HomeMy WebLinkAbout2023/12/12 REGULAR SESSION 10:00AMBRAZOS COUNTY
BRYAN, TEXAS
NOTICE OF MEETING AND AGENDA
BRAZOS COUNTY COMMISSIONERS COURT
zm DEC - 8 P E
l
THE COMMISSIONERS COURT OF BRAZOS COUNTY WILL MEET
IN REGULAR SESSION ON DECEMBER 12, 2023 AT 10:00 AM IN
THE COMMISSIONERS COURTROOM OF THE COUNTY
ADMINISTRATION BUILDING, 200 SOUTH TEXAS AVE., SUITE 106,
BRYAN, TX 77803, THE PUBLIC MAY WATCH THE MEETING LIVE
AT FACEBOOK.COM/BRAZOSCOUNTYTX
1. Invocation and Pledge of Allegiance
• U.S. and Texas Flag - Commissioner Watson
2. Call for Citizen input and/or-concems
3. Presentations and/or Discussions
• Presentation of the Leadership Academy Session I I Certificate by Chadd
Caperton to Commissioner Chuck Konderla.
Consider and take action on agenda items: 4 - 20
4. Acceptance of donated or unclaimed property left by inmates leaving the Brazos County
Jail for the month of October 2023.
5. Request authorization to wire transfer up to $851,179.39 to HHSC for the Federal Fiscal
Year (FFY) 2022 Hospital Augmented Reimbursement Program (HARP) Retroactive
Payment for the benefit of participating hospitals using funding from the Brazos County
Local Provider Participation Fund.
6. Approval of Addendum #3 to Contract #19-149 Dental Services for the Jail to extend
the agreement for one year.
7. Award of RFP #23-600-2 Bond Engineering Design Services at Rellis, SH 47 at SH 21.
Recommended Award: Binkley & Barfield, Inc.
8. Approval of Amendment #1 to CI P #23-601 Architect Design Contract for Brazos
County Administration Building for additional design services.
9. Approval of Bid #24-062 Road Signs and Sign Posts. Recommended award to Vulcan,
Inc. dba Vulcan Signs.
10. Approval of No Award Bid due to lack of proposal responses and Permission to Re -
Advertise Bid #24-072 Crack Seal.
11. Approval of the following committee for RFP #24-082 Grant Administrator- GLO.
• a. Katie Conner
• b. Michele Meade
• c. Kyle Eppler (Wickson Water SUD)
• d. Purchasing (Non -Voting)
• e. Legal (Non -Voting)
12. Permission to Advertise RFP #24-082 Grant Administrator- GLO.
13. Approval of Contract Renewal #24-084R Heavy Machinery Rental with Mustang Rental
Services of Texas.
14. Approval of the following committee for RFQ #CI P 24-603 Construction Manager at
Risk for Medical Examiner's Facility.
• a. Trevor Lansdown
• b. William (Bill) Hadley
• c. Brian Baker
• d. Lt. Steven White
• e. Lt. Sean Dwyer (College Station PD)
• f. Lt. Wait Melnyk (Bryan PD)
• g. Lt. Jennifer Enloe (TAMU-PD)
• h. Jerry Nickerson (Civilian)
• i. Purchasing (Non -Voting)
• j. Legal (Non -Voting)
• k. Broddus - Consultants (Non -Voting)
15. Tax Refund Applications for the following:
Overpayments
• a. Sheila Stokes - $593.86
• b. Elizabeth Boettcher - $79.77
• c. Sylvia Lorraine Craig - $200.00
• d. Mary J. Almeidea-Carter - $10.00
16. Budget Amendments.
• FY23/24 Budget Amendments 11.01 -11.03
17. Personnel Change of Status.
• a. Employment & Separations
• b. Personnel Action Forms
18. Payment of Claims.
19. Convene into Executive Session pursuant to the following:
• a. Texas Government Code §551.071 to consult with attorney about pending or
contemplated litigation and/or a settlement offer, along with Texas Government
Code §551.0785 for deliberations involving medical or psychiatric records of a
county employee.
• b. Texas Government Code §551.087 for deliberation regarding economic
development negotiations.
20. Consider and possible action on Executive Sessions.
21. Acknowledgement of FY 2023-2024 Budget to Actuals by Fund as of December 6,
2023.
Acknowledgement of FY 2023-2024 Contingency Budget to Actuals by Fund as of
December 6, 2023.
22. Acknowledgement of the Fiscal Year 2024-2028 Capital Improvement Program.
23. Acknowledgement from the County Treasurer of the Investment Report for Quarter
Ending September 30, 2023.
24. Acknowledgement of the Reserve Officers Report.
25. Juvenile director's report on detention population.
26. Sheriff's report on inmate population.
27. Announcement of interest items and possible future agenda topics.
Commissioners Court will not convene during the week of December 25-29, 2023 due
to the holiday break.
28. Adjourn.
PUBLIC COMMENTS
Public Comment during the Commission Meeting may be for all matters, both on and off the agenda, and be limited to four
minutes per person. Persons are invited to submit comments in writing on the agenda items and/or attend and make comment at
the Commission meeting. Members of the public are reminded that the Brazos County Commissioners Court is a Constitutional
Court, with both judicial and legislative powers, created under Article V, Section 1 and Section 18 of the Texas Constitution. As a
Constitutional Court, the Brazos County Commissioners Court also possesses the power to issue a Contempt of Court Citation
under Section 81.024 of the Texas Local Government Code. Accordingly, members of the public in attendance at any Regular,
Special and/or Emergency meeting of the Court shall conduct themselves with proper respect and decorum in speaking to,
and/or addressing the Court; in participating in public discussions before the Court; and in all actions in the presence of the
Court. Those members of the public who are inappropriately attired and/or who do not conduct themselves in an orderly and
appropriate manner will be ordered to leave the meeting. Refusal to abide by the Court's Order and/or continued disruption of
the meeting may result in a Contempt of Court Citation.
It is not the intention of the Brazos County Commissioners Court to provide a public forum for the demeaning of any individual or
group. Neither is it the intention of the Court to allow a member (or members) of the public to insult the honesty and/or integrity
of the Court, as a body, or any member or members of the Court, or County employees, individually or collectively. Accordingly,
profane, insulting or threatening language directed toward the Court and/or any person in the Court's presence and/or racial,
ethnic or gender slurs or epithets will not be tolerated. Violation of these rules may result in the following sanctions:
1. cancellation of a speaker's time;
2. removal from the Commissioners Court;
3. a Contempt Citation; and/or
4, such other and/or criminal sanctions as may be authorized
under the Constitution, Statutes and Codes of the State of Texas.
The County Commissioners Court can deliberate or take action only if a matter has been listed on an agenda properly posted
prior to the meeting. During the public comment period, speakers may address matters not listed on the published agenda. The
Open Meeting Law does not expressly prohibit responses to public comments by the Commissioners Court. However, responses
from the County Judge or Commissioners to unlisted public comment topics could become deliberation on a matter without
notice to the public. To ensure the public has notice of all matters the Commissioners Court will consider, the County Judge
and/or Commissioners may choose not to respond to public comments, except to correct factual inaccuracies, recite existing
policy in response to an inquiry or to ask that a matter be listed on a future agenda. See Texas Open Meetings Act Section
551.042.
INVOCATION
Any invocation that may be offered before the official start of the Court meeting shall be to and for the benefit of the Court. The
views or beliefs expressed by the invocation speaker have not been previously reviewed or approved by the Court and do not
necessarily represent the religious beliefs or views of the Court in part or as a whole. No member of the community is required to
attend or participate in the invocation and such decision will have no impact on their right to actively participate in the business
of the Court.
The Commissioners Courtroom of the County Administration Building, 200 South Texas Ave., Suite 106, Bryan, TX 77803, THE
PUBLIC MAY WATCH THE MEETING LIVE AT FACEBOOK.COWBRAZOSCOUNTYTX is wheelchair accessible. Handicap parking
spaces are available. Any request for sign interpretive services must be made two working days before the meeting. To make
arrangements, please call (979) 361-4102.
The foregoing minutes of the Commissioners Court Meeting held December 12, 2023, have been
examined and are approved in open Court this 2nd day of Januar4, in Bryan, Brazos
County, Texas.
Duane Peters
County Judge
`Chuck Konderla
Commissioner, Precinct 2
Attest:
Karen McQueen
County Clerk
Steve Aldrich
Commissioner, Precinct 1
Nancy Berry
Commissioner, Precinct 3
MINUTES
DECEMBER 12, 2023
BRAZOS COUNTY COMMISSIONERS COURT
REGULAR MEETING
A regular meeting of the Commissioners' Court of Brazos County, Texas was held in the
Brazos County Commissioners Courtroom in the Administration Building, 200 South
Texas Avenue, in Bryan, Brazos County, Texas, beginning at 10:00 a.m. on Tuesday,
December 12, 2023 with the following members of the Court present:
Duane Peters, County Judge, Presiding;
Steve Aldrich, Commissioner of Precinct 1;
Chuck Konderla, Commissioner of Precinct 2;
Nancy Berry, Commissioner of Precinct 3;
Wanda J. Watson, Commissioner of Precinct 4;
Karen McQueen, County Clerk, Absent.
The attached sheets contain the names of the citizens and officials that were in
attendance.
1. Invocation and Pledge of Allegiance
• U.S. and Texas Flag -Commissioner Watson
2. Call for Citizen input and/or concerns
Charles Mancuso spoke to the Court about the large amount of trash along Mancuso
Road. Mr. Mancuso brought in a bag of trash to give an example of the amount and
types of trash he has picked up. Mr. Mancuso asked the county to help keep the roads
clean and also expressed his concern over speed violators, gun fire, and trash burning
taking place in Precinct 2.
3. Presentations and/or Discussions
• Presentation of the Leadership Academy Session I I Certificate by Chadd
Caperton to Commissioner Chuck Konderla.
Judge Peters stated Mr. Caperton was not able to attend court, but he congratulated
Commissioner Konderla on completing Session I I of the Leadership Academy.
Commissioner Konderla asked for prayers for fellow academy member Judge Falcon
who is recovering from a recent health issue.
Consider and take action on agenda items: 4 - 20
4. Acceptance of donated or unclaimed property left by inmates leaving the Brazos County
Jail for the month of October 2023.
A copy of the donation forms is attached.
Motion: Approve., Moved by Commissioner Nancy Berry, Seconded by Commissioner
Wanda J. Watson. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
5. Request authorization to wire transfer up to $851,179.39 to HHSC for the Federal Fiscal
Year (FFY) 2022 Hospital Augmented Reimbursement Program (HARP) Retroactive
Payment for the benefit of participating hospitals using funding from the Brazos County
Local Provider Participation Fund.
Motion: Approve, Moved by Commissioner Steve Aldrich, Seconded by Commissioner
Chuck Konderla. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
6. Approval of Addendum #3 to Contract #19-149 Dental Services for the Jail to extend
the agreement for one year.
A copy of the contract addendum with Dentrust Dental Texas, P.C. is attached.
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Chuck Konderla. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
7. Award of RFP #23-600-2 Bond Engineering Design Services at Rellis, SH 47 at SH 21.
Recommended Award: Binkley & Barfield, Inc.
The Court voted unanimously to accept the the recommendation of the Purchasing
Agent and awarded RFP #23-600-2 Bond Engineering Design Services at Rellis, SH
47 at SH 21 to Binkley & Barfield, Inc. A copy of the contract is attached.
Motion: Approve, Moved by Commissioner Steve Aldrich, Seconded by Commissioner
Nancy Berry. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
8. Approval of Amendment #1 to Cl P #23-601 Architect Design Contract for Brazos
County Administration Building for additional design services.
Commissioner Aldrich questioned what the amount on the original contract. Charles
Wendt said the increase is due to additional items included in the scope of work. Mr.
Wendt stated he would provide the Court with the amount from the original contract. A
copy of the amended contract with PlanNorth Architectural Co. is attached.
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Wanda J. Watson. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
9. Approval of Bid #24-062 Road Signs and Sign Posts. Recommended award to Vulcan,
Inc. dba Vulcan Signs.
The Court voted unanimously to accept the the recommendation of the Purchasing
Agent and awarded the Bid # 24-062 Road Signs and Sign Posts to Vulcan, Inc. dba
Vulcan Signs. A copy of the bid tabulation and contract is attached.
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Wanda J. Watson. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
10. Approval of No Award Bid due to lack of proposal responses and Permission to Re -
Advertise Bid #24-072 Crack Seal.
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Chuck Konderla. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
11. Approval of the following committee for RFP #24-082 Grant Administrator- GLO.
• a. Katie Conner
• b. Michele Meade
• c. Kyle Eppler (Wickson Water SUD)
• d. Purchasing (Non -Voting)
• e. Legal (Non -Voting)
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Chuck Konderla. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
12. Permission to Advertise RFP #24-082 Grant Administrator - GLO.
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Steve Aldrich. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
13. Approval of Contract Renewal #24-084R Heavy Machinery Rental with Mustang Rental
Services of Texas.
A copy of the renewal of contract and bid tabulation is attached.
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Chuck Konderla. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
14. Approval of the following committee for RFQ #CI P 24-603 Construction Manager at
Risk for Medical Examiner's Facility.
• a. Trevor Lansdown
• b. William (Bill) Hadley
c. Brian Baker
• d. Lt. Steven White
• e. Lt. Sean Dwyer (College Station PD)
• f. Lt. Walt Melnyk (Bryan PD)
• g. Lt. Jennifer Enloe (TAMU-PD)
• h. Jerry Nickerson (Civilian)
• i. Purchasing (Non -Voting)
• j. Legal (Non -Voting)
• k. Broddus - Consultants (Non -Voting)
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Chuck Konderla. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
15. Tax Refund Applications for the following:
Overpayments
• a. Sheila Stokes - $593.86
• b. Elizabeth Boettcher - $79.77
• c. Sylvia Lorraine Craig - $200.00
• d. Mary J. Almeidea-Carter - $10.00
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Chuck Konderla. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
16. Budget Amendments.
• FY 23/24 Budget Amendments 11.01 -11.03
11.01 Transfer Contingency funds to 472nd District Court.
11.02 Reallocate funds for the Bond Series 2023 - On System Road Bond - TXDOT.
11.03 To recognize a donation of furniture to the Sheriff's Office.
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Wanda J. Watson. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
17. Personnel Change of Status.
• a. Employment & Separations
• b. Personnel Action Forms
A copy of the Personnel Changes of Status is attached.
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Steve Aldrich. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
18. Payment of Claims.
Claims
8126333 — 8126497
9009210 - 9009275
Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner
Chuck Konderla. Passed. 5-0. Ayes: Aldrich, Berry, Konderla, Peters, Watson.
19. Convene into Executive Session pursuant to the following:
• a. Texas Government Code §551.071 to consult with attorney about pending or
contemplated litigation and/or a settlement offer, along with Texas Government
Code §551.0785 for deliberations involving medical or psychiatric records of a
county employee.
• b. Texas Government Code §551.087 for deliberation regarding economic
development negotiations.
The County Judge stated the Court would consider items 21 through 27 and then
convene into Executive Session.
Having considered the previously noted agenda items, at 10:18 a.m. the County Judge
stated the Court would convene into Executive Session. Judge Peters stated Executive
Session (a) would not be discussed and the Court would only deliberate on Executive
Session (b) as stated above.
The following individuals were asked to attend the meeting:
Cheryl Coffman, Executive Assistant
Bruce Erratt, General Counsel
Allison Lindblade, Assistant General Counsel
Ed Bull, Chief of Staff
Kimberly Roach, I ntergovemmental Liaison
Katie Conner, County Auditor
Nina Payne, Budget Officer
20. Consider and possible action on Executive Sessions.
At 10:41 a.m. the County Judge announced the meeting open to the public and no
action was taken on the Closed Executive Session.
21. Acknowledgement of FY 2023-2024 Budget to Actuals by Fund as of December 6,
2023.
Acknowledgement of FY 2023-2024 Contingency Budget to Actuals by Fund as of
December 6, 2023.
The Court acknowledged receipt of the FY 2023-2024 Budget to Actuals by Fund as of
December 6, 2023 and FY 2023-2024 Contingency Budget to Actuals by Fund as of
December 6, 2023.
22. Acknowledgement of the Fiscal Year 2024-2028 Capital Improvement Program.
The Court acknowledged the Fiscal Year 2024 - 2028 Capital Improvement Program.
23. Acknowledgement from the County Treasurer of the Investment Report for Quarter
Ending September 30, 2023.
The Court acknowledged receipt of the Investment Report for Quarter Ending
September 30, 2023.
24. Acknowledgement of the Reserve Officers Report.
The Court acknowledged receipt of the Reserve Officers Report.
25. Juvenile director's report on detention population.
Juvenile Director Linda Ricketson reported there are 40 juveniles in the detention center,
33 are male and 7 are female, and 24 have electronic monitors.
26. Sheriff's report on inmate population.
Sheriff Wayne Dicky stated there were 726 inmates in jail, 606 inmates are male, 120
are female and 45 have electronic monitors.
27. Announcement of interest items and possible future agenda topics.
Commissioners Court will not convene during the week of December 25-29, 2023 due
to the holiday break.
Judge Peters announced the Commissioners Court will not convene during the week of
December 25-29, 2023 due to the Christmas holiday.
Commissioner Aldrich requested an update on the County Administrative Building
renovations. He also asked for clarification on the funding for the architect agreement.
Budget Officer Nina Payne stated the funds are from ARPA revenue replacement.
Commissioner Konderla gave his condolences to the families of Marvin Tate and Chuck
Manning.
28. Adjourn.
Pg I of 3
BRAZOS COUNTY
COMMISSIONER'S COURT
DAY OF 20 �3
1u�00 (9/pM, 1
Name
(PLEASE PRINT)
lI� �
�Jor V-"1 Un
Organization
(PLEASE PRINT)
C-T
Co . Cl-e,r k's
666
%
1 0qa s Gi t r e g
Pg 2 of 3
BRAZOS COUNTY
COMMISSIONER'S COURT
DAY OF Deco [,-�p�- 920
D :orb u f o� �
Name
(PLEASE PRINT)
A)wp2unq-
Jo5x Lalk
�(PA,
M /
6Z�Ud2 �.d ��Ss o try✓
Organization
(PLEASE PRINT)
&:&�j flgr CQ-
PVi'fl�
C-s- o4xic-
Pg - -3- of 3
Name
BRAZOS COUNTY
COMMISSIONER'S COURT
a� DAY OF 20 0-3
M,_
Organization
(PLEASE PRINT)
l�
44
BRAZOS COUNTY: DETENTION` CENTER
BRAZOS':COUNTY :DETENTION :CENTER
-Jail ID:320332
BRAZOS COUNTY DETENTION CENTER
INMATE PROPERTY, INVENTORY FORM
Date InMate Left Facility: 10/5/2023.:
SO#:13398®
This is to advise you, Bowles, Juanzarian Devashay that'the Brazos County Office of the Sheriff Will grant
you a period. of one week (five working days) to have anyone of your choice pickup and/or receive any
and all property that you have accumulated during your time' incarcerated 'in the Brazos County
Detention Center. In the event that no. one has picked up your property after the expiration of one
week (five•working days), any and all. property will be donated to the Brazos County Sheriffs Office and
disposed of to the person(s) or organization of choice by the order of the'Sheriff of Brazos County,
Texas. Your property will not be released to anyone other than the person that you have designated
to pick it up and can be picked up from the Release Lobby of the Brazos County Detention Center
located at 2835 Sandy Point Rd. Bryan, TX 77807. To avoid lone wait times please schedule the
n;rlrnn 7A hrnere in arlvan*ra_ =
Phone#
Date:: .
Date::-,
:•:.. ::::::.:........ :. .:::.: ..... .... .:
BRAZOS :COUNTY: DETENTION::CENTER
BRAZOS *COU NTY::DETENTI ON.'CENTER'.
INMATE 'PROPERTY'INVENTORY::FORN9
BRAZOS •COUNTY,DETENTION -CENTER
.r
BRAZOS°COUNTY DETENTION: CENTER
BRAZOS..0OUNTY. DETENTION::CENTER
6RAZOS COUNTY DETENTION: CENTER
INMATE:: PROPERTY- INVENTORY. FORM
lnmat6left;-Facility:; 0/30/2023.:
. -BRAZOS:000NTY.:DETENTION CENTER
:INMATE �P,ROPERTY:IN1/ENTOIiY.:FO.RIV.I
.AtOjil na#e Left Fkiiity::10/30/2Q23
BRAZOS..0O0NTYDETEN'i•ION. CENTER
BRAZOS COUNTY DETENTION CENTER
BRAZOS. CG NTY. DETENTI.ON.:CENTER
f
BRAZOS COUNTY DETENTION CENTER
:.1NNIATE PROPERTY INVENTORY EORIVI
Date*lnlnate Leffi Vacillty:10/19/2023
Jail ID:342084 SOM130590
This is to -advise -you; Gue, Dejour Joshua that the Brazos County Office of the Sheriff will grant.you a
period of one week (five working days) to have anyone of your choice pickup and/or receive any and all
property• that you have accumulated ,during your time incarcerated in the Brazos County Detention .
Center. -in-the event'that no one.has:picked up your property after the expiration of one week (five.,:':
Working days), any and all property will: be donated to the Brazos County Sheriffs Office and disposed of.
.to the persons) :or organization of choice by the order of the:Sheriff of Brazos County, :Texas: - Your.-.....:
property will not be released to anyone other than the persorn:that you have designated:to'oick it up
and can be picked up from the Release Lobby of the Brazos County Detention Center located at-1835.
Sandy Point Rd: Bryan, TX 77807. To avoid lone wait times please schedule the pickup 24 hours in
advance.
LIST OF PROPERTY.
Date:
Date:
BRAZQ$ C®UNT:Y.:;DETENTION'CENTER
............ ::::.::::::.:.:. ,::.:..........:::::.::
BRAZOS` CO.Uf�TY. DETE:NTION::CENTER
':;'Uq:0AOPERT]
....... ... .......
..... ........
... .... .. ........
................ ........
............ .......o......f... o..t-.n.......
e.....m........e....e....k..... ........i.y.......g.......... �.".w............p..
..;....r....k....ffij..o......g....
.t.e.....e.. i............... ..... !.... ... ....
...... ..........!..:...:........:.f.;:.�.l....:........:...:.....:..:..:...:......,...:
..
... . ...........
..
....................�.:..:....
... ....
..........................
.... ... ................ .
azo
.pnyana:pop�yh hiVi.'k6..ud durqg: .tApe:Jrcarceratedn:.th.. ..... . ..on . . eAp ..
Detention Center In ahe.
rt...yWdekjfiV4-Wbek`N dOW an and 0Pope
......... .......... . ..vW.IV....naggd :te-Brazos:tpun
.........
......
...........
... r":'nfBrazes
:.1
BRAZOS COUNTY
BRYAN, TEXAS
DEPARTMENT: Budget Office
NUMBER:
DATE OF COURT MEETING:
12/12/2023
ITEM:
Request authorization to wire transfer up to $851,179.39 to HHSC forthe Federal Fiscal
Year (FFY) 2022 Hospital Augmented Reimbursement Program (HARP) Retroactive
Payment for the benefit of participating hospitals using funding from the Brazos County
Local Provider Participation Fund.
TO:
Commissioners Court
FROM:
Nina Payne
DATE:
12/06/2023
FISCAL IMPACT:
False
BUDGETED:
False
DOLLAR AMOUNT:
$0.00
SOURCE OF FUNDS:
Brazos County LPPF (Fund 16000)
REQUIREMENTS:
NOTES/EXCEPTI ONS:
ACTION REQUESTED OR
ALTERNATIVES:
ATTACHMENTS:
File Name
HARP_IGT Memo.pdf
HARP_IGT Backup_ Agenda.pdf
HHSC requires this I GT to be entered into TexNet no later than close of business Monday,
December 18, 2023 with a settlement date of Tuesday, December 19, 2023.
The Hospital Augmented Reimbursement Program (HARP) is a statewide supplemental
program providing Medicaid payments to hospitals for inpatient and outpatient services that
serve Texas Medicaid fee -for -service (FFS) patients. The program serves as a financial
transition for providers historically participating in the Delivery System Reform Incentive
Payment program. HARP will provide additional funding to hospitals to assist in offsetting the
cost hospitals incur while providing Medicaid services. Subject to CMS approval, eligible
participants in Federal Fiscal Year 2022 include non -state government -owned and operated
hospitals and private hospitals. The public HARP S PA was approved for non -state
government -owned and -operated hospitals on August 31, 2022. The private HARP SPA
was approved for private hospitals on August 15, 2023. Reimbursement rules are located at
Title 1 of the Texas Administrative Code, Part 15, Chapter 355, SubChapter J, Division 4,
Rule 8070
Request approval.
Description Tvae
HARP I GT Memo Cover Memo
HARP IGTBackup Backup Material
0
ii
Duane Peters Date
County Judge
Nina Payne
From: Kelly O'Brien <kelly@ahcv.com>
Sent: Wednesday, December 6, 2023 11:08 AM
To: Edward C. Bull; Nina Payne; Jamie L. Cartwright; Cristian T. Villarreal
Cc: Justin Flores; Colt Sullivan
Subject: FY22 HARP IGT - Brazos County LPPF
Attachments: HARP MRSA Central Allocation Summary - Brazos LPPF.xlsx; HARP Travis Allocation Summary -
Brazos LPPF.xlsx
Brazos County Disclaimer
***** This is an email from an EXTERNAL source. DO NOT click links or open attachments unless you recognize the
sender and have verified that the content is safe. Never enter USERNAME, PASSWORD or sensitive information on '
pages.linked from this email.***-**
Good morning, Brazos County Team.
As you know, the upcoming FFY22 HARP IGT is taking place on Monday, December 18th. Accordingly, the
hospitals participating within the Brazos_County LPPF, would like to request the following IGT amounts noted
below. (Please review the accompanying allocation.)
FFY22 HARP — total requested IGT amount $851,179.39
• MRSA Central SDA: $824,424.69
( 9
• Travis SDA:_ $26,754.70
Brazos County should submit 2 separate TexNets and allocation forms (attached) for the specific amounts
noted above, attributable to each SDA. It is not sufficient to provide one TexNet.
HHSC requires these amounts to be entered into TexNet no later than the close of business 12/18/2023 with a
settlement date of 12/19/2023. These funds will need to be placed in the "HARP" Bucket. Upon successful
completion of the IGT, please submit the PDF of the TexNet Trace Sheets and allocation forms to
hhscpfdharppavments@hhs.texas.gov.
AHCV also kindly requests to be copied on the TexNet submission to HHSC on or before the deadline noted
above.
Please do not hesitate to contact us with any questions.
Thank you,
Kelly
Kelly O'Brien
Adelanto Healthcare Ventures L.L.C.
401 W. 15th Street, Suite 8401 Austin, TX 78701
Main Office: (512) 322-9413
Direct: (802) 825-2466
http-//www.ahcv.com
Brazos County LPPF
FFY 22 HARP IGT
Agenda Date: December 12, 2023
TexNet: Monday, December 18, 2023
Settlement Date: Tuesday, December 19, 2023
Bucket: HARP Bucket
SDA
Government Entity
IGT'Total
MRSA Central
Brazos County LPPF
824,424.69
Travis
Brazos County LPPF
$26,754.70
Total PGY3 CHIRP Final IGT 1 $851,179.39
AGREEMENT FOR DENTAL SERVICES
"ADDENDUM 3
THIS ADDENDUM 3, made this 27tt day of..:Nbyember ._ 2023, by and between
the COUNTY OF BRAZOS, having its principal place of business at 1700 Highway 21
West, Bryan, Texas 77803 (hereinafter referred to as the "COUNTY") and DENTRUST
DENTAL TEXAS, P.C. having its principal place of business at 6097 Easton Road,
Pipersville, PA 18947 (hereinafter referred to as "DENTRUST").
WHEREAS, the parties entered into an Agreement dated 30 July 2019, ("Original
Agreement") and subsequent Addendums., wherein DENTRUST was retained to provide
dental care for inmates and detainees at the Brazos County Detention Center;
WHEREAS, the Addendum 2 dated 10 October 2022, ("Addendum 2") by its terms,
is set to terminate on February 28, 2024; and
WHEREAS, the parties hereto wish to extend this Addendum for an.additional one-
year renewal term;
NOW THEREFORE, in consideration of the terms and conditions contained herein
and in the Original Agreement and Addendums, the parties agree as follows:
FIRST: The term of the Addendum 2 shall be extended for an additional
one (1) year period commencing March 1, 2024, and terminating February 28, 2025,
unless otherwise terminated in accordance with Paragraph "14" of the Original
Agreement.
SECOND: All other terms and conditions of the Original Agreement and -
subsequent Addendums shall remain the same for the period of this renewal term.
1
IN WITNESS WHEREOF, the parties have executed this ADDENDUM 3 on the
date hereinabove set forth,..
ATTEST
ATTEST
COUNTY OF BRAZOS
7
Name, uANE PE-rev-rev
Title: GowN'1` Zunroc
Name: F.
Title: �C
TEXAS, P.C.
2
AGREEMENT FOR DENTAL SERVICES
AGREEMENT BY AND BETWEEN:
AND:
The COUNTY OF BRAZOS with offices at 1700 Highway 2I West, Bryan,
Texas 77803
Hereinafter referred to as the "COUNTY",
DENTRUST DENTAL TEXAS, P.C., a corporation of the
State of Texas, with offices located at
6097 Easton Road, Pipersville, Pennsylvania 18947
Hereinafter referred to as "DENTRUST".
WHEREAS, the COUNTY desires to provide dental care for inmates and detainees at the
Brazos County Jail (hereinafter "the Jail"); and
WHEREAS, Dentists provided by DENTRUST are duly licensed dentists in the State of Texas,
desires to conduct part of its practice of dentistry at the Jail;
WHEREAS, the provisions of the Health Insurance Portability and Accountability Act (HIPAA)
as set forth hereto in Appendix "A", HIPAA Business Associate Agreement, is hereby made part of
this Services Agreement and incorporated by reference;
IT IS MUTUALLY AGREED by and between the above=referenced parties hereto, for one
dollar ($1.00) and for other goods and valuable consideration, as follows;
1. DENTRUST agrees to conduct an independent practice of dentistry at the Jail. The
COUNTY in turn, agrees to provide DENTRUST with the required space and sufficient time to
conduct its dental practice. The COUNTY will neither contract with nor allow any other provider to
perform routine or non -emergent dental services on inmates or detainees housed at the Brazos
County Jail while the COUNTY is under contract with DENTRUST. The COUNTY will allow
1
DENTRUST access to the Jail twice a month and any other time when DENTRUST's services are
required-as-scheduled=by-either-the Jail-or-DENTRUST;---.--- - — �-
2. DENTRUST agrees that it shall give priority scheduling to inmates in need of emergency
dental treatment; inmates who have medical problems, such as allergies, diabetes, heart conditions
and/or blood diseases; and inmates who do not have sufficient teeth to masticate the food provided
by the Jail.
3. DENTRUST agrees to perform necessary dental services upon any and aII County, State and
Federal prisoners presently detained at the Jail. In the course of performing said dental services for
County, State and Federal prisoners, DENTRUST agrees to adhere to any and all applicable Statc
and Federal regulations governing dental services for prisoners and detainees.
4. DENTRUST agrees that it is responsible for furnishing, at its own expense, all additional
necessary equipment and supplies and its own paid personnel, as determined by DENTRUST, for thc
proper and safe operation of its clinic at the Jail.
5. In addition to emergency treatment DENTRUST shall only perform the treatment necessary
to control and prevent pain, infection, decay or other abnormalities of the hard and soft tissue within,
and immediately adjacent to the oral cavity of any inmate or detainee presently being housed at the
Jail. DENTRUST shaII not perform any cosmetic or other dental services other than the
aforementioned, without first obtaining authorization from the Jail Administrator.
6. The COUNTY agrees to pay the fees in Appendix "B" for all treatment performed on inmates
and detainees housed in the Jail, and that a fee of fifty-five dollars ($55.00) will be billed to the
COUNTY for travel expenses incurred by DENTRUST for each day it operates the clinic at the Jail.
This fee will also apply to any emergency calls to which DENTRUST may respond.
7. The COUNTY agrees that it is responsible for disposing of all bio-hazardous waste products
created as a result of the operation of the dental clinic at the Jail.
8. The COUNTY agrees to make the medical records available to DENTRUST, in advance of
any dental treatment, of any patient expected to be examined or treated by a Dentist provided by
DENTRUST. DENTRUST agrees to treat all patients with proper infection control procedures
including barrier protection, chemical disinfectants, sterilization, and, where possible, disposable
equipment.
9. The COUNTY agrees that when a Dentist provided by DENTRUST is in the presence of
inmates or other detainees under the jurisdiction of the Jail at least one corrections officer will be
immediately present. At no time will the COUNTY leave any Dentist alone with an inmate or other
2
detainee under the jurisdiction of the Jail regardless of how rehabilitated or trustworthy that inmate
or -detainee -may -appear,
10. DENTRUST agrees to maintain the appropriate amounts of Dental malpractice insurance
necessary for it to satisfy its obligations under this Agreement. Moreover, this Agreement will not
be effective unless and until DENTRUST demonstrates that it possesses said malpractice coverage.
11. DENTRUST shall indemnify and hold harmless the COUNTY and its officers, agents and
employees from any claims, demands, cause of action and judgments arising directly out of injuries
to persons or property of whatever kind or nature as a direct result of furnishing the services provided
under this Agreement.
12. DENTRUST shall adopt and comply with all federal, state, county, and city laws, ordinance,
regulations and standards applicable to the provision of services described herein and the
performance of all obligations undertaken pursuant to this Contract, including the Prison Rape
Elimination Act of 2003 (PREA) which establishes a zero -tolerance standard against sexual abuse
and sexual harassment of incarcerated persons, including juveniles, and addresses the detection,
elimination, prevention, and reporting of sexual abuse and sexual harassment in facilities housing
adult and juvenile Offenders. [PREA § 115.312(A)]. Under PREA, DENTRUST must comply with
PREA standards [PREA § 115.312(A)] and shall make available to the Brazos County Sheriff's
Office all incident -based aggregated data reports of sexual abuse at its facility within 24-hours of the
allegation. All such data may be requested by the Department of Justice from the previous calendar
year no later than June 30"1 [PREA § 115.387 (e) and (f)].
13. The COUNTY agrees that during the terms of this Agreement and for a period of two (2)
years afler its termination, the COUNTY will not engage, directly or indirectly, any employee or
dentist -employee of DENTRUST in connection with the provision of dental services.
14. The terms of this Agreement shall be for three (3) years effective March 1, 2019 and may be
renewed by mutual consent of both parties, for additional one (1) year terms.
15. It is understood and agreed that either party retains the right to revoke this Agreement at any
time, and for reasonable cause, upon ninety (90) days written notice.
16. AIl, notices, approvals, consents and other instruments required or permitted to be given
under this Agreement shall be in writing.
17. This Agreement may not be changed, modified or discharged, except in writing, and signed
by both parties.
3
COUNTY OF BRAZOS
By:
Name:
Title:
18. This Agreement constitutes the entire understanding between DENTRUST and the
COUNTY'Fhere-are-no•E-inderstandings, r-epresetitations? or�agreernents; either-oral-or-�vritten;other
than those set forth herein.
19. Waiver of any provision of this Agreement shall not be deemed a waiver of future
compliance herewith and such provisions shall remain in full force and effect.
20. In the event any provision of this Agreement is held invalid and illegal, or unenforceable, in
whole or in part, the remaining provisions of this Agreement shall not be affected thereby and shall
continue to be valid and enforceable. In the event that any provision of this Agreement is held to be
unenforceable as written, but enforceable if modified, then such provision shall be deemed to be
modified to such extent as shall be necessary for such provision to be enforceable, and it shall be
enforced to that extent.
21. This Agreement shall be construed and interpreted according to the laws of the State of
Texas.
22. The undersigned represent that they have been authorized by each of the above -referenced
parties to execute this Agreement.
IN WITNESS WHEREOF, the officers of the respective parties have signed and sealed this
Agreement this B day of , 2019.,
ATTEST
ATTEST
APPENDIX "A"
HIPAA BUSINESS ASSOCIATE. AGREEMENT
This Appendix "A" is made part of the Services Agreement (as defined below) by and
between DENTRUST DENTAL TEXAS, P.C. ("Covered Entity") and the COUNTY OF
BRAZOS ("Business Associate").
WHEREAS, Covered Entity and Business Associate are parties to the Service Agreement
pursuant to which Business Associate provides certain services. to Covered Entity. In connection
with Business Associate's services, Business Associate creates or receives Protected Health
Information from or on behalf of Covered Entity, which information is subject to protection
under the Federal Health Insurance Portability and Accountability Act of 1996, Pub. L. No. 104-
191 ("HIPAA") and related regulations promulgated by the Secretary ("HIPAA Regulations").
WHEREAS, in light of the foregoing and the requirements of the HIPAA Regulations,
Business Associate and Covered Entity agree to be bound by the following terms and conditions:
1. Definitions.
a. General. Terms used, but not otherwise defined, in this Agreement shall have the
same meaning as those terms in the Privacy Rule.
b. sage -in
i. IndividuaI. "Individual" shall have the same meaning as the term "individual"
in 45' CFR 164.501 and shall include a person who qualifies as a personal
representative in accordance with 45 CFR 164.502(g).
ii. Privacy R-ulc. "Privacy Rule" shall mean the Standards for Privacy of
Individually Identifiable Health Information at 45 CFR part 160 and part 164,
subparts A and E.
M. Protected Health Information. "Protected Health Information" shall have the
same meaning as the term "protected health information" in 45 CFR 164.501,
limited to the information created or received by Business Associate from or
on behalf of Covered Entity.
iv. Required 13-+s.Law. "Required by Law" shall have the same meaning as the
term "required by law" in 45 CFR 164.501.
V. Seeretaa. "Secretary" shall mean the Secretary of the Department of Health
and Human Services or his designee.
A-1
future A. Ser%dccs.A reenient. "Services Agreement" shall mean any present or
agreements, either written or oral, between Covered Entity and Business
Associate under which Business Associate provides services to Covered
Entity which involve the use or disclosure of Protected Health Information.
2. Obligations and, Activities of Business Associate.
a. Use and Disclosure. Business Associate agrees not to use or disclose Protected
Health Information other than as permitted or required by the Services Agreement or
as Required by Law.
b. Appropriate Safe u� ards. Business Associate agrees to use appropriate safeguards to
prevent use or disclosure of the Protected Health Information other than as provided
for by the Services Agreement. Without limiting the generality of the foregoing,
Business Associate agrees to protect the integrity and confidentiality of any Protected
Health Information it electronically exchanges with Covered Entity.
C. Mitigation. Business Associate agrees to mitigate, to the extent practicable, any
harmful effect that is known -to Business Associate of a use or disclosure ofProtected
Health Information by Business Associate in violation of the requirements of this
Agreement.
d. Reporting. Business Associate agrees to report to Covered Entity any use or
disclosure of the Protected Health Information not provided for by the Services
Agreement of which it becomes aware.
e. Agents. Business Associate agrees to ensure that any agent, including a
subcontractor, to whom it provides Protected Health Information received from, or
created or received by Business Associate on behalf of Covered Entity agrees to the
same restrictions and conditions that apply through this Agreement to Business
Associate with respect to such information.
f. Access to.Designated`Record Sets. To the extent that Business Associate possesses or
maintains Protected Health Information in a Designated Record Set, Business
Associate agrees to provide access, at the request of Covered Entity, and in the time
and manner designated by the Covered Entity, to Protected Health Information in a
Designated Record Set, to Covered Entity or, as directed by Covered Entity, to an
Individual in order to meet the requirements under 45 CFR I64.524.
g. Ameridmerifs to -Designated. Record. Sdis. To the extent that Business Associate
possesses or maintains Protected Health Information in a Designated Record Set,
Business Associate agrees to make any amendment(s) to Protected Health
Information in a Designated Record Set that the Covered Entity directs or agrees to
pursuant to 45 CFR 164.526 at the request of Covered Entity or an Individual, and in
the time and manner designated by the Covered Entity.
A-2
h.
Access to Books and Records. Business Associate agrees to make internal practices,
books, and records, including policies and procedures and Protected Health
Information, relating to the use and disclosure of Protected Health Information
received from, or dreated or received by Business Associate on behalf of, Covered
Entity available to the Covered Entity, or to the Secretary, in a time and manner
designated by the Covered Entity or designated by the Secretary, for purposes of the
Secretary determining Covered Entity's compliance with the Privacy Rule.
i. Accountings. Business Associate agrees to document such disclosures of Protected
Health Information and information related to such disclosures as would be required
for Covered Entity to respond to a request by an Individual for an accounting of
disclosures of Protected Health Information in accordance with 45 CFR 164.528.
j. Rggiiests:foit Addotii tints. Business Associate agrees to provide to Covered Entity or
an Individual, in the time and manner designated by the Covered Entity, information
collected in accordance with Section 21 of this Agreement, to permit Covered Entity
to respond to a request by an Individual for an accounting of disclosures of Protected
Health Information in accordance with 45 CFR 164.528.
3. Permitted Uses and Disclosures by Business Associate. Except as otherwise limited in
this Agreement, Business Associate may use or disclose Protected Health Information to
perform functions, activities, or services for, or on behalf of, Covered Entity as specified in
the Services Agreement, provided that such use or disclosure would not violate the Privacy
Rule if done by Covered Entity or the minimum necessary policies and procedures of the
Covered Entity.
4. Permissible Regticsts by,,_Covcred Entity. Covered Entity shall not request Business
Associate to use or disclose Protected Health Information in any manner that would not be
permissible under the Privacy Rule if done by Covered Entity.
5. Term and Termination.
a. Term. This Agreement shall be effective as of the date of the Services Agreement,
and shall terminate when all of the Protected Health Information provided by
Covered Entity to Business Associate, or created or received by Business Associate
on behalf of Covered Entity, is destroyed or returned to Covered Entity, or, if it is
infeasible to return or destroy Protected Health Information, protections are extended
to such information, in accordance with the termination provisions in this Section.
b. Termination for Cause. Upon Covered Entity's knowledge of a material breach by
Business Associate, Covered Entity shall either:
i. In its sole discretion, provide an opportunity for Business Associate
to cure the breach or end the violation. If Business Associate does
not cure the breach or end the violation within the time specified by
Covered Entity, Covered Entity shall terminate: (A) this Agreement;
A-3
(B) all of the provisions of the Services Agreement that involve the
use or disclosure of Protected Health Information; and (C) such other
provisions, if any, of the Services Agreement as 'Covered
designates in its sole discretion;
ii. Immediately terminate: (A) this Agreement; (B) all of the provisions
of the Services Agreement that involve the use or disclosure of
Protected Health Information; and (C) such other provisions, if any,
of the Services Agreement as Covered Entity designates in its sole
discretion if Business Associate has breached a material term of this
Agreement; or
iii. If termination is not feasible, Covered Entity shall report the violation
to the Secretary.
C. Effect of Termination.
i. Except as provided in paragraph ii. of this Section 5.c., upon termination of
this Agreement, for any reason, Business Associate shall return or destroy all
Protected Health Information received from Covered Entity, or created or
received by Business Associate on behalf of Covered Entity. This provision
shall apply to Protected Health Information that is in the possession of
subcontractors or agents of Business Associate. Business Associate shall
retain no copies of the Protected Health Information.
ii. In the event that Business Associate determines that returning or destroying
the Protected Health Information is infeasible, Business Associate shall
provide to Covered Entity notification of the conditions that make return or
destruction infeasible. Upon mutual agreement of the Parties that return or
destruction of Protected Health Information is infeasible, Business Associate
shall extend the protections of this Agreement to such Protected Health
Information and limit further uses and disclosures of such Protected Health
Information to those purposes that make the return or destruction infeasible,
for so long as Business Associate maintains such Protected Health
Information. If Covered Entity makes a reasonable determination that
returning or destroying the Protected Health Information is feasible, Business
Associate shall return or destroy the Protected Health Information in the time
and manner designated by Covered Entity.
6. MiscelIaneous.
a. Regulatory References. A reference in this Agreement to a section in the Privacy
Rule means the section as in effect or as amended.
b. Amendment. The Parties agree to take such action as is necessary to amend the
Services Agreement from time to time as is necessary for Covered Entity to comply
with the requirements of the Privacy Rule and HIPAA.
A-4
c. Survival. The respective rights and obligations of Business Associate under Section
5.c. of this Agreement shall survive the termination of the Services Agreement.
d. Interpretation. Any ambiguity in this Agreement shall be resolved to permit Covered
Entity to comply with the Privacy Rule.
e. Miscellaneous. The terms of this Agreement arc hereby incorporated into the
Services Agreement. Except as otherwise set forth in Section 6.d. of this Agreement,
-in the event of a conflict between the terms of this Agreement and the terms of the
Services Agreement, the terms of this Agreement shall prevail. The terms of the
Services Agreement which are not modified by this Agreement shall remain in full
force and effect in accordance with the terms thereof. The Services Agreement
together with this Business Associate Agreement constitutes the entire agreement
between the parties with respect to the subject matter contained herein.
A-5
i
I
Dentrust Dental Texas, P.C.
eaaltin.1 I
DOCS
oeamuer wiwun e►oe eeymekf
FEE SCHEDULE
Diarnoslic
0110
Initial Examination
0120
Periodic Examination
0140
Problem Focused Examination
0210
Full Mouth Series
0220
Peciapical-First Film
0230
Periapical-Additional Film
0240
Occlusal X-ray
0270
Bitewing-Single
0272
Bitewing-Two Films
0273
Bitewing-Three Films
0274
Bitewing-Four Films
0460
Pulp Vitality Test
Preventive
]l10
1204
1330
Adult Prophylaxis
To Fluoride -Adult
Oral Hygene Instruction
Restorative
1
2140 Amalgam-Permanant-One Surface
u
2150 Amalgam-Permanant-Two Srface
2160 Amaigam-Permanant T-bree.Surface
2161 Amalgam-Permanant-Four Surface
2162 Amalgam Perinaiiant-I ive Surface
Anterior Composite Resins
2330 Orie Surface
2331 Two Surface
2332 Three Surface
2335 Four Surface or Incisal Angle
2336 Facial Veneer
Posterior Composite Resins
i
2391 Permanant-One Surface
2392 Permanant-Two Surface
2393 Permanant-Three Surface
2394 Permanent -- Four or more Surfaces
30.00
30.00
40.00
85.00
20.00
15.00
30.00
15.00
25.00
30.00
35.00
25.00
60.00
20.00
55.00
75.00
90.00
110.00
135.00
55.00
75.00
90.00
115.00
135.00
85.00
115.00
155.00
185.00
Dentrust Dental Texas, P.C.
rowns-Single'
2710 Acrylic Temporary 100.00
2830 Stainless Steel 125.00
Other Restorative Services
2920
Recement Crown
55.00
2940
Sedative Filling
55.00
2950
Buildup For Crown
85.00
2951
Pin Retention In Addition to Restoration
30.00
Endodontics 1
3110
Pulp Cap -Direct
25.00
3120
Pulp Cap -Indirect
25.00
3210
Theraputic Apical Closure
85.00
3220
Vital Pulpectomy
85.00
3310
Root Canal -Anterior Tooth
325.00
3320
Root Canal -Bicuspid Tooth
400.00
3330
Root Canal -Three Canal Molar
575.00
3340
Root Canal -Four Canal Molar
625.00
1
,Periodontics
4050
i
Periodontal Evaluation
55.00
4320
Provisional Splinting Intracoronal
85.00
4321
Provisional Splinting Extracoronal
85.00
4330
Occlusal Adjustment
50.00
4331
Occlusal Adjustment -Complete
150.00
4340
Scaling & Root PlaningFull Mouth
375.00
4341
Scaling andiRoot Planing per Quadrant
125.00
4342
Scaling and Root Planing One -Three
70.00
4345
Tlieraputic Periodontal Scaling
100.00
4399
Isolated Scaling
70.00
4910
Periodontal Maintenance (perio prophy)
100.00
Removable Prosthodontics
i
5110
Complete Upper Denture
625.00
5120
Complete Lower Denture
625.00
5130
Immediate Upper Denture
625.00
5140
Immediate Lower Denture
625.00
5211
Resin Base Upper Partial
325.00
5212
Resin Base Lower Partial
325.00
5213
Upper Cast Partial
695.00
5214
Lower Cast Partial
695.00
5310
Each Additional Clasp With -Rest
85.00
5410
Adjustment Complete Upper
70.00
5411
Adjustment Complete Lower
70.00
Dentrust Dental Texas, P.C.
5421
i
Adjustment Partial Upper
70.00
5422
Adjustment Partial Lower
I
70.00
t
Denture Repairs
5510
Complete Denture No Teeth Damaged
50.00
5520
Missing Tooth -Complete Denture (each)
40.00
5610
Partial Denture Acrylic Saddle
55.00
5620
Cast Framework of Partial
100.00
5630
Broken Clasp
100.00
5640
Missing Tooth -Partial Denture (each)
40.00
5650
Addition of Tooth -Partial Denture (each)
40.00
5660
Addition of Clasp
100.00
Denture Relines
f
5730
Upper Complete-Chairside
165.00
5731
Lower Complete-Chairside
165.00
5740
Upper Partial-Chairside
140.00
5741
Lower Partial-Chairside
140.00
5750
Upper Complete -Laboratory
175.00
5751
Lower Complete=Laboratory
175.00
5760
Upper Partial -Laboratory
175.00
5761
bower Partial -Laboratory
175.00
6920
Recementation of Maryland Bridge
60.00
6930
Re cement Bridge
60.00
Oral Surgertc
7140
Simple Extraction
75.00
7140
Simple Extraction (third molar)
85.00
7210
Su .cal Extraction
95.00
7210
Surgical Extraction (third molar)
115.00
7220
SA Tissue Impaction
165.00
7230
Partial Bony Impaction
225.00
7240
Full Bony Impaction
275.00
7250
Removal of Residual Root Tip
90.00
7260
Fistula Closure
275.00
7281
Exposure of Unerupted/Impacted Tooth
95.00
7285
Hard Tissue Biopsy (exc. path report)
195.00
7286
Soft Tissue Biopsy (exc, path report)
195.00
7310
Alveoloplasty With Extractions
105.00
7320
Alveoloplasty Without Extractions
185.00
7321
Tuberosity Reduction
95.00
7452
Excision of Hyperplastic Tissue -Quadrant
105.00
Dentrust Dental Texas. P.C.
7510 Incision & Drainage Intraorai 175.00
7971 Excision of Pericoronal Gingiva 65.00
Miscellaneous
9110 Palliative Treatment 75.00
9941 Athletic Mouthguard 85.00
AGREEMENT FOR DENTAL SERVICES
ADDENDUM
THIS ADDENDUM, made this 4th day of February 2022, by and between
the COUNTY OF BRAZOS, having its principal place of business at 1700 Highway 21
West, Bryan, Texas 77803 (hereinafter referred to as the "COUNTY") and DENTRUST
DENTAL TEXAS, P.C. having its principal place of business at 6097 Easton Road,
Pipersville, PA 18947 (hereinafter referred to as "DENTRUST").
WHEREAS, the parties entered into an Agreement dated 30 July 2019, ("Original
Agreement") wherein DENTRUST was retained to provide dental care for inmates and
detainees at the Brazos County Detention Center;
WHEREAS, the Original Agreement, by its terms, is set to terminate on February
28, 2022; and
WHEREAS, the parties hereto wish to extend the Agreement for an additional one-
year renewal term;
WHEREAS, the Fee Schedule contained in the Original Agreement, Appendix "B"
has changed;
NOW THEREFORE, in consideration of the terms and conditions contained herein
and in the Original Agreement, the parties agree as follows:
FIRST: The term of the Agreement shall be extended for an additional
one (1) year period commencing March 1, 2022 and terminating February 28, 2023,
unless otherwise terminated in accordance with Paragraph "14" of the Original
Agreement.
1
SECOND: A revised Fee Schedule, Appendix °B", is attached hereto and
is effective through the extension period commencing March 1, 2022.
THIRD: All other terms and conditions of the Original Agreement shall
remain the same for the period of this renewal term.
IN WITNESS WHEREOF, the parties have executed this ADDENDUM on the date
hereinabove set forth.
ATTEST
COUNTY OF BRAZOS
Name: N� t e.�S
Title: Gou.cs 4 J LLOGE
DENTRUST DENTAL TEXAS, P.C.
Name: Rishi
Title: CEO
2
DCSHEALTH
APPENDIX " B"
TEXAS FEE SCHEDULE
Brazos County
Effective 3/1/2022
ADA Code
Procedure
Tooth #
Fee
0110
INITIAL EXAM
$ 45.00
0120
PERIODIC EXAMINATION
$ 45.00
0140
PROBLEM FOCUSED
$ 45.00
0220
PERIAPICAL-FIRST FILM
$ 25.00
0230
PERIAPICAL-ADDITIONAL FILM
$ 20.00
0270
BITEWING-SINGLE
$ 20.00
0272
BITEWING-TWO FILMS
$ 30.00
0273
BITEWING-THREE FILMS
$ 35.00
0274
BITEWING-FOUR FILMS
$ 40.00
1110
ADULT PROPHYLAXIS
$ 95.00
2140
AMALGAM-PERMANANT-ONE SURFACE
$ 75.00
2150
AMALGAM-PERMANANT-TWO SURFACE
$ 95.00
2160
AMALGAM-PERMANANT-THREE SURFACE
$ 115.00
2161
AMALGAM-PERMANANT-FOUR SURFACE
$ 135.00
2162
AMALGAM-PERMANANT-FIVE SURFACE
$ 150.00
2330
COMPOSITE RESIN - ONE SURFACE
$ 90.00
2331
COMPOSITE RESIN - TWO SURFACE
$ 105.00
2332
COMPOSITE RESIN - THREE SURFACE
$ 135.00
2335
COMPOSITE RESIN - FOUR SURFACE OR INC!
$ 155.00
2391
RESIN BASED COMPOSITE; ONE SURFACE
$ 95.00
2392
RESIN BASED COMPOSITE; TWO SURFACES,
$ 130.00
2393
RESIN BASED COMPOSITE; THREE SURFACE
$ 165.00
2394
RESIN BASED COMPOSITE; FOUR OR MORES
$ 195.00
2920
RECEMENT CROWN
$ 85.00
2940
SEDATIVE FILLING
$ 85.00
2950
BUILDUP FOR CROWN
$ 145.00
3110
PULP CAP -DIRECT
$ 45.00
3120
PULP CAP -INDIRECT
$ 45.00
3220
VITAL PULPOTOMY
$ 125.00
3310
ROOT CANAL -ANTERIOR TOOTH
'
3320
ROOT CANAL -BICUSPID TOOTH
'
3330
ROOT CANAL -THREE CANAL MOLAR
'
4320
PROVISIONAL SPLINTING ITRACORONAL
$ 255.00
4321
PROVISIONAL SPLINTING EXTRACORONAL
$ 255.00
4330
OCCLUSAL ADJUSTMENT
$ 85.00
4331
OCCLUSAL ADJUSTMENT COMPLETE
$ 150.00
4340
SCALING & ROOTPLANING
$ 375.00
4341
QUADRANT SCALE/ROOTPLANING
$ 145.00
4342
PERIO SCALING & ROOT PLANNING ONE-THR
$ 125.00
5110
COMPLETE UPPER DENTURE
'
5120
COMPLETE LOWER DENTURE
5130
IMMEDIATE UPPER DENTURE
'
5140
IMMEDIATE LOWER DENTURE
'
5211
MAXILLARY PARTIAL;RESIN BASE
'
5212
MANDIBULAR PARTIAL; RESIN BASE
'
DCSHEALTH
ADA Code
Procedure
Tooth #
Fee
5213
UPPER CAST PARTIAL
5214
LOWER CAST PARTIAL
5410
ADJUSTMENT COMPLETE UPPER
$ 75.00
5411
ADJUSTMENT COMPLETE LOWER
$ 75.00
5421
ADJUSTMENT PARTIAL UPPER
$ 75.00
5422
ADJUSTMENT PARTIAL LOWER
$ 75.00
7140
EXTRACTION, ERUPTED TOOTH OR EXPOSED
$ 110.00
7140
EXTRACTION, ERUPTED TOOTH OR EXPOSED
1
$ 125.00
7140
EXTRACTION, ERUPTED TOOTH OR EXPOSED
16
$ 125.00
7140
EXTRACTION, ERUPTED TOOTH OR EXPOSED
17
$ 125.00
7140
EXTRACTION, ERUPTED TOOTH OR EXPOSED
32
$ 125.00
7210
SURGICAL EXTRACTION
$ 135.00
7210
SURGICAL EXTRACTION
1
$ 155.00
7210
SURGICAL EXTRACTION
16
$ 155.00
7210
SURGICAL EXTRACTION
17
$ 155.00
7210
SURGICAL EXTRACTION
32
$ 155.00
7220
SOFT TISSUE IMPACTION
$ 190.00
7230
PARTIAL BONY IMPACTION
$ 255.00
7240
FULL BONY IMPACTION
$ 325.00
7250
REMOVAL OF RESIDUAL ROOT TIP
$ 125.00
7310
ALVEOLOPLASTY WITH EXTRACTIONS
$ 135.00
7320
ALVEOLOPLASTY WITHOUT EXTRACTIONS
$ 185.00
7510
INCISION & DRAINAGE INTRAORAL
$ 175.00
9110
PALLITIVE TREATMENT
$ 95.00
X010
ITRAVEL
$ 65.00
° Non -Routine Services. These services can be provided at the request of the facility and in
consultation with DOCS' Chief Dental Officer. Non -Routine Services will require prior written
approval from the Jail Administration.
AGREEMENT FOR DENTAL SERVICES
ADDENDUM 2
THIS ADDENDUM 2, made this 201 day of October 2022, by and between
the COUNTY OF BRAZOS, having its principal place of business at 1700 Highway 21
West, Bryan, Texas 77803 (hereinafter referred to as the "COUNTY") and DENTRUST
DENTAL TEXAS, P.C. having its principal place of business at 6097 Easton Road,
Pipersville, PA 18947 (hereinafter referred to as "DENTRUST").
WHEREAS, the parties entered into an Agreement dated 30 July 2019, ("Original
Agreement') and subsequent Addendum, wherein DENTRUST was retained to provide
dental care for inmates and detainees at the Brazos County Detention Center;
WHEREAS, the Addendum dated 4 February 2022, ("Addendum") by its terms, is
set to terminate on February 28, 2023; and
WHEREAS, the parties hereto wish to extend this Addendum for an additional one-
year renewal term;
NOW THEREFORE, in consideration of the terms and conditions contained herein
and in the Original Agreement and Addendum, the parties agree as follows:
FIRST: The term of the Addendum shall be extended for an additional
one (1) year period commencing March 1, 2023, and terminating February 28, 2024,
unless otherwise terminated in accordance with Paragraph "14" of the Original
Agreement.
SECOND: All other terms and conditions of the Original Agreement and
subsequent Addendum shall remain the same for the period of this renewal term.
1
IN WITNESS WHEREOF, the parties have executed this ADDENDUM 2 on the
date hereinabove set forth.
ATTEST
ATTEST
W I
,,M.MwrAArW,Ale1ll
COUNTY OF BRAZOS
Name: fpuA�Jt PE-VE25
Title: & o,.kN , y
ST DENTAL TEXAS, P.C.
E
AGREEMENT BETWEEN COUNTY AND ENGINEER
THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN
ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION.
THIS AGREEMENT is made on the Z day of L7648 M501C , 2023,
Between the COUNTY: BRAZOS COUNTY, TEXAS
c/o Brazos County Commissioners Court
Attention: County Judge
200 S. Texas Ave.
Suite 332
Bryan, Texas 77803
and the ENGINEER: Binkley & Barfield, Inc.
Attention: Brandon M. Boatcallie, PE
1701 Southwest Parkway
Suite 111
College Station, Texas 77840
for the following PROJECT: Professional Engineering and Surveying Services for
Project CIP 23-600 SH 47 at SH 21
in an AMOUNT not to exceed: Three Million, Six Hundred Ninety -Seven Thousand, Three
Hundred Sixty and 00/1-00 Dollars ($3,697,360.00)
The COUNTY and ENGINEER agree as set forth below.
ARTICLE I
ENGINEER'S RESPONSIBILITY
1.1 ENGINEER'S SERVICE
1.1.1 The ENGINEER'S services consist of those services performed by the ENGINEER, ENGINEER'S
employees and the ENGINEER'S consultants as enumerated in Articles 2 and 3 of this Agreement.
1.1.2 The ENGINEER'S services shall be performed as expeditiously as is consistent with professional
skill and care and the orderly progress of the Work. The ENGINEER shall submit for the COUNTY'S
approval a schedule for the performance of the ENGINEER'S services which may be adjusted as the Project
proceeds and shall include allowances for periods of time required for the COUNTY'S review and for
approval of submissions by authorities having jurisdiction over the Project. Time limits established by this
schedule approved by the COUNTY shall not, except for reasonable cause, be exceeded by the ENGINEER
or the COUNTY.
ARTICLE II
SCOPE OF ENGINEER'S BASIC SERVICES
2.1 DEFINITION
2.1.1 The ENGINEER'S Basic Services consist of those described in attached Exhibit "A" and
incorporated by reference hereto — SCOPE OF BASIC SERVICES TO BE PROVIDED BY BINKLEY &
BARFIELD, INC., TO BRAZOS COUNTY.
ARTICLE III
ADDITIONAL SERVICES
3.1 GENERAL
3.1.1 The services described in attached Exhibit "A" as Additional Services are not included in the Basic
Services. It is expressly understood and agreed that ENGINEER shall not furnish any of the additional
services without the prior written authorization of the COUNTY or the COUNTY'S designee. The
COUNTY shall have no obligation to pay for such additional services, which have been performed without
the prior written authorization of the COUNTY as herein above provided.
3.1.2 Services which could possibly be required, but at the time of this Agreement were yet to be
determined and which are not included in the Basic Services or Additional Services as identified and
described in EXHIBIT "A" and EXHIBIT `B," respectively, shall be considered Contingent Additional
Services. A list of possible Contingent Additional Services that could be needed as the Project proceeds is
included at the end of Exhibit `B."
It is expressly understood and agreed that the ENGINEER shall not furnish any of the Contingent
Additional Services without the prior written authorization of the COUNTY or the COUNTY'S designee.
The COUNTY shall have no obligation to pay for such Contingent Additional Services, which have been
performed without the prior written authorization of the COUNTY as herein above provided.
ARTICLE IV
COUNTY'S RESPONSIBILITY
4.1 The COUNTY shall provide full information regarding requirements for the Project, including a
program, which shall set forth the COUNTY's objective, schedules, constraints, and criteria.
4.2 The' COUNTY shall establish and update an overall budget for the Project, including the
Construction Cost, the COUNTY'S other costs and reasonable contingencies related to all of these costs.
4.3 The COUNTY shall designate a representative authorized to act on the COUNTY'S behalf with
respect to the Project. The COUNTY, or such authorized representative, shall render decisions in a timely
manner pertaining to documents submitted by the ENGINEER in order to avoid unreasonable delay in the
orderly and sequential progress of the ENGINEER'S service.
4.4 The COUNTY shall give prompt written notice to the ENGINEER if the COUNTY becomes aware
of any fault or defect in the Project or non-conformance with the contract documents. Any delay by the
COUNTY in providing said notice shall not constitute a waiver, a bar or act to estop the COUNTY from
exercising any of its rights under this contract.
4.5 Examine all studies, reports, sketches, drawings, specifications, proposals and other documents
presented by the ENGINEER, obtain advice of an attorney, insurance counselor and other consultants as
the COUNTY deems appropriate for such examination and render in writing decisions pertaining thereto
within a reasonable time so as not to delay the services of the ENGINEER.
4.6 The proposed language of certificates or certifications requested of the ENGINEER or the
ENGINEER'S consultants shall be submitted to the ENGINEER for review and approval at least 14 days
prior to execution. The COUNTY shall not request certifications that would require knowledge or services
beyond the scope of this Agreement.
4.7 The COUNTY shall also provide those specific items identified in the attached Exhibit A
incorporated by reference hereto — ITEMS TO BE PROVIDED BY THE COUNTY TO THE ENGINEER.
ARTICLE V
CONSTRUCTION COST
5.1 DEFINITION
5.1.1 The Construction Cost shall be the total cost or estimated cost to the COUNTY of all elements of
the Project designed or specified by the ENGINEER.
5.1.2 -The Construction Cost shall include the cost at current market rates of labor and materials fumished
by the COUNTY and equipment designed, specified, selected or specially provided by the ENGINEER,
plus a reasonable allowance for the Contractor's overhead and profit. In addition, a reasonable allowance
for contingencies shall be included for market conditions at the time of bidding and for changes in the work
during construction.
5.1.3 Construction Cost does not include the compensation of the ENGINEER and the ENGINEER'S
consultants, the costs of the land, right-of-way, financing or other costs which are the responsibility of the
COUNTY.
5.2 RESPONSIBILITY FOR CONSTRUCTION COSTS
5.2.1 Evaluations of the COUNTY'S Project budget, preliminary estimates of Construction Cost and
detailed estimates of Construction Cost, if any, prepared by the ENGINEER, represent the ENGINEER'S
best judgment as a design professional familiar with the construction industry. It is recognized, however,
that neither the ENGINEER nor the COUNTY has control over the cost of labor, materials or equipment,
over the. Contractor's methods of determining bid prices, or over competitive bidding, market or negotiating
conditions. Accordingly, the ENGINEER cannot and does not warrant or represent that bids or negotiated
prices will not vary from the COUNTY'S Project budget or from any estimate of Construction Cost or
evaluation prepared or agreed to by the ENGINEER.
ARTICLE VI
USE OF ENGINEER'S DRAWINGS, SPECIFICATIONS, AND OTHER DOCUMENTS
6.1 The COUNTY shall be the absolute and unqualified owner of all drawings, preliminary layouts,
record drawings, sketches and other documents prepared pursuant to this Agreement by the ENGINEER
with the same force and effect as if the COUNTY prepared same. Copies of complete or partially completed
mylar reproducible, preliminary layouts, record drawings, sketches and other documents prepared pursuant
to this Agreement shall be delivered to the COUNTY when and if this Agreement is terminated or upon
completion of this Agreement, whichever occurs first. The ENGINEER may retain one set of reproducible
copies of the documents and these copies shall be for the ENGINEER'S sole use in preparation of studies
or reports for the COUNTY. The ENGINEER is expressly prohibited from selling, licensing, or otherwise
marketing or donating these documents, or using the documents in preparation of other work for any other
client, without the prior express written permission of the COUNTY.
6.2 All documents including reports, drawings and specifications prepared by the ENGINEER pursuant
to this Agreement are instruments of service in respect of the Project. They are not intended or represented
to be suitable for reuse by the COUNTY or others on extensions of the Project or on any other project. Any
reuse without written verification or adaptation by the ENGINEER for the specific purposes intended will
be at the COUNTY'S sole risk and without liability or legal exposure to the ENGINEER. Any such
verification or adaptation will entitle the ENGINEER to further compensation at rates to be agreed upon by
the COUNTY and the ENGINEER.
6.3 Submission or distribution of documents to meet official regulatory requirements or for similar
purposes in connection with the Project is not to be construed as publication in derogation of the
ENGINEER'S reserved rights.
ARTICLE VII
-TERMINATION, SUSPENSION, OR -ABANDONMENT
7.1 This Agreement may be terminated by either party upon not less than fourteen (14) days written
notice should the other party fail to substantially perform in accordance with the terms of this Agreement
through no fault of the party initiating the termination.
7.2 If the COUNTY suspends the Project for more than thirty (30) consecutive days, the ENGINEER
shall be compensated for services performed prior to notice of such suspension.
7.3 This Agreement may be terminated by the COUNTY upon not less than fourteen (14) days written
notice to the ENGINEER in the event that the Proj ect is permanently abandoned. If the COUNTY abandons
the Project for more than ninety (90) consecutive days, the ENGINEER may terminate this Agreement by
giving written notice.
7.4 If the COUNTY fails to give prompt written authorization to proceed with any phase of services
after completion of the immediately preceding phase, the ENGINEER may, after giving seven (7) days
written notice to the COUNTY, suspend services under this Agreement.
7.5 Failure of the COUNTY to make payments to the ENGINEER in accordance with this Agreement
shall be considered substantial nonperformance and cause for termination.
7.6 If the COUNTY fails to make payment when due to the ENGINEER for services and expenses, the
ENGINEER may, upon seven (7) days written notice to the COUNTY, suspend performance of services
under this Agreement. Unless the ENGINEER receives payment in full within seven (7) days of the date
of the notice, the suspension shall take effect without further notice. In the event of a suspension of services,
the ENGINEER shall have no liability to the COUNTY for delay or damage caused by the COUNTY
because of suspension of services.
7.7 In the event of termination that is not the fault of the ENGINEER, the ENGINEER shall be
compensated for services performed prior to termination, together with Reimbursable Expenses, if any,
then due.
ARTICLE VIII
MISCELLANEOUS PROVISIONS
8.1 Unless otherwise provided, this Agreement shall be governed by the law of the principal place of
business of the COUNTY. Venue for any dispute or disagreement regarding the terms of this Agreement
shall be in Brazos County, Texas.
8.2 Causes of action between the parties to this Agreement pertaining to acts or failures to act shall be
deemed to have accrued and the applicable statutes of limitation shall commence to run not later than either
the date of Substantial Completion, or the date of issuance of the final Certificate for Payment for acts or
failures to act occurring after Substantial Completion.
8.3 The COUNTY and the ENGINEER, respectively, bind themselves, their partners, successors,
assigns and legal representatives to the other party to this Agreement and to the partners, successors, assigns
and legal representative of such other party with respect to all covenants of this Agreement. Neither the
COUNTYnor the ENGINEER shall assign -this Agreement without the express written consent of the other
Ply
8.4 This Agreement represents the entire integrated agreement between the COUNTY and the
ENGINEER and supersedes all prior negotiations, representations or agreements, either written. or oral.
This Agreement may be amended only by written instrument signed by both the COUNTY and the
ENGINEER.
8.5 Nothing contained in this Agreement shall create a contractual relationship with or a cause of action
in favor of a third party against either the COUNTY or the ENGINEER
8.6 Unless otherwise provided for in this Agreement, the ENGINEER and the ENGINEER'S
consultants have no responsibility for the discovery, presence, handling, removal or disposal of, or exposure
of persons to, hazardous materials in any form at the Project site, including but not limited to asbestos,
asbestos products, polychlorinated biphenyl (PCB) or other toxic substances.
8.7 The ENGINEER shall have the right to include representations of the design of the Project,
including photographs, among the ENGINEER'S promotional professional materials. The ENGINEER'S
materials shall not include the COUNTY'S confidential or proprietary information, if the COUNTY has
previously advised the ENGINEER in writing of the specific information considered by the COUNTY to
be confidential or proprietary.
8.8 COMPLIANCE AND STANDARDS. The ENGINEER agrees to perform the work hereunder in
accordance with generally accepted standards applicable thereto, and shall use that degree of care and skill
commensurate with the engineering profession to comply with all applicable state, federal and local laws,
ordinances, rules and regulations relating to the work to be performed hereunder and the ENGINEER'S
performance.
8.9 SURVEYING SERVICES: In accordance with the Professional Land Surveying Practices Act of
1989, the COUNTY is informed that any complaints about surveying services may be forwarded to the
Texas Board of Professional Land Surveying, 7701 North Lamar, Suite 400, Austin, Texas 78752, (512)
452-9427.
8.10 INDEMNIFICATION: ENGINEER shall save and hold harmless the COUNTY from and against
any and all claims and liability due to activities of the ENGINEER, its agents or employees, performed
under this Agreement and which result from any negligent act, error, or omission of the ENGINEER, or of
any person employed by the ENGINEER. The ENGINEER shall also save harmless the COUNTY from
and against any and all expenses, including attorney's fees which might be incurred by the COUNTY in
litigation, or otherwise, resisting said claims or liabilities which might be imposed on the COUNTY as the
result of such activities by the ENGINEER, its agents or employees.
ARTICLE IX
PAYMENTS TO THE ENGINEER
9.1 PAYMENTS ON ACCOUNT OF BASIC SERVICES
9.1.1 Upon approval by the COUNTY, or the COUNTY'S designee, payment for Basic Services shall
be made monthly and shall be in proportion -to services performed that month within each phase of service.
9.2 PAYMENTS ON ACCOUNT OF ADDITIONAL SERVICES
9.2.1 Upon approval by the COUNTY or the COUNTY'S designee of the ENGINEER'S statement of
services rendered or expenses incurred, payment on account of the ENGINEER'S Additional Services and
for Reimbursable Expenses shall be made monthly.
9.3 PAYMENTS WITHHELD
9.3.1 No deductions shall be made from the ENGINEER'S compensation on account of penalty,
liquidated damages or other sums withheld from payments to Contractors, or on account of the cost of
changes in the work other than those for which the ENGINEER has been found to be liable.
9.4 ENGINEER'S ACCOUNTING RECORDS
9.4.1 Records of Reimbursable Expenses pertaining to Additional Services and services performed on
an hourly basis shall be available to the COUNTY or the COUNTY'S authorized representative at mutually
convenient times.
9.5 LIMIT OF APPROPRIATION
9.5.1 Prior to the execution of this Agreement, the ENGINEER has been advised by the COUNTY and
the ENGINEER fully understand and agrees, such understanding and agreement being of the absolute
essence to this Agreement, that the total maximum compensation that ENGINEER may become entitled to
hereunder, and the total maximum sum that the COUNTY shall become liable to pay to the ENGINEER
hereunder, shall not, under any conditions, circumstances or interpretations hereof, exceed the sum certified
as available by the County Auditor in the Auditor's Certificate attached hereto.
ARTICLE X
BASIS OF COMPENSATION
The COUNTY shall compensate the ENGINEER from funds obtained through the Transportation Road
Improvement Program Initiative or current revenue of Brazos County as follows:
10.1 BASIC COMPENSATION
10.1.1 For Basic Services, as described in Article 2, Basic Compensation shall be computed as follows:
In accordance with the attached Exhibit "C" incorporated by reference hereto, SCHEDULE OF
FEES.
10.2 COMPENSATION FOR ADDITIONAL SERVICES
10.2.1 For Additional Services of the ENGINEER, as described in Article 3, compensation shall be
computed as follows:
In accordance with the attached Exhibit "C" incorporated by reference hereto, SCHEDULE OF FEES.
10.3 COMPENSATION FOR CONTINGENT ADDITIONAL SERVICES
10.3.1 For Contingent Additional Services of the ENGINEER, as described in Article 3, compensation
shall be computed as follows:
In accordance with the attached Exhibit "C" incorporated by reference hereto, SCHEDULE OF FEES.
10.3.2 Payments shall be made by the COUNTY in accordance with Texas Government Code Chapter
2251' The COUNTY shall pay the ENGINEER'S statement as approved by the COUNTY's designee
within thirty (30) days after the COUNTY' S designee's approval of the same, provided that the approval
or payment of any such statement shall not be considered to be evidence of performance by the ENGINEER
to the point indicated by such statement or of receipt or acceptance by the COUNTY of the work covered
by such statement.
ARTICLE XI
OTHER CONDITIONS OR SERVICES
11.1 INSURANCE
11.1.1 The ENGINEER shall file with the COUNTY a Certificate of Professional Liability (Errors and
Omissions) Insurance having minimum limits of One Million and No/100 Dollars ($1,000,000.00) for each
occurrence and annual One Million and No/100 Dollars ($1,000,000.00) aggregate. Such Professional
Liability (Errors and Omissions) Insurance shall have a deductible not in excess of Two Hundred Thousand
and No/100 Dollars ($200,000.00) self -insured. Such Certificate shall bear the endorsement "Not to be
canceled without thirty (30) days prior notice to BRAZOS COUNTY, TEXAS." The ENGINEER shall
maintain the Professional Lability (Errors and Omissions) Insurance at all times this Agreement is in effect
and for a period of five (5) years after completion of the Project. Failure to maintain the required insurance
shall be deemed to be a material breach of this Agreement.
The ENGINEER shall also provide Worker's Compensation, automobile and comprehensive general
liability policies. The ENGINEER shall deliver the insurance certificates to the COUNTY. The coverage
provided herein shall contain an endorsement providing thirty (30) days notice to the COUNTY prior to
any cancellation of coverage. Said coverage shall be written by an insurer acceptable to the COUNTY and
shall be in a form acceptable to the COUNTY. If the ENGINEER has canceled or allowed to lapse any of
these insurance policies then the COUNTY may pay for such insurance and may hold the amount of such
payment out of the ENGINEER's fees or be otherwise reimbursed. Failure to maintain the required
insurance shall be deemed to be a material breach of this Agreement.
11.2 PERIODS OF SERVICE
11.2.1 The ENGINEER shall begin work immediately upon receipt of the Notice -to -Proceed in writing
by the COUNTY or the COUNTY's designee. The project will proceed according to the schedule shown
in Exhibit "A." The schedule makes certain assumptions regarding review processes and other activities
that are beyond the control of the ENGINEER.
11.2.2 ' Working days shall- be defined- as standard workdays between Monday and Friday, exclusive of
national holidays.
11.2.3 This schedule assumes an orderly progression of the ENGINEER'S services. Delays beyond the
control of the ENGINEER may be cause for extension of this period of service, in which case the
ENGINEER shall submit in writing to the COUNTY its request for such extensions a minimum of thirty
(30) calendar days prior to the end of the affected service period.
11.2.4 If the COUNTY has requested significant modifications or changes in the general scope, extent or
character of the Project, the time or performance of the ENGINEER'S services shall be adjusted equitably.
11.3 PROJECT MANAGER COMMITMENT
11.3.1 The COUNTY expects the ENGINEER to commit its PROJECT MANAGER and TASK
LEADERS, as proposed in the RFQ, for the duration of the contract. The COUNTY further expects the
PROJECT MANAGER's commitment to the contract to include commitment as PROJECT MANAGER
for each work authorization without further delegation or substitution over the course of the contract.
PROJECT MANAGER replacement on an active contract, while not strictly prohibited, will require the
COUNTY's prior consent.
11.3.2 Requirement for Submittal of Request by Provider:
When requesting a replacement for a PROJECT MANAGER or TASK LEADER, the ENGINEER must
submit a request to the COUNTY with the following information:
• Certification that replacement PROJECT MANAGER is employed by the ENGINEER, or
certification that the replacement TASK LEADER is employed by the ENGINEER or one of the
approved subconsultants.
• The name of proposed individual and the reason for the replacement.
• Resume of the proposed replacement including, the credentials and experience of the individual.
Also include information about their licensures, TxDOT pre -certifications, or other certifications
required in the contract.
• Resume of the person being replaced.
This Agreement entered into as of the day and year first written above.
The undersigned officers and/or agents of the parties hereto are the properly authorized officials and have
the necessary authority to execute this Agreement on behalf of the parties hereto, and each party hereby
certifies to the other that any necessary resolution extending said authority have been duly passed and are
now in force and effect.
BRAZOS COUNTY, TEXAS
Duane Peters, County Judge
Acting by and through the authority of
the Brazos County Commissioners Court
Attest:
AUDITOR'S CERTIFICATE
ENGINEERING FIRM
by:
Brandon M. Boatcallie
Corporate Vice President
Binkley & Barfield, Inc.
I hereby certify that funds are available in the amount of $ to
accomplish and pay the obligation of Brazos County under this contract.
Brazos County Auditor
Contract ID No. CIP 23-600
Project 2 SH 47
EXHIBIT A
SERVICES TO BE PROVIDED BY THE ENGINEER
PROJECT DESCRIPTION
The Engineer shall provide preliminary engineering services for development of a design schematic,
environmental documents, and studies in support of the schematic work, public involvement, permit
procurement, data collection and analysis, mitigation and remediation, monitoring, drainage, conceptual traffic
control, traffic projections, traffic engineering and operations including capacity analysis, traffic simulations,
safety analysis, and 3-13 modeling, surveying and mapping, utility engineering investigation, and. utility
coordination for SH 47 at SH 21 in Brazos County located within the State of Texas.
GENERAL REQUIREMENTS
1.1. Coordination.
The Engineer shall coordinate issues and communications with State's internal resource areas
through the County and State's Project Manager. The State will communicate the resolution of
issues and provide the Engineer direction through the State's Project Manager.
The Engineer shall notify the County/State and coordinate with adjacent engineers on all controls at
project interfaces. The Engineer shall document the coordination effort, and each engineer must
provide written concurrence regarding the agreed project controls and interfaces. In the event the
Engineer and the other adjacent engineers are unable to agree, the Engineer shall meet jointly with
the County/State and each adjacent engineer to resolve disagreements. If the engineers are unable
to resolve an issue with the County/State as mediator, the County/State may decide the issue and
the decision will be final.
The Engineer shall prepare each exhibit necessary for approval by each utility, and other
governmental or regulatory agency in compliance with the applicable format and guidelines required
by each entity and as approved by the County/State. The Engineer shall notify the County/State in
writing prior to beginning any work on any outside agency's exhibit.
1.2. Progress Reporting and Invoicing.
The Engineer shall submit each invoice in a format acceptable to the County.
With each invoice, the Engineer shall include a completed projected vs. actual invoice form. The
Engineer shall submit a monthly written progress report to the County and State's Project Manager
regardless of whether the Engineer is invoicing for that month.
The Engineer shall complete the services according to the milestone work schedule established in
the work authorization. The Engineer shall submit a monthly written progress report to the
County/State indicating the actual work accomplished during the month, scheduled work to be
accomplished for the month, the estimated work to be accomplished for the coming month,
problems encountered and actions taken to remedy them, list of meetings attended, and overall
status. The progress report must use a bar chart diagram to indicate the percentage complete of
each task shown on the previous report and the percentage complete of each task. The Engineer is
required to meet with the designated County/State project manager and/ environmental coordinator
on a monthly basis for progress tracking purposes unless prior written agreement is made with
County/State not to hold a meeting in any given month. The Engineer shall submit minutes of the
meeting- summarizing the events of the meeting within seven calendar days after each meeting.
The Engineer shall prepare a project work schedule, using the latest version of Primavera software
or another scheduling program approved by the County/State in writing. The schedules shall
Page 1 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
indicate tasks, subtasks, critical dates, milestones, deliverables, and review requirements in a
format that depicts the interdependence of the various items. The work schedule must incorporate
an allocation of time for stage reviews of the design schematic and the environmental documents
by County/State personnel. The Engineer shall present the work schedule to the County/State for
review and acceptance and provide assistance in interpreting the proposed work schedule. The
Engineer shall provide advance written notice to the County/State if the Engineer is not able to meet
the scheduled milestone review date.
Once the project has been completed and accepted by the State, the Engineer shall deliver all
electronic files to the State within 30 calendar days of County/State's written request.
Final payment is contingent upon the County/State's receipt and confirmation by the County/State's
Project Manager that the electronic files can be opened and are usable utilizing the current version
of the software in use by the State, all files are formatted in accordance with Computer Graphics
Files for Document and Information Exchange, and all the review comments have been addressed.
The Engineer shall prepare a letter of transmittal to accompany each document submittal to the
County/State. At a minimum, the letter of transmittal must include the TxDOT control -section -job
(CSJ) number, the highway number, county, project limits, TxDOT contract number, and TxDOT
work authorization number.
1.3. Traffic Control.
The Engineer shall provide all planning, labor, and equipment to develop and to execute each traffic
control plan (TCP) needed'by the Engineer to perform services under each work authorization. The
Engineer shall comply with the requirements of the most recent edition of the Texas Manual on
Uniform Traffic Control Devices (TMUTCD). The Engineer shall submit a copy of each TCP to the
State for approval prior commencing any work on any State roadway. The Engineer shall provide all
signs, flags, and safety equipment needed to execute the approved TCP. The Engineer shall notify
the State in writing 24 hours in advance of executing each TCP requiring a lane closure and shall
not begin lane closure without having obtained State's written approval. The Engineer shall ensure
that it's field crew possess a copy of the approved TCP on the job site at all times. Upon request by
the State, the field crew must make the TCP available to the State for inspection. The Engineer
shall assign charges for any required traffic control to the applicable function code.
1.4. Right of Entry. .
Prior to performing any work outside of the State's right of way, the Engineer shall request right of
entry from public and private landowners to allow services (e.g. environmental services, surveying
services, geotechnical services) to be performed and shall request concurrence from the State. The
Engineer shall prepare right of entry permissions, which must be signed by the landowner. Letters
or other materials seeking right of entry must contain explicit reference to the kinds of activities for
which right of entry is requested and an indication of the impacts (if any) that will result from
performance of these services. The Engineer shall not commit acts which will result in damages to
private property and shall make every effort to comply with the wishes and address the concerns of
private property owners.
1.5. Level of Effort.
For each work authorization, the Engineer shall base the level of effort at each phase on the prior
work developed in earlier phases without unnecessary repetition or re -study. As directed by the
State, the Engineer shall provide written justification regarding whether or not additional or repeated
level of effort of earlier completed work is warranted, or if additional detail will be better addressed
at a later stage in the project development.
1.6. Quality Assurance (QA) and Quality Control (QC).
The Engineer shall provide peer review at all levels. For each deliverable, the Engineer shall retain
evidence of their internal review and mark-up of that deliverable as preparation for submittal. A
milestone submittal is not considered complete unless the required milestone documents and
Page 2 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
associated internal mark-ups are submitted. If requested by the County/State's Project Manager,
the Engineer shall submit the Engineer's internal mark-up (e.g., red -lines, comments) developed as
part the Engineer's quality control step. When internal mark-ups are requested by the County/State
in advance, the County/State may reject the actual deliverable if the Engineer fails to provide
sufficient evidence of quality control. The Engineer shall clearly label each document submitted for
quality assurance as an internal mark-up document.
The Engineer shall perform QA and QC on all survey procedures, field surveys, data, and products
prior to delivery to the County/State. If, at any time, during the course of reviewing a survey
submittal it becomes apparent to the County/State that the submittal contains errors, omissions, or
inconsistencies, the County/State may cease its review and immediately return the submittal to the
Engineer for appropriate action by the Engineer. A submittal returned to the Engineer for this
reason is not a submittal for purposes of the submission schedule.
1.7. Underground excavation
If necessary, the Engineer shall contact the Texas Excavation Safety System, Inc. (DIGTESS) or
call telephone number 811 to have underground utilities marked prior to digging holes for right-of-
way monuments, utility engineering investigation, geotechnical investigation, or other purposes. The
Engineer shall separately contact utilities not a part of the DIGTESS organization. The Engineer
shall maintain documentation of all notification calls. The Engineer shall comply with Texas's
excavation laws.
1.8. Preventative Measures to Prevent the Spread of Oak Wilt Disease Contamination
The Engineer shall take the following preventive measures while cutting, pruning, or removing oak
trees in counties which have confirmed cases of oak wilt disease or when directed by the State:
A. When possible, employ alternative methods instead of pruning or cutting oak trees.
B. When possible, perform necessary pruning and cutting of healthy trees during January or
February when sap beetles are least active.
C. Treat wounds with pruning paint in oak wilt disease infected counties to discourage insects,
especially during warm weather.
D. Sterilize all pruning tools between each use on each tree with either Lysol spray or a 70 percent
rubbing alcohol solution.
E. Dispose of the tree cuttings by burning, burying, or another approved method.
1.9. Personal Protective Equipment (PPE).
A. The Engineer shall, and shall require its subcontractors to:
1. Provide personal protective equipment (PPE) to their personnel,
2. Provide business vehicles for their personnel, and
3. Require their personnel to use PPE and drive only business vehicles while performing work
on or near roadways.
B. The PPE must meet all:
1. Current standards set by Occupation Safety and Health Administration (OSHA)
2. TxDOT requirements (e.g., safety glasses, Type 3 (TY 3) pants for night work).
C. Each business vehicle must be clearly marked with the Engineer's business name, or the name
of the appropriate subcontractor, such that the name can be identified from a distance.
1.10. Training Requirements.
A. Each key staff member of the Engineer's project team that is performing or overseeing design or
plan review tasks must complete the Environmental Management System (EMS) e-Learning
Page 3 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
courses prescribed by the State prior to working on the project. The required training for key
staff members on the design project team is listed on the EMS training matrix, which may be
accessed at: hftps://ftp.txdot.gov/pub/txdot-info/env/ems/070-04-fiq.pd
The courses listed on the EMS training matrix are e-learning (online); unless otherwise noted as
classroom learning. Information about these online courses may be accessed at:
https://www.txdot gov/inside-txdottdivision/environmental/ems-courses html.
The Engineer shall ensure that each key staff member of the Engineer's project team that will
be performing or overseeing design or plan review tasks has completed the required training
listed on the EMS training matrix prior to working on the project. In addition, the Engineer shall
ensure that the required training is repeated by each key staff member of the project team
based on the repeat requirements stated in the EMS training matrix.
B. Deliverables for Training Requirements:
The Engineer shall provide a list, signed by the Engineer's Project Manager that includes the
following:
1. The names and titles of all key staff personnel performing or overseeing design or plan
review tasks
2. The names of the training courses completed by each person on the list
3. The completion dates for the training courses completed by each person on the list
The Engineer shall update this list and resubmit it to the State any time new key staff personnel
are assigned to the project team and any time training is repeated by key staff personnel on the
project.
1.11. Information Resources and Security Requirements.
Engineer (as °Contractor") shall perform its work in accordance with Information Resources and
Security Requirements. A Contractor -Related Entity might create, access, transmit, store, or use
Public TxDOT data in a Contractor -Related Entity Environment. Contractor shall ensure that
Contractor -Related Entity Environments comply with the TxDOT Low Security Baseline.
TASK DESCRIPTIONS AND FUNCTION CODES
The Engineer shall categorize each task performed to correspond with the Function Codes (FC) and Task
Descriptions.
FUNCTION CODE 102 (110) — FEASIBILITY STUDIES
ROUTE AND DESIGN STUDIES
The Engineer shall prepare an alignment and proposed roadway schematic layout that includes projected
traffic volumes and existing and proposed typical sections. The Engineer shall furnish Microsoft Office and
MicroStation and OpenRoads computer generated media containing the roadway schematic layout to the
County/State. All supporting attachments and exhibits must accompany the schematic layout. All MicroStation
and OpenRoads computer generated files containing the roadway design schematic must be fully compatible
with the software used by the County/State without further modification or conversion.
The Engineer shall produce, obtain, review, and evaluate existing and twenty-year projected traffic data for use
in the preparation of the schematic design layout. The.data must be utilized in accordance with the
requirements for schematic development and consistent with the policies of the County/State.
Page 4 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
The Engineer shall prepare preliminary drawings to identify any potential impacts and constraints within the
project corridor, including impacts to the nature, cultural, and human environment. The potential impacts. and
constraints identified must include all existing and proposed utilities (both public and private), structures, burial
grounds, neighborhood communities, historical landmarks, and undeveloped areas. Any potential utility
conflicts and structural impediments must be identified as such. The Engineer shall propose alternative
alignments that avoid or minimize displacements and damages and prepare any additional attachments or
exhibits required to illustrate a preferred alternative alignment. The Engineer shall assist the County/State with
agency meetings during the development of the schematic design as requested by the State. If requested by
the County/State, the Engineer shall prepare a Notice and Opportunity to Comment and assist the
County/State with stakeholder meetings, public meetings, and a public hearing, if requested.
An itemization of the schematic design and engineering work activity to be performed under this contract is
detailed below. The Engineer shall prepare all designs in accordance with the latest version of:
A. Roadway Design Manual, published by TxDOT
B. TxDOT Project Development Process Manual, published by TxDOT;
C. Policy on Geometric Design of Highways and Streets, published by the American Association
of State Highway and Transportation Officials' (AASHTO);
D. Standard Specifications for Construction of Highways, Streets, and Bridges, published by
TxDOT;
E. Texas Manual on Uniform Traffic Control Devices (TMUTCD), published by TxDOT;
F. Highway Capacity Manual (HCM), published by the Transportation Research Board (TRB);
G. Highway Safety Manual (HSM), published by AASHTO;
H. Hydraulic Design Manual, published by TxDOT;
I. Access Management Manual, published by TxDOT; and
J. other State approved manuals and guides.
When design criteria are not identified in these manuals, the Engineer shall notify the County/State and
request direction.
The design schematic horizontal layout must adhere to a design scale of 1 inch = 100 foot (or 1 inch = 200
foot, when directed by the State.) The Engineer shall develop the schematic layout, exhibits, and attachments
in English units. All Microsoft Office, MicroStation, Keyhole Markup Language (KML), Keyhole Markup
Language Zipped (KMZ), and Bentley OpenRoads computer graphic files furnished to the State must be
submitted on USB flash drive to the State in their native format, which must be fully compatible with the
programs currently used by the State. Schematics must follow TxDOT and Federal Highway Administration
(FHWA) standards. The schematic must follow TxDOT's computer -aided design and drafting (CADD)
standards. The Engineer shall submit the schematic as an original document, accompanied with an original
MicroStation formatted graphics file. Final copies of the schematic design must be signed and. sealed by a
professional engineer licensed in the state of Texas.
Schematic Design Work Outline.
A. Develop Base Maps
The Engineer shall develop the base maps to be used for the analysis and proposed
schematic layout from existing construction and right of way (ROW) plans as available. The
Engineer shall re-establish the existing centerline horizontal alignments for all roadways,
identify existing ROW and easements, property owners, and the approximate location of major
utilities based on a utility engineering investigation in the preparation of base maps.
B. Planimetrics and Aerial Mapping
Page 5 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
The Engineer shall obtain planimetrics, digital terrain modeling (DTM), and aerial photographs
from the County/State, if available.
C. Analyze Existing Conditions
Using collected data and base maps, the Engineer shall develop an overall analysis of the
existing conditions to develop the schematic design. The analysis must include the following:
ROW and easement determination
Horizontal alignment
Vertical alignment
Pavement cross slopes and pavement type
Soil exploration
Geotechnical testing
Intersection design and analysis
Sight distance
Large guide signs and roadside signing
Level of service
Safety (i.e., crash data)
Locations of critical constraints
Drainage
Traffic control and construction phasing sequence
D. Schematic Alternatives
The Engineer shall identify and analyze schematic alternatives to minimize potential adverse
operational impacts, crash impacts, ROW impacts, environmental impacts, major utility
conflicts, structural impediments, or exceptions to the State and. FHWA design criteria.
E. Deliverable Schematic
The Engineer shall evaluate and document the following in the analysis to optimize the design:
Efficient use of the allocated ROW
Control of access (COA) and driveway locations
Roadway and intersection geometry
Cross sections
Bicycle and pedestrian design
Drainage and hydraulic design
Stopping sight distance
Level of service
Safety
Traffic and signal operations
Construction, ROW, easement, and utility costs
Construction sequencing
Page 6 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
Traffic control during construction
Roadside safety appurtenances
Large guide signage
Environmental mitigation (e.g., noise walls, storm water best management practices (BMPs))
Bridge layouts and clearance
Railroads (if applicable)
Interface with existing high occupancy vehicle (HOV) lane, managed lanes, and park -and -ride
facilities
Accommodation of ultimate corridor configuration.
Accommodation of future cross street expansion as described in local thoroughfare plan (if
applicable)
Avoidance of utility lines (if feasible)
Impact of construction delays from utility relocations
F. Project Management and Coordination
The Engineer shall direct and coordinate the various elements and activities associated with
developing the design schematic.
The Engineer shall prepare the detailed graphic project work schedule indicating tasks, critical
dates, milestones, deliverables, and State review requirements. The project work schedule must
depict the order of the various tasks, milestones, and deliverables. The Engineer shall review
the schedule monthly and provide updates regarding its progress on the schedule to the State.
The Engineer shall submit written monthly progress reports to the State.
The Engineer shall provide ongoing quality assurance and quality control to ensure
completeness of product and compliance with the State procedures.
The Engineer shall conduct site visits in both the AM and PM peak hour and develop a technical
report that includes photographs outlining the findings and observations.
G. Data Collection
The Engineer shall conduct field reconnaissance and collect data as necessary to complete
the schematic design. Data must include the following information. Items 1 through 8 must be
obtained from the County/State, if available. Items 9 through 13 must be obtained from other
agencies as required.
1. Available corridor major investment studies
2. Design data from record drawings of existing and proposed facilities
3. Existing and future design year traffic data
4. Historical crash data
5. Roadway inventory information, including the number of lanes, speed limits, pavement
' widths and rating, bridge widths and ratings, and ROW widths
6. Aerial photos, planimetric mapping, and DTM
7: Environmental data
8. Previously prepared drainage studies
9. , Adopted land use maps and plans (if available)
Page 7 of 49
Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
10. Federal Emergency Management Agency (FEMA) flood boundary maps and flood insurance
studies and models
11. Public and private utility information
12. Plat research for adjacent properties (if available)
13. Local major thoroughfare plan
H. Roadway Design Criteria
The Engineer shall develop the roadway design criteria based on the TxDOT Roadway Design
Manual and AASHTO Policy on Geometric Design of Highways and Streets guidelines. The
design criteria must include the following roadway design elements: design speed, lane and
shoulder widths, pavement structure and slopes, horizontal curvatures, horizontal and vertical
clearances, range of vertical -profile -grades, and side slopes. If there is a discrepancy between
the two sources, the TxDOT Roadway Design Manual will govern unless otherwise directed by
the State.
I. Preliminary Design Conference
The Engineer shall prepare and submit a preliminary Design Summary Report (DSR) to the
County/State for review and approval and shall attend an initial kick-off meeting to establish
and agree on fundamental aspects, basic features, concepts, and design criteria. This meeting
will be coordinated with any adjacent roadway projects to ensure continuity with the design of
the adjacent roadway projects.
Schematic Design — General Tasks.
A. ROW Property Base Map
The Engineer shall obtain information on existing ROW, easements, and property information
from as -built plans, ROW maps, and tax records. The Engineer shall prepare a base map
depicting the information.
B. Typical Sections
.The Engineer shall develop both existing and proposed typical.sections that depict the number
and type of lanes, shoulders, median width, curb offsets, cross slope, border width, clear zone
widths, and ROW limits.
C. Environmental Constraints
The Engineer shall evaluate and document impacts to environmentally sensitive sites (as
identified by the Engineer and verified by the County/State) during the schematic design
process. Environmentally sensitive sites -include natural, cultural, and the human environment.
Examples are historic and archeological resources, burial grounds, neighborhood communities
and residential areas, farmland, floodplains, wetlands, endangered species, rare habitats,
wildlife corridors, wildlife crossings, parks and nature preserves, geologic features,
undeveloped areas, and significant trees.
D. Drainage
The Engineer shall use data from as -built plans and FEMA maps to locate drainage out falls and
to determine existing storm sewer and culvert sizes, design flows, and water surface elevations
for use in the design of roadway geometry.
The Engineer shall conduct a preliminary drainage study to determine and evaluate the
adequacy of the ROW needed to accommodate the proposed roadway and drainage system.
The drainage study must:
Page 8 of 49 - Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
identify the impacts to abutting properties and the 100-year floodplain due to proposed
highway improvements
identify the water surface elevations for the 2, 5, 10, 25, 50, and 100-year storm events
identify and locate outfalls
provide drainage outfall descriptions
provide overall drainage area map, sub -drainage area map, and storm water detention
facilities (if required)
For drainage crossings (3 crossings) located on FEMA studied streams located within the
project area or adjacent to the project area and receiving runoff from the project, the
effective FEMA models and previous Letter of Map Revision (LOMR) study models, will be
obtained, reviewed, and used. if the- review identifies no major inadequacies in the models
(1) If existing effective models are found inadequate, corrected effective models
shall be prepared in coordination with the flood plain administrator.
Provide a preliminary drainage study report identifying the results of the study.
The preliminary drainage report, which must be signed and sealed *by a professional engineer
licensed in Texas, must include applicable hydrologic and hydraulic models (e.g., HEC-1 and
HEC-2, HEC-RAS, HEC-HMS, XP-SWMM). The models must be approved by the local TxDOT
district hydraulic engineer prior to generating any reports. If requested, the Engineer shall
prepare a final drainage report in accordance with one or more of the following: TxDOT
Hydraulic Design Manual, local TxDOT district criteria, and any other specific guidance provided
by the State.
Preliminary storm sewer design shall be completed for the bridge deck drains (12 bridge
decks), four intersections, SH 21 and SH 47, and 3 additional intersections. The Engineer
shall complete a preliminary ditch design for the 6.0 miles of roadway improvements. The
ditch capacity shall be determined based on simplified calculations method such as
manning's equation. Preliminary outfall mitigation requirements shall be evaluated and
recommended based on proposed resulting outfall flows and velocities. The Engineer shall
prepare design sheets based on the recommended alternative, to a 30% design level, for
the following drainage items:
Preliminary Drainage Area Sheets for Stream Crossing Bridges & Bridge Class Culverts,
Non Bridge Class Culvert Crossings (Approximately 27 Crossings)
Preliminary Hydraulic Data Sheets for Stream Crossing Bridges & Bridge Class Culverts,
Non Bridge Class Culverts Crossings (Approximately 27 Crossings)
Preliminary Culvert Layout Sheets (Approximately 27 crossings)
Preliminary Storm Sewer plan sheets for four intersections along the project corridor.
Preliminary ditch layout shown on roadway roll plot and typical sections for approximately
6.0 miles
E. . ROW Requirements
The Engineer shall determine the ROW requirements based on the proposed alignment,
typical sections, design cross sections, access control, terrain, construction requirements,
Page 9 of 49 Exhibit A
Contract 1D No. CIP 23-600
Project 2 SH 47
drainage, clear zone, maintenance, intelligent transportation system (ITS), and environmental
constraints and mitigation requirements.
F. Construction Sequence
The Engineer shall evaluate and document the requirements for construction staging and
traffic control throughout the development of schematic design to ensure that the proposed
design can be constructed. The Engineer shall provide construction phasing assumptions to
the State as requested and provide preliminary traffic control plan (TCP) layouts.
G. Design Exceptions
The Engineer shall identify design exceptions and waivers. The Engineer shall determine the
necessity for each design exception or waiver for approval. If the County/State agrees that
design exception or waiver is necessary, the Engineer shall prepare the State's required
design exception or design waiver documentation. The Engineer shall document the
operational and safety analysis for comparison of the no -build, build with standard design, and
build with proposed design alternatives.
H. Traffic Data and Projections
The Engineer shall obtain the base year traffic data from TxDOT and develop the opening -
year, design -year (opening year +20), and pavement design year (opening year + 30) travel
forecasts, and related traffic analysis in coordination with the TxDOT Transportation Planning
and Programming Division (TPP). The developed traffic projections must be utilized for design
and environmental analysis. The Engineer shall develop traffic forecasts for the mainlanes,
ramps, cross streets, interchanges, intersections, and frontage roads for no -build and build
alternatives. These projections must include graphic representations of the anticipated daily
movements along the corridor (suitable for inclusion in the design schematic and
environmental document) and the traffic analysis for highway design table. The Engineer shall
prepare a traffic projections methodology memo, based on the information provided in the
traffic analysis package. The Engineer shall review the proposed methodology with the State
and refine it based on these discussions. The Engineer shall submit the traffic volumes
developed by the Engineer to TPP for review and approval (Option B). The Engineer shall
revise the traffic -volumes based on TPP's comments.
I. Financial Plan and Project Management Plan (OMITTED)
J. Traffic and Operational Analysis
The Engineer shall review and analyze traffic data (including percent trucks, design hourly
volume, and directional distribution), existing roadway features (including ramp locations,
weaving sections, number of lanes, offset to obstructions, lane widths, frontage road
operations, and intersection operation and geometry), traffic flow patterns, and transit and
traffic operations.
Engineer shall perform preliminary CAP-X analyses for the opening year and design year
(opening+20 year) to determine alternative intersection/interchange improvements which are
feasible within the study area. Engineer shall determine the 3 most feasible alternatives at
each intersection to be studied based on CAP-X results and these alternatives will be
presented for further study.
The Engineer shall conduct detailed capacity analysis studies for designated locations and
sections of. roadway and make recommendations for improving traffic flow. The Engineer shall
use VISSIM to analyze and make appropriate recommendations. The analysis must be done
for existing/base year, opening year, design year (opening+20 year), for existing and future
conditions for up to three (3) design alternatives. Results of this analysis must be incorporated
Page 10 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
into the schematic design. The Engineer shall develop and submit to TxDOT a traffic and
operational analysis report. summarizing all analysis performed. If microsimulation is used, the
Engineer shall develop and calibrate'an existing condition traffic model. The calibration memo
must be included in the traffic analysis report. The analysis must be performed using the latest
versions of TxDOT-approved software (e.g., HCS, Synchro, VISSIM, CORSIM, SIDRA).
K. Safety Analysis
The Engineer shall review and analyze historical crash data for latest 5 full calendar years
(i.e., January 1 to December 31, inclusive) with respect to crash characteristics such as
severity, crash types, frequency, rates, pattems, clusters, and their relationship to crash
contributing factors. The purpose of the historical crash analyses is to determine safety
performance of the existing conditions to understand any safety issues within the study area.
,Predictive; or quantitative safety analysis.,- involves -using -HSM-based methods that use safety
performance functions (SPFs) and crash modification factors (CMFs) to estimate anticipated
change in crashes from existing condition to the proposed design. The predictive safety
analysis must be done for no -build and build conditions for design year. The purpose of the
predictive safety analysis is to compare the safety performance of the no -build and build
(Preferred Alternative) alternatives to. help determine the preferred alternative and to
determine the countermeasures, if necessary, to improve safety. Bicycle and Pedestrian
Accommodations
The Engineer shall comply with the United States Department of Transportation Policy
Statement on Bicycle and Pedestrian Accommodation Regulations and Recommendations.
The inclusion of bicycle and pedestrian facilities must be evaluated when the project is
scoped. Public input when applicable, as well as local city and metropolitan planning
organization for bicycle and pedestrian plans must be considered in this evaluation.
L. Interstate Access Justification (OMITTED)
M. Toll -Managed, Express, High Occupancy Vehicle, Managed Lanes, Other Special -Use Lanes,
and Transit Elements (OMITTED)
N. Project Implementation Plan (OMITTED)
110.3. Conceptual Design Schematics.
The Engineer shall develop conceptual design schematics in MicroStation format to evaluate
various methods of handling traffic while providing access in key areas. The Engineer shall develop
a single recommended design alternative that optimizes traffic flow and access. Three (3)
conceptual alternatives will be developed for interchange at SH 21 and SH 47 and two (2) additional
alternate intersection options at each of the intersection of Luza Ln and SH 21, 5th Street and SH
47, Goodson Bend Road and SH 47 or another alternative approved by County/State. The
conceptual schematics are to be plan view only. Profile work must be done only to the extent
necessary to lay out the proper horizontal geometry.
The schematics must contain the following design elements:
A. Mainlane roadway alignment
B. Pavement edges, face of curbs, and shoulder lines of mainlanes, intersections, interchanges,
and connecting highways or streets
C. Typical sections of existing and proposed roadways
D. .Anticipated structure locations (including wildlife crossings and fencing structures)
E. Anticipated retaining wall and sound wall locations
F. Anticipated conveyance of major drainage elements
Page 11 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
G. Preliminary ROW and easement requirements and control -of -access locations
H. Diredtion of traffic flow and the number of lanes on all roadways
I. Existing and projected traffic volumes
J. Existing utilities
K. Waters of the United States (WOTUS)
110.4. Geometric Design Schematics.
The Engineer shall develop geometric design schematics based on the conceptual schematics after
the basic layout, lane arrangement, and anticipated ROW and easement impacts depicted on the
conceptual schematics are approved. The Engineer shall use Bentley OpenRoads tools in
performing this task. The geometric design schematics must include both a plan view and profile
view.
A. The geometric schematic plan view must contain the following design elements:
Bentley OpenRoads calculated roadway alignments for mainlanes, general purpose lanes,
ramps, direct connectors, bridges, frontage roads and cross streets at major intersections and
grade separations
Horizontal curve data shown in tabular format
Pavement edges, curb lines, and sidewalks for all roadway improvements
Typical sections of existing and proposed roadways
Proposed bridge structures, including bridge deck, abutment, bent, and rail locations
Proposed retaining walls and sound walls
Proposed cross -drainage structures with outfall flow arrows and significant drainage features or
waterways identified
Existing utilities and proposed utilities
Existing property lines and respective property ownership information
Existing ROW and easements
Proposed ROW and easements adequate for preparation of ROW maps
Waters of the US (WOTUS)
Control -of -access limits
Existing and projected traffic volumes
Location and text of the existing and proposed guide signs and the preliminary locations for
changeable message signs
Lane lines, shoulder lines, and direction of traffic flow arrows indicating the number of lanes on
all roadways
B. The geometric schematic profile view must contain the following design elements:
Calculated profile grade and vertical curve data including X' values for all curves and sight
distance values for crest vertical curves on the mainlanes
Existing ground line profiles along the mainlanes
Grade separations and overpasses including preliminary abutment and bent locations, girder
type, and span lengths
Page 12 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
Calculated vertical clearances at grade separations and overpasses
Anticipated cross -drainage structures with approximate inlet and outfall elevations
Proposed ditch grading (special grading), if it does not follow the typical section.
Approximate locations of existing and proposed major utility crossings
The calculated profile grade for frontage roads, connectors, ramps, and cross streets will be
shown on separate Supplemental Profile rolls
110.5. Cross -Sections.
The Engineer shall use a Bentley 3D OpenRoads model to generate preliminary cross -sections at
50 feet intervals (unless otherwise directed by the County/State) and at culvert locations in
conjunction with the geometric schematic. The Engineer shall determine earthwork volumes for use
in the cost estimate. The Engineer shall prepare 11 inch x17 inch or roll plots of the cross -sections.
110.6. Retaining Walls.
The Engineer shall prepare preliminary retaining wall concepts to be shown on schematics, typical
sections, and cross sections.
A. The Engineer shall determine if any additional walls are required and verify the need for and
length of the retaining wall as shown on the ultimate schematic.
B. The Engineer shall compute and tabulate retaining wall quantities for preliminary design
milestone plans submittal.
110.7. Renderings and Traffic Simulation.
The Engineer shall develop renderings, three-dimensional (31)) models, illustrations, and
animations as a means of expression and understanding for what the owner of a project envisions
and what the public perceives. In support of the public outreach effort, the State will choose
reasonable build alternatives, which the Engineer shall carry forward into creating one rendering
-and one traffic animation for each of the various alternatives. The Engineer shall create a 3D model
for the reasonable build alternatives from: horizontal and vertical alignments, existing and proposed
DTMs,. proposed typical sections, traffic counts, and ground photography. When requested by the
State, the Engineer shall use aerial video footage captured by unmanned aircraft systems (UAS).
The use of UAS is regulated by the Federal Aviation Administration (FAA). The Remote Pilot in
Command (RPIC) must possess a current FAA Remote Pilot Certificate (14 CFR Part 107) and be
sufficiently trained, capable, and competent to operate the type of system in the environment in
which it is to be operated. The RPIC must be responsible for the safe conduct of the UAS flight.
Visual Observers as required must be familiar with UAS operations and in positive two-way
communication with the RPIC. Additionally, operators must comply with the general safety protocols
established in the TxDOT Flight Operations Manual.
The animations and renderings must give the public and stakeholders a clear awareness and
appreciation for the reduction of traffic congestion and how traffic is to flow into and out of the
project area.
110.8. Preliminary Construction Sequence.
The Engineer shall prepare preliminary construction sequence layouts in conjunction with the
geometric design schematic depicting the phasing and traffic detours anticipated to safely convey
traffic. The layouts must demonstrate that adequate horizontal and vertical alignments are
maintained, sufficient lane widths and shoulder widths or barrier offsets are feasible, and
construction zones are adequate for constructability of all proposed features. Proposed construction
detours must ensure that adequate superelevation is provided. The layouts must indicate how
existing pedestrian and bicycle facilities are accommodated for each phase.
Page 13 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
110.9. Preliminary Cost Estimate.
The Engineer shall prepare a preliminary cost estimate for the 30%, 60%, 90%, and 100%
milestones of the project, including the costs of construction, required ROW and associated
improvements, and eligible utility adjustments. Current State unit bid prices must be used in
preparation of the estimate.
110.10. Engineering Summary Report.
The Engineer shall prepare an engineering summary report to summarize the design criteria, traffic
analysis, preliminary cost estimate and basis of estimate, construction sequence description, and
utility conflict issues.
110.11. Support or Attendance at Value Engineering Study.
If requested by-the-County/State in. a work authorization; the Engineer shall provide documents and
drawings to the County/State to support the value engineering study. If requested by the State in a
work authorization, the Engineer shall provide the number and type of personnel requested by the
County/State to attend the value engineering study.
110.12. Agency Coordination and Public Involvement.
A. The Engineer shall assist the County/State in conducting meetings with property owners,
stakeholders, and various agencies to discuss and review the schematic design. The Engineer
shall document and respond to issues related to the schematic design.
B. The Engineer shall prepare a Notice and Opportunity to Comment as needed and assist in
conducting public meetings and public hearing during the project development process. The
Engineer shall prepare schematic exhibits, constraints maps, and other necessary exhibits, and
assist the State with all presentations.
C. The Engineer shall coordinate, schedule, reserve, and pay for all meeting locations and
facilities.
D. For all public involvement activities, the Engineer shall prepare the adjacent property owner list;
mail out and pay for notices; draft letters to public officials; prepare, publish and pay for notices
to .major and. local. newspaper; .hire court reporter and. law. enforcement for public meetings and
hearing; and provide audio and visual rental equipment and changeable message boards.
E. The Engineer shall attend pre -meetings at the County and local TxDOT district in preparation
for every meeting and hearing, as directed by the County/State.
F. The Engineer shall compile public comments received and responses to comments and
prepare the required documentation for all public involvement activities. The Engineer shall
comply with the environmental compliance toolkits related to public involvement.
110.13. Schematic Design Project Deliverables.
In conjunction with the performance of the services included under Function Code 110 of this
attachment, the Engineer shall provide the following draft and final documents and associated
electronic files as applicable
A. Draft and final copies of the engineering summary report
B. Draft and final copies of the traffic and operational analysis report and safety analysis report for
non-interstates
C. Draft copies of the preliminary drainage study
D. Draft and final copies of the geometric schematic layouts on rolls, as requested by the State
E. 30%, 60%, 95%, and final copies of the conceptual design schematics roll plots
Page 14 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
F. 30%, 60%, 95%, and final copies of the geometric schematic layouts (1 inch = 100 feet)
G. 30%, 60%, 95%, and final copies of the design schematic profiles 'rolls
H. 30%, 60%, 96%, and final copies of the preliminary cross -sections in a roll plot format or 11
inch x17 inch format, as requested by the County/State
I. Electronic 3D model copy of the preliminary cross -sections created using OpenRoads tools
J. Six final copies of the preliminary drainage study
K. Electronic submittal of the hydrologic and hydraulic model digital files from the drainage study
L. Copies of the preliminary construction sequence layouts in a roll plot or 11 inch x 17 inch
format, as requested by the County/State
M. • Copies of the preliminary construction sequence typical -sections in 11 inch x17 inch format
N. Electronic copy of the 3D rendering and traffic simulation for the reasonable build alternatives
O. Electronic files shall be furnished to the State on a USB flash drive
P. Traffic data schematics ,
Q. Traffic projections methodology memo
R. Average daily corridor traffic projections report
S. Risk management plan
T. Participation in CER
U. Line schematics with traffic data shown
V. Documentation of public involvement activities
W. Utility plan — electronic file in latest version of MicroStation fully compatible with OpenRoads
civil design system
X. Design exception and design waiver documents
Y: Hard -copy- of a draft hydraulic report for review and comment
Z. Culvert hydraulic data sheets and preliminary culvert layouts
AA. Drainage report — one hard copy of final drainage report, one electronic copy of the entire
drainage report in PDF format, and computer files of hydrologic and hydraulic modeling with
appropriate labeling of location, CSJ, and submittal date
BB. Preliminary Retaining wall layouts
CC. Cost estimates for 30%, 60%, 95%, and final submittals
DD. KMZ or KML file of conceptual design schematic created from applicable DGN files for
reviewing in Google Earth
EE. Final schematic 3D model created using OpenRoads software
FF. Draft and final copies of traffic analysis report
FUNCTION CODE 120 (120) — SOCIAUECON/ENV STUDIES
SOCIAL, ECONOMIC, AND ENVIRONMENTAL STUDIES AND PUBLIC INVOLVEMENT
120.1. Environmental Documentation Standards.
Page 15 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
Each environmental service provided by the Engineer must have a deliverable. Deliverables must
summarize the methods used for the environmental services and the results achieved. The
summary of results must be sufficiently detailed to provide satisfactory basis for thorough review by
the State, FHWA, and (where applicable) other agencies with regulatory oversight. All deliverables
must meet regulatory requirements for legal sufficiency and adhere to the requirements for reports
enumerated in the State's National Environmental Policy Act of 1969 (NEPA) Memorandum of
Understanding (MOU).
A. Quality Assurance/Quality Control Review
For each deliverable, the Engineer shall perform quality assurance quality control (QA/QC)
reviews of environmental documents and on all supporting environmental documentation to
determine whether documents conform with:
1.- - Current Environmental, -Compliance Toolkit guidance, documentation requirements, and
templates published by TxDOT's Environmental Affairs Division (ENV) and in effect as of
the date of receipt of the documents or documentation to be reviewed;
2. Current state and federal laws, regulations, policies, guidance, agreements, and
memoranda of understanding between the State and other state or federal agencies; and
3. Guidelines contained in Improving the Quality of Environmental Documents, A Report of
the Joint AASHTO/ACEC Committee in Cooperation with the Federal Highway
Administration (May 2006) for:
a. Readability, and
b. Use of evidence and data in documents to support conclusions.
Upon request by the County/State, the Engineer shall provide documentation that the QA/QC
reviews were performed by qualified staff.
B. The Engineer shall maintain the project environmental record in TxDOT's Environmental
Compliance Oversight System (ECOS), including project review, completing the work
development plan screens, uploading documents, and completing activities as assigned by the
District.
C. Deliverables must contain all data acquired during the environmental service and be written to
be understood by the public in accordance with the TxDOT's Environmental Toolkit guidance,
documentation standards, and current guidelines, policies, and procedures.
D. Electronic versions of each deliverable must be written'in software that is fully compatible with
the software currently used by the County/State and provided in the native format of the
document for future use by the County/State. The Engineer shall supplement all hard copy
deliverables with electronic copies in searchable Adobe Acrobat (.pdf) format unless another
format is specified. Each deliverable must be a single, searchable .pdf file that mirrors the
layout and appearance of the physical deliverable. The Engineer shall deliver the electronic
files on USB flash drive in both the document's native format and the PDF format.
E. When the environmental service is to apply for a permit (e.g., United States Coast Guard
(USCG) permit or USACE permit), the Engineer shall provide the permit and all supporting
documentation to the State as the deliverable.
F. Submission of Deliverables
1. Deliverables must consist of documentation to support a categorical exclusion (CE)
determination, or the. preparation of an Environmental Assessment (EA) or an
Environmental Impact Statement (EIS), as applicable. Technical reports and
documentation must be prepared to support the applicable environmental classification
(e.g. CE, EA, or EIS). Additionally, an Open -Ended (d) list Categorical Exclusion
Page 16 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
Classification Request Form must be prepared to classify the project as an Open Ended
(d) list CE, if needed.
2. All deliverables must comply with all applicable state and federal environmental laws,
regulations, procedures, and TxDOT's Environmental Compliance Toolkits,
documentation requirements, and templates.
3. On the cover page of any environmental documentation, the Engineer shall insert the
following language in a way that is conspicuous to the reader or include it in a CE project
record:
"The environmental review, consultation, and other actions required by applicable Federal environmental laws
for this project are being, or have been, carried -out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum
of Understanding dated December 9, 2019, and executed by FHWA and TxDOT."
G. The County/State's will provide the County/State's and other agency comments on draft
deliverables to the Engineer. The Engineer shall revise the deliverable:
1. To include any County/State commitments, findings, agreements, or determinations (e.g.,
wetlands, endangered species consultation, Section 106, or Section 4(f)), required for the
transportation activity as specified by the County/State;
2. To incorporate the results of public involvement and agency coordination;
3. To reflect mitigation measures resulting from comments received or changes in the
transportation activity; and
4. To include with the revised document a comment response form (matrix) in the format
provided by the County/State.
H. The Engineer shall provide photographs and graphics that clearly depict details relevant to an
evaluation of the project area. Comparable quality electronic photograph presentations must
be at least 1200 x 1600 pixel resolution. The State can request images/graphics be provided in
another format or quality.
120.2. Environmental Assessment (EA) Content and Format. (OMITTED)
120.3. Environmental Impact Statement (EIS) Content and Format. (OMITTED)
120.4. ' Environmental Re-evaluation Form. (OMITTED)
120.5. Environmental Technical Analyses and Documentation.
A. Definition of technical analyses and documentation for environmental services.
In general, technical analyses and documentation for environmental services might include a
report, checklist, form, or analysis detailing resource -specific studies identified during the
process of gathering data to make an environmental decision.
The County/State may determine what technical reports and documentation are necessary for
any given project. The Engineer shall prepare all technical reports and documentation for the
State with sufficient detail and clarity to support environmental determinations. All technical
reports must be compliant with TxDOT's Environmental Compliance Toolkits, documentation
requirements, and templates. The environmental document must reference the technical
reports.
Environmental technical reports and documentation must include appropriate NEPA or federal
regulatory language in addition to the purpose and methodology used in delivering the service.
Page 17 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
Technical reports and forms must use templates and documentation standards as applicable
and include sufficient information to determine the significance of impacts.
B. Minimum Deliverables:
1. Draft technical analyses and documentation
2. Final technical analyses documentation
C. The exact environmental technical analyses and documentation must be determined at the
work authorization level, but can include:
1. Section 4(f) Evaluations
The Engineer shall provide Section 4(f) Evaluations. The Section 4(f) Evaluation must conform to the
appropriate TxDOT Section 4(f) checklist for exceptions, de minimus, and programmatic evaluations. For
individual Section 4(f) Evaluations, the format and outline must be approved by the State beforehand. All
Section 4(f) Evaluations must meet the requirements set forth in TxDOT's Environmental Compliance Toolkits.
The 4(f) Section of the environmental document states the reason a Section 4(f) evaluation is being completed.
The 4(f) Section of the environmental document discusses the presence of all Section 4(f) properties located in
the project area.
2. Section 6(f) Evaluation
The Engineer shall determine if Land and Water Conservation Fund Act funds were used for the Section 4(0
property in accordance with the regulatory requirements and TPWD guidelines and document.
3. Environmental Public Involvement (23 CFR §771.111)
The Engineer shall provide public involvement activities, which might include:
a. Developing a plan for public involvement activities, public involvement plan. The
plan must specify all activities to be performed and alternatives to be discussed
during public involvement activities. Public involvement activities must be carried out
in compliance with Attachment A, Article 38, sections J and K of the contract. The
plan must also discuss outreach strategies for both the general public and targeted
strategies for environmental justice and limited English proficiency populations
b. Compiling, maintaining, and updating a mailing list of people, agencies, and
organizations interested in the transportation activity
c. Making all arrangements for public meetings and hearings, including the site of the
meetings, mailing and publishing notices, preparation of exhibits, provision for
taping or transcription of proceedings, security, and any other arrangements as
directed by the State. The Engineer shall not hold public meetings or hearings in the
absence of State personnel
d. Submitting all legal notices to the County/State for review no less than six weeks
prior to publication I
e. Arranging a meeting with the State to review all exhibits and other materials to be
used prior to public meetings or hearings
f. Obtaining the County/State's approval for all legal notices, exhibits, and other
materials
g. Providing personnel to staff meetings and hearings; including, people to perform
registration, make presentations, and answer questions. Staffing levels of personnel
to be provided must be identified in the work authorization
h. Developing and submitting to the County/State a meeting or hearing documentation
packet
Page 18 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
1. Developing and sending acknowledgement or response letters to commenters at
public meetings or hearings. The Engineer shall not distribute acknowledgement or
response letters without prior approval by the County/State
j. Developing, publishing, and distributing a newsletter on the transportation activity,
including compiling and maintaining a mailing list. The Engineer shall not distribute
the newsletter without prior approval by the County/State
k. Submitting to the State a request for development and maintenance of a website to
disseminate information on the transportation activity and to gather comments from
the public.
I. Providing materials and information regarding the transportation activity to the State
to be posted on the State -developed website.
m. Ensuring the website conforms to state law, Texas Department of Information
Resources requirements, TxDOT policies and procedures, and TxDOT Brand
Guidelines.
4. Community Impacts Analysis
The Engineer shall provide community impact analyses. Community impacts includes environmental justice,
limited English proficiency, and other issues as addressed in TxDOT environmental guidance. The Engineer
shall perform community impact assessments including environmental justice analysis in accordance with
Attachment A, Article 38, Sections J and K of the contract. Community impact analyses might include:
a. Community Impacts Assessment Technical Report Form; or
b. Community Technical Report. The report must follow guidance provided in TxDOT's
Community Impacts Assessment Toolkit. The assessment may include:
(1) Identification of environmental justice communities within the study area;
(2) A community profile;
(3) A displacement analysis;
(4) . . An access. and travel pattern analysis;
(5) A community cohesion analysis;
(6) Determination if the project would have disproportionately high and adverse
impacts on environmental justice communities. All impacts identified in the
Community Impact Assessment and other relevant studies (i.e. noise
analysis) must be considered to determine if the impacts disproportionately
affect environmental justice communities;
(7) Identification of possible mitigation measures to avoid or minimize any
adverse impacts to the environmental justice population within the project
area;
(8) Summary of public involvement process including methods used to
accommodate persons with limited English proficiency; and
(9) Identification of possible mitigation measures including those to avoid and
minimize any adverse impacts to the environmental justice population within
the project area.
Page 19 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
5. Induced Growth Impact Analysis and Cumulative Impacts Analysis (OMITTED)
6. Air Quality Studies
The Engineer shall prepare all required technical reports and the air quality section -of all environmental
documents in accordance with the current version of the TxDOT Environmental Handbook for Air Quality and
Air Quality Toolkit. The State may determine what technical reports and documentation are required for any
given project. The required technical reports and documentation might include:
a. Applicable disclosure statements in the environmental document as prescribed in
the TxDOT Guidance for Preparing Air Quality Statements,
b. Response to public comments received on air quality issues.
7. Noise Analysis Technical Reporting
The Engineer shall prepare all necessary noise analyses and technical reporting.
a. Noise Analysis Technical Reporting Requirements. At the work authorization level,
the noise analysis technical reporting might include:
(1) Computer modeling of existing and predicted noise levels;
(2) Field measurements of existing noise levels and validation of existing model;
(3) Determining predicted noise impact contours for undeveloped property;
(4) Barrier analysis for impacted receivers.
b. Noise Analysis General Requirements.
(1) The Engineer shall use TxDOT's .DGN file coordinate system for all traffic
noise modeling, so that all design files and traffic noise modeling software
coordinate systems are the same.
(2) The Engineer shall provide TxDOT with all .DXF files used for the traffic
noise model.
(3) The Engineer shall review all proposed noise barrier locations as part of the
traffic noise modeling process.
(4) The Engineer shall not begin identification of noise sensitive land uses
unless TxDOT's Environmental Affairs Division's Historical Studies Branch
(ENV -Historical Studies) has approved a Project Coordination Request
(PCR).
8. Water Resources Analysis and Documentation
The Engineer shall provide environmental documentation, conduct field surveys, and provide analysis of water
resources for compliance with state and federal regulations as described in the Environmental Guide: Volume
2 Activity Instructions, http://ftp.dot.state.tx.us/pub/txdot-info/env/toolkit/060-06-aui.pdf, and the associated
forms, templates, and guidance found in the Water Resources section of the Natural Resources Toolkit,
https://www.txdot.gov/inside-txdottdivision/environmental/compliance-toolkits/natural-resources.htmi. The
applicable water resource studies must be determined at the work authorization level. In the case that field
surveys are required, then the Engineer shall contact TxDOT's Environmental Affairs Division's Natural
Resource Management Section (ENV-NRM) for clearance prior to starting fieldwork. ENV-NRM will verify that
approved methods and appropriately permitted and experienced staff will be used.
At the request of the State, the Engineer shall provide the following water analysis:
a. Surface Water Analysis Form, including analysis of:
(1) Section 404 of the Clean Water Act
Page 20 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
(2) Section 303(d) of the Clean Water Act
(3) General Bridge Act/Section 9 of the Rivers and Harbors Act
(4) Section 10 of the Rivers and Harbors Act
(5) Section 401 of the Clean Water Act
(6) Executive Order 11990, Protection of Wetlands
b. TCEQ Edwards Aquifer Rules Analysis, including: (OMITTED)
c. International Boundary Water Commission (IBWC) approval (OMITTED)
d. Coastal Barrier Resources Act (CBRA) analysis (OMITTED)
e. National Wild and Scenic Rivers Act (NWSRA) analysis (OMITTED)
f. Texas Coastal Management Program (TCMP) analysis (OMITTED)
g. WOTUS Delineation report prepared in accordance with ENV's Documentation
Standard for Waters of the U.S. Delineation Report using ENV's Template: Waters
of the U.S. Delineation Report including all supporting forms and exhibits
h. Section 404/10 Impacts Table prepared in accordance with TxDOT ENV's Section
404110 Impacts Table and Instructions — Preparing a Section 404110 Impacts Table
i. Section 404/10/9 Permitting Package, including:
(1) USACE PCN Permitting Application prepared in accordance with TxDOT
ENV's Documentation Standard for PCN
(2) 401 Certification
j. For all WOTUS surveys, the Engineer shall:
(1) Provide the results of the land survey in electronic DGN file format to be
incorporated into the schematic and plans. GIS and KMZ files of the land
survey must also be provided.
(2) . • • Determine the acres -of permanent and temporary impacts and linear feet of
impacts at each WOTUS and provide figures of the WOTUS and associated
impacts overlaying the schematic and plan sheets.
9. Biological/Natural Resources Management Analysis and Documentation
The Engineer shall provide environmental documentation, conduct field surveys, and provide analysis of
biological natural resources for compliance with state and federal regulations as described in the•TxDOT
Environmental Guide: Volume 2 Activity Instructions, http://ftp.dot.state.tK.us/pub/txdot-info/env/toolkit/060-06-
ui. df and the associated forms, templates, and guidance found in the Natural Resources Toolkit,
https://www.b(dot.gov/inside-txdot/division/environmental/compliance-toolkits/natural-resources.htmi. The
applicable natural resource studies must be determined at the work authorization level. In the case that field
surveys are required, then the Engineer must contact ENV-NRM for clearance prior to starting work. ENV-NRM
will verify that approved methods and appropriately permitted and experienced staff will be used. At the
request of the State, the Engineer shall provide the following biological/natural resource analysis:
a. Species Analysis Form, including:
(1) Species Analysis Spreadsheet, which can include a habitat analysis for the
entire project area, field surveys for protected species, and
presence/absence surveys.
(2) Tier 1 Site Assessment, which can include early coordination or
administrative coordination with TPWD.
Page 21 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
(3) Bald and Golden Eagle Protection Act (BGEPA) analysis and coordination
assistance.
b. Farmland Protection Policy Act (FPPA) analysis
c. Marine Mammal Protection Act (MPPA) analysis (OMITTED)
d. Essential fish habitat (EFH) analysis (OMITTED)
e. Preparation of USFWS/National Marine Fisheries Service (NMFS) species
consultation, including section 7 informal consultation for USFWS/NMFS
f. For all projects within a USFWS Designated Karst Zone or Critical Habitat:
(OMITTED)
10. Initial Site Assessment (ISA) with Hazardous Materials Project Impact Evaluation Report
The Engineer shall provide an ISA with Hazardous Materials Project Impact Evaluation Report for the limits of
the proposed project in accordance with Statement of Work for Hazardous Materials Processes related to
NEPA in the TxDOT Hazardous Materials Management Toolkit (http://www.txdot.aov/inside-
txdot/division/environmental/compliance-toolkits/haz-mat. html).
11. Archeological Documentation Services
The Engineer shall provide archeological studies and documentation. All archeological studies must be
sufficient to satisfy the current TxDOT Archeological Sites and Cemeteries Toolkit. An archeological
background study must be performed prior to field work. If the Engineer was provided with a background study
by the State, a new background study is not required.
The Engineer shall provide archeological resource identification, evaluation, and documentation services. In
compliance with TxDOT's Environmental Compliance Toolkits, the Engineer shall provide the following
archeological services/deliverables:
a. Archeological background study
b. Archeological reconnaissance survey (OMITTED)
c. Archeological intensive survey
An archeological survey (reconnaissance or intensive) must be sufficient to satisfy state and federal
regulations. The applicable archeological survey must be determined at the work authorization level. The
Engineer shall contact TxDOT's Environmental Affairs Division's Archeological Studies Branch (ENV -ARCH)
for approval prior to starting field and survey work. ENV -ARCH will verify that approved methods and
appropriately permitted and experienced staff will be used.
12. Historic Resource Identification, Evaluation, and Documentation Services
The Engineer shall provide historic resource identification, evaluation, and documentation services. In
compliance with TxDOT's Environmental Compliance Toolkits, the Engineer shall provide the following historic
resource services/deliverables:
a. Historic Resources PCR,
b. Historic Resources Research Design, and
c. Historic Resource Survey Report, including windshield, reconnaissance, or intensive
level documentation.
All services, except the historic resource PCR, must have prior approval by TxDOT's Environmental Affairs
Division's Historical Studies Branch (ENV-HIST) to be performed. The historic resource PCR must be accepted
by ENV-HIST prior to survey field work.
Page 22 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
13. Floodplain Impacts
The Engineer shall determine whether the transportation activity has the potential to affect floodplains. The
Engineer shall document Trinity River Corridor Development Certificate Regulatory Zone requirements (Dallas
and Fort Worth Districts), and IBWC requirements (transportation activity within the floodplain of the Rio
Grande) if the project is within the area covered by these regulations. Studies for floodplain impacts must fulfill
the requirements of Executive Order 11988 and 23 CFR 650, Subpart A. Documentation must:
a. Briefly describe the watershed characteristics of the study area in terms of land uses
and changes in land use that may affect stream discharge.
b. Briefly describe the streams in the study area, including evidence of stream
migration, down cutting, or aggradations.
c. Identify the presence and nature (e.g., zone A, zone AE, zone AE with floodway) of
any FEMA mapped floodplains; including the panel number.
d. Indicate the existence of any significant development associated with the mapped
area and identify the jurisdiction responsible for the floodplain.
e. Identify the locations where an alternative might encroach on the base (100-year)
floodplain (encroachments), where an alternative might support incompatible
floodplain development, and the potential impacts of encroachments and floodplain
development. This identification must be included in the text and on a map.
f. Include a list of all jurisdictions having control over floodplains for each alternative.
g. Where an encroachment or support of incompatible floodplain development results
in impacts, provide more detailed information on the location, impacts, and
appropriate mitigation measures. In addition, if any alternative (1) results in a
floodplain encroachment or supports incompatible floodplain development having
significant impacts, or (2) requires a commitment to a particular structure size or
type, the report must include an evaluation and discussion of practicable
alternatives to the structure or to the significant encroachment. The report must
include exhibits that display the alternatives, the base floodplains and, where
applicable, the regulatory floodplains.
h. For each alternative encroaching on a designated or regulatory floodplain, provide a
preliminary indication of whether the encroachment is consistent with or requires a
revision to the regulatory floodplain. If the preferred alternative encroaches on a
regulatory floodplain, the report must discuss the consistency of the action with the
regulatory floodplain. In addition, the report must document coordination with FEMA
and local or state agencies with jurisdiction indicating that a revision is acceptable or
that a revision is not required.
1. If the preferred alternative includes a floodplain encroachment having significant
impacts, the report must include a finding that it is the only practicable alternative as
required by 23 CFR 650, Subpart A. The finding must refer to Executive Order
11988 and 23 CFR 650, Subpart A. In such cases the report must document
compliance with the Executive Order 11988 requirements and must be supported by
the following information:
(1) The reasons why the proposed action must be located in the floodplain;
(2) The alternatives considered and why they were not practicable; and
(3) A statement indicating whether the action conforms to applicable state or
local floodplain protection standards
Page 23 of 49 Exhibit A
14. Stormwater Permits (Section,402 of the Clean Water Act)
The Engineer shall:
Contract ID No. CIP 23-600
Project 2 SH 47
a. describe the need to use the TPDES General Permit, TX 150000. The text must
describe how the project will comply with the terms of the TPDES, including the
Stormwater Pollution Prevention Plan; and
b. describe the need for Municipal Separate Storm Sewer System (MS4) notification.
List MS4 participating municipalities.
FUNCTION CODE 130 (130) — RIGHT-OF-WAY DATA
130.1 General Requirements
A. Traffic Control
The Engineer's Surveyor shall control traffic in and near surveying operations
adequatelyto comply with provisions of the latest edition of the Texas Manual on
Uniform Traffic Control Devices — Part VI which can be found on the State's internet
site.
In the event field crew personnel must divert traffic or close traveled lanes, a Traffic
Control Plan based upon principles outlined in the latest edition of the Texas Manual on
Uniform Traffic Control Devices — Part VI shall be prepared by the Engineer's Surveyor
and approved by the State prior to commencement of field work. A copy of the
approved plan shall be in the possession of field crew personnel on the job site at all
times and shallbe made available to the State's personnel for inspection upon request.
B. Underground Excavation
The Engineer's Surveyor shall contact the "Texas Excavation Safety System, Inc."
(DIGTESS), or call telephone number 811, to mark underground utilities prior to
diggingthe holes for monuments, as necessary. The Engineer's Surveyor shall
maintain documentation of all notification calls. The Engineer's Surveyor shall comply
with the States excavation laws as they appear in the Texas Administrative Code
JAC).
C. Preventative Measures to Prevent the Spread of Oak Wilt Contamination
The Engineer's Surveyor shall take the following preventive measures while cutting,
pruning, or removing oak trees in counties which have confirmed cases of Oak Wilt or
atthe direction of the State:
1. When possible, employ alternative methods instead of pruning or cutting oak trees.
2. When possible, perform necessary pruning and cutting of healthy trees during
the winter months of January and February when Sap Beetles are least active.
Also, if possible, avoid pruning or cutting during Spring months when Sap
Beetles are mostactive.
3. Treat wounds with pruning paint in Oak Wilt infected counties to discourage
insects, especially during warm weather.
4. Sterilize all pruning tools between each tree with either Lysol TM spray or a 70
percentrubbing alcohol solution. The use of chlorine bleach solutions to sterilize
pruning toolsis discouraged due to premature oxidation or rusting of steel parts.
5. Destroy the tree cuttings by burning or burying the wood, or dispose of the wood
Page 24 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
inanother approved method.
D. Additional Requirements
1. Adherence to schedule
If at any time during the Contract Period the Engineer's Surveyor determines that it
isunable to meet a scheduled submission date, the Engineer's Surveyor shall notify
the State in writing immediately. This notification shall consist of an explanation as
to the reason(s) for the delay and a revised submission schedule, which shall to
the extent possible, incorporate a plan to recover days lost as a result of subject
delay.
If at any time during the Contract Period the Engineer's Surveyor encounters
unforeseen circumstances which may materially affect the scope, complexity or
character of the work authorized by the State, the Engineer's Surveyor shall notify
theState in writing immediately with a complete description of the circumstances
encountered.
2. Transmittal
All documents submitted to the State shall be accompanied by a letter of
transmittal which shall include, but need not be limited to, the highway number,
project limits, county, CSJ, contract number, work authorization number and an
inventory of attachments.
3. Right -of -entry
It shall be the responsibility of the Engineer's Surveyor to secure permission to
enter private property for purposes of survey. It is the stated policy of the State to
make every effort to maintain positive relations with the general public. In.
pursuance of thatpolicy, the Engineer's Surveyor shall not commit acts which will
result in damages to private property and the Engineer's Surveyor shall make
every effort to comply with the wishes and address the concerns of private
property owners.
E. Compensation
1. Payment requests shall include the Engineer's Surveyor's invoice.
2. Progress Report
The Engineer's Surveyor shall submit a monthly progress report electronically by
the5th of each month following the month through which status is being reported.
Progress and percent complete shall be according to the task as included in
thescope.
With each payment request, the Engineer's Surveyor shall submit the
corresponding project progress report which shall, as a minimum, include the
percentage of total work complete as of the date of the payment request and a
description of current workactivity. The percentage of total work complete shall not
be based simply on the percentage of funds expended, but shall be based on the
best judgment of the Engineer's Surveyor as to the percentage of actual work
complete.
Page 25 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
130.2 General Standards for Surveying
All surveys must meet or exceed all applicable requirements and standards provided by: (1) Professional Land
Surveying Practices Act, (2) General Rules of Procedures and. Practices promulgated by the Texas Board of
Professional Engineers and Land Surveyors (TBPELS), and (3) TxDOT Survey Manual. The Surveyor shall
perform all work in an organized and professional manner. All surveys are subject to the approval of the
County/State.
The Surveyor shall use the TxDOT ROW Preliminary Procedures for Authority to Proceed Manual and TxDOT
Survey Manual as the basis for the format and preparation of all right of way (ROW) documents produced,
including ROW maps, written parcel descriptions, parcel plats, and other ROW work products, unless
otherwise specified by the County/State.
Unless otherwise -directed by the County/State, the Surveyor shall use (1) the North American Datum of 1983
(NAD83), Texas Coordinate System of 1983 (State Plane Coordinates) applicable to thezone or zones in
which the work is performed, with values in U.S. survey feet, as the basis for all horizontal coordinates derived
and (2) the datum adjustment currently in use by TxDOT.
Project or surface coordinates must be calculated by applying a combined adjustment factor (CAF) to State
Plane Coordinate values. If provided by the State, the Surveyor shall use a project specific CAF.
Elevations must be based on the North American Vertical Datum 88 (NAVD88), unless otherwise specified by
the State.
All work using the Global Positioning System (GPS), whether primary control surveys or other, must meet or
exceed the requirements provided by the TxDOT Survey Manual to the order of accuracy specified in the
categories listed below or in a work authorization. Ifthe order of accuracy is not specified in this attachment or
in a work authorization, the work must meet or exceed the order of accuracy specified in the publication listed
in this paragraph.
All conventional horizontal and vertical control surveys must meet or exceed the order of accuracy specified in
the TxDOT Survey Manual unless specified otherwise in the contract.
All boundary determination surveys, whether for ROW acquisition, ROW re-establishment, or other boundary
needs, must meet or -exceed -the accuracy specified -in the Tx -DOT -Survey Manual unless specified otherwise in
the contract.
The County/State may authorize the Surveyor to use an Unmanned Aircraft System (UAS) to perform services
under this contract. The use of UAS is regulated by the Federal Aviation Administration (FAA). All UAS
operators must comply with Federal Aviation Administration (FAA) regulations and the TxDOT Unmanned
Aircraft System (UAS) Flight Operations and User's Manual.
The survey data must be fully compatible with the State's computer system and with programs in use by the
State at the time of the submission, without further modification or conversion. The current programs used by
TxDOT are: Microsoft Word, Bentley MicroStation, Bentley OpenRoads civil design system, Bentley GEOPAK
Survey, Excel, and ESRI ArcGIS. Data collection programs must be compatible with the current import formats
allowed by GEOPAK Survey and be attributed with current feature codes. These programs may be replaced at
the discretion of the State.
Drawing sizes are defined, based on American National Standards Institute (ANSI) standard paper sizes, as
follows: A -size means 8.5 inches by 11.0 inches, B-size means 11.0 inches by 17.0 inches, C-size means 17.0
inches by 22.0 inches, and D-size means 22 inches by 34.0 inches.
Variations from these software applications or other requirements listed above shall only be allowed if
requested in writing by the Surveyor and approved by the County/State.
The Surveyor shall perform quality control/quality assurance on all procedures, field surveys, data, and
products prior to delivery to the County/State. The County/State may also require the Surveyor to review the
Page 26 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
survey work performed by others. If, at any time, during the course of reviewing a submittal of any item it
becomes apparent to the State that the submittal• contains a substantial number of errors, omissions, and
inconsistencies, the County/State may cease its review and return the submittal to the Surveyor immediately
for appropriate corrective action. A submittal returned to the Surveyor for this reason is not a submittal for
purposes of the submission schedule.
The standards for services that are not boundary -related but that relate to surveying for engineering projects
may be determined by the construction specifications, design specifications, or as specified by the
County/State:
130.1. Right -Of -Way Surveys (15.1.1). (OMITTED)
130.2. Right -Of -Way Mapping — Traditional ROW Map. (OMITTED)
130.3. State Land Surveying (15.5.1). (OMITTED)
130.4. ROW Hearing Services. (OMITTED)
130.5. Utility Engineering Investigation.
Utility engineering investigation includes utility investigations subsurface and above ground
prepared in accordance with ASCE/CI Standard 38-02
[(http://www.fhwa.dot.gov/proaramadmin/asce.cfm)] and Utility Quality Levels.
A. Utility Quality Levels (QL)
Utility Quality Levels are defined in cumulative order (least to greatest) as follows:
1. Quality Level D - Quality level value assigned to a utility segment or utility feature after a
review and compilation of data sources such as existing records, oral recollections,
locations marked by DIGTESS, and data repositories.
2. Quality Level C - Quality level value assigned to a utility segment or utility feature after
surveying aboveground (i.e., visible) utility features and' using professional judgement to
correlate the surveyed locations of these features with those from existing utility records.
3. Quality Level B - Designate: Quality level value assigned to a utility segment or
subsurface utility feature whose existence and position is based upon appropriate surface
geophysical methods combined with professional judgment and whose location is tied to
the project survey datum. Horizontal accuracy of Designated Utilities is 18" (including
survey tolerances) unless otherwise indicated for a specific segment of the deliverable.
Quality Level B incorporates quality levels C and D information. A composite plot is
created.
4. Quality Level A — Quality level value assigned to a portion (x, y, and z geometry) of a
point of a subsurface utility feature that is directly exposed, measured, and whose
location and dimensions are tied to the project survey datum. Other measurable,
observable, and judged utility attributes are also recorded (per District Best Practices).
The utility location must be tied to the project survey datum with an accuracy of 0.1 feet
(30-mm) vertical and to 0.2 feet (60-mm) horizontal. As test holes may be requested up
front or during the project, test holes done prior to completion of QL D, C, or B
deliverables must be symbolized on the QL B deliverable with a call out indicating test
holes number. This is in addition to and not in lieu of the test hole.
B. Utility Investigations Methodology
Page 27 of 49 Exhibit A
The Engineer shall:
Contract ID No. CIP 23-600
Project 2 SH 47
Utility Investigation Quality Level D
a. Perform records research from all available resources. Sources include: Texas811,
Railroad Commission of Texas (Texas RRC), verbal recollection, as -built
information from plans, plats, permits and any other applicable information provided
by the utility owners or other stakeholders.
b. Document utility owners and contact information.
c. Create a utility drawing of information gathered.
2. Utility Investigation Quality Level C
The Engineer shall:
a. In combination with existing Quality Level D information, utilize surveyed above-
ground utility features and professional judgement to upgrade Quality Level D
information to Quality Level C. For those utilities unable to be upgraded, retain as
Quality Level D.
b. Overhead utilities information must be gathered and depicted. Sag elevations of
lowest utility must be documented at road crossings, per best practices document.
c. Storm and sanitary sewer information must be gathered from Level D and upgraded
to Level C as possible, unless otherwise directed by the state.
d. Mapping of underground vaults may be requested by the state.
e. Create composite utility drawing of information gathered.
3. Designate (Quality Level B)
Designate means to indicate the horizontal location of underground utilities by the application and
interpretation of appropriate non-destructive surface geophysical techniques and reference to established
survey control. Designating (Quality Level B) services are inclusive of Quality Levels C and D.
The Engineer must:
a. As requested by the State, compile "as -built" information from plans, plats and other
location data as provided by the utility owners.
b. Coordinate with utility owner when utility owner's policy is to designate their own
facilities at no cost for preliminary survey purposes. The Engineer shall examine
utility owner's work to ensure accuracy and completeness.
c. Designate, record, and mark the horizontal location of the existing utility facilities
using non-destructive surface geophysical techniques.
d. Using both active and passive scans to attempt to locate any additional utilities,
including unrecorded and abandoned storm and sanitary sewer facilities, at the
direction of the state, may be investigated using additional methods such as rodding
that would then classify them as Quality Level B. A non -water based pink paint or
pink pin flags must be used on all surface markings of underground utilities.
e. Correlate utility owner records with designating data and resolve discrepancies
using professional judgment. The Engineer must prepare and deliver to
County/State a color -coded composite utility facility plan with utility owner names,
quality levels, line sizes and subsurface utility locate (test hole) locations. The
Engineer and County/State acknowledge that the line sizes of designated utility
facilities detailed on the deliverable will be from the best available records and that
Page 28 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
an actual line size is normally determined from a test hole vacuum excavation. A
note must be placed on the designate deliverable only that states "lines sizes are
from best available records". All above -ground utility feature locations must be
included in the deliverable to the State. This information must be provided in the
latest version of OpenRoads civil design system used by the State. The Engineer
shall deliver the electronic file on USB flash drive, as requested by the County/State.
A hard copy is required and must be signed, sealed, and dated by the registered
engineer overseeing the utility engineering investigation. When requested by the
County/State, the designated utility information must be over laid on the State's
design plans.
f. Determine and inform the State of the approximate electronic utility depths at critical
locations as determined by the State. The limits of this additional information should
be determined, prior to -the commencement of work. This depth indication is
understood by both the Engineer and the State to be approximate only and is not
intended to be used preparing the ROW and construction plans.
g. Provide a monthly summary, with weekly updates, of work completed and in
process with adequate detail to verify compliance with agreed work schedule.
h. Close-out permits as required.
Clearly identify all utilities that were discovered from Quality Levels C and D
investigation but cannot be depicted in Quality Level B standards. These utilities
must have a unique line style and symbology in the designate (Quality Level B)
deliverable.
j. Comply with all applicable TxDOT policy and procedural manuals.
4. Subsurface Utility Locate (Test Hole) .Service (Quality Level A)
Locate is the process used to obtain precise horizontal and vertical position, material type, condition, size, and
other data that may be obtainable about the utility facility and its surrounding environment through exposure by
non-destructive excavation techniques that ensures the integrity of the utility facility. Subsurface Utility Locate
(Test Hole) Services (Quality Level A) are inclusive of Quality Levels B, C, and D.
The Engineer must:
a. Review requested test hole locations and advise the State in the development of an
appropriate locate (test hole) work plan relative to the existing utility infrastructure
and proposed highway design elements.
b. Coordinate with utility owner inspectors as may be required by law or utility owner
policy.
c. Place Texas 811 ticket 48 hours prior to excavation.
d. Neatly cut and remove existing pavement material, such that the cut does not
exceed 0.10 square meters (1.076 square feet) unless unusual circumstances exist.
e. Measure and record the following data on an appropriately formatted test hole data
sheet that has been sealed and dated by the Engineer:
(1) Elevation of top of utility tied to the datum of the furnished plan.
(2) Minimum of two benchmarks utilized. Elevations must be within an accuracy
of 15mm (.591 inches) of utilized benchmarks.
(3) Elevation of existing grade over utility at test hole location.
(4) Horizontal location referenced to project coordinate datum.
Page 29 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
(5) Outside diameter of pipe or width of duct banks and configuration of non-
. encased multi -conduit systems.
(6) Utility facility materials.
(7) Utility facility condition.
(8) Pavement thickness and type.
(9) Coating/wrapping information and condition.
(10) Unusual circumstances or field conditions.
f. Excavate test holes in such a manner as to prevent any damage to wrappings,
coatings, cathodic protection, and other protective coverings and features. Water
excavation can only be utilized with written approval from the appropriate TxDOT
district office.
g. Be responsible for any damage to the utility during the locating process. In the event
of damage, the Engineer must stop work, notify the appropriate utility facility owner,
the State, and appropriate regulatory agencies. The regulatory agencies include: the
Railroad Commission of Texas and the Texas Commission on Environmental
Quality. The Engineer shall not resume work until the utility facility owner has
determined the corrective action to be taken. The Engineer is liable for all costs
involved in the repair or replacement of the utility facility.
h. Back fill all excavations with appropriate material, compact backfill by appropriate
mechanical means, and restore pavement and surface material. The Engineer is.
responsible for the integrity of the backfill and surface restoration for a period of
three years.
I. Furnish and install a permanent above -ground marker (as specified by the State,
directly above center line of the utility facility.
j. Provide complete restoration of work site and landscape to equal or better condition
than before excavation. if a work site and landscape is not appropriately restored,
.....the Engineer.shall.return to correct.the condition at no extra charge to the County.
k. Plot utility location position information to scale and provide a comprehensive utility
plan signed and sealed by the responsible professional engineer. This information
must be provided in the latest version of MicroStation and be fully compatible with
the OpenRoads civil design system used by the State. The electronic file will be
delivered on USB flash drive as requested. When requested by the County/State,
the locate information must be over laid on the State's design plans.
I. Return plans, profiles, and test hole data sheets to the State. If requested, conduct a
review of the findings with the State.
m. Close-out permits as required.
FUNCTION CODE 145 (145, 164) — MANAGING CONTRACTED/DONATED PE
CONTRACT MANAGEMENT AND ADMINISTRATION
145.1. Contract Management and Administration.
The Engineer shall:
Page 30 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
A. Perform all work in accordance with the State's latest practices, criteria, specifications,
policies, procedures, and Environmental Compliance Toolkits. All documents shall be sufficient
to satisfy the current Environmental Compliance Toolkits available from the State.
B. Act as an agent for the County when specified in a work authorization.
C. Produce a complete and acceptable deliverable for each environmental service performed for
environmental documentation.
D. Incorporate environmental data into identification of alternatives.
E. Notify the County/State of its schedule, in advance, for all field activities.
F. Notify the State as soon as practical, by phone and in writing, if performance of environmental
services discloses the presence or likely presence of significant impacts (in accordance with
.40 Code of Federal Regulations (CFR)• 1500-1508}.-Inform the State of the basis for
concluding there are significant impacts and the basis for concluding that the impacts might
require mitigation.
G. Notify the State as soon as practical, by phone and in writing, if performance of environmental
services results in identification of impacts or a level of controversy that might elevate the
transportation activity's status from a categorical exclusion or environmental assessment. The
State will reassess the appropriate level of documentation.
FUNCTION CODE 160 (150) — ROADWAY DESIGN
DESIGN SURVEYS AND CONSTRUCTION SURVEYS
150.1. Design And Construction Survey.
A. Definitions
1. Design Survey (15.2.1)
A design survey gathers data in support of transportation systems design. A design survey includes the
research, fieldwork, analysis,• computation, -and documentation necessary to provide detailed topographic (3-
dimensional) mapping of a project site (e.g. locating the approximate existing ROW, surveying cross -sections
or developing data to create cross -sections and digital terrain models, horizontal and vertical location of utilities
and improvements, collecting details of bridges and other structures, review of ROW maps, establishing control
points).
2. Construction Survey (15.2.2)
A construction survey provides data in support of transportation systems construction. A construction survey
may include reconnaissance, field work, analysis, computation, and documentation necessary to provide
horizontal and vertical positions of specific ground points to establish lines or grades or for the validation of
quantities of materials placed or removed. Construction layout and staking is included in this category.
B. Technical Requirements for Design and Construction Surveys
1. Design surveys and construction surveys must be performed under the supervision of a
RPLS currently registered with the TBPELS.
2. All control must meet the accuracy requirements of the State.
The Surveyor shall comply with the standards of accuracy for control traverses provided in the TxDOT Survey
Manual or the TSPS Manual of Practice for Land Surveying in the State of Texas, as may be applicable.
3. Short traverse procedures used to determine horizontal and vertical locations must meet
the following criteria:
Page 31 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
a. Short traverses must begin and end on horizontal and vertical ground control as
. described above.
b. Required horizontal accuracy (unless otherwise stated):
(1) Bridges and other roadway structures: less than 0.1 feet.
(2) Utilities and improvements: less than 0.2 feet.
(3) Cross -sections and profiles: less than 1 foot.
(4) Bore holes: less than 3 feet.
c. Required vertical accuracy:
(1) Bridges and other roadway structures: less than 0.02 feet.
(2) Utilities and improvements: less than 0.1 feet.
(3) Cross -sections and profiles: less than 0.2 feet.
(4) Bore holes: less than 0.5 feet.
C. Data Requirements for Design and Construction Surveys
1. Planimetric DGN files must be fully compatible with the version of the MicroStation
graphics program currently used by TxDOT without further modification or conversion.
2. Electronically collected and processed field survey data files must be fully compatible
with TxDOT's computer systems without further modification or conversion. All files must
incorporate only those feature codes currently being used by TxDOT.
3. Digital terrain models (DTMs) must be fully compatible with the version of the Bentley
OpenRoads civil design system currently used by TxDOT without further modification or
conversion. All DTM must be fully edited to provide a complete digital terrain model with
all necessary break lines.
150.2. Design Survey (15.2.1).
A. Tasks to be Completed —Design Surveys.
If requested by the County/State, the Surveyor shall perform one or more Design Surveys.
Design Survey tasks include the following:
1. Collect data to create cross -sections and DTMs.
2. Locate existing utilities.
3. Locate existing improvements.
4. Provide details of existing bridge structures, including bridge limits, bents, columns,
retaining walls, and natural ground elevations.
5. Locate details of existing drainage features including culverts, manholes, retention and
detention ponds, flowlines, and associated features.
6. Locate all waters of the United States (WOTUS), including wetlands (established by
others).
7. Review existing ROW maps and locate the approximate existing ROW.
a. Locate existing ROW
The Surveyor shall establish the approximate existing ROW based on found
monumentation and existing ROW maps.
Page 32 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
8. Verify the condition and usefulness of existing control points including verification of the
values. Establish additional control as needed. Tie to other control points in the project
vicinity including points established by the National Geodetic Survey (NGS), the Federal
Emergency Management Agency (FEMA), and any other local entities as directed by the
State.
9. Update existing control information and prepare new survey control data sheets, as
directed by the State to be included in the construction plan set as described below:
a. The Surveyor shall prepare, sign, seal, and date a survey control index sheet and
horizontal and vertical control sheet(s) to be inserted into the plan set.
b. The survey control index sheet provides an overview of the primary project control
and must include:
(1) An unscaled vicinity map showing the general location of the project in
relation to nearby towns or other significant cultural features.
(2) A scaled project map showing the extents of the project and the location of
the primary control points. The map must show street networks, selected
street names, control point identification, and significant cultural features
necessary to provide a general location of the primary control.
(3) A table containing the primary control point values including the point
number, northing, easting, elevation, stationing, and stationing offset values.
(4) Map annotation including a graphic scale bar, north arrow, and standard
TOOT title block. The title block shall contain a section for the district name,
county, highway, and CSJ number. The title block shall also contain a
section for a Texas registered engineer to sign, seal and date the sheet to
include the following statement, "The survey control information has been
accepted and incorporated into this PS&E." The required format of the
survey control index sheet can be downloaded from the'TxDOT website.
(5) In the title block under the heading "Notes", identification of the horizontal
and vertical datum. on which the primary control is based with the date of the
current adjustment, the surface adjustment factor used, and unit of measure.
The Surveyor shall include a note stating that the coordinates are State
Plane and a notation specifying either grid or surface adjusted coordinates.
c. The Surveyor shall prepare horizontal and vertical control sheets providing detailed
information about the construction, location, and monumentation of the primary
control, which must include:
(1) An unscaled location map for each primary control point showing the location
of the monument in relation to physical features located in the vicinity. The
location map must include a north arrow, the monument designation, the
monument northing, easting, and elevation.
(2) Directly below the location map a text description of the monument including
size, material, and construction followed by a description of the location of
the monument starting with the county and state followed by a description
suitable to locate the monument on the ground.
(3) Map annotation including a graphic scale bar, north arrow, and a standard
TxDOT title block. The title block must contain a section for the district name,
county, highway, and CSJ number and contain a section for a Texas
registered engineer to sign, seal and date the sheet to include the following
statement, "The survey control information has been accepted and
Page 33 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
incorporated into this PS&E." The required format of the survey control index
sheet can. be downloaded from the TxDOT website.
(4) In the title block under the heading "Notes", identification of the horizontal
and vertical datum on which the primary control is based with the date of the
current adjustment, the surface adjustment factor used, and unit of measure.
The Surveyor shall include a note stating that the coordinates are either grid
or surface adjusted coordinates.
150.3. Construction Survey (15.2.2). (OMITTED)
150.4. Deliverables for Design and Construction Surveys.
The Surveyor shall prepare and submit the deliverables as specified in individual work
authorizations for design surveys and construction surveys. The deliverables might be any
combination of the following:
A. Digital terrain models (DTM) and the triangular irregular network (TIN) files in a format
acceptable by the State.
B. Maps, plans, or sketches prepared by the Surveyor showing the results of field surveys.
C. Computer printouts or other tabulations summarizing the results of field surveys.
D. Digital files or media acceptable by the State containing field survey data (ASCII data files).
E. Maps, plats, plans, sketches, or other documents acquired from utility companies, private
corporations, or other public agencies, the contents of which are relevant to the survey.
F. Field survey notes, as electronic and hard copies.
G. TxDOT Form 2462 for each primary and secondary control point. This form must be submitted
in printed format on letter (i.e., A -size) and submitted electronically in PDF format.
H. A digital and hard copy of all computer printouts of horizontal and vertical conventional
traverses, GPS analysis and results, and survey control data sheets.
I. All GEOPAK flies and OpenRoad files.
J. Survey reports in a format requested by the State.
150.5. Mapping (15.3).
Mapping includes the geospatial data collection and mapping by means of aerial photogrammetry,
terrestrial (close range) photogrammetry, terrestrial UDAR, mobile LIDAR, and other remote
sensing technologies.
A. Purpose
The purpose of mapping is to provide map and related data to support transportation projects
including project design and other uses.
B. Definitions
Aerial Photogrammetry (15.3.1) —Aerial Photogrammetry means the collection and
processing of photography acquired from an airborne platform to develop DGN and DTM
files.
2. Terrestrial Photogrammetry (15.1.2) — Terrestrial Photogrammetry means the collection
and processing of photography acquired at or near ground level to develop DGN and
DTM files.
3. Airborne LiDAR (15.3.4) — Airborne LiDAR means laser scanning equipment mounted on
a helicopter or other airborne platform to collect data to process for DGN and DTM files.
Page 34 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
4. Terrestrial LIDAR (15.3.3) — Terrestrial LIDAR means laser scanning equipment operated
from a stationary base on the earth's surface to collect data to process for DGN and DTM
files.
5. Mobile LIDAR (15.3.4) — Mobile LiDAR means laser scanning equipment mounted on a
moving vehicle operating on the earth's surface to collect data to process for DGN and
DTM files.
6. UAS means Unmanned Aircraft Systems (e.g., drones).
7. UAS LiDAR means laser scanning equipment on an unmanned aerial vehicle (e.g.,
drones) to collect data to process for DGN and DTM files.
150.6. Aerial Mapping Using a Metric Camera and Manned Aircraft.
-Aerial mapping using a, metric camera and manned aircraft includes the collection of digital aerial
imagery using a calibrated large -format metric aerial camera, performing relative orientation of the
imagery through the collection of tie and pass points between adjacent aerial photo frames,
performing a least -squares bundled absolute orientation adjustment using ground control points
supplemented with airborne GPS and inertial measurement unit (IMU) data, and deriving data from
the processed imagery including compilation of planimetric and topographic maps, creation of point
cloud digital elevation model (DEM) and digital terrain model (DTM) data, and production of
orthophotography.
The Surveyor shall provide the services of a certified Photogrammetrist to perform or oversee the
tasks under function code 150.6. The Surveyor remains ultimately responsible and shall ensure that
the work is performed as required.
A. Purpose
The purpose of aerial mapping using a metric camera and manned aircraft is to provide map
and related data to support transportation projects including project design and other uses.
B. Definitions
In 150.6, 150.7, and 150.8 the following definitions apply:
1. Photogrammetrist means an American Society for Photogrammetry and Remote Sensing
(ASPRS) Certified Photogrammetrist with a current certification.
2. Mapping Scientist means an American Society of Photogrammetry and Remote Sensing
(ASPRS) Certified Scientist-UAS with a current certification.
3. Metric Aerial Photograph means a vertical photograph taken from a manned aircraft
using a large -format calibrated digital metric aerial mapping camera.
4. Non -Metric aerial photograph means a vertical or oblique photograph taken from a fixed -
or rotary -wing unmanned aircraft system (UAS) aircraft using a non -metric small format
consumer -grade digital camera.
5. Large -format digital metric camera means a camera using charge -coupled device (CCD)
or complementary metal oxide semiconductor (CMOS) technology to capture an image
with a minimum final image size of 11500 by 7500 pixels.
6. Analytical triangulation means the process of developing absolute orientation parameters
for individual photogrammetric stereo models through the use of image tie and pass
points combined with ground control in a fully weighted least -squares bundle adjustment.
.Airborne GPS and IMU data may be used to reduce the number of ground control points.
7. Ground control means points established on the ground by the Surveyor and for which
the Northing, Easting, and Elevation coordinates have been determined sufficient in
Page 35 of 49 Exhibit A
r Contract ID No. CIP 23-600
Project 2 SH 47
number and geospatial distribution to allow analytical triangulation and mapping to meet
the required project accuracy. Ground control can be targeted using paint or other marker
material or can be non -targeted.
8. Airborne GPS/IMU — An airborne GPS receiver on -board the aircraft recording GPS and
orientation data to be included in the analytical triangulation with the purpose of reducing
the number of ground control points required for a metric aerial mapping task. IMU data
to supplement the analytical triangulation is optional and its use is at the discretion of the
Certified Photogrammetrist or Mapping Scientist.
9. KML means an uncompressed Google Keyhole Markup Language file, which is a two- or
three- dimensional map showing a location on the earth.
10. KMZ means a compressed Google .Keyhole Markup Language file, which is a two- or .
three- dimensional- map -showing. -a- location on -the earth: -
11. DEM means digital elevation model, which is a three-dimensional DGN and/or point cloud
in ASPRS LAS 1.2 file format containing all features located in the project area including
features, both on and above the.ground surface.
12. DTM means digital terrain model, which is a three-dimensional DGN and/or point cloud in
ASPRS LAS 1.2 format containing only features located on the ground surface.
13. Field Check means a ground survey validation of the deliverable map product with the
purpose of ensuring that the required mapping accuracy has been met.
14. Flight Map means a map depicting the flight line and ground control layout over the
project area.
15. Low Altitude Metric Aerial Photography means a metric aerial photography with a nominal
ground pixel size of 5 cm or less.
16. DGN means a two or three-dimensional graphics file produced using Bentley
MicroStation. The file may contain features and improvements plotted in a horizontal
plane along the N and E axes which correspond to the Texas Coordinate System. The
file may contain 2D or 3D elements representing topographic, existing, proposed,
schematic; arid general layout features.
17. Medium Altitude Photography means aerial photography with a film photo scale of
1:12,000 or a digital image with ground pixel size' of 20 cm.
18. Project Photo Length means the distance over which photographs are required to be
taken.
C. Procedure for Aerial Mapping Using a Metric Camera and Manned Aircraft
Ground Control
The positioning and density of ground control is at the discretion of the Photogrammetrist. Ground control is
required to be sufficient to meet the accuracy standard required for the final mapping products. Chapter 3 of
the TxDOT Survey Manual provides guidance for the location and density of the ground control. The
Photogrammetrist must determine the approximate position for ground.control points. The Surveyor shall
locate and mark the ground control points in the field using surveying methods.
2. Metric Digital Aerial Photography
The Photogrammetrist must acquire metric digital aerial photography using a large format calibrated metric
aerial mapping. camera. Unless otherwise stated, the imagery will be low altitude with a maximum nominal
ground sampling distance of 5.0 cm. The Photogrammetrist must ensure that all imagery acquisition
requirements including all flight parameters are met such that the imagery is suitable for intended use.
Page 36 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
3. Analytical Triangulation
The Photogrammetrist must process the metric digital aerial photography, ground control, and airborne
GPS/IMU data (if collected) to develop an absolute orientation of the imagery suitable for map compilation at
the required accuracy.
4. Aerial Mapping
The Photogrammetrist must prepare the following:
a. A two-dimensional DGN file containing planimetric map features.
b. A three-dimensional DGN file containing DTM features.
c. Orthophotography
The Photogrammetrist must provide orthorectified aerial imagery covering the project area.
D. Technical Requirements
1. Aerial mapping using a metric camera and manned aircraft must be performed under the
direct supervision of an ASPRS Certified Photogrammetrist.
2. Unless otherwise stated, aerial mapping must meet or exceed the requirements for
ASPRS Class 1 mapping at a 1 inch = 40 feet equivalent scale with a one -foot indicated
contour interval.
E. Data Requirements
1. Planimetric DGN files must be fully compatible with the current Bentley MicroStation
version graphics program used by TOOT without further modification or conversion.
2. Electronically collected and processed field survey data files must be fully compatible
with TxDOT's computer systems without further modification or conversion. All files must
incorporate only those feature codes currently being used by the State.
3. DTM must be fully compatible with the current version of Bentley OpenRoads civil design
system used by TOOT without further modification or conversion. All DTM must be fully
edited to provide a complete digital terrain model with all necessary break lines.
4. File features and level structure must be in accordance with the State's current
photogrammetry mapping legend.
5. Minimum text size is 0.1 inches when plotted at a scale of 1 inch = 40 feet.
F. Deliverables for Aerial Mapping Using a Metric Camera and Manned Aircraft
The Photogrammetrist must submit the following:
1. Digital orthophotography delivered on USB flash -drive or hard -drive in Tagged Image File
format (TIF) compatible with Bentley MicroStation software and including georeferenced
world files.
2. A photo index map in DGN and KMZ format showing the location of each digital image
frame. The index map must be overlaid on a base map to provide general location
information.
3. An orthophoto index map in DGN, KMZ, and PDF format showing the location of each
orthophoto panel. The PDF format index map must be overlaid on a base map to provide
general locational information.
4. An analytical triangulation report signed and sealed by the Photogrammetrist providing a
narrative of the aerial photography project and processing results. The report must
include the number of flight strips, overall number of photo frames, the number of ground
Page 37 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
control points used, the use of airborne GPS and IMU data, and the results of the fully
weighted least -squares bundled adjustment. The Photogrammetrist must include a
description and results of the analytical triangulation.
5. DGN files for the planimetric and DTM mapping.
150.7. Aerial Mapping Using a Non -Metric Camera and Unmanned Aircraft System (UAS).
Aerial mapping using an Unmanned Aircraft System (UAS) includes the collection of digital aerial
imagery using either a fixed- or rotary -wing aircraft; the use of a non -metric small -format consumer -
grade camera; performing relative orientation of the imagery through the collection of tie and pass
points between adjacent aerial photo frames; performing a least -squares bundled absolute
orientation adjustment using ground control points supplemented with airborne GPS and IMU data;
and deriving data from the processed imagery including compilation of planimetric and topographic
maps, creation -of point cloud digital elevation model- (DEM) and -digital terrain model (DTM) data,
and production of orthophotography as required.
The Surveyor shall provide the services of a certified Photogrammetrist or Mapping Scientist to
perform or oversee the tasks under function code 150.7. The Surveyor remains ultimately
responsible and shall ensure that the work is performed as required.
A. Purpose
The purpose of aerial mapping using UAS is to provide map and related data to support
transportation projects including project design and other'uses.
B. Procedure for Aerial Mapping Using a Non -Metric Camera and Unmanned Aircraft System
(UAS)
Ground Control
The positioning and density of ground control is at the discretion of the Photogrammetrist or Mapping Scientist.
Ground control is required to be sufficient to meet the accuracy standard required for the final mapping
products. The Photogrammetrist or Mapping Scientist must determine the approximate position for ground
control points. The Surveyor shall locate and mark the ground control points in the field using surveying
methods.
2. Aerial Photography
The Photogrammetrist or Mapping Scientist must acquire digital aerial photography using a non -metric small -
format consumer -grade digital camera. The Photogrammetrist or Mapping Scientist is responsible for ensuring
that all imagery acquisition requirements including all flight parameters are met such that the imagery is
suitable for intended use.
3. Analytical Triangulation
The Photogrammetrist or Mapping Scientist must process the non -metric digital aerial photography, ground
control, and airborne GPS/IMU data (if collected) to develop an absolute orientation of the imagery suitable for
map compilation.at the required accuracy.
4. Aerial Mapping
The Photogrammetrist or Mapping Scientist must prepare the following:
a. A two-dimensional DGN file containing planimetric map features.
b. A three-dimensional DGN file containing DTM features.
. .5_ Orthophotography
The Photogrammetrist or Mapping Scientist must provide orthorectified aerial imagery covering the project
area.
Page 38 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
C. Technical Requirements
1. Aerial mapping using a non -metric camera UAS must be performed under the direct
supervision of an ASPRS Certified Photogrammetrist or Certified Mapping Scientist-UAS.
2. Aerial mapping using a non -metric camera and UAS must be performed in compliance
with the TxDOT Unmanned Aircraft System (UAS) Flight Operations and User's Manual.
3. Unless otherwise stated, aerial mapping must meet or exceed the requirements for
ASPRS Class 1 mapping at a 1 inch = 40 feet equivalent scale with a one -foot indicated
contour interval.
D. Data Requirements
Planimetric DGN files must be fully compatible with the State's current Bentley
MicroStation version -graphics program. used by TxDOT -without further modification or
conversion.
2. Electronically collected and processed field survey data files must be fully compatible
with the TxDOT's computer systems without further modification or conversion. All files
must incorporate only those feature codes currently being used by the State.
3. DTM must be fully compatible with the current version of Bentley OpenRoads civil design
system used by TxDOT without further modification or conversion. All DTM must be fully
edited to provide a complete digital terrain model with all necessary break lines.
4. File features and level structure must be in accordance with the State's current
photogrammetry mapping legend.
5. Minimum text size is 0.1 inches when plotted at a scale of 1 inch = 40 feet.
E. Deliverables for Aerial Mapping Using a Non -Metric Camera and Unmanned Aircraft System
(UAS)
The Photogrammetrist or Mapping Scientist must submit the following:
1. Digital orthophotography delivered on USB flash -drive or hard -drive in Tagged Image File
format (TIF) compatible with Bentley MicroStation software and including georeferenced
world files.
2. A photo index map in DGN and KMZ format showing the location of each digital image
frame. The index map must be overlaid on a base map to provide general location
information.
3. An orthophoto index map in DGN, KMZ, and PDF format showing the location of each
orthophoto panel. The PDF format index map must be overlaid on a base map to provide
general locational information.
4. An analytical triangulation report signed and sealed by the Photogrammetrist or Mapping
Scientist providing a narrative of the aerial photography project and processing results.
The report must include the number of flight strips, overall number of photo frames, the
number of ground control points used, the use of airborne GPS and IMU data, and the
results of the fully weighted least -squares bundled adjustment. The Photogrammetrist or
Mapping Scientist must include a description and results of the analytical triangulation.
5. DGN files for the planimetric and DTM mapping.
150.8. Field Check Survey for Aerial Mapping Using Manned Aircraft or UAS.
Field checking of aerial mapping projects involves surveying a statistical sampling of discreet
features shown on the map. It is a collaborative effort between the Photogrammetrist or Mapping
Scientist-UAS and the Surveyor to validate that the map derived photogrammetrically meets the
Page 39 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
required accuracy standard. Because not all features shown on the map are good candidates for
checking, it is necessary for the Photogrammetrist or Mapping Scientist to select discreet and
unambiguous points that can then be surveyed and effectively evaluated between both the
photogrammetric and field survey data sets.
The Photogrammetrist or Mapping scientist-UAS will provide a minimum of twenty 20 check point
locations randomly distributed throughout the mapping area. The descriptions of the points must be
sufficient to eliminate any ambiguity of the exact point to be surveyed.
A. Purpose
The purpose of a field check for aerial mapping is to validate that map accuracy requirements
have been met.
B. Definitions
In 150.8, the following definition applies:
Check Point — A randomly distributed point captured in the DGN mapping file selected by the
Photogrammetrist or Mapping Scientist and provided to the Surveyor to be used to verify that
the mapping accuracy requirement has been met.
C. Procedure to Field Check Survey for Aerial Mapping Using Manned Aircraft or UAS
1. The Photogrammetrist or Mapping Scientist-UAS must prepare and provide the Surveyor
a listing of points to be validated in the field. Sufficient detail and description of the point
is required to eliminate the possibility of a misidentification of the point during the field
survey. A minimum of 20 horizontal and 20 vertical check points are required. Any single
point can be used for both horizontal and vertical data as appropriate. A check point must
not be part of the analytical triangulation least -squares adjustment.
2. The Surveyor shall locate and measure the provided validation points on the ground
using equipment and methodologies with a higher level of accuracy than the map being
checked.
3. Using the results from the field survey, the Surveyor shall prepare a map accuracy
assessment report detailing the results -of the field check. The report must include the
number of check points used, the field surveying technique used for validation, and the
results of the root mean square error (RMSE) and 95% confidence computations.
4. Using the validation data provided by the Surveyor, the Photogrammetrist or Mapping
Scientist must prepare a final report detailing the results of the map check. The report
must include both the following Statements of Accuracy, if applicable:
a. "This map was compiled to meet the ASPRS Standard for Class 1 map accuracy."
b. "This map was checked and found to conform to the ASPRS Standard for Class 1
map accuracy."
D. Technical Requirements
The Surveyor shall:
1. Determine the northing, easting, and elevations- of the check points provided by the
Photogrammetrist or Mapping Scientist using a surveying method of greater accuracy
than that used to produce the map being checked.
2. Perform RMSE and 95% confidence computations on the check points using the
following methodology:
For each horizontal coordinate, the Surveyor shall subtract the Northing value of the map coordinate from the
Northing value derived from the field survey and square the resulting value. The Surveyor shall perform the
Page 40 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
same operation for the Easting coordinate and then add the two squared values. The Surveyor shall repeat the
procedure for each check point. The Surveyor shall add up all of the resulting squared values and divide the
sum by the number of check points used (i.e., average the squares). Finally, the Surveyor shall calculate the
square root of the average. The Surveyor shall report the resulting value as the RMSE value for the horizontal
check point analysis. The Surveyor shall multiply the final RMSE value by 1.7308 and shall report the resulting
value as the 95% confidence value for the horizontal check point analysis.
For each vertical coordinate, the Surveyor shall subtract the elevation value of the map coordinate from the
elevation value derived from the field survey and square the resulting value. The Surveyor shall repeat the
procedure for each check point. The Surveyor shall add up all of the resulting squared values and divide the
sum by the number of check point used (i.e., average the squares). Finally, the Surveyor shall calculate the
square root of the average. The Surveyor shall report the resulting value as the RMSE value for the vertical
check point analysis. The Surveyor shall multiply the final RMSE value by 1.96 and shall report the resulting
values as the 95% confidence for the vertical check point analysis.
3. Provide the results of the RMSE and 95% confidence computations to the
Photogrammetrist.
E. Data Requirement
The Surveyor shall deliver the result of the field check as a report in PDF format.
F. Deliverables
The Photogrammetrist or Mapping Scientist must provide a map accuracy assessment report
detailing the methodology used and results of the map accuracy assessment.
150.9. Horizontal and Vertical Control for Aerial Mapping.
Placement and survey of horizontal and vertical control for aerial mapping establishes ground
control for aerial mapping projects.
A. Purpose
The purpose of an aerial photography control survey is to provide ground control for aerial
mapping projects.
B. Definitions
In 150.9, Aerial Photography Control Survey means reconnaissance, field work, analysis,
computation, and documentation necessary to provide horizontal and vertical position of
specific ground points. The ground control points are used in photogrammetric processing.
C. Procedure for Horizontal and Vertical Control for Aerial Mapping
The Surveyor shall:
Prepare and submit for approval an aerial ground control layout in DGN and KML format
based on the target positions selected by the Certified Photogrammetrist. The layout
must show the location of the proposed primary project control and aerial ground control
points.
2. Establish and determine the horizontal and vertical coordinates of the primary project
control points and aerial ground control points.
3. Place aerial ground control targets at the point location and maintain the targets until the
aerial flight has been completed.
D.. Technical Requirements
1. Aerial photography control surveys must be performed under the direct supervision of a
RPLS currently registered with the TBPELS.
Page 41 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
2. The horizontal and vertical coordinates of the aerial control points must be based on
acceptable methods, conducted by -the Surveyor, and must meet the standards of
accuracy as set forth below:
Survey Level 3 accuracy, as described in the TxDOT Survey Manual, latest edition, or the equivalent level of
accuracy described in the TSPS Manual of Practice for Land Surveying in the State of Texas.
E. Data Requirement
The Surveyor shall perform post processing of field data, which will be reviewed by the
County/State. Data processed by standard calculators, computers, and other business
hardware and software normally maintained and. used by the Surveyor will be considered
acceptable.
F. Deliverables
The Surveyor shall submit the following:
1. A final aerial control point layout in DGN and KML format showing the location of the
primary control and target points labeled with their respective alpha -numeric designation.
2. A plot and computer graphics of a B-size index map showing an overall view of the
project and the relationship of primary monumentation and control used in the
preparation of the project, signed and sealed by a RPLS, and as directed by the
County/State.
3. A plot and computer graphics of a B-size horizontal and vertical control sheet showing
the primary survey control monumentation used in the preparation of the project, signed
and sealed by a RPLS, and as directed by the County/State.
4. An A -size data sheet for each aerial ground control point, which must include a location
sketch, a physical description of the point, surface coordinates, elevation, and datums
used.
5. A USB flash drive containing the graphics files and scanned images of the control data
sheets.
6. A writteri statement*describing the'datum used along with copies of all relevant NGS and
data sheets.
7. A written tabulation of all aerial control points with their respective alpha -numeric
designations and horizontal and vertical coordinates.
150.10. Mapping Services to be Provided.
The Surveyor shall provide the following mapping services as requested by the County/State:
A. Aerial Photogrammetry
The Surveyor shall prepare planimetric design (DGN), digital terrain model (DTM), and
triangulated irregular network (TIN) MicroStation graphics files and orthophotography files
covering the specific work location, meeting standards and specifications as required.
B. Terrestrial Photogrammetry
The Surveyor shall prepare planimetric design (DGN), digital terrain model (DTM), and
triangulated irregular network (TIN) MicroStation graphics files covering the specific work
location, meeting standards and specifications as required.
Page 42 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
C. Terrestrial Lidar
The Surveyor shall prepare planimetric'design (DGN), digital terrain model (DTM), and
triangulated irregular network (TIN) MicroStation graphics files covering the specific work
location, meeting standards and specifications as required.
D. Mobile and Aerial Lidar
The Surveyor shall prepare planimetric design (DGN), digital terrain model (DTM), and
triangulated irregular network (TIN) MicroStation graphics files covering the specific work
location, meeting standards and specifications as required.
E. Mapping Tasks to be Completed
The Surveyor shall perform the following tasks as requested for each mapping service.
Horizontal and Vertical Control for Aerial Mapping
a. The Surveyor shall prepare and submit an aerial ground control layout showing the
proposed aerial ground control points, for approval by the State.
b. The Surveyor shall establish and determine the coordinates of the aerial ground
control points.
c. The Surveyor shall establish and determine the elevations of the aerial control
points.
d. The Surveyor shall place aerial ground control target material at the established
points and maintain until the photographs from the flight are approved.
e. The Surveyor shall prepare, to scale, a survey control index sheet for the aerial
control points.
f. The Surveyor shall be prepared to locate additional points, as determined by the
American Society for Photogrammetry and Remote Sensing (ASPRS) certified
Photogrammetrist, if any panel points are not visible from the air.
2. Deliverables for Horizontal and Vertical Control for Aerial Mapping
The Surveyor shall provide the following deliverables:
a. A final aerial control point layout showing the location of the points and labeled with
their respective alpha -numeric designations.
b. A plot and computer graphics of an B-size index map showing an overall view of the
project and the relationship of primary monumentation and control used in the
preparation of the project, signed and sealed by a RPLS, and as directed by the
State.
c. An A -size data sheet for each aerial ground control point, which must include a
location sketch, a physical description of the point, surface coordinates, the
elevation, and datums used.
d. A USB flash drive containing the graphics files and scanned images of the control
data sheets.
e. A written statement describing the datum used along with copies of all relevant NGS
and data sheets.
A written tabulation of all aerial control points with their respective alpha -numeric
designations, surface coordinates (for center panel points only), and elevations.
3. Prepare Planimetric and DTM Data
Page 43 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
The Surveyor shall perform the following tasks for each requested mapping service:
a. The Surveyor shall provide low altitude aerial mapping to cover an area 1,200 feet
wide centered on the roadway unless otherwise specified, with cross flights as
directed by the County/State.
The Surveyor shall follow all standards and specifications in accordance with
established guidelines and recommended or approved by the County/State.
b. The Surveyor shall prepare planimetric design (DGN), digital terrain model (DTM),
and triangulated irregular network (TIN) Bentley MicroStation graphics files and
orthophotography files covering the specific work location, meeting standards and
specifications as required.
(1) The Surveyor shall collect supplemental planimetric and DTM survey data.
(2) The Surveyor shall update aerial 2D and 3D mapping with ground surveys.
(3) The Surveyor shall maintain the current DGN level structure and legend
used by TxDOT.
(4) The Surveyor shall maintain -the current DTM level structure and legend
used by TxDOT.
(5) The Surveyor shall use file features and level structures in compliance with
TxDOT's current photogrammetry mapping legend.
(6) The Surveyor shall locate, and field check random points.
c. The Surveyor shall conduct quality assurance and quality control (QA/QC) for each
task performed and prepare a Surveyor's Report.
4. Deliverables for Planimetric and DTMs
The Surveyor shall provide the following:
a. Certification that the photographs or UDAR imagery were taken on the date
indicated, signed by the airplane pilot or aerial photographer.
b. The DGN, DTM, and TIN files on a medium and in a format acceptable to the State,
delivered on USB flash -drive or hard -drive.
(1) Orthophotography (created using the DTM) delivered on USB flash drive, or
hard -drive in tiff format (3 banded) with world files.
(2) TxDOT's photogrammetry mapping legend and supplements.
c. A tabulation showing the field -check points.
d. Quality Assurance and Quality Control (QA/QC) and Statement of Map Accuracy.
(1) Statement of map accuracy.
(2) A surveyor's report signed and sealed by an RPLS.
150.11. Horizontal And Vertical Control (15.3.5).
This includes the establishment of horizontal and vertical control for survey projects.
A. Overview of Horizontal and Vertical Control
A horizontal control survey is performed for the purpose of placing geographic coordinates of
latitude and longitude on permanent monuments for referencing lower levels of surveys. A
projection is used to place the coordinates on a plane of northing and easting values for
simplified measurements. Scale and elevation factors are applied to make the distance
Page 44 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
measurements applicable to the exact location on the working surface and the type of
projection chosen is an "equal angle" type.
A vertical control survey is performed for accurately determining the orthometric height
(elevation) of permanent monuments to be used as bench marks for lower quality leveling.
Spirit leveling is the usual method of carrying elevations across country from "sea level" tidal
gauges. However, Global Positioning System (GPS) can be used indirectly but with less
accuracy. Height measurements from the ellipsoid (as opposed to the "sea level" geoid) can
be determined very accurately with GPS and only GPS. Trigonometric leveling, with a total
station, is not acceptable for vertical control work.
B. Definitions
1. BM means bench mark, which is a relatively permanent object whose elevation above or
below an adopted datum is known.
2. CORS means continuously operating reference station, which is a network of the highest
quality horizontal stations, forming the National Spatial Reference System (NSRS).
3. Control Survey means a survey providing positions (horizontal or vertical) of points to
which supplemental surveys are adjusted.
4. Datum means a mathematical model of the earth designed to fit part or all of the geoid.
5. Datum Point Rod or Deep Rod Monument means a monument driven to refusal by a
power driver, used for major project control.
6. GPS means the Global Positioning System, which is based on a constellation of 24
satellites orbiting the earth at a very high altitude.
7. Horizontal Control Survey means placing geographic coordinates of latitude and
longitude on permanent monuments.
8. Level 1 survey means RRP, CORS or major control densification.
9. Level 2 Survey means primary project control.
10...Level 3.Survey means secondary project control.
11. NGS means National Geodetic Survey
12. RRP means Regional Reference Point, which is a TxDOT Continuously Operating
Reference Point.
13. Type II Monument means a disk driven onto a length of 5/8-inch rebar with the hole filled
flush with concrete.
14. Vertical Control Surveys means a survey performed for accurately determining the
orthometric height (elevation) of permanent monuments to be used as bench marks for
lower quality leveling-
C. Procedure for Horizontal and Vertical Control
1. The Surveyor shall establish horizontal and vertical control points, including offsite points.
The Surveyor shall prepare signed survey control data sheets, a survey control index
sheet, and a composite layout of the horizontal and vertical controls, and as directed by
the County/State.
2. The Surveyor shall update existing control information and prepare new survey control
data sheets, as directed by the County/State, to be included in the construction plan set
as described in Item 150.11, D.
Page 45 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
D. Technical Requirements for Horizontal and Vertical Control
The Surveyor shall adhere to the'following technical requirements.
1. Horizontal and vertical controls must be performed under the supervision of a RPLS
currently registered with the TBPELS.
2. Horizontal ground control used for design surveys and construction surveys, furnished to
the Surveyor by the State or based on acceptable methods conducted by the Surveyor,
must meet the standards of accuracy required by the State.
The Surveyor shall comply with the standards of accuracy for horizontal control traverses, as described in the
TxDOT Survey Manual or the TSPS Manual of Practice for Land Surveying in the State of Texas, as may be
applicable.
S. Vertical ground control used for, design surveys and. construction surveys, furnished to
the Surveyor by the State or based on acceptable methods conducted by the Surveyor,
must meet the standards of accuracy required by the State.
The Surveyor shall comply with the standards of accuracy for vertical control traverses, as described in the
TxDOT Survey Manual or the TSPS Manual of Practice for Land Surveying in the State of Texas, as may be
applicable.
4. Monuments
The Surveyor shall install survey monuments for a horizontal and vertical control survey that are reasonably
permanent and substantial. The monuments shall be easily identified and afforded reasonable protection
against damage and or destruction.
a. Offsite primary control points whether set by GPS or conventional survey methods
must be set in pairs approximately 2000 feet apart outside of the project on side
roads. Offsite points must be constructed approximately every 2 miles and set
approximately 6 inches below natural ground and must be inter -visible between
each pair of points.
b. Secondary control points must be set approximately 6 inches below ground at a
. maximum distance of 1.,5.00. feet apart.
5. Side shots or short traverse procedures for total stations used to determine horizontal
and vertical locations must meet the following criteria:
a. Short traverses and instrument setups for side shots must begin and end on
horizontal and vertical ground control as described above.
b. Standards, procedures, and equipment (e.g., GPS Equipment, LIDAR, Total
Stations) used must be such that horizontal locations relative to the control can be
reported within the specification to allow the engineer to accurately create the
design to the following limits:
(1) Bridges and other roadway structures: less than 0.02 feet.
(2) Utilities and improvements: less than 0.2 feet.
(3) Cross -sections and profiles: less than 0.2 feet.
(4) Bore holes: less than 0.5 feet.
c. Standards, procedures, and equipment (e.g., GPS Equipment, LiDAR, Total
Stations).used must be such that vertical locations relative to the control may be
reported to within 0.02 feet.
Page 46 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
6. The Surveyor shall update existing control information and prepare new survey control
data sheets, as directed by the State, to. be included in the construction plan set as
described below:
a. The Surveyor shall prepare, sign, seal, and date a survey control index sheet and
horizontal and vertical control sheets to be inserted into the plan set.
b. The Surveyor shall prepare a survey control index sheet that provides an overview
of the primary project control and must include:
(1) . An unscaled vicinity map showing the general location of the project in
relation to nearby towns or other significant cultural features.
(2) A scaled project map showing the extents of the project and the location of
the primary control points. The map must show street networks, selected
street names, control point identification, and significant culture features
necessary to provide a general location of the primary control.
(3) A table containing the primary control point values including the point
number, northing, easting, elevation, stationing, and stationing offset values.
(4) Map annotation including a graphic scale bar, north arrow, and standard
TxDOT title block. The title block must contain a section for the district name,
county, highway, and CSJ number. The title block must also contain a
section for a Texas registered engineer to sign, seal, and date the sheet to
include the following statement, "The survey control information has been
accepted and incorporated into this PS&F.
The Surveyor shall download the required format of the survey control index
sheet from the TxDOT website.
(5) In the title block under the heading "Notes", identification of the horizontal
and vertical datum on which the primary control is based with the date of the
current adjustment, the surface adjustment factor used, and unit of measure.
The surveyor shall include a note stating that the coordinates are State
-Plane and a notation specifying either grid or surface adjusted coordinates.
E. Data Requirement
The Surveyor shall perform post processing of field data, which will be reviewed by the State.
Data processed by standard calculators, computers, and other business hardware and
software normally maintained and used by the Surveyor will be considered acceptable.
F. Tasks to be Completed
The Surveyor shall perform the following tasks:
1. The Surveyor shall establish horizontal and vertical control points, including offsite points.
The Surveyor shall prepare signed survey control data sheets, a survey control index
sheet, and a composite layout of the horizontal and vertical controls, and as directed by
the County/State.
2. The Surveyor shall set primary offsite control points in pairs, approximately 2 miles apart
outside of the project area.
3. The Surveyor shall set secondary control points approximately 6 inches below ground at
a maximum distance of 1,500 feet apart.
4. The Surveyor shall establish horizontal and vertical control from the TxDOT Virtual
Reference Station (VRS) Network, and as directed by the County/State.
Page 47 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
5. The Surveyor shall tie and tabulate horizontal and vertical control to other control points
and datums in the vicinity established. by other sources such as the National Geodetic
Survey (NGS), the Federal Emergency Management Agency (FEMA), TxDOT VRS
Network, and as directed by the County/State.
G. Deliverables
The Surveyor shall provide the following:
1. A B-size plot and MicroStation graphics files of the index map showing an overall view of
the project and the relationship of the primary monuments and control points established
for the project, signed and sealed by a registered professional land surveyor (RPLS), and
as directed by the State.
2. One A -size data sheet for each control point which shall include, but need not be limited
to, a location sketch, a physical description of the point, surface coordinates, the
elevation, and the datum used.
3. A USB flash -drive containing the graphics files and scanned images of the control data
sheets.
4. A written statement describing the datum used, signed and sealed by a RPLS, along with
copies of all relevant NGS and TxDOT data sheets.
FUNCTION CODE 160 (163) — ROADWAY DESIGN
MISCELLANEOUS ROADWAY
163.1. Utility Coordination.
A. Utility Base Map
The Engineer shall obtain information on existing utilities from utility owners and shall conduct
investigations to identify and evaluate all known existing and proposed public and private
utilities. The Engineer shall identify potential conflicts and attempt to minimize the potential
adverse utility impacts in the preparation of the schematic design. The Engineer shall prepare
a base map depicting the utility locations. The Engineer shall create and maintain a utility
conflict matrix along with a utility conflict exhibit at the 90% submittal identifying potential
known conflicts. The format of the matrix and exhibit must be in a format acceptable to
County/State..
B. Utility Coordination
The Engineer shall assist the State in conducting utility coordination meetings with utility
companies, as required, to facilitate utility conflict identification and resolution.
1. The Engineer shall establish contact with all existing utilities within and adjacent to the
project limits and set up utility coordination, meetings to discuss concepts and options for
design and construction. This process must also be extended to utilities that approach
the State, regarding plans to install facilities within the project limits after the project has
been initiated.
2. The Engineer shall establish and conduct workshop meetings, both individually with each
utility and with all utilities that incorporate the County/State's project team to review and
resolve conflicts.
3. The Engineer shall create agenda and exhibits for the 90% coordination meeting as
directed by the State.
Page 48 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
4. The Engineer shall establish and promote the desired agenda and methodologies for
utility construction within the project limits. This shall consist primarily of promoting the
construction of utilities as a part of the highway contract.
5. The Engineer shall schedule and conduct a utility kick-off meeting to obtain more
information on existing facilities within the project limits. Major utility facilities must be
discussed and analyzed to avoid relocation, if possible.
6. The Engineer shall schedule and conduct one (1) milestone meeting with the State to
coordinate the work effort and resolve problems. The Engineer shall prepare a written
report of these meetings. The meetings must include review of the following:
a. Existing facilities including major facilities -to be avoided with the project, if possible
b. Utility Conflict Matrix (90% only)
c. Utility Conflict Exhibit (90% only)
d. Long lead items that could potentially impact the schedule during PS&E
C. Deliverables
1. Utility Conflict Matrix along with Utility Conflict Exhibit. The Utility Conflict Exhibit must be
on 11x17 sheets and include callouts to indicate the conflict ID#, utility owner, type of line
(water, sewer, high pressure gas, etc.), material (if it is an AC pipe line), and size (if
known).
2. Utility Contacts list in excel and pdf format
3. Utility Summary to indicate major utility facilities or time sensitive items pertaining to
utilities that need to be addressed in PS&E.
163.2. Geotechnical Borings and Investigations (OMITTED)
163.3 Aesthetics
The Engineer will develop a conceptual aesthetic rendering of the proposed SH 47 interchange, based on the
District's approved standards and in coordination with the District's landscape architect, using the OpenRoads
Designer Visualizer. Special structural analysis, detailing, etc. is not included in the scope of work.
Page 49 of 49 Exhibit A
Contract ID No. CIP 23-600
Project 2 SH 47
EXHIBIT B
ADDITIONAL SERVICES TO BE PROVIDED BY THE ENGINEER
SH 47
atSH21
CSJ: 3138-02-016
The Engineer shall provide the necessary engineering and technical services for the preparation of plans,
specifications, and estimates (PS&E) for the construction of interchange improvements at SH 47 at SH
21. The project will be prepared in conformance with state and federal requirements. The construction
plan sets shall contain the drawings, details, and applicable standards required to describe the grading,
paving, drainage, structures, signing, pavement marking, delineation, sequence of construction, and traffic
control for this construction project. The project will also require a TxDOT approved pavement design,
additional SUE investigations, and preparation of ROW maps and deed descriptions, in accordance with
the TxDOT approved schematics and environmental documents described in Exhibit A.
Under subsequent work authorizations, the engineer may provide some or all the following:
• Assistance with Right -of -Way Mapping and Acquisition, including, but not limited to, testimony at
eminent domain proceedings,
• Review of conflict analysis for utility relocation plans, and
• Construction phase services, including, but not limited to, preparation of change orders, review of
shop and fabrication drawings, schedule analysis and participation in project meetings, as
requested by TxDOT.
The ENGINEER will be the single point of contact between the County and all contractors/subcontractors
and will review all work performed, coordinate and conduct all meetings, and prepare and submit all
project reports and documents.
Page 1 of 1 Exhibit B
Prime Provider: Binkley'& Barfield, Inc.
Project CIP 23-600
SH 47 at SH 21 - Brazos County
SUBTOTALS
Binkley &Barfield,
Inc
Alliance
Transportation
Group
Baseline
Corporation
RQAW
EPR
ACACIA
FC 102(110)
$2,121,370.00
$1,846,550.00
$274,820.00
FC 120(120)
$343,670.00
$14,820.00
$285,365.00
$23,230.00
$20,255.00
FC 130(130)
$18,530.00
$18,530.00
FC 145(145,164)
$336,594.00
$321.390.00
$15,204.00
FC160(150)
$103,850.00
$9,840.00
$94,010.00
FC160(163)
$116,540.00
-$116,540.00
ODE FC 102(110)
$30,699.00
$10,062.00
$13,783.00
$4,571.00
$1,048.00
$135.00
$1,100.00
ODE FC 160(150)
$34,050.00
$34,050.00
UNIT COSTS FC 160(150)
$592.057.00
$377,202.00
$178,550.00
$32,085.00
$250.00
$3,970.00
Grand Totals
$3,697,360.00
$2,748,984.00
$303,807.00
$277,131.00
$318,498.00
$23,615.00
$25,325.00
Exhibit C - CIP 23-600
Exhibit C - Fee Schedule
Prime Provider. Binkley & Barfield, Inc.
Project CIP 23.600
SH 47 at SH 21 - Brazos County
TASK DESCRIPTION
SR PROJECT
MANAGER
QUALITY
MANAGER
SENIOR
ENGINEER
SENIOR
HYDRAULIC
ENGINEER
SENIOR
BRIDGE
ENGINEER
PROJECT
ENGINEER
DESIGN
ENGINEER
ENGINEER
IN
TRAINING
CARD
OPERATOR
JUNIOR
CADD
OPERATOR
AOMINr
CLERICAL
SENIOR
UTILfTIES
COORD
UTILITIES
COORD
TOTAL
LABOR HRS.
TOTAL
BY
LINE
FEASIBILITY STUDIES - FC 102 110
.OxirSelaHnaU'�d�!'�Work Gli rtB'-.4,A'..i;�.w.riur...-a.»3"6'k:.n'€.'.,s^.ST,✓:3�a.Y.£s.>zY »ln .:�.a .....-..»..
:. A.Develo Base Ma s.. .. •:, .;... :... �. ::.,.. ....,. ,::r .. •.
:.•�..w..""'k�.li'S:'.f..kXd..w
;; ..;
�f4�3. .:,: :::,�„
_.,
.T;:nn:.u»,:.tK:..C.r+a$,Tye%':,M,..,.,ii'.....».Ju..:'..a+«.R...:t
..
':
„L,m. ., xk hy..a...�'65.wu1a
..
i.:r•.rw«t•.u�..Cnt
ub';I.L3Yi2.e.4a.�,..,.L�.>�«.r;'u7Fi4..
.. v,.eSi
1E, lSe.}-.°�d. ,'>7li
f.++;4: x.; ;:.v
Prepare Edslin ROW/Pro a Maps Dn
1
4
a
8
16
16
53
$8.345.00
Prepare TanaDan
1
4
8
8
16
16
53
$8.345.00
Pre areBase UI➢ities n
1
2
a
8
24
24
67
$9,805.00
Pre are Existing Alignment 0 n
1
2
8
16
16
43
$7 365.00
VB. Planimetries and AerialMa in "''?,t.,
Obtain planImetrics. DTM, and aerial hots ra hs
1
1
4
8
8
22
$36435606
::C:Anal wE)dstin Condltmns',..,:' �.. ,:..._s .,. r:: ': ,.+s., .::.. .a :...::.. .:: :.:.'�
.-..;:,
Moor utilities investigation
2
2
8
8
12
12
44
57240.00
Existing eometric features. ROW width and typical sections
1
1
2
4
8
8
12
12
48
$8 30D.00
Drainage ExistinCondition H role
1
8
8
16
33
$6585.00
Drainage Exlst[no Condition Drainage Crossing Analysis
1
8
8
16
33
$6.585.00
Environmental constraints
1
1
4
2
8
8
24
$5,240.00
Existing Mo intersection ms
1
4
8
8
8
8
37
56,345.00
Level of Service analysis
2
2
8
8
8
28
$5.310.00
Crash analysis
2
2
8
a
8
28
$5 310 00
>?.G: Data Collection:.;:.,.9s r .. .:: ,. ..: :..:., .... ..- .:.- ....+6 .: ... .: .......
-
.rer.:.:,�-
.,-...:L
.�
«:.,r ,».; :..�
.Fr ,: r.,;. ,
s.r .:•'v:':'
a. Available Corridor Ma or Investment Studies
1
1
4
4
10
$2.095.00
b. Desi n data from record drawings of existing and propcsed facilities
1
1
4
4
10
S2 095.00
c. Historical traffic volumes
1
1
4
4
10
$2.095.00
d. Existing and future design year tra0lc data
1
1
4
4
10
52.095.00
a.Ori in-Destinatian 043data
1
1
4
4
10
52.095.00
If. Crash data — 5-year period
1
1
4
4
4
4
4
22
3435.00
Roadway Inventory information
2
2
2
2
8
1110110
.
h. Previously prepared drainage studies
1
1
4
4
10
$2,635.00
I. Aerial photos, planimetric mapping and DTM
4
4
8
8
24
$2900.00
Environmental Data
1
1
2
4
4
a
8
8
36
$5,375.OD
.
k. Adopted land use maps and plans as ova➢able
1
4
2
2
8
8
25
$3.665.00
I. Flood Boundary Maps and Flood Insurance Studies and Models
1
1
4
8
8
22
S4 735.00
m. Public and pnvat2 utility Information
a
8
8
8
8
40
$5,560.00
n. Plat research for ad aconl properties as available.
4
12
8
8
32
$5.860.00
o. Local Major Thoroughfare Plan.
1
1
4
4
10
$2 095.00
. Traffic Counts
Fletd visits
1
8
1
8
4
8
4
8
2
2
14
3
Z2.a
$2.595600
.
.: elArefimina- Desi-nCon(erence `ark„ rt:.rt,;.s.o r.<r:; .:.. :..::;:. �., �- ....... ,, ,. *��; �::x„
Attend Initial Kick -Off Meeting DCC
:., ..,..: a, ..
4
.•;.:.<:....
,�:......:n.
.: r.;:
.. ::
4
4
4
4
20
$3.940.00
Prelimina OSR
... .: .. ....... . s... ..L> •:a�.'�' d'P<3Y�aat�:>~'s,..aa'<:r3&.-_..d.7 �..-.. a
110?SbltilniaNct7esf n'�GanaraL7ssk
4
� . vt,....,.+.;t;..,w!
:.»
.___. 4
usrY}F'ei�r
.:;� ?_R..
:r ».;HI;S ..
12
rx...:.5....
12
...'�..,k:&'
�� 12
,,. a....�. ,zr
.
� ....&
.:
-.�.'x4,.:�rs.3:�..
t,
44
62000
A. ROW Properly Base Mai)
Identif ROW based on ROW maps) and easements and dovelo ROW base ma
2
4
4
8
12
12
42
$7 050 OD
Existing typical
1
1'
1
4
12
16
18
55
$821000
isections sections
Proposed oat sections alternates)
t�,D..Environmental Constraints �., s..; - .., .. _.. z,r•.. r ;s:._yx�•, ..:.:::- .. •r;.s.,i . ::, E..L.w."
2
.,....:.>: x
2
err. 4:.,::...:rzx
2
:. <..., ,.:..
.:, .,::�&sr. <5.,
�:.. _.: z..,,
8
...t,;:...f
24
.,.riv.,.w
40
; : .. _
40
;:r. ...,...x:.
....u.5. :;
,k`.a ...
1«
118
.,.tea'.,. <:.....
,
Environmental constraints
1
1
8
8
1 12
12
12
54
$7.580 00
x'
Preliminary Drainage studIncluding Flood IaInM acl Analysls
Proposed Hydraulic Analysis of Drainage Crossings (Approximately imatel 27 crossings)
4
4
V.
4
4
4
16
48
32
40
32
80
.+
48
80
�
77?7
°,.,>'.':,7:,?:
136
260
-.�:
$22A60.00
$44.800.00
Preliminary Drainage Report signed and scaled (Inc. Exdribils)
Preliminary Outfall M0' Lion analysis and recommendation
4
4
4
4
4
24
8
24
16
24
16
24
16
24
24
156
64
$25.400.00
$11.660.00
Preliminary storm sewer layouts for bridge decks 12 bridge decks
8
40
40
4D
128
$19.00D.00
Existing and Proposed Hydrologyfor Ditches
4
4
4
40
1
56
56
58
1
220
$39.040.00
Preliminary Drainage Area Sheets for Stream Crossing Bridges & Bridge Class Culverts, Non Badge
Class Culvert Crossings (Approximately 27 Crossings)
4
4
4
40
32
48
48
48
228
$37.160.00
Preliminary Hydraulic Data Sheets for Stream Crossing Bridges & Bridge Class Culverts, Non Bridge
Class culverts Crossings (Approximately 27 Crossings)
4
4
4
40
32
48
48
48
228
$37,160.01)
Preliminary.Culvert Layout Sheets (Approximately 27 Crossings)
4
4
40
40
88
88
88
352
$50,800.00
Preliminary Storm Sewer plan sheets for the box intersection at SH 21 and SH 47 Intersections and 3
additional Intersections
4
4
4
40
40
a8
88
88
356
$51.880.01)
Preliminary Ditch design layout on roadway roll plot and typical sections for approximately (6 miles
4
4
4
4D
40
88
1 88
88
356
$51.Ann no
Exhibit C - CIP 23-600
Exhibit C - Fee Schedule
Prime Provider: Binkley & Barfield, Inc.
Project CIP 23-600
SH 47 at SH 21 - Brazos County
F- ROWR6411ffirn6nts,
Determine ROW requirements
4
4
4
24
24
24
84
$15.800.DD
F.ConstrucrionSequance-
'I
Tt
Preliminary construction sequence
4
4
40
so
so
so
288
$43.620.00
G. Design Exceptions
! I -
.. .
.
.
-
Identify design exceptions and watyers
4
4
24
24
56
$11.260.00
Pre are design exceplJon and walvor documents
1
1
8
a
24
24
66
$9.535.06
H.-Traffic Data and Projections .. .. ........
1.
ReviewTPP data, traffic and land use data
1
1
8
8
8
26
$4.655.00
Traffm Projection Memorandum
1
1
8
8
8
8
34
$5.455.00
Traffic Line Diagrams
i
1
a
8
18
$3.535.00
L Traffic and Operational Analysis
Review traffic, and Operational Analysis
2
2
8
8
8
28
$5.310.00
J.SarelyAn.lysis
Safety Analysis Coordination
2
2
8
is
16
44
$6.870.00
K Bicycle and PedeWlan Accommodations
BIcyclo and Pedestrian Accomodations
B
8
48
72
112
M
360
S54A80.00
Conceptual Schematic (3 alternatives)
X
24
8
24
160
160
2561272
$173.920.00
Two alternate each at Luza Ln and SH 21, 5th Street and SH 47. Goodson Bond Road and SH 47
16
4
16
40
1 40
"
1 22
80
356
$52,860.00
flans-10brid(iosI
Dowle mnmptualmhematicbrldqoe)hibits(upto3opU
4
8
12
24
T..
2
320
S48,300.00
Cur- foal bridge preliminary cost estimates and retaining wall Ilmit study
4
24
40
1 32
32
1
140
528.300.00
Conceptual Schematic Alt Eval and Selection8
-
B
8
40
1 40
80
1
1184
$33200.00
IIMGed-iiidb-te'DocinnSchomalle' -'. L
Prepare Open Roads 3d models for prefered alternatio
2
2
2
80
120 280
240
240
956
S123,300.00
Horizontal Geometry and EDP files
2
2
2
24
16
40
80
so
246
$30A20.00
Schematic DIan New and design elements
2
2
2
24
80
120
120
350
$41,180.00
Vertical Geometry
2
2
2
a
16
40
80
80
230
$27300-00
Schematic wrtical view and design elements
2
2
2
24
32
24
so
so
246
S31) 820.DU
Bridge Layouts Wrath bridge deck. bent locatfan. girder type• s5an lenos. rail locations)
4
4
6
12
20
64
40
150
$23.34020
DrNeway Connections and access management
2
2
2
a
20
40
so
154
$21.160.00
Create KML Schematic File
4
a
a
20
$3,620.00
Create exhibits for MAPO meetings
a
a
16
16
40
80
80
248
$32.200.00
110.6 C16C Sections
Preferred desqpn alternative cross sections (50 feet intervals on 11X17 - 30%.60%.90%,95-%)
4
4
16
32
160
160
376
A
$51.120.00
IdenlifY retaining wall limits based on cross
b1fitTraN Ls!���
STMU14111O)IS 7
3D design rendering
'4-
- 6 -
"'T 77,77,
2
4
"'N�.
116
2
80
7—
32
40
40
40
80
so
77-7777—eF-�
80
777�=
�'U'4150a,
7777=Z';'-
186
M='�
316
---
$35.610.00
$40.950.00
TCP Narrative (preferred alternative)
7777=
7677,
7.-7f—
4
4
8
24
40
$7.540.00
TCP Layout (60%, 90%, and 100% (prglg-d ' n
%. and 100i F _ 2'�-L
TCP Sections (60%,90 a referred H.M)
4
4
4
4
24
16
40
32
80
32
80
8D
so
80
312
248
$40.700.00
$31,100.00
Allendanre at review meeting (preferred alternative)
4
4
4
12
S3AOO.00
12, ryCostEstImato
Develop quanfities and prepare estimates (Conceptual) (up to 3 altematrvres
Develop quanftes and prepare estimates (30%)
6
1
6
1
12
1
2
"W
8
1
24
36
24
36
96
61
$16,320.130
SlOA30.00.
Develop quantities and prepare estimates (69%)
1
1
1
2
8
24
24
61
$10AMOD
Develop quantities and prepare estimates (90%)
Develop quantilles and prepare osUmates (100%)
1
1
1
1
1
1
2
2
a
8
24
24
24
24
61
61
$110.430.0D
SIOA30.OD
110.10 Enalno;fthifirSuirintivy Rupert
Draft engincednq summary report
4
4
4
T
a
16
48
16
too
$16.320.00
Final engineering summoryrepart
4
4
4
a
16
32
B
76
$13.280.00
Review en ineedn re orts ( traffic. d
8
16
48
$9.580.00
of d.n- .1 value owl. S*Mv, rl.-01;";`
I VE study preparation (e)MIMS)
4
4
16
4a
48
B
12a
$118.640.01)
I VE study attendance (hosted by others, assume 5 days)
40
1 40
1
1
au
1 522.000.00
Exhibit C - CIP 23-600
Exhibit C - Fee Schedule
Prime Provider. Blnkley l4 Barfield, Inc.
Project CIP 23-600
SH 47 at SH 21 - Brazos County
10: � _£ Coordln tloWadRabl cOrvoNmen�Y.
Attend meetings with roe owners stakeholders. and varlous a encles u to 8
32
32
$18.560.00
BBI roll lot/erdllbil re ration ublic meeting1 1mee8n
8
16
24
$9.560.00
BBI roll lot/ whlbil re arallon public meelin 2 1 meeting)8
16
24
$9.560.00
BBI public meeting1 re meetingattendance Imeetin
6
6
6
6
12
12
$9780.00
BBI public meeting2 re meeting attendance Imee6n
6
6
6
6
12
12
$9780.00
BBI ubl''m mee6n 1 attendance 1 mee8n
6
6
6
6
12
12
M$135.00.
$9 780.03
BBI public meeting2allendance 11meetln
6
6
6
6
12
12
$9,780.00
HOURSSUB-TOTALS
36B
138
317
412
0
1248
1.764
3.192
2.838
1.764
124
0
CONTRACT RATE PER HOUR
$3%0D
S295.00
$2.7
530D.00
5300.00
$195.00
165.00
$140.00
$110.00
$85.00
$100.00
$180.00
TOTAL LABOR CO5T5
S141.680.00
540,71h0
S85,59D-00
$12360D.00
SO.OD
$243360.00
S291,O60.OD
$446,880.00
$512,18D.00
5149.090.00
$12,400.00
$0.00
$1.846.550.00%ISTRIBUTIONFSTAFFING
3.0%
1.1%
2.6%
3.4%
0.0%
10.3%
145%
26.3%
23.3%
14A%
1.0%
0.0,
SUBTOT FC 102 11it
1 84fi 550.00
TASK DESCRIPTION
SR PROJECT
MANAGER
QUALITY
MANAGER
•
SENIOR
ENGINEER
SENIOR
HYDRAULIC
ENGINEER
SENIOR
BRIDGE
ENGINEER
PROJECT
ENGINEER
DESIGN
ENGINEER
ENGINEER
IN
TRAINING
CARD
OPERATOR
JUNIOR
CADD
OPERATOR
ADMIN/
CLERICAL
SENIOR
UTILITIES
COORD
UTILITIES
COORD
TO AL
LABOR HRS.
SOCIAL ECONIENVIRON STUDIES -FC 120 120
QA/OC CE documentation
4
4
_ .:..�,.�'�"t
.:�.a:,..�
�>'���,.� ..;t?
8
€::a,�.:....':m
-:.., . <..
� .�:,
., a, .> _
16
$4.280.00
v
13. Flood lam Impacts assessment support
2
2
B
B
20
S5.270.00
14. Stonnwaler pemits supped
2
2
B
B
20
S5 270.00
HOURS SUB -TOTALS
1 8
1 4
1 4
1 16
1 0
24
1 0
0
0
0
1 0
0
0
56
CONTRACT RATE PER HOUR
$385.OD
$295.00
E270.00
5300.00
3300.00
519$AD
5165.OD
$140.00
5110.OD
$85,00
$100.00
S1B0.00
S135.OD
TOTAL LABOR COSTS
$3.080.00
$1.10D.60
$1 OBD.OD
54800.00
0.00
54680.OD
$D.00
EO.OD
$O.OD
$0.00
50.00
$0.00
$O.OD
$14820.00
E14.820.00
% DISTRIBUTION OF STAFFING
14.3%
7.1%
7.1%
28.1
0.0%
42.9%
0.0%
0.0%
0.0%
1 0.0%
1 0.0%
1 0.0%
1 0.0%
SUBTOTAL FC 120 120
14 820.00
TASK DESCRIPTION
PROJECT
MANAGER
QUALITY
MANAGER
SENIOR
ENGINEER
SENIOR
HYDRAULIC
ENGINEER
SENIOR
BRIDGE
ENGINEER
PROJECT
ENGINEER
DESIGN
ENGINEER
ENGINEER
IN
TRAINING
CADD
OPERATOR
JUNIOR
CADD
OPERATOR
ADMIN!
CLERICAL
SENIOR
UTILITIES
COORD
UTILITIES
COORD
TOTAL
LABOR HRS,
FC 130130 -RIGHT-OF-WAY(ROW) DATA
130.5 Uffilly Co klee7lA '/await al/om •r'' .-..,..:r,.'la•'� :x. ,., _:. , -. ;
. �, ;
...
r ..r,., ,, ,.
-.
.,.
-'r:.
<.
SUE data collection support coordination. OAfQC
4
2
4
24
16
32
32
114
318.530.00
4
2
4
0
0
24
16
32
32
ONTRACT RATE PER HOUR
$385.00
$295.U0
$270.00
$300.00
$300.00
$195.00
$185.00
$140.00
5110.00
85.00
100.00
$180.00
$135,00OTAL
LABOR COSTS
57540.00
$590.0
S1 OB0.00.DD
30.OD
54680.00
$264D.OD
$4480.00
53.520.00
$0.00
$0.00
$0.00
50.00$18530.00
1853D.00
[HOURSSUB-TOTALS
DISTRIBUTION OF STAFFING3S%
1.8%
3.5%
a.0%
0.0%
21.1%
14.0%
28.1%
28.1%
0.0%
0.0%
0.0%
0.0%
UBTOTAL FC 121)(121111
$18 530.00
TASK DESCRIPTION
SR PROJECT
MANAGER
QUALITY
MANAGER
SENIOR
ENGINEER
SENIOR
HYDRAULIC
ENGINEER
SENIOR
BRIDGE
ENGINEER
PROJECT
ENGINEER
DESIGN
ENGINEER
ENGINEER
IN
TRAINING
CARD
OPERATOR
JUNIOR
CADD
OPERATOR
ADMIN/
CLERICAL
SENIOR
UTILfriES
COORD
UTILITIES
COORD
TOTAL
LABOR HRS.
FC145 MANAGING CONTRACTEDAIONATED PE
144.1ConfMct Marsh omentandA6mintstratlon' - ."= "- '=�
.
Desl n team meelin s assume month) -24 months
48
48
48
72
48,
264
$53.040.00
Client Meetings assume bl-waakly, 24 months
96
96
96
144
48
480
$99.600.00
Schematic review meelln s Assumo 3 submittal meetings)
12
12
12
12
12
12
12
6
90
$21.390.00
Werksa meetin attendance Assume 6 mee0n s
24
24
24
24
96
•$22.080.00
Project Mona ement and Adminisu n 24 months
192
96
96
96
4B0
$125.280.00
HOURS SUB -TOTALS
1 372
0
276
12
1
1
276
0
0
0
348
0
102
7.410
CONTRACT RATE PER HOUR
$385.00
$2135.11
5270.00
S300.00
S300.00
$195.00
$165.00
$140.00
$110.00
$85.00
$100.00
$180.00
$135.00
TOTAL LABOR COSTS
$143,220.00
Su.uu
574520.00
53600.00
$3800.00
$23 00.00
545540.00
$0.00
$0.00
$O.OD
$34800.00
$0.00
$13.770.00
$321390.00
$32l 390.00
% DISTRIBUTION OF STAFFING
26A%
0.W
19.6 %
0.9 %
0.9%
0.9%
19.6%
0.0%
0.0%
D.to
24.7%
010%
7.2%
SUBTOTAL FC 145
5321 39D.00
Exhibit C - CIP 23-600
Exhibit C - Fee Schedule
Prime Provider. Blnkley & Barfield, Inc.
Project CIP 23-600
SH 47 at SH 21- Brazos County
TASKDESCRIPTION
SR PROJECT
MANAGER
DUALITY
MANAGER
SENIOR
ENGINEER
SENIOR
HYDRAULIC
ENGINEER
SENIOR
BRIDGE
ENGINEER
PROJECT
ENGINEER
DESIGN
ENGINEER
ENGINEER
IN
TRAINING
CADD
OPERATOR
JUNIOR
CADD
OPERATOR
ADMNI
CLERICAL
SENIOR
UTILITIES
COORD
UTILITIES
COORD
TOTAL
LABOR HRS.
FC 16011501 ROADWAY DESIGN
150.2 Design Surve
OAIDC sur,m deliverables
4
4
16
16
16
56
$9.840.00
HOURS SUB -TOTALS
4--1
4
1 0
1 0
I D
I16
0
76
1fi
0
0
0
0
56
CONTRACT RATE PER HOUR
5385.00
I $295.00
1 210.00
$300.00
5300.00
5795.00
5165.00
$140.00
$110,00
$LSS 00
$100.00
$180.00
5135,00
TOTAL LABOR COSTS
51.540A0
$1180.00
50.00
$0.00
50.00
$3120.00
50.00
5224D,00
517' .00
$0.60
SO.00
$0.00
50.00
$9840.00
$9840.00
% DISTRIBUTION OF STAFFING
7.1%
7.1%
1 0.0%
0.0%
0.07.
28.6%
0.0%
1 28.6%
28.6%
0.0%
0.0%
D.0%
0.0%
9UB7OTAL FC 1fi0 150
$9 840.00
TASK DESCRIPTION
SRPROJECT
QUALITY
SENIOR
SENIOR
SENIOR
PROJECT
DESIGN
ENGINEER
GADD
JUNIOR
SENIOR
UTILITIES
TOTAL
MANAGER
MANAGER
ENGINEER
HYDRAULIC
BRIDGE
ENGINEER
ENGINEER
IN
OPERATOR
CADD
UTO,ITIES
COORD
LABOR HRS.
ENGINEER
ENGINEER
TRAINING
OPERATORCOORD
FC 160163 ROADWAY DESIGN
tADIZN
B31 f .Codd/ndffon
.?.::,rl
nL.,t..a::4:'..,
General Uldity Kick Off MeetIna with utility companies
4
4
4
40
52
$B 800.00
Develop and Maintain Utility Contact List assumed 12 utilities
8
20
28
54260.00
Conflict assessment at 90%onl
4
4 1
12
12
40
20
92
E16.540.00
Milestone Utility Meetings 9D%-1 Meetln
4
4
4
20
40
72
$12020.00
WorkshopMeelin s vriih UUlies Assume 12 Ublilies
8
8
20
20
56
$11.540.00
Evaluate relocation altemalives and order of magnitude cost estimates (Long Lead Items
8
20
40
68
$10.560.00
8
40
20
68
511460A0
Utility Conflict Fadtbit 90%On
Maintain UWAY Base Map
B
8
40
56
$9.200.O1)
163.2600fecb'Botisandinvasf aflans OMIF- _: �• .. •:., .:[ ':�: -
"•?'x
�'<..,
_.
...
Task -OMIT
Sub task - OMIT
0
0
50.00
$0.00
103:3 Aesf0effcs: r {F:... ;.. .:..
;.. ;,<.,,
Aesthetics ConceptDevelopment and Coordination
4
16
16
24
BO
84
$9.540.00
$11.720.00
Aesthetic Rendedn and 1 revision
2
2
B
32
32
8
$10.900.00
Concept summaIdocumentation
2
2
12
24
24
12
76
HOURSSUB-TOTALS
28
4
20
0
0
76
0
92
8B
0
24
180
200
712
CONTRACT RATE PER HOUR
$385.00
$295A
$270,00
$30D.00
$300.00
E195.00
$165.OD
5140.00
$710.00
$85.00
$100,00
E180.00
$135.00
TOTAL LABOR COSTS
$10.780.00
$1.180.00
$5400.00
$0.00
$D.00
$14820.00
$O,OD
$12.880.00
S9680.00
$0.00
$2400.00
532400.00
E27.000.00
$116540.00
$116540.00
% DISTRIBUTION OF STAFFING
3.9%
0.6%
2.B%
O.D%
0.0°/a
10.7%
0.0%
12.9%
12.4%
0.0%
3A%
25.3%
28.1%
SUBTOTALFC 45 145164
11fi 540.00
TOTAL MH BY
TOTAL COSTS
FC
BY FC
DESCRIPTION
12,155
$1,846550.00
FEASIBILITY STUDIES-FC 102110
56
$14.820.00
SOCIALIECONIENVIRON STUDIES -FC 120120
114
$13*530.00
FC 130130 -RIGHT-OF-WAY ROW DATA
166
$32L390.00
FC145 MANAGING CONTRACTEDIDONATED PE
$9.840.00
FC 160 150 ROADWAY DESIGN
FC 160 163 ROADWAY DESIGN
72
1
116 540.00
SUBTOTAL LABOR EXPENSES
14.503
$2,327,670.00
Exhibit C - CIP 23-600
Exhibit C - Fee Schedule
Prime Provider: Blnkley & Borflold, Inc.
Project CIP 23.600
SH 47 at SH 21- Brazos County
OTHER DIRECT EXPENSES FC 102 110
# OF UNITS
COSTMUNff
UNIT
BASIS FOR # OF UNITS
Lodging/Hotel eveslfees not included
12
S98.0D
da ! erson
$1.176.00,
Lod inalel-Texas and Fees
12
$45.00
da! erson
5540.O0
Meals (Excludinn alcohol & lips) (Overnight stay required)
24
$54.00
da / arson
57296.00
Mlealle
4 D00
$0.655
rule
$2.620.00
Air Travel - In State -24 Weeks Notice Coach
5510.00
each
I 50.00
Parking
$20.00
day
$0.00
Rental Car (Includes taxes and fees; Insurance costs will not be
reimbursed
$74.00
day
SGAII
Toll Cha es
510.00
each
I
SD.00
Rental Car Fuel
$4.50
gallon
$0.00
Overnight Mal -letter size
$2550
each
5O.00
Ovemi ht Mal -oversized box
$45.00
each
SD.DD
Photocopies BMW 81M2' X 11'
1.000
50.11•
each
$110.00
Pholoco ies BMW 1 V X 17'
1,000
$0.22
each
$220.00
Photocopies Color 8 VY X 11'
1.000
$0.75
each
$750.00
Photacoles Color 11' X 1
1.000
$125
each
$1.250.00
Plots Color on Bond
1200
$1.76
square foot
S2 100.00
Presentation Boards 30' X 40-Color Mounted
$100.00
each
$0.00
SUBTOTAL DIRECT EXPENSES FC 102 11 D
10,062.00
OTHER DIRECT EXPENSES FC 160 150
# OF NITS
COSTIUNfr
UNIT
Lod in Motel axeslrees not Included
116
E98.0
da I erson
$11,363.00
Lod in olel-Taxes and Fees
116
$45.00
da I erson
$5220.00
Meals(Excluding alcohol & Ups) (Overnight starequired)
116
554.00
de / mon
$6264.00
Mil.. .
5264
50.66
mile
$3448.00
Traffic Control Services, Arrow Boards and Attenuator trucks - Large Project (includes labor, equipment and
'rd
1
$5,150.00
day
$5,150.00
1
$600.00
da
5600.O0
Board
=SUBToTALn[RECT
1
$500.00
da
5500.00
Uniformed Officer with Vehicle
10
$150.D0
hour
S1500.ODT
EXPENSES FC 160 150
S34 050.00
UNIT COSTS FC 160(150)
# OF UNITS
COSTNNIT
UNIT
BASIS FOR # OF UNITS
SUE (Quality Level C and 0) includes labor and equipment for records research, CADD, and Mapping
12.898
$0.75
LF
$9.673.50
SUE (Quality Level C Pole Inventory Survey)
13.811
$0.88
LF
$12.153.75
SUS (Quality Level B) Includes labor and equipment for records research,designating, engineering, surveying,
cadd mapping, and limited traffic control
154098
$2.00'
LF
$308,196.00
SUE (Quality Level A-UI00y Locale, Test Holes) Includes labor and equlpmentforvacuum excavation,
engineering, surveying. CADD, and limited traffic control. These prices reflect that a Quality Level B service
has been provided.
'
-
Level A: 01a 5 it
4
$1.300.00
Each
$5200.00
Level A. -S to 8 R
6
$1.620.00
Each
$9.720.00
LOW[ A.>8 to 13 R
8
$2,050.00
Each
$16,400.00
Level Aa13 to 20 R
2
52.700.00
Each
SSA00.00
Level A:.20 R
$209.00
Vortical Foot
$0.00
SUE Field Services One 1 Designating Person with equipment
$142.00
Hour
$0.00
SUEField Services Two 2)DeskinatingPersonviiihequipment
42
$220.00
Hour
$9.240.00
SUE MoblizationfDemoblizaUan-These costs are Intended to be a one-time expense compensatiIfor195
moblizln Idemoblllzin ersonnel and a ul ment ortal to rtal. Vacuum excavation trucknon-1
$625
We
$1.218.75
SUBTOTAL UNIT COSTS FC 160 150
5377 202.00
TOTAL DIRECT EXPENSES AND UNIT COSTS
$421 314.00
Exhibit C - CIP 23-600
Exhibit C - Fee Schedule
Prime Provider. Blnkley d Barfield, Inc.
Project CIP 23-600
SH 47 at SH 21 -Brazos County
SUMMARY
TOTAL COSTS FOR PRIME ONLY SZ327.670.00
NON -SALARY OTHER DIRECT EXPENSES FOR PRIME ONLY 5421.314.00
SUBCONTRACTS includes labor casts and d'uecte enses $940.376.00
GRAND TOTAL S3697,360.0 0
Exhibit C - CIP 23-600
Pdme Ismidor, Blnkloy BMkid, brie.
Project CIP 23.600
SH 41 at SH 21- Brnzes County
E)MIt C • Fee Schedule
t4mance rFanspotawu vtv..r, �.... 1 .,��...-.,....� o..... �......,. _......d•. _. __-" ---•-.. --��--
Project
ErTlg�
T�riOer
Dew
_
Demand
T ��0 on
�rMer
Control
Morint
Task l7uatty Mena9or Segheernior) �g )r
(P�)hreer
�g it-
Teclgnkian
bnPeer
Modolel kr
Modeler in
by
Speclabt-
Cledcal/
TotWHc= Totnl Fee
Senior
HI
Senior
$312.00 $27200 $199.00
$238.00
$150.00
$14000
$27600 $24100 $17100
$21400
S12800
$19700 $10400
r F Function C¢de
102 (110}:Feasibifityi
Studies
r
r. ryq
;
F
s.,. ;-«
". +`r«
r : r r rat! jr; : .,,
_. ,a ,..... ....
r,
Function Code II0.2 Schernatle Design - General Tasks
H. Traffic Data and Pro actions
-
-
4
47
$1.099.00
Tt...Pro ectlons Methodola Memo
1
1
10
3
28
7
$1,099.00
Obtain and Process Base YearTraHic Data
1
6
40
$6,714.00
No Build Opening Year. -20 Year. and v3O Year Traffic Projections
2
6
2
30
48
S7.914.00
Build O enin Year,+20 Year. and•30 Year Traffic Praections
2
6
2
38
47
S7.926A0
No Hulld and Build Traffic Dne Diagrams
1
2
6
2
36
J. Traffic and 0 n0anal Analysis
12
$2.201.00
I. AnalyzeEaistln Traffic Data
1
1
1
1
6
2
15
$2.,0"2
11. Establish Existing Traffic Volumes
1
1
2
1
6
2
9
$1.7B1.00
III. Calculate 0 enin YearTmff,,Volumes
1
1
1
1
4
1
9
$1.660.00
hr.Celculate Deli YearTmfficVolumes
1
1
1
1
4
1
14
$2.560.00
v.0 enin Year CAP -%Mai Is
1
1
2
1
6
1
14
SL560.00
,;.Desi nYear CAP•%Aral H
1
1
2
1
6
1
60
E9,993.00
VII.Develo Eahtln Conditions Traffic Models AM/PM Peaks VLSSIM
4
1
3
2
40
10
49
$6201.00
vid. Calibrate Edson Condltions Traffic Models AM PM Peaks VISSIM
3
1
3
2
32
8
24
S4b20.00
be Oevlea ment of E.Istin Conditions Calibration Memorandum
2
2
4
2
12
2
17
53.285.00
a. Development of enin Year No -Build VIS51M Models AM/PM
3
1
1
1
10
1
17
$3,285A0
al. Develo men, ofti-1 Year No-Bugd VISSIM Models(AM/PM)
3
1
1
1
10
1
56
$9.320.00
ail. Develo entofOpening Year Build (Alternative gl VISSIM Models All
3
1
4
2
40
6
56
$9.320.00
alit Develo merit of0 ringYear Build (Alternative p2 VLSSIM Models (AMJPM
3
1
4
2
40
6
56
$ 0
aiv. Develo ruent of 0 ening Year Build (Alternative 03) VISSIM Models (AM/PM)
3
1
4
2
40
6
88
E76,040.00
6.040.
ail.Develo mentpfo enin Year Build Preferred Ded Models IAM/PM Peaktl
6
2
16
10
50
4
66
all.Develo mentolDesi nYear Build (Alternative Al VLSSIMModels AM/PM
3
1
4
2
40
6
56
$9.320.00
$9,320A0
dll Develo merit of Desi nYear Build Alternative 42 VLSSIM Models AMPM
3
1
4
2
40
6
$6
$9,320.0
atv.Develo mentof Desl nYear Build Alternative03 VISSIM Models (AWPM)
3
1
4
2
40
6
74
513A80.00
a01. Develo mentof Desi Year Build Preferred Design) Models AM MPeaks
5
1
16
a
40
4
I56
526272.00
alv. Develo merit oITralflcMa sRe ort
8
4
16
a
80
40
72
$12.6HBA0
m Address Brazos Loon Comments an Traffic Ma Is Report
4
2
8
8
40
10
K Sale Mai Is
40
H
64
$70.9f0.00
I<Anal eFalstin Crash Data last S Years
2
2
6
6
46
$8,034.00
II. Calculate Crash Rates for past 5 Years
2
2
6
4
24
6
46
57.730.00
Ill. Cate orlte [rashesb T e.5everl .Cause[ Factors. etc
1
1
6
4
24
10
26.00
Iv. Create Heat Ma of Crash LocaUont
1
1
4
2
16
2
64
$9.80.00
v. Predictive Crash Anal Is for Design Year No-eulld (H5M Methodl
2
2
4
12
30
4
54
$9.880.00
vi. Predictive Crash Mai is for Desi nYear Prefered Alternative HSM Method
2
2
4
12
30
4
60
$8.966,00
V. Review aA I Crash Modification Factors 2 2
nd
10
6 20 10
90
$75,53L00
W Develo safety a a isPortionItraRic re ort 2 2
Z .: -;,, ,YFuncths.
16
Code 102 Sin Fe.sIbl
10 40 20
� ,dlesSlblfdtali z •x`atm 'T ..Iz
r d
ax 1E85
527AA7D.W
w .. 5M,61 ,__ - M 3r _ un4t)on,Codehi46
(145,ifi41
Ma a n •Coi7tractei3 Doliated PEa < tit- �.. _:
1�._�1 _g. __...... . / ....._ _ _.
,z
`,
r _ _ , . _ . -,� ..
Attending [oordlnaUon Meetings as necessa IAssummede Month Meetings)10
10 10
30
14
$8.600.00
$2.00
MeetingMtnutes/Phonel sElc
4
10
16
32
58.046,00 18.
Pre amtionof Pr rms Reports/Imro1.,
16
7H
Is2D4
Cdde
145' 14$164 -
Man3gIng Coetrn<ted
Donated PE': =.'
'• �+
Labor Sub Totals , `
78
76
166
335
974
190
0
4
0
0
0
0
16
1,661
$290,024.00
Total Labor Hours
S31L00
527Loo
Swim523B.W
$150.00
$140.00
5276.00
$241.Oo
5171.00
$214.00
S37H.00
5197.00
5104.00
Haud Pate
Tout Fee
$74 6.00
21216.00
1 S37,014.00
$32,130.00
5146100A0
526 600.00
.00
5964.00
$0.00
1 SO.00
1 $0.00
SO.00
$1.664.00
1
1 $290A24.00
fiat Laborfee
8.4%
1 7.3%
1 12.8%
11.1%
So.4%
9.2%
o.tt%
0.3%
0.0%
1 0.0%
1 0.0%
0.0%
0.6%
Eahls%C - CO' 23L00
Prim Prodder. BhMey BarOeM. Inc.
ProlecL CIP 23b00
SH 47 at SH 21- Sraxos C-MV
Edtbk C - Fee Schedule
..�.'xUnR ..,,-.'
�, c�aSx.RaL3xisx..
S3'�;4D03n0� C6azi.00113x`.,..
Taming Movement Counts
2-h.url.ming Movement Count. Major lntersectlon.Weekdper
Mans
S450.00
60.00
2-hour Tumbg Movement CounL Major Intersection,Weekend
erMmms
$500.00
$0.00
2•hwTummg Movement Count.MinormlemecWn,Weekday
perhams
$270.00
$0.00
2-hourTmnbg Movement Count Mmar mter..aclbn, Westland
per moms
$300.00
$0.00
13-hour Tumng Movement Cowl Maur htersection
partnInms
$1,500.00
$0.00
13-hourTuming Movement Count Minor Intersection
armlnms
$900.00
10 $9.000.00
24HourVldeo System Classgcatlon Counts-M ar hmrsec8on
erhrrma
$1.600.00
50.00
24-HowVideo System ChsskicaOon Counts- Mhor intersection
er htrms
$1.100.00
$0A0
rs Inteection Tumkrg Movement Counts-Mmor(addMnaltumin9 movamentcounthours)
erhour
$150.OD
- $0.00
"hour
5280.00
SO.00
mterseclkn Turning Mommem Counts -Me10r additional taming movement count hours)
Intetseclbn Video
perday
$1T5.00
$0.00
24411our Counts '
24-Hour Automated Tube Counts-Volrmo perdkectionipermunt,
$250.00
14
$3.500.00
24-Hour Automated Tube Counts -Speed or Class erdkeelWN er man
$276.00
$0.00
24-HourVolrme Malnlane VdeNRadarCount
I p.riwa.1day$300.00
$0.00
24-Hour3 Vehicle CE-Vicatbn Mats Lane Count
rlanald
$326.00
$0.00
24-Hour M Vahkle Classification Mah Lane Count
er faneld
$420.00
$0.00
Additional Traffic Control (no ions closurealdetour)
d
$2.200.00
$0.00
Additional Traffic Contra! (lane cbsuresfdatow)
d
$3,100.00
$0.00
Speed Surveys
Curve Speed Survey er curve $500.00 $0.00
Spot Speed Survey porbcaticn $250.00 SO.00
Travel Times
Travel Thee -MAC Address Capbae perhouduna $115.00 50.00
Odgfn Des0nag0n
72-HourBkreNaN OIO MaIn Lena perunit $1.390.00
$OAD
72-Hour Bluemoth OID Arterial per unk 5750.00
$0.00
Total Una Co,,
E72500.00
�Oinar Daeef F�ponau
Unit
Rate
04an010 • •
Cdetu
Lod h Malel-Taaw and Fear
dal arson
S45.00
2
$90.00
Lod h otol azevfeos hot Included) Cumrd State Rate
daylp.m.n
$198.00
2
$396.00
Moab gEyotuding almhol8 s Ovem htrequired) (Cement State Rele
day/person
$61.00
2
$122.00
Mk . Pumant Stale Rate
moo
Oak.
$0.655
$4.25
1000
S655.00
$0.00
Rental Car Fuel
d
$75.00
$0.00
Rental Car Includes taxes and feet Insutance costs vig not be reimW
Air Travef - In State -Short Notice Coach
Rd TrWperum
S650.00
$0.00
AirTmvel-to State-2-Wks No9ee Coach
Rd Triplamsen
$530.00
$0.00
TadrCeb fare
each/arson 1
day
$50.00
$20.DO
$0.00
Parkin
ea h
510.00
50.00
Tag C es
leder
$0.55
$0.00
Standard Postage
earn
S20.00
$0.00
Oven hl Mml-loaersho
each
S75.00
$0.00
Ovem ht Mml-overso:ed box
each
$40.00
$0.00
Courier Services
each
$0.20
50
$10.00
Phofoco ies BM! 11'X 17'
each
$0.10
100
$70.00
plate. lea BlYy 12'X11
each
SIM
$0.00
Photoco Ies Color 11'X1
each
$0.80
$0.00
Photaco ies Cabr 812' X 11'
r
$0.75
$0.00
Pbls on Bond
.fL
er og.ft.
$1.60
SO.00
Plots Cobron Bond
r
S4.30
$0.00
Plots Color an Photographic Paper)
.fl.
s uaro fool
$8.00
$0.00
Color Graphica an Faam Board
each
$95.00
$0.00
Presentation Boards 30' X40' Color Mounted
each
$75.00
$0.00
Re Pry1Un
each
$5.00
$0.00
Report Bindingand tabbfn
each
$8.94
$0.00
Notebooks
CDa
each
s1.50
$0.00
Total Dlncl Fsponsos
51,203.00
u Ske Vzb
Labor $290.024.00 95%
Unk Casts $12,500A0 4%
ODE S1,2B3.00 0%
Total $303,907A0 .300%,
F.hba C -CIP 23-600
Prime Provider. Binkley Barfield, Inc.
Project: CiP 2M00
SH 47 at SH 21 - Brazos County
Exhibit C - Fee Schedule
Sub Provider Baseline I occur
PRINCIPAL
SR GI$
PROJECT
PROJECT
SR SURVEY
SURVEY
ADMIW
TOTAL
NO OF
TASK DESCRIPTION
MANAGER
SURVEYOR
TECHNICIAN
TECHNICIAN
JABSTRACTOR
CLERICAL
LABOR HRS.
DWGS
& COSTS
SH 47121
ROADWAY DESIGN - FC 160/11/1
DESIGN SURVEYS AND CONSTRUCTION SURVEYS
15D.2 DESIGN SURVEY
1
12
Right of Entry for Creek Cross Sections
Collect data to create cross sections and digital terrain models
12
44
Locale existing above round uli ities
1
4
Locate tc ographic features and existing Improvements
2
8Provide
M24
detalls of existing drainage sWctures i.e. culverts, manholes, etc.)
1
4
Locale wetlands (established by others)
2
.Review
existing ROW maps and locate the a roximale existing ROW
4
8
80
Locate boreholas
1
3
Perform hydrogmphic surveys
4
16
Verify existing control points
1
2
Establish additional control points (8 primary and 9 secondary) as needed
2
4
3
16
Prepare survey control data sheets
2
4
4
24
Prepare horizontal and vertical control shoats
2
4
4
24
150A DELIVERABLES FOR DESIGN AND CONSTRUCTION SURVEYS
Digital terraln models (DTM) and the triangular irregular network (TIN) files
2
2
B
Maps, plants, or sketches showing field survey
2
2
8
8
Digital files containing 0eld survey data (ASCII data files)
2
2
TxDOT Form 2462 for each primary and secondary control point
2
2
8
All Geopak and OpenRoads files
2
2
8
11
0
50
170
468
0
12 10
711
D
HOURS SUB -TOTALS
$250.00
$140.00
$160.00
$140.00
$125.00
$100.00
$80.00
$90.00
CONTRACT RATE PER HOUR
$2.750.00
$0.00
$8.000.00
$23.800.00
$58.500.00
$0.00
$960.00
$0.00
$94.010.00
TOTAL LABOR COSTS
1.51%
0.0%
7.0%
23.9%
65.8%
0.0%
1.7%
0.0%
%DISTRIBUTION OF STAFFING
$94.010.00
SUBTOTAL - FC 160 (150
PRINCIPAL
SR. GIS
PROJECT
PROJECT
SR. SURVEY
SURVEY
ADMIN/
ABSTRACTOR
TOTAL MH BY
TOTAL
TASK DESCRIPTION
MANAGER
MANAGER
SURVEYOR
TECHNICIAN
TECHNICIAN
CLERICAL
FC
COSTS BY FC
RPLS
0
0
0
0
0
0
0
0
0
$0.00
FC 139 (130 - RIGHT-OF-WAY DATA
0
50
170
468
0
12
0
711
$94.010.00
FC 160 (150) -ROADWAY DESIGN
11
11
0
50
170
468
0
12
0
711
HOURS SUB -TOTALS
$250.00
$140.00
$160.00
$140.00
$125.00
$100.00
$80.00
$90.00
CONTRACT RATE PER HOUR
$2.750.00
$0.00
SB,000.00
$23,BOD.00
$58,500.00
$0.00
$960.00
50.00
$94,010.00
TOTAL LABOR COSTS
2.93%
0.00%
8.51%
25.32%
62.23%
O.OD%
1.02%
0.00%
% DISTRIBUTION OF STAFFING
$94.010.00
SUBTOTAL LABOR EXPENSES
OTHER DIRECT EXPENSES
FIXED COST
AMOUNT
UNIT
$0.655
200
mile
$131.00
Mileage
.600.00
$84
Type II Monuments (Poured)
$300.00
$40.00
12
21
each
each
00
Ground Target(Includes paint. panel material. etc.
54,571.00
SUBTOTAL DIRECT EXPENSES
UNIT COSTS
COST
AMOUNT
UNIT
$
2 MEMBER CREW
$175.00
750
hour
47.300.00
$7.3000
3 MEMBER CREW
$215.00
220
hour
5178,55D.00
SUBTOTAL UNIT COSTS
5277,131.0.
BLC SUB TOTAL
10 Exhibit C - CIP 23.600
Prime Provider. Binkley Barfield, Inc.
Project: CIP 23.600
SH 47 at SH 21- Brazos County
Exhibit C - Fee Schedule
Sub Provider: RCAW
SENIOR
ENVIRONMENTAL
ENVIRONMENTAL
ENVIRONMENTAL
SENIOR
HISTORIAN
TOTAL
TASK DESCRIPTION
ENVIRONMENTAL
SCIENTIST
SCIENTIST
SCIENTIST
HISTORIAN
III
LABOR HRS.
'
SCIENTIST
IV
111
II
& COSTS
SOCIALtECONIENV STUDIES -FC 120 1129
SOCIAL. ECONOMIC, AND ENVIRUNMENTAL STUDIES AND PUBLIC INVOLVEMENT
1202 ENVIRONMENTAL ASSESSMENT EA CONTENT AND FORMAT
84
40
40
Conductmeetln9s with roe 'avmers,SI31eh1Uer% and various agendas 108)
64
24
16
24
40
Pre are smd nece eMibOs for the NoO =aO mm fo Comment NOTC
120S ENVIRONMENTAL TECHNICAL ANALYSES AND DOCUMENTATION
Envbonmental Public Inwhmmenl
12
Demob a Lin for uble bwIvemenl ml"Jes
20
i6
Public Meeting 1
12
48
Coco 0e. mafntabr and date a mating oo tsl of lo a ender. and o antrations
20
8
12
Make al amen amens for pubic rneetlig
40
24
24
40
Prepare and obUii State appmval for al materials and edibhs Tor Public Meeting
Pa ate In PubSc MMnDeveb
16
24
40
and submit documentation of Puble Mwet comments and res nws
Public Moetrt 2
8
4B
Cam 00. mobfn, andu ate a mai b W of people. a enelos, and o anlaatIons
24
16
Make al artan amen for pubic mmUng
40
48
24
40
Pre aro and obtain State appmvalfor al matedals and m ill fts for Pub5c Meeting
e
Part!ate In Pub9C Hearlefl
B
16
24
40
Deselo antl subm4 dammenlatlon of Public Meetin Comments and ros Doses
16
8
12
CE ClmftaSon Request Form
6
6
12
12
EC OS Work Plan Dovelu menl
32
40
16
48
Communky Impacts AnalyslaTedrmdcal Relm
Nclse Ana" Technical Ro onM9
Water Resources Analpls and Dommentstlen
4
4
8
40
Sudacu Water Anal s Form
National Wrd and Sconic Rhem analysts
4
4
40
48
WOTUS Dfinwian repoil
B
8
16
24
Section 404110 Impacts Table
Section 40411019 Po='f&n Packs o
e
24
16
32
BIoJaqIcaVNatuW Resources MmagentAnaly.1s and Dommentallon
S ecies Ana Farm
4
20
8
48
Faredand Protection Po Ad ens is
Marne Mammal Protection Ad analysb
Ess.ntial fish habltsle ens b
USFWSMalional Marine Fisheries Servfco species consolation
S
8
mIw Ste Assessment SA watr H=rdou Werlak Pro ect kn act EwbaWn Re crt
B
IS
18
16
OB
15
Amheab lost Documentation SeMm
Archcob bat back round study
Amheo loal surM
Archmbglc.l fntensive surve
Historic Re- Iden'd3lmtion. EwUatvn, and Documentation Semices
2
10
20
Historic Resources PCR
2
1
4
25
Historic Resources Research Des' n
Historic Remomos Su Report
12
18
8
60
215
Flood lakt Impacts
St.-.Ier Permits
416
390
280
672
Ila
285
2153
-TRATEALS
HOURS SUB -TOTALS
HOURS SUB-TOTALS
$200.00
$130.00
$115.00
$95.00
$145.00
$95.00
$272,965.OD
HOUR
$83200.00
$50.700.00
$32200.00
$63840.00
$15.950.00
527,075.OD
132%
TOTAL LABOR COSTS
% DISTRIBUTION OF STAFFING
19.3%
18.1%
13.0%
31.25A
5.1%
$272,965.00
SUBTOTAL - FC 120 (120
FC145 MANAGING CONTRACTEDIDONATED PE
145.1 ConbaclM emenl and Ad.W.Velbn
28
D n lenm mee0n s assume march -24 months
Schama0c rovlow meetbrgs Assmna3submMal moe0n s
6
roles Management antl Aamnsuawn(2 monmi
8
62
HOURS SUB -TOTALS -
62
5200.00
$$0.00
5$0.000
59
A45.00
$95.00
CONTRACT RATE PER HOUR
51 0.00
.00
$0.00
E0,00
50.00
E72A00.00
TOTAL LIBOR COSTS
1DO.OYo
00.
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
% DISTRIBUTION OF STAFFING
Exhibit C - CIP 23-600
Prime Provider. Binkley Barfield, Inc.
Project, CIP 23-600
SH 47 at SH 21 - Brazos County
Exhibit C - Fee Schedule
SUBTOTAL-FC 14S 114
SENIOR
ENVIRONMENTAL
ENV9RONMENTAL
ENVIRONldENTAL
SENIOR
HISTORIAN
TOTAL COSTS BY
TASKDESCRIPTION
ENVIRONMENTAL
SCIENTIST
SCIENTL�T
SCL.NTIST
HISTORAAN
11
TOTALMHBYFC
FC
SCIENTIST
N
1n
II
416
390
280
572.
If0
2B5
2153
3272.965.00
FC 120120- SOCL4LfECONlENV STUDIES
$12.400.00
FC 145(145) - MANAGING CONTRACTEDIDONATED PE
102
672
110
205
2153
HOURS SUB -TOTALS
416 1
$200.00
390
$130.00
280
51200.0
00
51950.0
595.00
CONTRACT RATE PER HOUR
$83.200.00
$50.700A0
$32.200.00
$63,B40.00
3—.8
$15.950.00
527.075.00
5272.9e5.00
TOTALLABORCOSTS
19.3%
18.1%
13.0%
31.2%
5.1%
132%
% DISTRIBUTION OF STAFFING
E265,3fi5AD
SUBTOTAL LABOR EXPENSES
OTHER DIRECT EXPENSES
FOXED COST
AMOUNT
UNIT
t.Tdea a
$0.655
1600.00
moo
51.048.00
E1 048.00
SUBTOTAL DIRECT EXPENSES
COST
AMOUNT
UNIT
$200.00
UNITCOSTS
Hotel
5100.00
$85.00
2
3
nl hts
da
$265.00
Car Rental
$0.15
1000
5150.00
Plrotom los BAY (81Q'X11 chedl 6Ls forOAOC, Pubic Inmkemenl Malouts)
S$000
Photow les Cabr 81R'X 11
50.50
1000
Pbis Cabron Band)
S1.7b
$6.000.00
F Rental Pubflc.r and Pubic Hearin Fa
$3,000.00
2
hr
5800.00
S Officers for two PUblic lnwt+ementEwnLs
$50.00
16
$180.00
Posts a ub6c tmt- ent Mallwm
50.60
300
$20000
CourtRe arter
52,500.00
1
L-m,500.00
B Scale Pdnts 15 Boards perewnt
$50.00
30
$4.000.00ble
Notice
EI.DOD.00
4
516,000.00
Mersa e5 n 1 n fr2weekS, In,!UdesdOW and .a mll tvmdin 4a .for2 ubic InwNementewnts,=Itmsl mv1ded hem
E2.ODO.OD
8
n
$32.085.0
E,�mer
AL UNIT COSTS
SUB TOTAL
Exhibit C - CIP 23.600
Prime Provider. Binkley Barrield, Inc.
Project CIP 23-600
SH 47 at SH 21- Brazos County
Sub Provider: EPR
Exhibit C - Fee Schedule
TASK DESCRIPTION
QUALITY
MANAGER
TRAFFIC
NOISE
EXPERT
ENVIRONMENTAL
SCIENTIST
1
GIS/
CADD
ADMINI
CLERICAL
TOTAL
LABOR HRS.
& COSTS
SOCUUJECONIENV STUDIES -FC 120 (120)
120.5 ENVIRONMENTAL TECHNICAL ANALYSES AND DOCUMENTATION
Noise Analysis Technical Reporting
6
148
18
16
4
HOURS SUB -TOTALS
CONTRACT RATE PER HOUR
TOTAL LABOR COSTS
% DISTRIBUTION OF STAFFING
6
$165.00
$990.00
3.2%
140
$130.00
$19.240.00
77.9%
16
$85.00
$1,360.00
8A%
16
$90.00
$1.440.00
8A%
4
$50.00
$200.00
2.1%
190
$23.230.00
SUBTOTAL - FC 120 120)
TASK DESCRIPTION
QUALM
MANAGER
TRAFFIC
NOISE
EXPERT
ENVIRONMENTAL
SCIENTIST
I
GISI
CADD
ADMINI
CLERICAL
$23 230.00
TOTAL MH BY FC
TOTAL
COSTS BY
FC
FC 120 120-SOCIAUNV ECON/ESTUDIES
6
148
16
16
4
190
$23,230.00
HOURS SUB -TOTALS
CONTRACT RATE PER HOUR
OT, LABOR COSTS
%DISTRIBUTIONOFSTAFFING
6
$165.00
$990.00
3.2%
148
$130.00
$19.240.00
77.9%
16
$85.00
$1,360.00
8.4%
18
$90.00
$1.440.00
8A%
4
$50.00
$200.00
2.1%
190
$23.230.00
SUBTOTAL LABOR EXPENSES
$23,230.00
OTHER DIRECT EXPENSES
FIXED COST
AMOUNT
UNIT
Meal excluding alcohol 8li s
Ml eage
$36.00
$0.655
1.00
151.15
da / rson
Mae
$36.00
$99.00
BTOTAL DIRECT EXPENSES
SUs
$135.00
UNIT COSTS
Noise Meter Rental
COST
$250.00
AMOUNT
1
UNIT
week
$250.00
SUBTOTAL UNIT COSTS
$250.00
EPR SUB TOTAL
$23,815.00
13 Exhibit C - CIP 23-600
Prime Provider. Binkley Barfield, Inc.
Project: CIP 23-600
SH 47 at SH 21 - Brazos County
Sub Provider: Acacia
Exhibit C - Fee Schedule
TASK DESCRIPTION
Principal
Principal
Investigator
Project
Archeologist
Technician
II
Technician
1
ADM]W
CLERICAL
TOTAL
LABOR HRS.
& COSTS
120.5 ENVIRONMENTAL TECHNICAL ANALYSES AND DOCUMENTATION
Archeological Documentation Services
- - Archeological background study
1
6
10
Archeological reconaissance survey
Archeological Intensive survey 111
4
38
78 1
82
40 1
4
HOURS SUB -TOTALS
5
44
78
92V$2.4O0.00
4
263
coNTRACT RATE PER HOUR
$125.00
$103.00
$79.00
$68.00
$70.00
OTALLABORCOSTS
$625.00
$4.532.00
$6.162.00
$6.256.00
$280.00
$20,255.00
%DISTRIBUTIONOFSTAFFING
1.9%
16.7%
29.7%
35.0%
1.5%
SUBTOTAL - FC 120 120
$20255.00Principal
TASK DESCRIPTION
Pdndpal
Investigator
ProJeet
Archeologist
Technician
II
ADMIW
CLERICAL
TOTAL MH BY FC
TOTAL
COSTS BY
FC
FC120 120-SOCIAIJECOWENVSTUDIES
5
44
1 78
1 92
40
1 4
263
$20.255.00
HOURS SUB -TOTALS
5
1 44
1 78
92
40
4
263
CONTRACT RATE PER HOUR
$125.00
1 $103.00
$79.00
$68.00
$60.00.
$70.00
TOTAL LABOR COSTS
$625.00
$4.532.00
$6,162.00
$6.255.00
$2,400.00
$280.00
$20,255.00
% DISTRIBUTION OF STAFFING
1.9%
16J%
29.7%
35.0%
152%
1.5%
SUBTOTAL LABOR EXPENSES
$20.255.00
OTHER DIRECT EXPENSES =FIXE90).COST
AMOUNT
UNITNGlea
a
Per Diem
800.00
9
mile
day/person
$524.00
$576.00
SUBTOTAL DIRECT EXPENSES
$1,100.00
UNIT COSTS
Hotel
Photocopies B/W Is1W X 11-) (check plots for OAOC. Public involvement Malouts)
Photocopies Color 8112' X 11'
Curallon i
Baakhoe
Site Recording
COST
$120.00
$0.15
$0.50
$455.00
$1.600.00
$96.00
AMOUNT
12
460
236
1
1
3
UNIT
nights
project '
day
site
$1.440.00
$69.00
$118.00
$455.00
$1.600.00
1 $268.00
$0.00
SUBTOTAL UNIT COSTS
$3,970.00
Acacia SUB TOTAL
$25,325.00
14 Exhibit C - CIP 23-600
Brazos County CIP 23-600
BBI PN:PBBHOU5186.0000.0
ID
Task Name
Duration Start
Fnish
QV 3, 023
QV 4, 2023 Qtr 1, 2024
QV 2, 2024
QV 3, 2024
QV 4, n24
Qtr 1, 2025
Qtr 2, 2025
Qtr 3, 2021
QV 4, 2021
Mr 1,
I A
Nov a FebMar
a n
J I Au
Nov D
r M u
u 5
v
1
1
NTP
ji day iFri 12/1/23
!Fri 12/1/23
NT
12/1
2
Data Collection
i15 days Sat 12/2/23
ISat 12/16/23
Data Callectic
16
nTeIde
3
-.....__...........,--- —J
Stakeholder Coordination 580 days Wed 4/17/24
,Mon 11/17/25_-.._......----........_.__...
kCoordination
11/17
4
Utility Coordination
656 days Thu 2/1/24
' -._......._.._................._.._.._
;Mon 11/17/25
Util'
dY
oon11/17
5
Survey
130 days 1Sun 12/17/23
'Wed 4/24/24
Su
e,, 4/24
6
l.........--......_.....- ---
_.-------___m_�.-__._ys _- Rue 1/16/24 Sun 7/14/24
Conceptual Design 180days
6eometric5cheati,c---1491days -Sun7/14/24-€Mon11/17/25
Conce t
P
1Desi�n 7/14
9 -- -
GeometricSchematic [ .:k--_•_,•> -- 11/17
7
8
Preferred Alternative
t1 day Thu 8/1/24
Thu 811/24
Preferred Alternative 8/1
9
-_....... .-----.T_.........._._......�-_..__...
S&E 30%
--!----... -- _..-
i1 day ;Wed 1/1/25
._......c...._..__._._.._...._._.__
Wed 1/1/25
S&E 30% ♦ 1/�
10
VE Study
1 day ;Fri 2/14/25
Fri 2/14/25
VE Stud ♦ 2/14
11
_....._- _...�.
S&E 60%
-_--......_. --.... -I. ......... .--....-
1 day ITue 4/15/25
1--.._.- -
'Tue 4/15/25
ME 60% 4/15
ME 90,U
12
5&E 90°. 1 day JWed 8/20/25 !Wed 8/20/25
13
NEPA Clear
.1 day Pon 10/20/25
;Mon 10/20/25
EPA8Cle O
ME 100% 0 11/20
Project Complete 12/1
14
-•--—._....- ---
S&E 1009 1 da f11u il/20/25 TFtu 11/20/25
Y
I i
Project Complete 1 day iMon 12/1/25 Mon 12/1/25
15
Project: SH 47 Schematic & Env. Task Milestone
Date:
Tue 11/14/23
Page 1
AMENDMENT #1 TO CIP 23-601— ARCHITECT DESIGN SERVICES FOR BRAZOS
COUNTY ADMINISTRATION BUILDING
THIS AMENDMENT TO CIP 23-601 Architect Design Services for Brazos County
Administration Building ("Amendment") is entered into and effective this 12th day of December
2023 (`'Effective Date") by and between Brazos County ("Customer"), and Plan North
Architectural Co. ("Provider") each of which may alternatively be referred to herein as a "Party"
and collectively as the "Parties". All capitalized terms in this Amendment shall have the same
meaning as in the Agreement (as defined below) unless otherwise stated herein.
RECITALS
WHEREAS, the Parties entered into
("Agreement") for purposes of Plan North to
County; and
that certain original contract # CIP 23-601
provide architectural design services for Brazos
WHEREAS, the Parties desire to amend the pricing as set forth in original contract # CIP
23-601.
AGREEMENT
NOW THEREFORE, in consideration of the above premises, and other good and valuable
consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties hereto
agree to amend the Agreement as follows:
1. Adding additional scope and fees for design services by $224,600.00, as per Exhibit A.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be signed
by their authorized representatives as of the Effective Date. This Amendment may be executed in
counterparts, all of which taken together shall constitute one instrument. Electronic or facsimile
Signatures are acceptable forms of execution of this Amendment and shall be binding on all Parties
hereto.
COUNT
Si nature
f A rJ5 Pert p s
NaVe T
C'au� cJuDroGF
Title
Date
P n North Arch' ectural Co.
M&EC"AF-AW
Title
Date
PLANN®RTH
ARCHITECTURAL CO.
P.O. Box 2468
Brenham, Texas 77834
November 22, 2023
RE: AMENDMENT TO AGREEMENT BETWEEN BRAZOS COUNTY AND PLANNORTH
ARCHITECTURAL CO., DATED MAY 17, 2023
Brazos County Leadership:
Please accept this letter as a proposed Contract Amendment for the following project, as
described in our mutual agreement dated May 17, 2023:
"Brazos County to contract with an architectural firm to complete the design after the feasibility
study with Architect for remodel of select areas of the Brazos County Administration Building,
currently, located at 200 S. Texas Ave., Bryan, Texas"
Updates to the scope of work and corresponding fees are shown in Attachment 1 below. Please
contact me should you have any questions.
L� V
Ken Burch, AIA
Managing Principal, PlanNorth Architectural Co.
979-251-45o6
ken _plannorth.com
Attachment 1
1) Chiller Pipe Replacement, Additional Design Services of $15,000
• Scope of work includes:
a. MEP Engineering
b. Create pathway inside building with new chiller pipes
c. Replacing exterior chiller pipes between the stairs and North Wing in existing location
d. Building Envelope Consultant Services (Inspect the existing building envelope penetrations
and develop recommended and associate plan details/specs for the work)
2) Add Records Manager Office, Additional Design Services of $6,000
• Scope of work includes:
a. Repurpose existing room for office space on Level 1 Area C
b. New carpet, new light fixtures, replace gyp board on all 4 walls, paint, relocate door, new
door and frame, add/relocated outlets/data, new acoustical tile ceiling and grid
3) Renovation of Risk Management Area, Additional Design Services of $22,000
• Scope of work includes:
a. Repurpose existing areas, add new offices and storage rooms
b. Add transaction window
c. Add door access controls
d. Add millwork to Store/Copy room
e. New carpet, light fixtures, office layout, add and/or relocate outlets/data, new acoustical
ceiling the and grid, revise door locations, paint
f. Revise existing 4" CMU wall to add door/frame, add gyp board furring over wall
g. review/evaluation of existing CMU wall at corridor
4) Additional Corridor Hallway, Additional Design Services of $1,600
• Scope of work includes:
a. Refinish existing corridor on Level 1 Area B from main corridor to existing double doors at
exterior
b. Replace existing can lights with new 2x2 light fixtures
c. Replace ceiling with new acoustical tile ceiling, new gyp board ceiling furrdowns
d. New paint on walls
5) Sanctuary Window/Door Replacement —Area A (16 tall exterior windows & 1 double exterior door),
Additional Design Services of $75,000
• Scope of work includes:
a. Structural Engineering Design
b. Building Envelope Consultant Services (Inspect the existing windows and develop
recommendations and associated plan details/specs for the work)
c. Selection of glazing types
d. Exterior detailing for door/window replacements, waterproofing, sealants, revise brick
design around window casement areas
6) North Wing Window Replacement —Area C (17 windows), Additional Design Services of $71,000
• Scope of work includes:
a. Building Envelope Consultant Services (Inspect the existing windows and develop
recommendations and associated plan details/specs for the work)
b. Selection of glazing types
2
c. Exterior detailing for door/window replacements
7) New Elevator serving the Sanctuary Building, Additional Design Services of $34,000
• Scope of work includes:
a. Structural Engineering for foundation and shaft
b. MEP Engineering for elevator equipment and enclosure
c. Architectural plans and specifications for elevator and shaft
:REQUEST - FOR;BID.:.
• : BID N0:=24=062
:. Road Signs And Sign hosts
SEALED: BID5.T0 BE .SUBMITTED BEFORE: -
72023,.2.:00 :mCSTTuesdi Novamber
:TO THEN
BRAZOS.COUNTY
PURCHASINGDEPARTMENT'
:. •200 5: Texas Ave. Suite, 352
cyan, :TX'.77803 •
:. : • Phone: (979):361-4290.'
"Fax: (979) 36-1-4293 : " .
Respondents,-theii employees and/or. representatives .are prohibited from contacting_ariy offioial or. .
employee of Brazos County,' except the Purchasing Agent, regarding this solicitation from the issuing
date'of the solicitation until scheduled cjral presentations or the date.the Brazos County.Commissioners .
Court meets to••considei award of the -bid. 'Any.such contact will be grounds for iejection, of the
Respondent's bid: .:
kn compliance with this' solicitation, ahe undersigned Respondents) having examined the solicitation
and specification an:d.being familial with -the conditions.to be met; hereby- submits the:following bid
forfuriushmuig thema rial and/or services listed on:frie�a tached-Bid orm agrees to deliver said - `
items at the locations and for the prices'set forth on the Bid Form::
Company -Name:.. Vulcan.1ne dba. Vulcan:Signs
:By (Print):: David B Beyiacqua ' :::..' ::.Title: Vice President/GM ;
Physical Address: 408 East: Berry.: Ave Foley AL 36535 .
Mailing Address: ' Pq.Box:1.850 Foley. -AL 36536
Telephone:- 800-63M845 Fax: 251-94371544 E-1VIai1: vulcan3@vulcaninc.com. '
Bid No: 24-062
Page 2 of 16 .
Bids will be'.received at the. Brazos County Administration Building, Purchasing Department, 200
South Texas Ave Suite 352; Bryan; Texas prior to 2:00 p.m., Tuesday', November 7., 2023 at:which
time bids willbe publicly opened and read'aloud. - .
A.' SCOPE OF BID =
Bids are solicited• for, furnishing the merchandise, supplies; service, and/or :eduipment set forth in
this bid request fora one (.1) year period beginning January 25, 2024 thrqugh January 24, 2025 in
accordance with the'following Conditions of Bidding. Brazos County is in need to purchase road
signed, sign posts, and post hardware.
B. CONDITIONS OF BIDDING
1. ' The following instructions apply to all bids and become. a part of terms and conditions of.
any bid submitted.to•the Brazos .County Purchasing.Office, unless otherwise specified.
elsewhere m this'bid request: Al Respondents) are required to be informed of these terms
and conditions 'and will be held responsible for having done so._
2. Definitions: In order to simplify.the language throughoutthis bid; the following definitions -
shall apply:
a.-BRAZOS COUNTY — Same.as County.
b.' : COM WSSIONERS COURT:= The elected officials of Brazos County, Texas given ,
.the' authority to exercise such powers: and- jurisdiction • of all 'County business• as'
conferred by the State Constitution and Laws:
c: * 'CONTRACT — ' An agreement between the County and. a Contractor .to furnish
supplies and/or services over. a designated period of time during which repeated
;purchases are made of the commodity specified.
d.' 'CONTRACTOR - The successful Respondent(s)'of this bid request.
e. COUNTY — The. 'government of Brazos ' County,. -Texas -and its 'authorized...
:representative.
' SUB -CONTRACTOR -Any contractor - hired:' by the Contractor. or supplier to
f n-nish_materials -and services specified in the. bid request.
g. ' :RESPONDENT = Any siippher'or vendor responding to the bid request.'
3.' Upon .acceptance :and approval by the. Commissioners Court, this bid effects a working
contract. between Brazos County and the Contractor for the period designated.
4.
5,
Bids must be received by the Purchasing Office'prior to the time and date specified: The
were fact that the bid was dispatched will not be considered; the Respondents) must have
the bid actually delivered to and received by. the Purchasing Department.
The County reserves --the right -to accept or reject"in part or in whole, any bids 'submitted,
and to waive any technicalities for the best interest of the County.
Bid No. 24-062
Page 3 -of 16 -
6, Brazos' County shall- not be'.responsible for any .verbal. communication between any
employee of the 'County and -any Respondent(s). Only tiwritten specifications and written
price quotations will be considered. Respondents) with questions regarding the bid should
submit them-. in . writing via .: the Brazos Valley e-Marketplace .. • at
https//brazosbid.ionwade.net.,
7: Brazos County reserves the right to reject any bid that. does not fully respond to each
-specified item.
8. Respondent(s) .must include Tax Identification Number for. the bid to be valid:
9: Should there be a change :in: ownership or management; the Contract shall-be"canceled :
unless a mutual .agreement is .reached' with the new 'owrier:or manager to' Continue the
Contract with its -present provisions and prices. This Contract is nontransferable and may
not be reassigned.by'either party.
IQ. The • County may cancel -this: Contract at any time for any -reason;. -provided a thirty -day
written notice is given. -
11. ,The -bid -award shall.be based on, but not necessarily, limited to, the, following factors:''
a.. Unit Price.'
b.. -Extended price
c::: Special needs and requirements of Brazos County '
a,:. Results oftesting samples,(if required by Brazos County)
e. ' Delivery _
J. References
:g Brazos County's 'experience with'products bid -
h. ' Respondent's past performance. -record with,Brazos County
�12. ,Although the cost of products to be provided is an essential part of:the bid, Brazos County
is, not obligated to award a contract on the sole basis of but will award to Respondent
considered to be the best value to Brazos County.
13. A:cceptance of merchandise; work, and/or equipment, provided shall be made by the
County the sole discretion of the Commissioners: Courtwhen all terms and conditions
of .the Contract and. specifications have been met -to, its satisfaction,- including• the
submission to: the County of any and, all documentation as may be required: _
14. Title and risk of loss of the goods .shall not pass to Brazos County until the County actually
accepts and takes possession of the goods at the poiiit,or points of delivery.
Bid No' 24-062 '
:.. Page 4 of 16
15.
This Contract shall be governed by the Uiii rm. Commercial Code:as adopted in the State
of Texas 'as effective and in force on the. date of this Contract, when: applicable..
-16.
Bids must.be submitted on quantities and units of measure specified by:the bid. documents..
:.
In the event:of errors in'exterided prices the unit price shall. govern..: Any suggested change .
-
in quantity on the part of the Respondents) td-secure-better .price or delivery,• is welcomed
and may be given.. consideration provided that- the•.bidder also bidson the, quantity
:.
specified:
' 17.
Bids must specify the ,number ' of consecutive calendar � days required to deliver the
commodities under normal conditions. Failure -to. -specify delivery time will be.considered' '
reason enough to cause -ft. bid to'be_ disregarded. !Delivery time. quoted will be given-.
consideration :in' awarding. a' contract. -If delivery is not made withina* reasonable time of
the specified delivery in the: bid Ahe entire order or contract may be canceled; and the
Contractor barred from bidding in'future Solicifations:
• :18.
•Bids cannot be -altered -after receiving time... No. bid may be withdrawn after operiing:time
wrthout'acceptable- reason' and with the approval of the Purchasing.Agent. .
19..'Bids'
must. be submitted on: this* form and returned• in' a sealed • envelope clearly :: '
.. marked with A66oinden ''Name and Bid.Number:to ensure -proper•recosnition upon .
its arrival. Bids will not'be considered if submitted by telephone. fax or any other
means oftauid dispateh;'rior:will a bid be considered if submitted to any otheinerson
or: department. other than specifically- instructed.: Bids not 'received »rior to- the . .
expressed..daie and time listed -in this .bid-will�•be reiected or:retti ed unopened.to
.the Respondent(s). Bids. submiothe tted:to.any r person:or department other than the. : .
Brazos County' P.urchasins-Departinent.will not be accepted:,.::
20.1fis_the
Res • op ndent'.s sole responsibility:to print and review all-p of the bid document, -
attachments, -.questions and -responses, addenda, and; special. notices. -The. Certification -of
Bid Form must be --completed. to include full firm -name; mailing :address, ..telephone
number, email address,. Vendor. Tax -Identification number.and- signed.by.an authorized .
representative of:the firm. :Failure to-provide.signature onthe- Certification -of Bid. Form
:.
renders bid non -responsive. Failure to complete the submission -of all required- forms, .
'.
including but iiot.linuted to the.Reference Page, House.Bi1189 & Debarment "en cation * - =
form; Questionnaires (when applicable), Addenda (including .revised forms); and any
other -specified forms or •documents may -be grounds 'for rejection of 'entire .bid.- By-
submitting.a response to -'this solicitation, the Respondent(s)-agrees. to comply with HB
1295, Governirient.Code•2252;908; if awarded a contract.: Respondent(s) agrees to. provide
Bid No: 24 062'-
' . Page.5
Brazos County the "Certificate of Interested Parties Form .1295: as required, for•. renewals;
amendments or `extensions to the Contract.
Visit hops://ethics:state:tx.us/whatsnew/elf .info form1295.htm for more irifoizriation. -
- : 21.: In the: event of: a needed change :in the specifications sent :to :the bidder;. it; is understood
that all the foregoing terms shall apply to the; addendum or. addenda: Any. inteipretation,:: ,
corrections :or. •changes to these 'specifications will be made: by: addenda.: Sole ' issuing
authority of addenda shall be vested -in the: Brazos:County'Purchas" Agent; authorized- :: .
to do so b}► the .Coinmissioner.'s Court.: Addenda will. be made: available using the same
Aistribution.method used to post or make availdblelhe. original solicitation..' Bidders shall
ackuowledge're*pf of -all addenda or their proposal'may be considered non -responsive: :
' 22. It:is our:policy not to fiunisli bid results over the phone: Bidresults:and.fabulation sheets
• : will be-posted:on the Brazos Valley e-Marketplace (lions://brazosbid:ionwave:net), after :
bid award:byCommissioner's'Court:.
: 23:. The bid specifies: the •imiaber. of consecutive. calendar, days -required •to• reach substantial'
completion of the project -under normal .conditions: Failure to;comply:with completion'.
: tibie•will be considered•reasbn'enough to enforee:liquidated'damages and/or.cancel-the-.
contract: If the job-cannotbe completed. within the terms of the contract as'determined by'
.Brazos County; Brazos County vriill suffer:further loss.;Contractor'and Contractor'.s:Surety'.:
shall•be-hible for and shall. pay. Owner •stipulated andfixed sums, hereinafter agree toas.
. : liquidated "damages;. for. each .additional calendar day.' of delay'past:the thirty' (30) 'days'
stated hi the :contract: Two 11undreil Fifty • Dollars ($250:00).At: is. understood. that said
sum. shall ' be considered :liquidated, damages .and ,shall . not be -considered as a, penalty
against:the Contractor::.
`.24-.' Brazos. County reserves:the right to extend this -Contract annually for a maximum of:three
3) additional,' one (1) year periods -with no_changes'in-the :terms or:conditioris of. this
Contract, -if
:agreedupon byboth parties.
25.. The: Contractor. agrees to: extend prices and, terms to all: entities that has entered or will
enter into• joint purchasing inter -local -cooperation agreements) with Braz' s'Couhty:; -
26. 'Three(3). references are.to:be provided.by Respondent. Failure to submit -references may
result in disqualification of bid. Brazos County department references will not�be accepted::
-27.. Contractor shall: observe' and. comply: with .all federal, state and.' local. laws; safety, ' and.
health.regulatioris;'ordinances; and- all regulations.iwhieh-in any manner effect conduct=of _ '
_ :the work_ or_services bemg performed.
Bid No. 24-062. ,.
Pa' ' 6 of �16
:..28.: Any subcontracting must. be.approved prior to commencement of the Contract by Brazos
County.
..29: -: Any. variation from the, e' ications in this:bid documemi must be indicated on the:bid or
on a separate, attachment to -the bid -and -labeled as such..:
30.. Ariy branddame, :or manufacturer's reference used is: considered to be: de - not -
' restrictive;= and, is indicative of the type- and quality the County desires to purchase. Bids - -
on similar items of like, quality will be considered:only if it is noted iri the'bid documents
-and accompanied by Affly descriptive product literature: All- substitutions will'contain the .:
same: active ingredients: in. the same percentages or quantity of the :items: listed in the bid.
If notation of substitution iti-not made, it is: as, the.Respondent(9) is bidding the item.
specified :.. .
.31 The --County does not guarantee to purchase any miniMum:ormaximum quantities: -If any. =
quantities are listed in the:bid; they are estimated quantities used_for.calculating purposes
Only.
32; Iri,the event the. Contractors: unable to furnish any item: within .a: reasonable time after-
:. ' :.older is..placed:due "to:.strilces; war or any.reason beyond the :Contractor's: -control, the
County: reserves the right tb purchase these items from any: source, without causing this
Contract to, be canceled. : .
_ - .33, $razos'Couuty will only be required to.pay for inaterials actgally receivedand/or services
actually.proyided: Brazos. County•shall:not be:required:to pay'for:materials:or services .
described in the contract that are not•used.orprovided-by the Contractor in completion_of':
the. Contract: ''This term supersedes. any contradicting terms throughoutthe Contract and/or
any attachments.
34.: The Contractor. should §ubmifltemized invoices with'clearly inarked.remittance copies -to.. '
the following address: -
Brazos County.
ATTN: Auditors .
P.O.-Box 914 : .
= Bryan, TX :77806 ;
Statements of accounts will . not -be sufficient -to . warrant '.payment.. iJnless other ,
arrangements have . en made' all invoices Ao be: paid. in:' full , within 30 days ' after .
satisfactory- delivery. of commodities: and: or :services :and receipt.of invoice at the listed:
Bid No. 24-062
Page 7 -of 16
Address. Checks will be made payable to the Contractor only, and shall not include sub-
contractors, assignees, or any other party.
35'. As a governmental subdivision, Brazos County .is exempt from most types. of taxes,
including but not limited to sales tax,. excise tax,, ind import duties: Such costs must not
be- included in bid prices.. Tax Exemption Certificates can be obtained upon request. from . .
County.
' :36. Upon award of Contract for any commodity or materials purchased•by Brazos County; the
Contractor- . agrees • - to protect the County from any. claim involving. patent right
= infringement, copyright infringement, sales franchise disputes.
37.. Unless otherwise specified, all items- ordered from the Contractor must be new;, unused,
and- in- first class condition: -Products..usually packaged• for- commercial .sale shall be
furnished in proper container so as to facilitate; storage and handling.
38: This bid shall be governed by the laws of the State of Texas and Potential Respondent(s)
and ' the subsequent Contractors) are advised they may have disclosure requirement -
pursuant to Texas Local Govemment: Code, Chapter 176. This law- requires persons "
desiring to:do�busiiiess with the County to disclose.any gifts that have an aggregate value
in excess. of $250.00 "given: to any employee of the County, County Official to the County
Official's family:members or:employment of any employee of the County, County Official
or.the.County Official's family members during. the preceding twelve (12) month.period:
The: disclosure questionnaire must be filed with the Brazos County Clerk. Refer to Texas
Govemhapter 176 for the detailsofthis.law.Local:r
39.. Venue for any dispute, shall lie exclusively in. Brazos County, Texas; notwithstanding
anything -to the contrary. ;
.40. Respondent(s) .understands that Brazos County is a •governmental entity subject to Texas
-------- - . --State-and Federal public-in.forn at-ionstatutes.=The_requirements of -Subchapter ,chapter
552, Government Code,- may apply to this bid - and/or subsequent contract .and the
-contractor or vendor- agrees that the contract can be terminated if the" contractor or vendor.
knowingly or intentionally fails to comply with a requirement of that subchapter. This
provision is mandatory and may not be altered or deleted, as.required by Sec. 552.372_(b)
of the Texas Government -Code.
41. Notwithstanding any provisions contained herein, the*obligations of Brazos County•are
expressly contingent upon the, availability of funding for the obligations contained herein
for the term of the contract and any extensions and renewals thereto.
Bid No: 24-062
= Page'8 of 16
42. The. Contractor's work and materials shall comply with all. state and federal laws;
municipal' ordinances, regulations, and directions of inspectors appointed by- proper
authorities having. jurisdiction.
43. The. Contractor shall- perform 'and require all subcontractors to perform the: work in
accordance with applicable laws, codes, ordinances, and •regulations of the State of Texas
and the United States and in compliance with OSHA and other laws as they apply-'to.its
employees. 'In the event any of the conditions of the' specifications violate the code for
any industry; then such code conditions shall prevail.
.44. The Contractor shall follow all applicable • state and federal .laws, municipal • ordinances',
and' guidelines con cernm ; soil erosion' and :sediment control -throughout the Project and
warranty.term.
C: SPECIAL PROVISIONS .
1. All deliveries are to be made•F:O.B. Brazos•County Road and -Bridge Department; during
regular working days, and between the hours of 7:30. A:M. -and 5:00 P.M.-Monday'throtighi
Thursday, unless otherwise.' quested by the County and loaded into County bucks by the.
Supplier; :or loaded and hauled aiid delivered anywhere in the County by the Supplier
:. .during* the mentioned- •working days and hours: Supplier will :have carrier notify Brazos
County 24:hours in advance of delivery or delivery may be refused.
2. Vendor will be required to 'notify the Brazos Courity'Road and Bridge Department in the
event -of unforeseen delay arising in the delivery of -a specified shipment. In the event a
shipment will not arrive at. the job' site within two (2) hours- of designated -time -Brazos.
County shall have the right to. refuse acceptance of the order.
3:' Vendor will be required to deliver to Brazos County. Road •and.Bridge Department or joii-
site in Brazos County when and wliere requested and remain on the. job with: truck and
operator aqong as required-fo completely place.load: j-- -. -
4.. Brazos County reserves the right .to test any materials -delivered ut the requested site for
compliance with specifications. The•vendor will remove immediately from the job site or .
right of way any materials that- are deemed unsatisfactory.
.5•. ' Material Safety Data' Sheets and Placards' must be furnished at. the time of delivery as
specified by State and F.ederal:Regulations (1F APPLICABLE).
6. Any vendor vehicles traveling -on County roads will not exceed its legal gross weight.
Bid NOO 24-,062
Page 9 of 16
Brazos County will perform test through a third
.7. If samples or sample testing is required,
party. Vendor will be requifO to. allow .the . third -party access to the facilities in order to
acquire samples for testing.. Failure to submit reqqqstdd testing. may disqu&idisqualifybid...
8.
Brazos County reserves the right to award the contract to several vendors.. The successful
bidders will have. the . exclusive right. and duty 6 -provide the -prod . uct§ -lisied hereiii to the
Co4nty. The County does not. guarantee to purchase any. minimum quantities.
D. INSURANCE REQUIREMENTS
1. The Contractor shall instruref."his insurance t furnish to the. County a
9 agent or, carrier to sh
ceriihcate',of -ln§uran*' 6 -attesting to. the issudAce'.oHhe following parts of this section;
ce
-Pleaie note that suchtdrtifiOies of.Insu'rancei.and any'requiiO bonds* must be'issued and
th6n apprived by Brazos
o' Risk. Management. T16 Certificate of Insurance must be
approved by Risk-Manag*dment before any deliveries-cahbe:made.
2.. TheCo'ntractor shall furnish and keep in full force the following insurance duFifig the term
of this Contract:
1 Siitutory. Worlan6n` 9. Compe'n' safion.. or $ 1,000,000 Employe?'s L*iability'Insuranc'e with
waiver of spbrogatiQ'A.
-4. General: Liability with limits for bodily.injury and for pr6perty damages of not legs than
$1,000,000. aggregate, .$500,000. each occurrence with- Brazos County named 'as''an
Additional insured and waiv*er'o'f subrogation.
9: Commercial Automotive Liability
with $500'0'06 -SL,for Bodily Injury and
Property Damage Liability with Brazos CountY -named as additional insured.
b.: Cargo Insurance to suffidiently-pover materials transported.
0 aforementioned vblici�s - and Certificates -of .5. ..All T the s __.IrjsuKanc.6_ should be issued
immediately after the Contractor receives notificationofdward.
J
The Contractor agrees to release and hold harmless . Brazos County from any and all claims.
and liability'due to the acts of the Confract&s`dmpfoyees and the operation of his
equipment.. Tbe'C6ntrhcior also agrees to hold harmless.Brazos County from any and all
expenses, -including attorney fees, incurred 'by Brazos.County in litigation or. otherwise
resisting such claims or liabilities. as a result -of the Contractor's employees' activities.
'
Further,, th6 Contractor agrees to protect, indemnify and Sold h amiless Brazos
from -and against all claims, demands and causes of -action of every kind and character
brought by any employees of the Contractor against ' Brazos County due to personal
Vulcan:Signs
APartofVulcan, Inc.
408 East Berry Avenue • P.O. Box 1850 • Foley, Alabama 36536-1850
=
(251)• 9.43-1641 FAX (251).943=1544 • E-mail: vulcan3@vulcaninc.com • Website: www:vulcaninc.co.m
CUSTOMER REFERENCES'..
Greene t6,. MO'. . '
Galveston Co'.TX
=:'Mr. Leroy Gott. —Buyer.
. ' .:. Mr.. Rufus:Crowder _Purchaser
933 N. �Robberson.Ave.
::: 722 Moody;:4�' Floor ;
Springfield., :MO; 65802 _
Galveston; TX 77550
• . Phone #41.7=868-4013
Pho.66 #409-770'537.2
Igott Qreeneco.untvmo:cov...
- — .. ..
rufus.crowdoi@co.daiveston.tx.us -
:.
.. : City:of Raleigh; NC :: -
:. State of Alabama : : .
..
Ms: Eric Johnson -Purchaser .: := :.
:. Mr.:Michael Wright:= buyer .
222 West Hargett St:
:. 523'Traffic Open Dr:
:.. ...
Raleigh, NG27601 _ :
Montgomery; AL'36130 '
:Phone #919-996-3240
Phone #407-836=8G62-
eric.ioHnsan(a�raleighnc•:gov
wrightmf@dot.state.al.us,
:. State of Tennessee .
.,State of•Louisiaha
Mr .Erick B;usby:- Procurement -Spec. ::
Ms. Maftie.Sachse:--=Procur.; Spec:'
:312 Rosa L: Parks Ave. :.
-PO: BOX 94245': ,
Nashville,. -TN: 37243 :.
:Baton Rouge, LA 70804:.
-Phone: #615=2.5.3 8900- .
Rhohe .#225-3.7.9-�1761;_�-
'Erik.busbvCaD_tn.gov- .
mattieaachse@la:gov : • :
"AN EMPLOYEE OWNED COMPANY!"
Bid No. 24-062
Page 11:of 16
F. SPECIFICATIONS & QUOTE
EST
-DESCRIPTION
SIZE
SIGN #
PRICE•EA.'
TTL PRICE '
1-
I`
(Blank),Speed Limit- White w/ black letters
24 x 30
R2-1 (BLANK)'
$ 25.15
$ 25.15 .
2
-10
20 MPH Speed Limit - White wlblack letters
24 X 30
R2-1- 20 -
$ 25:15
$ 251.50
3
10
25 MPH Speed -Limit - White wlblack letters
24 X 30
R2-1-'25
$ 25.15,
$-251.50
-A
.10.
30 MPH Speed Limit - White-Oblack letters
24:X 30
R24- 30.
$ 25.15
$ 254.50 :
5.
10
35 MPH Speed Limit : White wlblack let 6s
24 X 30
R2-1- 35
$ 25.15
$ 25.1.50 - =
6
'10.
40 MPH Speed' Limit - White wlblack letters •
24 X 30
R2-1- 40
$ 25.15 :
$ 251•.50
7
10.
45. MPH. Speed Limit -:White wlblack letters
24'X 30
R2-1-45.
$ 25.15-
$. 254.50
8
' 10
50 MPH Speed.Limit - White wlblack letters
24•X 30
R2-1-.50
$ 25..15
$ 251.50
9
10 :
65.MPH.Speed Limit-- White.w/black letters
.24.X 30
R2-.1.- 55
$ 2,
$ 251.50
10
•20
60 MPH Speed .Limit = White wlblack letters
24 X 30
• R2. -1- 60'
$ 25.15
$ 503.00
11
10
15 MPH Speed: Advisory - Yellow wlblack letters
18 X 18'.
8
w13-1-15
$11.74
$117.40
' 12
-1, .
15 MPH Speed Advisory - Orange:w/ black letters
18-x 18
W13-1--15
$11.74
$11.74
13
-10'
20 MPH Speed Advisory - Yellow wlblack letters
18:X 18..
W13-1=.20
$11.74
$.1.17.4.0.
.14
. 1
20 MPH Speed Advisory-7 Orange w/ black letters
18 X 18
W134- 20
$11.74
$11.74-
15
•10
25 MPH Speed Advisory - Yellow wlblack letters
18 X 18
W13-1- 25
$ 11.74
$117A0
16
1.
25 MPH Speed:Advisory•= Orange w/:black letters
18 z 18
W13-1- 25
$L 1 774
$11.74 •
• 171
10
30 MPH Speed Advisory - Yellow wlblack letters:
18•X 18
W13A - 30
$11.74
$1.17.40 '
18
1
30 MPH Speed Advisory -*Orange wlblack letters
18 x 18
W13-1= 30
$11.74
$11.74
.19
10.
35 MPH Speed Advisory - Yellow wlblack letters
18 X 18'
' W13-1.= 35
$11.74
$117.40 .
20
1
35 MPH Speed Advisory - Orangelwl black letters
18 x 18
W13-1- 35
$11.74
$11.74
21
10
40 MPH Speed:Advisory:- Yellow•w/black letters
181X 18
W13-1- 40
$11.74
$.117.40
22
-.1• :
40 MPH Speed Advisory'- Orange.w/ black letters:
18 x 18
W13-1• - 40 • .
$11.74. •
$1.1.74
23
.10
.46 MPH'Speed Advisory- Yellow wlblack letters'
18 x' 18
W13-1-45
$1.1.74
$117:40
24
1:
45 MPH Speed'Advisory - Orange w/ black letters
18 x 18
W13-1-50
$11.74
$11.74.
25
10.
50 MPH Speed Advisory- Yelloww/black letters
18'x 18
W13-1-55
$11.74
$117.40 -
26
10
55 MPH Speed.Advisory- Yellow w/black letters
18 x 18
W13455
$11.74
$�117.40
271
20
STOP - Red wl white letters..
36 X 36 .
R1=1
$ 43.36
$ 867.20
28
'10'.
YIELD - Red w/, white letters
36 X 36
R1-2'
$ 23.92
$ 239.20 .
29
10
STOP AHEAD -Yellow wlblack letters
36 X 36
W3-1
$ 49.4.1
$ 494.10
.30--20-
DEAD END =Yellow wlblack letters
30 X 30
W14-1.
$ 31.434
$ 628.60 -
31
20'.
NO' OUTLET - Yellow-w/black letters
30 X 30,
•W14-2
$ 31.43:
$ 628.60
32
' 20
1 NO OUTLET -.Yellow wlblack'letters'(w/arrow)
36 x 8
W14-2a
$11.78
$.235.60 .
33
-10 ,
90 degree Left Turn - Yellow wlblack letters
30 X 30
11111-1 L
$ 31.43
$ 314.30
34.
10:
90 degree Right Tum - Yellow w/black letters
30 X 30
W1-1 R
$ 31.43
$ 3.14.30
35
10*
45 degree Left Curve- Yellow wlblack letters
30:X 30
W1-21-
$ 31.43
$ 314.30
36
10
45 degree Right Curve - Yellow: W/black letters •
30-X 30
W1-2R
$ 31.43
$ 314.30 -. =
37
10
90 degree Left Reverse Tum - Ye116W wlblack letters
30 X•30'
W1-3L
$ 31.43
$ 314.30
38
' -10 '
90 degree Right Reverse Turn - Yellow w/black letters
30 X 30
W1-3R
$ 31.43
$ 314.30 - '
39
10
45 degree Left Reverse,Curve - Yellow.w/black letters
30 X 30
W14L
$ 31.43
$ 314.30 '
40
10.
45 degree Right Reverse Curve -Yellow w/black letters
30.X 30
WlAR
$ 31.43
$ 314.30 '
41
-10
Left Winding Road - Yellow wlblack letters
30 X 30
W1-5L
$ 31.43
$ 314.30
Bid No. 24-062
Page 12 of 16
42
10
Right Winding Road -Yellow w/black letters
-30 X 30 .
W1-5R
$ 31.43
$314.30
43
10 .900
Side Road Symbol -Yellow wlblack letters
30 X 30
W2-2
$ 31.43
$ 314.30 "
44
1
ONE LANE BRIDGE - Yellow wlblack letters
30 X 30
W5-3
$ 31.43
$ 31.43
45
10
T -'Road Symbol - Yellow w/black letters*'
'30 X 30 '
W24
$ 31.43
$'-314.30
46
5..
Y -Road Symbol Left - Yellow w/black letters
30 X 30
W2=5L
$ 31.43 .
$157.15
47
5
Y - Road Symbol Right - Yellow'w/black letters
30 X 30
02-5R
$ 31.43
$157.15
48
-5
Y - Road Symbol Left - Yellow w/ black letters
30. X.30
W25L
$ 31.43
$157.15
49
5..
Y - Road. Symbol Right - Yellow.w/black letters
30 X 30.
W2-3R
$ 31.43 . :
$157.15 _
501
1 '.
One way. arrow, -'left -
' 96 X 48
W1-9L
$188.48
$188.48
51
_ -1..
One way arrow:-. right
96 X 48.
W1-9R
$188.48
$188.48
52
1.
Two way arrow
96 X 48
W1-10
$188.48.
$188.48 .
53
:10 '
Large Arrow - Yellow wlblack letters
48 X 24
W116
$ 47.:12 .
$ 471.20 "
54
10'
Large Double Arrow - Yellow wlblack: letters
.48 X 24.
W1-7
$ 47.12 .
$ �471.20
55
150..
Chevron -Yellow wlblack letters
`18 X 24
W1-8
$15.09
$ 2,263.50
56
5 .
COUNTY MAINTENANCE ENDS - White w/black letters
24 X 15
D27
$12.56
$ 62.80
57
.5
COUNTYWAINTENANCE BEGINS -White w/black letters
24'X 15
D28 --
$12.56
$ 62.80 .
58
30
Flood Gauge -' Fluor Yellow wlblack letters ..
12 X 72
W819 '
$ 41..10
$'1233.00 .
59
30-
Flood Gauge (Plaque) - Fluor Yellow wlblack letters
18X1.2
W8-'19aTP
$10.49 -
$-314.70
60
.30
Object Marker Left - Yellow wlblack stripes
-12 X 36
-OM-3L
$17.67 - .
$ 530.10
61
30.
Object.Markers:Right - Yellow w/black stripes
12 X 36.
OM-3R
$17.67
$ 530.10.
.62
5:-
DETOUR Left -_Orange w/black" letters
30 X 24
M4-9L
$ 25.15
$12535
63
5
DETOUR Right -Orange wlblack letters
'30. X 24 '
:M4-9R
$ 25.15.
$125.75
64
20
NO DUMPING=White wlblack letters
18 X 24
R19-5
$:15.09 .
$301.80
651
10
PAVEMENT ENDS -.Yellow wlblack letters
30 X 30
W8-3
$ 31.43
$ 314.30
_66
1
FLAGMAN AHEAD - Orange w/black letters
36 X 36
MCW20-7D
$-53.01-
$ 53.01 '
67
1:
OBSERVE WARNING SIGNS - Orarige wlblack letters
***MDO***
48 X 42'
R20-3.
$ 95.62 ..
$ 95.62
68
1
END CONSTRUCTION -Orange wlblack letters
***MDO***
60 X24
G20-2
$ 68.30
$ 68.30
69
1
BE' PREPARED TO STOP - Orange wlblack letters
.30 X 30 .
CW21-8
$ 31.43
$ 31.43
70
-1
ROAD..CONSTRUCTION NEXT MILES Orange
W1black' letters
60 X 36
G20-1
$"88.35
$ 88.35
.71
-5 .
ROAD.CLOSED- White wlblack letters " . ***MDO***
:30 X 48 -
: R11-2
$ 68.30
$341.50
72
5 -
ROAD CLOSED TO THR_U T_ RAFFIC-White w/black __
letters
'30 X 60.
R114 _ _
$. 85.37
$ 426.85
_
73
1
DIP - Yellow w/black letters
:30 X 30 •
DIP
$ 31.43
$ 31.43
74
"1 .
CAUTION - UNEVEN LANES - Orange w/black letters
36 X 36
CW21-14"
$ 53.01
$ 53.01
75
10
Round RAIL -ROAD CROSSING - Yellow wlblack letters
36"
W10-1
$ 42.86
$ 428.60
76
5
RAIL -ROAD Advance Warning - Yellow w/black letters
30 X 30
W10-2
$ 31.43
$157.15
771
5 "
RAIL -ROAD Advance Warning - Yellow wlblack letters.
30.X 30
W10-3
$ 31.43
$157.15
781
5
RAIL -ROAD Advance Warning - Yellow wlblack letters
30 X 30 :
W10-4 .
$ 31.43
$157.15
79
10
FRESH OIL.- Orange w/black letters
30 X.30
CW21-2
$ 31.43
$ 314.30
80
10'
ROAD MACHINERY AHEAD - Orange wlblack letters
36 X 36
CW21-3
$ 53.01
$ 530.10-
81
5 .
ROAD MAY FLOOD - Yellow wlblack letters
36 X 36
W818 '
$ 53.01
$ 265.05
82
5
WHEN FLOODED TURN AROUND DON'T DROWN-
Yellow w/black letters
48 X 48.
W8-18bT '
$ 94.24
$ 471.20
831
4
INO TRUCKS'- White w/ black &red graphics*
24 x 24 "
R5-2
$ 20.44
$'81.76
Bid No. 24-062
Page 13 of 16
84
2
Keep Right - White w/Black Letters and Arrow
24 x 30
R4-7a
$ 25.15
$ 50.30 .
85
1
Any unforeseen -signs not listed here but are in the Texas
Manual'on Uniform Traffic Control Devices ***Bid per
5 uare foot**' •
***ALUM***'
goo sa HlP one color
$ 5.89
$ 5:89
86
50
Extruded Street Name Sign Blanks - Green Aluminum
6 X 18
$ 9.57•
$ 478.50 -
87
50'
Extruded Street Name Sign Blanks* -.Green Aluminum
6 X 24
$12.77, . ' ' .
$ 638:50
88
'50
Extruded Street Name Sign Blanks - Green Aluminum'
6 X 30•
$15.95 :
$ 797.50 '
89
1-
Extruded Street Name Sign Blanks - Green Aluminum
9 x 30
$ 21.98
$ 21.98
90
50.
Extruded Street Name Sign Blanks - Green Aluminum
6 X 36
$1-9.14.
$ 957.00
911.
1,
Extr ided Street Name Sign Blanks'- Green Aluminum
9 X 36 ,
$ 26.37
$ 26.37
92
50
Extruded Street Name Sign Blanks - Green Aluminum
6 X 42'
$ 22.33 . '
$1,116.50
93
-20.'
Extruded Street Name Sign Blanks - Green Aluminum
6 X 54
: -
$ 28.71 ' :
$ 57.4.20'
= : 94
1.
Extruded Street Name Sign'Blanks - Green Aluminum
9 x.42•
$ 30.76 • :
:$ 30.76
95
20.
Extruded Street Name Sign Blanks = Green Aluminum
•9 x 48
$ 35.16
$ 703.20:
96
20
Extruded Street Name Sign Blanks - Green Aluminum
9 x 54
$ 39:55
$ 791.00
97
20
Extruded Street Name Sign Blanks - Green Aluminum
9 x 60
$ 43.96
$ 87.9.00
98
•20
Extruded Street Name Sign Blanks - Green Aluminum'
9 x 66
$ 48.34
$ 966.80
99
1:
Carsonite Road marker
62"
CRM-375
$14.50-
$14:50
100
1
Carsonite Road market- Tape on'both sides -
- 62"
CRM-375
$15.50
$15.50
101
50:
Round Post Caps (For Extruded Signs)
2-3/8".
$ 6.15
$ 307.50'
102
50
"U" post brackets 9004hd 480 6 for Nucor Rib -Bak posts
for extruded si ns ea .
$ 6:15
$ 307.50
103.
50:
Cross Brackets 45 & 90.(for extruded 'signs)
$ 6.15 :
$ 307.50
-104
25
Traffic Cones
2811
.
$ 23.4.0
$ 585.00
105
'1
Barricade Assembly. - Orange wlwhite
72"
Type -I
$ 87.33
$ 87.33
106
1-
Barricade Assembly - Orange wlwhite. Type III Prismatic
sheeting
Sin le side - crash.worth
• 48" :
Type -III
$186.15
$186.15
'107
1-
Barricade Assembly - Orange w/ white. Type Ill
Prismatic sheeting
Sinde side - crash worth
96"
Type -III -
$ 231.69
$ 231.69 •
108
500
Cherry Mate Pop Rivets 7/8"'Grip Range
$1.40
$ 7.00.00 • .
109
200:
Delineator Posts, 318" Holes Full Length - green 72". -
72"
$ 8.95'
$1.,790.00.
--11.0
-1-Yellowftefl_ecVve
a ep (Eng: Grade " res�ensitive.
3"•wide x 50 yds long
$-39:37.-
111
:1
Green Reflective -Tape (Eng. Grade) Pressure Sensitive
6" wide:x 50 yds long
-
$ 78.75
$ 78.75 '.
112
1,
White Reflective Tape (Eng. Grade) Pressure Sensitive
18" wide x 50 . ds long
72"
$ 236.25 •
$ 236.25
113
1. '
Black Pressure Sensitive Tape 4" wide x 50 ft long
$ 88.95.
$ 88.95
114
300
Rib -Bak Si n.Post - Green
S'-0"
$ 26.40
$ 7,920.00
115
:300-
Rib -Bak Sign Post - Green
9'-0"
$ 29.70 .
$ 8, 910.00
-116
300
Rib -Bak Sign -Post -Green
1041,
$ 33.00 • •
$ 9,900.00
117
800
Rib -Bak Base.Post - Green
3'-6"
$1'1.55 '
$ 9,240.00
118
800
Rib -Bak Trapezoidal Soil Plate Hardware
$12.95
$10.360:00
119
800
,Complete)
Lap -Splice Breakaway Hardware (Total Package
$ 8.95
$ 7,160.00
Bid No. 24-062
Page 14 of 16
120
50
Slip -Safe Breakaway Hardware (Total Package
Complete)
$144.76
$_7.238.00
121
250
Yellow Dia. Gr., aluminum delinator markers
4" X 4
OR-44 .
$ 4.95
$1.237.50
122
200
BHP 76 - Button Head Bolts - steel plated
5/16" X 3�4"
$ 0.40
$ 80.00
123
100
2-3/8" OD x 10'0" LG Pos-Loc sign post assy or equal
10'-0"
$ 66.43
$ 6,643.00
1241
10
18chool Advance Sign -Yellow w/ black letters
36 x 36
S1-1
$ 51.68
$ 516.80
1251
10
ISchool Crossing Sign -Yellow w/ black letters
36 x 36
S2-1
$ 51.68
$ 516.80
126
10
When Children Are Present - white w/ black letters
24 x 10
S4-2
$ 8.68
$ 86.80
127
10
School -Yellow w/ black letters
24 x 8
S4-3
$ 8.78
$ 87.80
128
10
All -Way sign - Red w/ white letters
18 x 6
R1-3
$ 4.65
$ 46.50
129
10
Round Post Caps (for extruded signs)
2-7/8"
$ 9.95
$ 99.50
1301
10
1 Loose Gravel - Orange w/black letters - aluminum
30x30
W8-7
$ 31.43
$ 314.30
131
10
Road Work Ahead - Orange w/black letters - aluminum
36 x 36
MCW20 -1 D
$ 53.01
$ 530.10
132
50
Extruded Street Name Sign - Blanks -green -aluminum
6 x 48
$ 25.52
$1 276.00
133
2
T-100 Tool
$ 8.50
$17.00
134
Letters - Pressure Sensitive Series "C" - White Letters and
Numbers in packages
A
20
A - Z, 0 - 9, high intensity
4"
$17.50
$ 350.00
B
20
A - Z, 0 - 9, diamond grade
6"
$ 31.50
$ 630.00
C
20
A - Z. high intensity
2"
$14.50
$ 290.00
D
20
A - Z, diamond grade
4"
$ 21.50
$ 430.00
135
Al20
Letters - Pressure sensitive Series "C" - Black Letters
And Numbers in packages
A - Z, 0 - 9, diamond grade
4"
$17.50
$ 350.00
B
20
A - Z, 0 - 9, diamond grade
6" �
$ 26.25
$ 525.00
C
20
A - Z. diamond grade
8"
$ 35.00
$ 700.00
D
20
A - Z, 0-9 diamond grade
10"
$ 43.75
$ 875.00
136
250
Shear Bolts
$19.50
$ 4 875.00
137
60
Breakaway Assembly
$ 49.50
$_2.970.00
138
1
STOP on one side/SLOW on the other side ABS (3mm)
HIP two holes drilled
24"
$ 78.00
$ 78.00
139
_
1
84" L 3 Pieces Orange PVC Three Piece Pole. Pieces
when assembled are 84" Iona. 12"L Top Handle Slides
onto bottom pole pieces, secured with spring loaded
button. Included mounting hardware for sign.
$ 37.50
$ 37.50
140
-200
Shear Pins
--
$ 29.55
$ 5.910.00
142 1200
Minuteman Safety Cables
1$19.50
$ 3.900.00
Notes: Lead Time 30-45 days after receipt of PO All roll goods are subject to supplier minimum purchase requirements
Item #85 bid as 100 gauge HIP one color
Item #110, 111, 112 bid as 3400 series
Item #114 and 115 purchased in bundles of 50
Item #120 sold in cases of 4. No broken cases
Item #123 bid post, wedge, and socket
Item-#1-36-extra-shear-pin-and lock -nut -
Item #137 entire assembly minus cable
Item #140 Extra nuts (6), bolts (6), washers (6)
- -- -- - - -- - -- -------- - -- --- --- - -- ----
Item #142 cable only
Bid No. 24-062
Page 15 of 16
G: CERTIFICATION 'OF BID
By signing the certification below; the Respondent verifies that all plans. and- specifications have.
been reviewed: and are considered in the pricing attached: Prior to award; the Respondent also -
completes - the- -Verification of ;No Delinquent :Taxes or _Fees :form . (V.T:C.A:.: LOCAL
GOVERNMENT .CODE §262.0276),. Legislative Certification .Form, and :the Disclosure of .
Interested- Parties (1295). These- are - available on -the Brazos County Purchasing website. -The '
undersigned affirms: that they, are duly authorized execute this contract, that this quote has not been
prepared _in collusion with• any. other- vendor,: and. that the contents of this -quote have not been
communicated to any othef vendor-pfior to the official opening of this: quote: -
Signed'By..
Typed Name:. David B- Beviacq�5_
ua Title: 'Vice.President/GM
Company 1Vame:.Vulcan Inc dba: Vulcan Signs.
'Phone: 80.0-633-6845
Mail' 'Address: PO Box 1850 Foley AL 36536
Email Address:: vulcan3@vulcani.nc.com
-
;;&,_ '
-Vendor Tax.Identification Number: 63=0513868 -
_ . END OF:BID REQUEST NO. .24-062 Road Signs -and Sign Posts
By signing below,. Brazos County agrees that this bid; 24-062 will.be awarded as dictated on the
y : associated bid tabulation sheet, to'the Respondent whose ,name appears above and both .parties
agree.tCallr conditions 7o,4ined.herX�
t
A=8sgl
V.
p8Y3mSalmzim
eJdAlPd�1.$Y8P3
O18ffifC9fS
FA
SCC
q'_"fS
YeSt&GSBP.S
a
v'J'
9Y)k'l3
f3kI14rA>^-1uOIo
ES
t3=2imm
Se
SSG=omm
-3
W
F4-i5-k4
SS
t9
-
ogwwyl3
Li
Siwwgo
-
-'
''
62i�B6ctl'a
-
-
-'
-oho
--
-
�'
3
g�€€€
49gggggg��
�
g��
E
��•
���
�sssaGsas�s���$6�xt5ssssda��ot�gzt--emes�sar�ae�
R
gg gg
gg 55+�
� �
$
�
8 �
Y �
�' 8
9
•R �
`
9 '°
R'
id
�
�
9
�
�g �
�
� �'
� �
�
�
� �
9 "
�
g �
� C
� �
G
�
Q
--
-
-
m�������
is Aop
-------.�1-.
- a
wwwww
8$$$8N88
ww
aou�MEMO
$$$88
gig
888$8
0 0
n
0 0
mam-
0 0
n$8$$$$$$$$$$$$$$$$8$8$88$888888$$8a8$8s8
mg
W Nuwi
w,w.,
umuuw
ee
NN�gi
y
$ $$$S�
yy
yy
iS$��S
�8879$
yy
"'$$mm
uwi
a wn
�
d'"000b88o800808$8$88$888�"
a
Nw.�u
ni
u Nm.�o
e�eeme
me �
w
g
w
wwwww�wN��u^dwWWwwwww
8
V"$
"S.
S
o$so
0 z
z z
oa
1919888888898888s888s88888888$888$8888s8$889
8��g�gyd6oaopb�0008
wS
�
d
��118211
w4awoNAw�NNtivwtivNwS:1�11CxG�S�
ss88EH8
8$8888E8ss$8
8o$888888
$�88s8s8s8888
�#
�
w��W
b
a>
`
WkWWE�E�EeWW��N�
W B
o
i5
r" w
8 �b„
$�
U 9
���
°; .'n
o +"
��k�mm
m$
N
WSW
W�W�WW:WWWW
U-
W
W ,
'l-
WR,,
WWTwu
2
8
�r°''
El
w�
8moo
ww.
il
N8$W�SNi���BNeoos�s�oomm�
NWSons8800sg>SSpsakegpsp$8o��o
��BNom
rbW
u"
C
N2Ud
�L^tm
"8
z
0
s
93
20
EftkdShad Nuns Bhoo-Green Akadnan
6X54
535.00
5700.00
528.71
ME
84
1
Erfided Star ft..BhNa - Gran Aksleum
9x42
$45.50
545.50
530.76
530.76
95
20
E0ded Sired Nano SM Blinks -Gran Aaalmse
9x48
$48.50
$970.00
535.16
$703.20
98
20
Extddee Seed Noma B'mds-Gran Aaa-
ex54
558.00
51.160.00
93955
S791M
97
20
Extruded Seed Norm BW"-Gan Ahmsem
9x60
$62.00
51.240.00
543.95
$879.00
98
20
Emceed Seal Norm EhMs.GanAMusan
9x66
$67.50
$1,350.00
548.34
$966.60
99
1
CarsmbRod make
62'
CIUk375
$24.00
$24.00
$14.50
$14.50
100
1
L�smbRodrtrke-T mbdhado
BarCNAJ75
525.00
525.00
51550
$15.50
101
50
RPod (FaElAuded
asd
24r
$5.50
$275.00
5UT
$GAS
$30750
102
50
V bads&601adi8001a Nuzr Rio" elaudd ea
57.50
$375.00
5Mr
56.15
530750
1D3
50
Crosa Br¢tds 45 S 90 .edntlal
$5.50
$275.00
511T
$&15
$307.50
104
25
Trtlfie Cones
1.
522.50
$562.50
7Pound
S73A0
$585.00
105
1
Barkedl Waade
72'
T
$115.00
$115.00
S3733
587.33
106
1
BmcadeAssab-OrartaMde.T IO Rmn Weareting
b•
Typa01
$185.00
$185.00
$196.15
S18&15
-
. situ -a h
107
1
Bm�Ats� - �°�' pPrds�
w
Typoal
$220.00
$220.00
$23169
$231.69
t de -sash
108
500
MMVAWPCPRMft7irGWPArOD
$1.00
$SOo.00
$1.40
$700.00
1091
200
Deirod. Pods. 3lr Hales Full 77
7r
I 510.50
52,100.001.120
$8.95
$1,790.00
Ito
1
lYdbwW Wadi Two Gradal Prose SastM 7wide x9 Vch long
$95.00
$95.00
53937
$39.37
bid Bs 3400 series
III
1
lGrawnRdkdmTom Gad) Prisons SarmOw r adaxW Irds W9
$195.00
$195.00
578.75
578.75
bid as 3400 series
112
I
lVjhb ReacbraT GIa0s Prtmca Sansill alradox 50 yds bV
7r
$350.00
5350.00
S236.25
$236.25
bid as 3400 series
113
1
Imack Prenaa&.seum Taxarvadema mm
$50.00
550.00
$98.95
WAS
114
300
RtsBN - Pad -Greco
fro
$30.00
59.000.00
20 CTitaoHei hts
S26A0
$7920.00
Purchased In bundles of 50
115
MO
lRb" Dm Post •Oven
9i7
$34.00
$10.200.00
2e Chitaffa Heights
529.70
58,910.00
Purchased In bundles of 50
116
700
JFUa&SKPPsd-&-
10141'
' 536.00
530.800.00
20 Chicago Height.
533.00
59,900.00
117
B00
RbBABae Post -Ban
3-r
$10.00
$8,000.00
20 Chic oHeights
$11.55
59,240.00
118
800
RbBAT Sd Pole Hadaae
NO Bid
NO Bid
S12.95
$20,360,00
111)
800
Had4ee crew Package kite
$22.00
$17,600.00
S&95
$7,160.00
120
50
SIpSf, Hard- od Pa
No Bid
No Bid
$144.76
$7 238.00
sold in uses of 4. No broken uses.
121
250
YeDwQ. Gr.. eI-ddrearmark-
4'X4
0R44
$2.15
5537.50
54.95
$1,737.50
122
200
BHP 76-Man Head Bob -sail Oared
91rX Y.,
50.95
$190.00
50.40
580.00
123
100
2.Vr OD a IDP LO Pos4m a WA
10'.7
$58.00
$5,800.00
Pole/Socket/Wedge
S66A3
56643.00
bid post, wedge, and socket
124
10
Sdad Ad7ada SkpYU,,J Mat left-38x36
St-1
$95.00
$950.00
551.68
$516,80
1.
1D
Sdml Oossirg SigoYellow4bLecklam
36.36
521
595.00
$950.00
$51.68
$515.80
126
10
Mw MUmAm Preset-sdtlea/blsck Yeas
24x 10
542
$28.50
$285.00
S&68
$86.80
127
10
Su1m1-Ye9oa14blockleeaa
24x8
SO
1 $25.00
$250.00
59.78
587.80
,2Iij
10
-Rd Wsddakrbss
18x6
RI-3
$10.001
5300.00
$4.65
$4650
129
111
lRmWPWC=#aexindd
2.7/r
530.00
$100.00
$9.95
599.50
130
111
ama
LG d- uNka:kh0__damarmn
3040
W3-7
S60.00
5600.00
S31A3
$31430
131
10
RodWokAhad-Ora w1lsct YNes-aloft.
38 x36
MLYRO-ID
$88.00
$880.00
$53.01
5530.10
132
50
IlExindod Brad Ham -Blanks doinan
6.48
533.00
$1,650.00
52552
$3276.00
133
2
T-IW Tad
No Bid
No Bid
SS.50
517.00
134
Lebas-PressaeS-6.S- C'-VM LMm and Nunbesa ale
A
20
A-ZO-9.Ndr'ftrafty
4'
522.00
5440.00
517.50
MOM
8
20
A-ZO-g.d-.dpd,
r
$30.00
$6GO.00
$3250
$630.00
C
20
A-Z fligh Iftsly
2'
$15.00
MOM
51450
5290.00
0
20
A-z"mandgrade
4'
S26.001
$520.00
$2250
$430.00
135
Lslla-Rs4seaaaa6beSoft V-Mock Ldoa
Ad Nun0ae m
0.
20
A-Z 0.9. dssrtad dda
4'
$15.00
$300.00
Wnyt
537.50
$350.00
B
20
A-ZO-Bdo-diascia
r
$18.00
5360.00
Vinyl
526.25
5525.00
C1
20
1 A-Z d®mad -
r
522.00
5440.00
Vinyl
$35.00
5700.00
0
20
A-Z 09 D;enrald d
lr
$25.00
5500.00
V1.0
543.75
$975.00
136
250
Sea Bob
No Bid
NO Bid
$2950
54.875.00
extra sheer pin and lock nut
137
80
NO Bid
NO Bid
5495O
$7,97O.00
entire assembly minus able
135
1
STOP an ce sx1dSCOWmde W-WeAB3 )HIP bo holes d0d
2P
NO Bid
NO Bid
576.00
578.00
139
1
BP L3 P- Crape PYOM- Pam Pah, Pieces when ass nWm 84'long
InTp Headesidn e(bbotampda pm.. addbdlon
No etd
No Bid
$3750
53750
140
270
Steer P.
No Bid
No Bid
$29.55
55.910.00
Extra Nuts (6). boles (6). Washers J61
142
20O
MaxsmsmSeelyCaden
lNo Bid
jNo Old
$1950
$3,900.00
Cable OnN
G
Brazos County
� N
Purchasing Department
200 S. TX AVE., SUITE 352 BRYAN, TX 77803
PHONE (979) 361-4290 FAX (979) 361-4293
BRAZOSCOUNTY
BID/RFP/RFQ DOCUMENTATION SHEET
The Purchasing Department would like to request Commissioner's Court approval to advertise
and go out for Bid on the following:
DATE: December 12, 2023
BID NUMBER: 24-072
TITLE: Crack Seal
REQUESTING DEPARTMENT: Road and Bridge
APPROVAL SIGNATURE:
Duane Peters, County Judge
DATE APPROVED: t a l a 0@ 3
BRAZOS COUNTY
BRYAN, TEXAS
DEPARTMENT: Purchasing NUMBER:
DATE OF COURT MEETING: 12/12/2023
ITEM: Approval of the following committee for RFP #24-082 Grant Administrator- GLO.
• a. Katie Conner
• b. Michele Meade
• c. Kyle Eppler (Wickson Water SUD)
• d. Purchasing (Non -Voting)
• e. Legal (Non -Voting)
TO:
Commissioners Court
FROM:
Kaitlyn Battles
DATE:
12/07/2023
FISCAL IMPACT:
False
BUDGETED:
False
DOLLAR AMOUNT:
$0.00
ATTACHMENTS:
File Name
Description
hboAttachments hdl&e
Tvoe
APPROVED
t lla Was
Duane Peters Date
County Judge
Brazos County,
Purchasing Department
OF
200 S. TX AVE., SUITE 352 BRYAN, TX 77803
PHONE (979) 361-4290 FAX (979) 361-4293
BRAZOSCOUNTY
BID/RFP/RFQ DOCUMENTATION SHEET
The Purchasing Department would like to request Commissioner's Court approval to advertise
and go out for Bid on the following:
DATE: December 12, 2023
RFP NUMBER: 24-082
TITLE: Grant Administrator - GLO
REQUESTING DEPARTMENT: Auditor's Office
APPROVAL SIGNATURE:
uane Peters, rounty Judge
DATE APPROVED: 1 a , c2 a Q �
REQUEST FOR BID
BID...NO. 22-088
Heavy Equipment Rental
SEALED BIDS TO BE SUBMITTED BEFORE:
Thursday January 13, 2022, 2:00pm CST
TO THE:
BRAZOSCOUNTY
PURCHASING DEPARTMENT
200 S. Texas Ave. Suite 352
Bryan, TX 77503-
Phone: (979) 361-4290
Fax: (979) 361-4293
Respondents, their employees and/or representatives are prohibited from contacting any official or employee of
Brazos County, except the Purchasing Agent, regarding this solicitation from the issuing date of the solicitation
until scheduled oral presentations or the date the Brazos County Commissioners Court meets to consider award
of the bid. Any such contact will be grounds for rejection of the Respondent's bid.
In compliance with this solicitation, the undersigned Respondent(s) having examined the solicitation and
specifications and being familiar with the conditions to be met, hereby submits the following bid for furnishing
the material and/or services listed on the attached Bid Form and agrees to deliver said items at the locations and
for the prices set forth on the Bid Form.
Company Name: Mustang Rental Services of Texas, LLC (Tax ID: 76-0602621)
By (Print): Damon Lazarine Title: Rental Sales Manager
Physical Address: 5410 BURR OAK DR, HOUSTON TX 77092
Mailing Address: 5410 BURR OAK DR, HOUSTON TX 77092
Telephone: 979-450-8710 Fax: E-Mail: dlazarine@mustangcat.cor:t
Page 2 of 22
Bids will be received at the Brazos County Administration Building, Purchasing Department, 200
South Texas Ave Suite 352, Bryan, Texas prior to 2:00 p.m., Thursday, January 13, 2022 at which
time bids will be publicly opened and read aloud.
1. Bids are solicited for furnishing the merchandise, supplies, service, and/or equipment set
forth in this bid request for a one (1) year period beginning March 18, 2022 through March
17, 2023 in accordance with the following Conditions of Bidding.
B. CONDITIONS OF BIDDING
1. The following instructions apply to all bids and become a part of terms and conditions of
any bid submitted to the Brazos County Purchasing Office, unless otherwise specified
elsewhere in this bid request. All Respondent(s) are required to be informed of these terms
and conditions and will be held responsible for having done so:
2. Definitions: In order to simplify the language throughout this bid, the following definitions
shall apply:
a. BRAZOS COUNTY — Same as County.
b. CONjMHSSIONERS COURT— The elected officials of Brazos County, Texas given
the authority to exercise such powers and jurisdiction of all County business as
conferred by the State Constitution and Laws.
c. CONTRACT — An agreement between the County and a Contractor to furnish
supplies and/or services over a designated period of time during which repeated
purchases are made of the commodity specified.
d. CONTRACTOR — The successful Respondent(s) of this bid request.
e. COUNTY — The government of Brazos County, Texas and its authorized
representative.
f. SUB -CONTRACTOR — Any contractor hired by the Contractor or supplier to
furnish materials and services specified in the bid request.
g. RESPONDENT — Any supplier or vendor responding to the bid request.
3. Upon acceptance and approval by the Commissioners Court, this bid effects a working
contract between Brazos County and the Contractor for the period designated.
4. Bids must be received by the Purchasing Office prior to the time and date specified. The
mere fact that the bid was dispatched will not be considered; the Respondent(s) must have
the bid actually delivered to and received by the Purchasing Department.
5. The County reserves the right to accept or reject in part or in whole, any bids submitted,
and to waive any technicalities for the best interest of the County.
Page 3 of 22
6. Brazos County shall not be responsible for any verbal communication between any
employee of the County and any Respondent(s). Only written specifications and written
price quotations will be considered. Respondent(s) with questions regarding the bid should
submit them in writing via the Brazos Valley e-Marketplace at
httl2s://brazosbid.ionwave.net.
7. Brazos County reserves the right to reject any bid that does not fully respond to each
specified item.
8. Respondent(s) must include Tax Identification Number for the bid to be valid.
9. Should there be a change in ownership or management; the Contract shall be canceled
unless a mutual agreement is reached with the new owner or manager to continue the
Contract with its present provisions and prices. This Contract is nontransferable and may
not be reassigned by either party.
10. The County may cancel this Contract at any time for any reason, provided a thirty -day
written notice is given.
11. The bid award shall be based on, but not necessarily limited to, the following factors:
a. Unit Price
b. Extended price
C. Special needs and requirements of Brazos County
d. Results of testing samples (if required by Brazos County)
e. Delivery
f. References
g. Brazos County's experience with products bid
h. Respondent's past performance record with Brazos County
12. Although the cost of products to be provided is an essential part of the bid, Brazos County
is not obligated to award a contract on the sole basis of cost but will award to Respondent
considered to be the best value to Brazos County.
13. Acceptance of merchandise, work, and/or equipment provided shall be made by the
County at the sole discretion of the Commissioners Court when all terms and conditions
of the Contract and specifications have been met to its satisfaction, including the
submission to the County of any and all documentation as may be required.
14. Title and risk of loss of the goods shall not pass to Brazos County until the County actually
accepts and takes possession of the goods at the point or points of delivery.
Page 4 of 22
15. This Contract shall be governed by the Uniform Commercial Code as adopted in the State
of Texas as effective and in force on the date of this Contract, when applicable.
16. Bids must be submitted on quantities and units of measure specified by the bid documents.
In the event of errors in extended prices the unit price shall govern. Any suggested change
in quantity on the part of the Respondent(s) to secure better price or delivery is welcomed
and may be given consideration provided that the bidder also bids on the quantity
specified.
17. Bids must specify the number of consecutive calendar days required to deliver the
commodities under normal conditions. Failure to specify delivery time will be considered
reason enough to cause the bid to be disregarded. Delivery time quoted will be given
consideration in awarding a contract. If delivery is not made within a reasonable time of
the specified delivery in the bid, the entire order or contract may be canceled, and the
Contractor barred from bidding in future solicitations.
18. Bids cannot be altered after receiving time. No bid may be withdrawn after opening time
without acceptable reason and with the approval of the Purchasing Agent.
19. Bids must be submitted on this form and returned in a sealed envelope clearly
marked with Respondent Name and Bid Number to ensure proper recognition upon
its arrival. Bids will not be considered if submitted by telephone, fax or any other
means of rapid dispatch, nor will a bid be considered if submitted to any other person
or department other than specifically instructed. Bids not received prior to the
expressed date and time listed in this bid will be rejected or returned unopened to
the Respondent(s). Bids submitted to any other person or department other than the
Brazos County Purchasing Department will not be accepted.
20. It is the Respondent's stile responsibility to print and review all pages of the bid document,
attachments, questions and responses, addenda, and special notices. The Certification of
Bid Form must be completed to include full firm name, mailing address, telephone
number, email address, Vendor Tax Identification number and signed by an authorized
representative bf the firm. Failure to provide signature on the Certification of Bid Form
renders bid non -responsive. Failure to complete the submission of all required forms,
including but not limited to the Reference Page, House Bill 89 & Debarment Verification
form, Questionnaires (when applicable),. Addenda (including revised forms), and any
other specified forms or documents may be grounds for rejection of entire bid. By
submitting a response to this solicitation, the Respondent(s) agrees to comply with HB
1295, Government Code 2252.968, if awarded a contract. Respondent(s) agrees to provide
Page 5 of 22
Brazos County the "Certificate of Interested Parties", Form 1295 as required, for renewals,
amendments or extensions to the Contract.
Visit https://ethics.state.tx.us/whatsnew/elf info_form1295.htm for more information.
21. In the event of a needed change in the specifications sent to the bidder, it is understood
that all the foregoing terms shall apply to the addendum or addenda. Any interpretation,
corrections -or changes to these specifications will be made by addenda. Sole issuing
authority of addenda shall be vested in the Brazos County Purchasing Agent, authorized
to do so by the Commissioner's Court. Addenda will be made available using the same
distribution method used to post or make available the original solicitation. Bidders shall
acknowledge receipt of all addenda or their proposal may be considered non -responsive.
22. It is our policy not to furnish bid results over the phone. Bid results and tabulation sheets
will be posted -on the Brazos Valley e-Marketplace (https://brazosbid.ionwave.net) after
bid award by Commissioner's Court.
23. The bid specifies the number of consecutive calendar days required to reach substantial
completion of the project under normal conditions. Failure to comply with completion
time will be considered reason enough to enforce liquidated damages and/or cancel the
contract. If the job cannot be completed within the terms of the contract as determined by
Brazos County; Brazos County will suffer further loss. Contractor and Contractor's Surety
shall be liable for and shall pay Owner stipulated and fixed sums, hereinafter agree to as
liquidated damages, for each additional calendar day of delay past the thirty (30) days
stated in the contract: Two Hundred Fifty Dollars ($250.00). It is understood that said
sum shall be considered liquidated damages and shall not be considered as a penalty
against the Contractor.
24. Brazos County reserves the right to extend this Contract annually fora maximum of three
(3) additional one (1) year periods with no changes in the terms or conditions of this
Contract, if agreed upon by both parties.
25. The Contractor agrees to extend prices and terms to all entities that has entered or will
enter into joint purchasing inter -local cooperation agreement(s) with Brazos County.
26. Three (3) references are to be provided by Respondent. Failure to submit references may
result in disqualification of bid. Brazos County department references will not be accepted.
27. Contractor shall observe and comply with all federal, state and local laws, safety, and
health regulations, ordinances, and all regulations which in any manner effect conduct of
the work or services being performed.
Page 6 of 22
28. Any subcontracting must be approved prior to commencement of the Contract by Brazos
County.
29. Any variation from the specifications in this bid document must be indicated on the bid or
on a separate attachment to the bid and labeled as such.
30. Any brand name, or manufacturer's reference used is considered to be descriptive — not
restrictive — and is indicative of the type and quality the County desires to purchase. Bids
on similar items of like quality will be considered only if it is noted in the bid documents
and accompanied by fully descriptive product literature. All substitutions will contain the
same active ingredients in the same percentages or quantity of the items listed in the bid.
If notation of substitution in not made, it is assumed the Respondent(s) is bidding the item
specified.
31. The County does not guarantee to purchase any minimum or maximum quantities. If any
quantities are listed in the bid, they are estimated quantities used for calculating purposes
only.
32. In the event the Contractor is unable to furnish any item within a reasonable time after
order is placed due to strikes, war or any reason beyond the Contractor's control, the
County reserves the right to purchase these items from any source, without causing this
Contract to be canceled.
33. Brazos County will only be required to pay for materials actually received and/or services
actually provided. Brazos County shall not be required to pay for materials or services
described in the contract that are not used or provided by the Contractor in completion of
the Contract. This term supersedes any contradicting terms throughout the Contract and/or
any attachments.
34. The Contractor should submit itemized invoices with clearly marked remittance copies to
the following address:
Brazos County
ATTN: Auditors
P.O. Box 914
Bryan, TX 77806
Statements of accounts will not be sufficient to warrant payment. Unless other
arrangements have been made; all invoices to be paid in full within 30 days after
satisfactory delivery of commodities and or services and receipt of invoice at the listed
Page 7 of 22
address. Checks will be made payable to the Contractor only, and shall not include sub-
contractors, assignees, or any other party.
35. As a governmental subdivision, Brazos County is exempt from most types of taxes,
including but not limited to sales tax, excise tax, and import duties. Such costs must not
be included in bid prices. Tax Exemption Certificates can be obtained upon request from
County.
36. Upon award of Contract for any commodity or materials purchased by Brazos County, the
Contractor agrees to protect the County from any claim involving patent right
infringement, copyright infringement, sales franchise disputes.
37. Unless otherwise specified, all items ordered from the Contractor must be new, unused,
and in first class condition. Products usually packaged for commercial sale shall be
furnished in proper container so as to facilitate storage and handling.
38. This bid shall be governed by the laws of the State of Texas and Potential Respondent(s)
and the subsequent Contractor(s) are advised they may have disclosure requirement
pursuant to Texas Local Government Code, Chapter 176. This law requires persons
desiring to do business with the County to disclose any gifts that have an aggregate value
in excess of $250.00 given to any employee of the County, County Official to the County
Official's family members or employment of any employee of the County. County Official
or the County Official's family members during the preceding twelve (12) month period.
The disclosure questionnaire must be filed with the Brazos County Clerk. Refer to Texas
Local Government Code, Chapter 176 for the details of this law.
39. Venue for any dispute, shall lie exclusively in Brazos County, Texas, notwithstanding
anything to the contrary.
40. Respondent(s) understands that Brazos County is a governmental entity subject to Texas
State and Federal public information statutes. The requirements of Subchapter J, Chapter
552, Government Code, may apply to this bid and/or subsequent contract and the
contractor or vendor agrees that the contract can be terminated if the contractor or vendor
knowingly or intentionally fails to comply with a requirement of that subchapter. This
provision is mandatory and may not be altered or deleted, as required by Sec. 552.372(b)
of the Texas Government Code.
41. Notwithstanding any provisions contained herein, the obligations of Brazos County are
expressly contingent upon the availability of funding for the obligations contained herein
for the term of the contract and any extensions and renewals thereto.
Page 8 of 22
42. The Contractor's work and materials shall comply with all state and federal laws,
municipal ordinances, regulations, and directions of inspectors appointed by proper
authorities having jurisdiction.
43. The Contractor shall perform and require all subcontractors to perform the work in
accordance with applicable laws, codes, ordinances, and regulations of the State of Texas
and the United States and in compliance with OSHA and other laws as they apply to its
employees. In the event any of the conditions of the specifications violate the code for
any industry, then such code conditions shall prevail.
44. The Contractor shall follow all applicable state and federal laws, municipal ordinances,
and guidelines concerning soil erosion and sediment control throughout the Project and
warranty term.
C. SPECIAL PROVISIONS
1. All prices shall include freight. Deliveries will be F.O.B. Brazos County, Bryan, Texas,
on regular working days of Brazos County, and between the hours of 7:30 AM and 5:00
PM, Monday through Friday, unless otherwise requested by the County and loaded into
County Trucks by the Supplier; or loaded, hauled, and delivered anywhere in the County
by the Supplier. Delivery addresses may also include, but are not limited to, the following:
a. Brazos County
Building Maintenance Department
206 North Washington
Bryan, TX 77803
b. Brazos County
Road and Bridge Department
2617 West Highway 21
Bryan, TX 77803
c. Brazos County
Expo Center
5827 Leonard Road
Bryan, TX 77803
d. Brazos County
Brazos Center
3232 Briarcrest Drive
Bryan, TX 77803
Page 9 of 22
e. Brazos County
Detention Center
1835 Sandy Point Road
Bryan, TX 77807
2. Respondent will be required to notify the County in the event of unforeseen delay arising
in the delivery of a specified shipment. In the event a shipment will not arrive at the job
site within two (2) hours of designated time Brazos County shall have the right to refuse
acceptance of the order.
3. Brazos County reserves the right to inspect any equipment delivered at the requested site
for compliance with specifications. The Respondent will remove immediately from the
job site or right of way any materials that are deemed unsatisfactory.
4. Any Respondent vehicles traveling on County roads will not exceed its legal gross weight
5. All Respondents must be recognized, and authorized dealers of the products specified.
6. The unit(s) shall be completely assembled, adjusted, and include all standard and
supplemental equipment installed, and the unit made ready for continuous operation.
7. The unit(s) provided shall meet or exceed all Federal and State of Texas safety, health,
lighting, and noise regulations and standards in effect and applicable to the equipment
furnished at the time of manufacture.
8. Bidders must submit with their bid, if possible, the latest published price list pertaining to
rental equipment that the Bidder proposes to furnish.
9. Brazos County reserves the right to lease apiece of equipment that is not listed in this Bid.
In this case, prices must be comparable to the bid prices and the clauses and conditions of
this bid will apply to all such transactions.
10. The County does not guarantee to purchase any minimum quantities/time. if any
quantities/time is listed in the bid, they are estimated quantities/time used for calculating
purposes only.
Page 10 of 22
D. INSURANCE REQUIREMENTS
1. The Contractor shall instruct his insurance agent or carrier to furnish to the County a
Certificate of Insurance attesting to the issuance of the following parts of this. section.
Please note that such Certificates of Insurance and any required bonds must be issued and
then approved by Brazos County Risk Management. The Certificate of Insurance must be
approved by Risk Management before any deliveries can be made.
2. The Contractor shall furnish and keep in full force the following insurance during the term
of this Contract:
3. Statutory Workmen's Compensation and $1,000,000 Employer's Liability Insurance with
waiver of subrogation.
4. General Liability with limits for bodily injury and for property damages of not less than
$1,000,000 aggregate, $500,000 each occurrence with Brazos County named as an
additional insured and waiver of subrogation.
a. Commercial Automotive Liability with $500,000 CSL for Bodily Injury and
Property Damage Liability.
b. Cargo Insurance to sufficiently cover materials transported.
5. All of the aforementioned policies' and Certificates of Insurance should be issued
immediately after the Contractor receives notification of award.
6. The Contractor agrees to release and hold harmless Brazos County from any and all claims
and liability due to the acts of the Contractor's employees and the operation of his
equipment. The Contractor also agrees to hold harmless Brazos County from any and all
expenses, including attorney fees, incurred by Brazos County in litigation or otherwise
resisting such claims or liabilities as a result of the Contractor's employees' activities.
Further, the Contractor agrees to protect, indemnify and hold harmless Brazos County
from and against all claims, demands and causes of action of every kind and character
brought by any employees of the Contractor against Brazos County due to personal
injuries and/or death to such employee resulting from any neglect act, by either
commission or omission on the part of the Contractor or Brazos County.
Page 11 of 22
E. REFERENCES
Respondent(s) shall provide a list of at least three (3) references, where work comparable
in quality and scope to that specified has been performed within the past five (5) years.
This list should include the names, phone number and email of the company/entity for
which the prior work was performed to contact these references. A negative reference may
be grounds for disqualification of bid. Respondent(s) are not allowed to use Brazos County
as a reference.
Company/Entity: Knife River Corporation
Contact: Brad Schmucker
Phone: 254-379-2278
Email: brad.schmucker@kniferiver.com
Company/Entity: Legacy Concrete
Contact: Skyler Schulz
Phone: 979-251-0830
Email: legacy@legacyconcrete.com
Company/Entity: Texas KB Utilities
Contact: Bubba Krolczyk
Phone: 979-421-0075
Email: bkrolczyk@texas kbutilities.com
Page 12 of 22
F. SPECIFICATIONS & QUOTE
Fill in the blanks supplies with the unit price that is firm for the entire contract period. If a piece
of equipment is bid which differs from the item description, please enumerate the differences as
completely as possible.
1. Backhoe/Loader and accessories; 93 HP
Model
Monthly
Weekly
Daily
CAT 416/420
1,950
715
259
2. Small crawler Tractor with 6-way blade; 64 HP
Model
Monthly
Weekly
Daily
CAT D3K XL CROP
$ 2,475
$ e62
$ 266
3. Crawler tvve Tractor; 80 HP
Model
Monthly
Weekly
Daily
CAT WK XL OROP
2,475
862
266
4. Crawler type Tractor; 140 HP
Model
Monthly
Weekly
Daily
CAT D6N XL CAB AIR
5,445
1,815
605
5. Crawler type low ground pressure Tractor; 140 HP
Model
Monthly
I Weekly
Daily
CAT D6N LGP CAB AIR
$ 6,930
$ 2,310
$ 770
6. Disc Plows: 36 hinee offset
Model
Monthly
Weekly
Daily
ROME TRH-1630
1,905
635
223
7. Crawler type Loader; 1-1/2 yard bucket; 80 HP
Model
Monthly
Weekly
Daily
CAT 963 TRACK LOADER
$ 10,135
$ 3,575
$ 1,260
Page 13 of 22
8. Wheeled tvne Loader: 1-1/2 vard bucket: 80 HP
Model
Monthly
Weekly
Daily
CAT 926 WHEEL LOADER
$ 3,275
$ 1,175
$ 395
Pneumatic Roller, 18 tons, 9 wheels
Model
Monthly
Weekly
Daily
CAT CW16
$ 2,120
$ 710
$ 235
10. Soil Compactor, vibratory, padded drum, 25 tons, 84"
Model
Monthly
Weekly
Daily
CAT CP56
$ 3,500
$ 1,170
$ 410
11. Soil Compactor, vibratory, smooth drum, 25 tons, 84"
Model
Monthly
Weekly
Daily
CAT CS56
$ 3,255
$ 1,085
$ 376
12. Asphalt Recycler, Bomag MPH100 or equivalent
Model
Monthly
Weekly
Daily
CAT RM300R CAB
$ 17,590
$ 7,445
$ 3,145
13. Pulver Mixer
Model
Monthly
Weekly
Daily
CAT RM300 OPEN CANOPY
$ 10,530
$ 4,465
$ 1,885
14. Water Truck. 1.200 - 2.000 eallon capacity
Model
Monthly
Weekly
Daily
LEDWELL LW2000V T
$ 2.505
$ 835
$ 290
15. Motor Grader; 135 HP
Model
Monthly
Weekly
Daily
CAT 120M
$ 5,295
$ 1,765
$ 845
Page 14 of 22
16. Excavator, 26 tons, 1-3/8 yard bucket
Model
Monthly
Weekly
Daily
CAT 320
$ 4,770
$ 1,650
$ 550
17. Self -Propelled Mechanical Broom
Model
Monthly
Weekly
Daily
BROCE BW260
$ 1.600
$ 650
$ 275
18. Tam er. Make: Boma , BT 58 Vibrator or. Equip ment
Model
Monthly
Weekly
Daily
MULTIQUIP MTX70
$ 70
$ 240
$ 550
19. aterpillar D61) or Equivalent) Clearing Dozer; With Rake - 140 HP
Model
Monthly
Weekly
Daily
CAT D6K XL CAB AIR CLEARING DOZER
$ 7490
$ 2497
$ 830
20. Rammax (or Equivalent) Trench Compactor; Walk Behind - Width 24/33
Model
Monthly
Weekly
Daily
BOMAG BMP8500
1675
675
225
21. Rammax or Equivalent) Remote Trench Com actor; Width 24/33
Model
Monthly
Weekly
Daily
BOMAG BMP8500
1675
675
225
22. Air Compressor; 185 CFM
Model
Monthly
Weekly
Daily
SULLAIR DPQ 185
595
285
95
23. Skid Steer Loader (Bobcat); Min. 58 H.P., .5 Yd. (1/2 YD) G P Bucket w/Track -Not
Wheels
Model
Monthly
Weekly
Daily
CAT 259 OROPS
$ 1795
$ 605
$ 250
Page 15 of 22
24. Skid Steer Loader (Bobcat); Min. 58 H.P., .5 Yd. (1/2 YD) G P Bucket w/ Wheels - Not
Tracks
Model
Monthly
Weekly
Daily
CAT 242 OROPS
$ 1595
$ 535
$ 195
25. Rubber Tire Loader w/Hammers, Loader/Hammer 1000# IE
Model
Monthly
Weekly
Daily
CAT 416 H90 HAMMER
$ 4250
$ 1425
$ 475
26. Low Ground Pressure Tractor; 80 HP, P.A.T. Blade-17,800#
Model
Monthly
Weekly
Daily
CAT D3K LPG OROPS
$ 3780
$ 1260
$ 420
27. Low Ground Pressure Tractor, 90 HP, P.A.T. Blade-20,200#
Model
Monthly
Weekly
Daily
CAT D5K LGP OROPS
$ 4310
$ 1430
$ 480
28. Specialty Excavator; Long Reach-60' Reach, 48'0" Depth
Model
Monthly
Weekly
Daily
CAT 324/326/3291330 LONG REACH
$ 11,870
$ 4205
$ 1485
29. Specialty Excavators; Excavator W/Thumb Attachment
Model
Monthly
Weekly
Daily
CAT 320 MECHANICAL THUMB
$ 5445
$ 1725
$ 605
30. 308 Hvd Thumb
Model
Monthly
Weekly
Daily
CAT 308 HYDRAULIC THUMB .
$ 3815
$ 1340
$ 460
31. Paving Breakers; 90 lbs. air operated)
Model
Monthly
Weekly
Daily
SULLAIR MPB-90A
$ 295
$ 125
$ 50
Page 16 of 22
32. Reach Lift: 6000 # Capacity
Model
Monthly
Weekly
Daily
CAT TL642 TELEHANDLER
$ 1950
$ 875
$ 350
33. Mini Excavator, 18'HP, 6' 10" Depth
Model
Monthly
Weekly
Daily
CAT' 302.7
$ 1310
$ 440
$ 150
34. Mini Excavator, 30 HP, 9' 11" Depth
Model
Monthly
Weekly
Daily
CAT 303.5
$ 1575
$ 540
$ 185
35. Excavator: 39 ton, 270 HP
Model
Monthly
Weekly
Daily
CAT 336
$ 8705 .
$ 3150
$ 1075
36. Specialty 24-ton Excavator w/ 5000# hammer
Model
Monthly
Weekly
Daily
CAT 320 WITH HAMMER
$ 13,150
$ 4375
$ 1450
37. Crawler Dozer; 200 HP, Straight w/ Tilt Blade
Model
Monthly
Weekly
Daily
CAT D6T XL CAB AIR
$ 11,790
$ 3950
$ 1250
38. 25 Ton Articulated Off Road Truck. 309 HP
Model
Monthly
Weekly
Daily
CAT 725
$ 11,405
$ 4135
$ 1450
39. Telescopic Forklift; 9,000#, 43' Lift, 31' 5" Reach
Model
Monthly
Weekly
Daily
CAT TL943 TELEHANDLER
$ 2550
$ 995
$ 395
Page 17 of 22
40. Man Bucket (Work Basket) 48" x 48" Suspended with Top Cover -Standard Model
Model
Monthly
Weekly
Daily
NO BID
$
$
$
41.65 HP Excavator with 13' — 7" Dig Depth
Model
Monthly
Weekly
Daily
CAT 308
$ 2,875
$ 1025
$ 375
42.70HP Excavator with 19' —10" Die Depth
Model
Monthly
Weekly
Daily
CAT 313
$ 3635
$ 1365
$ 475
43. Portable Light Plant 30 ft Mast with 4 each 1250-Watt Bulbs
Model
Monthly
Weekly
Daily
ALLMAND LIGHT TOWER
$450
$ 195
$ 75
44. Attachments for Skid Steer Loaders
Monthly
Weekly
Daily
72" Angle Blade
$
575
$
225
$
75
Cold Planer (CAT PC205/PC305)
$ 2280
$ 765
$ 255
72" Extreme Duty Root Grapple Bucket
Grapple Forks
$
585
$
196
$
65
Grapple Forks
$ 585
$195
$ 65
Hydraulic Auger 6" Bit
$ 90
$ 30
$10
Hydraulic Auger 9" Bit
$ 90
$ 30
$10
Hydraulic Auger 12" Bit
$180
$ 60
$ 20
Hydraulic Auger 18" Bit
$ 270
$ 90
$ 30
Hydraulic Auger 24" Bit
$ 270
$ 90
$ 30
Hydraulic Auger 12" Auger Extension
$ 45
$15
$ 5
Hydraulic Auger 48" Auger Extension
$135
$ 45
$15
Page 18 of 22
300 Pound Hyd. Hammer
$
$
$
945
315
100
Hydraulic Trencher
$
$
$
975
350
110
Landscape Tiller
$
$
$
975
350
110
84" Material Handling Arm
$ NO BID
$
$
66" Multi -Purpose Bucket
$
$
$
No Charge with CTUSSL Rental
450
150
50
50# Capacity Pallet Forks
$
$
$
315
105
35
72" Pick-up Broom
$
$
$
1,075
375
125
Stump Grinder
$
$
$
2,250
750
250
45. Other rental equipment not listed on bid will be offered to the County at a discounted rate.
5/10120% off list price of rental.
46. Delivery charge is $ N/A' please see helow per mile. It is charged per (circle one loaded mile
or round-trip mile or other Less than 100HP, $100 each way. Over 100HP, $150 each way. Any equipment requiring routed permit,
$660 each way.
47. Delivery can be completed in approximately 1-2 days after receiving order.
48. State the complete address of your nearest branch office:
8206 WEST SH 21, BRYAN TX 77807
49. Number of billable miles from nearest branch to Brazos County Road & Bridge Department,
located at 2617 Hwy. 21 West; Bryan, TX 77803: 3 miles
50. Emergency contact information:
Benton Schulze, 0-970-775-7368, C-979-251-2438, bschulze@mustangcat.com
51. Do you charge for "Rain Days"? If so, what documentation is required?
No, if notified by 8:OOAM on each day of RAIN OUT
52. Response time in case of emergency: 1-2 hours.
Page 19 of 22
G. PERCENTAGE DISCOUNT
In addition to pricing listed above, Brazos County requests vendors to provide a discount
from the list percentage for Heavy Equipment. Vendors shall have a published price list
(either electronic or printed catalog) in which pricing is provided.
Discount from list percentage will be used for Heavy Equipment that is not listed in this bid
in the event that additional items are needed by the Brazos County.
The vendor needs to provide a copy of a printed catalog with the bid or provide a web
address below for an electronic catalog.
Web
address: mvw.catrentaistore.com/mustang/en_US/home.html
Discount from list price (in
percentage):
For equipment not listed in bid package, list price discount is 6/10120%
(day/weeklmonlh)
Respondent may list multiple percentage discounts for various categories if needed.
Respondents will be awarded based on the actual prices for the items listed above. Discount
from list will only be awarded in conjunction with actual cost pricing of items and will be
used only when needed for products not listed on this contract. There is no guarantee that
additional items will be purchased or that discount from list percentage will be used.
Page 20 of 22
H. V.T.C.A. LOCAL GOVERNMENT CODE §262.0276
This Section must be completed. Failure to complete this section will disqualify the bid.
Brazos County shall refuse to enter into a contract or other transaction with a person who
owes a debt to the County per V.T.C.A Local Government Code §262.0276.
1. This refusal to award a contract to or enter into a transaction with a person, pertains to an
apparent low bidder or successful proposer that is indebted to the County;
2. "Person" includes an individual, sole proprietorship, corporation, nonprofit corporation,
partnership, joint venture, limited liability company, and any other entity that proposes or
otherwise seeks to enter into a contract or other transaction with the County requiring
approval by the Commissioner's Court;
3. "Debt shall include delinquent taxes, fines, fees, or delinquencies arising from written
agreements with the County.
4. Prior to award of a contract by the Commissioners' Court, the Purchasing Department will
request a statement of account from the Brazos County Tax Office.
5. Any "debt" as defined above, that is reflected on the statement of account, will be
documented and placed in the bid file. The bid or proposal from the person with the debt
shall be considered "non -responsive" and "not responsible", eliminating it from any
further consideration of award.
6. These provisions shall apply to any "person" owned, partially owned, managed, operated
or represented by a "person" indebted, to the County.
Please list all the names of the individuals that have ownership, officers, managers, and board
of directors that you have associated with your entity .below.
Name
Title (Owner, Officer, Director, Manager, Etc.)
Brad Tucker
Owner, Chairman
Todd Fisk
Owner, CEO
Sam Tucker
President
Ben Wallace
Executive Vice President
Mary Ann Wright
CFO
Jerry M.Young
VP/General Counsel
Page 21 of 22
I. HOUSE BILL 89 & DEBARMENT VERIFICATION
Brazos County is federally mandated to adhere to the directions provided in the President's Executive Order
(EO) 13224, Executive Order on Terrorist Financing — Blocking Property and Prohibiting Transactions With
Persons Who Commit, Threaten to Commit, or Support Terrorism, effective 9/24/2001 and any subsequent
changes made • to it via cross-referencing respondents/vendors with the Federal General Services
Administration's Excluded Parties List System (EPLS, https://www.sam.gov), which is inclusive of the United
States Treasury's Office of Foreign Assets Control (OFAC) Specially Designated National (SDN) list.
Respondent certifies that the responding entity and its principals are eligible to participate in this transaction and
have not been subjected to suspension, debarment, or similar ineligibility determined by any federal, state or
local governmental entity and that Respondent is in compliance with the State of Texas statutes and rules relating
to procurement and that Respondent is not listed on the federal government's terrorism watch list as described in
Executive Order 13224. Entities ineligible for federal procurement are listed at https://www.sam.gov.
The undersigned affirms the non -debarment statement above, that they are duly authorized to execute this
Contract.
The company representative below further affirms, that the company submitting this bid, under the provisions
of Subtitle F, Title 10, Government Code Chapter 2270:
1. Does not boycott Israel currently; and
2. Will not boycott Israel during the term of the Contract..
Pursuant to Section 2270.001, Texas Government Code:
1. "Boycott Israel" means refusing to deal with, terminating business activities with, or otherwise taking
any action that is intended to penalize, inflict economic harm on, or limit commercial relations
specifically with Israel, or with a person or entity doing business in Israel or in an Israeli -controlled
territory, but does not include an action made or ordinary business purposes; and
"Company" means a for -profit sole proprietorship, organization, association, corporation, partnership, joint
venture, limited partnership, limited liability partnership, or any limited liability company, including a wholly
owned subsidiary, majority -owned subsidiary, parent 'company or affiliate of those entities or business
associations that exist to *make a profit.
Company Name: Mustang Rental Services of Texas, LLC
Authorized Company Representative: Damon Lazarine
Address: 12800 Northwest Freeway
Houston, TX 77092
Signature: Z CW-"AL 4: C, ,"
Date: January 12, 2022
Contract #: 22-088
Page 22 of 22
The following items should be completed and included in your bid submission. Failure to include
'these items will disqualify your bid.
12 References (Section E)
la V.T:C.A. Local Government Code §262.0276 for Tait Verification (Section H)
12 House Bill 89 & Debarment Verification (Section 1)
❑ All Addendums (if applicable)
12 Certification of Bid (Section J)
J. CERTIFICATION OF BID
The undersigned affirms that they are duly authorized to execute this Contract, that this bid has not been
prepared in_collusion with any other vendor and that the contents of this bid have not been communicated -•
...to any other vendor prior to the official -opening of this bid.
Signed By: �Caisteri LYLGit6+L�
Typed Name: Damon Lazarine Title: Rental - Sales Manager
Company Name: Mustang Rental Services of Texas, LLC (Tax ID: 76-0602621)
Phone: 979-450-8710
Mailing Address: 12800 Northwest Freeway
Houston, TX 77092
Email Address: dlazarine@mustangcat.com
END OF BID REQUEST NO.22-088 Heavy Equipment Rental
By signing below, Brazos County agrees that this bid, 22-088 will be awarded as dictated on the associated
bid tabulation sheet; to the Respondent whose name. appears above and both parties agree to terms and
conditions contained herein.
By:
Brazos County Commissioner's Court: Ou A Kic IRETO(r_s . COu N-cy Z-u L
Date: �EY��lll�rlQ`i t l o20c�o�.
Attest:
Brazos County Clerk:
«r: Brazos County
G Purchasing Department
200 SOUTH TEXAS AVE SUITE 352 BRYAN, TX 77803
PHONE (979) 361-4290 FAX (979) 361-4293
November 30, 2023
Mustang Rental Services of Texas, LLC
5410 Burr Oak Dr
Houston, TX 77092
Re: Renewal of Contract # 24-084R for Heavy Machinery Rental for Brazos County.
Brazos County appreciates the quality work your company has provided and would like to exercise the
renewal option for Heavy Machinery Rental 24-084R, previously known as 22-088 and 23-083R.
All terms, conditions, and pricing shall remain the same. This renewal term will be for one year from
March 18, 2024 to March 17, 2025.
To accept the renewal option, please fill out the information and sign below. Return the signed
documents by email to sdubec@brazoscountytx.gov or fax to (979) 361-4293. Please then submit an
updated Certificate of Insurance by email or mail to the address listed above. Please return acceptance
as soon as possible. If you have any questions, I may be reached at (979) 361-4294.
Contact Name: Damon Lazarine Title: Sales Manager
E-Mail: dlazarine@mustangcat.com Telephone: 979-450-8710
MUSTANG RENTAL SERVICES OF TEXAS
�c�i2eiz ,� a�
Authorized Signatur
�7�ZOS N
11-30-2023
Date
Lal. la19na-3
Duane Peters, County Judge Date
Bid # 24-084R
Previously known as 22-088 AND 23-083r
HEAVY MACHINERY RENTAL
March 18, 2024 through March 17, 2025
TYPE OF EQUIPMENT
HERC RENTALS
MUSTANG RENTAL SERVICES OF
TEXAS,LLC
United Rentals
BACKHOE/LOADER-93 HP
_
-
MAKEIMODEL
Deere 310LEP or equivalent
CAT 4161420
Casa 58ON/John Deere 310
1
MONTHLY
$1.850.00
$1,950.00
$1.382.00
WEEKLY
$825.00
$715.00
$949.00
DALY
$275.00
$259.00
$242.00
SMALL CRAWLER TRACTOR W16 WAY
BLADE,64HP
MAKEIMODEL
Douro 450k or equivalent
CAT 03K XL DROP
John Deere 450K
2
MONTHLY
$4,500.00
$2,475.00
$2,527.00
WEEKLY
$1.500.00
$862.00
$927.00
DAILY
$500.00
$288:00
$309.00
CRAWLER TYPE TRACTOR, 80HP
MAKEIMODEL
Deere 650k or equivalent
CAT D3K XL DROP
Case 650L
3
MONTHLY
$5,750.00
$2.475.00
$2.527.00
WEEKLY
$1.800.00
$882.00
$927.00
DAILY
$600.00
$288.00
$309.DO
CRAWLER TYPE TRACTOR, 140HP
4
MAKEIMODEL
NO Bid
CAT DON XL CAB AIR
Case 1650M
MONTHLY
No Bid
$5,445.00
56.481.00
WEEKLY
No Bid
$1.815.00
$2.250.00
DAILY
No Bid
$605.00
$115.00
CRAWLER TYPE LOW GROUND PRESSURE
TRACTOR 140 HP
5
MAKEIMODEL
NO Bid
CAT DON LGP CAB AIR
John Deere 750K LGP
MONTHLY
No Bid
58,930,00
$6.365.00
WEEKLY
NO Bid
12,310.00
$3.183.00
DAILY
No Bid
ST70.00
$1.061.00
DISC PLOWS -36 HINGE OFFSET
6
MAKEIMODEL
No Bid
ROME TRH-1530
No Bid
MONTHLY
No Bid
$1.905.00
No Bid
WEEKLY
No Bid
$635.00
No Bid
DAILY
No Bid
$223.00
No Bid
CRAWLER TYPE LOADER 1412 YARD BUCKET
80 HP
MAKE/MDDEL
No Bid
CAT 963 TRACK LOADER
John Deere 655K
7
MONTHLY
No Bid
$10.135.00
$9.58740
WEEKLY
NO Bid
$3.575.00
$3.834.00
DAILY
No Bid
$1.260.00
$1.392.00
WHEELED TYPE LOADER 1412 YARD BUCKET
80 HP
-
MAKEIMODEL
Volvo L70H or equivalent
CAT 926 WHEEL LOADER
Case 570N/John Deere 21OLE
8
MONTHLY
$5.200.00
S3,275.00
S1,362D0
WEEKLY
$1.800.00
31,175A0
$649.00
DAILY
$600.00
$395.00
$242.00
PNEUMATIC ROLLER.18 TONS. 9 WHEELS
MAKEIMODEL
No Bid
CAT CW16
Bomag BW27RH41
9
MONTHLY
No Bid
$2.120.00
$2.381.00
WEEKLY
No Bid
$710.00
$903.00
DALY
No Bid
$235.00
$228.00
SOIL COMPACTOR VIBRATORY, PADDED
DRUM, 25 TONS 84"
'
MAKEIMODEL
Case SV212D or equivalent
CAT CP58
Bomag BW213-04/Hamm HI t DIP
10
MONTHLY
$4,200.00
$3.500.00
53,829.00
WEEKLY
$1,500.00
$1.170.00
$1,689.00
DAILY
$500.00
$410.00
$479.00
SOIL COMPACTOR VIBRATORY, SMOOTH
DRUM, 25 TONS 84"
MAKMODEL
EI
Volvo SD1168 or equivalent
CAT CS56
Bomag BW2114DR1ammH11lx
11
MONTHLY
$4.200.00
$3,25S.0I
$3,829.00
WEEKLY
$1.500.00
$1.085.00
S1.689.110
DALY
$500.00
S375.00
S47940
ASPHALT RECYCLER, BOMAG MPH 100 OR
• EQUIVALENT
,
12
MAKEIMOOEL
No Bid
CAT RM30OR CAB
No Bid
MONTHLY
No Bid
$17,590.00
No Bid
WEEKLY
No Bid
$7,445.00
No Bid
DAILY
No Bld
$3,145.00
No Bid
PULVER MIXER
MAKEIMODEL
No Bid
CAT RM300 OPEN CANOPY
No Bid
13
MONTHLY
No Bid
$10.530.00
No Bid
WEEKLY
No Bid
$4,485.00
No Bid
DALY
No Bid
$1.885.00
No Bid
TYPE OF EQUIPMENT
HERC RENTALS
MUSTANG RENTAL SERVICES OF
TEXAS,LLC
United Rentals
WATER TRUCK,1,200 -2,000 GALLON
CAPACITY
MAKEIMODEL
Hino 338 or equivalent
LEDWELL LW2000WT
Freightliner M2108
14
MONTHLY
$2,950.00
$2,505.00
$2.651.00
WEEKLY
$1,800.00
$836.00
$1.243.00
DAILY
$600.00
$290.00
$337.00
MOTOR GRADER,135 HP
MAKEIMODEL
No Bid
CAT 120M
Case 8658
16
MONTHLY
No Bid
$5,295,00
$5,316.00
WEEKLY
No Bid
$1.765.00
$2,135.00
DAILY
No Bid
$845.D0
$574.00
EXCAVATOR, 26 TONS 1 318 YARD BUCKET
MAKEIMODEL
Volvo EC250EL
CAT 320
John Deem 25OG
16
MONTHLY
$6,900.00
$4,770.00
$8,283.00
WEEKLY
$2,550.00
$1,650.00
$2,371.00
DAILY
$850.00
$550.00
$980.00
SELF-PROPELLED MECHANICAL BROOM
MAKEIMODEL
Laymor SM450ST or equivalent
BROCE BW260
Lay-MOR SM300
17
MONTHLY
$2 200.00
$1,600.00
$11558J10
WEEKLY
$900.00
11850.00
$699.00
DAILY
$300.00
$275.00
$239.00
TAMPER MAKE -BOMAG BT 58 VIBRATOR (OR
EQUIV)
MAKEIMODEL
Wacker BSSOAAS or equivalent
MULTIOUIP MTX70
Bomag BT65IMultiquip MTX70
18
MONTHLY
$750.00
$70.00
$416A0
WEEKLY
$250.00
$240.00
$175.00
DALY
$85.00
$550.00
$57.00
CAT D6D (OR EQUIV)140 HP CLEARING DOZER
WIRAKE
MAKEJMODEL
No Bid
CAT D6K XL CAB AIR CLEARING DOZER
Case 16SOM
19
MONTHLY
No Bid
$7.490.00
$6.36540
WEEKLY
No Bid
$2,497.00
$3.183,00
DAILY
No Bid
$830.00
$1.061.00
RAMMAX TRENCH COMPACTOR WALK BEHIND
WIDTH 24133
20
MAKEIMODEL
Weaker RTKXSC3 or equivalent
BOMAG BMP8500
Bomag BMP8500IWaeker RTKXSC3
MONTHLY
$1,900.00
$1,675.00
$1.503.00
WEEKLY
$750.00
$675.00
$731.00
DAILY
$250.00
11225.00
525010
RAMMAX REMOTE TRENCH COMPACTOR
WIDTH 24133
MAKEIMODEL
Wacker RTKXSC3 or equivalent
BOMAG BMP8500
Home BMP85OOlWaeker RTKXSC3
21
MONTHLY
$1,900.00
$1.675.00
$1.603.00
WEEKLY
$750.00
$675.00
$731.00
DAILY
$250.00
$225,00
$250.00
AIR COMPRESSOR 165 CFM
22
MAKEIMODEL
DOOSAN C185WDO-T4F or equivalent
SULLAIR DPQ 185
Atlas Capes XAS 185DPQ-KU
MONTHLY
$595.00
SKID STEER LOADER (BOBCAT) MIN 58 HP, .5
YD, (112 YD) G P BUCKET WITH TRACK NOT
WHEELS
-
23
MAKEIMODEL
BOBCAT T590 or equivalent
CAT 259 CROPS
Bobcat T590
DAILY
$215.00
$250.00
$242.00
SKID STEER LOADER (BOBCAT) MIN 58 HP, .5
YD, (112 YD) G P BUCKET WITH WHEELS NOT
TRACKS
24
or equivalent
o t
MONTHLY
$1,800.00
$1.595.00
$1,499.00
WEEKLY
$600.00
$535.00
$629.DO
DALY
$200.00
$195.00
$255.00
RUBBER TIRE LOADER W HIAMMERS,
LOADERS/HAMMER -10000 IE
25
MAKEIMODEL
DEERE 31 OLEPIFRO FSFSP-W R or
equivalent
CAT 416 HBO HAMMER
Case 58ON/Jahn Deere 310.Hammer
MONTHLY
$3,700.00
$4,250.00
$3,093.00
WEEKLY
$1.650.00
$1.425.00
$1,480.00
DALY
$550.00
$475.00
$538.00
LOW GROUND PRESSURE TRACTOR 80 HP,
PAT. BLADE-17,800a
26
MAKEIMODEL
No Bid
CAT D3K LPG CROPS
Case 650M LGPIJohn Deere 450K K2 LGP
MONTHLY
No Bid
$3,760.00
$2,527A0
WEEKLY
No Bid
$1,280.00
$927.00
DAILY
No Bid
$420.00
5309.00
TYPE OF EQUIPMENT
HERC RENTALS
MUSTANG RENTAL SERVICES OF
TEXAS, LLC
United Rentals
LOW GROUND PRESSURE TRACTOR, 90 HP, PAT.
- BLDE-20,2005
27
MAKEIMODEL
No Bid
CAT DIM LGP CROPS
Case 750M LGPIJohn Deere 660K K2 LGP
MONTHLY
No Bid
$4,310.00
S3,704.00 �-
WEEKLY
No Bid
$1.430.00
$1,521.00
DAILY
NoBid
5460.00
S530.00
SPECIALTY EXCAVATOR LONG REACH -60'
REACH, 48' 0" DEPTH
-
28
MAKER40DEL
No Bid
CAT 32413261329WO LONG REACH
Caso Cx250D LR
MONTHLY
No Bid
$11.870.00
$10.609.00
WEEKLY
No Bid
$4.205.00
$4.43440
DALY
No Bid
$1,485.00
S1,952.00
SPECIALTY EXCAVATORS WITHUMB
ATTACHMENT
MAKEIMODEL
VOLVO EC220EL or equivalent
CAT 320 MECHANICAL THUMB
Bobcat E45 wrrhumb Attachment
29
MONTHLY
$5,550.00
$5,445.00
$2.057.00
WEEKLY
$2.250.00
$1,725.00
$702.00
DALY
$750.00
$005.00
$367.00
308 Hyd Thumb
MAKEIMODEL
Case CX80X or equivalent
CAT 308 HYDRAULIC THUMB
No Bid
30
MONTHLY
$4,100.00
S3,815.00
No Bid
WEEKLY
$1,800.00
$1.340.00
No Bid
DAILY
$600.00
$460.00
No Bid
PAVING BREAKERS, 90 LEIS (AIR OPERATED)
MAKEIMODEL
APT 190 or equivalent
SULLAIR MPB-90A
APT M190
31
MONTHLY
5630.0D
$296.00
S309.110
WEEKLY
$280.OD
$125.00
S141.00
DAILY
$70.00
$50.00
548.00
REACH LIFT, 6000 S CAPACITY
MAKEIMODEL
GENIE GTH-844 or equivalent
CAT TL042 TELEHANDLER
Skybak 6042
32
MONTHLY
$2,400.00
$1.950,00
$1.676.00
WEEKLY
$1,050.00
$875.00
$865.00
DALY
$350.00
$350.00
$327.00
MINI EXCAVATOR 18 HP, 6' 10." DEPTH
MAKEIMODEL
BOBCAT E351 or equivalent
CAT 302.7
Takeuchi T8216
33
MONTHLY
51,850.00
$1,310.00
$1.219.00
WEEKLY
$750.00
$440.00
SS31.00
DAILY
$250.OD
$150.00
$192.00
MINI EXCAVATOR, 30 HP, 9' 11" DEPTH
MAKEIMODEL
BOBCAT ESO or equivalent
CAT 303.5
Bobcat E32rrakeuchi T8235
34
MONTHLY
$2,450.00
S1,575.00
$1,732JX1
WEEKLY
$1.050.00
5540.00
$627.00
DAILY
$350.00
$185.00
S304.00
EXCAVATOR 39 TON, 270 HP
MAKEIMODEL
VOLVO EC350EL or equivalent
CAT 335
John Deere 35OG LCIKotwldo SK35OLC
35
MONTHLY
$10,500.00
58,705AD
$7.500.00
WEEKLY
$4,500.00
$3.160.00
S3,600.00
DAILY
$1.500.00
$1,075.00
$1.350.00
SPECIALTY 24 TON EXCAVATOR W150009
HAMMER
_
36
MAKEIMODEL
VOLVO EC220ELIFRD FX175QTV or
equivalent
CAT 320 WITH HAMMER
John Demo 200 LC wI6000N Hammor
MONTHLY
311,100.00
$13,160.00
$10,820.00
WEEKLY
$4.500.00
S4,375.00
$3,528.00
DAILY
$1,500.00
S1,450.00
57,350.00
CRAWLER DOZER, 200 HP, STRAIGHT W TILT
BLADE
MAKEIMODEL
No Bid
CAT 06T XL CAB AIR
Case 20SOM
37
MONTHLY
No Bid
$11,7ea.00
57,004.00
WEEKLY
No Bid
S3,95D.00
$3.502.00
DALY
No Bid
$1,250.00
$1.167.00
25 TON ARTICULATED OFF ROAD TRUCK 309 HP
MAKEIMODEL
No Bid
CAT 725
Torox TA30
38
MONTHLY
No Bid
$11.405.00
571,292.00
WEEKLY
No Bid
$4,135.00
$4.701.00
DAILY
No Bid
$1,450.00 .
$1.773.00
REACH
MAKEIMDDEL
AD GB-03A or equivalent
CAT TL943 TELEHANDLER
JLG G9-43A
39
MONTHLY
$3,400.00
$2,550.00
$2,649ZO
WEEKLY
$1,500.00
S995A0
51,192.00
DALY
$500.00
$395.00
$440.00
MAN BUCKET (WORK BASKET) 48" X 48"
SUSPENDED WITH TOP COVER STANDARD MODEL
,
40
MAKFJMODEL
No Bid
No Bid
No Bid
MONTHLY
No Bid
No Bitl
No Bid
WEEKLY
No Bid
No Bid
No Bid
DALY
No Bid
No Bid
No Bid
TYPE OF EQUIPMENT
HERC RENTALS
MUSTANG RENTAL SERVICES OF
TEXAS,LLC
United Rentals
65 HP EXCAVATOR WITH 13' -7" DIG DEPTH
"
MAKEIMODEL
CASE CXSOC or equivalent
CAT 308 HYDRAULIC THUMB
Bobcat E45Rakeuehl TB26O
41
MONTHLY
$3,800.00
$2,875.00
$2,057.00
WEEKLY
$1,650.00
$1.025.00
$702.00
DALY
$550.00
$375.00
$367.00
70HP EXCAVATOR WITH 19' -10" DIG DEPTH
,
MAKEIMODEL
JOHN DEERE 135G or equivalent
CAT 313
Bobcat E85Rakeuchi TB290C
42
MONTHLY
$4.300.00
$3.635.00
$2,615AO
WEEKLY
$1,950.00
$1.305.00
$997.00
DALY
$650.00
$475.00
$490.00
PORTABLE LIGHT PLANT 30FT MAST W ITH 4 EACH
1250 WATT BULBS
43
MAKEIMODEL
MAGNUM MLT6SK or equivalent
ALLMAND LIGHT TOWER
Magnum MLT6SWaekcr LTV6L
MONTHLY
$650.00
$450.00
$564.00
WEEKLY
$250.00
$195.00
$261.00
DALY
$85.00
$75.00
$10540
44
ATTACHMENTS FOR SKID STEER LOADER
72- ANGLE BLADE
a.
MONTHLY
No Bid
$575.00
No Bid
WEEKLY
No Bid
$225.00
No Bid
DAILY
No Bid
$75.00
No Bid
COLD PLANER
b
MONTHLY
No Bid
$2,280.00
No Bid
WEEKLY
No Bid
$765.00
No Bid
DAILY
No Bid
$255.00
No Bid
72"EXTREME DUTY ROOT GRAPPLE
BUCKETGRAPPLE BUCKET
C.
MONTHLY
$575.00
$585.00
$560.00
WEEKLY
$240.00
$195.00
$250.00
DA.Y
$80.00
$65.00
$95.00
GRAPPLE FORKS
d
MONTHLY
No Bid
$585.00
$560.00
WEEKLY
No Bid
$195.00
$250.00
DAILY
No Bid
$65.00
$96.00
HYDRAULIC AUGER 6" BR
MONTHLY
$900.00
$90.00
$208.00
e.
WEEKLY
$300.00
$30.00
$90.00
DAILY
$100.00
$10.00
$29.00
HYDRAULIC AUGER W BIT
t.
MONTHLY
$950.00
$90.00
$195.00
WEEKLY
$325.00
$3O.00
$73.00
DAILY
$115.00
$10.00
$35.00
HYDRAULIC AUGER 12" BIT
MONTHLY
$1.000.00
$180.00
$275.00
B
WEEKLY
$350.00
$60.00
$87.00
DAILY
$125.00
$20.00
$38.00
HYDRAULIC AUGER 18" BIT
-
tl
MONTHLY
$1,050.00
$270.00
$203.00
WEEKLY
$400.00
$90.00
$128.00
DALY
$150.00
$30.00
$43.00
HYORAULICAUGER 24"BIT
L
MONTHLY
$1.200.00
$270.00
$320.00
WEEKLY
$600.00
$90.00
$141.00
DAILY
$200.00
$30.00
$50.00
12"AUGER EXTENSION
MONTHLY
$100.00
$45.00
$135.00
WEEKLY
$30.00
$15.00
$52.00
MONTHLY
$10.00
$5.00
$19.00
48"AUGER EXTENSION
k.
MONTHLY
$150.00
$135.00
$135.00
WEEKLY
$45.00
$45.00
$52.00
DAILY
$15.00
$15.00
$19.00
3000 HYDRAULIC HAMMER1.
.
MONTHLY
$1,500.00
$945.00
$1,139.00
WEEKLY
$650.00
$315.00
$621.00
DAILY
$225.00
$100.00
$190.00
HYDRAULIC TRENCHER
M.
MONTHLY
No Bid
$975.00
No Bid
WEEKLY
No Bid
$350.00
No Bid
DAILY
No Bid
$110.00
No Bid
LANDSCAPETILLER '
n.
MONTHLY
$760.00
$975.00
No Bid
WEEKLY
$325.00
$350.00
No Bid
DAILY
$110.00
$110.00
No Bid
84" MATERIAL HANDLING ARM
O.
MONTHLY
No Bid
No Bid
No Bid
WEEKLY
No Bid
No Bid
No Bid
D.4LY
No Bid
No Bid
No Bid
TYPE OF EQUIPMENT
HERC RENTALS
MUSTANG RENTAL SERVICES OF
United Rentals
TEXAS,LLC
66" MULTWURP. BUCKET
MONTHLY
$90.00
$450.00
$0.01
P.
WEEKLY
$30.00
$150.00
$0.01
DALY
$10.00
$50.00
$0.01
500 CAP. PALLET FORKS
,
MONTHLY
$280.00
$315.00
$365.00
q•
WEEKLY
$120.00
- $105.00
$122.00
DALY
$40.00
$35.00
$40.00
7r PICK-UP BROOM
r.
MONTHLY
$850.00
$1,075.00
$823.00
WEEKLY
$350.00
$375.00
$395.00
DALY
$110.00
$125.00
$142.00
STUMP GRINDER
s.
MONTHLY
No Bid
$2,250.00
No Bid
WEEKLY
No Bid
$750.00
No Bid
DAILY
No Bid
$250.00
No Bid
OTHER RENTAL EQUIPMENT NOT LISTED ON
45
BID WILL BE OFFERED TO THE COUNTY AT A
Day 5%. Week 10%, Month 15 %
5110120%
NET PRICE AGREEMENT
DISCOUNTED RATE
Non-perrnitod loads in Brazos County
By Loaded Mile
46
are $t Standard non.
Roundds to
Less than 100HP, $100 Each Way, Over
Flat Delivery Rates -$95 for Non -Permit
DELIVERY CHARGE
to not
permit loads not to exceed 50,000Iba
a
100HP, $150 each way. Any equipment
Loads - $250 for Permit Loads
are $450 Roundtrip. Outside Hauler
requiring routed permit, $650 each way.
permits loads are TBD
47
DELIVERY CAN BE COMPLETED IN APPROX.
1-2
1.2
1
DAYS AFTER RECEIVING ORDER
48
COMPLETE ADDRESS OF NEAREST BRANCH OFFICE
2787 N Ead Rudder Fi-ay Bryan, TX 77803
8206 WEST SH 21, BRYAN TX 77807
23Texas Aye S
College Station, TX 77840
49
NUMBER OF ad I ABLE MILES FROM NEAREST
6
3
7
BRANCH TO BC ROAD & BRIDGE DEPT.
50
EMERGENCY CONACT INFO
Alien Hous1ey 979606-0227
Benton Behuim, 0d178.77&73M C-072451-
Mike Johnson -(512)818.5014
2431, b=hutza@Mustanacatcem
(979)693.1313
51
No
No, if notified by 8:OOAM on each day of
NIA
DO YOU CHARGE FOR "RAW DAYS-? IF SO, WHAT
RAW OUT
DOCUMENTATION IS REQUIRED?
52
RESPONSE TIME IN CASE OF EMERGENCY
4 Houm
1.2 Hours
4 Hours
Exceptions to the Bid
Awarded Vendor: Mu ental Services of Texas, L%nL]C
��rr �
M�2023
proved by C ssloneer Court on day of IJCW by
Co u AJ-r-1 �t't' IJ�Ie
holding the position of
DEPARTMENT: Purchasing
DATE OF COURT MEETING: 12/12/2023
BRAZOS COUNTY
BRYAN,TEXAS
NUMBER:
ITEM:
Approval of the following committee for RFQ #CIP 24-603 Construction Manager at Risk
for Medical Examiner's Facility.
• a. Trevor Lansdown
• b. William (Bill) Hadley
• c. Brian Baker
• d. Lt. Steven White
• e. Lt. Sean Dwyer (College Station PD)
• f. Lt. Wait Melnyk (Bryan PD)
• g. Lt. Jennifer Enloe (TAMU-PD)
• h. Jerry Nickerson (Civilian)
• I. Purchasing (Non -Voting)
• j. Legal (Non -Voting)
• k. Broddus - Consultants (Non Voting)
TO:
Commissioners Court
FROM:
Kaitlyn Battles
DATE:
12/06/2023
FISCAL IMPACT:
False
BUDGETED:
False
DOLLAR AMOUNT:
$0.00
ATTACHMENTS:
File Name
Description Xvp-e
Wktachments Available
�PPRO
--1 iaia3
Duane Peters Date
County Judge
Kristeen Roe, CTA, PCC
Brazos County Tax Assessor/Collector
4151 County Park Ct
Bryan TX 77802
979-775-9930
979-775-9938 Fax
REFUNDS PENDING 12/0S/2023
REQUESTOR
SHEILA STOKES
ADDRESS
91 GOLDEN SHADOW CIR SPRING TX 77381
OWNER NAME
DANIEL & ANNA ANTONIUK
PROP ID#
395495
REFUND AMOUNT
$593.86
REQUESTOR
ELIZABETH BOE17CHER
ADDRESS
3088 COUNTY RD 405 LEXINGTON TX 78947
OWNER NAME
CRAIG & ELIZABEYH BOETTCHER
PROP ID#
44094
REFUND AMOUNT
$79.77
REQUESTOR
SYLVIA LORRAINE CRAIG
ADDRESS
3811 RAVENWOOD DR BRYAN TX 77802
OWNER NAME
CRAIG SYLVIA LORRAINE
PROP ID#
-39579
REFUND AMOUNT
$200.00
REQUESTOR
MARY J ALMEIDA-CARTER
ADDRESS
4701 RIVER ROCK DR BRYAN TX 77808
OWNER NAME
ALMEIDA MARY JEAN
PROP ID#
36365
REFUND AMOUNT
$10.00
REQUESTOR
ADDRESS
OWNER NAME
PROP ID#
REFUND AMOUNT
REQUESTOR
ADDRESS*
OWNER NAME
PROP ID#
REFUND AMOUNT
REQUESTOR
ADDRESS
OWNER NAME
PROP ID#
REFUND AMOUNT
REQUESTOR
ADDRESS
OWNER NAME
PROP ID#
REFUND AMOUNT
N
APPLICATION FOR TAX REFUND
Collecting Office Name `
Brazos County Tax Office
4151 County Park Court
Bryan, Texas 77802 Ph. 979-775-9936
OWNER'S NAME AND ADDRESS
ANTONIUK DANIEL S & ANNA R
156 OAK -RUN
COLLEGE STATION TX 77845-8618
Collecting Tax for: (taxing entities)
Brazos County, City of Bryan, City of College Station
Bryan ISD, College Station ISD, F1, F2, F3, F4,
City of Kurten, Navasota ISD
PROPERTY DESCRIPTION
Legal: •OAK CREEK MHC, SPACE 156 OAK RUN, SER# CLW039419TX, HUD# NTA1678319
Address: 156 OAK RUN (PVT) ,
Account# 395495
TAX PAYMENT INFORMATION
Name of Taxing Unit Tax Year of Refund - Payment Date . Amount Paid Refund Amount Requested
ZREFUND 2023 10/27/2023 $846.24 $593.86
Taxpayer's reason for refund: OP -Overpayment
REFUND TO:
STOKES SHELIA
91 GOLDEN SHADOW CIR
SPRING TX 77381
Sign below and return form to the Brazos County Tax Office.
"1 hereby apply for the refund of the above -described taxes and certify that the information on this form is true and correct."
�11 1�3
Si_ — L9 a
aeur� Da et r
Phone # Email Address Q co"
if you make a false statement on this application, you could be found guilty of a Class A misdemeanor or a state jail felony
-- - — —underTexas•Penal•Code Section 37.10. -- "— -- --• —.
TAX REFUND DETERMINATION
e tax re is [ pprove [ ]Disapproved
Authorized Officer Signature
Date
laha l ap.
Authorized Officer of taxing unit for refund applications over amount required under Section 31.11 Tax Code
Authorized Officer Signature
Date
TAX RECEIPT., 10/27/2023 08:32AM
KRISTEEN ROE, CTA PH# (979) 775-9930
BRAZOS COUNTY TAX ASSESSOR COLLECTOR
4151 COUNTY PARK CT
BRYAN, TX 77802
PAID BY:
STOKES SHELIA MOHKAMI
91 GOLDEN SHADOW CIR
SPRING, TX 77381-3151
Receipt Number�� _
3266669
geP,osted r}_ ,.__10127/2023-
Payment Type P'
Payment Code i 0 r/Refund,
TotalPald _ .'� $846.24.
Property ID Geo -^ -' - Ac er s -_
- Owner Marne and Address_.:
r 385495 -- 1702023-0000-0276 -~ y
_Legal
0.0000 ~
+ - _
_
ANTONIUK DANIEL S 8 ANNA R _
-
L'^
-
156 OAK RUN
Legal Description
._
COLLEGE STATION, TX 77845-8618
OAK CREEK MHC, SPACE 156 OAK RUN, SER# CLW039419TX, HUD# NTAI-878319-
Situs------ --- - ----- - -- DBAName
-- --
-. - --- -
156 OAK RUN (PVT)
-
'Entity" - -__ Year Rate Ta_x_ab_I_e_ V_ alue
#_ Vold
w0_rlpinal Tax D_ iscnts ' PBI . Att Fees Overage. Amonrit Pd
_Stint
Z REFUND ENTITY( -2023 r 0.00000 0
148384 N
593.88
_ ,
0.00 6.00 - 0.00 0.00
- 593.86
EMG SVCS DIST#1 2023 0.02071 55,574
4908 N
11.51
0.00 0.00 0.00 0.00
11.51
COLLEGE STATION
ISO 2023 0.96220 11370
4908 N
13.18
0.00 0.00 0.00 0.00
13.18
BRAZOS COUNTY 2023 OA0970 65,574
4908 N
227.69
0.00 0.00 0.00 0.00
227.69
846.24
Balance Due As Of 1012MO23:-593.86
Tender _ 6etafls Dest:ri-Pt lon __Amoun!
Check F2EPOST 2023 ESCROW' 846.24
846.24
Operator _Batch - ------ --- - - -: --- --- - - - - - - - - -- - - -. --.. -..:.: _ _ . .. _._.: _ . :o _ Idl
tmoore 46107 (E023 MH Escrow Payments)
846.24
Page:1 Receipt Issued In Accordance with Section 31.075 of the Texas Property Tax Code T-Ad-.Sm He
APPLICATION FOR TAX REFUND
Collecting Office Name
Brazos County Tax Office
4151 County Park Court
Bryan, Texas 77802 Ph. 979-775-9930
OWNER'S NAME AND ADDRESS
BOETTCHER CRAIG & ELIZABETH
3088 COUNTY ROAD 405
LEXINGTON TX 78947-5142
Collecting Tax for: (taxing entities)
Brazos County, City of Bryan, City of College Station
Bryan ISD, College Station ISD, F1, F2, F3, F4,
City of Kurten, Navasota ISD
PROPERTY DESCRIPTION
Legal: SOUTHWOOD VALLEY PH 22C, BLOCK 47, LOT 18
Address: 813 VAL VERDE DR ,
Account# 44094
TAX PAYMENT INFORMATION
Name of Taxing Unit tax Year of Refund Payment Date Amount Paid
ZREFUND 2022 04/30/2023 $4465.97
Taxpayer's reason for refund: OP -Overpayment
REFUND TO:
BOETTCHER ELIZABETH
3088 COUNTY ROAD 405
LEXINGTON TX 78947-5142
Refund Amount Requested
$79.77
Sign below and return form to the Brazos County Tax Office.
"I hereby apply for the refund of the above -described taxes and certify that the information on this form is true and correct."
G.�..Y, !!- z
Signat�'ure bate
e? 3 I^d itAb, f-tcL�� l
Phone # Email Address
If you make a false statement on this application, you could be -found guilty of a Class A misdemeanor or a state jail felony
under Texas Penal Code Section 37.10.
TAX REFUND DETERMINATION
The tax refund is [Approved [ ] Disapproved
Authorized Officer Si nature Date
ZAulzed Officer f taxing �t=s r amount required under section 31.11 Tax Code
Authorized Officer Signature Date
TAX RECEIPT 05/03/2023 09:53AM
KRISTEEN ROE, CTA PH# (979) 775-9930
BRAZOS COUNTY TAX ASSESSOR COLLECTOR
4151 COUNTY PARK CT
BRYAN, TX 77802
PAID BY:
BOETTCHER ELIZABETH
3088 COUNTY ROAD 405
LEXINGTON, TX 78947
Receipt Number
3250583
Date Posted 04/30/2023
Payment Type . P
Payment Code Over/Refund
Total Paid $4,486.97
Property lb --did Legal Acres.,' , Owner Name and Address
44094 ' '582800-CF 0-0180 •-0.0000 BOETTCHER CRAIG & ELIZABETH
- - - - - -- - 3088 COUNTY ROAD 405
Legal Description , �_ _ '_ • LEXINGTON, TX 78947-5142
soul- W00D V_ ALLEY PH 42C,BLOCK 47, LOT 18
Situs DBA Name
813 VAL VERDE DR ,
Entity , , - Year 'R'ate Taxable 1%atue Stnif # Void_. Orlginal.Tax Discnts P81 Att Fees Overage Amount Pd
Z REFUND ENTITY
2022
0.00000
0
146392
N
79.77
0.00
0.00
0.00
0.00
79.77
BRAZOS COUNTY
2022
0.42941
185,334
13299
N
795.84
0.00
87.54
0.00
0.00
883.38
CITY OF COLL
STAT.
2022
0.52461
185,334
13299.
N
972.28
0.00
106.95
0.00
0.00
1,079.23
COLLEGE STATION
1SD
2022
1.17810
185,334
13299
N
2,183.42
0.00
240.17
0.00
0.00
2.423.59
4,466.97
Balance Due As Of 0413012023; -79.77
Tender betaifs . . _ - Description
Check ECK
Operator"
tmoore 45977 (E-CHECK PAYMENTS 05/02/23) - -
Page:1 Receipt issued In Accordance with Section 31.076 of the Texas Property Tax Code
1
Amount
4465.97
4465.97
Total Paid
4.465,97
TrieAu'.crmVu�4c
Collecting Once Name
Brazos County Tax Office
4151 County Park Court
Bryan, Texas 77802 Ph. 979-775-9930
OWNER'S NAME AND ADDRESS
CRAIG SYLVIA LORRAINE
3811 RAVENWOOD DR
BRYAN TX 77802-3524
Legal: SFA #9, BLOCK 15, LOT 23 (TR-105)
Address: CUNNINGHAM LN
Account # 39579
TAX PAYMENT INFORMATION
Name of Taxing Unit Tax Year of Refund
ZREFUND 2022
Taxpayer's reason for refund: OP -Overpayment
REFUND TO:
CRAIG SYLVIA LORRAINE
3811 RAVENWOOD DR
BRYAN TX 77802-3524
Collecting Tax for: (taxing entities)
Brazos County, City of Bryan, City of College Station
Bryan 1SD, College Station ISD, F1, F2, F3, F4,
City of Kurten, Navasota ISD
Payment Date Amount Paid Refund Amount Requested
06/30/2023 $200.00 $200.00
Sign below and return form to the Brazos County Tax Office.
"I hereby apply for the refund of the above -described taxes and'certify that the information on this form is true and correct."
Ll' -� ti
. S'g70:�'
t
_' 7 7 -731 ! 54 2,.
Phone g
l)lz1,/2a2:?.
DY .
at . L%.
Email Addfess
If you make a false statement on this application, you could be found guilty of a Class A misdemeanor or a state jail felony
under Texas Penal Code Section 37.10.
TAX REFUND DETE ON
he tax refun 's [�App ved [ ;tisapproved
Authorized Officer Signature
Date
Authorized Officer of taxing unit for refund applications over amount required under Section 31.11 Tax Code
Authorized Officer Signature
Date
TAX RECEIPT 06/301202311:03AM
KRISTEEN ROE, CTA PH# (979) 775-9930
BRAZOS COUNTY TAX ASSESSOR COLLECTOR
4151 COUNTY PARK CT
BRYAN, TX 77802
PAID BY:
CRAIG SYLVIA LORRAINE
3811 RAVENWOOD DR
BRYAN, TX 77802-3524
-.Receipt Number
L 3261391
Date Posted 4_ •— 06130/9023j
Payment Type P
Payment Code i _0_ ver/Refund
Total Pa Id i- _ _$200_00
Property ID _ _ _ .Geo - _ _ _ Legal Acres _ ' Ow_n_er Name and A_ dress
' 39579 1555000-0015-0230 10.0000 CRA1G 8YLVIA LORRAINE
- - -- - - - - - - Legal Description - -" - - -- 3811 RAVENWOOD DR
_ _ _ _ . _ BRYAN, TX 77802-3524
;SFA #9, B_LUC_K 75_, L0 f 23 (TfZ-106) _
Situs DBA Name i
CUNNINGHAM LN
Year - Rate Taxable Value Stmt # Void Original Tax _ _Disc_nts _ P8-0 _ Att Fees _O_verage Amount Pd•
Z REFUND ENTITY 2022 0.00000 0 146M N 200.00 - 0.00 0.00 0.00 O.OD 200.00
200.00
Balance Due As Of 0613012023:-200.00
Tender _ Details- Amount
Check 1 os0 - y 200.00
200.00
0 erator _ Batch, _ - - - - -- - - - - - - - -_-- --�-- - - Total Paid;
p _ .� - . -.-- -- • ---- -__-..-
tmoore 46805 (06/30/2023TM) - - - - - _ - - - -_ - - - g00.00,
Page:1 Receipt issued in Accordance with Section 31.075 of the Texas Properly Tax Code
I
APPLICATION FOR TAX REFUND
Collecting Office Name
Brazos County Tax Office
4151 County Park Court
Bryan, Texas 77802 Ph. 979-775-9930
OWNER'S NAME AND ADDRESS
ALMEIDA MARY JEAN
4701 RIVER ROCK DR
BRYAN TX 77808-2108
Collecting Tax for: (taxing entities)
Brazos County, City of Bryan, City of College Station
Bryan ISD, College Station ISD, F1, F2, F3, F4,
City of Kurten, Navasota ISD
PROPERTY DESCRIPTION
Legal: OAKWOOD TOWNHOMES, BLDG D, UNIT 35
Address: 4509 CARTER CREEK PKY 4,
Account# 36365 ,
TAX PAYMENT INFORMATION
Name of Taxing Unit Tax Year of Refund Payment Date Amount Paid Refund Amount Requested
ZREFUND 2023 11/17/2023 $2443.96 $10.00
Taxpayer's reason for refund: OP -Overpayment
REFUND TO:
ALMEIDA-CARTER MARY J
4701 RIVER ROCK DR
BRYAN TX 77808-2108
Sign below and return form to'the Brazos County Tax Office.
"1 hereby apply for the refund of the above -described taxes and certify that the Information on this form is true and correct."
/
/ 5- le';
5ignatur) , v Date I
P w - nw,&na inka
Phone # Email AWess " v
If you make a false statement on this application, you could be found guilty of a Class A misdemeanor or a state jail felony
under Texas Penal Code Section 37.10.
The ax refun ( V Ap\pi ved jDisapproved
Authorized Officer Signature
to /la. / 0-3
Date
Authorized Officer of taxing unit for refund applications over amount required under Section 31.11 Tax Code
Authorized Officer Signature Date
1
fA
TAX RECEIPT 11/17/2023 09:11AM
KRISTEEN ROE, CTA PH# (979) 775-9930
BRAZOS COUNTY TAX ASSESSOR COLLECTOR
4151 COUNTY PARK CT
BRYAN, TX 77802
PAID BY:
ALMEIDA CARTER MARY J
4701 RIVER ROCK DR
BRYAN, TX 77808-2108
_ Receipt Number
3274500
Date Posted `7 11/1712_3i
Payment Type
Payment.Code Over/Rafundi
Total Paid _ $2A43.96:
Property ID , Geo - - _` -- --- - _ Legal A_cre_s _'• �- Owner Name an_d
' -
Y
r 36365 !481000-0004-00350
_--
10.0000
' - j
_Address_
ALMEIDA MARY JEAN -
4701 RIVER
_
-
-'-
—,
ROCK DR
,OAKWOOf)TOWNHOMES, BL'DG D,UNIT35
BRYAN, TX 77808-2108
I
Situs _
-�DBA Name
t
i 4509 CAR?ER CREEK PKY 4 ,--
--- -
- - - - -
- -- -- - - - -- --
---- - --
Entity _ Y.ear
_ Rate
_Taxable_ Value --Stint
# + Vold
Taxes DlIccrits ^ P&1� AttFees ' 'Ov_erage Amount Pd:
Z REFUND ENTITY 2023
_
0.00000
0
148421 N - - _
_Original
1-0.00
0.00 0.00 0.00 `- 0.00 `-
10.00
BRAZOS COUNTY 2023
0.40970
122,747
3457 N
502.90
0.00 0.00 0.00 0.00
502.90
CITY OF BRYAN 2023
0.62400
122,747
3457 N
765.94
0.00 0.00 0.00 0.00
765.94
BRYAN ISD 2023
0.24920
122,747
3457 N
1,185.12•
0.00 0.00 0.00 0.00
1.165.12
2,443.96
Balance Due As Of 11/17/2023: -10.00
Tender -Details - _ _ _ �` - Description Amount=
Check -- - 894- - - - - — - -� Y_ - --- 2443.96
2443.96
Operator
Moore 48480 (RTL Batch 528 Payment File-1 1172023) 2,443.96�
Page:1 Receipt issued in Accordance with Section 31.075 of the Texas Property Tax Code
•:r
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS) FOR THE 2023-2024 BUDGET YEAR
NO.23/24 11.01-11.03
On this the 121' day of December 2023 at a regular meeting of the Commissioners' Court, the
following members were present:
A. Duane Peters, County Judge, Presiding
B. Steve Aldrich, Commissioner, Precinct 1
C. Chuck Konderla, Commissioner, Precinct 2
D. Nancy Berry, Commissioner, Precinct 3
E. Wanda Watson, Commissioner, Precinct 4
F. Karen McQueen, County Clerk
The following proceedings were held:
THAT WHEREAS, on 1211' day of December 2023 the Court heard and approved a budget
amendment(s) for the 2023-2024 budget year for Brazos County, Texas; and
WHEREAS, expenditure is necessary due to the necessity to meet unusual and unforeseen conditions
which could not be reasonably included in the original budget adopted 19 September 2023, the following
amendment(s) to the original budget are hereby authorized, as described on the attached page(s).
ADOPTED AND APPROVED this the 121h day of December 2023.
THE COMMISSIONERS COURT OF BRAZOS COUNTY, TEXAS.
By:
Duane Peters, County Judge
Original: County Clerk's Office and
Attached to the original budget
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 23/24 -11.01
12/12/2023
FUND NAME DEPARTMENT NAME CLASS DESCRIPTION ACCOUNT CATEGORY INCREASE DECREASE
General Fund Contingency I Supplies and Other Charges Expenditure 50.000.00
Court Support Child
General Fund Protective Services - 472nd I Professional Services I Expenditure 1 50.000.00
General Fund
of funds to correct accounts for attorney fees for 472nd District Court.
���aY�. cie Ent ,. �Q�Y.�R�: ..
�. .. ��:�:°s��r .,-^=.,�'s �. ,.�
n.�.1#x�. .+...-.4.§.+.a. ''r .s n ... ":nY�"r�"i. e'�.5. .�'
v'. S�a� .i...t2 ��'S� •�:�.e`.�!+'�s.,F°v�e.
��: �i''i„ _< _ ...� h'��`. �.5
�'�'.. ff`t iyi '. tl �.��.
FUND
DIV
ACCT
Change in Budget
ACCOUNT NAME
01000
11001500
61130000
50,000.00)
01000
11024720
72110000
50,000.00
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 23124 -11.02
12/12/2023
FUND NAME
DEPARTMENT NAME
CLASS DESCRIPTION
ACCOUNT CATEGORY
INCREASE
DECREASE
On systems Road Bond
Inner Loop East
Contractual Services
Expenditure
2,950,087.00
On systems Road Bond
RELLIS
Contractual Services
Expenditure
2,950,087.00
J
On Systems Road Bond
Reallocation of funds to the correct accounts for contractual services for the Rellis Project (CIP # 23-600-2). Projec is part o General Obligation Bonds: Series
2023 - On System Road Bond - TXDOT_
Qz " 4s t
rR17 yJ =fO
Counfa89e'Proval'
tk "
FUND
DIV
ACCT
Change in Budget
ACCOUNT NAME
43230
63432304
71025000
2,950,087.00)
43230
63432305
71025000
2,950,087.00
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 23/24 -11.03
FUND NAME
DEPARTMENT NAME
CLASS DESCRIPTION
ACCOUNT CATEGORY
INCREASE
DECREASE
General Fund
Sheriffs office Administration
Revenue
2,295.77
General Fund
Sheriffs office Administration
Supplies and Other Charges
Expenditure
2,295.77
Sheriff's Office -Administration
Recognize donated furniture to be used in the soft interview room at the Sheriffs Office. Donation was a proved by o�ime.rton December 5, 2023.
12/2023
�,� County Judge�Approval ` _ ��;- Dates; , "�
Fo46rac"le Entr}On1} ,..
..ta : r a•h x Re
, ,E
x
��{� �
FUND
01000
DIV
28000100
ACCT
46023000
Change in Budget
2,295.77
ACCOUNT NAME
01000
28000100
60010000
2,295.77
Personnel Change of Status
( Dec 7, 2023 )
Commissioners' Court Date: 12-12-2023
Department Submitting Information: Human Resources
Purpose of Submissions: Consider and Take Action on Change
Employment
., Department Name
Employee Name
a°
Sheriff Office - ]ail Administration
Register, Katlyn
Al
Separations
-Department Name
Employee Name,
• - a�t�k"t
:.are .��.'��"„+
d..
Human Resources -
Reazola, Monica
Administration
County Auditor - Administration
Zdunkewl¢, Cynthia
Approved in Commissioners' Court:12-12-202
County Judge's or Commissioner's Signature:
(This Copy to be attached to minutes)
PERSONNEL .
CHANGE OF STATUS REQUESTS
Commissioner Court Date: 12-12-2023
Department Submitting Information: Human Resources
Purpose of Submissions: Consider and Take Action on Change Requests
Department Submitting Employee Request Action Requested
Request(s) Applies To
County Court'at Law 1 Martinez, Amy Change of Status
Approved in Commissioners' Court: 12-12-2023:
County Judge's or Commissioner's Signature:
(This Copy to be attached to minutes) ai
J
1-1