WHEREAS. Article 3. Section 52-a of the Constitution. Section 381 of the Local
Government Code of the State of Texas and V.A.T.S. §5190.6 provide for COUNTY to engage
in economic development activities; and
WHEREAS, a primary focus of economic development inquires is the quality of arts
programs in a community; and
WHEREAS. ACBV provides assistance to local arts organizations of the COUNTY
through funding and support which improves the quality of life in COUNTY and which assists in
attracting industry and business to COUNTY; and
WHEREAS. COUNTY provides various youth-related services; and
WHEREAS, ACBV has provided funding and support for programs involving substance
abuse prevention and education for Brazos County children through arts programs and continues
to provide arts-related programs and scholarships for young people which foster positive self-
image and thereby assists in prevention of drug and alcohol use and abuse; and
f
1~ r
.
WHEREAS. Article 152m. VJLT.S. recognizes that the health. education. and general
welfare of the citizens of the State of Texas require promotion and education about the
performing. dramatic, visual. and literary arts; and
WHEREAS, said Article permits COUNTY to provide funding for cultural education
facilities, and is to be liberally construed; and
WHEREAS, ACBV provides funding to member organizations, in part. for facilities
acquisition and upkeep. and
WHEREAS. Article 5190.7. V.A.T.S. permits COUNTY to assist with urban enterprise
zones, and.
WHEREAS. ACBV through its funding programs has provided benefit to Brazos County.
Texas through programs attracting over 25,000 participants, and resulting in significant
purchases of goods from Brazos County merchants; and
WHEREAS, ACBV has provided funding to assist local performing arts groups; and
WHEREAS. Chapter 318 of the Local Government Code of the State of Texas provides
for historic preservation; and
WHEREAS, other programs provided by COUNTY art directly benefited by ACBV and
its member organizations.
NOW, THEREFORE, COUNTY and ACBV hereby agree as follows:
1.
ACBV through its funding and support of members organizations agrees to provide the
above enumerated services which it has provided and agrees to continue to engage in support of
arts organizations.
.y
Vii pG,t~ 00
- -
T ~ -
Y
•
•
0
H.
COUNTY, for and in consideration of the services provided to COUNTY, hereby agrees
to pay to ACBV a lump sum payment of EIGHTEEN THOUSAND FIVE HUNDRED
DOLLARS ($18,500) for the year beginning October 1, 1998 and ending September 30, 1999.
ACBV agrees to provide an account of how the $18,500 was distributed to meet the
above described services.
ACBV hereby agrees to hold COUNTY, its officers, agents, servants, and employees
harmless from any loss, damage, injury or claim arising from any negligent act during the course
of its operations.
WITNESS OUR HANDS this &6day of September, 1998
ARTS COUNCIL OF BRAZOS VALLEY, INC.
BY
EuttiJv~e~DQirector
putive Director VZAZM
fY
President
BRAZOS COUNTY, TEXAS
BY
Alv W. ones, ounty Judge
CERTIFIED AS TO AVAILABILITY OF FUNDS:
By.
my Auditor
,E
t;
i
C
am=
~
.
1
CACIVIat ud Agreement
Ba=a County Sail & Water Consensdm Diaataid
And
Brazos County Commissianera Coat
Bm= County Soil and Water Conservation District 1450. hereinafter called to Dbb icl.
and Brazos County Commissioners Cow% bm aatter called the County, does baeby enter
into a contractual agxoement for tbo District to provide sod and water conservation aervioa
to the residents of Brazos Canty and to the Canty proper.
Thee sorvioos will incuudo. but not bo limited to. erosion control. water management, and
naal development. This will be carried out by planning and application through informal
agreements with land users. or, as required by Federal or State law. An information and
reoogait; oa program will bo used to inform the public. Technical assistance is utilized
davugh a bbfezoo of Understanding between the District and the USDA - Natural
Resources Conservation Service.
Fosion control will beep the, land productive for its various uses for many generations.
Sediment resulting from erosion obgs our local streams reducing water carrying aps*
and resulting is Baal flooding. F-ooessive siltation ruins our local wetlands. and. tbaeforer
roduow a dwindling wildlife habitat. Silt fiom erosion ar ins many pollutants dirv*
into our beat streams and rivers. Conservation practices consist of arosim oontrol
structures. erosion control ponds. gully shaping, diversions,, vegetating old fields, proper
management of grazing rosourrces.
Water managemoat includes .ooommerrdatioos for proper irrigation, flood oootrol. and
water quality Irrigatod amps account for Me of all water used Proper irrigation saves
that resource for tomorrow's uses including domestic, consumption. Proper irrigation helps
to kwp agriculture pollutants firm entering underground water supplies. Cansavation
practices include total anh atioa of irrigation systems and application procedures.
precision land lev hn& and underground pipelines. water management includes
floodplain mnmgemcat.
The District's role is Rural Development in Brazos Coanq is in providing fire protection
utilizing dry hydrants. Insurance rates artsido the city limits an be bWered a great deal.
as well as provide, a reliable source of water to fight rural fires. Farm ponds provido the
water and we plan the dry hydrant system The District la evaluating the use of artificial
wetlaa& to replace septic tank filter fields. The prospects are very promising. but, much
work rcmains to be done before this technology can be implementod. Water quality is
rural Brazos Canty will be greatly iahanoed if this method can be, used
Vu 1 57 Ara " ~
f
1
r
i
• 1
I
i
•
0
i
v
lie District and the County have interacted aver ainoe the bwopfm of the District in 1942
Many commmitian problems affect not only the individual landawner but the County
itself.
The District oo o tracts to the Brazos County to pravido the above se vioes for 1999 FY for
$4.400.00. : i
(DAZE)
Al Jones
Camty Judge
Brazos County. Tows
Pr7
(DATE)
?77~
02 ,,:1 C, - ~ . QLa,'.
Preston J. Ruffifio M ~L
Chairman
Brazos County 3WCD #450
1 7-.~
i
I
i
CONTRACT FOR SERVICES FROM BRAZOS BEAUTIFUL, INC.
THE STATE OF TEXAS
COUNTY OF BRAZOS
This is an agreement by and between the County of Brazos
(hereinafter referred to as "COUNTY") and BRAZOS BEAUTIFUL, INC.,
a non-profit association for the improvement of Brazos County
(hereinafter referred to as "BRAZOS BEAUTIFUL").
WHEREAS, BRAZOS BEAUTIFUL is an educational volunteer
organization dedicated to improving waste handling practices (i.e.,
recycling and the buying of recycled products) and improving litter
control in Brazos County; and
NOW, THEREFORE, FOR AND IN CONSIDERATION of mutual promises
recited herein, the parties agree as follows:
1. BRAZOS BEAUTIFUL shall provide services to the County as
follows:
Assist in coordination of Christmas tree recycling, telephone
book recycling two times a year, distribution of the recycling
directory to include the Citizen Collection Stations in rural
Brazos County.
Educate the community on the need for buying recycled products
through the use of displays in the local schools, libraries,
shopping malls, and wherever else requested.
Organize and train area teachers on the importance of litter
abatement, recycling, buying of recycled products, maintain
recycling boxes in area schools used as teaching aids and
maintain a lending library to assist area teachers in teaching
litter control and reuse practices.
Promote all adopt road programs in the county through a
newsletter.
r~
k.
1
•
•
•
2. BRAZOS BEAUTIFUL, INC. will be funded by the COUNTY in
the amount of Twelve Thousand Dollars (;12,000.00), from the County
1998-99 Fiscal Year funds to be used for salaries, rent, telephone,
and other operating expenses.
3. BRAZOS BEAUTIFUL shall maintain fiscal records and
supporting documentation in the form of canceled checks, payroll
records, invoices, or other documents required for all expenditures
of funds made under this agreement.
4. BRAZOS BEAUTIFUL shall submit a financial statement to
COUNTY annually.
5. All notices and documentation required to be sent to
COUNTY shall be forwarded to
ALVIN W. JONES
County Judge
Brazos County Courthouse
300 East 26th St., Suite 114,.-
Bryan, Texas 77803
6. It is understood and agreed that COUNTY'S participation
in BRAZOS BEAUTIFUL is limited to the contribution of funds.
COUNTY at no time shall be liable or responsible for the acts of
BRAZOS BEAUTIFUL, INC. it agents, or employees. BRAZOS BEAUTIFUL,
INC. at no time shall be liable or responsible for the acts of
BRAZOS COUNTY, its agents or employees.
7. Either of the parties shall have the right to terminate
this agreement in whole or in part at any time. Notice to
terminate this agreement will be given in writing at least thirty
(30) days prior to the date of termination. The notice shall
include the reasons for such termination, the effective date of the
2
V tJI 1 ~5 PpGi14 ate,,
S
t
F
2
r
!
-
5
i
-.-~.~,•~•.y~..•.•,.,~+s""S^'.xyc~^±a,~"~'^'"'.~.'~y^r ~w'7"~';•~r'F'-0~,,.~,s ~ ~•~rs;~'ei^r-' - - -
termination, and in the case of partial termination, the portion of
the agreement to be terminated.
SIGNED this day of , 1998.
BRAZOS BEAUTIFUL, INC. BRAZOS COUNTY
`
A. By:
Coun Judge '
Administrator
C,~000-1 ATTEST :
Chairman of the oard
County Jerk
r
e
l~
i .r
Lr.. PAG .2 (P
I'
.
i
I
i
I
i
JTHE STATE OF TEXAS
•
COUNTY OF BRAZOS .
This contract, made this th day of September, 1998, by and between TEXAS VOTING
SYSTEMS, INC., a Texas Corporation, and the COUNTY OF BRAZOS, State of Texas.
WITNESSETH:
Whereas, Texas Voting Systems, Inc. Is in the business of selling election services, and;
Whereas, BRAZOS COUNTY is desirous of employing the services of Texas Voting Systems
Inc. In connection with the GENERAL ELECTION and a College Station Bond Election,
to be held on November 3, 1998, in Brazos County, Texas, and;
Now, Therefore, in consideration of the premises and mutual promises and obligations
herein set forth, it is agreed:
1.
TEXAS VOTING SYSTEMS, INC. will provide the following supplies;
•
(a) 50,000 numbered and printed Official Ballot Cards.
(b) All required hinged ballot pages and punched masks.
(Some 31 ballot groups - Some 550 ballot label books.)
(c) 5,000 sample ballots and 1,000 demonstration ballot cards.
(d) Fifty two (S2) election sets to include the 5 early voting locations, absentee
canvassing board set, and one central counting set.
(e) Writs E Notices of Election.
(f) All required seals for the voting equipment.
(g) Custon ballot layout for each voting precinct.
(h) Precinct polling place supplies (pens - tape -extra stylus) as required.
(1) 4,000 Early Vote absentee mail-out official ballot labels as required.
2.
TEXAS VOTING SYSTEMS, INC. will provide the following services:
(a) Assemble four hundred (400) voting devices (more if required), and check
each unit.
(b) Check each unit for proper ballot pages, label each unit by precinct, and'
stack units by precinct (and commissioner precinct) for delivery by Brazos
County.
(c) Deliver the voting equipment (65 units) to the five Early Voting locations
and pick up the equipment at the close of the early voting period. New ballot
labels will be inserted, labeled, and stacked for delivery on Monday, November
2, 1998.
(d) Provide complete ballot layout and design.
(e) Conduct one (1) class for early voting election judges and clerks.
(f) Conduct one (1) class for election judges and clerks on election procedure.
(g) Conduct one (1) class for all central counting personnel if required.
(h) Assist with Absentee Voting as required.
(1) Assist with preparation of all supplies for use In the individual precincts.
(j) Assist in the preparation of the computer test deck and holding of the Official
Test of the vote count computer.
(k) Assistance on election day, as required, to Include the central counting station.
1 -
2 of 2
(1) Provide any consulting services before and after the above mentioned elec-
tion.
(m)Provide repair crews for the voting device repair in the individual precincts
on election day.
(n) Provide all EDP programing for the'General Election vote count.
L
The COUNTY OF BRAZOS, State of Texas, will be responsible for, and hereby
assumes the following duties and obligations in regard to the GENERAL ELECTION
to be held on November 3, 1998.
(a) Payment of all Election Judges, Alternate Judges, and Clerks of Election,
to include the central counting station.
(b) Furnish Texas Voting Systems, Inc. a complete list of all candidates and issues
for all races to be conducted in the above mentioned election.
(c) All reports, expense accounts, canvass of the election, conduct of the elec-
tion at the individual polling places, and any other statutory requirements
as required by the Texas Election Code and/or the Federal Voting Rights
Act and not specifically covered above.
4.
The consideration to be paid by the COUNTY OF BRAZOS, to TEXAS VOTING
SYSTEMS, INC. for the services and supplies to be rendered by said corporation
in the GENERAL ELECTION to be held on November 3, 1998 is twenty five thousand
dollars and 00 cents. (;25,00.00)
IN WITNESS WHEREOF the parties have hereunto set their hands, the day and
year first written above.
COUNTY OF BRAZOS, TEXAS
Alvin W. Jones
County Judge of Brazos County
ATTEST:
A~"44~ kz4iz -
Mary Ann a d - County Clerk
i
t
.t
TEXAS VOTING SYSTEMS, INC.
liam H. McLeod - President
i
Y
,t •
1
THE STATE OF TEXAS
COUNTY OF BRAZOS .
•
This contract, made this th day of September, 1998, by and between TEXAS VOTING
SYSTEMS, INC., a Texas Corporation, and the COUNTY OF BRAZOS, State of Texas.
W ITN ESSETH:
Whereas, Texas Voting Systems, Inc. Is In the business of selling election services, and;
Whereas, BRAZOS COUNTY is desirous of employing the services of Texas Voting Systems
Inc. in connection with the GENERAL ELECTION and a College Station Bond Election,
to be held on November 3, 1998, in Brazos County, Texas, and;
Now', Therefore, in consideration of the premises and mutual promises and obligations
herein set forth, it is agreed:
1.
TEXAS VOTING SYSTEMS, INC. will provide the following supplies;
•
0
(a) 50,000 numbered and printed Official Ballot Cards.
(b) All required hinged ballot pages and punched masks.
(Some 31 ballot groups - Some 550 ballot label books.)
(c) 5,000 sample ballots and 1,000 demonstration ballot cards.
(d) Fifty two (52) election sets to include the 5 early voting locations, absentee
canvassing board set, and one central counting set.
(e) Writs & Notices of Election.
(f) All required seals for the voting equipment.
(g) Custon ballot layout for each voting precinct.
(h) Precinct polling place supplies (pens - tape -extra stylus) as required.
(1) 4,000 Early Vote absentee mail-out official ballot labels as required.
2.
TEXAS VOTING SYSTEMS, INC. will provide the following services:
(a) Assemble four hundred (400) voting devices (more if required), and check
each unit.
(b) Check each unit for proper ballot pages, label each unit by precinct, and
stack units by precinct (and commissioner precinct) for delivery by Brazos
County.
;(c) Deliver the voting equipment (65 units) to the five Early Voting locations
and pick up the equipment at the close of the early voting period. New ballot
labels will be inserted, labeled, and stacked for delivery on Monday, November
2, 1998.
(d) Provide complete ballot layout and design.
(e) Conduct one (1) class for early voting election judges and clerks.
(f) Conduct one (1) class for election judges and clerks on election procedure.
(g) Conduct one (1) class for all central counting personnel if required.
(h) Assist with Absentee Voting as required.
(I) Assist with preparation of all supplies for use In the individual precincts.
(j) Assist in the preparation of the computer test deck and holding of the Official
Test of the vote count computer.
(k) Assistance on election day, as required, to Include the central counting station.
VOM.• 1 /
,b
i.
l?
4
r.
(
t
of 2
(1) Provide any consulting services before and after the above mentioned elec-
tion. I
(m) Provide repair crows for the voting device repair in the individual precincts
on election day.
(n) Provide all EDP programing for the General Election vote count.
The COUNTY OF BRAZOS, State of Texas, will be responsible for, and hereby
assumes the following duties and obligations in regard to the GENERAL ELECTION
to be held on November 3, 1998.
(a) Payment of all Election Judges, Alternate Judges, and Clerks of Election,
to Include the central counting station.
(b) Furnish Texas Voting Systems, Inc. a complete list of all candidates and issues
for all races to be conducted in the above mentioned election.
(c) All reports, expense accounts, canvass of the election, conduct of the elec-
tion at the individual polling places, and any other statutory requirements
as required by the Texas Election Code and/or the Federal Voting Rights
Act and not specifically covered above.
0.
The consideration to be paid by the COUNTY OF BRAZOS, to TEXAS VOTING
SYSTEMS, INC. for the services and supplies to be rendered by said corporation
in the GENERAL ELECTION to be held on November 3, 1998 is twenty five thousand
dollars and 00 cents. (;25,00.00)
IN WITNESS WHEREOF the parties have hereunto set their hands, the day and
year first written above.
COUNTY OF BRAZOS, TEXAS
Alvin W. Jones
County Judge of Brazos County
ATTEST:
Mary Ann )Wd - County Clerk
TEXAS VOTING SYSTEMS, INC.
Ilam H. McLeod - President
tl~i / ~ AGi ~ ~0
f
1. "1 _ _
•
described premises located in Brazos County, Texas:
Office space (approximately 1760 sq. ft.) in the building located at 8991
East Highway 21, Bryan, Texas 77803, to include water and sewer
along with restrooms. It will also provide handicap access.
TERM
This lease Agreement is made and entered into this First day of
October, 1998, by and between FRED IZFJA ER of Brazos County, herein
called "Lessor", and BRAZOS COUN'T'Y, TEXAS herein called "Lessee".
In consideration of the mutual covenants and agreements herein set
forth, and other good and valuable consideration, Lessor does hereby demise
and lease to Lessee, and Lessee does hereby lease from Lessor, the following
The term of this lease shall be for a period of three months,
commencing October 1, 1998 and ending on December 31, 1998.
REN'T'
Lessee agrees to pay to Lessor as rent for the leased premises the sum
of $760.00 (Seven Hundred Fifty Dollars) per month on the first of each
month.
is
LEASE AGREEMENT
USE OF PREMISES
The leased premise shall be used only as an office and Lessee shall not
permit the leased premises or any part thereof to be use for, (a) the conduct
of any offensive, noisy, or dangerous activity that would increase the
r
.r• J
premiums for fire insurance an the leased premises; (b) ' the creation or
maintenance of a public nuisance; (c) anything which is against public
regulations or rule of any public authority at any time applicable to the
leased premises; or (d) any purpose or in any manner which will obstruct,
interfere with, or infringe on the rights of other tenants or adjoining
property owned by Lessor, nor shall the leased premises be occupied by any
person or persons other than the person or persons authorized by Lessee.
MEMNITY AG
Lessee agrees to indemnify and hold Lessor and the property of Lessor,
including the leased premises, fee and harmless, from any and all liability for
iWury to, or death of, any person, including employees of Lessee or for
damage to property arising from the use and occupancy of the leased
premises by Lessee or from the act or omission of any person, or persons,
including employees of Lessee, in or about the leased premises with the
express or implied consent of lessee; provided that nothing in this agreement
shall expand or enlarge the liability of lessee greater than that of Lessee
under the Texas Tort Claims Act.
ALTERATIONS AND M PROVEM OM
Lessee shall make no alterations to the building on the leased premises
nor construct any buildings or other improvements on the leased premises
without first having obtained the written consent of Lessor.
2
VO
i.
•
•
r ~
LESSOR REPAIRS
Lessor shall, at his expense, be responsible for fresh water lines to the
building. Unless otherwise herein provided, all normal repairs, painting and
replacements to the inside of buildings sball be made at the expense of Lessee
which shall surrender the same at the end of the Lease term or any extension
thereof in substantially as good condition as when received, ordinary wear
and tear, damage by fire or the elements and unavoidable casualties
excepted. Lessee shall keep the grass mowed and trimmed around the
building.
DESTRUCTION OF PREN[ISES
Should any building or improvements on the leased premises be
damaged or destroyed by fire, the elements, acts of God, or other causes not
the fault of Lessee or any person in or about the leased premises with the
express or implied consent of Lessee, they shall be repaired or replaced by
Lessor at his own cost and expense and the rent payable by Lessee pursuant
to this lease shall be abated to the extent such damage or destruction renders
the leased premises uninhabitable by Lessee. Provided however, should the
cost of repairing or restoring any buildings or improvements so damaged or
destroyed exceed twenty-five percent (25%) of the replacement cost of all
buildings and improvements now located on the leased premises, or if more
than fifty percent (50%) of the total floor space of the leased premises shall
3
JJOL )-f..PAQh-
i
n
l~
r
r•
Vr
.ill
~I
.1
_ ~v--~c.;.;cr;v~,r!;~•fs.sT-.v+".4'°"~1".SP'::z+ea~r"=~^.~
r
e
i
tt
1
be rendered unfit for Lessees occupancy this lease may be terminated by
either party by ten (10) days written notice. If less than fifty percent (60%)
of the total floor space of leased premises shall be uninhabitable and repair
and restoration can be accomplished within ninety (90) days. Lessor may, at
his option, either repair and restore the damaged buildings and
improvements or cancel this lease and retmu any unearned rent previously
paid by Lessee under this lease.
CONDITION OF PREMISES
Lessee stipulates that the leased premises, as well as all building and
improvements located thereon, are at the date of this lease in good order,
repair and a safe and clean condition.
All charges for electricity, water and other utility services shall be paid
by Lessee.
RKPROVEM MM PROPERTY OF LESSOR
All alterations, changes, and improvements built constructed, or placed
in the leased premises by Lessee, other than movable personal property shall,
unless otherwise provided by written agreement between Lessor and Lessee,
be the property of Lessor and remain in the leased premises at the expiration
or sooner termination of this lease. Lessee at the termination of the lease
shall not be required to restore the improvements to their original condition.
4
VO 5 Ara - 3 4hwau
' 4
•
Nothing contained in this paragraph, however, shall authorize Lessee to
make or place any such alteration, change, or improvements on the leased
premises without having first obtained the written consent of Lessor.
ASSIGNMENT AND SUBLETTING
Lessee shall not assign this lease nor sublet the leased premises or any
interest therein without first obtaining the written consent of Lessor, which
consent shall not be unreasonably withheld. A consent by Lessor to one
assignment or subletting shall not be deemed to be a consent to any
subsequent assignment or subletting. An assignment or subletting without
the written consent of Lessor, shall be void and shall, at the option of the
Lessor, terminate the lease.
LESSEE'S RIGHT TO PERFORM
•
In the event Lessor violates or fails to perform any provisions or
agreements of the lease to be performed or complies with by Lessor, and such
violation or failure continues for fifteen (15) days after written notice thereof
to Lessor, Lessee may, in addition to all remedies available to it, be entitled
to perform on behalf of Lessor and deduct all such payments from the rent.
DEFAULT BY LESSEE
Should Lessee* be in default for a period of more than ten (10) days in
the payment of any rent payable under this lease or in the performance of
any other provision of this lease and such default continues for thirty (30)
5
•
t,
- - r
t
1
h
i
f
I
days after written notice, Yre880r may terminate this lease and regain
possession of the leased premises in the manner provided by the laws of the
State of Texas in effect at the date of such default.
i
HOLD OVER
At the expiration of this lease, should Lessee hold over for any reason
whatsoever, it is hereby agreed that in the absence of a written agreement to
the contrary, such tenancy shall be from month to month only under the same
conditions and at the same monthly rental as provided herein.
SUBORDINATION OF LEASE
This lease and Lessee's leasehold interest under this lease are and shall
be subject, subordinate, and inferior to any lien or encumbrance now on the
leased premises by Lessor.
RIGHT OF INSPECTION
Lessor and his agents have the right at all reasonable times during the
terms of this lease to enter the leased premises for the purpose of inspecting
them and all building and improvements thereon; provided however that the
right of inspection shall not extend to any record, the disclosure of which is
prohibited by law.
PARKING
Ample space will be provided for parldng vehicles.
6
VOL-~S~~Arak, 34P
~J
•
NOTICES
Any and all notices or other communication required or permitted by
this lease to be served on or given to either party to this lease by the other
party hereto shall be in writing and shall be deemed duly served and given
when personally delivered to the party to whom it is directed, or in lien of
such personal service, when deposited in the United States Mail, postage
prepaid, addressed to Lessor, Fred Heller, at 8032 East State Highway 21,
Bryan, Texas 77803, addressed to Lessee, Brazos County, 300 East 26th
Street, Bryan, Texas 77803-5317 until otherwise notified. Either party hereto
may change his address for the purpose of this paragraph by giving written
notice of such change to the other party in the manner provided for in this
paragraph.
USE OF OFFICES
The leased premises are to be used as office space for the Justice of the
Peace for Precinct Three (3) of Brazos County.
LOCATION FOR RENT PAYMENT
Unless changed by written notice pursuant to the provisions in the
above heading under Notices, all rent payable under this lease shall be paid
to Lessor at 8032 East State Highway 21, Bryan, Texas 77806.
7
VOL.- ~5-YAQ& .3q
. ..............,,,.....,rTMc-•r~pr;w!.Z,;....TvrvM-T77 r'rR~'ti*sTne,•'r~"..r.-..-.ter, - - - - -
t
l
t
r
I
1
ATTORNEY'S FEES
Should any litigation be coked between the parties hereto
concerning the leased premises, this lease, or the rights and duties of either
party in relation thereof, the party prevailing in such ligation shall be
entitled, in addition to such relief as may be granted, to a reasonable sum as
and for his attorney's fees in such litigation.
TESAS LAW TO APPLY
This agreement shall be construed under and in aooordance with the
laws of the State of Texas, and all obligations of the parties created
hereunder are performable in Brazos County.
LEGAL CONSTRUCTION
In case any one or more of the provisions contained in the agreement
shall for any reason be held to be invalid, illegal or unenforceable it shell not
affect any other provision thereof and this agreement shall be construed as
if such invalid, illegal or unenforceable provision had never been contained
herein.
PRIOR AGREEMENTS SUPERSEDED
This agreement constitutes the sole and only agreement of the parties
hereto and supersedes any prior understandings or written or oral
agreements between the parties respecting the within subject matter.
8
voL 5 PAQR, - 3 9
r, p .
MiE LKENT
No amendment, modification, or alteration of the terms hereof shall be
binding unless the same be in writing, dated subsequent to the date hereof,
and duly executed by the parties hereto.
LESSOR:
FRED SELLER
By
LESSEE:
ATTEST: BRAZOS COUNTY
r By:
M Ann Ward Alvin W. Jones
County, clerk County Judge
0
R A V E Y & A S S O C I A T E S
1505 SOUTH COLLEGE AVENUE TEL 409 779-0769
BRYAN 77801 TEXAS
i
F
i
s
t
t
i
July 1, 1998
The Honorable Alvin W. Jones
Commissioners Court
Brazos County Courthouse
300 East 26th Street, Suite 114
Bryan, Texas 77803
Re: Brazos County Detention Center Addition
Bryan, Texas
Project No. 9401
Dear Judge Jones:
Sheriff Kirk has requested changes to the layout of the isolation cell area by opening all cell doors
to the outer chase corridors and converting the collection corridor to a mechanical chase. The
changes will improve access and control of the isolation cells and we recommend the
improvements. Since this area had previously been approved by Sheriff Riggs and subsequently
developed into the finished Drawings and Specifications, these changes will constitute additional
services as described in paragraph 3.3.1.1 of our contract. We must have approval from the Court
before we can perform additional services. We estimate the cost of this work to be $5,000 to
$6,000. The work will be billed by the hour.
If you have any questions, please contact us.
Sincerely,
Rick Ravey cc P?
Architect I
~ ~f~ 9. 16- 9P ~~;I
,
1
I 1
BRAZOS COUNTY
ROAD AND BRIDGE DEPARTMENT
Richard E Vance. AE„ County Engineer
Alvin W. Jones, County Judge
Commissioner Tony Jones
Precinct 1
Commissioner Randy Sims
Precinct 3
C. M Anderson Properties Ltd.
2307 River Forest Drive
Bryan, Texas 77802
Commissioner Willum S. Thornton
Precinct 2
Commissioner Carty Cauley
October 1, 1998 Precinct 4
Re: Proposed Greens Prairie Road Extension
Dear Dr and Mrs. Anderson:
•
•
As you know the Commissioners' Court of Brazos County is presently proceeding with the
acquisition of right-of-way for the construction of the proposed Greens Prairie Road
extension. It has been determined that 29.52 acres of your property will be required for the
construction of this project. Brazos County agrees to the following terms and conditions in
exchange for your conveying this 29.52 acres-
1. Based on an appraisal, made by a qualified appraiser, the County is authorized to
offer you $35,04100 for 29.52 acres of your property required for right-of-way.
Commissioner's Court will mail the $35,041.00 to you within 15 days of acceptance
of the Warranty Deed.
2. Build approximately 15,000 feet of new 5-strand barbed wire fence using 12-1/2 ga.
American made barbed wire with cedar comer posts in concrete. Cedar line posts
will be placed every 50' with metal t posts in-between on 10' centers. Cedar posts
will be used for the horizontal bracing. Wire will be placed on property owner's side
of the fence.
3. Install six (6), more or less, 16' x 2" heavy duty galvanized tubular gates at locations
designated by property owner. These gates will be installed flush with the new fence
line. Brazos County will install any other gates in the right-of-way perimeter fence
provided and located by the property owner (property owner to furnish materials
only) Any gates placed at utility crossings will not count against the six to be
installed for property owner.
4. Construction of seal coated access roads, with installation of culverts; from the
proposed Greens Prairie Road to the perimeter gates will be built and maintained by
Brazos County.
5. The County will push all cleared brush and trees inside of the new right-of-way for
disposal.
MUL.....,
2617 Highway 21 West Bryan. Tess 77803 (109)822.2127
~ k
~F
_ i t
r
Page 2 - -
October 1. 1998
6. Clear an additional 12' swath along the new fence line on your property for a
firebreak and to allow the fence builders room to work. The County will also push
-the trees and brush from this 12' swath into County right-of-way for disposal.
7. Install cattle guards furnished by property owner at initial time of construction.
8. Install one (1) 8' culvert with concrete bottom at a location to be designated by
property owner. This site will coincide with the Station No. as shown on Profile Map
prepared by Strong Surveying Company where the old hunting road meets the north
side of the new right-of-way. A funnel fence using same materials as perimeter fence
will be installed around this area.
9. Damages in the amount of $4,000.00 will be paid to property owner to allow for his
securing of the additional clearing of brush to facilitate his cattle reaching pastures
from the cattle crossing provided by Brazos County. This item was not addressed in
the appraisal prepared by Steven Trent Lovett dated August 6, 1998.
10. Brazos County will make reasonable efforts to control erosion. This will include the
design of all culverts on a 100-year storm frequency. Installation of erosion control
measures on the downstream side that reduces velocity to that which existed prior to
installation of the culverts. Those measures may include, but not be limited to,
grassed channels (using TP-61, or more current, design criteria), concrete aprons,
energy dissipators, filter cloth with/without block paving, rock rip-rap. It is
understood and natural that a blowhole below the pipe discharge will occur.
Measures installed on the Anderson property will be able to be maintained by
Anderson or, in the case of major practices that involve concrete, by Brazos County.
All culverts will be designed so that temporary storage of water will not be long
enough (one-week) for the area to be considered a man-made wetland as would be
determined today by U.S. Corps of Engineers.
11. timber recovery fee to be paid to property owner.
12. Property owner shall have access to his south pasture at both Tonkaway Lake Road
and the existing TMPA easement locations from the County right-of-way before and
during construction of the proposed Greens Prairie Road.
Please sign below of your acceptance of these terms and conditions.
1 •
1 .
.j
1 w --i - ''r .,y.....~ y _arL.a'.a.~o~,~_•.......L.:"at3i~~~_.~y'..c.,.iy.k~[t~c _
- - ate:
Sincerely,
Alvrn W. Jones
County Judge
C: Randy Sims, Commissioner Precinct 3
Richard Vance, County Engineer
I hereby agree to the terms and conditions as listed above
C.M.Anderson Properties Ltd.
Au orized Signature
voL i 5...~~AQE►.`li__,
f
,
i
1
r~
THE FOLLOWING
DOCUMENT
IS THE BEST IMAGE
POSSIBLE
DUE TO
THE POOR QUALITY
OF THE ORIGINAL
• t , . , 3
L
BID TABULATION 99-001
FLEXIBLE BASE -1998/99 CONTRACT
10116198 -10/16199
91,
0
LOADED
LOADED/
LOADED
LOADED/
PLANT
ON
BIDDERS EST TONNAGE
58,420 LBS
58,420 LBS
80,000 LBS
80,000 LBS
AUSTIN, TX
TYPE A, GRADE 1 215,000
3.75
15.45
3.75
$ 12.27
Round Rods. TX
LIMESTONE SCREENINGS 2,000
4.50
16.50
4.50
$ 13.60
D '
BRYAN, TX
TYPE A, GRADE 1 215,000
NB
NB
NB
$11.47 P/T
Kosse,TX
LIMESTONE SCREENINGS 2,000
N/B
NB
NB
$8.97 PIT
Vulcan Material
.0 0'" C,' _v
FM2439&FM1102
COMAL COUNTY, TX
Comal Cty-Pit
TYPE A. GRADE 1 215,000
$ 8.26
$ 13.61
$ 8.26
$ 9.58
Pease & Washington
LIMESTONE SCREENINGS 2,000
$ 8.01
$ 13.26
$ 8.01
$ 9.63
Strs Bryan-FOB Pt
BRYAN,TX
TYPE A, GRADE 1 215,000
$ 8.50
$ 13.50
$ 8.50
$ 11.50
OSR
LIMESTONE SCREENINGS 2,000
$ 9.50
$ 14.50
$ 9.50
$ 12.50
BRYAN TX
TEHUACANA,TX
TYPE A, GRADE 1 215,000
$ 4.50
NB
$ 4.50
$ 10.95
KOSSE, TX
LIMESTONE SCREENINGS 2,000
$ 2.50
NB
$ 2.50
$ 8.95
C
'
BRYAN, TX
TYPE A, GRADE 1
$ 8.90
$ 10.98
1
$ 8.90
$ 10.90
BRYAN
LIMESTONE SCREENINGS
$ 9.38
$ 11.46
$ 9.38
$ 11.38
AWARDED PRICES:
TYPE A. GRADE 1 LOADED ONLY 58,420 LBS:
P: Austin Crushed Stone
S: Vulcan Materials Co.
LIMESTONE SCREENINGS LOADED ONLY 58,420 LBS:
P Vulcan Materials
S: Austin Crushed Stone ;
TYPE A. GRADE 1 LOADED & HAULED 58,420 LBS:
P. Young Contractors
S: Gtffor"ill Co. Aft: Gifford H111 Co.
LIMESTONE SCREENINGS LOADED & HAULED 58,420 LOS*
P. Young Contractors
&Colorado Materials Aft Colorado Materials
TYPE A. GRADE 1 LOADED ONLY 80,000 LBS:
P: Austin Crushed Stone
S: Vulcan Materials Co.
LIMESTONE SCREENINGS LOADED ONLY 80,000 LBS:
P. Vulcan Materials Co.
S: Austin Crushed Stone
TYPE A. GRADE 1 LOADED & HAULED 80,000 LBS:
P: Colorado Materials
S: Young Contractors Aft Vulcan Materials
LIMESTONE SCREENINGS LOADED & HAULED 80,000 LBS:
RECOMMENDATION:
P: Vulcan Materials
S: Brazos Dozer Svc Aft Colorado Materials
SEE ABOVE
AWARD OATS:
i
1
. _ t tr_. .,.Jea..1+t'.w~.ww.aV.Ylir~avl..lRwiJ.nw ~'~.Yr'Y.,lie.t4'.e~•~s~n1u+ -\F1J Aty/Ar~w1,.1- •r4.4iiYltlL t}.5.~►t..r as r.~.aa~.a .r.... 4.~.n.:...17~..a..:rtiw I.w-. +at
r.
C
t
• • ,
Y
HAULED
ONLY
HAULED
LOCATION
L
THE FOLLOWING
DOCUMENT
IS THE BEST IMAGE
POSSIBLE
DUE TO
THE POOR QUALITY
OF THE ORIGINAL
for
_ BID TABULATION 99-002
AGGREGATE FOR SURFACE TREATMENTS 1
1998/99 CONTRACT
10/15/98 -10/15/99
LOADED
LOADED/
PLANT
BIDDERS
ONLY
HAULED
LOCATION
GEORGETOWN, TX
BUDA, TX
TYPE B, GRADE 3
8.50
17.91
TYPE B. GRADE 4
8.50
17.91
TYPE B, GRADE 5
8.50
17.91
SAN MARCOS, TX
FM 2439 &
TYPE B, GRADE 3
7.00
18.25
FM 1102
TYPE B, GRADE 4
7.00
18.25
COMAL COUNTY
TYPE B, GRADE 5
8.00
19.25
MEXIA, TX
OSR
TYPE B, GRADE 3
13.50
16.50
BRYAN
TYPE B, GRADE 4
14.00
17.00
TYPE B, GRADE 5
14.00
17.00
BRYAN, TX
TYPE B, GRADE 3
15.80
18.30
TYPE B. GRADE 4
15.80
18.30
6300 SH 21 W
TYPE B. GRADE 5
15.80
18.30
BRYAN
AWARDED PRICES:
TYPE B, GRADE 3,LOADED ONLY
P:
Colorado Materials,
TYPE B, GRADE 4, LOADED ONLY
P:
Colorado Materials,
TYPE B, GRADE 5, LOADED ONLY
P:
Colorado Materials,
TYPE B, GRADE 3, LOADED & HAULED
P:
Gifford Hill & Co.,
TYPE B, GRADE 4, LOADED & HAULED
P:
Gifford Hill & Co.,
TYPE B, GRADE 5, LOADED & HAULED
P:
Gifford Hill & Co.,
S: Austin Crushed Stone
S: Austin Crushed Stone
S: Austin Crushed Stone
S: Austin Crushed Stone
S: Austin Crushed Stone
S: Austin Crushed Stone
RECOMMENDA ON: SEE ABOVE
tl
AWARD DATE:
S
trR ,
IR,
6Fj` •
4
THE FOLLOWING
DOCUMENT
IS THE BEST IMAGE
POSSIBLE
DUE TO
THE POOR QUALITY
OF THE ORIGINAL
s
0
BID TABULATION 99-003
HOT MIX ASPHALTIC CONCRETE PAVEMENT
1998/99 CONTRACT
10/15/98 -10/15199 }
TYPE B, MODIFIED
TYPE D, MODIFIED
TYPE B. MODIFIED
HMAC
HMAC
HMAC - 3,000 SQ. YDS.
BIDDERS
750 NET TONS
1,500 NET TONS
PER SQUARE YARD
2 • t C 27 7 t r~
LOADED ONLY
$28.75
$28.75
LOADED AND HAULED
$ 33.25
$ 33.25
NIB
LOADED ONLY
NIB
N/B
LOADED AND HAULED
NB
N/B
NIB
f1 r L t
LOADED ONLY
$28.50
$28.50
LOADED AND HAULED
$32.00
$32.00
$3.75
RECOMMENDATION: PRIMARY:
nSE DA
D`
A 4 RD DATE:
YOUNG CONTRACTORS
I ~
`l
VC) pAra&-
Sam
i
t
_ _ ..A.. t _ • .Y...... -...`.Jw.iY.. wt ...maw-J V7S.il+-.I .l. r,. ~W M...M}.P K.. Yt(a.In • i J' . L.G rli .i. -r _ J _ _ r
COLORADO MATERIALS
I
Y + BID TABULATION 99004
ASPHALT, OIL, & EMULSION PRODUCTS
1998199 CONTRACT
10115198.10115199
l
ogre
i
MATERIAL
AE-PRIME
CRS-2
SS-1
HFRS•2
HFRS•2P
EST. GAL
200,000
30,000
30,000
200,000
6,000
FREE TIME
BIDDERS
GAL TOTAL
GAL TOTAL
GAL TOTAL
GAL TOTAL
GAL TOTAL
DEMURRAGE
CLEVELAND
2 HOURS
ASPHALT
0.5992 119,840.00
0.4592 13,776.00
0.4592 13,776.00
0.4592 91,840.00
0.8592 5,15520
S101HR
GATOR
RECYCLERS
NB
0.5199 15,597.00
0.5199 15,597.00
NB
NB
901HR
'GULF STATES
2 hotel
ASPHALT
NB
0.49 14,700.00
0.49 14,700.00
0.49 98,000.00
0.79 4,740.00
$401HR
"KOCN
2HOURS
MATERIALS
0.68 136,000.00
0.53 15,900.00
0.5300 15,900.00
0.53 106,000.00
0.86 5,100.00
tom
PRIME
2 HOURS
MATERIALS
0.66 132,000.00
0.49 14,700.00
0.49 14,700.00
0.49 98,000.00
0.86 5,160.00
S401HR
• Delivery time is one day after order is made. Delivered price is based on U transport.
"Delivery to be made within 24 hours of order.
AWARDED PRICES
AE-PRIME
Primary: Cleveland Asphalt
Secondary:
Prime Mated*
CRS-2
Primary: Cleveland Asphalt
Secondary
Gull States Asphaltr'
SS-11
Primary: Cleveland Asphalt
Secondary.
Prime Materials'"
HFRS•2
Primary Cleveland Asphalt
Secondary:
Prime Materlals'"
HFRS•2P
Primary: Gulf States Asphalt
Secondary:
Koch Materials
"'tots were drawn amording to statues to award secondary vendor.
RECOMMENDATION:
SEEABOVE
AWARD DATES
l
I
~I
LY,hI.•r~W iFIi~Y~+.Sn.a..x+Y.✓.n Y1~.u.....tn..R.vi a~rL~r... , 'w4~N'M'w~
BID TABULATION 99.005 (i
CULVERT CONTRACT • 1998
10115198.10115/99
1
2
I
I 3
I
f
4
5
E
CONTECH
CONSTRUCTION
METAL
CULVERTS
QTY.
HOUSTON, TX
NAVASOTA
ROUND AND CORRUGATED
IN FEET
5TOCK URDEV-
STOCK 700
1 16 Gauge round
500
Single Pipe, F.0 B. Destinabar
7.32
Single Pipe, F.0.8 Supplier
4.67
Truck Load, F.0 B. Destiratim
4.76
Truck Load, F.0 8. Suppler
4.67
Sloped ErdstPair
22 80 • pipe
15' 16 gauge round
1
Single Pipe, F.0.8 Desbrabon
8.36
Single Pipe, F.O.B. Supplier
562
Truck Load, F O.B. Destination
5.78
Truck Load. F.0 B. Suppler
5 62
Sloped Ends/Pair
29 64 + pipe
18' 16 gauge round
1850
Single Pipe, F.0 S. Destination
9 41
Single Pipe, F.O.S. Supple
690
Truck Load, F.O.B. Destination
715
Truk Load, F.0 B. Supplier
6.90
Sloped Ends/PaLr
36 48+ pipe
24' 16 gauge round
920
f
Single Pipe, F 0 B. Destination
1045
Single Pipe, F.0 B. Supplier
899
Truk Load, F.O.B. Destu!atim
9.38
Truck Load, F.O.S. Suppler
900
Sloped EndsJPair
50 16* Pipe
36' 1 gauge round
X
Single Pipe, F.0 B. Destinabar
14.89
SuglePipe,F.OB Suppler
13.49
Truk Load, F.0 B. Destination
1423
Truck Load, F.0 S. Supplier
1349
Sloped EndslPae
68 40+ppe
48' 14 gauge spiral corrugated 3X1
630
X
Single Pipe, F.O.B. Desbnabm
2926
Single Pipe, F.O.B Supplier
2711
Truk Load, F 0 B Destination
2934
Truk Load, F 0 S. Suppler
27.77
Sloped Ends/Pae
109 44+ pipe
•
•
•
t
r F
THE FOLLOWING
DOCUMENT
IS THE BEST IMAGE
POSSIBLE
DUE TO
THE POOR QUALITY
OF THE ORIGINAL
• GULVEKTGUNIKAGf •IMA19
10115198 - 10115199
I
0
t
10
11
12
CONTECH
CONSTRUCTION
METAL
CULVERTS
5EABREEZE
CULVERTS
WILSON
CULVERTS
GALVANIZED PEEL QTY-
HOUSTON, TX
NAVASOTA
STOWELL
ELKHA RT, TX
ROM AND CORRUGATED
IN FEET
gauge api 9 corrugated 3X1
120
x
Single Pipe, F.O.B. Destinafim
46.01
5114
NB
39.41
Single Pipe, FAR Supplier
45.60
WB
39.41
Truck Load, F.O.B. Destination
41.18
NB
35.53
Ttud Load, F.O.B. Supplier
45.60
NB
35.53
Sloped End"
131.94-pipe
NB
400opoe•errradwsawWpe
gauge spiral oomgated 3X
120
Srgle Pipe, F.O.B. Destination
36.58
40.01
NB
29.20
Single Pups, F.O.B. Supplier
34.49
we
29.20
Trudy Lea4 F.O.B. DesWwban
31.62
NO
28.28
Trudy Loa4 F.0 B. Supplier
34.49
WB
26.28
S WO EndslP*
31.94+pipe
NB
4t0Dop0aearb d no use wipe
gauge 7T 12 cartu9 3XI
780
Ongle Pipe, F.O.B. Dm&udon
58.43
64.19
NB
47.81
Single Pipe, F.O.B. Supplier
5580
WB
47.61
Trull L&,4 F.O.B. Dw6vbon
61.44
NIB
4291
Truck Low4 FAIL Supplier
55.80
We
4291
Slo* Er>dslPalr
182.40• '
NB
16 Who ease edge
7r 14 gauge spiral corrugated 3X1
180
X
Single Pipe, F.O.B. Destination
41.80
49.32
NB
35.30
Srgle Pipe, F.O.B. Supplier
39.62
• NB
35.30
Truck load, F.Qa Destination
45.14
NB
31.11
Trull Load, F.O.B. Sing w
39.62
NB
31.11
Slopecl Ends4W
182
NB
15. #Dand why ease e
84" 12 gauge spiral wngalo 3XT
120
x
Single Pipe, F.O.B. Destination
66.88
15.49
NB
54.92
Single Pipe, F.O.B. Supplier
64.98
NIB
54.92
Thud lca4 F.O.B. Destination
10.22
NB
49.43
Truck Load, F.QB. Supplier
64.98
NB
49.43
Slopecl EndwPar
228.00 • pipe
NB
100.00*pipe•Dan Inc ease edge
1 gauge spin corMated 3X1
120
x
Single Pipe, F.O.B. Destination
51.15
51.54
MB
40.95
Single Pipe, F.O.B. Supplier
49.40
WB
40L85
Trudy load, F.O.B. Destinnabm
56.93
WS
36.16
Trudy Iow4 F.O.B. Supplier
49.40
NB
36.16
Slopal EndslPeir
228.
NB
11MOD•pip" wndwino ease edge
7'2/3' X ur CORR
I
DELIVERED PRICES FOR
10R MORE PIPE ANYWHERE
IN BRAZOS COUNTY
RECOM EN TI N; CONTECH CONSTRUCTION -SLOPED ENDSMAIR #1,#2,#3,#4,#5,#6,#8
WILSON CULVERTS-REMAINING
6
A ARD DATE:
c
i
I
i
r
' r
a
i
4
I