Invocation and Pledge of Allegiance - U.S. and Texas Flag - Chaplain G.H. Jones and
Commissioner Mallard.
2. Call for Citizen input andlor concerns.
Consider and take action on agenda items 3 - 14:
3, Request for Out -of -State Travel for Eric Caldwell to participate in the IJIS Institute Corrections
Technology Forum in Arlington Virginia Dates of travel are December 11 - 13 2015. All travel costs
will be reimbursed by the IJIS Institute.
4, Payment Authorization to Avinext in the amount of $180.00 for costs to have a technician fix sound
problems at the Brazos Center: a purchase order was not obtained in advance.
5. Approval /Acceptance of donated / awarded items from Inmate property at the Brazos County Detention
Center.
g, Approval is requested for the Interlocal Agreement with City of Baan and Brazos County Office of the
Sheriff for the use of Inmate Work Crews.
7, Approval of maintenance contract with Spacesaver Service for movable filing system at Detention
Center.
S. Renewal of bid contract # 2016-137R Culverts with Contech Engineered Solutions and CPR Services.
g, Consider and take action on the Wellborn Special Utility District utility permit to construct a road bore
for a 1 -inch water line crossing under Matt Wright Road 2 miles Northwest of FM 159 Line will provide
service to customer at 5091 Matt Wright Road Site is located in Precinct 1.
Vol. - 2.7 Pg. /317
I
10. Consider and take action on the Apache Corporation utility permit to construct 2 road bores (8 518" line
and 4 112" line) a minimum depth of 10 feet under Bird Pond Road approximately 5.440' Southwest of
SH 30 Proiect will connect several oil wells in the area. Site is located in Precinct 2.
11. Tax Refund Applications for the following:
• a. Raymond Reed -overpayment -5200.00
12, Budget Amendments.
Budget Amendments FY 15116 10.1 - 10.17
13. Personnel Change of Status.
No Personnel Action Forms
14, Payment of Claims.
No Claims
15. Sheriffs report on inmate population.
16. Announcement of interest items and possible future agenda topics.
17. Call for Citizen input and/or concerns.
18. Adjourn.
Vol. Pg. /.3 e
PUBLIC COMMENTS
Public Comment during the Commission Meeting may be for all matters, both on and off the agendaand be limited to four
minutes per person. Persons are invited to submit comments in writing on the agenda items andlor attend and make comment
at the Commission meeting, Members of the public are reminded trial the Brazos County Commissioners Court is a
Constitutional Court, with both judicial and legislative powers, created under Article V, Section 1 and Section 18 of the Texas
Constitution. As a Constitutional Court, the Brazos County Commissioners Court also possesses the power to issue a
Contempt of Court Citation under Section 81 .024 of the Texas Local Government Code. Accordingly, members of the public in
attendance a; any Regular, Special andlor Emergency meeting of the Court shall conduct themselves with proper respect and
decorum in speakinc to, and/or addressing the Court in participating in public discussions before the Court', and in all actions in
the presence of the Court. Those members of the public who are inappropriately attired andior who do not conduct themselves
in an orderly and appropriate manner will be ordered to leave the meeting. Refusal to abide by the Court's Order andior
continued disruption of the meeting may result in a Contempt of Court Citation.
It is not the intention of the Brazos County Commissioners Court to provide a public forum for the demeaning of any individual
or group. Neither is it the intention of the Court to allow a member (or members) of the public to insult the honesty andlor
integrity of the Court, as a body, or any member or members of the Court, or County employees, individually or collectively.
Accordingly, profane, insulting or threatening language directed toward the Court and/or any person in the Court's presence
andior racial, ethnic or gender slurs or epithets will not be tolerated. Violation of these rules may result in the following
sanctions:
1. cancellation of a speaker's time,
2. removal from the Commissioners Court
3. a Contempt Citation. and/or
4. such other andior criminal sanctions as may be authorized
under the Constitution, Statutes and Codes of the State of Texas.
The County Commissioners Court can deliberate or take action only if a matter has been listed on an agenda properly posted
prior to the meeting. During the public comment penod, speakers may address matters not listed on the published agenda The
Open Meeting Law does not expressly prohibit responses to public comments by the Commissioners Court. However.
responses from the County Judge or Commissioners to unlisted public comment topics could become deliberation on a matter
without notice to the public. To ensure the public has notice of all matters the Commissioners Court will consider, the County
Judge and/or Commissioners may choose not to respond to public comments, except to correct factual inaccuraciesrecite
existing policy in response to an inquiry or to ask that a matter be listed on a future agenda. See Texas Open Meetings Act ?
551.042.
INVOCATION
Any invocation that may be offered before the official start of the Court meeting shall be to and for the benefit of the Court. The
views or beliefs expressed by Me invocation speaker have not been previously reviewed or approved by the Court and do not
necessarily represent the religious beliefs or views of the Court in part or as a whole. No member of the community is required
to attend or participate in the invocation and such decision will have no impact on their right to actively participate in the
business ofthe Court.
The Commissioners Courtroom of the County Administration Building, 200 South Texas Ave., Suite 106, Bryan, TX 77803 is
wheelchair accessible, Handicap parking spaces are available. Any request for sign interpretive services must be made two
working days before the meeting. To make arrangements, please call (979) 361-4102.
Pg. /,3 9
BRAZOSCOUNTY
BRYAN,TEXAS
MINUTES
December 1, 2015
BRAZOS COUNTY COMMISSIONERS COURT
REGULAR MEETING
0 Signature Page.pd(
IM File Stamped Agenda.pdf
1B Sign in sheet.0
A regular meeting of the Commissioners' Court of Brazos County, Texas was held in the
Brazos County Commissioners Courtroom in the Administration Building, 200 South Texas
Avenue, in Bryan, Brazos County, Texas, beginning at 10:00 a.m. on Tuesday, December 1
2015 with the following members of the Court present:
Duane Peters, County Judge, Presiding,
Lloyd Wassermann, Commissioner of Precinct 1;
Sammy Catalena, Commissioner of Precinct 2;
Kenny Mallard, Commissioner of Precinct 3,
Irma Cauley, Commissioner of Precinct 4,
Karen McQueen, County Clerk.
The attached sheets contain the names of the citizens and officials that were in attendance.
Invocation and Pledge ofAllegiance-
U.S. and Texas Flag - Chaplain G.H. Jones and Commissioner Mallard.
Commissioner Cauley led the prayer in Chaplain Jones' absence.
Call for Citizen input and/or concerns.
There was no citizen's input.
Consider and take action on agenda items 3 - 14:
Vol. pg. elio
3. Request for Out -of -State Travel for Eric Caldwell to participate in the IJIS Institute Corrections
Technology Forum in Arlington, Virginia. Dates of travel are December 11 - 13, 2015. All travel
costs will be reimbursed by the IJIS Institute.
LI®! Item 3.pdf
Motion: Approve , Moved by Commissioner Irma Cauley, Seconded by Commissioner LLoyd
Wassermann. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters ,
Wassermann .
4. Payment Authorization to Avinext in the amount of $180.00 for costs to have a technician fix
sound problems at the Brazos Center; a purchase order was not obtained in advance.
R Item 4.pdf
Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner
Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters ,
Wassermann .
5. Approval /Acceptance of donated / awarded items from Inmate property at the Brazos County
Detention Center.
tR Item 5.pdf
Motion: Approve , Moved by Commissioner Irma Cauley, Seconded by Commissioner Kenny
Mallard. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters ,
Wassermann .
6. Approval is requested for the Interlocal Agreement with City of Bryan and Brazos County Office
of the Sheriff for the use of Inmate Work Crews.
0' Item 6. pdf
A copy of the agreement is attached
Motion: Approve , Moved by Commissioner LLoyd Wassermann, Seconded by Commissioner
Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters ,
Wassermann .
7. Approval of maintenance contract with Spacesaver Service for movable filing system at
Detention Center.
1Q— Item 7.pdf
This contract is with Southwest Solutions Group for the spacesaver system in the medical
records section of the Brazos County Detention Center. A copy of the contract is attached.
Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner
LLoyd Wassermann. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters ,
Wassermann .
8. Renewal of bid contract # 2016-137R, Culverts with Contech Engineered Solutions and CPR
Services.
r -t Item 8.pdf
A copy of the renewal of contract and bid tab is attached.
Motion: Approve , Moved by Commissioner LLoyd Wassermann, Seconded by Commissioner
Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters,
Wassermann.
9. Consider and take action on the Wellborn Special Utility District utility permit to construct a road
bore for a 1 -inch water line crossing under Matt Wright Road 2 miles Northwest of FM 159.
Line will provide service to customer at 5091 Matt Wright Road. Site is located in Precinct 1.
L Item 9.pdf
Motion: Approve, Moved by Commissioner LLoyd Wassermann, Seconded by Commissioner
Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters
Wassermann .
10. Consider and take action on the Apache Corporation utility permit to construct 2 road bores (8
5/8" line and 4 1/2" line) a minimum depth of 10 feet under Bird Pond Road approximately
5,440' Southwest of SH 30. Project will connect several oil wells in the area. Site is located in
Precinct 2.
ILS Item 10.1pd1
Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner
LLoyd Wassermann. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters ,
Wassermann .
11. Tax Refund Applications for the following:
a. Raymond Reed -overpayment -$200.00
02 Item 11 .pd
Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by Commissioner Sammy
Catalena. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters ,
Wassermann .
12. Budget Amendments.
Budget Amendments FY 15/16 10.1 - 10.17
IM Item 12,pdf
10.1 Reallocate funds for General Capital Improvements - Sheriffs Office.
10.2 Reallocate funds for General Capital Improvements -Sheriffs Office.
10.3 Reallocate funds for General Capital Improvements -Sheriffs Office, Jail, and Constable,
Precinct 4.
10.4 Reallocate funds for General Capital Improvements -Sheriffs Office, Jail, and Constable,
Precinct 4.
10.5 Reallocate funds for General Capital Improvements - Constable, Precinct 4.
10.6 Reallocate funds for General Capital Improvements - Jail.
10.7 Reallocate funds for General Capital Improvements - Jail.
10.8 Reallocate funds for General Capital Improvements -Sheriff's Office.
10.9 Reallocate funds for General Capital Improvements - Sheriffs Office.
10.10 Reallocate funds for General Capital Improvements - Sheriffs Office.
10.11 Reallocate funds for General Capital Improvements - Sheriffs Office.
10.12 Reallocate funds for General Capital Improvements - Sheriffs Office.
10.13 Reallocate funds for General Capital Improvements - Sheriffs Office.
10.14 Reallocate funds for General Capital Improvements - Sheriffs Office.
10.15 Reallocate funds for General Capital Improvements - Sheriffs Office.
10.16 Reallocate funds for General Capital Improvements - Constable, Precinct 2 and
Constable, Precinct 3.
10.17 Reallocate funds for General Capital Improvements - Sheriffs Office and Constable,
Precinct 4.
Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner
Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters ,
Wassermann .
13. Personnel Change of Status.
No Personnel Action Forms
14. Payment of Claims.
Vol.o'�=P9.zVeL
No Claims
15. Sheriffs report on inmate population.
Sheriff Chris Kirk reported that a bomb threat was called into the Brazos County Courthouse
just before 2:00 p.m. on Monday. Sheriff Kirk said the courthouse was evacuated and a
thorough search of the building was conducted. Bomb sniffing canine units were brought in
from Austin, Houston and Conroe and no bomb was discovered. Sheriff Kirk thanked those
agencies along with Constable, Precinct 1 and Constable, Precinct 4 for their aid in the search.
Judge Peters thanked Sheriff Kirk and all the agencies who assisted in the bomb threat. He
said that he appreciates all that they do.
Sheriff Kirk stated there were 586 inmates in jail, 63 have electronic monitors and 6 are
pending for monitors.
16. Announcement of interest items and possible future agenda topics.
There were no announcements.
17. Call for Citizen input and/or concerns.
There was no citizen's input.
18. Adjourn.
The foregoing minutes of the Commissioners Court meeting held December 1, 2015 have
been examined and are approved in open Court this day of
2011), in Bryan, Brazos County, Texas.
Duane Peters
County Judge
Lloyd W ssermann
Commissioner, Precinct 1
Sammy C alena Kenny Mallard
Commit Toner, Precinct 2 Commissioner, Precinct 3
Commissioner, Precinct 4
Attest:
Karen McQueen
County Clerk
Vol.% Fig.__/�
BRAZOS COUNTY COMMISSIONERS COURT MEETING
Date and Time
Name
��'��1 i/
SIIor
"n r v,"t -> Ucl / t
,x�
`GGe �-7--
15QaG
l lb<
Organization/ Department
✓tea. /��
Bat )fib Vf5
73(Sb
TtAr-c q
M74
Z if
cf
c
I
STATE OF TEXAS §
COUNTY OF BRAZOS §
INTERLOCAL AGREEMENT
CITY OF BRYAN AND BRAZOS COUNTY
BRAZOS COUNTY SHERIFF'S DEPARTMENT INMATE SERVICES
DI TH INTERLOCAL AGREEMENT is hereby made and entered into this the I S 1 day of
eCf" 2015, by and between the CITY OF BRYAN, TEXAS, a home rule municipal
corporation ("Bryan") and BRAZOS COUNTY, a political subdivision of the State of Texas ("County"),
each acting by and through its duly authorized agents;
WHEREAS, the respective participating governments ("Parties") are authorized by the Interlocal
Cooperation Act, Texas Government Code, Chapter 791, to enter into a joint agreement for the
performance of the governmental function of constructing and maintaining public works projects and
public infrastructure; and
WHEREAS, the County has Sheriff's Department inmates who are capable of performing
community service work, including but not limited to minor public works construction and maintenance
projects, landscaping maintenance, and litter patrol; and
WHEREAS, the Parties recognize that allowing inmates to work off time saves the County tax
dollars by reducing the number of days in custody, and saves the City tax dollars by reducing labor costs
for minor projects; and
WHEREAS, the Parties previously entered into an agreement providing selected and specific
maintenance/beautification services dvough the use of Brazos County Sheriff's Department inmates on
March 27°i, 2014: and
WHEREAS, Bryan desires to increase the amount of projects being performed under this
Agreement, and the County would be willing to accommodate that desire, in exchange for Bryan's
agreement to share in some of the additional cost; and
NOW THEREFORE, in consideration of the mutual covenants and conditions contained herein,
the Parties agree as follows:
A. SCOPE OF WORK
1. The Countv shall provide Bryan with supervised inmates who can provide manual labor on minor
public works infrastructure construction and maintenance projects, landscaping construction and
maintenance projects, litter control, and any other reasonable task requested by the City, agreed to by the
County, and permitted by law. Depending on the availability of inmates and the needs of the particular
project, the County will provide labor crews of four (4) to six (6) inmates when scheduled by Bryan.
2. The County agrees to provide labor for 175 eight-hour work days annually, provided that Bryan is
able to provide sufficient suitable projects. A work day is from 7:00 a.m. to 3:30 p.m. with a thirty (30)
minute lunch break. Bryan will keep a running tally of the number of days worked in a given month.
Bryan shall provide a schedule of projects including the dates, times, locations, and the requested number
of inmates before the end of business on Thursday of the preceding week. In the event that Force
Majeure requires a change in the schedule, Bryan will provide at least twenty-four (24) hour notice of
Vol. pg.
S�
such change. If Bryan is unable to provide the required notice, the County will be deemed to have
provided the labor for that day.
3. For the purposes of this Agreement, Force Majeure shall mean any contingency or cause
beyond the reasonable control of a party including, without limitation, acts of God or the public
enemy, war, riot, civil commotion, insurrection, government or de facto govemmental action
(unless caused by the intentionally wrongful acts or omissions of the party), fires, explosions,
floods, adverse weather, materials or labor shortages, strikes, slowdowns, or work stoppages.
4. Services provided by the County to Bryan shall be limited to projects within the Bryan city limits.
The Parties may agree to limitations where inmate services may not be used, for example within the
vicinity of schools.
D. Bryan shall provide instructions and limited training so that inmates understand their duties and
responsibilities. Bryan shall provide limited supervision of construction projects so that the projects are
completed safely and effectively, provided however that the Sheriff s office retains the ultimate right and
responsibility for control and supervision of the inmates. Unless otherwise agreed to in writing by the
Parties, Bryan shall provide materials and equipment to be used by the inmates. Inmates shall not be
using riding lawn mowers when performing work under this Agreement. Bryan shall be responsible for
ensuring that inmates receive adequate instruction and safety training on any equipment to be used.
B. PAYMENT OF COSTS
6. Unless otherwise agreed to in writing by the Parties, or as otherwise stated herein, each party will
bear its own costs. When circumstances justify a sharing of costs, the City Manager and the Sheriff ma}'
reach a written agreement as to how costs will be shared without requiring an amendment of this
Agreement, provided that the cost to each party is within the budgetary authority of the City Manager and
the Sheriff.
7. In exchange for the County's agreement to ensure the availability of supervised inmates as
required by this Agreement, Bryan will pay the County an amount equal to $280 per workday, not to
exceed $49,000.00 annually. Payments shall be made on a monthly basis, in arrears, within thirty (30)
days following the end of the month for which payment is being made. A copy of the monthly tally of
days worked will be submitted with payment. Payment remitted to Brazos County Treasurer at 200 S.
Texas Ave.. Suite 240. Bryan, TX 77803.
C. TERM AND TERMINATION
8. The Parties hereby terminate the agreement entered into on March 27', 2014,
9. This Agreement shall be effective upon execution by all parties. The initial term of the
Agreement shall expire on September 30, 2016. This Agreement shall automatically renew for up to four
(4) additional one-year terms, unless either party elects not to renew by providing the other party with
written notice at least sixty (60) days prior to the end of the then current term.
10. Either party shall have the right to terminate this Agreement by giving the other party thirty (30)
days written notice.
Vol. _ oZ_ 02 9 pg.lell'
D. NOTICES
11. All notices issued between parties to this agreement shall be in writing. All notices shall be
deemed given on the date personally delivered, faxed, emailed, or deposited in the U.S. mail to fm
following parties, unless an alternative person is designated by the respective party;
Bryan: City of Bryan
P.O. Box 1000
Bryan, Texas 77805-1000
Attu: City Manager
County: Brazos County
TUU S. 'Texas Ave., Suite 332
Bryan, Texas 77803
Attn: County Judge
L. rvIIS ELLANEOUS PROViSION6
12. If any provision of the Agreement shall be held to be invalid, illegal, or unenforceable by a court
or other tribunal of competent jurisdiction, the validity and enforceability of the remaining provisions
shall not in anv way be affected or impaired thereby. The parties shall use their best efforts to replace the
respective provision or provisions of this Agreement with legal terms and conditions approximating the
original intent of the parties.
13. This Agreement is the entire agreement between Bryan and the County relating to the provision
of the Sheriffs Department inmate services for the specific functions as described above and supersedes
any and all prior agreements, arrangements, or understandings, whether written or oral.
14. This Agreement is for the benefit of the parties to the Agreement, and does not confer any rights
on any third parties.
15. No Amendment to this Agreement shall be effective and binding unless and until it is reduced to
writing and signed by the authorized representatives of all parties.
16. This Agreement has been made under and shall be governed by the laws of the State of Texas.
This Agreement and all matters related thereto shall be performed in Brazos County. Texas. The venue of
any lawsuits arising out of this Agreement shall be in Brazos County. Texas.
17. Failure of any party at any time, to enforce a provision of this Agreement, shall not constitute a
waiver of that provision, nor in any way affect the validity of this Agreement or the right of any parry
thereafter to enforce each and every provision hereof. No term of this Agreement shall be deemed waived
or breach excused unless the waiver shall be in writing and signed by the party(ies) claimed to have
waived. Furthermore, any consent to or waiver of a breach will not constitute a consent to or waiver of or
excuse of any other different or subsequent breach.
i8. It is understood and agreed that this Agreement may be executed in a number of identical
counterparts, each of which shall be deemed an original for all purposes.
[signatures to followl
L
l. pg. ��
NOW THEREFORE, this Agreement is made and entered into, by and between the City of Bryan and
Brazos County, to be effective when signed by the last party whose signing makes the Agreement fully
executed.
CITY OF BRYAN
Jason P. Biensld. Mayor
Date:
ATTEST:
idlary Lynne Stratta, City Secretary
APPROVED AS TO FORM:
Janis K. Hampton, City Attorney
ZOS CO
Duane Peters, County Judge
Date:
ATTEST:
Karen McQueen, ounty Clerk
APPROVED: /�
/z\
Christopher KK Sheriff
Vol. pg. ��1
7
6 0 j`
SOUTHWEST$OLUTIONSGROUP
business organization systems
Brazos County Detention Center
1835 Sandy Point Rd.
Bryan, TX 77807
Re: Spacesaver System in Medical Records
Dear Laura
SOUTHWEST SOLUTIONS GROUP
PREVENTIVE MAINTENANCE PROGRAM foryour SPACESAVER SYSTEM
Services to be performed by SSG authorized factory -trained personnel.
Inspection & Testing of:
Electric Systems
* Safety Features
* Electrical Wiring & Switches
* Mechanical & Logical Controls
* Anti -Tip Devices
* Carriage Limit Switches
* Floor .& Overall Operation
* Ease of Movement
Mechanical Assist Systems / Manual Systems
* Anti -Roll Locking Pin
* Tum -Handle Assembly
* Tension of chain on turn handle drive
* Mechanical Safety Features & Controls
*.Shelving Anchors
* Ease of Movement
* Loose Hardware & Fasteners
Lubrication & Adjustment of: (All Systems)
* All Moving Parts, Chains & Rails
* Limit Switches
General Maintenance & Cleaning of:
* Floor & Tracks
" Face Panels & Controls
Inspection Report:
* Communication of inspection findings to the customer
Preventive Maintenance services will be performed on a scheduled basis of 1 per
year. Covers all service calls.thru out the effective dates of agreement.
VO I. Pg. �J�
PROPOSAL PAGE (Page 2 of 4)
Submitted to:
Name Brazos CountyDetention Center
Contact
Laura Cook.
Address
1835 Sandy Point Rd.
City,.State, Zip
Bryan, TX 77807
Department:
Medical Records
Email:
Iscook@brazoscounqu.gov
Phone#:
(979)361-4997
We propose to fumish the materials and perform the labor necessary for the completion of the
Preventive Maintenance Program on Spacesaver System(s):
Model: Spacesaver Mechanical Assist, 3 carriages Location: Medical Records
Serviceable ID: 3665 PMA # 709
Gold Plan (Preventive Maintenance and Labor Proaram)
* One Scheduled service inspection per year.
* Covers 100% of all Labor Service charges for repairs.
* 25% discount for all pans required as a result of normal wear & tear.
Does not include operator error or misuse.
* Additional investment required for repairs performed outside of normal business hours.
Annual Investment to insure the safety of your equipment: $369.23
* One Scheduled service inspection per year.
* Covers 100% of all Labor Service charges for repairs.
* Covers 100% of al l_parts, does not include operator error or misuse.
* Additional investment required for repairs performed outside of normal business hours.
Annual Investment to insure the safety of your equipment: $630.77
To schedule service please call Paul Stanko at 800-803-1083 ext 9778 or via email
PStanko(alsouthwestsolutions.com. You can also request service from our website,
www.southwestsolutions.com by clicking on the "request service" link at the top of the page.
Other Notes (Page 3 of A)
1) The normal bill rate for service calls and repair is $150.00 per hour per person (1 -
hour minimum plus 1.25 cents per mile). Emergency 24-hour service is available,
but is not covered under service agreements. Normal bill rate for Emergency
service (5 p.m. to 8 a.m. and weekends) is $225.00 per hour. However, if you
require an Emergency service and maintain a service agreement there is a
discounted rate at $150.00 per hour.
2) Preventive Maintenance, service and repair calls are only provided during normal
work hours, Monday thru Friday, 8 a.m. to 5 p.m. This excludes Saturday,
Sunday, and company holidays. Southwest Solutions Group may agree upon
optional abnormal hours and days with additional costs per note # I above.
3) NOTE. Program does not cover repair cmrsed by act of God, vandalism or
misuse.
4) Replacement Parts: Southwest Solutions Group does not assume the
responsibility for delays or failure to furnish parts or service when the inability to
furnish same is caused by acts of God or government, labor difficulties, failure of
transportation, misuse of equipment, or operational errors and causes beyond the
control of Southwest Solutions Group. Components of the equipment or system
purchased from or installed by others than Southwest Solutions Group will be
excluded from this agreement.
5) Note: Invoice will follow with the terms Due upon Receipt, or Brazos County
can provide a VISA, Master Card or American Express #, expiration date, and full
name on card for payment.
• It is suggested that to maintain your system, you perform certain routine
periodic housekeeping duties outlined at the time of installation of the
TYPE System.
• The customer is responsible for foreign matter and debris that falls into
areas that may hinder or damage and result in equipment failure.
• The customer agrees to give reasonable notice to Southwest Solutions
Group for doral hours servicing.
• If equipment, under the Agreement, is moved, transported or tampered
without Southwest Solutions Group's supervision, this Agreement will
become null and void without refund.
Vol. pg.
ACCEPTANCE PAGE FOR SPACESAVER SERVICE AGREEMENT
(page 4 of 4)
Brazos County Detention Center—Medical Records Serviceable /D 3665 PMA 709
Program effective dates: 12/1/2015 thru 11/30/2016
When accepted, please circle the o tion on naRe 2, authorize below and return a copy to
Southwas o u 1 Grot via fax (888) B 77 to the attention of KIM WINDHAM,
retain orig al for your ec S.
Accepted by:
Bill To Address: 0
Attention: Accounts Payable Purchase Order if appropriate:
City, State, Zip:_
Ifpaying by VISA, MasterCard or American Express:
C/C #:
Expiration Date:
Full Name On Card:
Southwest Solutions Group would like to thank you for the opportunity to serve you and
our team looks forward, to serving you in other areas, please visit our website at
www.southwestsolutions.com for more products & services.
Sincerely,
Kim Windham
972-331-8880 or 888-241-7494 direct
972-250-2229 or 888-980-8177 fax
kw in dha m(i4iso uthwestsol ut i ons.com
[rates OkIACMOdy Houston
Aistin,
2535-B E State Hgftway 7718 N. Robinson Are 6105 Sdthnoore Rd
600 Round Rork W. Or,.
121,5te.110 ., I SulleA2l _ Houston, TX 77041
Ste 804.
LeWW1a,Texas75066 Oklahoma City, OK 73116 (71314674454
Austn,T%78681
(972)2501970 .(405)8793448 (713)467-4484 fat
(512)336.1328
(972) 2502229 far (405) 8793770 fax
(512)335-1358fax
Vol. a_ oz Pg. /��3
San Antonio
5123 N.Loop 1604 w,
Suite 100
San Antonio, TX 78249
(210) 55&6988
(210) 691-2238 IV
�k Brazos County
nr , Purchasing Department
200 SOUTH TEXAS AVE SUITE 352 BRYAN, TX 77803
PHONE (979) 361-4290 FAX (979) 361-4293
November 2, 2015
Contech Engineered Solutions
2201 W Royal LN Suite 260
Irving, TX 75063
Attn: Ken Kennedy
Ret Renewal ofContractjor Culverts -2015-137R previously known as1015-11
Brazos County appreciates the quality work your company has provided and would like to exercise the renewal
option for Culverts -2015-137R previously known as 2015-11. All terms, conditions, and pricing shall remain the
same. This renewal will be for one year for dates February I, 2016 through January 31, 2017.
Contech: Sections 1 —20 and 31 — 46
CPRServices: Sections23-30
No Award: Sections 21 and 22 due to no bids received
To accept the renewal option, please FII out the information and sign below. Return the signed documents by email
to enorion@brazoscountytx.gov or fax to (979) 361-4293. Please then submit the original signed documents and an
updated Certificate of Insurance by mail to the address listed above. Please return acceptance as soon as possible.
I f you have any questions, I may be reached at (979) 361-4291.
Contact Name: Xj=�)t% � .: /�/1-.�'f Telephone: ) �1�7- V6
E-Mail:/f%J/l{-'(i�Cr`/�%1.`i%%F/i •/.):%1 Fax:
ia
EGe[IizSignature _ Date
BRAZO C NTY
Duane Peters, County Judge Date
. Asti r. r
Brazos County
tfa��
;
Purchasing Department
200 SOUTH TEXAS AVE SUITE 352 BRYAN, TX 77803
PHONE (979).361-4290 FAX (979) 361-4293
November 2;2015
CPK Services
po Do:r 1148
New Caney; TX77357
Aft: Jennifer Flattery
Phone: 281-354-9621
Email: jnOmiC;vtnFmdne;iten>rises cnm
Re; Renewal of Contract jar Culverts -20l5 -137R previously known as 201541
Brazos County appreciates the quality work your company has provided and would like to exercise the renewal
.option for Culverts -701 i-/37Rprediut<sfy -kuown as 2015-11. All terms, conditions, and pricing shall remain the
same. This renewal will be for one year for dates February 1, 2016 through January 31, 2017.
Cometh: Sectionsi —20 and 3:1 —46
CPR Services: Sections 23-30
No Award: Sections2l and 22 dueto no bids received
To accept the renelval option, please fill out the information and.sien below. Return the signed documents by email
to cnorton@braz05cgmttyls.gov or fax to (979)361-4293. Please then submit the original signed documents and an
-updated CertificateofInsuranee.by mail to the address listed above, Please return nceeptnnec as soon as possible.
Ifyou have any questions, I may be reached at (979) 361-4291.
Contact Name:
Services S�Sapplies'luc., DBA: piDN Enterprises
i[ iorized Si •riafiire
BRA7.0S COU Y
Duane Peters, County Judge
ns ax:
Ln 6
f COIeS
Date
-JA-1k4;-
Date
2I 1 ISDate
FV071-:Z�=�
=Pg--Z�-�j
BID TABULATION 2016-137R previously known as 2015-11
CULVERTS, VARIOUS TYPES
February 1, 2016 - January 31, 2017
ITEM QTY ST iu
NO He Description FEET
Contech Engineered
Solutions
Ferguson Waterworks
CPR Services &
Supllies,Inc1MDN
Enterprises
Woodson Lumber
STOCK
ORDER
STOCK
ORDER
STOCK ORDER
STOCK
ORDER
. �.^ .' --_ Galy SfeePCorr CWv'&COlr Poly Plasf.PiPe�
1
15" 16 Gauge Round Spiral Culvert
Soo
Single Pipe, F.O.B. Destination
$19.00 F?t?,":+al'.
NO BID
NO BID
Single Pipe, F.O.B. Supplier
$9.00 : ,r- 7-k •i;
$l0 DD t'i ;n' .xx3
Truck Load, F.O.B. Destination
$9.00.
No Bid
Truck Load, F.O.B. Supplier
: $9.00
No Bid
Sloped Ends, Pair:581.00
:. ?t:;':-`r::•
No Bid
2
18" 16 Gauge Round Spiral Culvert
500
Single Pipe, F.O.B. Destination
$21.25
NO BID
NO BID
$13.24;as,4
t
Single Pipe, F.O.B. Supplier
$11.25 ."
$1150
i- ',r`(c;1
Truck Load, F.O.B. Destination
'..$11.25 r;st.q
NO BID
Truck Load, F.O.B. Supplier
$11;25_ 1`3s`::`j _:'
NO BID
Slo ed Ends, Pair
.
NO BID
3
24" 16 Gauge Round Spiral Culvert
500$14'25
-u..�'�'.',�*
�`k+` `ter='•+�=.'� '
z`�i `�-0: t �*
-': r =`'
Single Pipe, F.O.B. Destination
$24.25 ..: iL';
NO BID
NO BID
$16.76
`.,�'%3'_'-'
Single Pipe, F.O.B. Sup lier
r z
$15.83
Truck Load, F.D.B. Destination
$14.25 a
NO BID
Truck Load, F.O.B. Supplier
$14:25 ':T;",- i+:a
NO BID
Sloped Ends, Pair
. $154.00 V3"+.`w +i;,;,;
NO BID
Aluminum Corrugated Culvert.:
4
15" 16 Guage Round Spiral Culvert
500
Single Pipe. F.O.B. Destination
h*. ''>':'�` :�
$19.90-.
NO BID
NO BID
NO BID
Single Pipe, F.O.B. Supplier
- `:'''*`' ""
$9.90.
Truck Load, F.O.B. Destination
.=--11"";
$9.90
Truck Load, F.O.B. Supplier
?l:.+'• �'�4'_`'?
. $9.90'
Sloped Ends, Pair
$8300
S
18" 16 Guage Round Spiral Culvert
500$12.38
Single Pipe, F.O.B. Destination
q.-::,+_: .. $22.38 `
NO BID
NO BID
NO BID
Single Pipe, F.O.B. Supplier
.
Truck Load, F.O.B. Destination
'.,Y';in;'3; $12:38
Truck Load, F.O.H. Supplier:"�t>w.*"•:i
-:$12.38
Sloped Ends, Pair
`T +'�"t' := $110.00
6
24" 14 Guage Round Spiral Culvert
500
m.."-i2.
y'
Single Pipe, F.O.B. Destination
t:� 'rtu'. , $29.80
NO BID
NO BID
NO BID
Single Pipe, F.O.B. Supplier
tt' r'.13'ei"� $19:80
Truck Load, F.O:B. Destination
Truck Load, F.O.B. Su plier
:i•t�r':_T�.Y`" -$19180
Sloped Ends, Pair
i' 9 $193.001
T
36" 14 Guage Round Spiral Culvert
500
Single Pipe, F-O-B. Destination
$menti.".`3.i $39.70-
NO BID
NO BID
NO BID
Single Pipe, F.O.B. Supplier
"�,"?"' "' -$29:70
Truck Load, F.O.B. Destination
$29.70
Truck Load, F.O.B. Supplier
D&2'� : 11 $29.70,
Sloped Ends, Pair
ff,'.'` ` ' $385.00
6
48" 14 Guage Round Spiral Culvert
500'Ta.'"..:'
'� S.=N`
$ „.T •.� i
"
_"`Iw:7'�';F
Single Pipe F.O.B. Destination:,':-"
.$49.60
NO BID
11
NO BID
NO BID
Single Pipe, F.O.B. Supplier
$39,60:.
Truck Load, F.O.H. Destination
' '$39:60
Truck Load, F.O.B. Supplier
:��:'u`:-.^,•. $39.60.
Sloped Ends, Pair
zF.Y;Sit�- $632,00
9
60" 14 Guage Round Spiral Culvert
500
' ...,:+.�iv,",`.,, _,`;,,
.
Single Pipe, F.O.B. Destination
$65.28
$65.28::
NO BID
NO BID
NO BIO
Single Pipe, F.O.B. Supplier
a�'-�: ' $39.60:
Truck Load, F.O.B. Destination
y?:;;2j`"- „ $39.601
Truck Load, F.O.B. Su plier
': ;s`;;,'.?' ...$39.60 .
y"".'^'�::' •$1,034.00
Sloped Ends, Pair
10
72" 12 Guage Round Spiral Culvert
500
Single Pipe, F.O.B. Destination
l�:v 4t'. „v$160.75
NO BID
NO BID
NO BID
Single Pipe, F.O.B. Supplier
.: yi-:$F`^'- i. $90.75:
Truck Load, F.O.B. Destination
:4'z3. ,,.,,;, $gD:75
Truck Load, F.O.B. Su lier
i 7.7 890:75
Sloped Ends, Pairs"
?:,= :"-.$4;909:00
'Allurninum.Corrugated Culvert
18"16 Guage Circular Culvert
Single Pipe, F.O.B. Destination ,??'=;Y�'=�� . $24.25 .
Truck Load, F.O.B. Destination -500425 . NOB NO BID NO BID
Single Pipa, F.O.B. Sup tierbp-r
Vol. _ PHCI . ��
BID TABULATION 2016-137R previously known as 2015-11
CULVERTS, VARIOUS TYPES
February 1, 2016 - January 31, 2017
EST
ITEM QTY IN
NO Item Description FEET
Contech Engineered
Solutions
Ferguson Waterworks
CPR Services &
Supllies, Inc/MDN
Enterprises
Woodson Lumber
STOCK ORDER
STOCK
ORDER
STOCK ORDER
STOCK
ORDER
Truck Load, F.O.B. Supplier
`f"4`3it': '. -$14.25
Sloped Ends, Pair
:r=.. r.z : ' $12100
12
24" 16 Guage Circular Culvert
500
Single Pipe, F.O.B. Destination-'�C-',
$29.00
NO BID
NO BID
NO BID
Single Pipe, F.O.B. Supplier
EI3» :_""'+r $19.00
Truck Load, F.O.B. Destination
'*.� r�`T1, .$19.00
Truck Load, F.O.B. Supplier
$19.011
Sloped Ends, Pair
i3,;^"r.' $187.00.
13
30" 16 Guage Circular Culvert
500
Single Pipe, F.O.B. Destination
d r''*tee $33.75
NO BID
NO BID
NO BID
Single Pipe, F.O.S. Supplier
1's"'rx�" ' .$23.75:
Truck Load, F.O.B. Destination
k"" $23.75
Truck Load, F.O.B. Supplier
$23.75-`
Sloped Ends, Pair
$269.00
14
36" 16 Guage Circular Culvert
500
r .3 * .
:<".° -=`+�- a>'
--
Single Pipe, F.O.B. Destination
$38.50 .
NO BID
NO BID
NO BID
Single Pipe, F.O.B. Supplier
_''"3 �- - $28.50
Truck Load, F.O.B. Destination
- '.528.50
Truck Load, F.O.B. Supplier
$28;50
Sloped
Sloped Ends, Pair
$373.00
15
16
dB" 16 Guage Circular Culvert
500 -,<F
500
`�"ai
Single Pipe, F.O.B. Destination
Ya:;'.r:.::.'. $48.00
- NO BID
NO BID
NO BID
Single Pipe, F.O.B. SUPPIier,
hi•,:` .$38:00
- 'A -b_'. $38.00.
Truck Load, F.O.B. Destination
.Truck Load, F.O.B. Supplier
"�" 3i' _'�: $38.00.:
Sloped Ends, Pair
60"12 Guage Circular Culvert
$611.00'
Single Pipe, F.O.B. Destination
Ti %, = :' $88.85
NO BID
NO BID
NOB ID
Single Pipe, F.O.B. Supplier
"�- �' $78.85
Truck Load, F.O.B. Destination
' n: ..$78.85
Truck Load, F.O.B. Supplier
`••: F
Sloped Ends, Pair
v" '. $1;410.001
17
72" 12 Guage Circular Culvert
500
n .. a;,.
Sin le Pipe, F.O.B. Destination,,:,%£
Lr`:+: $105.00'
NO BID
NO BID
NO BID
Single Pipe, F.O.B. Supplier
�.: _," -'.' $95.00..
Truck Load, F.O.B. Destination
;,, ,v - Sg5.00-
Truck Load, F.O.B. Supplier
�'C: #`5'-c 595.00
Sloped Ends, Pair
::, „
a -$1,990.00
. -
-- Steel Reinforced
Polyethylene:Culvert & Pipe
18
72" Steel Reinforced Polyethylene Duromaxx Storm
120
iI;F'.
-
Single Pipe, F.O.B. Destination
No Bid
NO BID
NO BID
NO BID
Single Pipe, F.O.B. Supplier
Truck Load, F.O.B. Destination
No Bid
Truck Load, F.O.B. Su tier
No Bid
19
84" Steel Reinforced Polyethylene Duromaxx Storm
240
' _J °'''
s..2=•ter ,r:i'
Single Pipe, F.O.B. Destination
No Bid
NO BID
NO BID
NO BID
Single Pipe, F.O.B. Supplier
i` i;i,, ;; ,$372.33
Truck Load, F.O.B. Destination
No Bid
Truck Load, F.O.B. Su plior
No Bid
20
96" Steel Reinforced Polyethylene Duromaxx Storm
120
�. it: =' .,,,.;:r-`'
T _^^s'
- - . ice. _
Single Pipe, F.O.B. Destination
No Bid
NO BID
NO BID NO BID
Single Pipe, F.O.B. Supplier
f:T>-p;,.i„ .$419.57
Truck Load, F.O.B. Destination
No Bid
Truck Load, F.O.B. Supplier
No Bid
21
108" Steel Reinforced Pol ethylene Duromaxx Stor
192
Single Pipe, F.O.B. Destination
NO BID
NO BID
NO BID NO BID
Single Pipe, F.O.B. Supplier
Truck Load, F.O.B. Destination
Truck Load, F.O.B. Supplier
22
120" Steel Reinforced Polyethylene Duromaxx Stor:.7
192
_
Sin Ie Pipe, F.O.B. Destination
NO BID
NO BID
NO BID
NO BID
Single Pi e, F.O.B. Su Iier
Truck Load, F.O.B. Destination
Truck Load, F.O.B. Supplier
- Dual Wall Polypropylene Impact Modified Co-Polymor Culvert and Pipe _
15"ADS N-12 HP Storm Pipex:-u::;---T-
`t'+"�' y
Sin le Pipe, F.O.B. Destination I
No Bid $8 62 :; it
$8.21 l -d.•,-_ NO BID
vol. ;4-7 Pg. 42
Vol o? % Pg.
BID TABULATION 2016-137R previously known as 2015-11
CULVERTS, VARIOUS TYPES
February 1, 2016 - January 31, 2017
ITEMEsr
NO
Item Description
orr in
FEET
Contech Engineered Ferguson Waterworks
Solutions
CPR Services 8
Supllies, InclMDN
Enterprises
Woodson Lumber
STOCK
ORDER STOCK ORDER STOCK ORDER
STOCK
ORDER
23
Sin le Pipe, F.O.B. Supplier
120
H"-_'
$11.74 $862't,n
$8.04. + S "
NO BID
Truck Load, F.O.B. Destination
No Bid $8.62 'c� $8.2b r^ z'i` r '; w7ri. $8.32
Truck Load, F.O.B. Supplier
No Bid $8.62 t` J"?, $8 04 a• ' �
NO BID
24
18" ADS N-12 HP Storm Pie
200
_
Single Pipe, F.O.B. Destination
No Bid $11.00 -"'%I; $10.47
NO BIDr
1 Single Pipe, F.O.B. Supplier
r'� :�>_ $15.40 $11 00 •-..a; ;+r.; $10.26 i ':':v
NO BID
Truck Load, F.O.B. Destination
NO Bid $11.00 S'==+i<�''. ,;- $10.47
4i? $10.61
Truck Load, F.O.B. Supplier
No Bid $11.00 3'=5,$4;a $10.26 €-:'^rte
NO BID
25
26
24" ADS N-12 HP Storm Pi e="rS-zX�,'F'
160
�•r z:: r
i '". "Z7.
Single Pipe, F.O.B. Destination
No Bid $16 80 '" s±i�i_,� a -, $16.00'
NO BID
Bin le Pi e, F.O.B. Sup tier
n ?'. "^ $26.97 $16.110 `."z ,`1 $15.68 r
NO BID
Load, F.O.B. Destination
Na Bid $16.80 $16.00
?' $6.21
1N1O
Truck Load, F.O.B. Supplier
30" ADS N-12 HP Storm Pie
BIDTruck
<�t`' "f:`:•
Single Pipe, F.O.B. Destination
No Bid 27.08 -'.'z- $25.79 c R 4;� NOBID
Single Pipe, F.O.B. Supplier
$2708 w $25.27a
D1fi0
Truck Load, F.O.B. Destination
No Bid $27.08 . $25.79
$26.12
Truck Load, F.O.B. Supplier
No Bid $27.08 3; ti $25.27 r ':�
NO BID
27
36" ADS N-12 HP Storm Pipe
160
tx �3 a-'..£� `- _�= _ `- ' --"f 9 - ,•I
'
Single Pipe, F.O.B. Destination
No Bid $3216 F .'i zz $30.63 "'
NO BID•
Single Pipe, F.O.B. Supplier
r i7+c"ii•>: $56.97 1 $3216 .' $30.02
NO BID
Truck Load, F.O.B. Destination
No Bid 1 $32.16 P -'- s; -: $30.63-
_ $31.02
Truck Load, F.O.B. Supplier
No Bid $32.16 ±:.:=L=:'�s` $30.02 :row ";='- NO BID
28
42" ADS N-12 HP Storm Piper..r
120
r ` s:? ... ,+i{ `
Single Pipe, F.O.B. Destination
No Bid $42 99 a $40.95
�'
NO BID
Single Pipe, F.O.B. Supplier
'3-"e`: $fi9.72 $42 99 t a-. '840.13 " r
�No
NO BID
Truck Load, F.O.B. Destination
Bid $42 99 r�. x- $40.95 r - _ $41.47
Truck Load, F.O.B. Supplier
No Bid $42 99.$40.13 e _
NO BID
29
48" ADS N-12 HP Storm Pipe
120
.. _..
.- .,.;:-...a
Single Pipe, F.O.B. Destination
No Bid 1 $53 60 O5
NO BID
Single Pipe, F.O.B. Supplier
a�4eL&i � $89.09 $53.60 , - :? $50.03 ° w :
NO BIO
Truck Load, F.O.B, Destination
No Bid $53
.NO
Truck Load, F.O.B. Sup liar
No Bid $53.60 ` _ ` .$50.03 "-_ =
BID
30
60" ADS N-12 HP Storm Pipe
120
rt
Single Pipe, F.O.B. Destination
No Bid $6619 �_ $82.11 ' _
NO BID•
Single Pipe, F.O.B. Supplier
a•' <r'-mak': $137.85 $8619 - `d -. $80.46 F
NO BID
Truck Load, F.O.B. Destination
Truck Load, F.O.B. Supplier
No Bid $86.19 $80.46 T= z.1
NO BID
Hugger eantlS:=Re-Rolled
_
31
15" EPO Hugger Band Re-Rolled
36
$13.50&--=�_r�.'1' NO BID
NO BID
$19.30 -
j''`<'"
32
18" Poly Hugger Band Re-Rolled
36
` $16.88 - - NO BID
NO BID
$24.10 r
33
24" Poly Hugger Band Re-Rolled
1 24
a.
$21.38.! .a-:NO BID
NO BID
$30.55
Aluminum.Hugger
Band Re-Rolled
35
15" Aluminum Hugger Band Re-Rolled
36 _ S14.85 NO BID
NO BID
NO BID
36
18" Aluminum Hugger Band Re-Rolled
36 ?y.7:L`a-;'j`" $18.57 NO 81D
NO BID
NO BID
37
24" Aluminum Hugger Band Re-Rolled
24 'r-c "yY'-_:' $29.70 NO BID
NO BID
NO BID
38
36"Aluminum Hugger Band Re-Rolled
24 -=-:1^:' $44.55. NO 81D
NO BID
NO BID
39
4B" Aluminum Hugger Band Re-Rolled
24 '';;aN•i "-. $59.40 NO BID
NO BID
NO Bit)-
_01.
- Aluminum Flat Bands
40
15" Aluminum Flat Band
24 ""'i $19.80 1 NO BID
NO BID
NO BID
41
18" Aluminum Flat Band
24 !-"•i �=:;'C"I524.76" NO BID
NO BID
NO
BID
42
24" Aluminum Fiat Band
24 #H-::'x"'= $39.60 NO BID
NO BlD
NO
BID
43
30" Aluminum Flat Band
24 852.25 NO BID
NO BID
NO BID
44
36" Aluminum Flat Band
36 tE1,�?::'{".S $59.40' NO BID
NO BID
NO BID
45
48" Aluminum Flat Band
24''>`ii $79.20 NO BID
NO BID
NO BID
46
84" Aluminum Flat Band
24 :Sw,;_§- $155.00 1 NO BID
NO BID
NO BID
ro
i
Recommendation: Contech Engineered solutions: Sections 1-20, 31-46
CRP Services: Sections 23.30
No Awar ections 21 and 22 due to no bids received
d by mmis s Court on this day of r2 5 by
CQ olding the position ol=
Vol o? % Pg.
BRAZOS COUNTY
COMMISSIONERS' COURT
ACTION FORM
DEPARTMENT: Road & Bridge
MEETING DATE: December 1, 2015
SUBJECT: Utility Permit – Wellborn Special Utility District
Consider and take action on the Wellborn Special Utility District utility permit to
construct a road bore for a 1 -inch water line crossing under Matt Wright Road 2 miles
Northwest of FM 159. Line will provide service to customer at 5091 Matt Wright
Road. Site is located in Precinct 1.
SUBMITTED BY:
,:; )A �j.
Darrell W. Kolwes
Right of Way Agent
This request is
ACKNOWLEDGED BY:
of -le LU -V, kkk4�—
Lloyd Wassermann
Commissioner Precinct 1
/ ❑ DENIED,bv Commissioners' Court
Duane Peters, County Judge
DATE: �%i l 1 1
vol. Pg. �✓�
APPLICATION FOR WATER UTILITY PERMIT
DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY
TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS
Pursuant to the Texas Utility Code, Section 181.024, comes now Wellborn
SUD [company name], hereinafter referred to as "Company" a Texas
[state] Corporation, with authority to transact business in Texas, acting by and through its duly authorized
representative, and hereby petitions the County Engineer for the right to lay, construct, maintain, repair and/or operate
a gas facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached
hereto and said location described as follows:
Facility to Cross Road
Length of
Road Name & Block Number Crossing
TYPE OF CONSTRUCTION
CHECK ONE)
Bored Jacked Driven Cased
Matt Wright Rd 80 ft.
x x
Facility to Parallel County Road Within Riaht-Of-Wav
Road Name and Block
Number From To Depth Distance
CONSTRUCTION TYPE
1" Diameter 0.10" Wall Thickness 2" Encasement Pipe
Material Specification
Maximum Operation Pressure 200 PSI
The location and description of the proposed installation and appurtenances must be fully shown on the attached
detailed drawings.
The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and
shall complete said construction /work within 15 working days. (COMPANY MUST FILL IN). If such
construction is not begun by the 60th day, Company will be required to apply for a new permit.
Company declares that prior to filing this application, it has ascertained the location of all existing utilities, both aerial
and underground, and the filing of this application is prima facie evidence that the proposed installation will not
conflict with any existing utility.
A copy of this permit shall be kept at thejob site any time work is being performed
It is expressly stipulated that this Permit is a license for permissive use only and that the placing of facilities upon
public property pursuant to this permit shall not operate to create or vest any property right in said holder.
It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the County's
right, title and interest in the land to be entered upon and used by the holder and the holder will at all times assume risk
of and indemnify, defend and save harmless Brazos County from and against any and all loss, damages, cost or
vol. _o? � '19 Pg, /`(J
expense arising in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights
and privileges.
Any deviation from these specincations must be approved by Brazos County Engineer's Office or its designated
representative.
Approval of County Engineer's Office may take as long as two weeks after complete application is received.
Applicant agrees to comply with all rules of the County Commissioners and the County Engineer in construction of
said installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION
REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated
herein for reference.
In the event Company fails to obtain a permit prior to the installation or does not install utilities in compliance with
installation requirements set forth herein (Le. depth, location, etc), Company assumes all fnaneial responsibilityfor
damages and/or destruction of lines, cables, etc. based upon its failure to comply with Brazos County requirements.
Applicant agrees that if Brazos County demonstrates a violation of the terms of this policy, Applicant stipulates that
requisites for injunctive relief exist and that Brazos County is entitled to relief enjoining any conduct by applicant
which is contrary to the policies.
This permit is a revocable permit Brazos County reserves the right to revoke this permit at any time, in the sole
discretion of Brazos County, for interests of public health, safety or welfare, or for failure to repair any damages
upon demand, or for any other reason deemed sufficient by Brazos County.
In the event Company fails to comply with any or all of the requirements as set forth herein, the County may take
such action as it deems appropriate to compel compliance. The County Engineer further retains the right to revoke
this Permit by verbal notification to the Appheant/Company.
Failure to obtain this permit and/or notify the County Engineer's Office within 24 hours of beginning construction
shall constitute grounds for job .shutdown.
By signing below, I certify that I am authorized to represent the Company listed below, and that the Company agrees
to the conditions provisions included in this permit.
Wellborn SUD
Company Name
Stephen Cast
B : nit C4,
Signature —1
General Manager
Title
p.0. Box 250
Address
Wellborn Texas 77881
City State Zip
979-690-9799
Phone Number
wsud.js@verizon.net/wsud.sc@verizon.net
Vol. Pg. /G/ i
WATER UTILITY APPROVAL
Brazos County offers no objection to the proposed location of the utility in the County right of way as shown by
accompanying drawings and notice dated
EXCEPTIONS:
a
except as noted below:
(Month/Day/Year)
P'y Brazos County Engineer
Vol. ori � „� P9•_�� � _
ffi
Q
O
d
O
69T WU
W
a_
R IG HT -0 F4(UAV
w
x
J
LU
F
O
x
w
U
m
p
0
H----
'
v
---
LU
EL
O
V
F
Lry
Z
O O
0 0
O v
2 w
O It
F W
d
F-
0
O F—
J ((J
cd W
2 �
F" W
W 2
W
V F
2
0
L7 V
d x
z
O 0
F—
V ^
� 0
z
O O
J (if
d LL.
{� V
Z Z
C� F'
O n
d
< W
d
(? J
CL
rA Cko
00 d
L
� N
2
/\
MM/
]/
�
11111,
|3|!,1
� \
^
i,om
% §
r b f
m
]/
�
11111,
|3|!,1
� \
^
i,om
`��
r b f
m
- __plasso
9
a L
e m
O -
Pj
I
BRAZOS COUNTY ROADWAY SAFETY AND ROAD
PRESERVATION STANDARDS FOR WORK CONDUCTED IN
BRAZOS COUNTY RIGHTS OF WAY
A. General Requirements
1. Adequate drainage shall be maintained in ditches at all times.
2. Permittee will use best management practices ("BMP") (EPA and TCEQ both provide lists of examples of
BMPs) to minimize erosion and sedimentation resulting from the proposed installation.
3. The permittee shall take precautions to avoid damage to property. All County Right of Way and property
shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or
appointed representative.
4. The construction and maintenance of such utility shall not interfere with the property or rights of a prior
occupant.
5. Permittee shall not interfere with other utilities located in the right of way. In the event damages occur,
permittee will be liable to the County or other utilities running through the right of way.
6. County Engineer shall determine whether or not permittee's plans shall inconvenience the public. If it is
determined that inconvenience to the public exists, then the County Engineer will decide whether such
project will be allowed or if an alternative exists so as not to inconvenience the public.
B. Safety Requirements
I . Proper traffic control measures must be put in place prior to beginning work and remain in place during
the duration of the job. All traffic control measures must follow the Texas Manual of Uniform Traffic
Control Devices (TMUTCD). See Traffic Control Requirements below.
2. During construction, all safety regulations of the Texas Department of Transportation shall be observed.
3. Permittee must take such precautions and measures, including placing and displaying safety devices, as
may be necessary, in order to safely conduct the public through the project area. Company shall provide
flagmen, signs, signals or devices necessary to provide complete safety to the public.
4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property
owners.
5. No cable, conduit and/or pole line shall be laid, constructed, maintained and/or repaired so as to constitute
a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of
Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved
by the County Engineer.
C. Traffic Control Plan
1. A traffic control plan, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided
for the following:
a. Any construction (i.e. pit, excavation, hole) left open overnight, requires specific nighttime traffic
control measures pursuant to the TMUTCD;
Vol. ��2�_ pg %G G
b. If construction is within ten (10) feet of the roadway; or
c. Any work performed in the road right-of-way;
2. Plan must be attached to the permit and kept at the job site any time work is behtg performed.
3. Plan must set forth the time of completion for thejob.
D. Design Standards
1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation
and the pole be placed in the designated area for power specified as set forth in the Texas Utilities Code,
Section 181.045.
2. All pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure
safety to the public. Any pole placed in violation of this requirement will be required to be moved to the
appropriate location at the company's expense. Exceptions may be approved by the County Engineer.
All underground installations shall (these are minimum depths — utility may place deeper):
a. be placed at a minimum depth of forty-eight (48) inches below the top of the pavement;
b. be at least thirty-six (36) inches below ditch flow line when installation is within the area measured
from top of bank to top of bank;
c. beat least forty-eight (48) inches below ditch flow line if low pressure gas or petroleum lines. For
high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below;
d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of way of
less than 60 feet.
4. Water Lines: All water lines must be a minimum 36 -inches below the ditch flow line and cased.
Waterlines shall be cased if crossing under the roadway.
5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within
designated locations based upon the type of utility. The locations shall be as follows: (measured from
back of right-of-way).
Power -0 to 2 feet, nominally I'
Phone — 2 to 4 feet, nominally 3'
Gas — 4 to 6 feet, nominally 5'
Cable — 6 to 8 feet, nominally 7'
6. Utilities with less than 60 feet right-of-way in all new developments shall install the utility in a similar
manner as referenced in No. 3 above; however, the County Engineer or its designated representative will
provide final approval of each utility location.
7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longer than 400'
if left open over night or unattended.
8. Crossings under a county road shall:
a. be bored or jacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT;
b. be pressure grouted for the full length of the crossing if the annular space between pipe and casing and
soil exceeds one (1) inch. Brazos County must be given 24 hours notice of pressure grouting
operations and have the opportunity to have an inspector on site to observe pressure grouting
operations;
Vol.
c. TxDOT Standard Specification Item 476 shall be followed for all boring, jacking, tunneling and joints.
9. Bore Pits:
a. no pits shall remain open longer than 2 days;
b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above.
c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from
the County Engineer or his representative;
d. when pits are to remain open for more than 8 hours, due diligence will be used in protecting the spoil
pile to prevent drainage problems;
e. based upon soil conditions, the County Engineer or his representative may require shoring to protect
pavement integrity;
f. based upon soil conditions, the County Engineer or his representative may require pits be placed
further from the edge of road.
10. Any installation within ten (10) feet of edge of pavement shall meet the following:
a. location must be approved by the County Engineer or his representative
b. backfilled with cement stabilized material.
c. based upon soil conditions, the County Engineer or his representative may require shoring to
protect pavement integrity.
d. all excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed
during a rainy period or at other times where excess water cannot be prevented from entering the
trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized
material as soon as weather permits;
e. all disturbed base and pavement materials shall be removed and restored to the satisfaction of the
County Engineer or his representatives.
f. no side or lateral tamping to fill voids under the base and pavement materials is allowed.
11. Company must be careful to not jeopardize the slope or integrity of the shoulder of the road. In the event
Company damages the slope, shoulder or any other portion of the right-of-way, Company will be
responsible for repairing the damage and replacing the right-of-way to the condition it was prior to
commencing construction.
12. Operation of construction and/or maintenance equipment on the traveled surface of any improved County
road will not be permitted, except in an instance whereby the laying, construction, maintenance and/or
repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event
all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided
meeting TMUTCD requirements.
13. In the event said construction and/or maintenance and/or repair requires Company to remove, cut or
jeopardize any section of the road (asphalt, cement, road base, etc.), Company will be required to provide
a performance bond or letter of credit securing necessary repairs. Said bond amount will be determined by
the County Engineer.
14. The applicant shall submit a letter of "No Objection' from the Army Corps of Engineers for all
designated wetlands and environmentally sensitive lands.
E. En:erjzencv work
1. In the event Company is required to perform emergency services, that requires excavation in a County
Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Company
Vol. -,2 f Pg. '4
i T'
shall notify County Engineer within 24 hours of beginning construction/repairs. This will allow the
County Engineers Office an opportunity to inspect the site to ensure the integrity of the County Right of
Way and traffic safety controls used.
F. Repairs to existing facilities
1. Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the
soil, shall not be performed until plans describing such maintenance and/or repair have been approved by
the County Engineer or its designated representative and a permit has been obtained.
G. Relocation of utilities
I . When and if the County Engineer determines that it is necessary for the construction, repair, improvement,
alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or other
facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated
thereon, as required by the County Engineer within a reasonable time as determined by the County
Engineer and Utility Company, and at the expense of the Utility Company.
K High Pressure Pipelines
1. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining to
controlled access or non -controlled access installations, should contain the following additional
information in the description of the permit.
-diameter
-wall thickness
-material specification
-minimum yield strength
-maximum operation pressure of the pipeline
2. With the exception of the maximum operation pressure of the pipeline, this information is to be supplied
for both the carrier pipe and the casing.
3. Assurance must also be given that the installation material and design meet the minimum Federal Safety
Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed
by an authorized representative of the company.
4. Petroleum Pipelines:
Depth
Tvpe of Pipeline (below deepest ditch grade) Special Renuirements
Encased Pipe Less than 10' Must be covered with concrete pad at least 36" deep
Encased Pipe Greater than 10' No concrete pad required
Non -Cased Pipe Less than 10' Must be covered with concrete pad at least 48" deep
Non -Cased Pipe Greater than 10' No concrete pad required
Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum.
5. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -of -
Way. Transmission lines have been determined to be petroleum pipelines (which includes natural
gas lines) and shall not be parallel to a County Road.
6. Natural Gas Distribution is a line that se es tMe finalcustomer. r�
�¢ Nxo
� of
+%ISS
•
9p b
•rolnn�l
a65g
ifig6gg
o8
--
sgka
sem
„'so$nm�
Es§&
M'��HrvvNu
n�m
�¢ Nxo
� of
+%ISS
•
a
•rolnn�l
a N
_Q
$� V J 3
esEob-E
t�8f" b s_ NOV i%e`�s=g�se` F,e
5z..eeke �.."
��c nsBga €g"e JE
_g�"^s
eb`
-------------------
• p%I�VS
a
8 s m8
,� Ipm as .os
p
va lv�K
�WIK'YS
\
•rolnn�l
h�Nv a �C I
spa .o wp os .oy "II:
�n yv Ryn. Vpn vv .{v�o�jpae FII /,�1Miwaey. w� RRV pew v.W vl pizvye olVl W vtln eVI �tll nlvlJ SIC
Vol. % Pa. ���—
BRAZOS COUNTY 10
COMMISSIONERS' COURT
ACTION FORM
DEPARTMENT: Road & Bridge
MEETING DATE: December 1, 2015
SUBJECT: Utility Permit — Apache Corporation
Consider and take action on the Apache Corporation utility permit to construct 2
road bores (8 5/8" line and 4 1/2" line) a minimum depth of 10 feet under Bird Pond
Road approximately 5,440' Southwest of SH 30. Project will connect several oil wells
in the area. Site is located in Precinct 2.
SUBMITTED BY:
a , ,�
Darrell W. Kohves
Right of Way Agent
This request is
Duane Peters, County judge
DATE: 1,-2-11 / 7
"`''L _o? az , Pg.ZE
aers' Court
APPLICATION FOR PIPELINE UTILITY PERMIT
DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY
TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS
Comes APACHE CORPORATION, hereinafter referred to as "Company" a Delaware Corporation with authority to
transact business in Texas, acting by and through its duly authorized representative, and hereby petitions the County
Engineer for the right to lay, construct, maintain, repair and/or operate equipment under, over, across and/or along certain
County Roads as shown on drawings and diagrams attached hereto and said location described as follows:
Facility to Cross Road
Length of TYPE OF CONSTRUCTION
Road Name & Block Number Crossing (CHECK ONE)
Bored Jacked Driven Cased
Bird Pond Road 82.24 feet X
Note: The proposed pipeline easement crossing Bird Pond Road will include one (1) 6.625" OD x 0.432" WT, API 5L X-52 steel pipeline and
one (1) 4.500" OD x 0.337" WT, API 5L X-42 steel pipeline.
Facility to Parallel County Road Within Right -Of -Way
CONSTRUCTION TYPE
Diameter Wall Thickness ■ High Pressure Underground ❑ Low Pressure Underground
Pipeline (60 psi or greater Pipeline (60 psi operating
Material Specification Noted Above operating pressure) pressure)
Minimum Yield Strength Noted Above
Maximum Operation Pressure Noted Above
The location and description of the proposed installation and appurtenances must be fully shown on the attached detailed
drawings.
The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and
shall complete said construction /work within HS working days. (COMPANY MUST FILL IN). If such
construction is not begun by the 60 day, Company will be required to apply for a new permit.
Company declares that prior to filing this application, it has ascertained the location of all existing utilities, both aerial and
underground, and the filing of this application is prima facie evidence that the proposed installation will not conflict with
any existing utility.
A copy of this permit shall be kept at the job site any time work is being performed.
It is expressly stipulated that this Permit is a license for permissive use only and that the placing of facilities upon public
property pursuant to this permit shall not operate to create or vest any property right in said holder.
It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the County's right,
title and interest in the land to be entered upon and used by the holder and the holder will at all times assume risk of and
indemnify, defend and save harmless Brazos County from and against any and all loss, damages, cost or expense arising
in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights and privileges.
Any deviation from these specifications must be approved by Brazos County Engineer's Office or its designated
representative. ---
Vol. pg, -Zx�_
Approval of County Engineer's Office may take as long as two weeks after complete application is received
Applicant agrees to comply with all rules of the County Commissioners and the County Engineer in construction of said
installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION
REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated
herein for reference.
In the event Company jails to obtain a permit prior to the installation or does not install utilities in compliance with
installation requirements set forth herein (i.e. depth, location, etc), Company assumes all financial responsibility for
damages and/or destruction of lines, cables, etc. based upon its failure to comply with Brazos County requirements.
Applicant agrees that if Brazos County demonstrates a violation of the terms of this policy, Applicant stipulates that
requisites for injunctive relief exist and that Brazos County is entitled to relief enjoining any conduct by applicant
which is contrary to the policies.
This permit is a revocable permit. Brazos County reserves the right to revoke this permit at any time, in lite sole
discretion of Brazos County, for interests ofpub/ie health, safety or welfare, or for failure to repair any damages upon
demand, or for any other reason deemed sufficient by Brazos County.
In the event Company fails to comply with any or all of the requirements as set forth herein, the County may take such
action as it deems appropriate to compel compliance. The County Engineer further retains the right to revoke this
Permit by verbal notification to the Applicant/Company.
Failure to obtain this permit and/or notify the County Engineer's Office within 24 hours of beginning construction
shall constitute groundsfor job shutdown.
By signing below, I certify that I am authorized to represent the Company listed below, and that the Company agrees to
the conditions/provisions included in this permit.
APACHE CORPORATION
Company Name
Marco Herrera
.By/l /% /
Signature
Title
P.O. Box 468
Address
Snook TX 77878
City State Zip
210.478.9914
Phone Number
Marco.lierrera!a)apachecorp. com
Email
Vol. a 2 pg. %7j
L
PIPELINE UTILITY APPROVAL
Brazos County offers no objection to the proposed location of the utility in the County right of way as shown by
accompanying drawings and notice dated ./— / 9 — I `J except as noted below:
(Month/Day/Year)
EXCEPTIONS:
QaJ� b. wt�
,C, Brazos County Engineer
- P9• /_/ --V-
BRAZOS COUNTY, TEXAS
Ao 0
W o AB
B d p
AO 10 4 JQ
J J 01 OZO OS
o O
OJy 90 0Qo � O
b\ AF
SW R/W BIRD POND ROAD W W\` 4
N=370,291.35 \
E=3,287,282.59
LAT=30'37'11.64" N
LONG:=96'14'24.51" W
1 _
PIPELINE
EXISTING�ry 11
_
x�- 1
x�
a
x- EXIS d 4
�aTINC P=WE=LINE p
a a K
0
DON L RE4CHIE AND Z
SHEILA M. RENCHIE a
CALLED 16.69 ACRES O
VOLUME 5551, PAGE 27 'Y
O.R.B.C.T.
PLAN
SCALE: HDRZ. 1"=50'
PROPOSED PIPENNE
WARNINC SIGN AT
R VI PENCE �
Z 285
O
Q zSO
w
z7s
w
270
69.83
n p
w N m n
n
W p J W
EXISTING
NOTES:
'Fj 2 1.) ALL BEARINGS APE
bol, pa RERAENCED TO THE TEXAS
STATE PLANE COORDINATE
4d1 SYSTEM, CENTRAL ZONE (4203)
NAD 27, ALL DISTANCES AND
ACREAGES PRE MID.
2.) THIS PLAT IS NOT MENDED
TO BE A BOUNDARY SURVEY ANE
DOES NOT MEET THE
REQUIREMENTS FOR BOUNDARY
SURVEYS IN THE STATE OF
TEXAS.
GOEN FAMILY LIMITED PARTNERSHIP
'TRACT EIGHT' CALLED 1324 ACRES &
'TRACT NINE' CALLED 138.92 ACRES
VOLUME 3957, PAGE 136
O.R.B.C.T.
LAT:=30'37'11.24" N
LONG:=96'14'23.86"
OLIVER F. GOEN
CALLED 20.2094 ACRES
VOL 11555, PAGE 249
O.R.B.C.T.
PROPOSED PIPELINE
WARNING SIGN AT
'M FENCE
PROFILE LOOKING NORTHEAST
SCALE: HORZ. 1"=50'
VERT. 1"=20'
235 Z
O
EDO Q
275
w
270
PROPOSED PIPELINE CROSSING BIRD POND ROAD
FOOTAGE: 69.83 FEET = 4.23 RODS
APACHE CORPORATION
PROPOSED PIPELINE CROSSING
BIRO POND ROAD
RAZOS-COUNTY, TEXAS
Pg. / S�
LEGEND:
— -
— CENTERLINE OF PIPELINE
—R—
PROPERTY BOUNDARY
—'—'—
FENCE B/W
a
OVERHEAD EIFCTRIC
—1-1—
UNDERGROUND PIPELINE
W
UNDERGROUND WATERLINE
69.83
n p
w N m n
n
W p J W
EXISTING
NOTES:
'Fj 2 1.) ALL BEARINGS APE
bol, pa RERAENCED TO THE TEXAS
STATE PLANE COORDINATE
4d1 SYSTEM, CENTRAL ZONE (4203)
NAD 27, ALL DISTANCES AND
ACREAGES PRE MID.
2.) THIS PLAT IS NOT MENDED
TO BE A BOUNDARY SURVEY ANE
DOES NOT MEET THE
REQUIREMENTS FOR BOUNDARY
SURVEYS IN THE STATE OF
TEXAS.
GOEN FAMILY LIMITED PARTNERSHIP
'TRACT EIGHT' CALLED 1324 ACRES &
'TRACT NINE' CALLED 138.92 ACRES
VOLUME 3957, PAGE 136
O.R.B.C.T.
LAT:=30'37'11.24" N
LONG:=96'14'23.86"
OLIVER F. GOEN
CALLED 20.2094 ACRES
VOL 11555, PAGE 249
O.R.B.C.T.
PROPOSED PIPELINE
WARNING SIGN AT
'M FENCE
PROFILE LOOKING NORTHEAST
SCALE: HORZ. 1"=50'
VERT. 1"=20'
235 Z
O
EDO Q
275
w
270
PROPOSED PIPELINE CROSSING BIRD POND ROAD
FOOTAGE: 69.83 FEET = 4.23 RODS
APACHE CORPORATION
PROPOSED PIPELINE CROSSING
BIRO POND ROAD
RAZOS-COUNTY, TEXAS
Pg. / S�
BRAZOS COUNTY ROADWAY SAFETY AND ROAD
PRESERVATION STANDARDS FOR WORK CONDUCTED IN
BRAZOS COUNTY RIGHTS OF WAY
A. General Requirements
1. Adequate drainage shall be maintained in ditches at all times.
2. Permittee will use best management practices ("BMP") (EPA and TCEQ both provide lists of examples of
BMPs) to minimize erosion and sedimentation resulting from the proposed installation.
3. The permittee shall take precautions to avoid damage to property. All County Right of Way and property
shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or
appointed representative.
4. The construction and maintenance of such utility shall not interfere with the property or rights of a prior
occupant.
5. Permittee shall not interfere with other utilities located in the right of way. In the event damages occur,
permittee will be liable to the County or other utilities running through the right of way.
6. County Engineer shall determine whether or not permittee's plans shall inconvenience the public. If it is
determined that inconvenience to the public exists, then the County Engineer will decide whether such
project will be allowed or if an alternative exists so as not to inconvenience the public.
B. Safety Requirements
1. Proper traffic control measures must be put in place prior to beginning work and remain in place during
the duration of the job. All traffic control measures must follow the Texas Manual of Uniform Traffic
Control Devices (TMUTCD). See Traffic Control Requirements below.
2. During construction, all safety regulations of the Texas Department of Transportation shall be observed.
3. Permittee must take such precautions and measures, including placing and displaying safety devices, as
may be necessary, in order to safely conduct the public through the project arca. Company shall provide
flagmen, signs, signals or devices necessary to provide complete safety to the public.
4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property
owners.
5. No cable, conduit and/or pole line shall be laid, constructed, maintained and/or repaired so as to constitute
a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of
Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved
by the County Engineer.
C. Traffic Control Plan
1. A traffic control plan, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided
for the following:
a. Any construction (i.e. pit, excavation, hole) left open overnight, requires specific ni h¢ ttime traffic
control measures pursuant to the TMUTCD;
Vol.
b. If construction is within ten (10) feet of the roadway; or
c. Any work performed in the road right-of-way;
2. Plan must be attached to the permit and kept at the job site anytime work is being performed.
3. Plan must set forth the time of completion for thejob.
D. DesitnStandards
1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation
and the pole be placed in the designated area for power specified as set forth in the Texas Utilities Code,
Section 181.045.
2. All pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure
safety to the public. Any pole placed in violation of this requirement will be required to be moved to the
appropriate location at the company's expense. Exceptions may be approved by the County Engineer.
3. All underground installations shall (these are minimum depths — utility may place deeper):
a. be placed at a minimum depth of forty-eight (48) inches below the top of the pavement;
b. be at least thirty-six (36) inches below ditch flow line when installation is within the area measured
from top of bank to top of bank;
c. be at least forty-eight (48) inches below ditch flow line if low pressure gas or petroleum lines. For
high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below;
d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of way of
less than 60 feet.
4. Water Lines: All water lines must be a minimum 36 -inches below the ditch flow line and cased.
Waterlines shall be cased if crossing under the roadway.
5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within
designated locations based upon the type of utility. The locations shall be as follows: (measured from
back of right-of-way).
Power— 0 to 2 feet, nominally 1'
Phone -2 to 4 feet, nominally 3'
Gas — 4 to 6 feet, nominally 5'
Cable — 6 to 8 feet, nominally 7'
6. Utilities with less than 60 feet right-of-way in all new developments shall install the utility in a similar
manner as referenced in No. 3 above; however, the County Engineer or its designated representative will
provide final approval of each utility location.
7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longer than 400'
if left open over night or unattended.
8. Crossings under a county road shall:
a. be bored or jacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT;
b. be pressure grouted for the full length of the crossing if the annular space between pipe and casing and
soil exceeds one (1) inch. Brazos County must be given 24 hours notice of pressure grouting
operations and have the opportunity to have an inspector on site to observe pressure grouting
operations;
[Vol. _��.�. Pg. /7 -
c. TxDOT Standard Specification Item 476 shall be followed for all boring, jacking, tunneling and joints.
9. Bore Pits:
a, no pits shall remain open longer than 2 days;
b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above.
c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from
the County Engineer or his representative;
d. when pits are to remain open for more than 8 hours, due diligence will be used in protecting the spoil
pile to prevent drainage problems;
e. based upon soil conditions, the County Engineer or his representative may require shoring to protect
pavement integrity;
f. based upon soil conditions, the County Engineer or his representative may require pits be placed
further from the edge of road.
10. Any installation within ten (10) feet of edge of pavement shall meet the following:
a. location must be approved by the County Engineer or his representative
b. backfilled with cement stabilized material.
c. based upon soil conditions, the County Engineer or his representative may require shoring to
protect pavement integrity.
d. all excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed
during a rainy period or at other times where excess water cannot be prevented from entering the
trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized
material as soon as weather permits;
e. all disturbed base and pavement materials shall be removed and restored to the satisfaction of the
County Engineer or his representatives.
f. no side or lateral tamping to fill voids under the base and pavement materials is allowed.
11. Company must be careful to notjeopardize the slope or integrity of the shoulder of the road. In the event
Company damages the slope, shoulder or any other portion of the right-of-way, Company will be
responsible for repairing the damage and replacing the right-of-way to the condition it was prior to
commencing construction.
12. Operation of construction and/or maintenance equipment on the traveled surface of any improved County
road will not be permitted, except in an instance whereby the laying, construction, maintenance and/or
repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event
all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided
meeting TMUTCD requirements.
13. In the event said construction and/or maintenance and/or repair requires Company to remove, cut or
jeopardize any section of the road (asphalt, cement, road base, etc.), Company will be required to provide
a performance bond or letter of credit securing necessary repairs. Said bond amount will be determined by
the County Engineer.
14. The applicant shall submit a letter of "No Objection" from the Army Corps of Engineers for all
designated wetlands and environmentally sensitive lands.
E. Emernency work
1. In the event Company is required to perform emergency services, that requires excavation in a County
Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Company
shall notify County Engineer within 24 hours of beginning construction/repairs. This will allow the
County Engineer's Office an opportunity to inspect the site to ensure the integrity of the County Right of
Way and traffic safety controls used.
F. Repairs to existing facilities
1. Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the
soil, shall not be performed until plans describing such maintenance and/or repair have been approved by
the County Engineer or its designated representative and a permit has been obtained.
G. Relocation of utilities
1. When and if the County Engineer determines that it is necessary for the construction, repair, improvement,
alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or other
facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated
thereon, as required by the County Engineer within a reasonable time as determined by the County
Engineer and Utility Company, and at the expense of the Utility Company.
H. High Pressure Pipelines
1. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining to
controlled access or non -controlled access installations, should contain the following additional
information in the description of the permit-
-diameter
-wall thickness
-material specification
-minimum yield strength
-maximum operation pressure of the pipeline
2. With the exception of the maximum operation pressure of the pipeline, this information is to be supplied
for both the carrier pipe and the casing.
3. Assurance must also be given that the installation material and design meet the minimum Federal Safety
Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed
by an authorized representative of the company.
4. Petroleum Pipelines:
Depth
Type of Pipeline (below deepest ditch erade) Special Requirements
Encased Pipe Less than 10' Must be covered with concrete pad at least 36" deep
Encased Pipe Greater than 10' No concrete pad required
Non -Cased Pipe Less than 10' Must be covered with concrete pad at least 48" deep
Non -Cased Pipe Greater than 10' No concrete pad required
Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum
5. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -of -
Way. Transmission lines have been determined to be petroleum pipelines (which includes natural
gas lines) and shall not be parallel to a County Road.
6. Natural Gas Distribution is a line that serves the final customer.
8g0
Z I
a o�—
4�x 9= �D. • V €o
a`=8p�
a
J
kgs gG E =8
O xiDI�MIS
O�
ti W O
LLOtn
ti
pt a
Q_
�Um
$
�JSie '•S�y� m n�
�•%er�
..�
°S
�3=
f_E�3 -�R °,e ✓? Hca �68�
asses
4y�-`--
=fila
n
-t'�.SEe�-6�a�g6
8F -S
M$e
o$3rFm
�Y�x=
hBREFs
�js
8A=
o
Z I
a o�—
4�x 9= �D. • V €o
a`=8p�
a
J
kgs gG E =8
O xiDI�MIS
O�
ti W O
LLOtn
ti
pt a
Q_
�Um
$
�JSie '•S�y� m n�
..�
°S
�3=
f_E�3 -�R °,e ✓? Hca �68�
=fila
-t'�.SEe�-6�a�g6
+eJlrwK ® '
�s
JiD wive
eDe .
S
S
Z I
a o�—
4�x 9= �D. • V €o
a
o o a
O xiDI�MIS
O�
ti W O
LLOtn
ti
� U
Q_
�Um
-------------------
Fox-
��
L oc
4�x 9= �D. • V €o
O xiDI�MIS
�NI�iVs
Q_
�Um
$
OC SMAM 0 1 p ov�C
Vdi09 �1. aalg oxg
�wmws 7 - - I - 1.1— s
.oDvws E minws
°ai +. you os �usx v -ate
d.., �S >onee.'liiiivi:wa%.� a ano.o i i • : ": '° ° m,m'il i ioo'�i oe °<a'"e..'e. 9i �wal�y
ie so R..i<��>^ ox �.ii. siDee'ull�°.,I&°n .0 9�aWiFa'v=w�°+ of o+cis . Ix. imxlrnsla
Vol.
«m=
BRAZOSCOUNTY,TE\AS
BUDGET AMENDMENT(S) FOR THE 2015-2016 BUDGET YEAR
NO. 15/16 10.1 — 10.17
On this the 1st clay of December 2015 ata regular meeting of the Commissioners' Court, the following
members were present:
A. Duane Peters, County Judge, Presiding
B. Lloyd Wassermann, Commissioner, Precinct 1
C. Sammy Catalena, Commissioner, Precinct 2
D. Kenny Mallard, Commissioner, Precinct 3
E. Irma Cauley, Commissioner, Precinct 4
F. Karen McQueen, County Clerk
The following proceedings were held:
THAT W11E REAS, on 1st day of December 2015 the Court heard and approved a budget amendment
for the 2014-2015 budget year for Brazos County, Texas; and
WHEREAS, expenditure is necessarydue to the necessity to meet unusual and unforeseen conditions
which could not be reasonably included in the original budget adopted 3 September 2015, the following
amendment(s) to the original budget are hereby authorized, as described on the attached page(s).
ADOPTED AND APPROVED this the ist day of December 2015.
THE COINIMISSIONE16 COU10- 01, VRA'L,OS COUNTY, TEXAS.
By:
Duane Peters, County Judge
Original: County Clerk's Office and
Attached to the original budget
Pg, B�
Yj
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15/16 • 10.1
12/1/2015
FUNDI DIV I ACCT PROJ jDR/CRj ACCOUNT NAME Increase Decrease
4500 63000500 30890000 CR Vehicles 445.71
4500 63000500 60502300 DR Vehicle Equipment - SO 445.71
General Capital Im rocement Fund: SO
Reallocation of funds for the purchase of the light bar for Unit 166 PO #16001237).
the
r
� nim
Date: � 1=1 /2 412 0 8 5
BRAZOS COUNTY, TEXAS
BUDGETAMENDMENTS
No. 15116 - 10.2
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15116 - 10.3
1 21112 01 5
FUND
DIV
ACCT
PROJ DR/CR ACCOUNT NAME
Increase Decrease
4500
63000500
30590000
CR Vehicles
520.00
4500
63000500
67392500
DR Vehicle Equipment - 50
390.01
4500
63000500
67S92S20
DR IVehicle Equipment - Jail
36.66
4500
63000500
67593040
DR Vehicle Equipment - Constable Pct #4
43.33
I
I
I
I
I
I
I
I
General Capital Improvement Fund:
SO..Inil and Constable Pct. A
Reallocation of funds Cor the prouamrnin.g on the radios in the patrol vehicles..
I
I
I �
I
Vol. % pg./ YV
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15/16 - 10.4
VOL
121112015
FUND
4500
4500
4500
4500
DIV
6300000
63000500
63000500
63000500
ACCT
80890000
6759?800
67892820
67893040
PROJ DR/CR ACCOUNT NAME
CR Vehicles
DR Vehicle Equipment - SO
DR Vehicle Equipment - Jail
1 DR Vehicle Equipment - Constable Pct #4
Increase Decrease
40,104.15
30,133.80
6.646.90
3323.45
General Capital Im rocement Fund: SO, Jail and Constable Pct. h-1
Reallocation of funds to mrchase the radios for the atrol vehicles (PO 16001250).
VOL
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15116 - 10.5
1 21112 0 1 5
FUND DIV
ACCT
PROJ DR/CR ACCOUNT NAME
Increase Decrease
4500 63000500
30393040
CR Vehicles - Constable Pct. :4
1.909.00
4500 63000500
60303040
DR Vehicle Equipment - Constable Pct #4
1.17655
4500 63000500
67593040
DR Vehicle Equipment - Constable Pct 94
732.45
I
I
I
I
I
I
I
I
I
I
l
I
General rovement Fund:
Constable Pct. #4
Reallocation of funds to purchase the equipment far Unit 305 (PO 16001113).
4500
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15116 - 10.6
NT
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15116 - 10.7
1 21112 01 5
FUND DIV ACCT PROJ DR/CR ACCOUNT NAME Increase I Decrease
4500 63000500 30392320 CR Vehicles - Jail 56350
4500 63000500 60302320 DR Vehicle Equipment - Jail 563.50
I
I I I
I I
I
I
General Capital Im rovement Fund: Jail
Reallocation of funds to urchase the ee ui ment for Unit 133 PO 16001125).
I
4500
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15116 - 10.8
ncrease
-50
Vol. _o72 "�;m Pg, 197
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15/16 - 10.9
12/1/2015
FUND DIV ACCT PROJ DR/CR ACCOUNT NAME Increase Decrease
4500 63000500 50392500 CR Vehicles - SO 2,393.40
4500 63000500 60502300 DR Vehicle Equipment - SO 450.50
4500 63000500 67592300 DR Vehicle Equipment - SO 1,942.90
General Ca ital Im rovemcnt Fund: SO
Reallocation of fiords to purchase the equipment for Unit 154 (PO 160011 S4).
IvaL--_a�/�-. Pg /9y
L -
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15116 - 10.10
1 2/112 01 5
FUND DIV ACCT PROJ
DRICRI
ACCOUNT NAME
Increase Decrease
4500 63000500 SO892S00
CR
Vehicles - SO
2,393.40
4500 63000500 60S02S00
DR
Vehicle Equipment - SO
45050
4500 63000500 67592300
DR
Vehicle Equipment - SO
1,942.90
al EA,
I I
General Capital lm rovemcnt fund: SO
Reallocation of funds to purchase the equipment for Unit
137 (PO 16001153).
Vol. 2 //_ pq / /
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15116 - 10.11
12/1/2015
FUND DIV ACCT PROJ I DR/CR ACCOUNT NAME Increase Decrease
4500 63000500 8OS92S00 CR Vehicles -SO 2.259.92
4500 63000500 60302S00 DR Vehicle G ni ment - SO 355.02
4100 63000500 67892500 DR Vehicle Equipment - SO 1,574.90
I
i
I
r
I
I
I I
I
General Capital Improvement Fund: SO
Reallocation of funds to purchase the e ui ment for Unit 142 PO 16001135).
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15/16 - 10.12
121112015
FUNDI DIV ACCT I PROD
10R/CR
ACCOUNT NAME
Increase I Decrease
4500 63000500 50342S00
CR
Vehicles - SO
2,259.92
4500 63000500 60802SOO
DR
Vehicle Equipment - SO
355.02
4500 63000500 67392300
DR
Vehicle Equipment - SO
1.574.90
I I
I
I
�
I
Ell
General Ca ital Improvement Fund: SO
Reallocation of funds to purchase the cc ui ment for Unit
149 (PO 16001136).
FVol. I —7 J``��'g,_/p
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15/16 - 10.13
12/1/2015
FUNOI DIV I ACCT PROJ
DR/CR
ACCOUNT NAME
(ncrease Decrease
4500 63000500 SOS92SOO
CR
Vehicles _So
2.996.31
45001 63000500 60S02SOO
Df:
I Vehicle Equipment - SO
I.I01.83
4500 63000500 67592300
DR
Vehicle H ui ment - SO
1,394.43
General capital Improvement Fund: SO
Reallocation of funds to purchase the equitinnellt for Unit
183 (PO 160011.52).
Vol. p9.
y
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15116 -10.14
121112015
FUNDI DIV I ACCT PROJ
DR/CR
ACCOUNT NAME
Increase Decrease
4500 63000500 S0392S00
CR
Vehicles -SO
2.99631
4500 63000500 60802500
DR
I Vehicle E ui ment - SO
1,101.53
4500 63000500 67392500
DR
Vehicle Equipment - SO
1,894.45
I
)
I
I
I
I
I
I
I
I
I
I
I
I
General Capital Im rocement Fund: SO
Reallocation of funds to PLIrchase the e ui ment for Unit 193 (PO 16001151).
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15116 - 10.15
12/1/2015
FUND DIV I ACCT PROJ
DRICRI
ACCOUNT NAME
Increase Decrease
4500 63000500 50892500
CR
Vehicles - SO
2,996.31
4500 63000500 60802800
DR
Vehicle Equipment - SO
1,101.83
4500 63000500 67892800
DR
Vehicle Equipment - SO
1.894.46
General Capital Im rocement Fund: SO
Reallocation of funds to purchase the equipment Cor Unit
194 (PO 16001149).
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15116 - 10.16
12/1/2015
FUNDI DIV I ACCT
PROJ I DR/CR
I ACCOUNT NAME
Increase Decrease
4500 63000500 65950000
CR
Vehicle Maintenance
4,530.00
4500 1 63000500 67393020
DR
Vehicle E ui ment - Constable Pct. #2
2.265.00
4500 63000500 67393030
UR
Vehicle [ ui ment - Constable Pct. #3
2,265.00
I
I
I
I
I
I
LE— Ti
General Ca ital Int rovement Fund:
Constable Pet. #2 and Constable pet. #3
Reallocation of funds to purchase radars.
I
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 15/16 - 10.17
12/1/2015
(FUNDI DIV I
ACCT
PROJ IDR/CRI ACCOUNT NAME
Increase Decrease
4500 63000500
80890000
CR Vehicles
24.566.18
4500 63000500 1
80892S00
DR Vehicles - SO
7S,515.50
4500 63000500
S0393040
DR Vehicles - Constable Pct. 44
6,050.68
I
r
I
I
General Capital Improvement
Fund:
SO and Constable Pct. 94
Reallocation of funds
to pujchqse arbitrators
for patrol vehicles.