HomeMy WebLinkAbout2018-11-30 10:00AM PUBLIC HEARINGBRAZOS COUNTY
BRYAN, TEXAS
PUBLIC HEARING
!�} rirjNJ ;rl P_, 4
BRAZOS COUNTY COMMISSIONERS COURT
BRAZOS COUNTY COMMISSIONERS COURT WILL CONDUCT A
PUBLIC HEARING ON FRIDAY, NOVEMBER 30, 2018 AT 10:00 A.M. IN
THE COMMISSIONERS COURTROOM OF THE COUNTY
ADMINISTRATION BUILDING, 200 S. TEXAS AVENUE, SUITE 106,
BRYAN, TEXAS.
The Brazos County Commissioners Court will hold a public hearing to consider the
following:
e Application for Operation of a salvage yard by Mike Mosavi of Bryan Auto
Recycling Sales & Glass LLC located at 2873 N. Harvey Mitchell Parkway, Bryan,
TX 77807
The public hearing will be held in the Commissioners Courtroom on the first floor of the
Administrative Building, 200 South Texas Ave., Suite 106 located at the intersection of
the South Texas Avenue and 28th Street.
Interested parties are invited to speak for or against approval of the application and
conditions to be imposed on the location. For additional information please contact the
Road and Bridge Department at (979) 822-2127.
The Commissioners Courtroom of the County Administration Building, 200 South Texas Ave., Suite 106, Bryan, TX
77803 is Meelchair accessible. Flandicap parking spaces are available. Any request for sign interpretive services
must be made two working days before the meeting. To make arrangements, please call (979) 361-4102.
X61: �71�`r7 P9•
i
MINUTES
NOVEMBER 30, 2018
BRAZOS COUNTY COMMISSIONERS COURT
PUBLIC HEARING
The Commissioners' Court of Brazos County, Texas held a Public Hearing at the Brazos
County Administration Building in Bryan, Brazos County, Texas, at 10:00 a.m. on Friday,
November 30, 2018, with the following members of the Court present:
Duane Peters, County Judge, Presiding;
Steve Aldrich, Commissioner of Precinct 1;
Sammy Catalena, Commissioner of Precinct 2;
Nancy Berry, Commissioner of Precinct 3, Absent;
Irma Cauley, Commissioner of Precinct 4, Absent;
Karen McQueen, County Clerk, Absent.
Attached is a list of the citizens and officials in attendance.
The purpose of the hearing is to hear commentary on the Application for Operation of a
salvage yard by Mike Mosavi of Bryan Auto Recycling Sales & Glass LLC located at
2873 N. Harvey Mitchell Parkway, Bryan,TX 77807
The County Judge delayed calling the meeting to order until a quorum was present.
Judge Peters then call the meeting to order at 10:31 a.m. and invited others to speak.
Megan Lott with the Road and Bridge Department reviewed the criteria for approving an
application for a salvation yard. Ms. Lott noted that this application meets all the criteria.
Brazos County Sheriff's Deputy James Hall updated the Court on the status of the
case. He said the application process started in March 2017 and the business was
inspected on October 5, 2017. Deputy Hall stated that all permits are current and
active. He said that the salvage yard is in compliance with both the County and State
requirements.
vol. P9' °Z-- — —
Gina Mosavi submitted documents detailing the timeline of events during their efforts to
cooperate with the City of Bryan. She said she feels like they were not moving fast
enough for the city and their electricity was shut off.
Mike Mosavi stated they were doing their best to address the issues but it is very
expensive. He said he has to be able to operate his business to afford the necessary
changes. They feel they are an integral resource to the community since they assist in
locating auto parts for citizens. Mr. Mosavi said they have already spent $20,000 for
engineering to become compliant.
J udge Peters stated this will be placed on the agenda for consideration.
There being no one else to offer commentary for or against the salvage yard application,
the County Judge adjourned the hearing.
VF -04-
a - P � '7
-_
The foregoing minutes of the Commissioners Court Public Hearing held November 30, 2018, have
been examined and are approved in open Court this the 4th day of December , 2018, in Bryan,
Brazos County,
Duane PNdrs
County Judge
Commissioner,
Commissioner, Precinct 4
Attest:
Karen McQueen
County Clerk
Steve Aldrich
Commissioner, Precinct 1
I I V Jl A 'J
Nancy Berry
Commissioner, Precinct 3
vol. Pg. r� G�
BRAZOS COUNTY
COMMISSIONER'S COURT
DAY OF t�,)O kk )Cf , 20 I
k�-,)- =00 rQ/PM,�I�cc
Name
(PLEASE PRINT)
PgOf�
Organization
(PLEASE PRINT)
Arcc 20s GO. c r, f Oyl;41`c_�
i�Vol. Pg. /b
.. r
BRYAN AUTO RECYCLING, SALES & GLASS, LLC
Timeline of Events and Action
March 1. 2017
Code Enforcement Letter from Jim Frodge, Code Compliance Officer, City of Bryan
April 6, 2017
Bryan Planning and Zoning Regular Meeting — Recommended approving zoning change on
5.5 acres from AO (Ag Open) to Industrial District (I).
July 24, 2017
Removal of over 330 gallons of flammable liquid from site (see attached invoice).
July 31, 2017
Compliance Letter from Jim Frodge, Code Compliance Officer, City of Bryan
Aueust, 2017
Met with Randy Haynes, Senior Planner, City of Bryan, and other city representatives
regarding contents of letter.
August 17.2017
Applied for Brazos Co. salvage permit
September 8.2017
Contacted Schultz Engineering for a proposal for a Site Plan and services to comply with Jim
Frodge's Compliance Letter.
October 2, 2017
Signed contract with Schultz Engineering for Site Plan.
October 6. 2017
Contacted Dudley Engineering for building inspection and received proposal.
October 10, 2017
Attended Brazos Co. Commissioners Court for approval of county auto salvage license.
October 31, 2017
Site visit and initial consult with Dudley Engineering.
November 10, 2017
Site Plan delivered by Schulz Engineering detailing a total project cost of $366,432!
BRYAN AUTO RECYCLING, SALES & GLASS, LLC
Timeline of Events and Action
Thursday, August 16,2018
December 19 2017 and other dates throughout December, 2017
Meetings with the Mosavis, Deven Doyen, P.E., with Schulz Engineering, Randy Haynes,
and Cody Cravatt, Development Manager, City of Bryan, to discuss plans of action and
timeline to attack compliance of each issue.
January 15, 2018
Further removal of flammable liquids (see attached invoice).
March.2018
Spoke with Randy Haynes and told him that Mike Mosavi is crushing cars to raise funds and
finance the Site Plan and compliance with issues.
Februarv. 2018 -August. 2018
In order to pay for the Site Plan construction, Mike began to crush his inventory (cars) which
he has been doing from February through August (see attached Driver load reports from M.
Lipsitz & Co.). These copies show the range of dates but not the total amount of cars
crushed. In total over 1,200 cars were crushed, leaving a current inventory of less than 100
cars.
July, 2018
Contacted Schultz Engineering to begin engineering the extension of a water line from the
closest City connection (see attached e-mail). Schultz is completing drawings to submit to the
City for approval and construction will begin after approval.
August 14.2018
Final removal of all flammable and hazardous liquids from storage tanks on site (see attached
invoice).
Page 2 of 2
r—
Vol. pg. �l�
SCHULTZ ENGINEERING, LLC.
911 Southwest Pkwy E,
College Station, Texas 14840
Firm No. 12327
MOSAVI
Prdiminnry Raswlnwr'¢ Rari.n"to..fr.,.. w,....a:.... »neon
Item
. Detmlplion UNt
Fadmated
It Prim
Total
. Genercl Dent
1
MobWadort, Gvedread and Cdnmttedm Staking
IS
t
S 40.000.00
Sop, ODQ
2
Brnsiw&Sdb=t Cmool- SWPPP BopleamWdw& Mainitamom, Silt ftncr.
m Mlt Rack Paw Dam en, compiem in piece
1S
1
$ SA00.00
SSMCom=l
3
Hydm-edand Hydnmelchaadratw wspcciBmdmt BCS329213.complminpiace
SY
3,300
$ IAO
$3,3 00
Gevmal It scbtotal
Fh?Jme Cons mctIcn D�Asphnh pavom g
4
Baravadmt & emffln , mmplee 1n place
is
I
3 8Amw
Am
5
Mhdng&incnpm tI-ofLine, 6" deep. moplee in place
SY
4,075
S 280
$11,411
6
HydtmdLhaq compiee In phm(VIWSY for 6"deep)
Too
55
$ 185DO
$10.178
7
Crushed Uneoone Han Mateiel-6"thick, mmplee in plece
SY
4,075
S 14.00
35744
8
HMAC-7hvDPavonmtl-12"mickovalay-inckdmprirnetatatmtttpteleinplate
SY
3A46
S 15M
$51,686
F&elme Cotwmcdon Items Asplmlt Pavaumt Soh
$733.;3
- Amoss Drive Conshuetion Item
9 Bammw-&Grading. co -plea in place
IS
1
$ WANOM)
$IOAOO
10 Misiag & blceapondm of Bee, 6" deep, mnpkee In pi.
SY
4.568
S 2.80
$12,7 90
11 114y&ud LJ=, nmptete in place (271Nsy for 6! deep)
Too
62
$ M,00
$11.408
12 Cnnhd Urnectmte Ban Mmaial - 6" tW X mmpleeein place
SY
3;897
S 13.OD
$50,655
13 24"HDPE PiM Nmt-Seocaffd Backftll, complee in plain
1F
, 80 is
50.OD
$400
Aran Ddve ConstrocBoa Items Subtotal
IaUldng Lotmd SulevntOt Caastmtlion Items
14 HMAC-7'ypc D pavemmt l -lir ddck overlay-inckWmpli= mat, amplee in place
SY
551 IS
13.00
37.169
15 6" Ronformd CooavePavwm w/Cndb =pktc In plug
SF
540
S 5.00
52,700
16 Remove ww aing Favomm. mnpbae m place:
SF
720
3 250
SI,800
17 ADA Rmtgn, mmpteeto piste
BA
4
S 650.00
52,600
18 Conmamgidewaik&Ramps-4'ddck, mmpieeinpine
SF
830 IS
4.80
$7.984
NrMng Lot and Sidewalk Constmotion Item Sob W tal
Page i of 2
•il �9. l7 y'!"3
I
I,
MOSAVI
FIRM 1 12327'
SCHULTZ EMtINCE141NQ. LX
"Not Included in this Estimate:
1.) Paddng Lot Striping Bt Signage
2.) Lantlsfaping
3.) Electrical Improvements
4.) Building Improvements
Now:
General Items Sublets[
Flrelane Construction Items Aspham Favemud
Acces;DAve Conslacd® Renis
PazWngUt and SidewalkComtnmdon It, Subtotal
Water Construction 112019 Subtotal
Detention Pond Construction Ftsubtatal
10% Contingency
TOTAL.CONMUMON
The above construction estimate is based on quantities from a preliminary
layout of the subdivision and the engineer's opinion of probable construction
costs. During design and construction, additional features may become
apparent as the work progresses, which will -result in an increase or decrease
in cost.
Page 2 of 2
g.
IVol.
31,30
13831
S&M
18,253
36.955
62,WD
39,512
Description Unit
PaWatN
ihdt Rice
T.W
Water Construction Items
27
Site PrgmWm complae in place
1S
l
$ IS(DJD
51,500
28
Motdli ntioic Overhead and Camking
troution Staking.
1S
1
S T,SWAO
S$.50p
29
30
broom ascolmemt Control- SWPPP Implatmtation&Meimanamce, Sia Faire, F uD
Cossanction Ent. Rock am ktek
HydrosmdXdHydrormilcbmdFatilbapwapedficatim BCS329213.wmplmiaptace
IS
ST
1
3,200
$ 1500.00
$ 1.00
SI,50
$3,200
31
Remove and nBdace facing, completing in place
is
1
S 500.0
SSW
32
8°PVC DR -14, f5WWater Plpew/04=wbe- NonSot WM-4 Baidi0. compkte m plan,
1.F
572
S 3000
577,160
33 18"x
6° MJ. Teo umoplae in place
IIA
1
S 50DA0
5500
34
Fee HydratAnombly(whatm vac earmd o), eompide in p�
PA
1
$ 3.750A0
35 -
2"BlawaffAssembly,cmnpieleinpiece
PA
1
S 150DA0
� SIS
36
B"MJ. Cate Valve; wmpktein place
BA
I
S 1"730.00
SI,350
37 S" a 22-V MJ. Send, complete In place
BA
1
$ 425.0
$4
38 Comixt m lusting 6"Water line -
BA
1
S IStM
S1.5W
39 Watafine Testing ...... - -
1S
_
I
S LOW.00
51,000
Wats Comtrnrlion ItrmsBnblo
' Dmotion Pond Coawvetl® Iteoa
40 Pond & Drainage Excavation and OmNn& compiew in plaro
1S
I
S 35,00.00
S35.00(
41 Pond Ouda Structure, complete in place
FA
I
S 5AM.00
55,00
42 CoacraeFiume-VMdr.wmpleteinplace
SP
1500
$ 6.W
59,000
43 24"HDFBPipo- Stmcuval ltwj rq compiete in pince
LF
200
S 55.00
$11M
44
"- 4H:I V Coupe SET. cmoplete Inplex
PA
1
S 2,00.00
52,00
Detention Pond Construction Items Subtotal
S62AN
FIRM 1 12327'
SCHULTZ EMtINCE141NQ. LX
"Not Included in this Estimate:
1.) Paddng Lot Striping Bt Signage
2.) Lantlsfaping
3.) Electrical Improvements
4.) Building Improvements
Now:
General Items Sublets[
Flrelane Construction Items Aspham Favemud
Acces;DAve Conslacd® Renis
PazWngUt and SidewalkComtnmdon It, Subtotal
Water Construction 112019 Subtotal
Detention Pond Construction Ftsubtatal
10% Contingency
TOTAL.CONMUMON
The above construction estimate is based on quantities from a preliminary
layout of the subdivision and the engineer's opinion of probable construction
costs. During design and construction, additional features may become
apparent as the work progresses, which will -result in an increase or decrease
in cost.
Page 2 of 2
g.
IVol.
31,30
13831
S&M
18,253
36.955
62,WD
39,512
Deven
i l Water Line Construction Drawings
Jul 25, 2018 at 1:26:13 PM
Gina Mosavi
Joe Schultz
Gina,
Sorry if -has taken me so long to get back with you, we were waiting on a price from the
surveyor to prepare the easement needed for the water line. Below is a estimate of the
cost for us to prepare the waterline construction drawings and permit them through the
City.
Topographic Survey Allowance (By subcontractor) — $1000
Easement Preparation & Survey Allowance (By Subcontractor) _ $1800'
Waterline Construction Drawings and Permitting Allowance (By Schultz Engineering
Hourly) — $3250
We will also need any cars located in the area of the proposed waterline to be relocated
prior to the Topographic Survey. Let me know if you would like to proceed or give me a
call with any questions.
Thanks,
Deven Doyen, P.E.
Civil Engineer
SCHULTZ
911 Southwest Parkway East
College Station, TX 77840
(979) 764-3900 - Office
(979) 764-3910 - Fax
deven@schu Itzen g.com
ENGINEERING LLC
Preb minary - Structural Condition Assessment Report
2873 North Harvey Mitchell Parkway, Bryan, TX 77807
THIS REPORT HAS BEEN
AUTHORIZED FOR RELEASE BY
DREW S DUDLEY, P.E., LICENSED
TEXAS ENGINEER #123798 FOR
PURPOSES OF REVIEW AND
PRELIMINARY PRICING. THIS
DRAWING SHALL NOT BE USED
FOR PERMIT OR CONSTRUCTION.
I
Prepared by:
Drew Dudley, P.E.
Dudley Engineering LLC
11370 SH 30
College Station, TX 77845
TBPE Firm No- F-18677
(o) 936.666.0942
Prepared For.,
MIKE AND GINA MOSAVI
BRYAN AUTO RECYCLING SALES AND GLASS
Date:
9/26/2018
Table of Contents
ExecutiveSummary ...... ................................................................................................................................ 3
Scope of Work ...................................................
Background.................................................... ................................. ............................................................ 3
AreasNot in Compliance ............................................................................................................................... 4
Discussionand Recommendations ............................................................................................................... 5
Limitations................................................................................................... .................. .............................. 5
Z.
-P g.
Executive Summary
Dudley Engineering was engaged to perform a structural condition assessment of the Bryan Auto Recycling Sales
and Glass property structures. The results of our observations and analysis reveal the following:
• Building 1 and Building 1 Norpth Canopy will require substantial remedlation to be brought into code
compliance including adding new rigid frame, strengthening the existing rigid frames and adding
bracing.
• Building 1 West and South Canopies are beyond repair to bring into code compliance. We
recommend that they be removed_
• Building 2 can be brought into code compliance with relatively minor remediation.
• The Office building can be brought into code compliance with relatively minor remediation.
Although a number of items were found to not be code -compliant, the majority of the issues were related to their
ability to withstand a design wind event of 110 miles per hour (MPH). Under normal wind conditions (less than 20
MPH), the structures are stable as -is and are not a threat to life -safety.
We recommend that the remediations as outlined in the drawings and the report be completed in a timely manner
so that if/when a code -minimum design wind event occurs the buildings will maintain their structural integrity.
Scope of Work
Dudley Engineering's scope of work was to perform a limited, visual, structural condition assessment of multiple
structures on the property (reference site plan below). The assessment was to include the following:
Scope 1. Structural evaluation of primary structural frame and foundation for all (3) buildings to determine
whether the structure is sufficient to maintain structural Integrity under code -prescribed loading (2009
International Building Code (IBC))
Scope 2. Dimensioned and scaled floor plans for each building. The floor plans shall indicate exterior and
Interior walls, as well as doors and windows. Structural columns If visible will also be located.
Background
The Bryan Auto Recycling Sales and Glass property Is located at 2873 north Harvey Mitchell Parkway, Bryan TX,
77807. The buildings on the property consist of an Office, Building 1, Building 2, Building 1 South Canopy, Building 1
West Canopy and the Building 1 North Canopy. The office is a wood framed on cinder block piers. The other
structures are composed of steel framing construction.
Page ( 3
�1
Vol. C'� Pg. "-.2 /,%
Figure 1: Site Plan
Items Not in Compliance
The results from our structural analysis indicates that multiple steel members of Building 1 and Building 2
are inadequate for their current implementation per the 2009 IBC code.
Building 1 and Building 1 North Canopy:
• The steel pipe columns are not adequate to support the code minimum wind pressures.
• The roof purlins exceed the maximum allowable span for their size and loading.
• The wide flange beams in the rigid frames are subject to lateral torsional buckling and require
bracing.
Building 1 West Canopy:
The current structure has numerous members and framing conditions that will not support
code -minimum loading.
Building 1 South Canopy:
Building 2:
The current structure has numerous members and framing conditions that will not support
code -minimum loading.
The wide flange beams in the rigid frames are subject to lateral torsional buckling and require
bracing.
Page j 4
Vol:: P5 eZ 6
I
• The W10 beam on the western side of the north and south faces are inadequate to take the
code minimum wind pressures
The beam to column connection for the middle bay of columns is not adequate to transfer the
shear -and moment forces.
Office:
• The foundation is not anchored to the groundwhich is required to res&shear'and upliftloads
generated from the wind.
Discussion and Recommendations
Office Building
• The office Building needs to be anchored to the ground using earth auger anchors for wind uplift
-resistance.
Building 1
• Thebottom flange ofthe-W12 beams'needta be braced in order to provide adequate capacity to
the frame, refer to the structural drawings.
The pipe columns need to be stiffened to increase the moment capacity.
• The roof purlins need to be replaced or reinforced to increase their capacity.
As an alternative, new moment frames -need to be added to both reduce the load on
overstressed pipe columns and decrease the span of the purlins.
• The 8 -inch roof beams on the south canopy need to be reinforced or replaced.
• The west canopy would need extensive strengthening. Therefore, our recommendation is to
remove the.west canopy.
• Cable X -bracing needs to be added, refer to the structural drawings.
Building2
• Reinforcement of the moment connection by installing beam stiffener plates on the center beam
line of Building 2 (Reference Grid 2.2).
• The bottom flange of the W10 beams need to be braced in order to provide adequate capacity to
the frame, refer to the structural drawings.
• Acceptable methods for stiffening the W10X35 beams include the welding of a WT beam to the
inside web of the W10X15.
• Cable X -bracing needs to be added, refer to the structural drawings.
Limitations
Dudley Engineering offers no warranty regarding the condition of concealed construction or subsurface conditions
beyond what was revealed in our review. Any comments regarding.concealed.mnstruction or subsurfaceconditions
Page 15