Loading...
HomeMy WebLinkAbout1996-09-17-0900AM-RegularBRAZOS COUNTY BRYAN. TEXAS AGENDA BRAZOS COUNTY COMMISSIONERS COURT J 95 SEP 1111H 8: 4 0 8RAZOS MW Y COL'21110uSE [lRYA T1, 5 8Y ,EI'uTY THE COMMISSIONERS COURT WILL MEET IN REGULAR SESSION ON TUESDAY, SEPTEMBER 17, 1996 AT 9:00 A.M. IN THE COMMISSIONERS COURTROOM OF THE BRAZOS COUNTY COURTHOUSE, 300 EAST 26TH STREET, SUITE 115, BRYAN, TEXAS. 1. Invocation - Judge Jones. 2. Pledge of Allegiance - Judge Jones. Citizens input and/or concerns. At this time, the Judge will open the floor to citizens wishing to address the Court on county-related issues not scheduled on the agenda. Please limit subject matter to five minutes. The Commissioners will receive the information, conduct research into the matter, and/or place the matter on a future agenda for discussion. (A recording is made of the meeting; therefore, please give your name and address for the record.) Consider and take action on agenda items 4 - 26: 4. Personnel Change of Status. Payment of Claims. 6. Budget Amendment 95/96-42. Annual Agreement for 911 Emergency Communications Services Dispatching. 8. 1'exas Highway Traffic Safety Program Grant Agreement for County Attorney's office. 9. Lease Agreement for the Brazos Valley Art League. 10. Memo of Understanding for Consulting Services for landscaping work at the Juvenile Justice Center. ' 11. Change Order No. 08 for the contract with Chappell Hill Construction Company for the Juvenile Justice Center. E 12. Energy assessment for all County facilities. 13. Incentive package for Texas Recycling and Reclamation. c 14. Supplement to Independent Contractor Agreement with Junction Five-O-Five. 15. Approval of election judges and alternate judges. 1 I VOL Commissioners Court Meeting Agenda September 17, 1996 Page Two 16. Award Bid No. 96-037 Annual Contract for Office Furniture. 17. Award Bid No. 96-038 Annual Contract for Janitorial Supplies. 18. Requisition from General Funds for a copier for the Justice of the Peace, Precinct 4. 19. Requisitions from Capital Projects for the following: a. Ladder rack and freon tank tower for Maintenance. b. Chairs for Treasurer's Office. c. Tlets equipment upgrade for Sheriffs Office. 20. Approve blanket purchase orders. 21. Approval to advertise for the following Road & Bridge annual contracts: a. Hot Mix Asphalt Concrete Pavement. b. Aggregate for Surface Treatments. c. Flexible Base. d. Asphalt, Oil and Emulsion Products. e. Culverts. 22. Permission for Road & Bridge to enter Susan K. Deere's property located on Timberwilde Drive for the purpose of constructing driveway for school bus activity for the health, safety and welfare of the general public. Site is located in Precinct 3. 23. Acceptance of City of Bryan's cost estimate of $23,900.00 to relocate electrical distribution power lines for Fickey Road widening project. Site is located in Precinct 2. 24. Request from GTE to place a road bore in the right-of-way of I&GN Road and install buried cable in the right-of-way of Capstone Drive (in the Willow Run Subdivision utility easement). Site is located in Precinct 1. 25. The Preliminary Plat of Lot 1 & 2 Block 1 Hare Lane Estates, 10.00 acres, James D. Allcorn League. Site is located in Precinct 2. 26. The Final Plat of Joy Pottery Subdivision, 3.46 acres, Thomas M. Splane Survey. Site is located in Precinct 3. 27. Acknowledge receipt of Orders determining compensation of Count Auditor and Assistant Auditors and of Court Reporters. 28. Call for citizen input and/or concerns. 29. Announcement of interest items and possible future agenda topics. 30. Adjourn. a r The Courthouse is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive services must be made 48 hours before the meeting. To make arrangements, call (409) 3614102. vo~~~ pnae :_9..9 BRA20S COUNTY COMMISSIONERS' MEETING ON TUESDAY, SEPTEMBER 17, 1996 AT 9:00 A.M. 13 or r4 G 1 i i c C~~ E J~-LL ilk 00, Yom' ~ Grt> S C (Azz At 04 KK~=d~ vi 2 f ~ VO Aar, ~C t E FI COMMISSIONERS' COURT FI REGULAR MEETING ; SEPTEMBER 17, 1996 r i A regular meeting of the Commissioners' Court of Brazos ' County, Texas was held in the Commissioners' Courtroom in the Courthouse in Bryan, Brazos County, Texas, beginning at 9:00 a.m. on Tuesday, September 17, 1996, with the following members of the Court present: Alvin W. Jones, County Judge, Presiding; Gary Norton, Commissioner of Precinct 1; Sandie Walker, Commissioner of Precinct 2; Randy Sims, Commissioner of Precinct 3; Carey Cauley, Jr., Commissioner of Precinct 4; Mary Ann Ward, County Clerk. Attached is a list of citizens and officials in attendance. f 3 i • The County Judge gave the invocation and led the pledge of allegiance. There was no citizen input and/or concerns. The Court proceeded to consider the change of status of ` i the following employees. NAME DEPARTMENT REASON Nuche, Jean County Clerk New Emp Temp Orozco, Sonia Juvenile Serv. Promotion Sandle, Vincent Juvenile Serv. Promotion Albarado, Cynthia Juvenile Serv. Promotion Sims, Betty Bldg Maintenance New Emp Temp Childs, John Jr. Road & Bridge Resignation Holland, Shelley Treasurer Sal Increase Rice, Rhonda L Treasurer Sal Increase Sweeney, Ruth A Treasurer Sal Increase on motion by Commissioner Walker, seconded by Commissioner Norton, the Court voted unanimously to approve the changes as submitted. The Court next considered the following Claims as submitted by the County Treasurer for payment: 96-010275 through 96-010492 On motion by Commissioner Cauley, seconded by Commissioner Walker, the Court voted unanimously to approve the Claims as submitted. The Court next considered Budget Amendment #95/96-42, which would reallocate funds budgeted for Justice of the Peace Precinct 4, Environment Protection Department, transfer funds from Contingency to the Brazos Center and District Clerk's office, and to create a department within the Metropolitan Planning Organization to track the Brazos Transit contract. On motion by Commissioner Walker, seconded by Commissioner Cauley, the Court voted unanimously to approve the budget amendment as submitted, a copy of which is attached hereto. The next matter before the Court was the renewal of a c E i F L; Lie-• - ~h. ..-_..e_w_. Contractual Agreement between Brazos County and the Brazos County Emergency Communications District (9-1-1) for emergency communications services dispatching. Effective October 1, 1996, the District is appointed the emergency communications dispatching authority for Brazos County for the period October 1, 1996 through and including September 30, 1997. The County agrees to pay $144,140.00 for the services provided. On motion by Commissioner Sims, seconded by Commissioner Norton, the Court voted unanimously to enter into contractual agreement with the Brazos County Emergency Communications District (9-1-1) for emergency communications services dispatching. A copy of the contractual agreement is attached hereto. The next matter before the Court was approval of a Grant Agreement between the State of Texas through the Texas Department of Transportation and Brazos County. This grant, to be administered by the County Attorney's office, will provide funds to operate mobile videos in establishments to determine the sale of alcoholic beverages to minors and to file criminal or administrative cases on the sellers/ servers. Such grant to be in the total amount of $60,015.80 with seventy five percent (75%) or $45,000.00 to be state funded, and twenty five percent (25%) or $15,015.80 to be county funded. On motion by Commissioner Sims, seconded by Commissioner Cauley, the Court voted unanimously to authorize the County Judge to make application on behalf of Brazos vO~~__pAgE, ~O~- , 1 , , 01 County to the Texas Department of Transportation and accept on behalf of Brazos County such grant funds as may be tendered. A copy of the Grant Agreement is attached hereto. The Court next considered renewal of a lease agreement between the Brazos Valley Art League and Brazos County for rental of office space within the Brazos Center located at 3232 Briarcrest Drive, in Bryan, Texas. Term of the lease is for the period of one year commencing on October 1, 1996 and ending on September 30, 1997. The Art League agrees to pay Brazos County fifty dollars ($50.00) per month. On motion by Commissioner Walker, seconded by Commissioner Norton, the Court voted unanimously to renew the lease agreement between Brazos County and Brazos Valley Art League for the period stated above. A copy of the lease agreement is attached. The next matter for consideration was a Memo of Understanding between Brazos County Grounds Maintenance Division and TAMU College of Architecture for consulting services for the Juvenile Services Center and fee payment. On motion by Commissioner Walker, seconded by Commissioner Cauley, the Court voted unanimously to authorize the County Judge to execute the Memo of Understanding and authorized the payment of $4,400.00 to TAMU College of Architecture. The Court next considered Change Order No. 8 for the Juvenile Justice Center Construction Contract. This Change order would increase the contract in the amount of $1,001.10. On motion by Commissioner Norton, seconded by Commissioner Cauley, the Court voted unanimously to approve Change Order No. 8 for the Juvenile Justice Center Construction Contract. A copy of the Change order is attached hereto. The next matter for consideration was an energy assessment for all County facilities. The assessment is to be done at no cost to the County and will identify possible cost effective facility upgrade measures. On motion by the County Judge, seconded by Commissioner Norton, the Court voted unanimously to authorize the County Judge to execute the -JIA V , - - - . . -1 lza - . - - . application authorizing the Energy Conservation Coalition to conduct an energy assessment for all County facilities. The Court next considered an incentive package for Texas Recycling and Reclamation. On motion by Commissioner Sims, seconded by Commissioner Cauley, the Court voted unanimously to approve the incentive package for Texas Recycling and Reclamation in accordance with the City of Bryan agreement. A copy of which is attached. The next matter for consideration was a supplement to the Independent Contractor Agreement with Junction Five-0-Five. This is will add the Raymond Stotzer Parkway (SH 60) Citizen's Collection Station to the sites already manned by Junction Five-O-Five. On motion by Commissioner Sims, seconded by Commissioner Cauley, the Court voted unanimously to approve the supplement to the Independent Contractor Agreement and authorized the payment of $1,186.50 monthly for the services rendered by Junction Five-O-Five. A copy of the supplement is attached hereto. On motion by Commissioner Sims, seconded by Commissioner y4 1 c t Norton, the Court voted unanimously to appoint the following persons as presiding judge and alternate judge for the current voting year at the following voting precincts: Pct Election Judge 6 11 William S. McCulley 16 17 18 27/75/76 33 61 Linda Linder 63 Tommy Randolph 57/22/50/56 35 Kristy Hardy 8 Alternate Judge Madge Henry Barbara Benson Joan Kent Pat Allen Nora L. Wasson Meri Lynn Mills J.P. Jones Ryan Runkle Jean Aycock • W. A. Tony Davidson Jim Crawford The Court next considered awarding the following bid: Bid No. 96-037 - Annual Contract for Office Furniture Cheryl Turney, Purchasing Agent, explained the reason for removing the stacking chairs from the tabulation to allow comparing "apples to apples". On motion by Commissioner Walker, seconded by Commissioner Norton, the Court voted unanimously to award the contract to EOS and to name Sav-On as the alternate ~C F. K. VOL L._ PAaE,.I~. / z--1\ bidder. A copy of the bid tabulation is attached hereto. The Court next considered awarding the following bid: Bid No. 96-038 - Janitorial Supplies Annual Contract Cheryl Turney, Purchasing Agent, recommended acceptance of the bid submitted by Unisource. On motion by Commissioner Sims, seconded by Commissioner Norton, the Court voted unanimously to accept the recommendation of the Purchasing Agent and award the contract to Unisource. A copy of the bid tabulation is attached hereto. The Court next considered approval of a requisition from General Funds for the purchase of a copier for the Justice of the Peace, Precinct 4. Cost of the copier is $5,850.00. On motion by Commissioner Walker, seconded by Commissioner Cauley, the Court voted unanimously to approve the requisition in the amount of $5,850.00 to be paid from the General Fund for the purchase of a copier for the office of Justice of the Peace Precinct 4. The Court next considered approval of the following three (3) requisitions from Capital Expenditures: a) Ladder rack and freon tank tower for Maintenance. Cost $375.94. On motion by Commissioner Sims, seconded by Commissioner Cauley, the Court voted unanimously to approve the requisition in the amount of $375.94 to be paid from Capital Expenditures for the purchase of a ladder rack and freon tank tower for Maintenance. b) Chairs for the Treasurer's office. Cost $1,110.86. The Treasurer's budget will require $160.80 in additional funds to cover the cost of the chairs. Commissioner Walker moved to approve the requisition and to pay the additional $160.80 from the Capital Projects fund. Commissioner Norton seconded the motion. Commissioner Norton, Walker and Cauley voted "Aye". Commissioner Sims and the County Judge voted "No". The motion carried. c) T-lets equipment upgrade for the Sheriff's office. Total cost $10,456.00. On motion by Commissioner Norton, seconded by Commissioner Walker, the Court voted unanimously to approve the requisition in the amount of $10,456.00 to be paid from Capital Expenditures for the purchase of an equipment upgrade for the Sheriff's Office. ~i f VOL _ I The Court proceeded to consider the following blanket Purchase Order: Briggs Healthcare Jail $1,000 On motion by Commissioner Walker, seconded by Commissioner Cauley, the Court voted unanimously to approve the Blanket Purchase Orders as submitted. The next matter for consideration was approval for the Purchasing Agent to advertise for bids for the following items: a) Hot Mix Asphalt Concrete Pavement b) Aggregate for Surface Treatments c) Flexible Base d) Asphalt, Oil and Emulsion Products e) Culverts on motion by Commissioner Norton, seconded by Commissioner Cauley, the Court voted unanimously to authorize the Purchasing Agent to advertise for the previously mentioned bids. The Court next considered authorizing work outside of county rights-of-way for the health, safety and welfare of the general public. The Road and Bridge Department requested permission to enter the private property of Susan K. Deere's on Timberwilde Drive in Precinct 3 to construct a driveway for ' school bus activity. On motion by Commissioner Sims, seconded by Commissioner Cauley, the Court voted unanimously to 4 authorize the work. The next matter for consideration was the acceptance of the City of Bryan's cost estimate of $23,900.00 to relocate electrical distribution power lines for Fickey Road widening project in Precinct 2. On motion by Commissioner Walker, ~i j seconded by Commissioner Norton, the Court voted unanimously to accept the cost estimate and authorized the payment of $23,900.00 to the City of Bryan to relocate electrical distribution power lines. The Court next considered the request from GTE to place E' a road bore in the right-of-way of I&GN Road and install buried cable in the right-of-way of Capstone Drive. The site E_ is located in Precinct 1. The County Engineer stated that all 6' VOLq appeared to be in order and recommended approval. On motion by Commissioner Norton, seconded by Commissioner Walker, the Court voted unanimously to approve the request of GTE and authorized the installation. A copy of the request is • attached hereto. The Court next considered approval of the Preliminary Plat of Lot 1 and 2 & Block 1, Hare Lane Estates in Precinct 2. Richard Vance, County Engineer, stated that he had reviewed the plat and offered the following comments: 1) Add "Private" notation to Hare Lane 2) Rotate vicinity map 900 On motion by Commissioner Walker, seconded by Commissioner Norton, the Court unanimously approved the Preliminary Plat of the Lot 1 and 2 & Block 1, Hare Lane Estates subject to y compliance with the recommendations noted previously. The Court next considered approval of the Final Plat of Joy Pottery Subdivision in Precinct 3. Richard Vance, County Engineer, stated that he had reviewed the plat and offered the oil following comments: 1) Add 10 foot utility easement across back of lot. 2) In Note #3, the reference to a 5 foot sideline set back should be 15 foot to match the 15 foot utility easement. On motion by Commissioner Sims, seconded by Commissioner a P Cauley, the Court unanimously approved the final plat of the Joy Pottery Subdivision subject to compliance with the recommendations noted previously. ) a The Court acknowledged receipt of the Order Determining x Compensation of the County Auditor, Assistant Auditors and 3 Court Reporters. There was no citizen input and/or concerns. The County Judge made the following comments: 1) TxDOT is asking counties to list areas of traffic hazard for its 1999 Federal Hazard Elimination Program 2) Referenced Texas Natural Resource Conservation Commission (TNRCC) memo relative to Municipal Solid Waste Permit that allows medical waste disposal in the North Point Industrial area.. VOL- C? . YAQk ._/.dZ i t k ~ T • r. 3) Compensatory time balances. If an overpayment was made for compensatory time balances, the County would need to collect funds from employees. Commissioner Sims made the following comment: 1) The Subdivision Regulation Committee meets in Austin on September 19, 1996 and an agenda item is detrimental to county government. Commissioner Cauley made the following comment: 1) The Citizen's Collection Station on Raymond Stotzer Parkway (SH 60) will open September 23, 1996 and follow the same hours as the Smetana site. The County Judge commented that the Order setting the compensation for the Auditor was received after the budget was set and that he would speak to the District Judges about it. Commissioners Sims and Norton both question the title of Assistant County Auditors given to all employees in the department. Commissioner Norton then asked where the funds were coming from to fund these raises. The County Judge replied the funds would come from the Contingency Fund. Commissioner Cauley asked to see budgetary printouts from 1992 to 1995. Commissioner Norton noted that one District Judge had refused to sign the Order because it was done after the budget was set. He stated that it was the prerogative of the Court to determine where funding comes from. He then suggested that it come from the supplement paid to the District Judges' There being no further business to come before the Court, the meeting was adjourned. I t• 4 C P _ E VCi YAG F,1+0 . ~•...i..._.._L_. ~a. _.....~.....w.,._.. _,r,._n.4....n_.o.~`.4'.:5...:.~.~.:.4J: us: c-..._ u.=~..~ I'<cisc~ 1. The foregoing minutes of the Commissioners Court meeting held-September 17, 1996 have been examined and are approved in open Court this the 26th day of November 199, in Bryan, Brazos County, Texas. i Alv W. Jones County Judge Gary Norton Commissioner, Precinct 1 o C ~O - /~~',Ojpe - San ie al r Commissi r, Precinct 2 Cr-Y r. Commiss oner, Pre i ct 4 Commiseloner, Precinct 3 Mary And Ward County Clerk l ~ 9 BRAZOS COUNTY, TEXAS BUDGET AMENDMENT(S) FOR THE 1995-1996 BUDGET YEAR NO. 95/96-42 On this the 17th day of September 1996 at a regular meeting of the commissioners' Court, the following members were present: Alvin W. Jones, County Judge, Presiding Gary Norton, Commissioner, Precinct 1; Sandie Walker, Commissioner, Precinct 2; Randy Sims, Commissioner, Precinct 3; Carey Cauley, Commissioner, Precinct 4; Mary Ann Ward, County Clerk. The following proceedings were held: THAT WHEREAS, on September 17, 1996, the Court heard and approved a budget amendment for the 1995-1996 budget year for Brazos County, Texas. WHEREAS, an expenditure is necessary due to the necessity to meet unusual and unforeseen conditions which could not be reasonably included in the original budget adoptad September 26, 1995 the following amendment(s) to the original are hereby authorized, as described on the attached page(s). ADOPTED AND APPROVED this the 17th day of September 1996 THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS. By: Alvin W. Jones, County Judge f r r. Original: County Clerk's Office and attached to the original budget Copies: County Auditor County Treasurer G, Commissioners' Court Minutes Budget Amendment File r VUL .d.~s~~_,f_ _ a..~~s_...:..s__.,.i...i~ ..~.._......~,~r_.....a..uciFi..:r..Xlei:~.:...%dti~~...S~tis:riyl!~ ~ 9 r~~ BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS NO. 95196 - 42 FD DIV ACCT PROJ DESCRIPTION DR CR 01 244001 802300 Copier 5,850.00 01 244001 606000 Office Supplies 4,000.00 01 244001 610200 Autopsy 1,850.00 Justice of Peace - Pct 4 - To reallocate budget line items to allow for the purchase of capital outlay item. Dr = Increase Cr = Increase (Revenue) 01 480471 MPO - Brazos Transit 2,175.00 01 4250 723200 Contract Services 2,175.00 MPO - Brazos Transit - To setup a department to account for the contract that M'O has made with Brazos Transit and TAMU. BALANCING TOTAL 8,025.00 8,025.00 i Iyf71c~'o •~►pk' ;•*cft%r'? j t. ' taxi +r i PT6, ared~By:,MKW,', Ap roved By: , ~F t • ~ ;•f`:-"'- ~`~:.i..• : •1 r5. ; tin-;;~ ~ ~ Wail, VOIL r, BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS NO. 95/96 - 42 FD DIV ACCT PROJ ACCOUNT NAME Dr 01 365001 618800 Utilities 19,3 01 365001 611300 Contingency Brazos Center - To increase utilities to cover line item overrun to date of $1,000 and to cover two months at an average of $9,150.00. The current expenditures i $91,524 which represent 10 months of service. Dr = Increase Cr = Decrease cr 19,300.00 i BALANCING TOTAL 19,300.00 19,300.00 `Prepared By: Mk WN" FAppr c ved`B =Date: 9141'196 }~te]a e: y F V k M „v,w,. "•.r.ia~.....:t~a„ss.~t:~ J"Q`G "u~~,cre- -~,i~~i+ei.4....,. VO t d 3 i r BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS NO. 95/96 - 42 i FD DIV ACCT PROJ ACCOUNT NAME Dr Cr 01 560050 614500 Miscellaneous Ex p. 1,000.00 01 560050 617400 Telephone 200.00 01 560050 723200 Engineering Cpnsulting 5,000.00 01 560050 804620 C C S - Precinct 1 6,200.00 I Environement Protection - To reclassify budget line items to allow for expenditure overruns. T Dr = Increase Cr = Decrease • BALANCING TOTAL 6,200.00 6,200.00 Pared pro) VOL t , BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS NO. 95/96 - 42 FD DIV ACCT PROJ ACCOUNT NAME 01 200001 606000 Office Supplies 01 110015 611300 Contingency District Clerks Admin. - To increase budget line item Office Supplies for unexpected needs due to the move of Misdemeanor cases moved from the County Clerks office. Dr = Increase Cr = Decrease I~ 'AL Dr 5,000.00 cr 5,000.00 ;Prepared 8y: MKW pproved By: at : 9113196, VOL--q-._ IMAGE li i( . - ~ ~nr~'saar+w►rr : s..rnr.~..~ - ,•,,..m.,,,-„-~...r..,w...~ ~ _ r e t L+ .~._w.~_.`L .e _.._.,__.au~...__.w.~ ......._.._....~...~.W ~~.l.nm►a1-=rte _ __'..i.-L:.aLJ:.Lhfi•Sim~e.a..:,,.a•==~'+--•.:'..i....rL.i..+++.e'"aL ~ _ , AGREEMENT i r J • • THIS AGREEMENT is entered into this 11th day of September, 1996 A.D., by and between BRAZOS COUNTY, Texas (County) and the Brazos County Emergency Communications District 9-1-1 (District) pursuant to the authority of the Texas Interlocal Government Cooperation Act, Article 4413(32c), V.T.C.S. WHEREAS, pursuant to Article 1432 (e), V.T.C.S. , the District has been formed and is a political subdivision of the State of Texas; and, WHEREAS, Brazos County is also a political subdivision of the State of Texas authorized to enter into interlocal cooperative governmental agreements; and, WHEREAS, the Brazos County Commissioners in public meeting find that it is mutually beneficial for the County and the District to enter into an agreement for the District to perform for the County, Emergency Communications Services Dispatching; NOW THEREFORE; IN CONSIDERATION of the mutual promises to each other made hereinafter, the undersigned parties agree as follows: Effective October 1, 1996, the District is hereby appointed the emergency communications dispatching authority for Brazos County for the period October 1, 1996, through and including September 30, 1997. The District, shall be responsible for providing a functioning computer aided dispatch system to the County. -1- The County agrees to pay and the District agrees to accept as compensation for the services provided a flat fee of one hundred forty four thousand one hundred and by ($144.140) and N01100 DOLLARS. The County shall pay the full amount due within ten days of invoice from the District. All payments shall be subject to the Texas Prompt Payment Act. Should there arise any dispute, disputed amounts shall be deposited in a mutually agreed upon escrow account until a resolution. District employees shall not be considered as County employees. The County and the District understand and agree to be subject to all the laws, ordinances and regulations which govern and affect Emergency Communications Dispatching and National Crime Information Computer network telecommunications as promulgated by the State of Texas or the United States Government or any of its appropriate Agencies, such as the Texas Department of Public Safety or the Federal Bureau of Investigation. This agreement is made in accordance with the Texas Emergency Telephone Number Act, Section 772.301 et seq., Texas Health and Safety Code. Each of the parties to this agreement agrees to hold the other harmless for any and all claims of whatsoever nature or kind which may arise as a result of that party's fulfillment of this agreement. Each party hereby empowers and authorizes its Chief Administrative Officer to be signatory agents for any required documentation to implement the intent of this Agreement. This agreement contains all of the commitments and covenants of the parties and any oral or written promises not contained herein shall have no force or effect to alter any term or condition of this agreement. This agreement may only be modified or amended in writing by the mutual consent of the parties with said modification being attached to and incorporated into this agreement by this reference for all purposes. k , 4 i L ip t i -2- d r i _ y C~ F.~ SIGNED this 11th day of September, 1996 A. D. BRAZOS COUNTY EMERGENCY COMMUNICATIONS DISTRICT 9-1-1 BY: y A C. ti.e~ R. is " Ho mgrecrti0_ Chairman, Board of Managers ATTEST: BY: -tom - W t rd Secre o he BRAZOS COUNTY, TEXAS BY: A Jorles County Judge ATTEST: BY ary A ar County Clerk -3- VO ~ .~'Ia►Gi~ ~ ' V II • 5 - a t• Federal Pass 711 811 Misc. Contract: Gram Funds CPDA M ADD Charge Number: Sere Gram Funds PIN: 1746000433000 TEXAS HIGHWAY TRAFFIC SAFETY PROGRAM GRANT AGREEMENT THE STATE OF TEXAS THE COUNTY OF TRAVIS THIS AGREEMENT IS MADE BY and between the State of Texas, acting by and through the Texas Department of Transportation, hereinafter called the Department, and Brazos County , hereinafter called the Subgrantee, and becomes effective when fully executed by both parties. For the purpose of this agreement, The Subgrantee is designated as a(n) local Government. AUTHORITY: Article 6701j-1, Texas Civil Statutes, known as the Traffic Safety Act of 1%7, and the Highway Safety Plan for Fiscal Year 2L. WITNESSETH Project Title: CPn to Minor Stine Program Brief Project Description: to o2craw mobile videos in establishments to determine a sell of alcoholic bevera= to minors and to file criminal or administrative cases on the sellers/servers. AGREEMENT t i i Grant Period: The Grant becomes effective on 10-1-% , or on the date of final signature, whichever is later, and ends on 9-30-97 Maximum Amount Eligible for Reimbursement: $ 45.000.00 from Fund Source: Federal 402 6 Estimated Budget: Federal State Local Labor $ 20.106.00 12.540.80 Other Direct Cost 24.894.00 2.475.00 Indirect Cost TOTAL $ 45.000.00 15.015.80 Project Year: 97 . In addition to the Standard Provisions of the Agreement that follow, the following attachments are incorporated as indicated as a pan of the Grant Agreement: Attachment A. Approved Project Description Attachment B. Approved Project Budget Attachment C, Standard Assurances Attachment D, Debarment Certification _ Attachment E. Lobbying Certification Vet PAQE //e c t f «"~-""`u: ....~~_..~._~c:~w~.....~~:...,~+~(..:....~.'r...'a.:,..(~.~,ru~:~s,(%~4 '~.~•~a•l.?y~ys.~•~,+,~.~'-i~ ••ty.'r~ t ~ ~ ~ i 1 ' -I IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED DUPLICATE COUNTERPARTS TO EFFECTUATE THIS AGREEMENT. THE SUBGRANTEE THE STATE OF TEXAS Brazos County [Legal Name of Subgrantee] Date By [Signatur Alvin W. Jones, County Judge [Name and Title] September 17, 1996 Executed for the Executive Director and approved for the Texas Transportation Commission undcr the authority of Minute Order No. 82513 and Admin- istrative Circular 26-93 for the purpose and effect of activating and/or carrying out the orders, established policies or work programs heretofore approved and authorized by the Texas Transportation Commission under the authority of Minute Order No. 100002. By District Engineer Texas Department of Transportation (For local projects wrier S50,000 or recommended for approval for grants 550.000 or greater.) ATTEST: Date A~ltJj/_ lill79 ~G(/tstt~ [Signature] Mary Ann Ward, County Clerk By [Name and Title] Director, Traffic Operations Division (Not required for local grants wider 550.000.) Under authority of Ordinance or Resolution Number (for local governments): & Date Mailing Addresses For the purpose of this agreement, the following addresses shall be used to mail all required notices, reports, claims, and correspondence. (NOTE: For warrants, the address indicated by the mail code, last three digits of the PIN on page 1, shall be used. U that address Is not appropriate for warrants, please change the mail code accordingly and notify TxWT of any changes.): For the Subgrantee: For the Texas Department of Transportation: Mr. James M. Kuboviak Sarah C'hamherlantl T.C.S. Brazos ['p Into Attorney's artment of Transportation Office ySrera ~ QtiQ - 300 C 16th Sr Ste 325 1300 N. Texas Avenue Haan- TX 77803 R[yan TX 77803-2760 VOL ~ . _ PAGE STATE OF TEXAS COUNTY OFBRAZOS This agreement is made between BRAZOS COUNTY, TEXAS, hereinafter called Lessor, and PRAZOS VALLEY ART LEAGUE, hereinafter called Lessee is as follows: Lessor, the Owner of the Brazos Center, a multi-use building and the adjacent grounds has agreed and does hereby agree, to lease and demise unto Lessee, a portion of the Brazos Center, hereinafter described, upon the following terms and conditions. 1. Lessee shall be entitled to the space allocated to it by the Director of the Center for a term beginning October 1, 1996 and ending September 30, 1997. The space allocated to Lessee is described in Attachment "A" hereto, which has been signed by the Director of the Center. 2. A. In consideration therefore, Lessee agrees to pay the Lessor on the first day of each calendar month during the term hereof, in advance, the sum of $50 representing the agreed monthly rental for use of such space as herein set forth. B. In addition Lessee has permission to use Concourse and other space needed which has been scheduled with the Brazos Center for three art shows per year. Two shows, the Juried Art Show as well as the Nature in Art Show are to be the responsibility of Lessee. At least one other show, thrr Youth Art Show, has permission to use similar space scheduled with Brazos Center agreement if Lessee has agreed to serve as prime consultants. 3. Lessee agrees to arrange and hang work of local artists on a continual basis in Showcase Ill. Artists works chosen to be spotlighted are the sole responsibility of Lessee. At least six artists per year will be featured. 4. Lessor shall furnish all utilities, including gas, water and electricity. 5. Lessee will pay the regular User fees for space used by it, other than space allocated to it under this agreement. 6. Lessor does not provide and will not provide furnishings, custodial care, or maintenance of the space allocated to Lessee under this agreement. 7. Lessee shall take good care of the space allocated to it, reasonable wear and tear only excepted, and shall surrender the premises at the termination of this agreement. 8. Lessee agrees that no improvements to or alterations to the space shall be made without the consent of Lessor in writing. E V0L_'T____JPA(3La0, i ~ 9. Risk of loss of all property owned by Lessee shall remain with Lessee, it being understood that Lessor will maintain no insurance on such property. Any insurance desired by Lessee on Lessee's property shall be purchased by Lessee at its 01 expense. 10., Lessor shall not be liable to Lessee or the Lessee's employees for any damage to person or property caused by the negligent act of Lessor, its agent, servants,or employees or due to the act of any other tenant in the building, or due to any defect or want of repair in any part of the building of which the allocated space forms a part. 11. Lessee agrees to hold Lessor harmless from any and all claims, damages, expenses, including attorney's fees, growing out of or arising from any negligent act on the part of Lessee, its agent, servants or employees. 12. No sign shall be placed at, on, or about the premises by Lessee except with the approval of the Center Director in writing. IN TESTIMONY WHEREOF, the parties to this agreement have hereunto set their hands in duplicate, the day and year written below. BRAZOS COUNTY, TEXAS ALVIN JONES, B ZOS COUNTY JUDGE LESSOR y-/7-f DATE BRAZOS VALLEY ART LEAGUE oj~,~21,L PRESIDENT, BRA S VALLEY ART LEAGUE LESSEE 27 17 BAT ma a JAI. r •a%• THE FOLLOWING DOCUMENT IS THE BEST IMAGE POSSIBLE DUE TO THE POOR QUALITY OF THE ORIGINAL _---Own ' I ~ i , r Ururcrcw Tknr . + Bryan, Tcad 77802 • ' 409 776.9))8 t ,nnnnn~ STORAGE HALL STORAGE SERVERY - YMT OR 10TCHEN MEN F m wOrrEN F OADING a b P3 STORAGE • ! RECEIVING - - - - - 47 STORAGE RAMP FA C: d t t N.,. ASSE11BLY IV ASSEMBLY I PLAT/OM ASSEMBLY II STAGE r 3 SSEMBLY III FSfLAY oISP`AY Jl~~l DISP AY I~ 0 h ,4L U U - -~l • 0u » 108 106 0 0 -r•I N >o Studio , S. Studio II KIM E,, i z u r4 CORRIDOR x U 105 a H CLASSROOM H a OFFXE OFFICE a E 0 ECTURE / o CT ¢ NEARSAL cc 102 0 s G .0 S s _ p +J CE RECEPTION OFFICE STORAGE •rl V O CONCOURSE r•i rl SE DISPLAY CONCOURSE - DISPLAY tb Q1 3U bto ~VLNOm vENDNc VESTTBUI,E JAN VESTIBULE (NTRr ~i 0 v 11 f F. ESfEA1LE . JAN ST E rRK1Na •ra N 4) ID 0 L L ak LAI, TIC ET /r CCNCF SKM -T"E Af A m MEN LW jT I S ES SALES Tn m MEN WOMEN STORAGE STORAGE , L-10 w.f I.~ly 1 • • ...p,.ii v. i. ..+~..Z. Y•M •.w+.•. F ....c, ..-_u...uwA.r+Idnrw:+M.li,~Ae.,~,.•raua.er.wr 9-12-1996 8:27AM FROh1 TAMU COLL. OF ARCH 409 845 4491 M ~.Y • 1 N„ TEXAS A&M UNIVERSITY College of Architecture Landscape Architecture and Urban Planning Memo of Understanding for Consulting Services This is a memo of understanding by and between Brazos County-Grounds Maintenance Division and TAMU College of Architecture for consulting services and fee payment as described herein: Services to be provided to Brazos County: Survey and assessment of the landscape needs for the Juvenile Services Center. Supervision of Graduate Student(s) work relating to the Juvenile Services Ccnter landscape plans and implementation thereof. Signature of approval on final working plans for both landscape and irrigation. Professional services to be provided by Jon Rodiek, Ph.D., ASLA of the TAMU College of Architecture. Consulting fees of $4,400 will be paid to TAMU College of Architecture as follows: $2,200 on or before November 1, 1996 $2,200 on or before March 1, 1996 Due to the professional nature of the services described herein, standards of performance have been agreed to by both parties as outlined in Attachment 1 (revised June 25, 1996). Judg lvin Jon Date Jon R 'ek ate TAMU College of Architecture VC3 YAUb, 114L ism 0.0 ,n•r+ C- •.M. 0.1 110. .a.w. wn.n P. 2 0 r E, 1997 a iW , i • S i a r~ 1 I Introduction The following proposal outlines the work to be accomplished in order for a planting Master Plan to be produced for Brazos County Events Facilities. The planting Master Plan will be presented in three phases. 1. In phase one a base Master Plan will be developed at an appropriate scale so that a site preparation plan can be delineated. A site preparation plan will identify the following tasks: 1. Reuse of cidsting soil, plants, rocks and building materials so as to enhance the design character of the site. 2. Stockpiling of on-site construction debris and excess materials left from building construction. 3. Stockpiling of construction materials related to the plant master plan implementation. 4. Protection of on site trees, drainage ways, natural areas. 5. Pruning of existing on site trees to achieve desired design effect. 6. Stakeout and grading of special areas prior to actual construction. II. In phase two a master planting plan will be presented at a scale of 1: = 40'- 00". This plan will include all trees, shrubs. sod areas, hydromulching areas and wildflower areas to be located on the site. This phase of work will include a complete plant list which specifies the genus, species, common name, quantity, size and special conditions necessary to carry out the plan on the site. Also planting details for all tree and shrub types will be developed. III. In phase three a master irrigation plan will be presented at an appropriate scale. This plan will include irrigation pipe layout, irrigation head size and scheduling. Also construction details will be developed. Schedule of Activities T Ww Period Tasks September, 1996 Base Plan. Site Inventory, Plant Palette Selection. Site Preparation Concept Development October. 1996 Develop Planting Program, Develop Irrigation Program, Preliminary Final Master Plan November-December. 1996 Create working drawing details, Present Final Dec. 10. 1996 January. 1997 Revision if necessary February-May. 1997 Field support if necessary va 11 r I , i • S~ 1 2 Scope of Work The Planting Master Plan shall include a planting plan that comprehensively describes the construction of a landscape plan for the Juvenile Justice Center. which is divided into three related areas: 1. The employee parking lot on the west side of the building, 2. The back area of the facility, the loading area. and 3. The surrounding grounds or open field area to the north of the building. L# The planting plan will be derived using a low maintenance concept Low maintenance does not mean "no maintenance". It means a realistic amount of maintenance will be applied to the site in a judicious manner. This concept requires the selection of native plant species, and low maintenance plant species requiring low to normal amounts of irrigation and light-schedule cultivation, pruning, mowing and cutting. The entry signage area will be designed so as to carry out this low maintenance concept. This area will be given the attention a public entry requires. A quality visual image will be, created along this entry so as to modify the perception of the facility as being a totally negative place to be. Rather it should be portrayed in terms of its landscape elements as part of the cultural and social fabric of the City of Bryan. Tree and shrub selection will be based on a survey of the local surrounding plant communities. The selection will also be based on the availability of plant materials from within the central Texas region. An irrigation plan will be developed so as to keep the grounds in the primary, secondary and tertiary area under the same kinds of supplemental watering. Leery effort will be made to conserve water and limit Its use over the growing season. Client Meetings We wish to have at least three meetings with the client representative. An initial meeting should be held in early July to review the proposal and to visit the site. A mid-project meeting should be held to review progress being made in late October. A formal presentation of the Master Plan might be held around December 10. 1996. We can have subsequent meetings as required given proper notice in advance. We have scheduled the months of February and March as supervision time. We will meet on an as-needed basis at that time. 1 P 4 - - - ` ..ice .r.a....`r1~+_ ~..~_L.1`- ~ S ..~+L~.al t ' a(•L ~ _-~i ~x"+-irua.a~•l~G~[i`aL][f~..~i f--~.nC 1~ .i i ' - ' Y MANGE ORDER OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Brazos County juvenile justice Center CHANGE ORDER NUMBER: 08 (time, address) Bryan, Texas DATE: August 26, 1996 CONTRACTOR: Chappell Hill Construction ARCHITECT'S PROJECT NO: 94010 i (time, address) PO Box 602 Brenham, Texas 77834-0602 CONTRACT DATE: March 27, 1996 i CONTRACT FOR General Construction The Contract is changed as follows: Per ASI No. 07 - the raising of the roof will increase stud height by 2' and increase the sheetrock on each side of the wall by 1640 s.f. (This Includes the Genera/ Contractor's mark-up). ADD $ 1,052.10 Per ASI No. 12 - lowering the ceiling in Kitchen 301 will eliminate 81 s.f. of sheetrock. - DEDUCT $5 1.00 • TOTAL ADD $ 1,001.10 See attached information. Not valid until signed by the Owner. Architect and Contractor. The original Contract Sum was $ 5,453,618.00 Net change by previously authorized Change Orders $ -61,955.17 The Contract Sum prior to this Change Order was $ 5,391,662.83 The Contract Sum will be (increased) (dea eased) (and ange by this Change Order in the amount of $ 1,001.10 The new Contract Sum including this Change Order will be $ 5,392,663.93 The Contract Time will be (increased) (decreased) (unchanged) by Zero (-0- ) days. The date of Substantial Completion as of the date of this Change Order therefore is June 13, 1997. NOTE. This summary does not reflect dar+ga is the Contract Sum. ContractTime or Guaranteed MoiYun Price why have been authorized by Construction Change Direcbve. Croslin and Associates. Inc. Chappell Hill Construction Brazos County Commissioners Court ARCHITECT CONTRACTOR OWNER 1114 Lost Creek Blvd, Suite 430 PO Box 602 300 East 26th Street Address Address Address Austin. Texas 78746 Brenham, Texas 77834-0602 Brvan Texas 77803 BY BY BY Q date $28196 data ✓ 3 date ~f - 7- 4 G t~►1. PAU E..~~.~., - /22 '96 e3'e4PM A Ij;&c vSH SYSTEMS. INC P.O. BOX 690269 Houston, Texas 77269-0269 (713)937-8019 Fax (713)937-0717 August 21.1996 I Mr. Glenn Wehring Chappell Hill Construction Company RE: Brazos County Juvenile Justice Center ASI# 7 Dear Glenn, f It appears ASI 0 7 raises the roof deck by 2' at ell of Segment "C* except for ! Multi-Purpose Facility 300. This change will increase our stud height by 2' and ' also add two additional feet of sheetrock on each side of the wall. ASI # 7 will result in an Add of One Thousand One Hundred and Twenty Four Dollars 1 ( S 1.124.00). Please advise with a'written change orde'r• by August 28,1996 if this ASI will be accepted as it will affect the length of metal studs we will be ordering. This change affects 471 I,f of wall and Increases the height of 400 metal studs by 2' and also adds 942 square feet of sheetrock. incer ly. Adrian ip) Anderson VIA FAX BRAZJuv7 As1 I~ 1 I E P.2/3 I. I. VoL. 'F.-~-JPAQ k- IL m~rrrwswr.+r-c""- - - .o...-.rte .~...~wM.~....- - _T _ , _ - - - - aw,• THE FOLLOWING DOCUMENT IS THE BEST IMAGE POSSIBLE DUE TO THE POOR QUALITY OF THE ORIGINAL 23 '96 03:39PM CHAPPELL HILL CONST. P.1/1 CROSUN ANO ASSOCIATES. INC. Architecture and Plannin 1114 Lost Creek Blvd, Suite 43 Austin, Texas 7874 (512) 328-9551 Fax 328-955 FACSIMILE TRANSMITTAL FORM To: Glenn Wehring Dam: August 23. 1996 Company: Chappell Hilt Construction Fax No.: 409-830-1363 ! ^ i U From: Larry Miller Project No. 94010 .y Subject: Maros County Juvenile Justice Center Pages: I (wdudin& cover thett) Remarks: Glenn - we have received your transmittals regarding Applied Finish Systems and the drywall situation and the transmittal regarding Austin ConstrLdon Steel and the additional 4olumn.steel. I . Applied Finish Systems revisions: We did a quick calculation of the walls affected by the raising of the roof i ' structure and carne up with approx. 370 linear feet. Are we missing something? ` 2. Austin Construction Steel's additional steel needed to raise the roof: The total cost of $ 1,707.60 is acceptable. This amount will be deducted from the total amount per STRUCTURAL STEEL NOTE 4. Per Note 4 - Allow 4 tons of additional structural steel/$1900 = $ 7,600.00 Less additional (S 1.707_.64) Remaining in allowance $ 5,892.40 S~Z3 l . ~ . Lary - po o/n.., ;z yr. ✓ed@ e mP ~ " l f 7,4- 1 Q' D O v Consider this as the Original j if you did not receive all pages, please dl (512) 328.9551. i • a . r . ~ . r .....tel.. _ L ti • , i r 22 '96 03`05PM ii.-HN4,W1STafSH SYSTEMS. INC P-O BOX 690269 / Houston, Texas 77269-0269 ' (713)937-8019 Fax (713)937-0717 { August 21,1996 i ! ? Mr. Glenn Wehring Chappell Hill Construction Company I RE: Brazos County Juvenile Justice Center ASI * 12 f Oear Glenn, i • ASI 0 12 only affects our work In Kitchen 301. We wil be eliminating 81 s.f• of sheetrock on the kitchen walls for a Deduct of Fifty One Dollars ( $ 51.00 Please advise by written change order if we are to proceed with this work Incerely Brian ( hip) Anderson i iF 1 VIA FAX BRA UM ASI { I r I I P.3/3 i i { i I ' I 1 I V0 .~►aa~ .l...,D •L•-3 ~ ' .3u ~ a:. cti..~Yi.;t.Jt.3 = _ .rte...-.~. _ _ _ _ _ . , . L L .I 4 GARY NORTON RANDY SIMS Precinct 1 Preanct 3 361-4106 Brazos County Commissioners' Court 361 X105 3 WALKER JONES ALVIN W CAREY CAULEY Prednd 2 . Precind 4 361.4115 JudQe 361-4111 361.4102 September 18, 1996 Mr. Glenn Wehring Project Manager Chappell Hill Construction Company P. O. Box 602 Brenham, Texas 77834-0602 Dear Mr. Wehring: Enclosed is a fully executed copy of Change Order No. 08 for the Brazos County Juvenile Justice Center contract (CHCC Job #178). This was approved by the Commissioners Court on September 17, 1996. Also, by copy of this letter, 1 am forwarding a copy of this document to Lary Miller of Croslin & Associates, Inc. Sincerely, Susan Gandy Administrative Assistant copy: Mr. Richard Vance Brazos County Courthouse • 300 East 28th St. • Suit 118 • Bryan, Texas 77803.5327 • Fax: (409) 823.6993 Lr 1 r , r t i 1 i~ d, ~ APPLICATION UNITED STATES DEPARTMENT OF ENERGY REBUILD AMERICA PROGRAM ENERGY CONSERVATION COALITION Alvin W. Jones , duly authorized representative of Brazos County request that the Energy Conservation Coalition (ECC) conduct a no cost preliminary survey of our facilities to identify possible cost effective Facility Upgrade Measures. These measures along with Operation and Maintenance (O&M) modifications will reduce our utility costs and will assist in funding our facility upgrades. I understand that after identifying the cost effective Facility Upgrade Measures, my organization/company will receive a Preliminary Facility Survey Report at no cost or obligation. I also understand that my organization's staff will be instrumental in choosing the Facility Upgrade Measures identified for further detailed study if we decide to go forward with the project. However, we will give every consideration to implementing the recommended upgrades. Z- Signat of -authoo(zed County Judge Title Brazos County Department Brazos County Organization/Company 300 East 26th Street, Ste. 114 Address ' Bryan, Texas 77803 City/State/Zip-code I Ed Dobbins Contact Person i• (409) 361-4460and fax - (409) 823-6993 r Phone Number/ Fax Number G a k , VO :Aar , /3 ' r k f /1~ BRAZOS COUNTY BRYAN. TEXAS SUPPLEMENT TO INDEPENDENT CONTRACTOR AGREEMENT WHEREAS, Brazos County, Texas, acting by and through its duly elected Commissioners Court (hereinafter "COUNTY") and Junction Five-O-Five, a Texas non-profit corporation (hereinafter "JUNCTION"), executed an Independent Contract Agreement dated the 17th day of November 1992 for the establishment and management of recycling centers in Brazos County, Texas (hereinafter the "Agreement"); and WHEREAS, it was contemplated by the parties that additional recycling center sites would be added over time to be operated upon the same terms and conditions set forth in said Agreement. NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS, that for and in consideration of the mutual conditions and covenants herein set forth the receipt and sufficiency is hereby acknowledged, the parties hereto agree as follows: 1. To add to the list of recycling center sites to be operated pursuant to the Agreement the sites(s) described on Exhibit "A": attached hereto and made a part hereof for all purposes. 2. COUNTY agrees to pay JUNCTION the sum of One thousand one hundred eighty six and 50/100 Dollars ($1,186.50) per month for the services to be rendered by JUNCTION at the site(s) described pursuant hereto and the Agreement. In all other respects the terms and conditions of the Agreement remain unaltered and the parties hereto confirm, ratify and reaffirm the terms and conditions of said Agreement. Dated:} - 17 1996 BRAZOS COUNTY, TEXAS By. Alt-in W. on , County Judge JUNCTION FIVE-0-FIVE By: VOL. YAU h. 'JZDSWAWAW-C~ Alm i j-06/21/96 06:43 V409 775 0433 BRAZOS CO RD&BR It 002 NIE'Jl'ES ANA BOUNDS DESCRIPTION OF A 3S38 ACRES TRACT JOHN H. JONES SURVEY A-26 BRAZOS COUNTY, TEXAS Metes and Bounds description of all that certain 3.538 acres tract orparcel of land, lying and being situated in the John H. Jones Survey. A-26, Brazos County, Texas and being composed of Lot 1 of the Marshall C. Peters Subdivision dated May 10, 1944 and recorded in VOLUME 129, PAGE 37 and conveyed to Merion Ellis by Virgin Howard Litchford on November 4, 1965 and recorded by Deed in VOLUME 250, PAGE 622 and a 1.03 acres tract dated November 24,1981 and conveyed to Merion Ellis by Norman F. Godwin in the Deed Recorded in VOLUME 501, PAGE 550, both said tracts recorded in the Deed Records of Brazos County, Texas, said 3.538 acres tract being more particularly described as follows: REGDMUNG at a found 1/2" iron rod lying in the northwesterly right-of-way line of Highway No. 60 marling a common comer of said Lot 1 and that of Lot 2 of said Marshall C. Peters Subdivision, from said iron rod a 1/2" iron rod marking a common corner of Lot 3 and Lot 4 of said Marshall C. Peters Subdivision bears S 45° 04'20" W. 478.93 feet (called 478.7 feet); THENCE N 45° 33'01" W, 805.55 feet (called 807.0 feet) along an old fence line marking the common line ofsaid Lots 1 and 2 (said fence also being the northeasterly line of Paul S. Garcia called 1.395 acres tract and also of the Mary Garcia 1.395 acres tract. said two tracts being part of the original Manuel G. Garcia et ux 3.8 acres Lot 2 tract recorded in VOLUNX 118, PAGE 18 of the Deed R(xords of Brazos County, Texas) to a 12" iron rod set for comer in the southeasterly line of the Merion Ellis 1.00 acre adjoining tract recorded by Deed in VOLUME 297, PAGE 591, said 1.00 acre tract also being part of the 6.394 acres reserved tract of the Briarwood Retreat Subdivision recorded in VOLUME 288, PAGE 637, both dead and plat part of the Deed Records of Brazos County. Texas; , R t. THENCE N 45° OS 34" F., along the said southeasterly line of said 1.00 acre tract and also of a remainder 0.394 acre tract now or formerly Edna Mae Collins and also being part of the said reserved 6.394 acres tract, passing at 32.64 feet the southwesterly side of a 14.35 by 24.19 feet dilapidated wood shed, the west corner of said shed lies 2.35 feet on the said adjoining 1.00 acre tract, passing at 56.80 feet the northeasterly side of said shed, the north corner of said shed lies 3.35 feet on the said adjoining 1.00 acre tract, passing at 77 feet the unmarked common comer of the said 1.00 acre tract and that of the said 0.394 acre tract, passing at 134.90 feet a found 1/2" iron rod marking the north comer of said Lot 1 and also marking a common corner of the said Briarwood Retreat Subdivision and the Brushy Paris Subdivision (dated Mauch 1982 and recorded in VOLUME 517, PAGE 703 in the Deed Record of Brazos County, Texas) continuing for a total distance or 195.84 feet to a 12" iron rod set fur comer in the southeasterly line of the Rick Pdasota Lot 2, Block 2 of said Brushy Park Subdivision, the same being the west comer of the Ricky Palasota Lot 3 of said Block 2, both Lot 2 and Lot 3 recorded by Deed in VOLUME 1034, PAGE 701 of the Official Records of Brazos County, Texas; oow9s.r.ot•taeuse) ~ VOIL -.vai.+J+:`b~: .:6W✓"'~_ _t":'3i~+.•.:.~lu.--_d1YY.~u1.1~..G. Y. L....a~a --y - ' 68/21/98 08:44 t i I a i 3 s i i V409 773 0453 BRAZOS CO RD&BR THENCE S 4410 54' 26" E along the southwesterly line of the said Brushy Park Subdivision passing a 260.36 feet (called 260.53 feet) a 1R" iron rod marling a common comer of said Lot 3 and that of the S. W. D., Inc., 5.00 acres tract called Lot 14 of Block 2 of the said Brushy Park Subdivision and recorded by Deed in VOLUME 501, PAGE 803 of the Deed Record of Brazes County, Texas passing at 805.16 feet a 1R" iron rod marking the south corner of said Lot 14 continuing for a total distance of 805.50 feet to a point for comer on the said northwesterly right-of. way line of Highway No. 60; =NCE S 45° 05' 34" W along the said northwesterly right-of-way line passing at 50.42 feet an unmarked common corner of the said 1.03 acres tract and that of said Lot 1 continuing for a total dismnce of 186.80 feet to the PLACE OF BEQINNINC containing 3.538 acres of land more or less. DECEMBER 1995 Municipal Development Croup College Station, Texas Basis of Bearing: N 44° 54' 26" W, marking a southwesterly line of the Brushy Park Subdivision recorded in VOLUME 517, PAGE 703 of the Deed Records of Brazos County, Texas. This survey was perforn professional current cBna d on the ground under my substantially complies with the ory IA, Condition IV survey. 5 No. 4756 ®003 i~ r THE FOLLOWING DOCUMENT IS THE BEST IMAGE POSSIBLE DUE TO THE POOR QUALITY OF THE ORIGINAL 1 4 1 y EUDIC111,3 ut DOES M01 tY WIION TNI sists Or 9 um : Tlti s0'AkwESTERLY LI< Or 00 PLAN AS GRAPHICALLY DEPICTED BRUSHY PARK SUBDMSM. CO-LED N W' S4.1C Be, BLOCK 2 AtM COIIMIINIY Pwn wD. 4acDIC01000 AS OEPKIED Dr Pul A[[ORDED k BRUSH PARK YADCN 19IDIVISM VOLUME 517. PAGE 103 VOLUME 517. PAGE 1113 (I i r 100 0 100 LOT 3 I LOT 14 ~ 0/f LOT 1 NLAMA PAN" roo Yt~uK~MO. H U ~ Scale I° = 100 Il YaucC1D34 I 1 KT I/f am Boo-1 0.w I 1/r an tIN 1/f IAw11 tow [~rC cwa us Mx M.. . (71 I *411 111. .T _ g ;q 3 . I J j~ I j . I 1 0111 N NN N1N••ININIMNM.IN. ECOR 8, CON IDN IV SURVEY S 475f A CALUD I403 ACRES TRACT ;R C, VA p JOHN H. JDNES SURVEY NO. 16 O '9/T1 Orr. <I'Y ,,•'1F I~l . 97~ Mti BOA COUII Y03 C"', 1W1 • T, f 'JO' I .1 D HN C. PETERS eiAeitr iew Dc.~ r IA 1 REGISTERED PROFESSIONAL LAND SURVEYOR NO. 4756 tw MM a c...«I M.D.G. No. AB026-395-1691 INS n1s O 1isli4 U 0391 AC.tEI oom % - - ( IDRt Cams Is 61P'-T Or 6.314 AC RES. TRACT "S pn LINE YDwMC 2W PACs ~sT uuNmal n[e ~LLsPG1 _ -nl n nwu asf+«o~ ItrKC gDyg } /i 1 11[ f01. 1170 . - C Wow .11C0N{„k to Clktum TOMS . . • r7 aouol/r iM 100 fj tJ9 ID O TORt P011 TT u 1.00 AC. TRACT y 3 boat 6wD 7 N 1435 1 2110 = [°y Kraft 1U° ° °1A°°AR6 LOT I ~c2te i,tt L Vot"a M)WOOD SHED n~ 1QII[ 134 AI w • V) K low YfD10r1 411f I - tW1[M ~ Q % lis EST LQ.L If 46131 r - 1 PAUL S. DARCIA t Ste 1/f MAN ROD P«1 t WK rDfu 1.393 ACRES AS PER INNERTTANCE tQUND 1/1• UM f ~Mrl «I6it11LY BONSL D. GDLN Cl W) w am Cr Ga69-t07(j '1"' I) ` T" [ wt2 ub61 rAtc S f u h I 'ice MARY 6AACII 0 6.395 ACRES AS PER UORGiRANCf 3..DETAC h /alI OF r«w[aY wNU c. wa n wrl Ishum D 6 "1 l l 2 OF 3 D AQ[s / \v_\1 A wt 114 Mil 11 vOtWL114PACE 16 OD OUNO II-1K RptO 1/f tId1100 w 0 s 43 TAO' Note. THE 1.03 AM TWT Dag 1101 A1PEY1 TO SAVE KEN A CCAWCDCIAL A'NtYAN 02 AUTO SAAVACE YAM 114701(10 IT HAS A"MINTLI I or iBICN USID AS A CAIUAL JUIX D4SPOSAL AREAL 01umAl n.neml~'~- INS 7119 Lo7 201 1 UD M1 MOM MMSNALL C. iY AS 4µK14N AU AUTO TOsow UAIVACE IVY W NAYI NOICI f. AN SAID 1APPAPEYI.03 VN tdfE KCCO TYACI DID 0 VAXCAS(YE=M? SO 10i TO EftAMKI Dm RAW 1?p TISC OPUSM AMAZED 3O1µ9 COW. 111%NtwD A AND ADSAID, AS AS I NWDICAILD ATED BY 11; IRACC PY W PARS. pES s IT-7 CA•ICO N YaWR H1 PA" 126, ACC[PKD NLY M0. 3 RRI/.~L17 o tau~l A.;7Y, 7Yy fu,1 d U {NDOKD Ow fOND11if MACH CUDKNILT ll9 ILWAN ON SIT. L A ILAIO(EI LIECIN C 11 IIIC iCITY L* Wa UYAN µ /'fnaY ~ L tD M YOIUM [ 43. 10. PACE 3 30L CORP. 1 S. , 693J 1937 A I3' S' WIDE BAUSIIY MAIID SUPPLY RPi AYWED' { fANCa9 R CaOgtglf A o (OFT wl ECCATArrI[ INR to ruu[Itss Of ascrllm ~,IItI,t••~. IECOMES, N IOLOME SW PACE 204 WED ARIL U 1111 LAND TALE BOUNDARY SURVEY Q'r~A9TF t~, qF Sy 3.538 ACRE TRACT Too I * o ;N IS SURVEY WAS PERFORMED ON THE CROUNO UNDER so" capokm TO 11 N.N«•r•NINNNN......•N PROFESSIONAL SUPERVISION AND SUDSTAILTUIIJ.Y LOT 1 -t JOHN C. FIETF.RSQ PLIES WITH THE CURRENT STANDARDS FOR A YMSI•All UN PETERS SUDDIYISIOM YIAwE Ill. ►AK u v I THE FOLLOWING DOCUMENT IS THE BEST IMAGE POSSIBLE DUE TO THE POOR QUALITY OF THE ORIGINAL a r 'y, " r ' e '..4r ' t`", t^+,. ~w~.py'th'h 14v - ^ ^a.f^ „t, • ~ .rill' r' ' " z . Yi i ~M :t v.s a ev5 •.n a _ n [y-rLf1'. n.r) r S. . ,n v 1+, r-N , •cY _ r • r y, n?-f,., ..~"r H C '1~'n=Mv ras. k-c•.~ _ 'r r2;r r.h.w ~ •-5, aC'G ,T , - - 7 • + n, L ' • k t ' `r , .a ' , a , r' ~ ~ ) .r tit ' I, i~ r~'y p r ` r ' 9'1' tl Ip~ ' , r r Y ; . t C'd ^ - • = "dY' r, Y t t. V' f , l r rL % ,f' 't 1 - rV( ' rt ` Y • ' t r - , ' ' t `n ' ` ` t' . ..c . V• •'11 Y~ ' r , ' , - r t_ .L •'ry ' r ' -Y, t -ry~ = fi ~ ' u f' . '1 ' ~ it R' l n• -fir. - , r r ` , J ti i X 'J_ _ ' r.l , . ' ,i"iliri ,~^rr 1 ir Ywr[ l _'r l'- J" - A -rt^ - r ,i. . r l S 'p . w , ~ r r ' r- sY, ! ~ r. ^ _ f1 ^ ~ Yf 1 , r ~ r,f r , ` `n ' _ " , "1 .r \ " , 7 f r 1 , n , - r a = -J?r ry ' r r, r J,t f- • nl J Z' n , _ i I r r ^ cF r7 ~ , {r' .-.,r''t.'t fire . , r - r Y: i 6 ) ~ ' r _ 'r' _ ' - t `s r` , nor • } „ , r k t , Y t - . " l• r :J .-Y ~'•a - 'r ` ' • ` i ' 1 ,;:M1. ' i ; d I r_ ~ - ' n w ',r, • 1 •Y-1 . r' , ' ' • 'J ,F, ~'Y' . •+V _ ' ` ~ ' F, ` a kp , ` r., ,f~_ y ' 3' • ` J`, ' J 1[ 1, _ - 1 r e .1 , . , i 4)~, ' YY r 1 , • ` i -F r ~ , t " s ,t- 1 r ' l - 4 r J • i.a 1` - t , , ' , y ` . ~ r ~ ` - - , _ ^ A,j^ • w ' i ' f < r r 4 1 ~ , r J ^ , L ' , , ' , ' . M • ! ,i : , •1n , ~ r i • , Y n ` ` Z. M' • ` !t Y, - REVISED BID TABULATION 96-037 COURTHOUSE FURNITURE ! _ r• 991 tee cos9 EOS-Steelcaso c Fumiture-GF ice xpress tee case av n on nicor Delivery 35 aye Delivery 30 days Delivery 30-45 days Delivery 31 days a wary 4• aays Est ply Descnpbon Unit Price TOTAL Unit Price TOTAL Unit Price TOTAL Unit Price TOTAL Unit Price TOTAL Unit Price TOTAL 1 Executive Desk $ 641 14 S 641 14 708 24 S 708 24 °29 00 529.00 716 83 $ 716 83 235 00 235 00 NIB 1 Secretarial Desk wlLefl Return $ 93542 S 93542 1.03904 $ 1.03904 81100 S _ 81100 1.04585 $ 1.04585 34700 347 00 NIB 1 Secretarial Desk wIR ht Return $ 93542 $ 935 42 103904 $ 1.03904 811001 5 81100 1.04585 $ 1.04585 34700 347 00 NIB 4 2 Drawer Vertical Fie Cabinet $ 27543 $ 1,10172 255 52 $ 1.02208 .24400 1 3 97600, 30794 $ 1,23176 9900 396 00 NIB 2 4 Drawer Vertical fde Cabinet $ 408 00 $ 816 00 378 51 $ 757 02 34a 00 3 69000 45616 $ 912 32 13100 262 00 NIB 1 5 Drawer Vertical File Cabinet S 481 14 S 481 14 446 36 S 446 36 408 00 S -.440800, 53794 $ 53794 21900 21900 NIB 2 2 Denver Lateral File Cabinet S 32914 S 656 28 - 305 35 S-,-' 61070 324 00 $ 648 00 368 00 S 736 00 135 00 270 00 NIB 1 4 Drawer Lateral File Cabinet $ 56514 S 56514 546 51 S 548 51 556 00 S 556 00 63185 S 63185 177 00 177 00 NIB a 5 Drawer lateral fde Cabinet $ 66971 S 5,35768 621 30 S 4,97040 66000 S 528000 748 77 S 5,99016 36500 2.92000 NIB 11 Bookcase S 264 57 $ 2.91027 245 45 $ 2 699 95 - 21000 ,$''52,310 001 295 80 $ 325380 9300 1.02300 NIB 1 low Beck Executive Chair $ 404 57 S 404 57 386 99 S 1 ^386 M 513 00 $ 513 00 426 77 S 416 77 144 00 144 00 NIB 3 Side Chair S• - 721486 S-'-,.4644 58 220 53 S 661 59 33100 S 993 00 19166 $ 574 96 106 00 318 00 NIB 7 Secretarial Chair S 31029 S 2.17203 286 86 $ - 2,008 02 32000 $ 2.24000 323 27 S 2,26289 110 00 770 00 152 00 $1 064 00 1 Secretarial Char wl Arms $ 37314 $ 37314 34617 $ ' ' 34617- 36700 ,S 367 00 393 55 $ 393 55 126 00 126 00 NIB 3 H h Beck Executive Chair $ 706 29 $ 2118 87 678 55 $ 2 035 65 ._,61400 41,842 001 73727 S 2,21181 178 00 534 00 NIB 3 Stools S 418 86 $ 1.25658 = : 399 71. Slt„1,19913' 49600 $ 1.48800 44018 $ 1,32054 112 00 336 00 NIB t r 1 y , , y r Q~ i r. xi - r - J r , r, t Sly" IA F« _i~~'"','J . i : 1'~ ~ ~f TOTAL BY VENDOR 21,371.98 20,47619 20,462 00 23,29290 I,A24 00 1,064 00 WARD IS 64468 15 10,067 92 $ 1,377 00 TOTAL BY LINE AWARD + '•f{~) -`i-r3`'7.. ter' 7 , ^ ` , ' r k' r r ` , :wit r;+~ »-k• y'9 =;'ld + ~l+`'a - ){f a . ` +r✓< 4 i`-.i~"•-.,'..n... h i r', ESTIMATED COST TO AWARD LOW BIDDERS: $19,089.10 L Ik•s,,. '1 ! v~yj _ - • _ J r 4 . 1 . i ,~f 1 ~ r,~~• 'S , • r^' : 1,4 i^~ ~~tr^ 4, ' I.,, ' ' ~ ' Cs x.3,1 ' - . _ ,'r r , I'' ~ ,r t t ~ F „ r; , S ` ,.r 1 l ~ y'r • 'iA'• Y',~1 .r' ~'a:a , r .`v,=R'r'' - , c. _ •ir1+,~ *w. ^r :r.~ Y _r M p? 'J` i. r,: !',.%n•"; ,1 , ~~kr .r '\o~ ` r'^_'.,k'. [ r yf r j•X' ` C,;'"w, j, i~ 1 \ i, .1 r.,;.~M 4 •r rte,: .r r. 4 RECOMMENDATION. ~y!+At%' `'*L Tr'^r :~V,'J, DATE OF AWARD. 41 -150 ]SUckling Chair ♦ is 2500 IS 3,150 00 37 35 S 5,60250 6500 IS 9,15000 4400 IS 6 600 00 3600 5,400 00 NIB ; > Unaulltori:ed Stookess doft- tt ' w + ♦ a r ' 1;• ~ . ^ J Sat11t10n119 1630114M65 , , • r j,. , J' •F r r , i S' t J. - - ` - , ' , r i..Y'`,• J +i " '1 r v f r 1 k•`„ r4, =^f~ ' >v 'Lr .t 1 4• _ _ -,.-=1 __i.,y_-._-r-_r_-.---T-_ . .r i - _`r ;r. -1'-r_ •.r,~,_,-~ __~t'_,y. ',.y r~ i; 'S1-;'_r_~'1i M~k,-: _"'~.LT'•Y.3 f'~«_._ _ Y_ _ ` - r , i ' . t` , 1 + , . - 1r t ' ,k~ ' j J r i~' '-i' 3` - t ' `t; - r7 z ` r t,. , _ 1 rr "A• , - r'. Cd' - rl 5r fv i r . , S ' ! 7 . / I 1`•+ F l irk ^ 3 1'_ ' 9 ~ I J 'tr i- r ^ - ' ' yr` S y , ,'r • • ~ 9 , i r r: - 'rr `+r , r J„ `n,F,r r. -ti ^t 4••Y „1+ ,+J, t~' `k r l~ r , ,J, k _ • •f; ~~-'V' ' iry, dr d,+'r kr~, ( •M rlfr • V4, y ' 'tr r ?r" 4 J e . J- t• < +.r f,l-: ~t• ',r"• F ~ i d r' r ~f" ' r kr.r+ -Y 1 . . r a. ~ ,.i-7 t~~ n fN b> •r• d r, F ' , • J `r ,t ~ J 1 " ,i - , rry - EL•, - r . . ~j'rr 'r' .r , , ~ ` -y_ • ,t " !r , . r , t ; r ' _ 1~, 'I' , r '4^ - ti' f i r r,y v _ - .iM1 s -e rp^ r I • ~ p ,t Yl' r " ~ jlr I r - t - ' y ~i L ! , I _ 1. ' - C , ' + f V' n ~ r " t - R r , ' .'1 0 ' . 4 ' ' t;'i~, ` y',' ['r Y'•i1, 4 l" '.M1V' S, , ^a` `i` :r t li yZ .C ,5 d,.+ Z~ I t•''S,. ~S. ~rl .y' "rlr-• 1+ ~,`l, '4+ 'r, ' 'J ~ ix: t: t''`~' J.,J ~ ir_t _ n c/ ! , , -il - ,.•A ^ s• J^,f .H r. d ^r 4 y •.f~' t r , `yJ , Y • rd4'~ , , ,f ' rrw 1 .,t r r • - 1+4r, r• '1^ C`+c: ,f+- L Y^ j r h`, stir fr , " ,N~+ y,"i fi ,tr r l^ rr •ti. i^ , ui ~ r, ~c. } _ ,.ti .a - 'y, '7 < ) - r it ! • Si' , f"„ Y, ~ _ _ ! r r ' , t 1~ ; - ,.ti , f , _ : y Y J ' . , " J r J r J. r ' L:4 . , ~ - ~ I , ' i • y r Y . r`t`., -e.-f-v ..r.•.•w:^n, w-,.rr,_..-. ,,r,c-t ^.!]-^-utilr•n4r*' -w.-..,~»_- - ^ w-"•sr+uarl _ _:dr;.,..t •x'; 1 t:rt ";,5~•~L ;RY w•C' aLi j' 7 `v _ t", f r - , tr ' i •~4~ aF I ro 1 2 X11 ~r , , . i .J 4t' ~ d'r/[ .IrG+ ' f . ? .w -q' tr'• » r , ~ li - ' ~ , i - , , ^ ~ { , BID TABULATION N-M / JANfrOR1AL SUPPLIES - ANNUAL CONTRACT 19N-97 L PAPER GOODS Toilet Tissue Rolls Towels: Multitotd Pager Towels Rolls Paper Woes TOTAL SW shUroll,98 rollaft 9-1/24.1/2 White, 2 ply Boot COST Min. WL Cs.: 489 Min. WL Cs.: 249 Min. WL Cs.: 240 Min. WL Cs.: 200 PAPER BY Est Oy.: 3251boxes Est Qty 200 boxes Est Oty.: 25/boxes Est Oty.: 60/cs COMPANY APOLLO Bmnd%"ht BAY WEST 540 BAY WEST 480 BAY WEST -410 BAY WEST 3314 PAPER CO. Item/Product 0 BW 540 BW480 BW410 OW -3314 BRAZOS VLLY RotVPkgJCass 500/96 (420 cs) 200/20/4000 90/30(220 cs) 80110(140 cs) BRYAN Price/Caae $31.50,10/31/96 $14 90,10/31/96 $18.20,10/31/98 SU 00,12/31/96 TOTAL '510,237.50 $2,980 •$455.00 •$2,040 $15,612.50 CENTURY Brand/Weight +JAS. RIVER MULTILAYER JAS RIVER JAS. RIVER JAS. RIVER PAPERS Item/Product 0 132 55999 951 8670W BRYAN Ro1VPkg./Case 500/96(440 cs) 334/12 90/30(21.50 cs) 35/20(178 ca) Price/Case $3100 $1360 $18.95 $2800 TOTAL '$10,075.00 $2,714.56 '$473.75 '$1,680 00 $14.94331 RAY Brand/Weight FT. HOWARD FT. HOWARD FT. HOWARD FT HOWARD CRISWELL Item/Product 9 198 233 273 804-90 DIST. RoIVPkg /Case 500/96 250/16 (230 cs) 100130 75/15 BRYAN Price/Case $3395 15 85.NOV 30'98 22.90, NOV30,98 $51.00, NOV 30,96 TOTAL $11,03375 '53,170 00 $572.50 $3,06000 $17,836.25 GULF Brand/Weight FORT HOWARD FORT HOWARD FORT HOWARD KIMBERLY CLARK COAST Itern/Product 0 FH158 FH24990 FH27990 S570 PAPER RoIVPkg /Case 500/96 (380 cs) 250/16(230 cs) 100/30 1008/18 TEMPLE Price/Case $29 57-DEC t.98 $15.53-DEC 1,98 $20.29-DEC 1,98 $48.20-DEC 31,98 TOTAL •59,610 25 •53,108 00 $507.25 $2,77200 $15.99550 L a D Brand/Weight ATLAS ENCORE ENCORE ATLANTIS SUPPLY IteMProduct 0 505 480 410 570A ARLINGTON RoIl/Pkg /Case 500/96 250116 85/30(230 cs) 50118(09) Pnce/Case $28.59 $14.29 $15.95 $32.00 TOTAL $9,291.75 $2,858.00 •$422.20 $1,920.00 $14,491.95 - TALLEY BrandlWeight BAY WEST 540 BAY WEST 480 BAY WEST BAY WEST CHEMICAL IteridProduct 0 540 20841480 20771410 1257801/3332 MEXIA RoIVPkg /Case 500/96(cs 420) 200/20 90/30(220 cs) 125/8(180 cs) Pnce/Case $34.10 $1625 $20.81 $4450 TOTAL '$11,082 50 $3,25000 •$520 25 $2.67000 $17.52275 UNISOURCE Brand/Weight GPTM6120 SAVOY +GPMK596X CHOREMASTE GPHM9201CORONE FORT HOWARD 292-15 AUSTIN Item/Product 0 5134004 5154016(NAT) 5154035 5360026 RoIVPkg /Case 500/96 250/16 (230 cs) 90/30(210 ca) 90/30(07) Pnce/Case $3068 $1364 $1988 $1988 $14.42880 TOTAL $9.97100 •52,768 00 S 00 $1,19280 +514,388.80 RECOMMENDATION: V1~11 62CUf C(..111 AWARD DATE: C r R • - Price adjusted to reflect variations in size and/or quantity -Prices guaranteed until 12131/96 + Century Papers-Atlas Savrsoft Unisoume: Brand G.P. M8550 (bleached) Iteriute 168-1923 Item 111: 5154022 Sheets per pkg 500 Sheets per pkg: 250 Rolls per box 96 Pkgs per box: 16 Lbs/per box 30 Lbs/per box: 23 Pace per box $28 88 Price per box: $13 64 '59.386.00 '$2,728.00 • r ._..c._•• s..:: _ _.0... . - . ~ v _..+.+.-.+m~...-.a.,.`~...:i~ :..A.~' ....i~'11..+~..r.w .L~6iSa.i'rhv= - ~JES i r' „'4f-~i~~.llik Y.R~~ra.z...:..r. . `su: _u~•_ ..4• ems-.sue=Y~~_ - _ , Aok. THE FOLLOWING DOCUMENT IS THE BEST IMAGE POSSIBLE DUE TO THE POOR QUALITY OF THE ORIGINAL BID TABULATION 07t JANITORIAL SUPPLIES • ANNUAL CONTRACT 1""? L S, 1 i t b L TRASH LtFIERS 2 X 1e X Se 22 X 18X58 23 X 10 X 39 23 % 10 X 39 1 X D X 32 40 X 48 39x56 TOTAL Eat Qty.* 401= Eat Qy • 4a= ESL Oy • 2018 EaL Oy. . 201= Eat Oy 30ka Eat Oty Elva Est Qy : Efts COST 3 m$ 1.1/2 mo 1-112 m$ I nw ?"a 12 MxYOta 17 fro& w< LINERS BY 100 par b= 200 par box 150 par box ' 1000 per Cwt 1000 per box Mobs StP S.It COMPANY APOLLO Brand *SUNBELT 'SUNBEL *SUNBELT 'SUNBEL 'SUNBEL SUNBELT SUNBELT PAPER CO iwwSbdt 0 PT1658GY 38X56 81658BXMR 38X56 $39 WH HR 33 740 S39 MRBK 33x40 832LWBK 24X33 4046 12 MH PT16S8GY 38X58 BRAZOS VLLY Lxw LCa» 100 a XXHW(12W I0o= X Ayr (8 m$ bk) 150= x NvyVVpt(S m$ v#4 250 CS HVY(62 wA bk) 1000 Lot w (3 m$ bat) 250 CS 100 a XX Ay, (125 ma pry) BRYAN Prtca/Cese $2025 $1249 $1035 $1375 81820 81435 $2025 TOTAL $81000 $99920 9207.00 '51,10000 $546 00 $1,148 3507 50 $5,41770 CENTURY Brand CENTURY CENTURY CENTURY 'CENTURY CENTURY •HIMOLEN CENTURY/MOBILE-PT2.6070 PAPERS iwwStwk9 433.8120 4310538 433.8103 433-1061 433-0374 4334163 433.8383 BRYAN Lnara/Casa 100 200 1S0 250 1000 100 so Pnesicase $1300 $2048 311 9e $1300 $1983 $580 $1330 TOTAL $52000 $81920 $27960 81,040 00 S59550 $464 00 $79800 $4,47130 RAY Brand HERITAGE BAG HERITAGE BAG HERITAGE BAG 'HERITAGE SAO 'HERITAGE SAO HERITAGE BAG HERITAGE BAG CRISWELL lt@WStDck I 35X58ST 3SX58 33X39ST 33X39 24X32 UN 4OX48 H7856WS SILVER GIST Lr»n/Caso 100 200 150 250 500 250 so BRYAN Prtea/Caso $1375 320 50 81200 $1400 $995 $1750 111550 TOTAL SS50 00 $82000 $240 00 $1.12000 $59700 $1.40000 $93000 $5,65700 GULF Brand 'CARLISLE•STEELFLEX 'CARLISLE-STEEL FLEX 'CARLISLE STEEL FLEX CARLISLE STEELFLEX 'CARLISLE STEEL FLEX CARLISLE TENNECO COAST ItanVStm* 0 SFSM58XHR SF3858HR SF3339XHR(S n* SF3339MR 8F2423LR2 S404e12 58STL PAPER Lmarvesse 100 ( a rra) 100( 60 mr) 150 250 1000( 37 mf) 250 so TEMPLE Pr"Cass $1002 $751 $897 $967 $1245 $1290 $1231 'A' TOTAL $400 80 5600 so $17940 $77360 $37350 $1.03200 $73560 $4.09670 GULF Brand 'TENNECO 'TENNECO 'TENNECO 'TENNECO 'TENNECO 'TENNECO 'CARLISLE COAST Itomvstx t / PG84161 PG64151 39TL PG&4041 PL2-3323 KCXL4812 SF38USPR PAPER ld*ra/Casa 100(2 mi) 100 (15 md) I50( a mn 250 500 250 so TEMPLE PrKWCasa S2343 $1760 $338 $21311 812 82 $1178 $852 'B TOTAL $93720 51,40800 516760 $1.71040 $76920 $94240 351120 $6.44600 L a D Brand GP 'GP GP 'GP 'GP GP GP SUPPLY ttaMStod s C618 0516 C550 Coto 0004 MD020 C518 ARLINGTON LY»rslCaso 100 100 150 250 500 250 100 PrwalCass $1809 31809 $13.00 $1661 1141 $1665 $1605 TOTAL $64390 $1,28720 5260 00 $1,32880 ""so $1,33200 $4a1 50 $cola 00 TALLEY Brand OLLPAK 'ROLLPAK ROLLP 'ROLLPAK ROLLPAK ROLLP ROLLPAK CHEMICAL 1tamlSbck6 15e1051PR58150GR 15020WMX2006 15671MX204OW 156605/RH1440N 1576051RHOM 156905IRM1646N 15E2o5/Mx2oa6 MEX7A Utr»ra/Caaa 100 100 150 250 1000 250 top Pn4GIC41160 S2238 51540 $1351 $15.74 $21.90 $2553 81540 TOTAL $89520 $1232 W $27020 $1,25920 $657.00 $2,04400 "a 00 38,81900 UNISOURC Brand -SUNBELT PT18588 *SUNBELT SI658 R SUNBELT S39WXKR *SUNBELT S39H 8K SUNBELT SULWBX SUNBELT 404812MH SUNBELT PTISMY AUSTIN tlr,vsbat a 3370"6 3376082 3378073 3370340 3378033 3370$46 un sr-Asa 100 100 A ISO 250 low 250 100 Pr1C601011 31850 $11.40 $9.40 $1250 81466 $13.10 816.50 TOTAL 874000 5912 00 , $I88 00 $1,000 00 8499 50 81.048.00 SM-00 $4.94250 • • Prim adjusted tom flect variat)ons in Susan a quantity RECOMMENDATION: (_~w AWARD DATE NoS' 6u(f Cm,4 Poylr' "p,' did nof- meet 5pt e5. VCX_.~ JPAQk • n ' . r1 r S. ~r . ~ 1. i - e*% THE FOLLOWING DOCUMENT IS THE BEST IMAGE POSSIBLE DUE TO THE POOR QUALITY OF THE ORIGINAL i s 9 . r I t NO TABULATION 96-44 JANITORIAL SUPPLIES • ANNUAL CONTRACT 1Sa-117 LCLEAUMSUPPLJES rowoereo Foaming Cleanser urpose boule ss une Non-Bun blrppw- mess ee Waterless ear scen cwwww With Disinfectant LKlud Cleanser Plastic; Flea Wax Floor Wax Polish Handsoap Hsoa COST Sena: 21 of an Size 16120 oz Sae 1 gallon WArgger Sae 1 gallon Sae 5 ga-h- Sae 5 ganon size 1 gallon Sae 1 quart Sae 1 gallon SUPPLIES Est Oy:3 a Est Oy ISO a Est Oty 50 gel Trigger only Est Oy 24 gel Est Oty 30 gal Est Oty 20 gel Est Oty 2 gal Est Oty 24 qts Est Oty 12 gal BY COMPANY PAPER CO homfStock 0 AJAX A-Fbnan 250.20 F09•1,All purpose TS Drawn tnggw sprayer GMPC-1 R•120 Passport HD-5 R-810 Shat SS13 Branca R•912 MHS1 Frosty Soap BRA20S VLIY Sha4T a Co. 210z111 20 oz-1112 lose 4gaVcase 32oz bott"sproyer-31 30ea 49aVase 1 galls a 1222 oz times 1 gal/4 case BRYAN PricelCase .76451518 35 1658131990 5 99 gel 75 esangger only, 2 30 gal 7 70fgal-W 50 5 gel 3130-5 gal 14 271gal,95 62 a 3 283 tubep9 40 41598VI6 60 a TOTAL $5505 32.985 3299 50 355 20 523100 $12520 318 54 '3114 67 34980 53,94396 PAPERS IIemrStak 0 412.1562 409.1582 440.1638 40833766406-0105 4401972 440.1166 4400917 409-0071 4154)201 414.2608 BRYAN SkW aa. Ca. 21 oz.24 lose 20 oz 112 case 1 gel I6 a $098 1 gal 16 a 5 gaVase 5 gallon 1 gal I6 a 24 gUase 1 gel 14 a PrfoalCan .75 ea 140 ea 3 00 EA $070 $2 981gM 331845 gal S20 0015 gal $13 30fgal S2 80/qt S41pal TOTAL SU 00 $2,52000 $150 $7176 $19080 S8000 $2660 $6720 $48 00 $3,20836 CRISVWELL ArnfStotk/ PGD8571 AIR 102 126 TOLIW CARL41 CAR600 CAR164 SHESSI3 1109 CARS57 DISTT. Shw as Ca. 21 oz./14 me 18.5oz-112 caw 1 gel 14 a 82 wl sprayer 1 gal /4 a 1 galr 4 caw 1 gal 14 a 1 gaV6 a 12(18ozyco 1904 case BRYAN PrioefCasa BBhaa21.12kaw 1951eer~23 4dcase 3 6dpe41140 all 59 sprayer 2 96/paI 1184 a 317515 pal 27 8<1 a 217515 paF1710 a 14 00/gat-84 00 a 5.13Ipal 2172 a TOTAL $83.38 •33,780 (20 oz cons) $18000 $7104 $20850 $8700 52800 '380 64 58518 $4.56370 COAST Item/Stock0 BLJAX ENVYAERO S0201 TRIGGTIBOTTLEOT GLASSNMORE14 NO BID RINSEFREES CSSC14 3122 NO BID PAPER Shw ea Ca 21 oi24 a 19 oz/12 a 1 gal/4 a 78 whprayw 1 gm14 a 1 gaV4 a 1 gal/4 a 27 oz1900mI,12 a TEMPLE PrioalCasa 7e can, 1 B 71 a 2.721an, 32 63 a 4 99 gal/19 90 a 48 sprsyw any 322 pal 11.87 a 29 5915 ge1,24 86 a 20 70/pa1,82 79 a 338x27 oz,40 55 a 12M198 TOTAL 55613 'SS•748(20 oz cans) $24950 $7728 $11836 54140 396 22 $8,38689 SUPPLY ROMistodtt 21 2307 110 TRt 155 630 605 667 0903 500 ARLINGTON S'aaf/ as Ca 2102114 17 oz 112 a 1 gel 14 a $070 1 gate a 1 gal 14 a 1 gal 14 a 1 gel 14 a 22 oz/S3 87gt 19014 a PrIacne .66 EA 1.69 EA 3 26 GAL $045 $2 231gal $29 6415 gat $17 4615 pal ss Ia/ga 46 "cue $3 561gs1 TOTAL $4752 'S3.564 (20 oz cons) $16300 353 52 $17784 $6984 31236 S9288 $4272 $4,22368 CHEMICAL Itery4todt0 117700108447 1251044207 119615/507PM 401300-28RE 101103PM-GR It 18301253 PM 172120.21 SS1.3 0913 NO BID MEItlA Shell e. Co. 21 oz/24 a 25 oz/as a 4 gaVcs 96 wArnppw 1 gaV4 a 1 paV 4 aw 1 pal 14 a 1 gaV6 a 240z cs112 tubes Prb6le a .941can 2 84 a S5 20 gal/20 80 cm 63 sprayer only 4.10 gau16 40 a 42 0015 gal 35 7515 gal 15 67gaV94 02 ease 3 96.24/47 52 a TOTAL $6768 154.068 (20 oz cans) $26000 $9840 $25200 $14300 $3134 $12672 55,04714 AUSTIN hem/Stock0 4144001 4402071 4401137 41122168,4112216•T 4477427 4401304 4401409 4490440 4490108 4401420 Shen as Cs. 21 oz.M2 a ' 19 =112 a 1 peal a Be wlsprayw 32 oiA a. S paean 5 gallon 1 pays a 1 gaV4 aw 1 gal 14 a PrbWCaw 1.40ken,16 96 a 136 can, 16 30 a 415/gal,16 60 a 47 sprayer only 1831ga135 oo a 33 2515 pek33 25 a 18 2515 gal-18 25 a 13 Odgal,78 00 a 615/gm,24 60 a 4 40/gat 17 60 a TOT Be 'S2,556 (20 oz cans) $20750 '517568 31-09 50 $7300 316 00 "S36 90 $5480 53.38026 RECOMMENDATION: AWARD DAM • • Noe 94 0W to. a variations in size and/or quantity Prioea only guaranteed until 1211196 ♦ One quart makes 5 gallons • 5 gallon dispensers furnished at NJC a; A 4 :yt I • • h • 1 A sq d i i BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridge NUMBER 560001 DATE OF COURT MEETING: 09/17/96 ITEM: Permission to enter Susan K. Deere's property located on Timberwilde Drive for the purpose of constructing driveway for school bus activity for the health, safety and welfare of the general public. Site will be maintained for duration of school bus use. Site is located in Precinct 3. SOURCE OF FUNDS: N/A 1. EXCEPTIONS: I II.' ACTION REQUESTED OR ALTERNATIVES: SUBMITTED BY: L 7-Al Richard P. Vance, P.E. County Engineer CC96-097 APPR 'ED B . ommissio r Randy Sims Precinct Approved in Commissioners' Court Date: 4- Alvin-W. Jones, Cd6nty Judge : Y4. r 1 t 4 , 1 c OF 6 J O Cry 9 BRAZOS COUNTY BgIoGft PRIVATE PROPERTY ACCESS PERMISSION FORM Alvin W. Jones County Judge Gary Norton Commissioner Pct 1 Sandie Walker Commissioner Pot 2 Randy Sims Commissioner Pct 3 Carey Cauley [ Q Commissioner Pct 4 Date 7 T ?40 1. LAND OWNER AND ADDRESS K . 9;Z0'0 ~ w.~Oev w:l~e ~v. Qa.~-~., ??8~~ II. LOCATION OF WORK ,z,,, mmr ostrW &.o; diyo, m4nt~, ~~h~ III. DESCRIPTION OF WORK TO BE DONE 1'• i( 4'rr/v. 1 C.f!!~- 904 IV. MAINTENANCE YES NO IF YES, ESTIMATED FREQUENCY OF MAINTENANCE as it t.+c AZ ss may, ttwr zts" Gn2 ,4y/ bus • (Owrier will be notified prior to maintenance) Richard F. Vance, P.E. a c. County Engineer gi e - g Aide OWNER'S SIGNATURE DATE I - Y- ?;b P• - - I~ ' C G ~_r~ _ ...~n`r...._<..., ..a ~.a_~..~i.~s:~.d....~..e.,..1._.:BwuC+.w.t::.t~G ~i~iriJ.niL.u::e:.v:~f .:'.;2`s.~e~ • - .-....d.t~rr'i•s I ORDER DETERMINING COMPENSATION L OF COUNTY AUDITOR AND ASSISTANT AUDITORS i• 3:t ILEl- Ac•clock M i SEP 1996 AMA"C HhMLIN. DIST CLERK Brazos County, Texas On this date, August 13, 1996, the Judges of the 85th, 272nd and 361st District Courts met in a public hearing in accordance with the Texas Local Government Code, and determined the compensation to be paid to the County Auditor, and Assistant Auditors as set 1 ' forth in this order. IT IS THEREFORE ORDERED that, effective October 1, 1996, the compensation of the County Auditor and Assistant Auditors be set as follows: V Position Name Salary A County Auditor John Reynolds $50,300 Asst. County Auditor Margie Wedel $35,700 4 3 7 Asst. County Auditor David Fojtik $30,500 Asst. County Auditor Irene Jett $30,500 Asst. County Auditor Katie Stevens $23,400 Asst. County Auditor Lorissa Wylie $23,400 9 i Y Asst. County Auditor Amy Krepps $20,200 Asst. County Auditor Terry Rayford $17,800 ° Asst. County Auditor Beverly Murph $17,800 j TOTAL $249,600 s q PAUk VUL . - i~ 1, F• It . 7 i j Wi 1 . n•i•. ~ 1 .Y~`+:H~CY~iTintiT~~y:!'.',i+T'Ll.~: ~:'!:~ZY r r f P t I l _ r t t Y i Y IT IS FURTHER ORDERED that the District Clerk of Brazos County shall file this order in the minutes of the District Courts of Brazos County and shall certify this order to the Commissioners Court of Brazos County for its observance. SIGNED this l;#,Nday of September, 1996. JOI N DELANEY CAROLYN FFINO Presiding Judge Presiding yu Ntirt 272nd District Court 0-1-L / ' D. LANGLE Presiding JudgjV v 85th District Court V r ~ 1 _ ...u._.a,i.~~_..~..i..`~l~xJ .~......,:~5•, t•:::a':Jn?]~.rclLnl7aia'~~tz:i.!'Ir'•E7~1'triar3.f.~.~ew.+.:.. i.La.fb:s.~. :.y.'..ut•~c'_'.•__.~_~ _ _ .K ~ ORDER DETERMINING COMPENSATION OF COURT REPORTERS On this date, the Judge of the 361st District Court met and, after a public hearing in accordance with the Texas Local Government Code, determined the compensation to be paid to the Court Reporter as set forth in this order. It is therefore ORDERED that, effective October 1, 1996, the compensation of the Court Reporter of the 361st District Court be set as follows: Position Name Salary Court Reporter Dawn Baldwin $36,723.00 361st District Court , It is further ORDERED that the District Clerk of Brazos County file this order in the minutes of the District Courts of Brazos County and shall certify this order to the Commissioners Court of Brazos County for its observance. SIGNED this day of 1996. i i i • S 1 :,VDFILIt U V /,,o'clock S EP 4 1996 BAR BfIi ra Qunry DIST. CLERK CAROL L. UFFINO Presiding Judge 361st District Court VOL ti• F~ i f E f t t. t• 4 r i M-I a T-aaoX m l SEP 10 0"i ORDER DETERMINING COMPENSATION OF COURT REPORTER On August 13, 1996, after a public hearing in accordance with the Texas Local Government Code, the undersigned Judge of the 85th District Court determined the compensation to be paid to the Official Court Reporter of the 85th District Court as set forth in this order. IT IS THEREFORE ORDERED that, effective October 1, 1996, the annual compensation of the Official Court Reporter of the 85th District Court be set as follows: Position NAM &alarY Court Reporter Deborah Carroll $40,845.00' 85th District Court IT IS FURTHER ORDERED that the District Clerk of Brazos County shall file this order Ii J t A I (r in the minutes of the District Courts of Brazos County and shall certify this order to the Commissioners Court of Brazos County for its obsavartce. SIGNED this 30th day of August, 1996. L D. LANGLEY iding Judge 85th District Court } ii + `This amount is roc greater than 10% V=W than the salary mo nved during the preoodit budget year and was &wusse d with the Corurrdssioned Coat during the budget woriatap nnoetings and during the open moetine held an August 13,199& The purpose for lids 1 inarase is to assist Nts Carroll in paying for new oortpumor equip ma t which she will bt Mvidually ptadmsivi& During de rout fiscal year; she will be aogrdrim the capability to provide r al-tirne trartsaipua % meaning the ability to see the wads in printed farm within scowds after they have boon spoken in the courtrom using compu to iaod trarm ptiart -6. VOL-11 ~'pU !4 mom l - It_. ,..~...:....iti_. _ i._ _n.._.. ._,.z.li~~_. - ....~.:.i.,. i1i.• .r:• b..f_.m_:~.. ..i..~a.r .'.,~',e..r::tiics•JY.,.jd;n::w ` a - BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridge NUMBER 560001 DATE OF COURT MEETING: 09/17/96 ITEM: Request from GTE to glace a road bore In the right of way of I&GN Road and Install buried cable in the right of way of Capstone Drive (in the Willow Run Subdivision utility easement). Site is located in Precinct 1. SOURCE OF FUNDS: N/A 1. PRESENTATION: A) No work will be permitted between front slope and/or back slope. B) The line shall be installed within 3-5' of and parallel to the right-of-way line. C) If clearing of brush, trees and other obstruction is necessary, it shall be the Applicant's responsibility to do so and to remove all cleared brush, trees, etc. from county right-of-way. D) Construction shall be In strict conformance to the latest Texas Manual of Uniform Traffic Control Devices for Streets and Highways, published by the Texas Department of Transportation, and all other State and Federal laws governing utility constrictlon. Il. ACTION REQUESTED OR ALTERNATIVES: BY' SUBMITTED BY: 4Precint A4~ chard F. Vance, P.E. ary No on County Engineer CC96-099 Appr oved in Commissioners' Court Date: Alvin W. Jones, County Judge vas AQL..ZXZ, I; ® GTE Telephone Operations Engineering Department 301 Industrial Blvd Bryan, Texas 77803 September 4, 1996 Richard Vance Brazos County Engineering County Engineer 2617 W. Hwy. 21 Bryan, TX 77803 Dear Mr. Vance: Subject: AGRMNTS 24 BURIED CABLE Reply To Bryan, TX Enclosed are two copies of Form ED-135 and work location sketch showing the location of our proposed road bore and service drop on County Roads in Brazos County at College Station, Texas. This work is to be completed on Work Order 5416 - 9P00IDB which is scheduled for September 9, 1996. If you have any questions concerning this work, please contact Alan Colley at our office in Bryan, telephone 409-821-4715. If this meets with your approval, please sign one copy of the form and return for our files. Sincerely, t ~ 7~~\ Alan Colley - ! v Senior Engineer OSP AC:ec Attachment ~ ~x~rFTi e~3 a U,r~.I A '4C14 rJ A part of GTE Corporation va`~~,A~ / ~.4 Y09 9 w`ri4al.naia►r~~rv..1'i•fL ~4~RY •rt..r.'." , - , , + ' . _1=_..t.,._..•~.. ]'t...~_.r....~,.__........... a-'. G.~~. •~b +W..{ kia;~C.m..:,a: "~'"'~~',r:•. ~Pa..1 • / L , GENERAL TELEPHONE NOTICE OF COMMUNICATION COMPANY LINE INSTALLATION September 4•, 1996 t" TO THE COMMISSIONER'S COURT OF BRAZOS COUNTY ATTENTION COUNTY JUDGE: Formal notice is hereby given that GTE will construct a communication line within the right-of-way of County Roads in Brazos County, Texas as follows: From College Station take Wellborn Road towards Wellborn, turn right on Capstone Road before Barron Road-go about 3/4 mile. House under construction on right before IGN Road-only house between Wellborn Road and IGPIRoad. Roo o 8-OR0 C~iv'Oe i- 1 ~ C /1~ ~tio C~N~ T~ ~e /tisre~f ~ti l~iuc~✓/1v,,. ~Jr~c.~.-~i The location and description of this line and associated appurtenances is more fully shown by two (2) copies of drawings o attached to this notice. The line will be constructed and L maintained on the County Road right-of-way in accordance with 6 governing laws. O Notwithstanding any other provision contained herein, it is s expressly understood that tender of this notice by the GTE o Southwest Incorporated does not constitute a waiver, surrender, Z abandonment of impairment of any property rights, franchise, R easement, license, authority, permission, privilege or right now granted by law or may be granted in the future and any provision or provisions so construed be null and void. - -A Construction of this line will begin on or after September 9, 1996. GENERAL TELEPHONE COMPANY 5416 9P001DB Alan Colley , Senior Engineer - OSP 301 Industrial Blvd. Bryan, Texas 77803 VOL--!Z ..w4w". fj~ I r I i rt 0 1 i i j i ~ 49 ~6 - - I- f T C~ n1 of C.s~vdw T f'" to. ,aa 4/ e4valorerj M COCC54 R!r'J @ 171 a v L-b m TM Wn"vesr -~s cr ~ ST 5 ~1~ «a-C1r~ vv y w _ `~r= rr CAT2 -C i o~-r C7 O 9 7 r EXCHANGE LOCATION 574!1 WORK ORDER -e, 'C Oo ID8 NARRATIVE ~'R~ V SERV 1..Q,SS I~TER T PRE:~AREG Ear DATE 9/x/9 F=O JE:.T COOF MNAi OR 0A T E PLANT ENGINE=r-3 OPiE i