BID TABULATION 98 -003
HOT MIX ASPHALTIC CONCRETE PAVEMENT
1997/98 CONTRACT
10/15/97 - 10/15/98
k�
TYPE B, MODIFIED
TYPE D. MODIFIED
TYPE B. MODIFIED
TYPE B. 750 TONS LOADED ONLY
HMAC
HMAC
HMAC - 3,000 SO. YDS.
BIDDERS
750 NET TONS
1,500 NET TONS
PER SQUARE YARD
G e0 •.O
P - YOUNG, S - HELMCAMP
RECOMMENDATION: SEE ABOVE
AWARD DATE:
LOADED ONLY
$2500
$2650
LOADED AND HAULED
$2750
$2900
$416
LOADED ONLY
$22.00
$2300
LOADED AND HAULED
NB
N/B
N/B
NB
N/B
LOADED ONLY
LOADED AND HAULED
N/B
N/B
$4.98
LOADED ONLY
N/B
NB
LOADED AND HAULED
NIB
N/B
N/B
k�
AWARDED PRICES
TYPE B. 750 TONS LOADED ONLY
P - YOUNG
TYPE D, 1,500 TONS LOADED ONLY
P - YOUNG
TYPE B, 750 TONS LOADED & HAULED
P -YOUNG
YPE D. 1,500 TONS LOADED & HAULED
P -YOUNG
TYPE B. MODIFIED HMAC W/ ROLLER
P - YOUNG, S - HELMCAMP
RECOMMENDATION: SEE ABOVE
AWARD DATE:
/n - z&
1�C�►� /� pACak 17/
RECOMMENDATION: SEE ABOVE
ell-
AWARD DATE: /O-
�'t (r yA -. •...►
•
•
■
1
i
BID TABULATION 98 -004
ASPHALT, OIL, & EMULSION PRODUCTS
1997198 CONTRACT
10/15/97 - 10115198
CRS-2 SS•1 HFRS•2
HFRS -2P
ATERIAT
AE -PRIME
30,000
165,000
6,000
FREE TIME
;EST. GA104,000
30,000
TOTAL GAL TOTAL
GAL TOTAL
GAL
TOTAL
DEMURRAGE
IDDERL
TOTAL
GAL
NO DEMURAGE
CLEVELA
0.525 15.750.00 0.5250 15,750 00
0.525 86.625 00
0 8593
5,155.80
p•�
ASPHALT
0 i0 72,716.80
2 HOURS
GATOR
0.5320 15,960.00 NIB NIB
NIB
$ 40.00
RECYCLERS
NIB
2 hours
GULF STATES
p.� 16,800.00 0.56 92,400.00
0.79
4,740.00
40.00
ASPHALT
NIB
NB
2 hours
KOCH
0.53 15.900.00 0.5300 15,900.00
0.53 87,450.00
0.85
5,100.00
40.
MATERIALS
0.68 70,720.00
2 hour
i
PRIME
0.4999 14,997.00 0.4999 14,997.00 0.4999 82.483.50
0 8400
5,040.00
40.00
MATER IALS
0.65 67,60 0.00
/
AWARDED PRICES:
PRIME. S- LT •CLEVELAND
KOCH. A
AE -PRIME
P -
CRS-2
P - PRIME, S - CLEVELAND, ALT - KOCH
,
I,
1\
SS -1
P - PRIME, S - CLEVELAND, ALT KOCH
HFRS -2
P - PRIME, S - CLEVELAND, ALT KOCH
P - GULF STATES, S - PRIME, ALT - KOCH
t
HFRS -2P
RECOMMENDATION: SEE ABOVE
ell-
AWARD DATE: /O-
�'t (r yA -. •...►
•
•
■
1
i
•
0
•
BID TABULATION 98 -005 (A)
CULVERT CONTRACT - 1997/98
10115/97 - 10/15/98
3f�..�..._. PAZ& . �
GUNTEGH
INTERNATIONAL
WILSON
EST.
CITY.
CONSTRUCTION
HOUSTON. TX
SUPPLY
COLLEGE STATION
CULVERTS
ELKHART. TX
GALVANIZED STEEL
ROUND AND CORRUGATED
IN FEET
STOCKI ORDER
STOCKI RDER
STOCKI ORDER
12' 16 Gauge round
500
x
X
X
Single Pipe. F O B Destination
665
"• 478
4 15
Single Pipe, F O B Supplier
389
••• 419
390
Truck Load. F O B Destination
397
••• 372
390
Truck Load F O B Supplier
389
••• 372
390
Sloped Ends /Pair
19 00 • PIPE
N/B
25 85 EA W/BAND
15' 16 gauge round
1120
X
X
X
Single Pipe F O B Destination
760
"' 604
517
Single Pipe F O B Supplier
468
... 529
486
Truck Load, F O 8 Destination
482
"' 4 70
486
Truck Load, F O B Supplier
468
•.. 4 70
486
Sloped Ends/Pair
24 70 \ PIPE
NJB
35 95 EA W/ BAND
18' 16 gauge round
1850
x
x
X
Single Pipe F O 8 Destination
855
"' 879
620
Single Pipe F O B Supplier
575
"' 769
583
Truck Load, F O B Destination
$ 96
••. 683
583
Truck Load, F O 8 Supplier
575
••• 683
583
Sloped Ends /Pair
30 40 • PIPE
NIB
50 29 EA W/BAND
24' 16 gauge round
920
X
X
X
Single Pipe. F O 8 Destination
950
"\ 1286
825
Single Pipe, F O 8 Supplier
749
"• 1125
776
Truck Load, F O B Destination
782
"' 1000
7 76
Truck Load, F O B Supplier
750
"' 1000
7 76
Sloped Ends/Pair
4180 • PIPE
NIB
78 49 EA W/BAND
36' 16 gauge round
1990
X
x
X 2 66 X 112 CURR
Single Pipe, F O B Destination
13 54
••• 2643
1240
Single Pipe, F O 8 Supplier
1124
"' 2313
1166
Truck Load. F O B Destination
1186
"' 2055
11 GG
Truck Load. F O 8 Supplier
1124
••. 2055
11 GG
Sloped Ends/Pair
57 00 \ PIPE
NIB
156 27 EA W /BAND
48' 14 gauge spiral corrugated 3X1
630
x
x
x
Single Pope, F O B Destination
2660
"' 5229
23 70
Single Pipe, F O B Supplier
2314
••• 4750
2228
Truck Load, F O 8 Destinstion
2445
"• 4222
2228
Truck Load, F O B Supplier
2314
••• 4222
2228
Sloped Ends/Pstr
91 20 \ PIPE
I N 3
1 317 48 EA W/BAND
3f�..�..._. PAZ& . �
BID TABULATION 98 -006 (A)
CULVERT CONTRACT - 1997/98
10/15/97 - 10/15/98
._..... �.. ....�... �...w.•��. -
-MI. C"Mm IC 01v -- •4YIr't- tiAr&NVrNU
PER ATTACHED SPECS EASE EDGE.
i
12"& 15" P- INTERNATIONAL SUPPLY, S • CONTECH
J� RECOMMENDATION: PRIMARY- FOR REMAINING WILSON,
I SECONDARY: FOR REMAINING CONTECH
l\ BACKUP FOR REMAINING INTERNATIONAL SUPPLY
AWARD DATE: /0 - 14— — y 7 may_
NOTE AREAS CONCERNED W/ CORROSION OF STEEL PIPE - WE WILL USE
THE ADS ALTERNATE PIPE OUOTED BY INTERNATIONAL SUPPLY
C
CONTECH I
INTERNATIO
CONSTRUCTION S
SUPPLY C
CULVERTS
EST. C
GALVANIZED STEEL Q
ROUND AND CORRUGATED I
IN FEET S
STOCKI ORDER S
STOCKI ORDER S
STOCKI ORDER
60" 12 gauge spiral corrugated 3X1 1
120 x
x x
x
Single Pope. F O B Destination 4
4370 N
NB 3
3947
Single Pipe, F O 8 Supplier 3
3800
3711
Truck Load. F O B Destination 3
3980 3
3711
Truck Load. F O B Suppler 3
3800 3
3711
Sloped Ends/Pair 1
1 114 95 • PIPE •
••4800
60' 14 gauge spiral corrugated 3X1 1
120 x
x x
x
Single Pipe. F O 8 Destination 3
3325 N
NB 2
24 53
Single Pipe. F O B Supplier 2
2874 2
2305
Truck Load, F O 8 Destination 3
31 35 2
2305
Truck Load. F O B Supplier 2
28 74 2
2305
Sloped Ends/Palr 1
114 95 - PIPE "
" 48 00
72' 12 gauge spiral corrugated 3X1 7
780 x
x x
x
Single Pipe, F O 8 Destination 5
5130 N
NB 4
4768
Single Pope.F O B Supplier 4
4650 4
4481
Truck Load, F O 8 Destination 5
5120 4
4481
Truck Load. F O 8 Supplier 4
4650 4
4481
Sloped Ends/Pair 1
1 152 00 4 PIPE "
"75 00
72' 14 gauge spiral corrugated 3X1 7
780 x
x X
X
Single Pipe, F O 8 Destnatwn 3
3800 N
N/B 3
3530
Single Pipe. F O 8 Supplier 3
3302 3
33 18
Truck Load. F O B Destination 3
3762 3
33 18
Truck Load. F O 8 Supplier 3
3302 3
33 18
Sloped Ends/Pair 1
152 00 4 PIPE 1
117500
84' 12 gauge spiral corrugaled 3X1 1
120 x
x X
X
Single Pipe. F O B Destination 6
6080 N
NM 5
5493
Single Pipe, F O B Supplier 5
54 15 5
5163
Truck Load F O B Destination 5
5852 5
5163
Truck Load F O B Supplier 5
54 15 5
5163
Sloped Ends/Pair 1
190 00 - PIPE '
'•100 00
84' 14 gauge spiral corrugated 3X1 1
120 x
x X
X
Single Pipe. F O B Destination 4
4655 N
NB 4
4085
Single Pipe F O 8 Supplier 4
4117 3
3040
Truk Load. F O B Destination 4
4744 3
3840
Truck Load. F O 8 Supplier 4
4117 3
3840
Sloped Ends/Pair 1
190 00 4 PIPE •
••t00 00
-MI. C"Mm IC 01v -- •4YIr't- tiAr&NVrNU
PER ATTACHED SPECS EASE EDGE.
i
12"& 15" P- INTERNATIONAL SUPPLY, S • CONTECH
J� RECOMMENDATION: PRIMARY- FOR REMAINING WILSON,
I SECONDARY: FOR REMAINING CONTECH
l\ BACKUP FOR REMAINING INTERNATIONAL SUPPLY
AWARD DATE: /0 - 14— — y 7 may_
NOTE AREAS CONCERNED W/ CORROSION OF STEEL PIPE - WE WILL USE
THE ADS ALTERNATE PIPE OUOTED BY INTERNATIONAL SUPPLY
C
•
•
•
BID TABULATION 98 -006 (B)
CULVERT CONTRACT - 1997198
10116/97 - 10/16/98
- r•RIy GO VVV iGV nnG in LrnGI -n ICC.
PIP. RECOMMENDATION: PRIMARY WILSON
\/`
L v SECONDARY CONTECI4
,1 1
AWARD DATE.
W /NO BAND
**'& PIPE&BANDB
--CONTECH'
INTERNATIONAL
L
CONSTRUCTION
HOUSTON, TX
SUPPLY
COLLEGE STATION
CULVERTS
ELKIjART. TX
EST.
CITY.
ARCHED PIPE STEEL
2 213" X 112" CORRUGATIONS
IN FEET
STOCK ORDER
STOCKI ORDER
STOCK ORDER
17" SPAN BY 13' RISL
S00
X.16 GAGE
WB
X
Single Pipe, F O B Destination
760
640
Single Pipe, F 0 B Supplier
498
5 60
Truck Load F O B Destination
612
560
Truck Load F O 0 Supplier
490
560
Sloped Ends/Pair
24 70 - PIPE
41_12 EA W/ BAND
21' SPAN BY 15' RISE
500
X•16 GAGE
NIB
X
Single Pipe F 0 B Destination
903
74
Single Pipe F O B Supplier
611
652
Truck Load F O B Destination
633
652
Truck toad F 0 0 Supplier
611
652
Sloped Ends/Pair
30 40 - PIPE
56 40 EA WIELAND
28" SPAN BY 20" RISE
S00
X•16 GAGE
N/O
X
Single Pipe F O B Destination
1083
957
Single Pipe F 0 0 Supplier
797
6 37
Truck Load, F O B Destination
$28
837
Truck Load F 0 B Supplier
797
837
Sloped End! /Pau
41 800 - PIPE
94 00 EA W/ BAND
35' SPAN BY 24' RISL
Soo
X•16 GAGE
NIB
X
Single Pipe F O B Destination
1377
11 71
Single Pipe F O 0 Supplier
909
1024
Truck Load F O 0 Destination
1053
1024
Truck Load F 0 0 Supplier
909
1024
Sloped Cnds/Pau
51 30 - PIPE
15081
42" SPAN BY 29" RISE
600
X•16 GAGE
N/8
X 2 66X1/2 CURR
Single Pipe F O B Destination
1S 20
1641
Single Pipe F O B Supplier
1203
14 35
Truck Load, F 0 B Destination
1289
14 35
Truck Load F O B Supplier
1203
14 35
Sloped Ends/Psir
61 75 - PIPE
246 75 EA W /BAND
49' SPAN BY 33' RISE
500
X•14 GAGE
NIB
X 2 66X112 CURR
Single Pipe, F 0 B Destination
1995
1696
Single Pipe, F 0 B Supplier
1652
16 se
Truck Load F 0 0 Destination
17 e6
16 58
Truck Load F 0 B Supplier
1652
1658
Sloped Ends/Pau
79 80 - PIPE
"3400
57" SPAN BY 38' RISE
500
X•12 GAGE
NIB
X
Single Pipe F O B Destination
2945
27 80
Single Pipe F O B Supplier
2623
2502
Truck Load F O 0 Destination
2795
2507
Truck Load F O B Supplier
7623
7502
Sloped Ends/Pair
91 20 - PIPE
—45 00
64' SPAN BY 43' RISE
500
X•12 GAGE
N/B
X
Single Pipe, F 0 6 Destination
3467
31 00
Single Pipe, F O B Supplier
2960
2797
Truck Load F 0 B Destinawn
32 39
27 97
Truck Load. F 0 B Supplier
2966
27 97
Sloped Ends/Pau
102 60 - PIPE
"'6500
71" SPAN BY 47' RISE
760
X• 10 GAGE
NIB
NIB
Single Pipe F O 6 Destination
47 50
Single Pipe F 0 B Supplier
4180
Truck Load F O B Destination
4441
Truck Load.F O 8 Supplier
4160
Sloped Ends/Pair
114 00 - PIPE
- r•RIy GO VVV iGV nnG in LrnGI -n ICC.
PIP. RECOMMENDATION: PRIMARY WILSON
\/`
L v SECONDARY CONTECI4
,1 1
AWARD DATE.
W /NO BAND
**'& PIPE&BANDB
L
BID TABULATION 98 -005 (C)
CULVERT CONTRACT - 1997/98
10/15/97 - 10/16/98
946
i
CONTECH
INTERNATIONAL
WILSON
EST.
CONSTRUCTION
SUPPLY
CULVERTS
ARCHED PIPE STEEL CITY.
HOUSTON, TX
COLLEGE STATION
ELKHART. TX
!- BY 1' CORRUGATIONS IN FEET
STOCK I ORDER
STOCKI ORDER
STOCKI ORDER
53' SPAN BY 41' RISE
S00
X -14 GAGE
NIB
x
Single Pipe. F O B Destination
2945
24 75
Single Pipe, F O 8 Supplier
2477
2227
Trek Load, F O B Destination
2508
2227
Truck Load, F O B Supplier
2477
2227
Sloped Ends/Pair
NIB
"65 00
60' SPAN BY 46' RISE
500
X -14 GAGE
N/B
X
Single Pipe, F O B Destination
3135
3025
Single Pope, F O B Supplier
2686
2722
Truck Load, F O B Destination
2762
27 22
Trek Load, F O B Supplier
2686
2722
Sloped Ends/Pair
NIB
—7500
66' SPAN BY 51' RISE
500
X -14 GAGE
NIB
x
Single Pipe, F O 8 Destination
3420
3025
Single Pipe, F O 8 Supplier
2978
2722
Truck Load. F O B Destination
3083
2722
Truck Load, F O 8 Supplier
2978
2722
Sloped Ends/Pair
NB
118500
73' SPAN BY 55' RISE
500
X -14 GAGE
NB
X
Single Pipe, F O B Destination
3895
3330
Single Pipe. F O B Supplier
3370
2997
Truck Load. F O 8 Destination
3475
2997
Truck Load, F O B Supplier
3370
2997
Sloped Ends/Patr
NIB
"100 00
81' SPAN BY 59' RISE
S00
X -14 GAGE
NIB
X
Single Pipe, F O B Destination
41 80
3635
Single Pipe. F O B Supplier
3689
32 37
Truck Load, F O 8 Destination
3823
32 37
Truck load F O 8 Supplier
3689
32 37
Sloped Ends/Pair
N8
•••115 00
87' SPAN BY 63' RISE
S00
X -14 GAGE
NIB
x
Single Pipe F O B Destination
4560
39 18
Single Pope F O 8 Supplier
4013
35 2G
Truck load, F O 8 Deslrulion
4122
3526
Truck Load, F O B Supplier
40 13
3526
Sloped Ends/Pair
NIB
••12500
95' SPAN BY 67' RISE
500
X -12 GAGE
NIB
x
Single Pipe F O B Destination
62 70
5597
Single Pope F O B Supplier
56 12
5038
Truck Load F O B Destination
5709
5038
Truck Load. F O B Supplier
5612
5038
Sloped Ends/Pair
N/B
"150 00
946
i
•
•
e�
J
BID TABULATION 98 -005 (C)
CULVERT CONTRACT - 1997198
10/15/97 -10/15198
• rrcwtb uuu I to AKt: IN LINLAN rttT °BPIPEBBAND8NO EDGE
•••.PIPE•BAND W/
RECOMMENDATION: P - WILSON, S - CONTECH
AAWARD DATE: /p -
1
�w
CONTECH
INTERNATIONAL
WILSON
EST,
CITY.
CONSTRUCTION
HOUSTON, TX
SUPPLY
COLLEGE STATION
CULVERTS
ELKHART. TX
ARCHED PIPE STEEL
3" BY 1" CORRUGATIONS
IN FEET
STOCK I ORDER
STOCKI ORDER
STOCKI ORDER
103' SPAN BY 71' RISE
500
X -12 GAGE
NB
X
Single Pipe, F O 8 Destination
6745
6003
Single Pipe, F O 8 Supplier
6051
5402
Truck Load, F O B Destination
6185
5402
Truck Load, F O B Supplier
6051
5402
Sloped Ends /Pair
N/B
•• 160 00
112' SPAN BY 75- RISE
500
X -12 GAGE
N/B
Single Pipe. F O B Destination
7125
6403
Single Pipe, F O D Supplier
6374
5762
Truck Load, F O 8 Destination
6484
5762
Truck Load. F O 8 Supplier
6374
5762
Sloped Ends/Pair
N/B
•••18000
117' SPAN BY 79' RISE
500
N/B
NIB
N/8
Single Pipe, F O 8 Destination
Single Pipe, F O 8 Supplier
Truck Load, F O B Destination
Truck Load. F O 8 Supplier
Sloped Ends/Pair
128" SPAN BY 83' RISE
500
NIB
NIB
N/B
Single Pipe, F.O B Destination
Single Pipe, F O B Supplier
Truck Load, F O 8 Destination
Truck Load, F O B Supplier
Sloped Ends/Pau
137" SPAN BY 87' RISE
500
NIB
NIB
N/B
Single Pope, F O B Destination
Single Pope, F O 8 Supplier
Truck Load, F O B Destination
Truck Load, F O 8 Supplier
Sloped Ends/Pair
142' SPAN BY 91" RISE
500
NIB
N/B
N/13
Single Pipe, F O B Destination
Single Pipe, F O B Supplier
Truer Load, F O 8 Destination
Trull Load, F O B Supplier
Sloped Ends/Pair
• rrcwtb uuu I to AKt: IN LINLAN rttT °BPIPEBBAND8NO EDGE
•••.PIPE•BAND W/
RECOMMENDATION: P - WILSON, S - CONTECH
AAWARD DATE: /p -
1
�w
BID EVALUATION 98 -005 (D)
CULVERT CONTRACT - 1997/98
10115/97 - 10/15198
VOL :PAt3E, ...�„
EST.
CONTECH
INTERNATIONAL
WILSON
REINFORCED
QTY.
CONSTRUCTION
SUPPLY
CULVERTS
CONCRETE
IN FEET
HOUSTON, TX
COLLEGE STATION
ELKHART. TX
STOCK ORDER
STOCK ORDER
STOCK ORDER
12" Round
500
NB
X
N/B
Single Pipe, F O 8 Destination
••' 4 78
Single Pipe, F 0 B Supplier
'•' 419
Truck Load, F O B Destination
"' 372
Truck Load, F O 8 Supplier
"• 372
Sloped Ends
N/B
15" Round
1,120
NB
X
NB
Single Pipe, F 0 B Destination
"' 604
Single Pipe, F O B Supplier
"• 529
Truck Load, F O B Destination
"' 470
Truck Load, F 0 8 Supplier
"• 470
Sloped Ends
NB
19" Round
1,850
NB
X
NB
Single Pipe, F O B Destination
"' 879
Single Pipe, F O B Supplier
"' 769
Truck Load, F O B Destination
"' 683
Truck Load, F O 8 Supplier
'•' 683
Sloped Ends
NB
24" Round
920
NAB
X
N/B
Single Pipe, F 0 B Destination
"' 1286
Single Pipe, F 0 B Supplier
"' 1125
Truck Load. F O 8 Destination
••• 1000
Truck Load, F O 8 Supplier
••' 1000
Sloped Ends
NB
30" Round
100
NB
X
N /F!
Single Pipe, F O B Destination
"' 2200
Single Pipe. F 0 B Supplier
"' 1925
Truck Load. F 0 8 Destination
•" 1711
Truck Load. F 0 B Supplier
"• 1711
Sloped Ends
NB
VOL :PAt3E, ...�„
•
•
36• Round
1990
N/B
X
NIB
Single Pipe, F.O 8 Destination
"' 2643
Single Pipe, F O B Supplier
"' 2313
Truck Load, F O B Destination
"' 2055
Truck Load, F.O.B. Supplier
"' 20.55
Sloped Ends
N/B
48' Round
630
N/B
X
NIB
Single Pipe, F O 8 Destination
"' 52.29
Single Pipe, F O B Supplier
"' 47.50
Truck Load, F O B Destination
"' 4222
Truck Load, F O B Supplier
•'• 4222
Sloped Ends
N/B
60• Round
400
NIB
NM
NIB
Single Pipe, F O B Destination
Single Pipe, F O 8 Supplier
Truck Load, F O B Destination
Truck Load, F O B Supplier
Sloped Ends
72• Round
780
NIB
N/B
N/B
Single Pipe, F O 8 Destination
Single Pipe, F O B Supplier
Truck Load, F O 8. Destination
Truck Load, F O B Supplier
Sloped Ends
84' Round
120
N/B
NIB
N/B
Single Pipe, F 0.6 Destination
Single Pipe, F.O B Supplier
Truck Load, F.O.8 Destination
Truck Load, F.O B Suppler
Sloped Ends
• • PRICES QUOTED ARE IN LINEAR FEET.
Minimum Order Required NO NO
Amount of Order If Minimum Required: N/A NONE N/A
Delivery single pipe within 24 hrs. of order: *YES YES NO
Delivery of truckload/special order within 5.7 3 3 -�
Truckload quantity is: $3.300.00 SEE ATTACHED $ 1.50000
• DEPENDING ON DIAMETER
•" ALTERNATE BID :ADS PER ATTACHED SPEC
RECOMMENDATION: INTERNATIONAL SUPPLY
AWARD DATE: LO -/j• _'q:2
• VOL, % g.176