Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2016-02-23 10:00AM REGULAR MEETING
BRYAN,TEXAS NOTICE OF MEETING AND AGENDA BRAZOS COUNTY COMMISSIONERS COURT THE COMMISSIONERS COURT OF BRAZOS COUNTY WILL MEET IN REGULAR SESSION ON FEBRUARY 23,2016 AT 10:00 AM IN THE COMMISSIONERS COURTROOM OF THE COUNTY ADMINISTRATION BUILDING, 200 SOUTH TEXAS AVE., SUITE 106, BRYAN, TX 77803 Invocation and Pledge of Allegiance - U.S. and Texas Flag - Chaplain G.H. Jones and Judge Peters 2. Call for Citizen input and/or concerns Consider and take action on agenda Items 3-20'. 3. Approval of the following proclamations recognizing outstanding citizens who have made significant contributions to the Brazos ValleyAfrican American museum and this community: • 16-003 Ingrid Charmel BisorAnderson • 16-004 Dee Dee Cooks . 16-005 Mildred Ray Davis • 16-006 Dr. Clark Ealy G • 16-007 Dr. Ernestine Gamer — _' • 16-008 Sid Gamer_ • 16-009 Dr. Wailing He • 16-010 Fayeola Jones • 16-011 Dr. Patricia Larke • 16-012 Dr. Alvin Larke . 16-013 Dr. John M. Nichols • 16-014 Dr. Cedric L. Payton • 16-015 Dr. Thomas A. Wallis 4. Consider and possible action regarding a bum ban. 5. Letter in support of the Brazos Transit Districts application for funding through the 2016 Federal TransitAdministration Section 5310, Enhanced Mobility of Seniors and Individuals with Disabilities Program. 6. Approval of the following Job Descriptions: • a. Clerk, Temp. (Class Code 2355, Position 2) Tax Office • b. Clerk, Temp.1040hrs (Class Code 1713,•Position 1) District Clerk 7. Request review and approval of a modification to the previously approved 'Microfiche Conversion' project, which modification will permit the Sheriffs Office to expend approximately $18K to purchase a Microfilm Scan Pro 3000 and its ancillary support hardware/software. 8. Request from the Sheriffs office for additional funding in the amount of $800 to complete the installation of eight in -car radar units approved in FY16 Capital.Funds for the installation were not requested in that original submission. 9. Consider and take action on an Agreement with the developer to improve a certain road within the Indian Lakes Subdivision 10. Approval of order exempting the contract with Southern Cement Slurry, LLC from competitive solicitation pursuant to the Texas Local Government Code 262.024 (a)(7) (A)- 11. Approval of contract 2016-162 Cementitious Slurry with Southern Cement Slurry, LLC. 12. Consider and take action on the Verizon Southwest utility permit on Deer Park Drive located 1,400 feet West of the State Highway 6 frontage road. Work consists of placing 478 feet of buried cable within 5 feet of the South right of way line of Deer Park Drive. Verizon will bore a distance of 160 feet under an existing creek as part of this work Proposed cable will be buried a minimum depth of 36 inches and 5 feet under the creek crossing. Site is located in Precinct 1. 13. Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Old Reliance Road 1,600 feet northeast of Reliance Church Road. Crossing will be encased and be a minimum of 36 inches under the bottom of the ditch. Site is located in Precinct 2. 14. Request permission to enter private property owned by Scott and Angelique Toler located 2 miles Southwest of SH 47 on Leonard Road. Project will require the County to clean out drainage channel to improve water flow under Leonard Road. Sits is located In Precinct 4. 15. Tax Refund Applications for the following: • a. Yan Zhao-overpayment-$340.73 • b. Dain Schaefer -overpayment -$246.00 • c. City Bank -overpayment -$4885.82 • d. Heritage litre Company -payment in error -$8499.06 16. Budget Amendments. Budget Amendments FY 15/16 22.1 - 22.5 17. Personnel Change of Status. Personnel Action Forms 18. Payment of Gafms. 19. Convene into Executive Session pursuant to Texas Government Code 551.071 to consult with attorney about pending or contemplated litigation and/or a settlement offer. 20. Consider and possible action on executive session. 21. Acknowledgement of the 2015 Racial Profile Report for Constable, Pct. 1. 22. Acknowledgement of Bryan -College Station Chamber of Commerce Independent Auditors' Reportand Financial Statements for years ending September 30, 2015 and 2014. 23. ShedfFs report on inmate population. 24. Announcement of interest items and possible future agenda topics. 25. Call for Citizen input and/or concerns 26. Adjourn. Vol. , Pg. PUBLIC COMMENTS Public Comment during the Convnission Meeting may be for all matters, both on and off the agenda, and be luted to four minutes per person. Persons are invited to submit comments In writing on the agenda hems andlor attend and make comment at the Commission meeting. Members of the public are reminded that the Brazos County Commissioners Court is a Constitutional Court, With both Judicial and legislative powers, created under Article V, Section 1 and Section 18 of the Texas Constitution. As a Constitutional Court, the Brazos County Commissioners Court also possesses the power to Issue a Contempt of Court Chation under Section 81.024 of the Texas Local Government Code. Accordingly, members of the public In attendance at any Regular, Special and/or Emergency meeting of the Court shall conduct themselves with proper respect and decorum in speaking to, and/or addressing the Court In participating in public discussions before the Court; and in all actions in the presence of the Court Those members of the public who are Inappropriately attired and/or who do not conduct themselves In an orderly and appropriate manner will be ordered to leave the meeting. Refusal to abide by the Court's Order and/or continued disruption of the meeting may result in a Contempt of Court Citation. it is not the intentlon of the Brazos County Commissloners Court to provide a public forum for the demeaning of any Individual or group. Neither is it the intention of the Court to allow a member (or members) of the public to insult the honesty and/or Integrity of the Court, as a body, or any member or members of the Court, or County employees, Individually or collectively. Accordingly, profane, insulting or threatening language directed toward the Court and/or any person In the COurrs presence and/or racial, ethnic or gender slurs or epithets WE not be tolerated. Vlolatlon of these rules may result In the following sanctions: 1, cancellation of a speaker's time; 2. removal from the Commissioners Court; 3. a Contempt Citation; and/or 4, such other and/or criminal sanctions as may be authorized under the Constitution. Statutes and Codes of the State of Taus. The County Commissioners Court can dellberete or take action only If a matter has been listed on an agenda properly posted prior to the meeting. During the public comment period, speakers may address matters not listed on the published agenda. The Open Meeting Law does not expressly prohibit responses to public comments by the Consnlssioners Court However, responses from the County Judge or Commissioners to unlisted public comment topica could become deliberation on a matter without notice to the public. To ensure the public has notice of all matters the Convnissloners Court WE consider, the County Judge and/or Commissioners may choose not to respond to public comments, except to correct factual inaccuredes, recite existing policy In response to an inquiry or to ask that a matter be listed on a future agenda. See Texas Open Meetings Act 1551.042. INVOCATION Any invocation that may be offered before the official start of the Court meeting shall be to and for the benefit of the Court The views or beliefs expressed by the Invocation speaker have not been previously reviewed or approved by the Court and do not necessarily represent the religious beliefs or views of the Court In part or as a whole. No member of the community, Is required to attend or participate In the Invocation and such decision will have no impact on their right to actively participate in the business of the Court. The Commissioners Courtroom of the County Administration Building, 200 South Texas Ave., Suite 106, Bryan, TX 77803 Is wheelchair accessible. Handicap parking spaces are available. Any request for sign Interpretive services must be nada two working days before the meeting. To make arrangements, please call (979) 361-0102. Vol. 9 pg. ��-41% MINUTES FEBRUARY 23, 2016 BRAZOS COUNTY COMMISSIONERS COURT REGULAR MEETING A regular meeting of the Commissioners' Court of Brazos County, Texas was held in the Brazos County Commissioners Courtroom in the Administration Building, 200 South Texas Avenue, in Bryan, Brazos County, Texas, beginning at 10:00 a.m, on Tuesday, February 23, 2016 with the following members of the Court present: Duane Peters, County Judge, Presiding; Lloyd Wassermann, Commissioner of Precinct 1; Sammy Catalena, Commissioner of Precinct 2; Kenny Mallard, Commissioner of Precinct 3; Irma Cauley, Commissioner of Precinct 4; Karen McQueen, County Clerk. The attached sheets contain the names of the citizens and officials that were in attendance. Invocation and Pledge of Allegiance - U.S. and Texas Flag - Chaplain G.H. Jones and Judge Peters 2. Call for Citizen input and/or concerns There was no citizen's Input. Consider and take action on agenda items 3-20: 3. Approval of the following proclamations recognizing outstanding citizens who have made significant contributions to the Brazos Valley African American museum and this community: Vol. Pg.- �lD • 16-003 Ingrid Charmel BisorAnderson • 16-004 Dee Dee Cooks • 16-005 Mildred Ray Davis • 16-006 Dr. Clark Ealy • 16-007 Dr. Ernestine Garner • 16-008 Sid Garner • 16-009 Dr. Weiling He • 16-010 Fayeola Jones • 16-011 Dr. Patricia Larke • 16-012 Dr. Alvin Larke • 16-013 Dr. John M. Nichols • 16-014 Dr. Cedric L. Payton • 16-015 Dr. Thomas A. Wallis The County Judge read aloud the Proclamations recognizing citizens who have made contributions to the Brazos Valley African American Museum. A copy of the proclamations is attached. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner 1 -Loyd Wassermann. Passed. 5-0. Members voting Ayes. Catalena, Cauley, Mallard, Peters, Wassermann Consider and possible action regarding a burn ban. On a motion by Commissioner Catalena, seconded by Commissioner Wassermann the Court unanimously voted to remove this item from the agenda. Motion: Remove, Moved by Commissioner Sammy Catalena, Seconded by Commissioner -Loyd Wassermann. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann Letter in support of the Brazos Transit District's application for funding through the 2016 Federal Transit Administration Section 5310, Enhanced Mobility of Seniors and Individuals with Disabilities Program. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner Kenny Mallard. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann Approval of the following Job Descriptions: • a. Clerk, Temp. (Class Code 2355, Position 2) Tax Office • b. Clerk, Temp. 1040hrs (Class Code 1713, Position 1) District Clerk A copy of the job descriptions is attached. Motion: Approve, Moved by Commissioner -Loyd Wassermann, Seconded by Commissioner Sammy Catalena. Passed. 5-0. Members voting Ayes: Catalena, Cauley, 9 Vol. a___✓ � pg, Mallard, Peters, Wassermann Request review and approval of a modification to the previously approved 'Microfiche Conversion' project, which modification will permit the Sheriff's Office to expend approximately $18K to purchase a Microfilm Scan Pro 3000 and its ancillary support hardware/software. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner Kenny Mallard. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann 8. Request from the Sheriff's office for additional funding in the amount of $800 to complete the installation of eight in -car radar units approved in FY16 Capital.Funds for the installation were not requested in that original submission. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner LLoyd Wassermann. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann 9. Consider and take action on an Agreement with the developer to improve a certain road within the Indian Lakes Subdivision Judge Peters thanked Bill Ballard, Kendra Suhling, Alan Munger, Commissioner Wassermann and the developer, Paul Clark for working together to accomplish this project. Motion: Approve, Moved by Commissioner LLoyd Wassermann, Seconded by Commissioner Sammy Catalena. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann 10. Approval of order exempting the contract with Southern Cement Slurry, LLC from competitive solicitation pursuant to the Texas Local Government Code 262.024 (a)(7) (A). A copy of the order is attached. Motion: Approve, Moved by Commissioner LLoyd Wassermann, Seconded by Commissioner Sammy Catalena. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann 11. Approval of contract 2016-162 Cementitious Slurry with Southern Cement Slurry, LLC. A copy of the contract is attached. Motion: Approve, Moved by Commissioner LLoyd Wassermann, Seconded by Commissioner Sammy Catalena. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann Vol. _4;1 — pg, 12. Consider and take action on the Verizon Southwest utility permit on Deer Park Drive located 1,400 feet West of the State Highway 6 frontage road. Work consists of placing 478 feet of buried cable within 5 feet of the South right of way line of Deer Park Drive. Verizon will bore a distance of 160 feet under an existing creek as part of this work. Proposed cable will be buried a minimum depth of 36 Inches and 5 feet under the creek crossing. Site is located in Precinct 1. Motion: Approve, Moved by Commissioner Lloyd Wassermann, Seconded by Commissioner Sammy Catalena. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann 13. Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Old Reliance Road 1,600 feet northeast of Reliance Church Road. Crossing will be encased and be a minimum of 36 inches under the bottom of the ditch. Site is located in Precinct 2. Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Lloyd Wassermann. Other. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann 14. Request permission to enter private property owned by Scott and Angelique Toler located 2 miles Southwest of SH 47 on Leonard Road. Project will require the County to clean out drainage channel to improve water flow under Leonard Road. Site is located in Precinct 4. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner Lloyd Wassermann. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters. Wassermann 15. Tax Refund Applications for the following: • a. Yan Zhao-overpayment-$340.73 • b. Dain Schaefer -overpayment -$246.00 • c. City Bank -overpayment -$4885.82 • d. Heritage Title Company -payment in error -$8499.06 Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner Sammy Catalena. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann 16. Budget Amendments. Budget Amendments FY 15/16 22.1 -22.5 F_V01_ p9_213- 22.1 Reallocate funds for Fleet Maintenance Building. 22.2 Reallocate funds for General Capital Improvements - Constable, Precinct 2. 22.3 Reallocate funds for General Capital Improvements - Constable, Precinct 3. 22.4 Reallocate funds for General Capital Improvements - Sheriff's Office. 22.5 Transfer of funds from General Fund Contingency to Risk Management. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner Sammy Catalena. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann 17. Personnel Change of Status. Personnel Action Forms A copy of the Personnel Change of Status requests is attached. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner LLoyd Wassermann. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann 18. Payment of Claims. Claims 7141652-7141867 Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner -Loyd Wassermann. Passed. 5-0. Members voting Ayes: Catalena, Cauley, Mallard, Peters, Wassermann 19. Convene into Executive Session pursuant to Texas Government Code 551.071 to consult with attorney about pending or contemplated litigation and/or a settlement offer. At this point, the County Judge announced the Court would consider items 21 through 25 then return to convene into Executive Session. Having considered the previously noted agenda items, at 10:15 a.m. the County Judge stated that the Court would convene into Executive Session to deliberate pursuant to Texas Government Code 551.071 as stated above. The following individuals were asked to stay for the meeting: Candy Gallego, Executive Assistant Bill Ballard, Civil Counsel Kendra Suhling, Civil Counsel 20. Consider and possible action on executive session. At 10:42 a.m. the County Judge announced the meeting open to the public and announced that no action would be taken on the Closed Executive Session. pq. d-14 21. Acknowledgement of the 2015 Racial Profile Report for Constable, Pct. 1. The Court acknowledged receipt of the 2015 Racial Profiling Report for Constable, Precinct 1. 22. Acknowledgement of Bryan -College Station Chamber of Commerce Independent Auditors' Reportand Financial Statements for years ending September 30, 2015 and 2014. The Court acknowledged receipt of the Bryan -College Station Chamber of Commerce Financial Reports for 2014 and 2015. 23. Sheriff's report on inmate population. Sheriff Chris Kirk stated there were 617 Inmates In jail, 49 have electronic monitors and 15 are pending for monitors. 24. Announcement of interest items and possible future agenda topics. There were no announcements. 25. Call for Citizen input and/or concerns There was no citizen's input. 26. Adjourn. vol. 3 d2 pg. ,a is The foregoing minutes of the Commissioners Court meeting held February 23, 2016 have been examined and are approved in open Court this day of GV) , 2016, in Bryan, Brazos County, Texas. Duane Peters County Judge Commissioner, Precinct Attest: Rf'N—wMcQueen 41Y Lloyd Wassermann Commissioner, Precinct 1 Kenny Mallard Commissioner, Precinct 3 voi. �30� pg.. -24k Dp I BRAZOS COUNTY COMMISSIONER'S CURT D Name (PLEASE PRINT) I v ' PD1 V\-eo 0!!> AY OF , M, 20 1 Organization (PLEASE PRLNT) ec P, C-0,� sr, j I ,-- hof I T T- Vol. j l Pg. Pg ofz BRAZOS COUNTY COMMISSIONER'S COURT a,3�DAY OF C9.0 Name (PLEASE PRINT) ,n, 20/4 M, Organization (PLEASE PRINT) S Cly OF C4�/Z6n S74 rl pAr olm('f - bol. a =-!� Proclamation 3lonoring Ingrid CGia"neCBisor .Anderson In .Appreciation of Her Significant Contributions to the Brazos "Valley .African .American Museum "Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and 'Whereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and "Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. Now, Therefore, Be It Proclaimed that the Commissioners Court of Brazos County, Texas does hereby recognize Ingrid Charmel Bisor Anderson in appreciation of her significant contributions to the Brazos Valley African American Museum in Bryan, Tei Proclaimedthis 231d day o ebruary, 2 inman, Brazos Coun exas. Duane Peters County Judge Commissioner Lloyd Wassermann f Prec' CommissioWer Kenny Mallard Precinct 3 FyO oZ p9 -2--J g 16-003 3 Proclamation Honoring Dee Dee Cooks In .Appreciation of Her Significant Contributions to the Brazos 'Valley .African .American .Museum Whereas 'the African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and Whereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. Now, T6ierefore, Be It Procfain wd that the Commissioners Court of Brazos County, Texas does hereby recognize Dee Dee Cooks in appreciation of her significant contributions to the Brazos Valley African American Museum in Bryan, Texas. PYOC�Q.Ltin.edthis 23rd o Februa , 16 in Bryan, razos C ty, Te Duane Peters County Judge �/ n Commissioner Lloyd Wassermarm Precinct Commissi er Kenn Mallard Precinct 3 Sammy Catalena Precinct 4 Vol. ��_ Pg. -a;o lJ 16-004 Proclamation Honoring Mi(fredRay Davis In appreciation of Her Significant Contributions to the Brazos TaCCey .African .American Museum 'Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and -Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and -Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and -Whereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and 'Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. Now, Therefore, Be It Proclaimed that the Commissioners Court of Brazos County, Texas does hereby recognize Mildred Ray Davis in appreciation of her significant contributions to the Brazos Valley African American Museum in Bryan, Texas. Procfaimedthis 23re o e ruary, 6 in Bryan, azos County, Te s. Duane Peters Commissioner Lloyd Wassermann Precinctl CommissionNKenny %hard Precinct 3 County Judge 16-005 Proclamation 'if onoring Dr. CCark EaCy In .Appreciation of His Significant Contributions to the Brazos vaCley .African .American Auseum "Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and 'Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and -Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and Whereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and -Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. Now, `therefore, Be It Prock imed that the Commissioners Court of Brazos County, Texas does hereby recognize Dr. CCark EaCy in appreciation of his significant contributions to the Brazos Valley African American Museum in Bryan, Texas. Proc1himedthis 23*a Duane Peters County Judge >(Aet j%u-ssyt,.uaA... Commissioner Lloyd Wassermann Precinct 1 - Commissionbtyenny MaUh�d Precinct 3 16-006 VoL 3 Pg.a Proclamation Honoring Dr. Ernestine Garner In Aypreciation of Her Signfftcant Contributions to the Brazos 'Vaffey African American Museum "Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and "Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and -Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and -Whereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and "Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. .Now, 'rfterefore, Be It Proclaimed that the Commissioners Court of Brazos County, Texas does hereby recognize Dr. Ernestine Garner in appreciation of her significant contributions to the Brazos Valley African American Museum in Bryan, Texas. Proclaimedthis 23rd Duane Peters County Judge Commissioner Lloyd Wassermann {� Precinct 1 J J --V h.X� Commissions enny Mallard Precinct 3 FyO:IK-31-2=—P9 =V-P-3 16-007 Proclamation Honoring Sid Garner In .Appreciation of His Significant Contributions to the Brazos Ta(Key .African .American Auseum "Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and 'Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and "Whereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and -Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. Now, Therefore, Be it Procfainted that the Commissioners Court of Brazos County, Texas does hereby recognize Sid Garner in appreciation of his significant contributions to the Brazos Valley African American Museum in Bryan, Texas. Proc(aimedthis 23,d Duane Peters County Judge Commissioner Lloyd Wassermann Precinc� Commissione • :enny Ma and Precinct 16-008 Proclamation onaring Dr. tiWei'Cmg He In .appreciation of His Significant Contributions to the Brazos valley African American Nuseum Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and 'Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and 'Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and -W6eereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and 'Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. Now, Therefore, Be It Proclaimed that the Commissioners Court of Brazos County, Texas does hereby recognize Dr. "Weiling He in appreciation of his significant contributions to the Brazos Valley African American Museum in Bryan, Texas. Proclaimedthis 23rd Duane Peters County Judge Commissioner Lloyd Wassermann CO&Mis ' Catalena Precinct red 2 Commission envy Niallard ommis ioner a Precinct3 Precinct4 35 u 16-009 Proclamation Honoring FayeoCa Jones In .Appreciation of Her Significant Contributions to the Brazos TaCfey .African .American Museum "Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and -Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and -Whereas The Museum continues to welcome new members of all races, creeds and ethnicitics who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and -Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. Now, Therefore, Be It Proc(li7ned that the Commissioners Court of Brazos County, Texas does hereby recognize gayeo(a Jones in appreciation of her significant contributions to the Brazos Valley African American Museum in Bryan, Texas. Proc(ainwdthis 23rd Duane Peters County Judge Commissioner Lloyd Wassermann Precinctl rrn�, Dk— Commissioner Denny Mallard Precinct of 43� Sammy Catalena Precinct 4 Vol. 02 3a _ Pa. 16-010 Proclamation Honoring Dr. Patricia Larke In Appreciation of Her Significant Contributions to the Brazos Talley .African .American Nuseum Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and -Whereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and 'Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. Now, Therefore, Be It Procfaimed that the Commissioners Court of Brazos County, Texas does hereby recognize Dr. Patricia Larke in appreciation of her significant contributions to the Brazos Valley African American Museum in Bryan, Texas. Procktimedthis 23rd tA-&—Icz Commissioner Lloyd Wassermann Precinct - N , Commissionrr enny Mallard Precinct 3 Duane Peters County Judge 16-011 Fyo7l-t--:�--- Pg. Q3-7 Proclamation Honoring Dr..AMn Larke In .Appreciation of His Significant Contributions to the Brazos 'VaCCey .African .American Museum 'Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and "Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and 'Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and -Whereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and ]Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. Now, therefore, Be It Proclaimedthat the Commissioners Court of Brazos County, Texas does hereby recognize Dr. Mvin. £arke in appreciation of his significant contributions to the Brazos Valley African American Museum in Bryan, Texas. ProcCaimecithis 23rd day Zat Brazos County, 'xas. Duane Peters County Judge Commissioner Lloyd Wassermann mrsston Sammy Catalena Precinct 2 Commissio er Cenny Mall d Commissi ma Precinct Precinct C ey P aaU— 16-012 Proclamation Hanoring Dr. John JW. NichoCs In Aypreciation of 3fis Significant Contributions to the Brazos 'Valley .African .American Museum -Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and 'Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and 'Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and Whereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. NOW, `therefore, Be It Proclaimed that the Commissioners Court of Brazos County, Texas does hereby recognize Dr. John X Nichols in appreciation of his significant contributions to the Brazos Valley African American Museum in Bryan, Texas. Proclaimedthis 23,11 Duane Peters County Judg, Commissioner Lloyd Wassermann Precinctl Commissioned ird Precinct 3 16-013 Vol. __ . j _ pg., ` 7i Proclamation Honoring Dr. Cedric L. Payton In .2lppreciation of His Significant Contributions to the Brazos 'Valley African American Museum 'Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and 'Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and 'Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and 'Whereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. NOW, Therefore, Be It Proclaimed that the Commissioners Court of Brazos County, Texas does hereby recognize Dr. Cedric L. Payton in appreciation of his significant contributions to the Brazos Valley African American Museum in Bryan, Texas. Prociaimedthis 23=d WLu.- 0 S&L Commissioner Lloyd Wassermarm Precinctl Commissioner Denny MalMrd Precinct Duane Peters County Judge Sammy Precinct 16-014 Proclamation Honoring Dr. 7hiomas A 'WaCCis In .Appreciation of His Significant Contributions to the Brazos 'Valley .African .American Museum -Whereas The African American National Historical Society and the Brazos Valley African American Museum are pleased to recognize thirteen (13) outstanding citizens who have made significant contributions to the Brazos Valley African American Museum and to this community; and Whereas The Brazos Valley African American Museum was dedicated and celebrated its grand opening on July 22, 2006 thanks in large part to the efforts, contributions and prayers of these outstanding citizens; and 'Whereas The Museum's membership started with over 50 citizens upon the grand opening of its doors; and 'Whereas The Museum continues to welcome new members of all races, creeds and ethnicities who have an appreciation for the wealth of diversity in the Brazos Valley now and throughout its history; and 'Whereas The Museum showcases through art exhibits the works of talented local artists, and offers educational enrichment programs to the general public. .Now, `therefore, Be It Proclaimed that the Commissioners Court of Brazos County, Texas does hereby recognize Dr. Thomas .A. Wa(Cu in appreciation of his significant contributions to the Brazos Valley African American Museum in Bryan, Texas. Proc(aimed Ns 23,d e r rr 2016 ' ryan, Brazos Coun ,Texas. Duane Peters Commissioner Lloyd Wassermann Precinct Commissionere y Mallall Precin 3 County Judge 16-015 Vol. LLOYD WASSERMANN Precinct 1 (979) 3614106 lwassermann@w.brazos.tx.us SAMMY CATALENA Precinct 2 (979) 361-4115 scatalena@co.br2zos.tK.us February 23, 2016 BRAZOS COUNTY COMMISSIONERS COURT Eric Gleason Public Transportation Division Texas Department of Transportation 125 E. II" St. Austin, TX 78701-2483 E. DUANE PETERS County Judge (979) 361-4102 dpeters@co.brazos,tx.us Re: Letter of Support for 2016 FTA Section 5310 Dear Mr. Gleason: W G. KENNY MALLARD Precinct 3 (979) 3614105 kmallard@co.brazos.tx.us IRMA CAULEY Precinct 4 (979)361-4111 icauley@oo.brazos.tx.us Brazos Transit District (BTD) and the Brazos Valley Center for Independent Living (BVCIL) are partnering with a funding request through the 2016 Federal Transit Administration Section 5310, Enhanced Mobility of Seniors and Individuals with Disabilities program. It is our understanding this is the second joint application for these two agencies which have formed a partnership to provide a single source reservation system for health and human service agencies and other entities serving individuals with disabilities and the elderly through the use of a mobility manager; expand transportation services to the target population during nights, weekends and holidays and to purchase additional lift -equipped vehicles for use by non-profit organizations that presently have a need, but do not have a vehicle available to meet their demand. We are pleased to support this joint application for funding to the Texas Department of Transportation in support of their effort to build on options for increasing transportation opportunities for the elderly and people with disabilities in our community. This letter expresses our commitment to work with BTD, BVCIL and other local entities as described in the 2016 application. BTD is known for its expertise in the delivery of transportation services to the public in our community. BVCIL has demonstrated its passion for increasing options for individuals with disabilities to fully participate in all aspects of our community. These two organizations have worked together to increase transportation options and this partnership is another step toward increasing options and filling gaps in the Brazos Valley. We look forward to working with them on this project. incere I vim_ Duane Peters County Judge Brazos County Administration Bldg. 200 S. Texas Ave. • Suite 310 • Bryan, Texas 77803_Fox: (979) 361-4176 Vol. '2 j.4' -Pg. ���:.�y��, Brazos County /l +,t„ ;,tio Job Description e—n� '<,F" Last Updated: Class Number: 2355 Pay Group: 06 FLSA Status: Non Exempt Approved Date: This Is a non -supervisory, position. Position End Date: 09/30/2016 Title: Department: Reports To: EEOC Category: Temporary Employee Signature: Clerk, Temp -Tax Office Tax Assessor/ Collector Tax Assessor/ Collector Office and Clerical k'Gr/�h /�r✓'l_i General Summary: a variety of clerical and cashier duties for the Tax/Assessor Collector`s Office. Tum[rlalB R.Osion 1.2 W Y2012 Essential Duties: Other duties may be assigned. NOTE: All Tax Office Employees report to the Tax Assessor/Collector through the Chief Deputy. Please refer to Tax Office Organizational Chart. Assists the public in person, by telephone, and by mail concerning department information, researching records, filling out fors, and resolving relevant problems; Performs general clerical duties as required, including fling, scanning, indexing, recording information, and making copies. Property Tax Clerk Receives and processes property tax payments in person, and through mail. Assists taxpayers with questions and general inforation on payment of taxes, homestead eligibility, trust/payment agreements and processes requests for tax certificates. Must assist with refund/overpayment documentation. Assists with beer and liquor license renewals by verifying tax information. Assists bookkeeping department with cash balancing duties. Balances cash drawer with work on a daily basis. Assists Supervisors with balancing and reporting duties for various taxing jurisdictions. Must maintain a current knowledge of Texas Property Tax Code. Motor Vehicle Clerk Processes vehicle registration applications, including receiving payments and issuing sticker/receipts. Processes vehicle title transfers, including assisting customers with required documentation and examination of title paperwork for accuracy and completion. Processes various permit applications. Assists with processing beer and liquor license renewals, Including receiving payments and issuing receipts. Assists bookkeeping department with cash balancing duties. Must maintain current knowledge of Texas Transportation Code as It affects registration and title processes. Voter Registration Clerk Processes voter registration applications, including reviewing applications, entering valid applicants in computer, printing and mailing voter certificates and notices of incomplete applications and suspense notifications. Provides voter registration applications and information to public. Updates voter Information including name and address changes, deletion of voters no longer eligible, and processes and tracks convicted felons for voting and jury wheel purposes. Works to provide the most accurate Information for election processes in Brazos County. Deputizes volunteer deputy voter registrars and tracks and documents assigned inventory. Assists with the switchboard and with processing county mail. Must maintain current knowledge of the Texas Election Code as it affects Voter Registration processes. Other Duties as assigned. (1%) Supervision Received: ' Given: This Is a non -supervisory, position. EducationHigh Required: - g school graduation or its equivalent, plus at least six months of office experience, or any equivalent combination of education and experience which provides the required knowledge, skills, and abilities. Preferred: Experience -qui .. Required: _ _ .. c - - --- - -- �- .. _. --- --. .. - perform this job successfully, and individual must be able to perform each essential duty Satisfactorily. The re requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Preferred: - VO.J1 Pg.-- Certificates, Licenses, Re –g Required: None –Wiiiiarrid: i P_hysicalj-DernarjdsTypical: The - physical demands described here are napresentatilveoffhose that must be met by anemPxYee to perform the essential functions of this job. Reasonable accommodations maybe made to enable successfully Individuals with disabilities to perform the essential functions. While performing the duties of this job, the is required to sit; use hands to finger, handle, or feel: reach with hands and arms: bend and employee regularly kneel; and talk and hear. The employee frequently is required to stand and walk. The employee must to 20 such as books and stacks of records. Specific frequently lift and/or move objects weighing up pounds, vision abilities required by this job include close vision, distance vision, and ability to adjust focus. Knowledge, Skills, & Abilities ---- pical: dF cash and m king change. Operate computers Standard once practices and procedures, including han handling a and understand manuals, journals, policies and procedures, and office I and standard office equipment; read memos; write form letters, memos, and accurate telephone massages; perform basic mathematical calculations, including making change; communicate effectively, both orally and in writing; and maintain effective working relationships with co-workers and the general p I ublic. Imbr-k—En-vironment TyplCat:I The work environment characteristics described here are representative of those an employee encounters Reasonable accommodations maybe made to enable while performing the essential functions of this job. individuals with disabilities to perform the essential functions. The noise level in the work environment is usually moderate. The employee is constantly required to work closely with others SS a part of a team; to perform task to another. The employee is frequently required to perform tedious, exacting work, and to switch from one multiple tasks simultaneously, and to work under time pressures to meet deadlines. Date Duane Peters County Judge t' Brazos County ;r, ;'''?j� Job Description i. 'o Si i'Lc>�o Last Updated: September 2014 Temp(ate,Redsion 1.2 08)15;2012 C -b5. Class Number: ( 1713 Title: Clk, Temp. 1040hrs y_Group: 1 07 Department: District Clerk _ FLSA Status: i Non Exempt Reports To Supervisor & District Clerk Approved Date: 110/0112015 -------------- EEOC Category: Office and Clerical - D ate: on End Date: , 09/30/2016 --- Temporary Employee -- I I Signature: Scan both active and disposed paperwork and files. File documents and files after scanning. Assist the public and other employees, as needed or requested; with records search which may includemicrofilmsearch and making of copies. Assistother employees, as needed or requested, with answering telephone calls, answeringquestions. and directing to proper person according to cifice procedures. Perform all otherduties assigned with fall within the general scope and ability level of the job. Other Duties as assioned. ( 1 %) ---- Required: j To perform this job successfully, an individual must be able to perform each essential duty satisfactorily. The requirements listed below are repretentative of the knowledge, skill, and/or ability required. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Licenses, P_.hys_----I De_mands - - ... -- ical J Typical: I The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disalo[Ries to perform the essential functions. While performing the duties of this job, the j employee is regularly required to sit; use hands to finger, handle or feel; reach with hands and arms; bend and kneel; and talk and hear. The employee frequently is required to stand and walk. The employee must frequently lift and/or move objects weighing up to 20 pounds, such as books and stacks of records. Specific vision abilities required by this job Include close vision, distance vision, and ability to adjust focus. —____. __..__,.--_____.__—________-..-.__.__._...____.,...-..___...._..._..__.__-__-__-------- _—_____________— ----- ___ Knowledge, Skills,-& Abilities - - — - ----------------------- — - Typical. -Operate computersincluding spreadsheet and word processing software; terpret -read and Inmanuals-and memos; perform basic mathematical calculations; write letters; memos, and telephone messages; manage time effectively, understand and follow Instructions; operate standard office equipment, such as copy machine and ! facsimile machine; communicate effectively, both orally and in writing; and maintain effective working relationships with co-workers and the general public. - Typical: 1 1 he work environment characteristics described here are representative of those an employee encounters while performing the essential functions of this job.. Reasonable accommodations may be made to enable individuals w;th disabilities to perform the essential -functions. The noise level In the work environment is usually moderate. The employee is constantly required to work closely with other as a part of a team. The employee Is frequently required to perform tediousand exacting work; to perform multiple tasks simultaneously; to switch from one task to another, and.to work under time pressures to meet deadlines., I' A 0VED Duane Peters Date County Judge ROAD IMPROVEMENT AGREEMENT BETWEEN BRAZOS COUNTY AND SMILING MALLARD DEVELOPMENT, LTD. THIS ROAD IMPROVEMENT AGREEMENT (hereinafter referred to as the "Agreement") is entered into as of the day of 2016, by and between Brazos County, Texas, a political subdivision of the State of Texas (hereinafter referred to as the "County"), and Smiling Mallard Development, LTD. (hereinafter referred to as the "Developer') for the project known as 3620 Lineal Feet ('117") of Indian Lakes Drive, (known as entirety Indian Lakes Drive on Final Plats of Indian Lakes Subdivision, Phase VIII and Phase X) and 2295 Lineal of Anasazi Bluff Drive (known as entirety of Anasazi Bluff Drive as shown on Final Plat of Indian Lakes Subdivision, Phase XI), Brazos County Texas, limited to what is shown on Exhibit "A-1", Exhibit "A-2" and Exhibit "A-3" attached hereto and incorporated herein for all purposes (hereinafter referred to as the "Project"). WITNESSETH WHEREAS, the Developer warrants that it has dedicated to the use of the public forever, all streets shown on the plats of record pertaining to the lands on the Exhibits herein holds legal title to the lands located in Brazos County, Texas, said real property being more particularly described on Exhibit "B", Legal Description for the Subject Property, attached hereto and by this reference made a part hereof; and, WHEREAS, the Developer desires to facilitate the orderly development of the Project in compliance with the Brazos County Subdivision and Development Regulations, and of other governmental authorities, and the Developer desires to ensure that its development is compatible with other properties in the area and planned traffic patterns; and, WHEREAS, the County desires that the Project be completed to an engineering standard that exceeds the minimum regulatory specifications embodied in the current Brazos County Subdivision and Development Regulations; and, WHEREAS, it is the purpose of this Agreement to clearly set forth the understanding and agreement of the parties concerning the matters contained herein. NOW THEREFORE, in consideration of the mutual covenants and agreements contained herein, and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereto agree as follows: 1. Recitals and Definitions. The recitals herein contained are true and correct and are incorporated herein by reference. All capitalized terms not Page 1 0 otherwise defined herein shall be as defined or described in Brazos County's Subdivision and Development Regulations, unless otherwise indicated. 2. Developer Responsibilities: a. The parties acknowledge that the Developer has performed the following work, which was done as part of the consideration for this Agreement: blade and grade work of existing flex base to remove pot holes, prepare unsurfaced base for surface, apply an RC -250 Prime with a Grade 5 aggregate surface material to currently unsurfaced areas. b. File with the Commissioners Court ("Court") a bond or other security acceptable to the Brazos County Engineer ("Engineer"), which shall be (i) executed with sureties as may be approved by the Court, or (ii) executed by a surety company holding a license to do business in the State of Texas, (iii) made payable to the County Judge of Brazos County, Texas, and his successors in office, (iv) approved by the Commissioners Court, (v) in an amount of $80,000, and; (vi) for a term to expire not earlier than September 30, 2016. C. Beginning upon the written approval by the Engineer; L Reclaim all road materials, process, chemically stabilize and compact reclaimed base materials. ii. Place, grade and compact a minimum of 4" Grade 1 Flexible Base (materials to be provided by Brazos County). iii. Prepare base for surface applications. The work described by this paragraph 2.c. shall be completed on or before June 30, 2016. 3. County Responsibilities a. Brazos County to provide for the Project L A minimum of 4" depth flex base, delivered within 15 days of written request by Developer but no later than May 15, 2016 (to be placed by Developer in accordance with Item 2.c.iii. above. ii. County shall place Asphalt Prime and Seal Coat Surface iii. Provide a minimum 1" Hot Mix Asphalt Overlay by no later than 9/30/2016. 4. Obligations. a. Upon written request by Developer the Engineer shall timely inspect all work contained in Section 2.c above, but no later than June 30, Page 2 Vol. 2, �� _ Pg,__a321 2016 and shall provide in writing deficiencies, if any, to said work and the Developer shall have 30 days to cure deficiencies, if any, Should the Developer fail to undertake and complete its obligations as described in this Agreement to the County's specifications, then the County, without further notice to the Developer, or its successors in interest, may, without prejudice to any other rights or remedies it may have, place liens and take enforcement action on the Subject Property including a claim against the bond or other security for the Project. A lien of such assessments shall be superior to all others, and all existing lienholders and mortgagees, by their execution of the subordination or joinder documents, agree to subordinate their liens or mortgages to the County's said liens or assessments. b. Brazos County, in its sole discretion, will in writing accept Project for maintenance upon the effective date of this Agreement. 5. Indemnification. The Developer and County shall indemnify and hold the other harmless from any and against all claims, demands, disputes, damages, costs, expenses, (to include attorneys' fees whether or not litigation is necessary and if necessary, both at trial and on appeal), incurred by the other Party as a result, directly or indirectly, of the use or development of the Subject Property, except those claims or liabilities caused by or arising from the failure to comply with the conditions herein, negligence or intentional acts of the County or Developer, or its employees or agents. 6. Compliance. The Developer agrees that it, and their successors and assigns, will abide by the provisions of this Agreement, the Brazos County Subdivision and Development Regulations, including but not limited to, the standards for road and street design and construction. 7. Notices. Where notice is herein required to be given, it shall be by certified mail return receipt requested, hand delivery or nationally recognized courier, such as Federal Express or UPS. E-mail delivery of documents shall not replace or be in lieu of the aforementioned process. Said notice shall be sent to the following, as applicable: OWNERMEVELOPER'S REPRESENTATIVES: Paul Clarke 3608 East 29th Street, Suite 100 Bryan, Texas 77802 FVO . _ajf�Pct._ x-39_ Page 3 COUNTY'S REPRESENTATIVES: R. Alan Munger Brazos County Engineer 2617 W. Hwy 21 Bryan, Texas 77803 Should any party identified above change, it shall be said party's obligation to notify the remaining parties of the change in a fashion as is required for notices herein. 8. Compliance with the Law. The failure of this Agreement to address a particular permit, condition, term, or restriction shall not relieve the Developer of the Subject Property from the necessity of complying with the law governing said permitting requirements, conditions, terms, or restrictions. Notwithstanding the aforementioned once executed this Agreement satisfies all known permitting required of Developer by the County to commence the work defined herein, at time of its execution. This Agreement vest the permitting of the Project under the current Regulations. 9. Captions. The captions used herein are for convenience only and shall not be relied upon in construing this Agreement. 10. Binding Effect. This Agreement shall run with the land, shall be binding upon and inure to the benefit of the Developer and their successors and assigns in interest, and the County and their successor and assigns in interest. This Agreement shall become effective upon its execution by the Brazos County Judge acting on behalf of and in accordance with the voted decision of the Brazos County Commissioners Court. 11. Severability. If any part of this Agreement is found invalid or unenforceable in any court, such invalidity or unenforceability shall not affect the other parts of this Road Improvement Agreement, if the rights and obligations of the parties contained herein are not materially prejudiced and if the intentions of the parties can be affected. To that end, this Agreement is declared severable. 12. Applicable Law/Venue. This Agreement and the provisions contained herein shall be construed, controlled, and interpreted according to the laws of the State of Texas. Venue of any litigation relating to this Agreement shall be in the courts of _ Brazos County, Texas. 13. Agreement; Amendment. This Agreement constitutes the entire agreement between the parties, and supersedes all previous discussions, understandings and agreements, with respect to the subject matter hereof; provided, Page h vol. _ 3 a -- P9--ta�� however, that it is agreed that this Agreement is supplemental to the County's Subdivision Regulations and does not in any way rescind or modify any provisions of the County's Subdivision Regulations. Amendments to and waivers of the provisions of this Agreement shall be made by the parties only in writing by formal amendment. 14. Effective Date. The Effective Date of this Agreement shall be the day this Agreement is approved by the Brazos County Commissioners Court and signed by the Brazos County Judge. [SIGNATURES TO FOLLOW ON NEXT PAGE] COUNTY, TEXAS BY: Duane Peters, County Judge rs) Date: �Aq J / �( n ATTEST: SMILING MALLARD DEVELOPMENT COMPANY, LTD. A Texas Limited Partnership BY: SMILING MALLARD MANAGEMENT, LLC. a Texas Limited Liability Company its Sole General Partner In Date: Paul J. Clarke, Managing Member THE STATE OF TEXAS ACKNOWLEDGMENT COUNTY OF Before me, the undersigned authority, on this day personally appeared Paul J. Clarke, Managing Member of SMILING MALLARD MANAGEMENT, LLC, the Sole General Partner Page 5 Fvol--- of SMILING MALLARD DEVELOPMENT, LTD. and known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same for the purposes and consideration therein expressed. Given under my hand and seal of office on this the of 12016. Notary Public, State of Texas Page 6 EXHIBIT "A" PROJECT SCHEMATIC Page 7 Vol.__�_ pg._i EXHIBIT "B" LEGAL DESCRIPTION OF PROPERTY Page S vol._ 3 —� g 10 ORDER COMPETITIVE BIDDING REQUIREMENT EXEMPTION OF A CONTRACT FOR SOLE SOURCE MADE BY A COUNTY UNDER LOCAL GOVERNMENT CODE SECTION 262.024(A)(7)(A) The attached Agreement between Brazos County and Southern Cement Slurry, LLC. for the provision of goods and services described in the attached Customer Agreement constitutes a contract. The Brazos County Commissioners Court finds that this is a contract for goods and services for which competition is precluded due to limited availability by a sole source and is made by a county under V.T.C.A. Section 381.004(a)(10) and is exempt from competitive bidding. This Order is made pursuant to V.T.C.A. Local Government Code §262.024(a)(7)(A) and is to be entered into the Commissioners Court minutes. APPROVED (*4ISAPPROVED () p BY COMMISSIO T ON (�hi�� d'✓ iI(�(DATE) Duane Peters, County Judge Vol. 3.Z_ Pg— CEMENTITIOUS SLURRY CONTRACT BRAZOS COUNTY PURCHASING DEPT. 200 S. Texas Ave., Ste. 352 Contract No. 2016-162 Bryan, Texas 77803 Page I of Pages Telephone (979) 361-4294 GENERAL REQUIREMENT FOR CONTRACT as a duly authorized representative of Snunvt.� r�t1 5•' Contractor" willingly attest to perform (or deliver) as per Exhibit "A" and Exhibit "B' f o B s County. I further agree to all of the provisions and specifications contained in this contract. Brazos County is responsible for Item 6, Construction, A through F of Exhibit A. Contractor is responsible for all other items of Specifications in Exhibit A. ASSIGNMENT The successful offeror may not assign, sell or otherwise transfer this contract without written permission of Brazos County Commissioners Court. Should there be a change in ownership or management; the contract shall be terminated unless a mutual agreement is reached with the new owner or manager to continue the contract with its present provisions and prices. AWARD Brazos County reserves the right to award this contract on the basis of LOWEST AND BEST OFFER in accordance with the laws of the State of Texas, to waive any formality or irregularity, to make awards to more than one offeror, to reject any or all bids. CONTRACT OBLIGATION Brazos County Commissioners Court must award the contract and Brazos County Judge or other person authorized by Brazos County Commissioners Court must sign the contract before it becomes binding on Brazos County or the offerors. Department heads are NOT authorized to sign agreements for Brazos County. Binding agreements shall remain in effect until all products and/or services covered by this purchase have been satisfactorily delivered and accepted. QUANTITIES The quantities specified in this agreement are estimates only. Brazos County does not guarantee to purchase any minimum quantities or services other than those listed on a purchase order. HOLD HARMLESS AGREEMENT Contractor, the.successful offeror, shall indemnify and hold Brazos County harmless from all claims for personal injury, death and/or property damage resulting directly or indirectly from contractor's Vol.. o� 5 9 . Contract Continuation Sheet Contract No. 2016-162 BRAZOS COUNTY, TEXAS Page 2 of 7 Pages performance. Contractor shall procure and maintain, with respect to the subject matter of this bid, appropriate insurance coverage including, as a minimum, public liability and property damage with adequate limits to cover contractor's liability as may arise directly or indirectly from work performed under terms of this bid. Certification of such coverage must be provided to Brazos County upon request. INSPECTIONS & TESTING Acceptance of merchandise, work, and/or equipment provided shall be made by Brazos County at the sole discretion of the Commissioners Court when all terms and conditions of the contract and specifications have been met to its satisfaction, including the submission to Brazos County of any and all documentation as may be required. INVOICES & PAYMENTS Payments to Contractors will not be made if the Contractor cannot produce a Brazos County Purchase Order. Offerors shall submit an original invoice on each purchase order or purchase release after each delivery, indicating the purchase order number. Invoices must be itemized. Any invoice, which cannot be verified by the contract price and/or is otherwise incorrect, shall be corrected by the Contractor. When multiple deliveries and/or services are required, the offeror may invoice following each delivery or performance of service and Brazos County will pay on invoice with in thirty (30) days upon receipt of invoice. Contracts providing for a monthly charge will be billed and paid on a monthly basis only. The Contractor will provide an invoice for each month in which. Brazos County is responsible for payment, during the duration of the contract. Prior to any and all payments made for goods and/or services provided under this contract, the offeror should provide his Taxpayer Identification Number or social security number as applicable. This information must be on file with Brazos County Auditor's office. Failure to provide this information may result in a delay in payment and/or back-up withholding as required by the Internal Revenue Service, PRICING Prices for all goods and/or services shall be firm for the duration of this contract and shall be stated on the Pricing/oelivery Information form. Prices shall be all inclusive: No price changes, additions, or subsequent qualifications will be honored during the course of the contract. All prices must be written in ink or typewritten. Pricing on all transportation, freight, drayage and other charges are to be prepaid by the contractor and included in the bid prices. If there are any additional charges of any kind, other than those mentioned above, specified or unspecified, offeror MUST indicate the items required and attendant costs or forfeit the right to payment for such items. Where unit pricing and extended pricing differ, unit pricing; prevails. Pricing contained on the attached pricing proposal will be held for the duration of this project. TAXES Brazos County is exempt from all federal excise, state and local taxes unless otherwise stated in this document. Brazos County claims exemption from all sales and/or use taxes under Texas Tax Code §151.309, as amended. Texas Limited Sales Tax Exemption Certificates will be furnished upon written request to Brazos County Purchasing Agent. GOVERNING FORMS In the event of any conflict between the terms and provisions of these requirements and the specifications, the specifications shall govern. In the event of any conflict of interpretation of any part vol. Contract Continuation Sheet Contract No. 2016,162 BRAZOS COUNTY, TEXAS Page 3 of 7 Pager of this overall document, Brazos County's interpretation shall govem. In the event of a conflict between the terms, conditions, provisions, and specifications of this document and any other terms, conditions, provisions, and specifications provided by the Contractor; the.terms of this document shall supersede. GOVERNING LACY This bid solicitation is governed by the, competitive bidding requirements of Brazos County Purchasing Act, Texas Local Government Code, §262.021 et seq., as amended. Offerors shall comply with all applicable federal, state and local laws and regulations. Offeror is further advised that these requirements shall be fully governed by the laws of the State of Texas and that Brazos County may request and rely on advice, decisions and opinions of the Attorney General of Texas and Brazos County Attomey concerning and portion of these requirements. DISQUALIFICATION OF OFFEROR Upon signing this bid document, an offeror offering to sell supplies, materials, services, or equipment to Brazos County certifies that the offeror has not violated the antitrust laws of this state codified in Texas Business and Commerce Code §15.01, et seq., as amended, or the federal antitrust laws, and has not communicated directly or indirectly the bid made to any competitor or any other person engaged in such line of business. Any or all bids may be rejected if Brazos County believes that collusion exists among the offerors. Bids in which the prices are obviously unbalanced may be rejected. If multiple bids are submitted by an offeror.and after the bids are opened, one of the bids is withdrawn, the result will be that all of the bids submitted by that offeror will be withdrawn; however, nothing herein prohibits a Contractor from submitting multiple bids for different products or services. SEVERABILITY If any section, subsection, paragraph, sentence, clause, phrase or word of these requirements or the specifications shall be held invalid, such holding shall not affect the remaining portions of these requirements and the specifications and it is hereby declared that such remaining portions would have been included in these requirements and the specifications as though the invalid portion had been omitted. SILENCE OF SPECIFICATIONS The apparent silence of specifications as to any detail, or the apparent omission from 'it of a detailed description concerning any point, shall be regarded as meaning that only the best commercial practice is to prevail and that only material and workmanship of the finest quality are to be used. All interpretations of specifications shall be made on the basis of this statement. The items furnished under this contract shall be new, unused of the latest product in production to commercial trade and shall be of the highest quality as to materials used and workmanship. Manufacturer furnishing these items shall be experienced in design and construction of such items and shall be an established supplier of the item bid. TERMINATION Brazos County reserves the right to terminate the contract for default if offeror breaches any of the terms therein, including warranties of offeror or if the offeror becomes insolvent or commits acts of bankruptcy. Such right of termination is in addition to and not in lieu of any other remedies which Brazos County may have in law or equity. Default may be construed as, but not limited to, failure to deliver the proper goods and/or services within the proper amount of time, and/or to properlyperform any and all services required to Brazos County's satisfaction and/or to meet all other obligations and Vol. a 3 pg,_ Contract Continuation Sheet Contract No. 2016.162 HPAZOS COUNTY, TEXAS Page 4 of 7 Pages requirements. Brazos County may terminate the contract without cause upon thirty (30) days written notice. POLICY REQUIREMENTS FOR CERTIFICATE OF INSURANCE CON'TRACTOR'S INSURANCE The Contractor/Contractor, before starting work for Brazos County, must furnish Brazos County a Certificate of Insurance or other acceptable evidence from a reputable insurance company or companies with an A.M. Best Rating of AA@ (such companies to be acceptable to Brazos County) licensed to write insurance in the state of Texas, showing that the Contract is covered by the insurance as follows: (I) Statutory Workers Compensation Insurance with Employers Liability Insurance in the amount of $1,000,000. In the event any work is sublet, the Contractor shall require the subcontractor similarly to provide the same coverage and shall himself acquire evidence of such coverage on behalf of the subcontractor. (TLC Sec. 401.011) Waiver of subrogation is required. (2) Commercial General Liability Insurance with a $ 2;000;000 Combined Single Limit. The policy shall be on the Comprehensive General Liability 1986190 occurrence form, and shall include coverage for acts of independent contractors, and shall name Brazos County as an additional insured. Waiver of subrogation is required. No claims made policies are acceptable without prior approval by the Commissioners Court/Risk Management (3) Automobile Public Liability Insurance with a $1,000,000 Combined Single Limit, in all self- propelled vehicles used in connection with the contract, whether owned, non -owned or hired. The Certificate of Insurance furnished to Brazos County shall contain a provision that coverage under such policies shall not be canceled or materially changed until at least 30 days prior written notice has been given to Brazos County. Brazos County shall be named as "Additional Insured" LIMITATIONS The parties are aware that there are constitutional and statutory limitations on the authority of Brazos County to enter into certain terms and conditions of the Agreement, including, but not limited to, authorizations of the placement of liens on Brazos County property; disclaimers and limitations of warranties; disclaimers and.limitations of liability for damages; waivers, disclaimers and limitations of legal rights, remedies, requirements and processes; limitations of periods to bring legal action; granting control of litigation or settlement to another party; liability for acts or omissions of third parties; payment of attorneys' fees; dispute resolution; indemnities; and confidentiality (collectively, the "Limitations'. Any Agreement terms and conditions related to the Limitations will not be binding on Brazos County except to the extent authorized by the laws and Constitution of the State of Texas. COVERAGESIWAGES Nothing in this Agreement shall be construed ac making Brazos County responsible for the payment of compensation and/or any benefits for Contractor including health, property, motor vehicle, workers' compensation, disability, death, and dismemberment insurance for the Contractors employees and/or Contract Continuation Sheet Contract No. 2016162 BRAZOS COUNTY, TEXAS Page 5 of 7 Pages equipment. Nothing in the Agreement shall be construed as making Brazos County responsible for wages, materials, logistical support, equipment, and related travel expenses incurred by the Contractor. PREVAILING WAGES The Contractor shall be responsible .for following all provisions of Chapter 2258 of the Government Code relating to the payment of prevailing wages. The wage rates to be used are included in Exhibit A attached. A contractor or subcontractor who violates this section shall pay to Brazos County $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated on Exhibit A. SOVEREIGN IMMUNITY The parties understand that Brazos County does not waive or relinquish any immunity or defense on behalf of itself, officers, employees, agents, and volunteers as a result of its execution of this Agreement and the performance of the covenants contained herein. Further, Brazos County is not responsible for any civil liability that arises from any act or omission made within the course and scope of this Agreement. The Parties understand and agree that Brazos County does not assume civil liability under any theory of law for the actions of the Contractor in providing services hereunder. NOTICES Notices shall be mailed to the addresses designated herein or as may be designated in writing by the parties from time to time and shall be deemed received when sent postage prepaid U.S. Mail to the following addresses: BRAZOSCOUNTY: Brazos County, Texas Duane Peters, Brazos County Judge 200 South Texas Avenue, Suite 332 Bryan, Texas 77803 CONTRACTOR: Sales Contact Name: Phone Number: Billing Info: ASSIGNABILITY This agreement may not be assigned without the prior written permission of Brazos County. FISCAL FUNDING CLAUSE Notwithstanding any provisions contained herein, the obligations of Brazos County are expressly contingent upon the availability of funding for the obligations contained herein for the term of the Agreement and any extensions thereto. Contract Continuation Shect BRAZOS COUNTY, TEXAS Contract No. 2016-162 Page b or 7 Pages WAIVERS No waiver by either party hereto of any term or condition of this Agreement shall be deemed or construed to be a waiver of any other term or condition or subsequent waiver of the same term or condition. ENTIRE AGREEMENT This Agreement represents the entire and integrated agreement between Brazos County and the Contractor and supersedes all prior negotiations, representations, or agreements, either written or oral. This Agreement may only be amended by written instrument approved and executed by the parties. AVAILABILI'T`Y AND RETENTION OF RECORDS All records relating to the service provided under this contract and supporting documentation for invoices submitted to Brazos County by the Contractor shall be retained and made available by the Contractor for audit by Brazos County, it duly authorized representatives, the State of Texas (including, but not limited to the Auditor of the State of Texas, Inspector General or duly appointed law enforcement officials) and agencies of the United States Government. Such records shall be returned by Contractor and made available for any time period required by state or federal law. If changes occur in the governing state or federal law, regarding retention records, Contractor shall comply with such changes. If an audit is initiated before the expiration of such time periods required by state or federal law regarding retention of records, the Contractor shall retain such records until the audit is concluded and all .issues resolved- Contractor esolvedContractor shall provide Brazos County with copies of such audits that be conducted with respect to the contract. AUDIT RESPONSIBILTY The Contractor shall be responsible for receiving, replying to and/or complying with any audit exception by appropriate federal, state or local audit directly related to the provision of this contract, The Contractor shall repay to Brazos County the full amount received for duplicate billings, erroneous billings, false or deceptive claims. The Contractor recognizes and agrees that Brazos County may withhold any money due and recover through any appropriate method any money erroneously paid under [his contract if evidence exists of less than full compliance with this contract. INDEMNIFICATION The Contractor shall defend, indemnify and save harmless.Brazos County and all its officers, agents, and employees from all suits, actions, or claims of any characters name and description including attorney's fees expenses brought for or on account of any injuries or damages received or sustained by any person or persons or property, by or from the said Contractor or his employees or by or in consequence of any negligence in safeguarding the work, or through the use of unacceptable materials in construction of the work, or by or on account of any act of omission, the Worker Compensation Law or any other law, ordinance, order or decree, and so much of the money due the said Contractor under and by virtue of his contract as shall be considered necessary by Brazos County may be retained for the use of Brazos County, or in case no money is due, his sureties shall beheld. until suit or suits, action or actions, claim or claims for injury or damages as aforesaid shall have been settled and satisfactory evidence to that effect famished Brazos County. Contractor shall defend, indemnify and save harmless Brazos County, its officers, agents and employees in accordance with this indemnification clause for any injury or damage is caused in part the Contractor, it's employees, agents or assigns. Contract Continuation Sheet BRAZOS COUNTY, TEXAS Contract No. 2016.162 Page 7 of 7 Pages The undersigned affirms that they are duly authorized to execute this contract, that this proposal has not been prepared in collusion with any other Proposer, and that the contents of this proposal have not been communicated to any other Proposer prior to the official opening of this proposal. The signatory also agrees to all provisions and specifications of this contract. Signed By:Title: iu Typed Name: r�iatlo J/ Company Name: ;501,J 4r. -v dle Phone No. Email Address: 1!1 Mailing Address: PO -8 0"" we Pp/`YV- �WS P. O. Box or Street City State Zip Employer Identification Number 2- 9-;2,9 71 -7 Social Security Number: �p ved y Commission Court on this day of 016 by o mL the position of Q�� J SPECIAL SPECIFICATION Centenddous Slurry (Plant Mix) 1. Description. PaaumaUcally mux of xcineatitious materials with .water for modification and stabilization of aubgrade soils. subbases, and bases. 2. Datinldoms. The terms used duoughout the specification are defined as follows: m Cementitious — Bonding particles together by a cementing affect. o Soil -cement - Untfmm mixture of a cemendtious shury and in-situ soils. 3. MAerials. Furnish uncontaminated materials of uniform quality that meet the requirements of the plans and/or specifications. Notify the Engincer of the proposed material sources and of changes to material sources; Min Engineer will verify that the specifications are met before the sources can be used. The Engineer may sample and test project materials at any time before placement. A. Cement Furnish cement conforming to DMS4600, "Hydraulic Cement." store cement to pmtentmoistaic damage. Do not use material which has become -caked due to moisture absorption Do not use cement containing lumps or foreign matter of a naturo and in amounts that maybe deleterious to the mixing operations. B. Supplementary Centeiatitlous Materials (SCM11) A. Fly Ash. Furnish fly ash conforming to DMS4610, "Fly Ash". B. Ultra -Fine Aly Ash (UFPA). Fumbb UFFA confirming DMS -4610, "Fly Ash'. C. Ground Granulated Blast-FFumaca Slog (UGEIRS). Furbish t3GBF5 conforming to DMS4620, "Ground Granulated Blast Furnace Sieg", tirade 100 or 120. D. Silica Fume. Furnish ailica fume conforming toDM 4630, "Silica Frame". E. Metakeolin. Ftunish metakaolin conforming to DMS -4635, "Metekaolin F. Alkali By-pass Dust (ABD). Fundsh Alkali By-pass Dust conforming to DMS- 46XX, "ASL By-pass Dust". C. Additives. Proprietary blend consist of approximately 0.06 % of total batched weight. D. Water. Furnish water free of industrial wastes and other objectionable matter. 1-5 d. Equipment. Provide a mixing plant, tools, and equipment necessary for proper mixing and delivery of slurry. A.Storage Facility. Store all components, 'except water, in weatherproof containers. B. Slurry Plant. Provide a pneumaticAydraulic mixing plant with monitoring devices to regulate flow rates and line pressurea. Regulate slurry proportions by calibrated scales. Include all storage ailos, weather protection, sheds, scales, pumps, mixers, valves, gauges and regulating, devices required to continuously measure and mix cementitious slurry at the .batch plant The plant .should provide sofa and easy access for the QC personnel so they may obtain samples. Ali mechanical mixing:must he pump driven and can not rely on lime slaking tanks, paddle driven mixers or other similar technology. C. Delivery egulpment. Deliver slurry to the project site in a nod -baffle tank. Do not stir or agitate with any form of mechanical'device. D.Tkkem. To be generated through the function of the calibrated plant scales. Tickets should document the amount of cementitious product in a dry ton mass. 5. Slurry Physical Requirements A. Physical Requirements. Slimy should meet the following requirements: Tablel Lab Teats + Note: Perform test 30 minutes after batching with a minimum of 60 second flow rate All rejected loads must be verified by a secand.round of testing within 30minutes after the failed test. 2-5 vol. P! a��� Mix Property Test Procedure Requirement % Mtn. . _ Percent solids TEX-103-13, Part I 55 Viscosity + Tex -130-E Pert . IV Mia of 1 minurte + Note: Perform test 30 minutes after batching with a minimum of 60 second flow rate All rejected loads must be verified by a secand.round of testing within 30minutes after the failed test. 2-5 vol. P! a��� 6. Construction. Construct each layer uniformly, free of loose or segregated areas and with the required density and moisture content. Provide a smooth surface that conforms to the typical sections, lines, and grades sbown on the plans or as directed. A. Preparation of Sobgrade or Existing Hese for Treatment. Before treating pulverize, mill or remove exiating pavement in accordance with pertinent bid items or plans as directed. Sbape existing material to conform to the typical sections shown on the plans or as directed. When shown on the plans or directed, proof roll the roadbed in accordance with Item 216, "Proof Rolling" before pu v dzing or scarifying existing material. Correct sof spots as directed. When now base is required to be mixed with existing base, deliver, place, and spread the new material in the required amount per station. Manipulate and tborougbly mix new baso with existing material to provide a uniform mixture to the specified depth h are shaping B Pulverkeation, After dmp'uig, pulverize oracsrify existing material so that I WA passesa 2 -l/2 -in. sieve. If the material cannot be uniformly processed to the requited depth in a single pass, windrow and excavate the material to expose a secondary grade to acideve plan depth. C. Application of Cemeniitloot Starry. Uniformly apply`cementitious material using slurry'placoment. The Engineer will determine the percent content to produce a stabilized mixture that meets the, requirements shown on the plans. The percentage will be based on laboratory fesults or prior experience with the project materials. 'lure Engineer will use the tests shown in Tables 1 and 2 for acceptance of the mixhrre. I. Determine the placement rate in a percentage converted into a coverage area of dry pounds per square yard. 2. Complete all mixing and compaction operations within 2 hours after the initial mixing of slurry to the soil. Apply cementitioos material only.on an area whore mixing compacting, and finishing can be completed during the same working day. Start application only when the air temperature is at least WE and rising. The temperature will W taken in the shade and away from any artificial beat Suspend application when (he$mglncw dot. mines dud weather conditions aro unsultable. 3-3 Vol. _�_ Hy. u�JCS 1. Slurry Placement. Mix cementitious material with water, as approved Provide slurry free of objectionable materials and with a uniform consistency that can be easily applied. Slurry should be placed oa material that is at optimum moistureor slightly higher. Distribute slurry uniformly by making successive passes over a measured section of the roadway until the specified content Is rewbcd. D. Miring. Thoroughly mix the material and slurry using approved equipment. Mix until a homogeneous mixture is obtained. Sprinkle the treated materials during the mixing operation, as directed, to maintain Optimum mixing moisture. Spread and shape the completed mixturo in aunit'orm layer. Atter mixing, the Engineer will sample the mixture at roadway moisture and test in accordance with Tex -101- E, Part III, to determine compliance with the gradation requirements in Table 1. 'Sable 1 Gradation iter alrements Minimum % Passu Sieve She Base Sn de 1-3/4 in. l00 l00 314 in, 85 85 No. 4 60 D. Compaction. Compact the mixture in one lift using density control unless otherwise shown on thaplans. Complete compaction within 4 hours after thoroughly mixing of cementitious material into the soil. Sprinkle or aerate the treated material in accordance with Ram 204, "Sprinkling "to adjust fhe. moisture content during compaction so that itis within 2.0 percentage points of optiritum as determined by Tax -120.5 Determine the moisture content of the mixturo at the beginning and during compaction in accordance with Tox-1 IS -E. Adjust operations as required. Begin rolling longitudinally at the sides and proceed towards the center. overlapping an successive trips by at least Otto -half the width of the roller unit. On super elevated curves, begin tolling at the low'side and progress toward the high side. Offset alternate trips of the toiler. Operate rollers -at a speed betwem2 and 6 MPH, as directed. Remove areas that lose required senility, compaction, or finish. Replace with cementitious mixture at the Contractor's expanse. 1. Ordinary fiampacdom Roll with approved compaction equipment, as directed. Correct irregularities, depressions, and weak sputa immediately by scarifying the areas afiteted,.adding or, moving treated material as required, reshaping, and ro-compacting, 4-5 2. Density Control. Compact to at least 95% of the maximum density determined in accordance with Tex -120-E. The Engineer will determine roadway density in aexordanca with Test Method Tex -115-5. If necessary, remove material that does not meet density requirements; Remove areas Ow lose required stability, compaction, or finish. Replace with cementitious mixture and compact and test in accordance: with density control methods. The Engineer may accept the section if no more than I of the 5 most recent density tests is below the specified density and the failing test is no more than 3 pef below the specified density. L Finishing. Immediately after.completing compaction, clip, akin, or tight -blade the surface of the cenentitious material. with a maintainer or subgrade trimmer to a depth of approximately 114 inch. Remove loosened material and dispose of it at an approved location. Roll the clipped surface immediately with apneumatio-tire roller until a amoothamface is attained. Add small increrneits of water as needed during rolling. Shape and maintain the course and surface in conformity with the typical sections, lines and grades shown on the plans oras directed. Finish grads of constructed subgrade, subbase or base.in accordance with Item 132.3.12.1, "QtadeToletances." Finish grade of constructed sabgrade, subbase or base in accordance with Item, "Finishing." Do not surface patch. F. Caring, Cure for at least 3 days by sprinkling in accordance with Item 204, "SpdnkIW' by m"; '";n;"g the moisture content no lower than two percentage points below optimum or by applying an asphalt material at the rate of 0.05 to 0.20 gallon per aquae yard, as shown on the plans to directed by the engineer. Do not allowe d egrupmenton the finished amuse during curing except as required for sprinkling, unless otherwise approved. Measurement. 'lire treated area will be measured by the square yard of sorfaco arm at the specified depth shown on the plans or. approved by the Engineer. Ccmentitious slurry will be measured by the dry ton weight of cementitious material used to produce the shury. The mass of cementitious materiel shall be determined by calibrated load cells on the mixing plant during the manufacturing of the chary. This known mass shall be recorded on all delivery tickets to the project Areas of overlapping will not be measured more than once. Quantities of cementitious matetialw.placed during remixing to achieve the required specification or fall outside the mixing area will .not be measured for payment unless approval by the Enocer. 3. Payment. The unit prices bid torthe cementitious ahvry will beIully compensated if all equipment, materials. towing, .and labor were famished as required to correctly install cementitious slurry. The slimy imiat meet the specified teat requirements: and placed within the plan arca. No separate measurement will be made for additional quantities of cemeatitious slurry installed to overcame obstructions. Transportation and disposal of soil mix spoil will be subsidiary to this procedure and will not be a separate pay item. 5-5 CXW FD Southern Cement Slurry, LLC Quotation and Sales Contract VC?S6UPERSLURRY- Brazos County Road and Bridge Department Date: 2/1/2016 Attn: Purchasing Bid Date: 2/1/2016 Subject to terms and conditions, we are pleased to quote the following forme in the construction of Job Name: Misc. Brazos County Projects Located at Brazos County, TX Prices quoted are F.O.B. Slurry Plant Ouantity U.0m. Description Unit Price (South of Hwy 21) Cement SuperSlurry Delivered $195.00 /dry ton Cern—Lime SuperSlurry Delivered $205.00 /dry ton (North of Hwy 21) Cement SuperSlurry Delivered $205.00/dry ton Cem-Lime SuperSlurry Delivered, $220.00 /dry ton Job Specification: As per client request 1) The above prices are for the reference project only during normal working hours. 2) Please sign and return quotation within 30 days and prices will be honored for 12 -months. 3) Partial loads (Less than 12 tons) will be invoiced at full load &eight cost plus material cost. 4) Souther Cement Slurry is not.responsible for the mixing or compaction of the slurry. ° Payment in full is due on the last day of the month following the month of shipment.. Must be signed and returned for delivery of material. Southern Cement. Slurry by: Great Southern Stabilized Wade Carroll Sales / Quality" Control Cn�ifi,nrn (`o..v '. I ' 161an Cn.t>n AA Dnnrr Tevne 77iRt 2At-qAA-Mr) . Bili+ Nhw rn 1� BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: February 23, 2016 SUBJECT: Utility Permit — Verizon Southwest Consider and take action on the Verizon Southwest utility permit on Deer Park Drive located 1,400 feet West of the State Highway 6 frontage road. Work consists of placing 478 feet of buried cable within 5 feet of the South right of way line of Deer Park Drive. Verizon will bore a distance of 160 feet under an existing creek as part of this work. Proposed cable will be buried a minimum depth of 36 inches and 5 feet under the creek crossing. Site is located in Precinct 1. SUBMITTED BY: Darrell W. Kolwes Right of Way Agent ACKNOWLEDGED BY: Lloyd Wassermann Commissioner Precinct 1 This request isAPPROVED / ❑ DENIED by ommissioners' Court Duane Peters, CA ounty)udge DATE: � I NOTIFICATION OF PROPOSED INSTALLATION AND/OR REPAIRS OF TELEPHONE FACILITIES AND DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS Comes now VERIZON SOGTH\VEST[company name], hereinafter referred to as "Company' a TEXAS [state] Corporation, with authority to transact business in Texas, acting by and through its duly authorized representative, and hereby notifies the County Engineer of its intent to lay, construct, maintain, repair and/or operate a telephone facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached hereto and said location described as follows: Beginning at a point approximately 1396' west of the junction of Deer Park Dr. and Hwy 6, 478' of buried cable will be placed at 5' within the south right of way of Deer Park Dr. at a depth of 36"_ This work includes a 160' bore underneath the creek and erosion areas. The proposed cable will buried to a minimum depth of 36" and 5' below the culverts. The location and description of the proposed installation and appurtenances must be fully shown on detailed drawings attached to this Notification. The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and shall complete said construction Avork within 30 working days. (COMPANY MUST FILL IN). If such construction is not begun by the 60th day, Company will be required to provide a new notice. Company declares that prior to fling this application, it has ascertained the location of all existing utilities, both aerial and underground, and the filing of this application is prima facie evidence that the proposed installation will not conflict with any existing utility. A copy of this notice shall be kept at the job site any time work is being performed. In the event of deviation from this notice, the Brazos County Engineer's Office or its designated representative will be notified as soon as practicable. Approval of County Engineer's Office may take as long as two weeks after complete application is received. Failure to notify the County Engineer's Office within 24 hours of beginning construction shall constitute grounds for job shutdown. By signing below, I certify that I am authorized to represent the Company listed below, and that the Company agrees to the conditions/provisions included in this notification. VERIZON SOUTHWEST Company Name Brenda Vaidak By: Sisnature Supervisor -Network Engineer Title 301 Industrial Blvd.. Bryan. Texas 77803 Address 979-821-4770 Phone Number Brenda.vaidak(@,verizon.com Email ACCEPTANCE OF NOTIFICATION Brazos County offers no objection to the proposed location of the utility in the County right of way as shown by accompanying drawings and notice dated Nov. 4. 2015 except as noted below: (Month/Day/Year) EXCEPTIONS: 914�W 0, -kL, Brazos County Engineer Vol. � ,Z_ 1,g 5g16 wC§Ggoo w0g,7PCBIMW WORk L OCA7l©nI ,.m Sources: Esr,, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAiN, Esri Japan, NIETI, Esri Chins (Hong Kong), Esrl (Thailand), Mapmylndia, ©OpenStreetM2p contributors, 2ndthe GIS User Community, City of College Station, IT Department, GIS Office Vol.._o�_ Pg..3 10) rm I TP LONGEST LOOP 9 KFT •202659 � 1021 M^262 5 =0 822' 2 -2q P=p =O��� 01,176 1875 xoo.16 DIO611 22. VERIZON AREA STATE: TX 1062 OHMS 4.52 0e DIVISION: SOUTHWEST EXCH.: 5416 REM. Co.: 007 W.C.: 6900 WO No.:7POBIMW CONTROL NUMBER: NOTE AREA -- 1. BOND AND GROUND ACCORDING TITLE: RELO CA BRZS CNTY/DEER PARK OR TAX DST.: 2. COUNTY PERMIT REQUIRED. NO TWP: RNG.: SEC.: SAL: 3. LABOR TO BE PERFORMED BY DATE: 02/02716 REV. DATE: SCALE: VzI00.00' 4. BURY CA TO MINIMUM DEPTH C FILE: WPI DRWN ENG APRVD PRINT 5. LOCATE ALL BURIED UTIIjITIEY RVW RVW 1, OF I`11AI�AIIC 0 -AO -CO AAA Vol. BRAZOS COUNTY ROADWAY SAFETY AND ROAD PRESERVATION STANDARDS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY A. General Requirements I . Adequate drainage shall be maintained in ditches at all times. 2. Permittee will use best management practices (`BMP") (EPA and TCEQ both provide lists of examples of BMPs) to minimize erosion and sedimentation resulting from the proposed installation. 3. The permittee shall take precautions to avoid damage to property. All County Right of Way and property shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or appointed representative. 4. The construction and maintenance of such utility shall not interfere with the property or rights of a prior occupant. 5. Permittee shall not interfere with other utilities located in the right of way. In the event damages occur, permittee will be liable to the County or other utilities running through the right of way. 6. County Engineer shall determine whether or not permittcc's plans shall inconvenience the public. If it is determined that inconvenience to the public exists, then the County Engineer will decide whether such project will be allowed or if an alternative exists so as not to inconvenience the public. B. Safety Requirements 1. Proper traffic control measures must be put in place prior to beginning work and remain in place during the duration of thejob. All traffic control measures must follow the Texas Manual of Uniform Traffic Control Devices (TMUTCD). See Traffic Control Requirements below. 2. During constniction, all safety regulations of the Texas Department of Transportation shall be observed. 3. Permittee must take such precautions and measures, including placing and displaying safety devices, as may be necessary, in order to safely conduct the public through the project area. Company shall provide flagmen, signs, signals or devices necessary to provide complete safety to the public. 4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. 5. No cable, conduit and/or pole line shall be laid, constructed, maintained and/or repaired so as to constitute a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved by the County Engineer. C. Traffic Control Plan I. A traffic control plan, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided for the following: a. Any construction (i.e. pit, excavation, hole) left open over night, requires specific nighttime traffic control measures pursuant to the TMUTCD; b. If construction is within ten (10) feet of the roadway; or c. Any work performed in the road right-of-way; 2. Plan must be attached to the permit and kept at the job site anytime work is being performed. 3. Plan must set forth the time of completion for the job. D. Design Standards 1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation and the pole be placed in the designated area for power specified as set forth in the Texas Utilities Code, Section 181.045. 2. All pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure safety to the public. Any pole placed in violation of this requirement will be required to be moved to the appropriate location at the company's expense. Exceptions may be approved by the County Engineer, 3. All underground installations shall (these are minimum depths — utility may place deeper): a. be placed at a minimum depth of forty -tight (48) inches below the top of the pavement; b. be at least thirty-six (36) inches below ditch flow line when installation is within the area measured from top of bank to top of bank; c. be at least forty-eight (48) inches below ditch flow line if low pressure gas or petroleum lines. For high Pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below; d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of way of less than 60'. 4. Water Lines: All water lines must be a minimum 36 -inches below the ditch flow line and cased. Waterlines shall be cased if crossing under the roadway. 5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within designated locations based upon the type of utility. The locations shall be as follows: (measured from back of right-of-way). Power— 0-2 feet, nominally 1' Phone — 2-4 feet, nominally 3' Gas — 4-6 feet, nominally 5' Cable — 6-8 feet, nominally 7' 6. Utilities with less than 60 feet right-of-way in all new developments shall install the utility in a similar manner as referenced in No. 3 above, however, the County Engineer or its designated representative will provide final approval of each utility location. 7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longer than 400' if left open over night or unattended. Crossings under a county road shall: a. be bored or jacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT; b. be pressure grouted for the full length of the crossing ifthe annular space between pipe and casing and soil exceeds one (1) inch. Brazos County must be given 24 hours notice of pressure grouting operations and have the opportunity to have an inspector on site to observe pressure grouting operations; c. TxDOT Standard Specification Item 476 shall be followed for all boring, jacking, tunneling and joints. 9. Bore Pits a. no pits shall remain open longer than 2 days; vol. __.3u __ !-,(J. - b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above. c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from the County Engineer or his representative; d. when pits are to remain open for more than 3 hours, due diligence will be used in protecting the spoil pile to prevent drainage problems; e. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity; f. based upon soil conditions, the County Engineer or his representative may require pits be placed further from the edge of road. 10. Any installation within ten (10) feet of edge of pavement shall meet the following: a. location must be approved by the County Engineer or his representative b. backfilled with cement stabilized material. c. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity. d. All excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed during a rainy period or at other times where excess water cannot be prevented from entering the trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized material as soon as weather permits; e. All disturbed base and pavement materials shall be removed and restored to the satisfaction of the County Engineer or his representatives. f No side or lateral tamping to fill voids under the base and pavement materials is allowed. 11. Company must be careful to notjeopardize the slope or integrity of the shoulder of the road. In the event Company damages the slope, shoulder or any other portion of the right-of-way, Company will be responsible for repairing the damage and replacing the right-of-way to the condition it was prior to commencing construction. 12. Operation of construction and/or maintenance equipment on the traveled surface of any improved County road will not be permitted, except in an instance whereby the laying, constriction, maintenance and/or repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided meeting TMUTCD requirements. 13. In the event said construction and/or maintenance and/or repair requires Company to remove, cut or jeopardize any section of the road (asphalt, cement, road base, etc), Company will be required to provide a performance bond or letter of credit securing necessary repairs. Said bond amount will be determined by the County Engineer. 14. The applicant shall submit a letter of "No Objection' from the Army Corps of Engineers for all designated wetlands and environmentally sensitive lands. E. Emergency work I. In the event Company is required to perform emergency services, that requires excavation in a County Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Company shall notify County Engineer within 24 hours of beginning construction/repairs. This will allow the County Engineer and Road & Bridge Office an opportunity to inspect the site to ensure the integrity of the County Right of Way and traffic safety controls used. Vol. _�3 Pg._ �r% E Repairs to existing - facilities 1. Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the soil, shall not be performed until plans describing such maintenance and/or repair have been approved by the County Engineer or designated representative and a permit has been obtained. G. Relocation of utilities: 1. When and if the County Engineer determines that it is necessary for the construction, repair, improvement, alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or other facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated thereon, as required by the County Engineer within a reasonable time as determined by the County Engineer and Utility Company, and at the expense of the Utility Company. H. High Pressure Pipelines I. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining to controlled access or non -controlled access installations, should contain the following additional information in the description of the permit. -diameter -wall thickness -material specification -minimum yield strength -maximum operation pressure of the pipeline 2. With the exception of the maximum operation pressure of the pipeline, this information is to be supplied for both the carrier pipe and the casing. 3. Assurance must also be given that the installation material and design meet the minimum Federal Safety Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed by an authorized representative of the company. 4. Petroleum Pipelines Depth Tvpe of Pipeline (below deepest ditch grade) Special Requirements Encased Pipe Less than 10' Must be covered with concrete pad at least 36"deep Encased Pipe Greater than 10' No concrete pad required Non -Cased Pipe Less than 10' Must be covered with concrete pad at least 48"deep Non -Cased Pipe Greater than 10' No concrete pad required The Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum. 5. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -of -Way. Transmission lines have been determined to be petroleum pipelines (which includes natural gas lines) and shall not be parallel to a County Road. 6. Natural Gas Distribution is a line that serves the final customer. Vol. N 5 ZEE .8 8 • re 'FSA �'_FPfi.. bat SAII� Pe' 8E � J � U 2 e: 1 nEl D'."c ap�_g ��$ ti5 x 80� ¢ Z o _ gaSg.B—EE R_g qyg_ s.ei. Slag0 eqeqy Fg pet-aP£E�3'8tE^o� 6�e xN i - — — _ — — — — —— — gg 8g �� 0 olro D—P ,i01 roV5 a a- - - - - - - - - - Esq;%tq-- �'soosos �L Ee frS$ �^---- ___ -- gyY9F9-p5� yy kR5"fiFm o8;g8 Rq:3'"er Pz°86 Com(\ �B= IID 'a5 8-23« .- - a =1e N 5 ZEE .8 8 • re 'FSA �'_FPfi.. bat SAII� Pe' 8E � J � U 2 e: 1 nEl D'."c ap�_g ��$ ti5 x 80� ¢ Z o _ gaSg.B—EE R_g qyg_ s.ei. Slag0 eqeqy Fg pet-aP£E�3'8tE^o� 6�e xN i - — — _ — — — — —— — gg 8g �� 0 olro D—P ,i01 roV5 Vol. 02- - pg.— a a- - - - - - - - - - .ea r>u oc ,w o8;g8 Pz°86 Com(\ �B= IID V e%ag 8-23« Vol. 02- - pg.— 3 BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: February 23, 2016 SUBJECT: Utility Permit — Wickson Creek Special Utility District Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Old Reliance Road 1,600 feet northeast of Reliance Church Road. Crossing will be encased and be a minimum of 36 inches under the bottom of the ditch. Site is located in Precinct 2. SUBMITTED BY: L L �Y Darrell W. Kolwes Right of Way Agent ACKNOWLEDGED Precinct 2 This request is L] APPROVED / ❑ DENIED by Commissioners' Court Duane Peters, County Judge DATE: APPLICATION FOR WATER UTILITY PERMIT DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS Pursuant to the Texas Utility Code, Section 181.024, comes now WICKSON CREEK SPECIAL UTILITY DISTRICT (company name], hereinafter referred to as "Company" a TEXAS UTILITY [state] Corporation, with authority to transact business in Texas, acting by and through its duly authorized representative, and hereby petitions the County Engineer for the right to lay, construct, maintain, repair and/or operate a gas facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached hereto and said location described as follows: Facility to Cross Road Length of TYPE OF CONSTRUCTION Road Name & Block Number Crossing CHECK ONE Bored Jacked Driven Cased OLD RELIANCE ROAD 60' X X Facility to Parallel Countv Road Within Right -Of -Way Road Name and Block Number From To Depth Distance CONSTRUCTION TYPE 1" Diameter Wall Thickness 11/2" Encasement Pipe Material Specification Maximum Operation Pressure 80 PSI The location and description of the proposed installation and appurtenances must be fully shown on the attached detailed drawings. The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and shall complete said construction /work within l working days. (COMPANY MUST FILL LN). If such construction is not begun by the 60°i day, Company will be required to apply for a new permit. Company declares that prior to filing this application, it has ascertained the location of all existing utilities, both aerial and underground, and the filing of this application is prima facie evidence that the proposed installation will not conflict with any existing utility. A copy of this permit shall be kept at thejob site any time work is being performed. It is expressly stipulated that this Permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or vest any property right in said holder. It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the County's right, title and interest in the land to be entered upon and used by the holder and the holder will at all times assume risk of and indemnify, defend and save harmless Brazos County from and against any and all loss, damages, cost or VOL expense arising in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights and privileges. Any deviation from these specifications must be approved by Brazos County Engineer's Office or its designated representative. Approval of County Engineer's Office may take as long as two weeks after complete application is received. Applicant agrees to comply with all rules of the County Commissioners and the County Engineer in construction of said installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated herein for reference. In the event Company fails to obtain a permit prior to the installation or does not install utilities in compliance with installation requirements set forth herein (i.e. depth, location, etc), Company assumes all financial responsibilityfor damages andlor destruction of7ines, cables, etc. based upon its failure to comply with Brazos County requirements. Applicant agrees that if Brazos Comity demonstrates a violation of the terms of this policy, Applicant stipulates that requisites for injunctive relief erist and that Brazos County is entitled to relief enjoining any conduct by applicant which is co Crary to the policies. This permit is a revocable permit. Brazos County reserves the right to revoke this permit at any tine, in the sole discretion of Brazos County, jor interests of public health, safety or welfare, or for failure to repair any damages upon demand, or for any other reason deemed sufficient by Brazos C'ounl)'. In the event Connpary fails to comply with any or all of the requirements as set forth herein, the County may take such action as it deems appropriate to compel compliance. The County Engineer farther retains the right to revoke this Permit by verbal notification to the ApplicantlConpany. Failure to obtain this perinit and/o• notify the Counh, Engineer's Office within 24 hours of beginning construction shall eonstinue grounds for job shutdown. By signing below, 1 certify that I am authorized to represent the Company listed below, and that tine Company agrees to the conditions/provisions included in this permit. WT('KSnN ('R RK SP ECTAL UTILITY DISTRICT Company Name KENT W TSON By leg� Signature GENERAT MANAGER Title 8770 HWY 21 E Address BRYAN TX 77808 City State Zip (979)589-3030 Phone Number watson@wicksoncreek.com Email: Vof. �.3— pg._ ��� WATER UTILITY APPROVAL Brazos County offers no objection to the proposed location of the utility in the County right of way as shown by accompanying drawings and notice dated &?-1a —/(, except as noted below: (MonthMay/Year) EXCEPTIONS: Brazos County Engineer iTYPICAL UTILITY CROSSING DETAIL COMPLETE: North Arrow Direction, Name of Closest Road, Distance to Closest Road, Current Road Width, Current Richt of Way Width. Minimum Cover at Centerline and Ditches, and Pipe and Casing Information. Closest Read Intersection = Vna-'CM3G2 Ch`ti`'OL W -Q - Distance toNearest lntersection='i Draw North Arrow Right of Way Width PLAN VIEW i Mi .cover= 3 r Min. Co er Min Cover= 3 r Casing r r Pipe Size= 1 iZ Size Wall Thick = Wall Thick = Length = bo' Name of Road for Crossing ELEVATION VIEW Prop. Crossing Location ol�t� Rte--eT_P�1JC.� �ikb Company iS�to-t``"'Loc� Gze'-- � Submitted by Date Ztl211W — a7 Vola BRAZOS COUNTY ROADWAY SAFETY AND ROAD PRESERVATION STANDARDS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY A. General Requirements 1. Adequate drainage shall be maintained in ditches at all times. 2. Permittee will use best management practices ("BMP") (EPA and TCEQ both provide lists of examples of BMPs) to minimize erosion and sedimentation resulting from the proposed installation. 3. The permittee shall take precautions to avoid damage to property. All County Right of Way and property shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or appointed representative. 4. The construction and maintenance of such utility shall not interfere with the property or rights of a prior occupant. 5. Permittee shall not interfere with other utilities located in the right of way. In the event damages occur, permittee will be liable to the County or other utilities running through the right of way. 6. County Engineer shall determine whether or not permittee's plans shall inconvenience the public. If it is determined that inconvenience to the public exists, then the County Engineer will decide whether such project will be allowed or if an alternative exists so as not to inconvenience the public. B. Safety Requirements 1. Proper traffic control measures must be put in place prior to beginning work and remain in place during the duration of the job. All traffic control measures must follow the Texas Manual of Uniform Traffic Control Devices (TMUTCD). See Traffic Control Requirements below. 2. During construction, all safety regulations of the Texas Department of Transportation shall be observed. 3. Permittee must take such precautions and measures, including placing and displaying safety devices, as may be necessary, in order to safely conduct the public through the project area. Company shall provide flagmen, signs, signals or devices necessary to provide complete safety to the public. 4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. 5. No cable, conduit and/or pole line shall be laid, constructed, maintained and/or repaired so as to constitute a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved by the County Engineer. C. Traffic Control Plan 1. A traffic control plan, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided for the following: a. Any construction (i.e. pit, excavation, hole) left open overnight, requires specific nihg ttime traffic control measures pursuant to the TMUTCD; b. If construction is within ten (10) feet of the roadway; or c. Any work performed in the road right-of-way; 2. Plan must be attached to the permit and kept at thejob site any time work is being performed. J. Plan must set forth the time of completion for the job. D. Desien Standards 1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation and the pole be placed in the designated area for power specified as set forth in the Texas Utilities Code, Section 181.045. 2. All pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure safety to the public. Any pole placed in violation of this requirement will be required to be moved to the appropriate location at the company's expense. Exceptions may be approved by the County Engineer. All underground installations shall (these are minimum depths — utility may place deeper): a. be placed at a minimum depth of forty-eight (48) inches below the top of the pavement; b. be at least thirty-six (36) inches below ditch flow line when installation is within the area measured from top of bank to top of bank; c, be at least forty-eight (48) inches below ditch flow line if low pressure gas or petroleum lines. For high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below; d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of way of less than 60 feet. 4. Water Lines: All water lines must be a minimum 36 -inches below the ditch flow line and cased. Waterlines shall be cased if crossing under the roadway. 5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within designated locations based upon the type of utility. The locations shall be as follows: (measured from back of right-of-way). Power — 0 to 2 feet, nominally P Phone -2 to 4 feet, nominally 3' Gas — 4 to 6 feet, nominally 5' Cable -6 to 8 feet, nominally 7' 6. Utilities with less than 60 feet right-of-way in all new developments shall install the utility in a similar manner as referenced in No. 3 above; however, the County Engineer or its designated representative will provide final approval of each utility location. 7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longer than 400' if left open over night or unattended. 8. Crossings under a county road shall: a. be bored orjacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT; b. be pressure grouted for the full length of the crossing ijthe annular space between pipe and casing and soil exceeds one (1) inch. Brazos County must be given 24 hours notice of pressure grouting operations and have the opportunity to have an inspector on site to observe pressure grouting operations; c. TxDOT Standard Specification Item 476 shall be followed for all boring,jacking, tunneling and joints. 9. Bore Pits: a. no pits shall remain open longer than 2 days; b, all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above. c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from the County Engineer or his representative; d. when pits are to remain open for more than 8 hours, due diligence will be used in protecting the spoil pile to prevent drainage problems; e. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity; f. based upon soil conditions, the County Engineer or his representative may require pits be placed further from the edge of road. 10. Any installation within ten (10) feet of edge of pavement shall meet the following: a. location must be approved by the County Engineer or his representative b. backfilled with cement stabilized material. c. based upon soil conditions, the County Engineer or his representative may requite shoring to protect pavement integrity. d. all excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed during a rainy period or at other times where excess water cannot be prevented from entering the trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized material as soon as weather permits; e. all disturbed base and pavement materials shall be removed and restored to the satisfaction of the County Engineer or his representatives. f. no side or lateral tamping to fill voids under the base and pavement materials is allowed. 11. Company must be careful to not jeopardize the slope or integrity of the shoulder of the road. In the event Company damages the slope, shoulder or any other portion of the right-of-way, Company will be responsible for repairing the damage and replacing the right-of-way to the condition it was prior to commencing construction. 12. Operation of construction and/or maintenance equipment on the traveled surface of any improved County road will not be permitted, except in an instance whereby the laying, construction, maintenance and/or repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided meeting TMUTCD requirements. 13. In the event said construction and/or maintenance and/or repair requires Company to remove, cut or jeopardize any section of the road (asphalt, cement, road base, etc.), Company will be required to provide a performance bond or letter of credit securing necessary repairs. Said bond amount will be determined by the County Engineer. 14. The applicant shall submit a letter of "No Objection' from the Army Corps of Engineers for all designated wetlands and environmentally sensitive lands. E. Enierzency ivork 1. In the event Company is required to perform emergency services, that requires excavation in a County Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Company VOL o2 �% v2 027 shall notify County Engineer within 24 hours of beginning construction/repairs. This will allow the County Engineer's Office an opportunity to inspect the site to ensure the integrity of the County Right of Way and traffic safety controls used. R Repairs to existing facilities 1. Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the soil, shall not be performed until plans describing such maintenance and/or repair have been approved by the County Engineer or its designated representative and a permit has been obtained. G. Relocation of ri ilities 1. When and if the County Engineer determines that it is necessary for the construction, repair, improvement, alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or other facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated thereon, as required by the County Engineer within a reasonable time as determined by the County Engineer and Utility Company, and at the expense of the Utility Company. H. Hikh Pressure Pipelines 1. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining to controlled access or non -controlled access installations, should contain the following additional information in the description of the permit. -diameter -wall thickness -material specification -minimum yield strength -maximum operation pressure of the pipeline 2. With the exception of the maximum operation pressure of the pipeline, this information is to be supplied for both the carrier pipe and the casing. 3. Assurance must also be given that the installation material and design meet the minimum Federal Safety Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed by an authorized representative of the company. 4. Petroleum Pipelines: Depth Type of Pipeline (below deepest ditch grade) Special Requirements Encased Pipe Less than 10' Must be covered with concrete pad at least 36" deep Encased Pipe Greater than 10' No concrete pad required Non -Cased Pipe Less than 10' Must be covered with concrete pad at least 48" deep Non -Cased Pipe Greater than 10' No concrete pad required Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum 5. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -of - Way. Transmission lines have been determined to be petroleum pipelines (which includes natural gas lines) and shall not be parallel to a County Road. 6. Natural Gas Distribution is a line that serves the final customer. Vol. ��� pg,?�I x V1 w83 0 4 { •i OS S� H�� 4�° 09 ♦ n Y Q °v . { =a•.00 � ¢YSd by e2x � • ; e •' • a91na' 6 ,ei liWli N � - - - - - - 3 Sy � �+Vs YJlnd,s $ aBfi fi.aie jg8.o Q9 a o V -Fy C�OT'o a�4F� ----'- " KB�B y9tEb�8 �s 8'Sc — bx^5 fi�^ �i" rbc - °� :ag$3 °., as ass la Fv e$�- ' a as_a r- §• fi 68885 2888=YS��3� �� g 66�� � 9�e -2� $'p M x V1 w83 0 4 { •i OS S� H�� 4�° 09 ♦ n Y Q °v . { =a•.00 � ¢YSd by e2x � • ; e •' • a91na' 6 ,ei liWli N � - - - - - - 3 Sy � �+Vs YJlnd,s $ aBfi fi.aie jg8.o Q9 a o V -Fy C�OT'o a�4F� r- " y9tEb�8 �s 8'Sc $ Z Z K - °� :ag$3 °., as ass la ' �u-e'a $-fi$§a $v Lsi sgs- as_a r- §• fi 68885 2888=YS��3� �� g 66�� ® E sx; -- -2� .' x V1 w83 0 4 { •i OS S� H�� 4�° 09 ♦ n Y Q °v . { =a•.00 � ¢YSd by e2x � • ; e •' • a91na' 6 ,ei liWli a a- - - - - - - 3 � �+Vs YJlnd,s �.,oi � �'k;"' ,°,� a • ,;,,ice -S'.; .t " F �„�F'.,>'° Y�wp oars.:°°°�" °3nrnsLo Vol. °�1- - Pg. `a�� Cr J IAN 3 �.,oi � �'k;"' ,°,� a • ,;,,ice -S'.; .t " F �„�F'.,>'° Y�wp oars.:°°°�" °3nrnsLo Vol. °�1- - Pg. `a�� Cr J BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: February 23, 2016 SUBJECT: Private Property Access Request permission to enter private property owned by Scott and Angelique Toler located 2 miles Southwest of SH 47 on Leonard Road. Project will require the County to clean out drainage channel to improve water flow under Leonard Road. Site is located in Precinct 4. SUBNIITTED BY: Darrell W. Kolwes Right of Way Agent This request ACKNOWLEDGED BY: Commissioner Duane Peters, County Judge Date: �QLI 110 oL0 iers' Court 14 1pTE OF F a y °°H7y of e�zti BRAZOS COUNTY PRIVATE PROPERTY ACCESS FORM E. Duane Peters Brains County Judge Lloyd Wassermann Commissioner Pct 1 Sammy Cata%ro, Commissioner PcL 2 Kenny Mallard Commissioner Pct 3 Imna Cauley Commissioner Pct 4 I. OWNER(S): Scott and Angelique Toler - (979) 690-1009 (281) 382-4337 II. ADDRESS: 2932 Chaco Canyon Drive College Station, Texas 77845-4630 R. Alan Munger, P.E. County Engineer Brazos County Road 8 Bndge Dept 2617 Hwy 21 West Bryan, Texas 77003 Office: 979.022-2127 Fax: 979-7750453 rsmunger(ol6razoscountyQgow III. LOCATION OF WORK: 2.0 miles Southwest of SH 47 on Leonard Road Property ID: 14078—T.J. Wooten Sy., A-59, Tract 11, 70.74 acres IV. DESCRIPTION OF WORK: Project will clean out drainage channel to improve water flow and rock riprap will be placed in disturbed area to prevent erosion. All work shall be done within 40 feet of existing fence line. Additional Comments: Owner's gate will need to be unlocked in order to enter orooerty. Work shall be completed by March 15, 2016. V. Indemnification: BRAZOS COUNTY AGREES TO INDEMNIFY, DEFEND, PROTECT AND HOLD OWNER(S) HARMLESS OF AND FROM ANY AND ALL THIRD -PARTY CLAIMS, DEMANDS, COSTS, (INCLUDING BUT NOT LIMITED TO REASONABLE ATTORNEY AND EXPERT FEES) EXPENSES, DAMAGES, LOSSES, CAUSES OF ACTION OR SUITS FOR DAMAGES ARISING OUT OF INJURY TO PERSONS (INCLUDING DEATH) AND INJURY OR DAMAGE TO OR LOSS OF ANY PROPERTY OR IMPROVEMENTS CAUSED BY THE NEGLIGENCE, NEGLIGENCE PER SE, STRICT LIABILITY OR ANY OTHER TORTIOUS ACTS OR OMISSION AND/OR BREACH OF CONTRACT BY BRAZOS COUNTY, ITS AGENTS, EMPLOYEES Vol, .✓ Pg. _� I SERVANTS, CONTRACTORS OR ANY PERSON ACTING UNDER BRAZOS COUNTY'S DIRECTION OR CONTROL. FURTHER, OWNER(S) SHALL NEVER BE LIABLE FOR ANY CLAIMS, DEMANDS, COSTS, EXPENSES, DAMAGES, LOSSES, CAUSES OF ACTION OR SUITS FOR DAMAGES BECAUSE OF INJURY TO PERSONS OR PROPERTY ARISING SOLELY OUT OF THE NEGLIGENCE, GROSS NEGLIGENCE, NEGLIGENCE PER SE, STRICT LIABILITY OR ANY OTHER TORTIOUS ACTS OR OMISSION AND/OR BRACH OF CONTRACT BY BRAZOS COUNTY, ITS AGENTS, EMPLOYEES, SERVANTS, CONTRACTORS OR ANY PERSON ACTING UNDER BRAZOS COUNTY'S DIRECTION AND CONTROL ONTHE PROPERTY. VI. MAINTENANCE: Yes No X IF YES, ESTIMATE FREQUENCY OF MAINTENANCE: N/A I (we) the undersigned owner(s) grant permission to Brazos County the ability to access the above mentioned private property for roadway maintenance purposes. C Owner's Signature'., Z Date: Lf-zl��ZG%�• Scott Tqjp R. Alan Munger, P.E County Engineer IQO"LTL� Darrell Kolwes Right of Way Agent S BRAZOS COUNTY, TEXAS BUDGET AMENDMENT(S) FOR THE 2015-2016 BUDGET YEAR NO. 15/16 22.1-22.5 On this the 23rd day of February 2016 at a regular meeting of the Commissioners' Court, the following members were present: A. Duane Peters, County Judge, Presiding B. Lloyd Wassermann, Commissioner, Precinct 1 C. Sammy Catalena, Commissioner, Precinct 2 D. Kenny Mallard, Commissioner, Precinct 3 E. Irma Cauley, Commissioner, Precinct 4 F. Karen McQueen, County Clerk The following proceedings were held: THAT WHEREAS, on 23rd day of February 2016 the Court heard and approved a budget amendment for the 2014-2015 budget year for Brazos County, Texas; and WHEREAS, expenditure is necessary due to the necessity to meet unusual andunforeseen conditions which could not be reasonably included in the original budget adopted 8 September 2015, the following amendment(s) to the original budget are hereby authorized, as described on the attached page(s). ADOPTED AND APPROVED this the 23rd day of February 2016. THE COMiVHSSIONERS COURT OF BRAZOS COUNTY, TEXAS. Duane Peters, County Judge Original: County Clerk's Office and Attached to the original budget t BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 15/16 - 22.1 2/23/2016 FUND DIV ACCT I PROJ FRICRI ACCOUNT NAME Increase Decrease 4 00 63000500 50100000 I CR Buildings 1 13.031.97 4500 63000300 60300000 DR I Equipment , I.T. Enhancements I S91.00 45001 630003001 67342000 DR Fumiture 992.7E 4500 63000300 67256000 DR Equipment - Other 6, t4S.19 4500 63000300 71025000 { DR Contract Services 5,000.00 I I I I I I I I I I I I I 1 f I f I I I I I I I f I I { I I I I I I i I { I I I I I I I I I I I I I I I I I I Fleet \Inintennnce Building Reallocation of funds to the correct accounts to xnrchase equipment Cor the shop. along with staining the concrete tloor in the office area. I I { I I I I I I I I 1 I Vol _��� p9•_'�� BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 15116 - 22.2 2/2312016 FUND DIV I ACCT PROD DRICR ACCOUNT NAME Increase Decrease 4500 63000500 65950000 CR Vehiele Jlaintenance 150.00 1500 63000500 67593020 DR Vehicle Equipment - Constable Pct._ 150.00 I I I I I i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Cenerltl Capital Irutruvement - Constable Pct. iQ I Reallocation of funds to the correct account for the installation of a radar. I I I I I I I I I I I I I I I I I I VaLo_2z� _ pg. o294; BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 15/16 - 22.3 2/23/2016 FUND DIV ACCT PROJ 1 DRICRI ACCOUNT NAME Increase Decrease 4100 63000500 67256000 CR IEquipment - Other li0.00 4500 63000500 67893030 UR Vehicle E ui mert -Constable Pct. 43 150.00 I I I I I I I I I I I I I I I I 1 I 1 I I I I I I I I I I I I I I General Capital lm rorement- Constable Pct. 43 Reallocation of funds to the correct account for the installation of a radar. I I I I I I I I nnm Dater 21,17120 6 Vol a Pg. -AL BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 15116 - 22.4 2/23/2016 FUNDI DIV ACCT PROJ DR/CRI ACCOUNT NAME Increase Decrease 45001 63000500 SOS90000 CR (Vehicles 1,445.00 4500 163000500 SOS92S00 DR Wehicles - SO 1.445.00 I I � I I I I � I I I I I I I I I I � � I I I I I � I I I I I I I I I I I I General Capital Improvement -SO I I Reallocation of funds to the correct account for the uninstall/install of equipment. window tinting and nra hiss for Unit #149. I I I I I I I I I I Vol. ��j L�Pg..o�g� _ BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 15116 - 22.5 2/23/2016 FUNDI DIV ACCT PROJ I DR/CRj ACCOUNT NAME Increase Decrease 0111+1115,151001 61130000 1 CR Contimrencv 0102001001 31200000 DR Salary - DeltHeads 1 493,6.001 0100 1 12300100 I 53100000 DR Social Security 375.001 0100 I1500100 33200000 DR Retirement 691.00 0100 12300100 33500000 DR Workers Comp 19.00 I I I I I I I ( I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I - I I General Fund Coutinoenc9 and Risk Dlanalyement Reallocation of funds to su ton Solary increase for position 2211-1 that mai a move on February 16. 2016, agenda item #6. I I I 1 I I I I I I I I I I I I I I I i Eva Ev —,A ----p —g,- � !i—t—] PERSONNEL CHANGE OF STATUS REQUESTS Commissioner Court Date: February 23, 2016 Department Submitting Information: Human Resources Purpose of Submissions: Consider and Take Action on Change Requests Department Submitting Employee Request Action Requested Request(s) Applies To District Clerk Dydalewicz, Haylee New Hire Kennedy, Ernestine Transfer Min Dept. Extension Agency Hold, Charlotte Step Increase Fleet Services Davis, Gail Holloway, Dwayne Step Increase Step Increase Juvenile Services — Detention Stanley, Alyssa Resignation Road and Bridge Bruner, Brad Termination Sheriffs Office —Administration Muniz, Kelsey Resignation Tax Office Arredondo, April Dehmer, Kathy Termination New Hire Approved in Commissioners' Court: February 23, 2016 County Judge's or Commissioner's Signature: (This Copy to be attached to minutes) Vol. _�,Z_ P9• _��v �1 TIER 1- PARTIAL EXEMPTION RACIAL PROFILING REPORT Agency Name BRAZOS CO CONST PCT I Reporting Date 02/09/2016 TCOLE Agency Number 041101 Chief Administrator JEFF REEVES ACKNOWLEDGED Agency Contact Information Mailing Address BRAZOS CO CONST PCT 12845 fm 2154 Ste 140 Duane Peters College Station tx 77845 County Judge Date This Agency claims partial racial profiling report exemption because Our vehicles that conduct motor vehicle stops are equipped with video and audio equipment and we maintain videos for 90 days Certification to This Report 2 132 (Tier 1) — Partial Exemption Article 2 132(6) CCP Law Enforcement Policy on Racial Profiling BRAZOS CO CONST PCT 1 has adopted a detailed written policy on racial profiling Our policy (1) clearly defines acts constituting racial profiling (2) strictly prohibits peace officers employed by the BRAZOS CO CONST PCT I from engaging in racial profiling (3) implements a process by which an individual may file a complaint with the BRAZOS CO CONST PCT 1 if the individual believes that a peace officer employed by the BRAZOS CO CONST PCT I has engaged in racial profiling with respect to the individual (4) provides public education relating to the agency s complaint process (5) requires appropnate corrective action to be taken against a peace officer employed by the BRAZOS CO CONST PCT l who after an investigation is shown to have engaged in racial profiling in violation of the BRAZOS CO CONST PCT I s policy adopted under this article (6) require collection of information relating to motor vehicle stops in which a citation is issued and to arrests made as a result of those stops including information relating to (A) the race or ethnicity, of the individual detained (B) whether a search was conducted and if so whether the individual detained consented to the search and (C) whether the peace officer knew the race or ethnicity of the individual detained before detaining that individual and Page I of 3 pages submitted electronically to the The Texas Commission on Law Enforcement Vol. ✓� i'g (7) require the chief administrator of the agency regardless of whether the administrator is elected employed or appointed to submit an annual report of the information collected under Subdivision (6) to (A) the Commission on Law Enforcement and (B) the governing body of each county or municipality served by the agency if the agency is an agency of a county municipality or other political subdivision of the state I certify these policies are to effect Executed by JEFF REEVES Chief Administrator BRAZOS CO CONST PCT 1 Date 02/09/2016 Page 2 of 3 pages submitted electronically to the The Texas Commission on Law Enforcement V01. - �22,2, pg..� BRAZOS CO CONST PCT 1Motor Vehicle Racial Profiling Information Number of motor vehicle stops 1 793 citation only 2 0 arrest only 3 1 both Race or Ethnicity 5 116 African 6 24 Asian 7 504 Caucasian 8 134 Hispanic 9 13 Middle Eastern 10 3 Native American 4 794 Total (4 11 14 and 17 must be equal) 11 794 Total (lines 4 11 14 and 17 must be equal) Race or Ethnicity known prior to stop' 12 2 Yes 13 792 No 14 794 Total (lines 4 11 14 and 17 must be equal) Search conducted9 15 4 Yes 16 790 No Was search consented' 18 2 Yes 19 2 No 17 794 Total (lines 4 11 14 and 17 must be equal) 20 4 Total (must equal line 15) Page 3 of 3 pages submitted electronically to the The Texas Commission on Law Enforcement Vol. a�j . Pg.-�