Loading...
HomeMy WebLinkAbout2017-04-18 10:00AM REGULAR MEETINGBRAZOS COUNTY BRYAN,TEXAS NOTICE OF MEETING AND AGENDA 4'011 ITR 13 P 3 0U BRAZOS COUNTY COMMISSIONERS COURT THE COMMISSIONERS COURT OF BRAZOS COUNTY WILL MEET IN REGULAR SESSION ON APRIL 18, 2017 AT 10:00 AM IN THE COMMISSIONERS COURTROOM OF THE COUNTY ADMINISTRATION BUILDING, 200 SOUTH TEXAS AVE., SUITE 106, BRYAN, TX 77803 Invocation and Pledge of Allegiance - U.S. and Texas Flag - Chaplain G.H. Jones and Commissioner Cauley 2. Call for Citizen input and/or concerns Consider and take action on agenda items 3-16: 3. Acceptance from the Brazos Talent Initiative Committee of the Research Valley Partnership of a petition for Brazos County to establish a junior college district in accordance with Section 130 of the Education Code. 4. Request for approval of out of state travel for Jail Administrator Wayne Dicky to attend the Bureau of Justice Statistics 2nd Annual Jail Research Meeting in Aurora, Colorado April 25-26, 2017. Lodging, airfare and meals are paid by the Bureau of J ustice Statistics. 5. Acceptance of a donation from College Station Ford in the amount of $1000.00 to the Child Welfare Board for Rainbow Room purchases. 6. Approval of the job description for Class Code 0832, Position 12 - Temp. Attendant, Building & Grounds, for the Exposition Complex. 7. Permission to advertise RFP # 17-048 Emergency Notification System. 8. Approval to Amend the Brazos County Subdivision Regulations Fee Schedule (for various services). 9. The Final Plat of Duck Haven Subdivision Phase Nine (9); 12.816 Acres, Lots 1-9, Block 10; B. McGregor Survey, Abstract 170; City of College Station ETJ, Brazos County, Texas. Site is located in Precinct 1. 10. Consider and take action on the W ickson Creek Special Utility District utility permit to construct a road bore for a 2 inch water line crossing under Marcy Lane 230 feet southeast of SH 30. Crossing will be encased and be a minimum of 36 inches under the bottom of the ditch. Work is being done to repair an existing crossing. Site is located in Precinct 2. 11. Consider and take action on the W ickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Tonkaway Lake Road 1 mile northwest of William D. Fitch Parkway. Crossing will be encased and be a minimum of 36 inches under the bottom of the ditch. Line will provide service to customer at 14034 Tonkaway Lake Road. Site is located in Precinct 2. 12. Messina Hof Wine and Roses Half Marathon and 5K Event scheduled forApril 23, 2017 which will require roadway lane closures on Old Reliance Road, Wallis Road and Carrabba Road. Area Wide Protective (formerly N -Line) will provide traffic control assistance during this event. Site is located in Precinct 2. 13. Tax Refund Applications for the following: • a. Robert & Robin Gutierrez - Overpayment $30.00 • b. Petrobella Energy- Overpayment $43.52 • c. Edward Emile Pierce -Overpayment $14.92 • d. Reverse Mortgage Services -Overpayment $23.32 14. Budget Amendments. Budget Amendments FY 16/17 29.1 -29.3 15. Personnel Change of Status. Personnel Action Forms 16. Payment of Claims. 17. Sheriffs report on inmate population. 18. Announcement of interest items and possible future agenda topics. 19. Call for Citizen input and/or concerns 20. Adjourn. Vol. a2.'/ Pg. A PUBt1C COMMENTS Public Comment during the Commission Meeting may be for all matters, both on and off the agenda, and be limited to four minutes per person. Persons are invited to submit comments in writing on the agenda items and/or attend and make comment at the Commission meeting. Members of the public are reminded that the Brazos County Commissioners Court is a Constitutional Court, with both Judicial and legislative powers, created under Article V, Section 1 and Section 18 of the Texas Constitution. As a Constitutional Court, the Brazos County Commissioners Court also possesses the power to issue a Contempt of Court Citation under Section 81.024 of the Texas Local Government Code. Accordingly, members of the public in attendance at any Regular, Special andlor Emergency meeting of the Court shall conduct themselves with proper respect and decorum in speaking to, and/or addressing the Court; in participating in public discussions before the Court; and in all actions in the presence of the Court. Those members of the public who are inappropriately attired and/or who do not conduct themselves in an orderly and appropriate manner will be ordered to leave the meeting. Refusal to abide by the Court's Order andlor continued disruption of the meeting may result in a Contempt of Court Citation. It is not the intention of the Brains County Commissioners Court to provide a public forum for the demeaning of any individual or group. Neither Is it the intention of the Court to allow a member (or members) of the public to insult the honesty andlor integrity of the Court, as a body, or any member or members of the Court, or County employees, individually or collectively. Accordingly, profane, insulting or threatening language directed toward the Court and/or any person in the Court's presence and/or racial, ethnic or gender slurs or epithets will not be tolerated. Violation of these rules may result in the following sanctions: 1. cancellation of a speaker's time; 2. removal from the Commissioners Court; 3, a Contempt Citation; and/or 4. such other and/or criminal sanctions as may be authorized under the Constitution, Statutes and Codes of the State of Texas. The County Commissioners Court can deliberate or take action only if a matter has been listed on an agenda properly posted prior to the meeting. During the public comment period, speakers may address matters not listed on the published agenda. The Open Meeting Law does not expressly prohibit responses to public comments by the Commissioners Court. However, responses from the County Judge or Commissioners to unlisted public comment topics could become deliberation on a matter without notice to the public. To ensure the public has notice of all matters the Commissioners Court will consider, the County Judge and/or Commissioners may choose not to respond to public comments, except to correct factual inaccuracies, recite existing policy in response to an inquiry or to ask that a matter be listed on a future agenda. See Texas Open Meetings Act Section 551.042. INVOCATION Any invocation that may be offered before the official start of the Court meeting shall be to and for the benefit of the Court. The views or beliefs expressed by the invocation speaker have not been previously reviewed or approved by the Court and do not necessarily represent the religious beliefs or views of the Court in part or as a whole. No member of the community is required to attend or participate in the invocation and such decision will have no Impact on their right to actively participate in the business of the Court. The Commissioners Courtroom of the County Administration Building, 200 South Teras Ave., Suite 106, Bryan, TX77803 is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive services must be made two working days before the meeting. To make arrangements, please call (979) 361-4102. Vol. aZ MINUTES APRIL 18, 2017 BRAZOS COUNTY COMMISSIONERS COURT REGULAR MEETING A regular meeting of the Commissioners' Court of Brazos County, Texas was held in the Brazos County Commissioners Courtroom in the Administration Building, 200 South Texas Avenue, in Bryan, Brazos County, Texas, beginning at 10:00 a.m. on Tuesday, April 18, 2017 with the following members of the Court present: Duane Peters, County Judge, Presiding; Steve Aldrich, Commissioner of Precinct 1; Sammy Catalena, Commissioner of Precinct 2; Nancy Berry, Commissioner of Precinct 3; Irma Cauley, Commissioner of Precinct 4; Karen McQueen, County Clerk, Absent. The attached sheets contain the names of the citizens and officials that were in attendance. 1. Invocation and Pledge of Allegiance - U.S. and Texas Flag - Chaplain G.H. Jones and Commissioner Cauley 2. Call for Citizen input and/or concerns Karen Hall who resides at 6111 Highway 21 East , Bryan, Texas addressed the Court. Ms. Hall is retired but works part-time at Blinn College. Ms. Hall questioned ballot access. She said that it is required that the petition is circulated by each individual and each signature be notarized. Ms. Hall mentioned that the Libertarians lost ballot access and had to get signatures to get back on the ballot. She asked the Court if there is an exemption for this type of petition. Ms. Hall also asked that the Court consider delaying approval of the petition until the requirements can be determined. Ms. Hall thanked the Court for continuing to offer citizen's input at the beginning and end of the agenda. She Vol. said it is frustrating to hear something in a meeting and then have to wait until the next meeting to speak about it. Consider and take action on agenda items 3-16: 3. Acceptance from the Brazos Talent Initiative Committee of the Research Valley Partnership of a petition for Brazos County to establish a junior college district in accordance with Section 130 of the Education Code. Commissioner Cauley offered a motion to remove this item from the agenda. The motion was seconded by Commissioner Berry and passed unanimously. Judge Peters mentioned to Karen Hall that he would address her concerns with the Research Valley Partnership. Motion: Remove, Moved by Commissioner Irma Cauley, Seconded by Commissioner Nancy Berry. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 4. Request for approval of out of state travel for Jail Administrator Wayne Dicky to attend the Bureau of Justice Statistics 2nd Annual Jail Research Meeting in Aurora, Colorado April 25-26, 2017. Lodging, airfare and meals are paid by the Bureau of Justice Statistics. Commissioner Cauley said she would like to commend Wayne Dicky for representing Brazos County very well. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner Nancy Berry. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 5. Acceptance of a donation from College Station Ford in the amount of $1000.00 to the Child Welfare Board for Rainbow Room purchases. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner Nancy Berry. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 6. Approval of the job description for Class Code 0832, Position 12 - Temp. Attendant, Building & Grounds, for the Exposition Complex. A copy of the job description is attached. Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Steve Aldrich. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. Permission to advertise RFP # 17-048 Emergency Notification System. rV ol. _a.)�� Pg. W Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner Irma Cauley. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley Peters. 8. Approval to Amend the Brazos County Subdivision Regulations Fee Schedule (for various services). A copy of the amended Subdivision Regulations Fee Schedule is attached. Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Steve Aldrich. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 9. The Final Plat of Duck Haven Subdivision Phase Nine (9); 12.816 Acres, Lots 1-9 Block 10; B. McGregor Survey, Abstract 170; City of College Station ETJ, Brazos County, Texas. Site is located in Precinct 1. Judge Peters offered a motion to remove this item from the agenda. The motion was seconded by Commissioner Berry and passed unanimously. Motion: Remove, Moved by County Judge Duane Peters, Seconded by Commissioner Nancy Berry. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 10. Consider and take action on the W ickson Creek Special Utility District utility permit to construct a road bore for a 2 inch water line crossing under Marcy Lane 230 feet southeast of SH 30. Crossing will be encased and be a minimum of 36 inches under the bottom of the ditch. Work is being done to repair an existing crossing. Site is located in Precinct 2. Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 11. Consider and take action on the W ickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Tonkaway Lake Road 1 mile northwest of William D. Fitch Parkway. Crossing will be encased and be a minimum of 36 inches under the bottom of the ditch. Line will provide service to customer at 14034 Tonkaway Lake Road. Site is located in Precinct 2. Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 12. Messina Hof Wine and Roses Half Marathon and 5K Event scheduled for April 23, 2017 which will require roadway lane closures on Old Reliance Road, Wallis Road and Carrabba Road. Area Wide Protective (formerly N -Line) will provide traffic control assistance during this event. Site is located in Precinct 2. Vol. '—p(J Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Steve Aldrich. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 13. Tax Refund Applications for the following: • a. Robert & Robin Gutierrez- Overpayment $30.00 • b. Petrobella Energy -Overpayment $43.52 • c. Edward Emile Pierce -Overpayment $14.92 • d. Reverse Mortgage Services -Overpayment $23.32 Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner Irma Cauley. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 14. Budget Amendments. Budget Amendments FY 16/17 29.1 - 29.3 29.1 To recognize donated funds from College Station Ford to the Child Welfare Board. 29.2 To recognize donated funds from State -Aid Supplement Grant to the Juvenile Department. 29.3 Transfer funds from Non -Departmental to Information Technology. Motion: Approve, Moved by Commissioner Nancy Berry, Seconded by Commissioner Steve Aldrich. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 15. Personnel Change of Status. Personnel Action Forms A copy of the Personnel Change of Status requests is attached. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner Nancy Berry. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 16. Payment of Claims. Claims 7154682-7154920 Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Steve Aldrich. Passed. 5-0. Ayes: Aldrich, Berry, Catalena, Cauley, Peters. 17. Sheriff's report on inmate population. Sheriff Chris Kirk stated there were 657 inmates in jail, 571 inmates are male and 86 are female, 60 have electronic monitors and 21 are pending for monitors. 18. Announcement of interest items and possible future agenda topics. There were no announcements. 19. Call for Citizen input and/or concerns Bill Ballard introduced Bruce Erratt to the Court. Mr. Erratt was approved on agenda item number fifteen (15) as Civil Counsel for the Court. 20. Adjourn. sol. psi Pq.aZsz_� The foregoing minutes of the Commissioners Court meeting held April 18, 2017 have been examined and are approved in open Court this U_ day of 2017, in Bryan, Brazos County, Texas. Duane Peters Steve Aldrich County Judge Commissioner, Precinct 1 aW4647 Sadmy Cat ena Commiss ner, Precinct 2 Commissioner, Precinct 4 Attest 9ra-1-1 Azl z4v'-� Karen McQueen County Clerk N2YA-i— Nancycy Berry Commissioner. Precinct 3 b'ol. _dZs� Pa._o2 /�� Pg-J�ofA BRAZOS COUNTY COMMISSIONER'S COURT i(s�k DAY OF ' J , 20 r� lc)..co A /PM, Name (PLEASE PRINT) KAR c 1V J A -L -L cv� INnn��o/' Gu'��nfiN- Llr- 01LY'C101-� IftV►-,\ Organization (PLEASE PRINT) M1,4 l�l�crM C.0". aAn 15 c6,1 P2 b- of BRAZOS COUNTY COMMISSIONER'S COURT DAY OF i 0"-0° rAAM PM, Name I\/ ((I . 'I, d.c,7�: VIA � ���� � �t S WIL-ki 20 1-7 Organization (PLEASE PRINT) 0o.RI4 Vol. BRAZOS COUNTY, TEXAS ACCEPTANCE OF DONATED/AWARDED PROPERTY 9 DONATION OF COUNTY PROPERTY Date: 417/17 QAcceptance of Donated/Awarded Property ❑ Donation of county Property (Awarded property requires signed court documentation) ❑Acceptance of Donated Inmate Property (Requires signed inmate documentation —NO VALUE ASSESSED) Item Description: Check Please provide all information requested below as applicable to the property being accepted or donated. Forms containing any blank fields will be returned for completion. Make: Model: Year: SNNIN 4 ❑ Functional ❑ Non -Functional. Explain if Non -Functional Additional Description/Information: Donation from CS Ford to CWB for Rainbow Room purchases Estimated Value: $ 1,000.00 Checkthe appropriate account based on estimated value of property being accepted: Q 61235000 (Donation - Other) - 60010000 (No ther)- 60010000(No Asset Tag -Under S500) ❑ 67010000 (Minor Property -$500-$4999) ❑ 80010000 (Capital Property - Over $5000) Check box for Capital Asset (value/milial cost is over $5000) Check the appropriate entity property donated to: Government Entity: Organization Name Other (Due to Statuatory requirements prior approval is required by Purchasing: Organization Name — Other to be used for funds donated to Brazos Countyfor use ofa non -county expenditure. I certify that the above mentioned item has been donated or awarded to Brazos County. This item has been received in good faith and upon approval by Commissioner's Court will become a part of the General Fixed Asset Account of Brazos County. The determination to accept or reject the donation will be made at the sole discretions of Commissioners Court based upon such things as usefulness, projected operating, maintenance and insurance costs. Requesting Department: Auditors Office `Cs�-SZGt_ .CY— Department Name Authorized Signature Organization Receiving Donated Property: Authorized Signature AZedby C Ethis 1 day of Commissioners Court Approval I Brazos County Job Description Last. Updatted, September 2012 Te.pbld Rartslon U MI M012 Class Number. 832 lltle:- 'Aftendatht, Building & Grounds (104D his.) Temporary 0 Pay Group -09 Department: Exppsltlorv(Compl" FLSA Status: Non Exempt Reports To: Event Cobrdinators & All Managers Approved 10/0112,016' 1 EEOC Category: Service 1 MaIntenance Position End I)ate; 09/21012017 Temporary Employee. Signature; 7 IX GenoraVShu L Porforms�iind monitors daily operational responsIbiliftles-InClUding janitorial duties, responsibilities and maintenance of the Brazos Cou n ty. Exposition i -Coinnexi I Includin . g . se(flng.ulp, cleaning and.tortring-dowo rivaift Essentlal;Duties: .7-7 bp6rate0litht f6-m6dWra-t6-e—qu�l—p—m'e-i-ni--suc-6-,-a-s- skid wbr ---r Operates also is6rils..caltle lies; -'panels and pens; :Sets: upitears down meeting and ,event rooms, -Including stages; clance,floors, tables, chairs and equIlpment and- -.assIss1w11h_1hG soundlefecttl6l'systern setup andtor-tear.down; Cleans meeting andevent.rooms, Including sweeping; vacuuming and taking out I trash; Cleans nasfrocinis;'16cj6aj�g!uslng c6mmbrclal,damhials to remove slainsiodoisahil gicupi them free of lilter>buffs a6dkrubs floors as I nnAd.H;hnH lnm'n&.H- K,.nnq nil hnom dijntM innnned Wnd-vAcunmad- Chanomi llaht bulhsand cilstribuias.sucolles as nacessarV: Assists in I is janitorial and storage,areas clean -and organized; Mus Mo.,' Communicates with Exposition Complex administa Inventory control Including equipment and consumables. 1. .. _ -------- I_ - - _. - _. ___ :. J _ -, __ __ - - __ -, __ _. __ - - _ ____ _ -.- __ _. __ _ - --------- - - ---- Education, Required: Hlglschool graduation or its equ valent: or any equivalent cornblnatioWoed ucatton and experience that providds the r6 r qulred knowledge ,'sRlii,end ablitlos. Preferred: — --- — -------- 16 Vol. Pa.0277 Physical Demands Typical: i Knowledge, Skills, & Abilities Work Environnient .— ----- ----- The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations maybe made to enable Individuals with disabilities to perform the essential functions. While performing the duties of this job, the employee Is regularly required to sit; use hand to finger, handle, or to feel; reach with hands and arms; bend and kneel; and talk and hear. The employee frequently is required to stand and walk. The employee must frequently lift and/or move objects weighing up to 100 pounds, such as bags of mulch and rocks. Specific vision abilities required for this job Include close vision, distance vision, and the ability to adjust focus. ......................... ................. _............ ._....... __111.. 1 _.11.1.1.. . Typical' Safe operalion of custodial and maintenance equipment, Including the sate use of commercial cleaning chemicals. Ability to follow oral and written instructions; ability to learn the proper use of fanitorlat equipment and supplies; ability to make minor repairs; ability to communicate and work effectively with co-workers; ability to perform physical and strenuous work; and an ability to understand and follow Brazos County safely policies. Typical; 1 The work environment characteristics described here are representative of those an employee encounters 1 whllo performing the essentlal functions of this job. Reasonable accommodations may be made to enable j individuals with disabilities to perform the essential functions. The noise level in the work environment is frequently loud. The employee is constantly required to work closely with others as a part of a team to perform i multiple tasks simultaneously, and switch from one task to another, The employee Is frequently required to work under time pressures end meet deadlines. The employee may be exposed to extreme weather conditions. APP VED Duane Peters Date County Judge BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridge DEPT. NUMBER 56001000 DATE OF COURT MEETING: April 1 S, 2017 ITEM: Consider and take action on approval to Amend the Brazos County Subdivision Regulations Fee Schedule (for various services). SOURCE OF FUNDS: N/A NOTES/REQUIREMENTS: Change pertains to the addition of a Permit for Commercial Development Outside the Flood Plain and Fee. SUBMITTE BY: R. Alan Munger, P. - County Engineer This Request is ACKNOWLEDGED BY: Steve Aldrich Cr, Precin ssi n Sy Cata na Commissio er, Precinct 22 Nancy Be Commissioner, /DENIED [ ] by Commissioners' Court E. Duane Peters, County Judge PLATTING SERVICES (Plus Public Notice Fees) Brazos County Subdivision Regulations Fee Schedule March 1, 2017 January 1, 2018 Preliminary Plan $150+$5 per lot $150+$10per lot Final Plat $150+$10 per lot $200+$20 per lot Amending Plat $100 $100 Simplified Final Plat $100 $100 Replat $150 $200 Vacation of Right -of -Way / Easements $100 $100 Variance Request $0 $0 npvF1 nPMFfdT AN O INSPFCTION SERVICES Driveway Culvert Permit New Residential Private Install $100 Private Install $100 Existing Residential (includes modifications, i.e. extra pipe, etc.) Private Install $50 Private Install $50 New Commercial $100 $100 Existing Commercial (Includes modifications, i.e. extra pipe, etc.) $50 $50 Subdivision Construction Inspections 0.5% of Infrastructure Cost 1% of Infrastructure Cost Re -Inspection Fee $50-$100 $50-$100 nN-CITE GFPTIr FArI1 [TV PERMIT SERVICES Residential See Brazos County Health District See Brazos County Health District Commercial See Brazos County Health District See Brazos County Health District Modification See Brazos County Health District See Brazos County Health District Re -Inspection See Brazos County Health District see Brazos County Health District OTHER Floodplain Permit Single -Family Lot outside of Floodplain $20 $20 Single -Family Lot within floodplain $100+Bond $100+Bond Non-Single-Fam/Commercial Outside Floodplain $100 $100 Non-Single-Fam/Commercial Within Floodplain $500+ Bond $500+ Bond Manufactured Home Parkin Floodplain $100 $100 All other Developments in Floodplain (paving, storage sheds, pools etc.) $100 $100 Junk/Auto-Salvage/Wrecking Yards Permit $25 $25 Subdivision Construction Inspections 0.5% of Infrastructure Cost 1% of Infrastructure Cast Re -Inspection Fee $50-$100 $50-$100 Pipeline Crossing Permit $500+ Bond $500+ Bond Plan Review for Commercial Development $300.00 $300.00 Infrastructure Development Plan For Manufactured Home and W Parks) $200+$10 per lot $200+$10 per lot Copy of Plat (24x36) $20 per page $20 per page County Roll Map (24x36) $15 per page $15 per page County Roll Map (36x48) $20 per page $20 per page Cost of Public Notifications Varies Varies Tax Certificates for Platting See Tax Office Rates See Tax Office Rates Brazos County Subdivision Regulations I Vol.pg. -� �� I Page 89 BRAZOS COUNTY 10 COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: April 18, 2017 SUBJECT: Utility Permit — Wickson Creek Special Utility District Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 2 inch water line crossing under Marcy Lane 230 feet southeast of SH 30. Crossing will be encased and be a minimum of 36 inches under the bottom of the ditch. Work is being done to repair an existing crossing. Site is located in Precinct 2. SUBMITTED BY: �a,d b. WL, Darrell W. Kohves Right of Way Agent ED BY: Precinct 2 This request is,�l'APPROVED / ❑ DENIED by Commissioners' Court Duane Peters, County Judge DATE:0 vi COMMISSIONER COURT MINUTES OF APRIL 18, 2017 ARE CONTINUED IN VOLUME 252 PAGE 1 Vol. «Z3 / COMMISSIONER COURT MINUTES OF APRIL 18, 2017 ARE CONTINUED FROM VOLUME 251 Voi. Asa =pg. -z-- APPLICATION FOR WATER UTILITY PERMIT DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS Pursuant to the Texas Utility Code, Section 181.024, comes now WICKSON CREEK SPECIAL UTILITY DISTRICT [company name], hereinafter referred to as "Company" a TEXAS UTILITY [slate] Corporation, with authority to transact business in Texas, acting by and through its duly authorized representative, and hereby petitions the County Engineer for the right to lay, construct, maintain, repair and/or operate a gas facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached hereto and said location described as follows: Facility to Cross Road Length of TYPE OF CONSTRUCTION Road Name & Block Number Crossing CHECK ONE) Bored Jacked Driven Cased MARCY LANE 30' X X Facility to Parallel County Road Within Right -Of -Way Road Name and Block Number From To Depth Distance CONSTRUCTION TYPE Diameter Wall Thickness 4" Encasement Pipe Material Specification PVC Maximum Operation Pressure 80 PSI The location and description of the proposed installation and appurtenances must be fully shown on the attached detailed drawings. The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and shall complete said construction /work within 1 working days. (COMPANY MUST FILL IN). If such construction is not begun by the 60th day, Company will be required to apply for a new permit. Company declares that prior to filing this application, it has ascertained the location of all existing utilities, both aerial and underground, and the filing of this application is prima facie evidence that the proposed installation will not conflict with any existing utility. A copy of this permit shall be kept at the job site any time work is being performed. It is expressly stipulated that this Permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or vest any property right in said holder. It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the County's right, title and interest in the land to be entered upon and used by the holder and the holder will at all times assume risk of and indemnify, defend and save harmless Brazos -County -front -and -against -any- all loss, damages, cost or expense arising in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights and privileges. Any deviation from these specifications must be approved by Brazos County Engineer's Office or its designated representative. Approval of County Engineer's Office may take as long as two weeks after complete application is received. Applicant agrees to comply with all rules of the County Commissioners and the County Engineer in construction of said installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated herein for reference. In the evert Company jails to obtain a perrrtit prior to the installation or does not install utilities in compliance ivith installation requirements set forth herein (i.e. depth, location, etc), Company assumes all financial responsibilityfor damages and/or destruction of lines, cables, etc. based upon its failure to comply with Brazos County requirements. Applicant agrees that if Brazos County demonstrates a violation of the terms of this policy, Applicant stipulates that requisites for injunctive relief exist and that Brazos County is entitled to relief enjoining any conduct by applicant which is contrary to the policies. This permit is a revocable permit Brazos County reserves the right to revoke this permit at any time, in the sole discretion of Brazos County, for interests of pablic health, safety or welfare, or for failure to repair any damages upon deniand, or for any other reason deemed sufficient by Brazos County. In the event Company fails to comply with any or all of the requirements as set forth herein, the Cornrty may take such action as it deents appropriate to compel compliance. The County Engineer fiu-ther retains the right to revoke this permit by verbal notification to the Applicant/Conipany. Failure to obtain this perrrtit and/or notify the County Engineer's Office within 24 hours of beginning construction shall constitute grounds for jab shutdown. By signing below, 1 certify that I am authorized to represent the Company listed below, and drat the Company agrees to the conditions/provisions included in this permit. wTrxcr)N CBFFK .Sill) Cc?any any Namewr e By /K�/ Signature f r.NFRAT NIANAGER_ Title P.O. BOX 4756 Address RRVAN TX 77805 City State Zip (979)589-3030 Phone Number Email: ^ F-01- �� Pg. t3 _ WATER UTILITY APPROVAL Brazos County offers no objection to the propos/ed location of the utility in the County right of way as shown by accompanying drawings and notice dated 4 —, "r—n except as noted below: EXCEPTIONS: nw� (Month/Day/Year) Q,JJ 0 - W, 4,.- Brazos County Engineer [Vol..J Pg. rJ H IG HT -O F-IMON AVWr 0-14CJIH rn C� C x O � Vol. 3c)) W -I C7 F CJJ m C) O Z AVWr 0-14CJIH rn C� C x O � Vol. 3c)) Vol. pg. v BRAZOS COUNTY ROADWAY SAFETY AND ROAD PRESERVATION STANDARDS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY A. General Requirements 1. Adequate drainage shall be maintained in ditches at all times. 2. Permittee will use best management practices ("BMP") (EPA and TCEQ both provide lists of examples of BMPs) to minimize erosion and sedimentation resulting from the proposed installation. 3. The permittee shall take precautions to avoid damage to property. All County Right of Way and property shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or appointed representative. 4. The construction and maintenance of such utility shall not interfere with the property or rights of a prior occupant. 5. Permittee shall not interfere with other utilities located in the right of way. In the event damages occur, permittee will be liable to the County or other utilities running through the right of way. 6. County Engineer shall determine whether or not permittee's plans shall inconvenience the public. If it is determined that inconvenience to the public exists, then the County Engineer will decide whether such project will be allowed or if an alternative exists so as not to inconvenience the public. B. Safety Requirements 1. Proper traffic control measures must be put in place prior to beginning work and remain in place during the duration of the job. All traffic control measures must follow the Texas Manual of Uniform Traffic Control Devices (TMUTCD). See Traffic Control Requirements below. 2. During construction, all safety regulations of the Texas Department of Transportation shall be observed. 3. Permittee must take such precautions and measures, including placing and displaying safety devices, as may be necessary, in order to safely conduct the public through the project area. Company shall provide flagmen, signs, signals or devices necessary to provide complete safety to the public. 4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. 5. No cable, conduit and/or pole line shall be laid, constructed, maintained and/or repaired so as to constitute a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved by the County Engineer. _— —C_Traf>icCantroLPlan 1. A traffic control plan, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided for the following: a. Any construction (i.e. pit, excavation, hole) left open overnight, requires specific nighttime traffic control measures pursuant to the TMUTCD; - ------------------ --- Vol. _oT ✓�� Pg. -7 -- b. If construction is within ten (10) feet of the roadway; or c. Any work performed in the road right-of-way; 2. Plan must be attached to the permit and kept at the job site anytime work is being performed. 3. Plan must set forth the time of completion for the job. D. Design Standards 1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation and the pole be placed in the designated area for power specified as set forth in the Texas Utilities Code, Section 181.045. 2. All pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure safety to the public. Any pole placed in violation of this requirement will be required to be moved to the appropriate location at the company's expense. Exceptions may be approved by the County Engineer. All underground installations shall (these are minimum depths — utility may place deeper): a. be placed at a minimum depth of forty-eight (48) inches below the top of the pavement; b. be at least thirty-six (36) inches below ditch flow line when installation is within the area measured from top of bank to top of bank; c. be at least forty-eight (48) inches below ditch flow line if low pressure gas or petroleum lines. For high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below; d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of way of less than 60 feet. 4. Water Lines: All water lines must be a minimum 36 -inches below the ditch flow line and cased. Waterlines shall be cased if crossing under the roadway. 5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within designated locations based upon the type of utility. The locations shall be as follows: (measured from back of right-of-way). Power— 0 to 2 feet, nominally P Phone — 2 to 4 feet, nominally 3' Gas — 4 to 6 feet, nominally 5' Cable — 6 to 8 feet, nominally 7' 6. Utilities with less than 60 feet right-of-way in all new developments shall install die utility in a similar manner as referenced in No. 3 above; however, the County Engineer or its designated representative will provide final approval of each utility location. 7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longer than 400' if left open over night or unattended. 8 crossings-under-a-county-roadshall -- ----- - a. be bored or jacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT; b. be pressure grouted for the full length of the crossing iJthe annular space between pipe and casing and soil exceeds one (1) inch. Brazos County must be given 24 hours notice of pressure grouting operations and have the opportunity to have an inspector on site to observe pressure grouting operations; vol. __,91Z - _ Pg --O c. TxDOT Standard Specification Item 476 shall be followed for all boring, jacking, tunneling andjoints. 9. Bore Pits, a. no pits shall remain open longer than 2 days; b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above. c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from the County Engineer or his representative; d. when pits are to remain open for more than 8 hours, due diligence will be used in protecting the spoil pile to prevent drainage problems; e. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity; f, based upon soil conditions, the County Engineer or his representative may require pits be placed further from the edge of road. 10. Any installation within ten (10) feet of edge of pavement shall meet the following: a. location must be approved by the County Engineer or his representative h. backfilled with cement stabilized material. c. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity. d. all excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed during a rainy period or at other times where excess water cannot be prevented from entering the trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized material as soon as weather permits; e, all disturbed base and pavement materials shall be removed and restored to the satisfaction of the County Engineer or his representatives. f. no side or lateral tamping to fill voids under the base and pavement materials is allowed. 11. Company must be careful to not jeopardize the slope or integrity of the shoulder of the road. In the event Company damages the slope, shoulder or any other portion of the right-of-way, Company will be responsible for repairing the damage and replacing the right-of-way to the condition it was prior to commencing construction. 12. Operation of construction and/or maintenance equipment on the traveled surface of any improved County road will not be permitted, except in an instance whereby the laying, construction, maintenance and/or repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided meeting TMUTCD requirements. 13. In the event said construction and/or maintenance and/or repair requires Company to remove, cut or jeopardize any section of the road (asphalt, cement, road base, etc.), Company will be required to provide a performance bond or letter of credit securing necessary repairs. Said bond amount will be determined by the County Engineer. 14. The applicant shall submit a letter of "No Objection" from the Army Corps of Engineers for all designated wetlands and environmentally sensitive lands. E. Eneereencp work 1. In the event Company is required to perform emergency services, that requires excavation in a County Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Company Pg.__9 l�_ shall notify County Engineer within 24 hours of beginning construction/repairs. This will allow the County Engineer's Office an opportunity to inspect the site to ensure the integrity of the County Right of Way and traffic safety controls used. F. Repairs to existine facilities 1. Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the soil, shall not be performed until plans describing such maintenance and/or repair have been approved by the County Engineer or its designated representative and a permit has been obtained. G. Relocation of utilities 1. When and if the County Engineer determines that it is necessary for the construction, repair, improvement, alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or other facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated thereon, as required by the County Engineer within a reasonable time as determined by the County Engineer and Utility Company, and at the expense of the Utility Company. H. Hien Pressure Pipelines 1. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining to controlled access or non -controlled access installations, should contain the following additional information in the description of the permit. -diameter -wall thickness -material specification -minimum yield strength -maximum operation pressure of the pipeline 2. With the exception of the maximum operation pressure of the pipeline, this information is to be supplied for both the carrier pipe and the casing. 3. Assurance must also be given that the installation material and design meet the minimum Federal Safety Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed by an authorized representative of the company. 4. Petroleum Pipelines: Depth Tyne of Pipeline (below deepest ditch grade l Special Requirements Encased Pipe Less than 10' Must be covered with concrete pad at least 36" deep Encased Pipe Greater than 10' No concrete pad required Non -Cased Pipe Less than 10' Must be covered with concrete pad at least 48" deep Non -Cased Pipe Greater than 10' No concrete pad required Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum 5. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -of - Way. Transmission lines have been determined to be petroleum pipelines (which includes natural gas lines) and shall not be parallel to a County Road. 6. Natural Gas Distribution is a line that serves the final customer. V101.a tea' p9• �� OIM.IN•i YI ��O� M..nir jW�C Ie s.w/ .�i'1v'i� a�insr�,.wa� ��.~t� v PM..�!.I w�TIN iM •�.. •da � • - �aaaw ��� fig• smular stdlwr ..ss�s •.o - oMs�;g�3 SMtlwr . • • i • • 4otl Nr E� •RQral+r + +- F iy io i" j$894_; . e•.c• E' a O e S < ao•lu. a psi; —; �•„... � m —ED n �' anwn+.r • .11 • sdlwr A Z O YI:ReI. n x i -E3 gory $'S� y y i•q �oa �'.� 1.)L 9 _ r _ ,. r � Y :� m Life gs�9 JsAi�aR g•$ia$a E -9E49 r F ggR� 9 AI rl]-aia %jars M_i:$ s19 q Alf $ 31F @'epHsI�'iY �l ee�$ via 8eB g M, too 8t4g $@$ E3a} SSMSEeMx •da $ "x"ag"seEEcs��+ fig• ..ss�s •.o - oMs�;g�3 .qR11 o .1 .. -ZE �:Fa°E EE's EEE.=SE Y . . . . 1MiM f 5 ors�ex��x a"i� �5E Vol. OZ / pg.� BRAZOS COUNTY l COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: April 18, 2017 SUBJECT: Utility Permit — Wickson Creek Special Utility District Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Tonkaway Lake Road 1 mile northwest of William D. Fitch Parkway. Crossing will be encased and be a minimum of 36 inches under the bottom of the ditch. Line will provide service to customer at 14034 Tonkaway Lake Road. Site is located in Precinct 2. SUBMITTED BY: Darrell W. Kolwes Right of Way Agent ACKNOWLEDGED BY: Sammy Ca ena Commissioner Precinct 2 This request is FeAPPROVED / ❑ DENIED by Commissioners' Court I : Duane Peters, C',,/ounty Judge 7 DATE: `b I n IVol. 4cs4,2I7g,._��_ APPLICATION FOR WATER UTILITY PERMIT DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS Pursuant to the Texas Utility Code, Section 181.024, comes now WICKSON CREEK SPECIAL UTILITY DISTRICT [company name], hereinafter referred to as "Company" a TEXAS UTILITY [state] Corporation, with authority to transact business in Texas, acting by and through its duly authorized representative, and hereby petitions the County Engineer for the right to lay, construct, maintain, repair and/or operate a gas facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached hereto and said location described as follows: Facility to Cross Road Road Name & Block Number Length of TYPE OF CONSTRUCTION Crossing CHECK ONE Bored Sacked Driven Cased TONKAWAY LAKE 35' X X RD Facility to Parallel County Road Within Right -Of -Way Road Name and Block Number From To Depth Distance CONSTRUCTION TYPE 1" Diameter Wall Thickness 1 '/x" Encasement Pipe Material Specification PVC Maximum Operation Pressure 80 PSI The location and description of the proposed installation and appurtenances must be fully shown on the attached detailed drawings. The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and shall complete said construction /work within 1 working days. (COMPANY MUST FHL K. If such construction is not begun by the 60`h day, Company will be required to apply for a new permit. Company declares that prior to filing this application, it has ascertained the location of all existing utilities, both aerial and underground, and the filing of this application is prima facie evidence that the proposed installation will not conflict with any existing utility. A copy of this permit shall be kept at the job site any time work is being performed. It is expressly stipulated that this Permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or vest any property right in said holder. It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the County's right, title and interest in the land to be entered upon and used by the holder and the holder will at all times assume risk of and indemnify, defend and save hamiless Brazos County from and against any and all loss, damages, cost or expense arising in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights and privileges. Any deviation from these specifications must be approved by Brazos County Engineer's Office or its designated representative. Approval of County Engineer's Office may take as long as two weeks after complete application is received. Applicant agrees to comply with all rules of the County Commissioners and the County Engineer .in construction of said installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated herein for reference. In the event Company fails to obtain a permit prior to the installation or does not install utilities in compliance with installation requirements set forth herein (i.e. depth, location, etc), Company assumes all financial responsibilityfor damages and/or destruction of lines, cables, etc. based upon its failure to comply with Brazos County requirements. Applicant agrees that if Brazos County demonstrates a violation of the terms of this policy, Applicant stipulates that requisites for injunctive relief exist and that Brazos County is entitled to relief enjoining any conduct by applicant which is contrary to the policies. This permit is a revocable permit. Brazos County reserves the right to revoke this permit at any time, in the sole discretion of Brazos County, for interests of public health, safety or welfare, or for failure to repair any damages upon demand, or for any other reason deemed sufficient by Brazos County. In the event Company fails to comply with any or all of the requirements as set forth herein, the County may take such action as it deems appropriate to compel compliance, The County Engineer further retains the right to revoke this Permit by verbal notification to the Applicant/Conrpany. Failure to obtain this permit and/or notify the County Engineer's Office within 24 hours of beginning construction shall constitute grounds for job shutdown. By signing below, I certify that I am authorized to represent the Company listed below, and that the Company agrees to the conditions/provisions included in this permit. rrrrrccnnr �tzFvv SUn Comp pyty Name �<ey,' G�%ATS�tJ By: Signature GENERAL MANAGER Title —P.Q. BOX 4756 Address BRYAN, TX 77805 City State Zip (979)589-3030 Phone Number Watson@ i kann r k r -nm Email: Vol. _o�J�v� WATER UTILITY APPROVAL Brazos County offers no objection to the proposed location of the utility in the County right of way as shown by accompanying drawings and notice dated `f _ / except as noted below: EXCEPTIONS: ewc (Month/Day/Year) i Brazos County Engineer Vol. _�✓� f'g,_/�J�.. j 0 a C W Qom_ J d J a RIGHT-0FW.°,Y W a z O W u7 � Z Z af d J F- Lfl CL W Z O Z o J d LL - OU v -JW a O � d dF- V O z co � Lu w Z Lu � W W y fj H J m _ O? Z O V O NV a- d w _ W U7 p Z O Z Ln luM _ 4 JO I— C7 p U} Wa (� LE H {� Z ui V Z C7 r j Z O Q b LL a 0.K W O Z Q C. d Z CWL7 Z LL. dMUr_d,�7-1H�1a— Vol. Pg. /lv BRA%OS COl1NTl' ROADWAI' SAFCrI' AND ROAD PRT?SFRYATION STANDARDS FOR WORK CONDUCTED IN BR.AZOS COUNTYRIGHTS OF WAY A. General Reouirenreniv I. Adequate drainage shall be maintained in ditches at all times, 3. Permittee will use best management practices (` BMP") (EI1A and TCEQ both provide lists ofexamples of 13MPs) to minimize erosion and sedimentation resulting front the proposed installation. 3. The permittee shall take precautions to avoid damage to properly. All County Right of Way and property shall be restored to its original condition, as far as practical, in the opinion of lite County Engineer or appointed represeniative. 4. The construction and maintenance of such utility shall not interfere with the property or rights of a prior occupant. i. Permittee shall not interfere with other utilities locates) in the right ofway. In the event damages occur, permittee will he liable to the County or other utilities running through the right of way. 6. County Cl ineer shall determine whether or not pennittee's plans shall inconvenience the public. If it is determined that inconvenience to the public C.XiSIJ, then the County Engineer will decide whether such project will he allowed or if an alternative exists so as not to inconvenience the public. R. Safelt, Reuuirenrenls I. Proper traffic control measures aunt be put in place prier to heginning work and iemain in place during the duration of thejob. All traffic control measures must follow the Texas ,Manual of Uniform Tratlic Control Devices (TMUfCD). See Traffic Control Requirentcnts below. 1 During construction, all safely rogulations of the Texas Department of Transportation shall be observed. 3. Permittee must take such precautions and measures, including placing and displaying safety devices, as may be necessary. in order to safely conduct the public through the project area. Company shall provide Ragmen, signs, signals or devices necessary to provide complete safely to the public. 4. Adequate provisions nnrst be made to cause minimum inconveniences to traffic and adjacent property owners. 5. No cable, conduit and/or pole line shall be laid, constructed, maintained and/or repaired so as to constitute is danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of Way for furtue installation shall beplaced at the hack of the Right of �Vay. Exceptions may be approved by the County Engincar. C. Traffic Control Plrur L A trap lie comrol plan, pwxuant to the'I'itilU9'CD or 6nginacred "fraflic Cnnirol Plan must bo provided for the rollowin2: a. traffic control measures pursmuu to the TMUfCD: h. If construction iswithin ten (10) feet of the madwavt or c. Any work performed in the road right-of-ivay; 2. Plan nwst be attached to the permit and kept at the job site any time work is being performed. plan must set forth the time of Completion for thejob. D. Design Shiml rrde 1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation and the pole be placed in the designated area for power specified as set forth in the Te.r(!S Urilirr'es CO(le, Secriorr 151.045' 2. All pole instellatiOn (including lighting) shall be placed at ilio backside of the Right Of Wa)' ro ensure safety to the public- Anv pole placed in violation of this requircntent will be required to be moved to the appropriate location at the companv's expense. L--sceptioos may be approved by the County Engineer. All underground installations shall (these are minimum depths - utility nuty place deeper): a, be placed at a minimum depth of forty-eight (48) inches below the top ol'the pavement; b. be at least thirty-six (36) inches below ditch Ilowline when installation is within the area measured from top of bank to top of bank. c, be at least forty-eight (48) inches below ditch flow line if ow pressure gas or petroleum lines For high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below; d. not be closer than tell (10) feet from the edge ofpaventent. Exceptions may apply in rights of wag of less than 60 feet. 4. Water Lines: All water lines must be a minimum 30 -inches below the ditch flow line and eased. Ntaterfines shall he cased il'crossing under the roadway. 5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within dcsignaited locations based upon the type of utility. The locations shall be as follows: (measured from back of right-of-way). Power -0 to 2 feet. nominalh, I ` Phone - 2 to 4 feel, nominally 3' Gas - 4 to 6 feet, nominally 5' Cable - 6 to 8 feet. nominally T 6. Utilities with less than 60 feet right-of-way in all new developments shall install the utility in a similar manner as referenced in No. 3 above; however, the County Engineer or its designated representative will provide dual approval ol'cach utility location. 7. She. lciigth of any trench to be opened in advance of thepipe, conduit or ducts may not be longer than 400' if left open over night or unattended. -- - - -8: Crossingsunder a county -road sh111;._.-.-- a. be bored or jacked. rV13SOLUTELY NO OPEN CUTS WITI IIN COUNTY ROAD PAVEMENT; b. be pressure grouted for the full length of the crossing iJ the annular space between pipe and casino and soil exceeds one (1) inch. Brazos County must be given 24 howl notice of pressure grouting operations and have the opportunit_� to have an inspector on site to observe pressure grouting operations: c. TXDOT Sinjidard Specification Item 476 shall be followed for all boring. rs jacking. tunneling andioin. 9. 13 ore Pits: a. no pits shall remain open longer than 2 days: b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above. c. pits shall NOT be located within ten (10) feet hone the edge of pavement without prior approval from the County Engineer or his representative; d. when pits are to remain open for more than 8 hours, due diligence will be used in protecting the spoil pile to prevent drainage problems: C. based upon soil conditions. the County Engineer or his representative may require shoring to protect pavement integrity: f. based upon soil conditions, the County I"sn¢ineer or his representative play requite pits be placed further from the edge of road. 10. Any installation within ten (10) feet of edge of pavement shall meet the l'tilfovvine: a. location must be approved by the County Engineer or his representative b. backfilled with cement stabilized material. c based upon soil conditions; the County Engineer or his representative imm require shoring to protect pavement integrity. d. all excess wader and nlud shall be removed front the trench prior to backfilling. Any backfill placed during it rainy period or at other times where excess water cannot he prevented t}om entering the trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized nmterial as soon as weather permits: e. all disturbed base and pavement materials shall be ramoved and restored to the satisfaction Jibe County Engineer or his representatives. f. no side or lateral tamping to 1111 voids antler the base and pavement materials is allowed. 11. Company must be careful to notieopardize the slope or integrity of the shoulder of the road. In the event Company damages the slope; shoulder or any other portion ofthe right -of -cosy, Company will be responsible for repairing the clanlagc and replacing the riLht-of-way to the condition it was prior to commencing construction. 13. Operation of construction and/or maintenance equipment on the traveled surface of any improved County roast will not be permitted, except in an instance whereby the laying, construction, maintenance andlor repair of cables, conduits and/or pale lines cannot be accomplished by any other method and in this event all such equipment shall be of the lubber tiro variety. Appropriate traffic control shall be provided meeting'rMUrCD rcquirenlents. 13. In the event said construction and/or maintenance and/or repair requires Company to remove, cut or Jeopardize any section of the road (asphalt, cement, road base, etc.), Company will he required to provide a performance bond or letter of credit securing necessary repairs. Said bond amount will be determined by the County Engineer. 14. The applicant shall submit a letter of"No Objeetiar- Gone the Army Corps of Engineers for all dcsignatetf wetlands amt env itomilentally Sensitive lands. E. Emergency it-ork 1. In the event Company is recluired tD per imlcrgency services, that requires excavation in a Count, Right of Way, and Unable to notify the Countv Engineer prior to conducting emergency repairs, Company FVO I. ,Z,�o2 . pg, - shall notify County Engineer within 34 hours of beginning construction/repairs. This will allow the County Engineor's Oil -ice an oppoitunity to inspect the site to ensure the integrity of the County Right of Way and traffic safety controls used. 1'. monies In existing, %itcilities I. Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the soil, shall not be performed until plans describing such maintenance and/or repair have been approved by the County P.nginocr or its designated represenlativo and a permit has been obtained. G. Relocation of willies I . When and if the County L"ngineer determines that it is necessaryfor the construction, repair. improvement. alteration or relocation of all or any portion of said road, any or all poles, wires, pipes. cahles or other facilities and appurtenances authorized hereunder, shall lie removcd from said road, or reset or relocated thercou, as required by the County Engineer lvithin a reasonable time as determined by the County Enginecrand Utility Company', and at the expense of the Utility Company. IL Hi,h Pressure Pipelines 1. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining to controlled access or non -controlled access installations, should contain the following additional int'ornarion in the description of the permit. -diameter -wall thickness -material specification -minimum Yield strength -maximum operation pressure of the pipeline 2. With the exception of the nutxinntm operation pressure of the pipeline, this information is to be supplied for both the carrier pipe and the casing. 3. Assurance nwsi also be given that the installation material and design meet the minimum pederal Safety Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed by an authorized representative of the company. d. Petroleum Pipelines: Depth Tvoe of Pipeline (helms deepest ditch !rade) Snecial Renuirentenis Incased Pipe Less them 10' Must be covered with concrete pad at least 36' deep Encased Pipe Greater than 10' No concrete pad required Non -Cased Pipe Lcss than I0' Mitst be covered with concrete pad at least 48" deep Non -Cased Pipe Greater than 10' No concrete pad required Concrete pad shall be mininnmr of ;" thick .mcl width shall he pipe diameter plus 18" minimum 5. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -of= Way. Transmission lines have been determined to be petroleum pipelines (which includes natural gas lines) and shall not be parallel to a County Road. 6, Natural Gas Disk ibuticm is a line that serves the Filial customer. Vol. _o>2cso2 Pa. oZ/-- SP� • I r m._I �6A�e R3§98 ��'Es8$ gays aS3�eRs ski" .y3�;,ip GrS���dRA n �$ h tN w o '}� •-ate i=-Ap s.�pidp.�� b gg gas;° � LL�N •ei-a['c tl b t��t E-p`�p� � �'YS°�yy cEEELggBett����_g �aB •-`"a Fq ax°4 tl. a S6xE �9eftilg�'Y i, 6Y • •k_e salt �o .�o. qln N �I?se ppE ��•:bo. �i—u�I .. .sa[, .—T'o•i"T2 ee .rov+.x • I r m._I .mr�s s A'O wlfuut CHe�gpp e y,;'Ba QGhxS __n...'.1S ":....o.�o: .. �':Po« a.:....,iF°.n•'� l�. «a'•s.'o.�.;.»i::">.oi'o�: i:.... :1...� inn...>::c Veal. I BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Fleet Services DEPT. NUMBER 56002000 DATE OF COURT MEETING: April 18, 2017 ITEM: Consider and take action on the Messina Hof Wine and Roses Half Marathon and 5K Event scheduled for April 23, 2017 which will require roadway lane closures on Old Reliance Road, Wallis Road and Carrabba Road. Area Wide Protective (formerly N -Line) will provide traffic control assistance during this event. Site is located in Precinct 2. SOURCE OF FUNDS: N/A NOTES/EXCEPTIONS: SUB D Y: R. Alan Munger, P.E. County Engineer CC2017 A LEDGED Y: ammy Ca ena Commiss oner, Precinct 2 This Request is 4ppir ved , (or) Denied by Commissioners' Court Date: Duane Peters, County Judge Vol. _ Z i Tuesday, March 7, 2017 Ms. Megan Lott Brazos County Road & Bridge Department RE: 2017 Wine & Roses Half Marathon and 5K Event Dear Ms. Lott: Attached you will find a draft Temporary Traffic Control Plan (TTCP) for the 2017 Wine & Roses Half Marathon & 5K event to be held on Sunday, April 23, 2017. This running event will begin and end at the Messina Hof Winery on Old Reliance Road. The attached plan is a draft for review, was prepared by a Licensed Professional Engineer, and takes in to consideration the safety of our event participants and all roadway users. Several lane closures will be necessary, as well as the full closure of Old Reliance Road in front of the winery. I will be working with Area Wide Protective (AWP, formerly N -Line) with the implementation of this traffic control plan on the day of the event. Their personnel are fully experienced and certified in the deployment of temporary traffic control, as per TxDOT Item 7.2.6.5, and if you should need copies of those certifications, I can have them provide that to you. We will work with City of Bryan Police Officers the day of the event to secure the intersections where licensed officers are required as outlined by the traffic control plan. Flaggers will be given a tutorial on proper methods the week before the event and also the day of the event individually when they are dropped off at their specific location. Flaggers will all be required to wear neon, safety vests. Also, as mentioned, this event will require the full closure of Old Reliance Road in front of Messina Hof Winery on the morning of Sunday, April 23. The closure will be from approximately Gam-to–L amrapd-a-full-de-tour-plan-is included in the attached plan. Race Texas will provide as much public notification as possible prior to the event through the use of the print and social media. The attached plan also calls for the deployment of two (2) Pg Fol, Pq L— Portable Changeable Message Signs on Old Reliance Road at least 72 hours prior to the event to provide advance notice of the closure for those using this roadway and that live in this area. I hope this satisfies the requirements of Brazos County. I look forward to working with you and receiving any feedback you may have regarding this event. Please contact me if you have any questions. Thank you! Samantha Matush Race Texas Sports Race Director sam@racetx.com 254-760-7443 E01. _a�--� r__ -- Contingency Plan Weather related issues: The event will be canceled if bad weather is forecasted. Runners will be notified by email and Facebook posts. If there is a sudden onset of severe weather after the event has started, busses will be used to pick up runners to bring them back to Messina Hof Winery. Messina Hof Winery will be the place of safe refuge in case of a tornado. 2. Medical Issues: • An ambulance will be able to access Messina Hof Winery from going east on Old Reliance. • The Race Director and staff will conduct crowd control in the event of an emergency. • A first aid station will be at the event site in the small parking lot of the hotel on Messina Hof Winery for easy access. • Messina Hof Winery buildings will be open in case of severe heat. Water will be provided at the finish line. • Bryan PD, Race Staff, and Race Volunteers will man barricades as outline by the Traffic Control Plan. Race Staff will work the entry gates as needed. 3. Security: • Volunteers and Race Staff will all have phone numbers for EMS, Fire, and Police during the event. • Portable radios will be given to EMS, Officer in Charge, and the Bus Lead. 4. Event Logistics: • There will be an information booth with Race Staff to answer participate questions. • The crowd will begin dispersing at 8:30am and majority will be dispersed by 10:30am at the race's end. • The Race Director, Samantha Matush, will take responsibility for the event. She will be located at Messina Hof Winery and can be contacted by radio and/or cell phone (254.760.7443). �e LO � 0 M � M m (D Os 3t � Vol. )\ _ ! [a +`x� ) nf2 GE ƒ t$)/ §§ ® /4: ) § ! ,. _ \: Vol. )\ .O. 3NII HO1VV! r€ S a g b I v 1 4 .©. DW I HO MI vol.3 . p9 i� y b� LIOZ `£Z lady m s�x�F, S o F3 _ o�F; Ng 8 uoyleaeW IIeH sasoa )R GUM LIN: o � � L n cos `h= ueld loJIuoO 0I4eal Geaodwal o LL 11 a J .O. 3NII HO1VV! r€ S a g b I v 1 4 .©. DW I HO MI vol.3 . p9 "E' t4Drme�:E� MA1CH IINE'E' C �u ms Temporary Traffic Control Plan 2017 Wine & Roses Half Marathon & 5Ka�a o0 April 23, 2017 v s fd , �070 `lon MATCH LINE "F' c' Temporary Traffic Control Plan 2017 Wine & Roses Half Marathon & SK =;� �' ooh >� a April 23, 2017 ,� N � MATCH t1 PD, a0i F ,, NIADCH LINE "H" �N i Temporary Traffic Control Plant 3 M ' 2017 Wine & Roses Half Marathon & 5K April 23, 2017 °i0A MATCH LINE 'K' cn Temporary Traffic Control Plan h 2017 Wine &Roses Half Marathon & 5K m 3 3 � April 23, 2017 2 MATCH LINE 'K' cn Temporary Traffic Control Plan h 2017 Wine &Roses Half Marathon & 5K m m April 23, 2017 LINE'M' -- , MATCH LINE Temporary TramcControl Pla r 29 »e&Bee Amirthao �n » ` ` w - � April Temporary TramcControl Pla r 29 »e&Bee Amirthao �n » ` - April m ( /. , -`\. `r ' c�zo` P� ^ k° %I -CR - Aluo e� Ilq mma'R-«L -ai0JI moa. i te2wt - .O. 3NIl'HOIVV! v EE�giaa�m� " 1 14.1 44,1 .d.. 3Nll HO1HW .H. 3Nl H31VIN tIoz'£Zlladv g o Ng V uoil;VIOW {IVH Sa308 V aulm L401 veld 10aIu00 aI4Val Aaeaodway .O. 3NIl'HOIVV! v EE�giaa�m� " 1 14.1 44,1 .d.. 3Nll HO1HW .H. 3Nl H31VIN .1. 9NI1 HO1VY1 v Y 5 4 s, 1:�o�day+ .H.3NIl H91VW I .S..:mll xm LLOZ `£Z Ilady H >19 'R uoyleIeW lleH SGSOH'g aulM LOZ ueldlo.ilu000Weil. tieaodwaj a .1. 9NI1 HO1VY1 v Y 5 4 s, 1:�o�day+ .H.3NIl H91VW I .S..:mll �} |{ «rw r X. am` Pm \ g \ \( 0 ` +'SmpawmH_k!-« 62 k\ \ as to oo3i a tek_I \ �} |{ «rw r X. a2` wm «'Rm4!®lNIIL 2-q a2 ( ©md�Aeoa. i &� # f| .Y. 3NIl Holy l LIOZ'CZ llJdb' S o NS 8 uoy�e�eW;IeF{ sasoy g awM L40Z w ,I� Ueld lo.quoo oi4eil IGejodwa.L a e .Y. 3NIl Holy l 66'CZ pdV \ ° \t ¥�®L1�ewJH� m«®q a@ ae,o mom sejo du& � a� x A S ti L40Z '£Z lady ` 8 " pi ¢ ; 145'8 uoyRe�eW AeH sasoa � au4M 1402 join i e veld lo.i;uoo oluea1 Ajeaodwa.L a .SO. All LLoz ` @dv AV®L4lLawRHmme«a» 22 ( uBld jo eoa. &6ekme 3NIl HO1VY! d'V. 3NII HO1VW Vol. _oGJ o4 ._ r9. ''�'— 1,6 LWZ'£Z Ilady o u s = .- F ' "' �9 V uoy;eJBW JICH S9SOH 19 aulM LWF ^ ueld 10alu00 olj4eal ljejodwal � a 3NIl HO1VY! d'V. 3NII HO1VW Vol. _oGJ o4 ._ r9. ''�'— \: ! ......... d� - L Ia, AV®q!'eW mHema99UI # G2 \ u ........... �1�m00.i6�awt i� KWA k{}\}§\|}) ��:�.,,1;. w LLM'£Z ludv c o Hg g uoylejeW IIeH sasoa 8 aulM LWZ m veld 10alu00 ollleil AJejodwal u .A V.3Nll HO1VI9 .1-V. 3Nil HO1VW .trV. 31Nll HOIVW .f -V. 3NIl HDiVW '-�-_- .N.V. - Temporary TramcControl P�n 209 Wine &Roses Half Marathon &k April 23, 2017 �i()tc.+d8y Vol. ci ��m ZIOZ `£Z liady o " S% Ng V uoyIeaeW 11eH SOSO8 g au!M LIOZ �N 4� Ueld 10aIu00 ol ie�Aieaodwal w C'' ,.. a �i()tc.+d8y Vol. ci aC?! .2 / L�o'CZ «v Jy 17 +«©°�w+HmmaVm» a2 umdIOJI eDo. t 6ejo d_I - \ :I » .O -V. TNII Holm vol- ool-.P ao 2 @k Mg W, RHS k��«c�zo AdA� o� &� ,I ]) No / _ 0 � / z 0 0 \/( % a2'CZ 1#v _ Ns Vuo eJeN mHema2m» aE umdIkmD0. a fuek_I ) ) :_.1.., !i!!!!!!}! L ' Pk +Wuo eJeW JIq <m819a@¥ 62 Ucld IOJI uOO a. a fue _dw o - � org y F i', LWZ `CZ lady o NS V uoy;eJeW AeH sasoa g aulM LW veld loJluoo ollleil Ajejodwa.L i a L _ Cm gg�� a as E LLOZ `EZ I!jdV v o ouo eae a saso aul N4'8 41 W11 H kj'8 MLLOZ Ueld loJluoO ol}/ejl iGeaodwal o a Hg� ®� p — V Q .•ouuc p f � Seg.:i bHN oer� 3H Ce ga• M W N t f 2 � -s_ e z H$€ :'be:• gyp:gS yyHse bbt Me e HP•�8 gY 36FgP 2%gag c d j QO �[ CHs Eg&gab €-•ag fb Hg '�@z z p o F' f� •�$e Brg 1$ .'Sg i3bbz & op w zee H-9hg_- H$ •s �9'e.c 5 zz w� o . §Hi6i PggF EFig E @ b aa e $g $Q¢yg 9 yy y ss:e 82 C gbb®��_`'H5y�55gg -WIWit '.2 6 b^gip ] 6 x. ¢ o E ¢�c' g gbs- m $ s ob$ P�38_ Q'tl i �eoi^ws a l ®� p — V Q .•ouuc p f � g gbs- m $ s ob$ P�38_ Q'tl i �eoi^ws a l For OIce Ni Approval Dafe 04/05/2017 SPECIAL EVENT PERMIT ACTION NOTIFICATION Applicant: Race Texas Sports (Samatha Matush) Name of Event: Wine & Roses Half Marathon Date(s): 04/23/2017 Time(s): 6:30am-10:30am Phone #: 254-760-7443 Case No: Sep -03082017 The City of Bryan has approved your permit application, and all required fees have been paid. This notification is only good during your scheduled event. Please keep this posted at all times during your event. If there are any comments, please address them before the event. A follow-up may be done by any or all of these divisions if they feel the need. If you have any questions, please contact Parks and Recreation Division at 209-5528. The emergency after-hours telephone number is 822-3777. Planning Services — Martin Zimmerman (209-5037): No comments MZ3-24-17 Building Services — Gregory Cox (209-5030): No comments 3-23-17 Public Works — Marcelo Lovato/Gary Schatz (209-5130): Approved: GWS 4/4/17 Reviewed with Revisions: Environmental Services — Jared Birkbead/Elbert Moore (209-5900) Approved: Will Sweep Part of Race Route Reviewed with Revisions: Fire Services — Fred Taylor (209-5963): Approved: YES Reviewed with Revisions: Police Services — Dean Swartzlander (209-5371): Approved: Yes Reviewed with Revisions: Traffic direction will be provided by Off -Duty officers during the event. DS03/31/17 Parks and Recreation — SEP Committee Coordinator (209-5527) Processed per stipulations above. vol. BRAZOS COUN'T'Y, "TEXAS BUDGET ANIENDiA1ENT(S) FORTHE 2016-2017 BUDGET YEAR NO. 16/17 29.1 —29.3 On this the I8th day of April 2017 at a regular meeting of the Commissioners' Court, the following members were present A. Duane Peters, County Judge, Presiding B. Steve Aldrich. Commissioner, Precinct I C. Sammv Catalena, Commissioner, Precinct 2 D. Nancy Berry, Commissioner, Precinct 3 E. Irma Caulcy, Commissioner, precinct d F. Karen Iv(cQueen, County Clerk The following proceedings were held: HIAT Wil EREAS, on I Sth day of April 2017 the Court heard and approved a budget amendment for the 2016-2017 budget year for Brazos County, Texas; and W111IREAS, expenditure is necessary due to the necessity to meet unusual and unforeseen conditions which could not be reasonably included in the original budget adopted 6 September 2016, the following amendment(s) to the original budget are hereby authorized, as described on the attached page(s). ADOPTED AND APPROVED this the tSth day of April 2017. 'I'111" C0DiDIISSI0YEI2S COURT OF BRAZOS COUNTY, TEXAS. 13v: - Duane Peters, County Judge County Clerk's Office and _ Attached to the original budget v: -)l o2�S"� pg. S%— 14 BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 16117 • 29.1 411812017 FUND DEPARTMENT DIVISION I CATEGORY DESCRIPTION Increase i Decrease it General Fund I Other Re.enuc 1000.00 General fund I Child Pramivc 5emc< I De xnmcnml Support 1 1,000.001 DRICR I ACCOUNT NAME Increase Decrease 0100 I I CR Donations - Other I 1,000.00 I 35000!00 61233000 DR I I I I 1 I I I I I I I I I Child 11'clfarc Board I To recognize donation revenue from Colle¢e Station Ford to the Child WelGre Board for Rainbow Ronm ourchases. DCpartmenNAppfoval j4af+ 'iL N�'Date �*1 IC Ju_9c�APPLoJhh:%'EC'^,�F `*-'sy tc3i�-`5 �ttst' Kjy1 Iti:Aniiiiittit I ni'rnici Onl"e1.'Ger�'."�Yi llilH'$k"x^%.�+i4n"R515!§,�-:"9F"vA"�fi±Yi*riZ i�:.. RS��;:of.'r.E:de`:$°?�T-ai'&:`.L`sY �'r " '?D9 I FUND I DIV ACCT I DRICR I ACCOUNT NAME Increase Decrease 0100 1 46023000 1 CR Donations - Other I 1,000.00 0100 35000!00 61233000 DR (Donations - Other 1.000.00 I I I I I I I I I I I I I I I I I I I FoiPq, Z --e Vol J.0 BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 16117 - 29.2 enannn FUND DEPARTMENT DIVISION CATEGORY DESCRIPTION Increase Decrease Grant Fund I I 1Inter ovemmemal 6,230.00 Grant Fund I Juvenile Service, TJJD-SA-Pre CPost Ad"- Minor Acuisitions 6230.00 I 4%046500 ` I WDSmteAid-A 6J30.00 1 3000 312130 1 67255000 I DR Equi mens -Sur: eil. & Secu. 6,230.00 I I 1 I I I I I I I J.,eaile Sen'ices I "1'o recoenize donation revenue for supplement ¢cant (m State Aid) for the purchase of securiry eauipmem for [he.luvenlle Detention area AMD 13 Fv ol. --- --- ------J I I I I I FUND I DIV I ACCT DR/CR ACCOUNT NAME Increase Decrease 1 3000 4%046500 CR WDSmteAid-A 6J30.00 1 3000 312130 1 67255000 I DR Equi mens -Sur: eil. & Secu. 6,230.00 I I � I I I I �— I I Fv ol. --- --- ------J BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 16117 - 29.3 FUND f _. General Fund I G IF d �It General Rind O,nmd Fund I DEPARTMENT DIVISION Commissioners Court Jon-0epar[meoral r (e hole Information formation Technoloes'� Intonnmion Te1hncd0a L"r. Sell I 411812017 CATEGORY DESCRIPTION _ I Minor Acquisitions Dp enzI-po I Minor Ae wauons tt1ce, Dep t I S I E Increase Decrease 4.39>.?3 674.86 1A33.63 1?S6.7a1 .•'t ;- .3`3%4-1fiTx` ( I ACCT 6'03000 60'00000 67203000 DR/CR CR Dli 1712 ACCOUNTNAME I Minor CanrwerEiardaare Eaui rnen[ & IT Enhancement Minor Cmn tmer Flardscare Increase _-_ 674.86 1.41161 I De ease »,9�.zs OIOU 14000200 60500000 DR [gu" ren C lT Enhancement 1.7S6.7e Commissioner, CouII and lnrormution'Iechnolo",r Reallocation effund, to the a t rmriut, ocmr us to replacement osed comonten and monitors. - Vol. o1J Pg. _ ` 0— .•'t ;- .3`3%4-1fiTx` FUND DIV 0100 11000500 0100 14000100 0100 14000100 ACCT 6'03000 60'00000 67203000 DR/CR CR Dli 1712 ACCOUNTNAME I Minor CanrwerEiardaare Eaui rnen[ & IT Enhancement Minor Cmn tmer Flardscare Increase _-_ 674.86 1.41161 I De ease »,9�.zs OIOU 14000200 60500000 DR [gu" ren C lT Enhancement 1.7S6.7e I II I I L— Vol. o1J Pg. _ ` 0— PERSONNEL I� CHANGE OF STATUS REQUESTS Commissioner Court Date: April 18, 2017 Department Submitting Information: Human Resources Purpose of Submissions: Consider and Take Action on Change Requests Department Submitting Employee Request Action Requested Request(s) Applies To Change of Status County Attorney Alvarado, Mireya Change of Status Burkhalter, Tammy Separation Carroll, Ashley Change of Status Erratt, Bruce Employment Estrada, Leticia Change of Status Guzman, Graciela Change of Status Hubbard, Valerie Employment Hubbard, Valerie Change of Status Kopetsky, Holly Change of Status Exposition Complex Fadem, Scott Employment Juvenile Services — Admin. Correa, Itzel Change of Status Graham, Kenneth Employment Reyes, Christina Change of Status Storemski, Jonathan Change of Status Juvenile Services — Detention Desir, Raymond Change of Status Guerrero, Porscha Employment Obrien, Nichole Employment Schoppe, Kimberly Employment Juvenile Services — State Aid Escalon, Julio Employment Pennington, Shawn Change of Status Road & Bridge LeFlore, Jimmy Change of Status McCartney, Brittany Separation IVol o�t!-a^ �'9. Sheriffs Office — Detention Nance, Rickey Change of County Judge's or Commissioner's Signature: (This Copy to be attached to minutes) Vol. 720-0Cl pg.