Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2015-11-10 10:00AM REGULAR MEETING
BRAZOSCOUNTY BRYAN,TEXAS -t. ? J'4I -b P R 29 NOTICE OF MEETING AND AGENDA BRAZOS COUNTY COMMISSIONERS COURT THE COMMISSIONERS COURT OF BRAZOS COUNTY WILL MEET IN REGULAR SESSION ON NOVEMBER 10, 2015 AT 10:00 AM IN THE COMMISSIONERS COURTROOM OF THE COUNTY ADMINISTRATION BUILDING, 200 SOUTH TEXAS AVE., SUITE 106, BRYAN, TX 77803 Invocation and Pledge of Allegiance - U.S. and Texas Flag - Chaplain G.H. Jones and Judge Peters 2. Call for Citizen input and/or concerns. Consider and take action on agenda items 3 - 25: 3, Appointment of the following to the Blinn College Board of Trustees term of appointments is December 1 2015 - November 30. 2017. s a. Nancy Berry • b. Ann Horton 4. Nomination of Duane Peters to serve on the Board of Directors of Brazos Transit District 5. Request to perform US Army Special Operations military training Unconventional Warfare Exercise 16 in Brazos County. 6. Approval and signature for the Non -Profit Organization Application for Brazos County Inmate Work Crew Labor to help with the Aggieland Humane Society Weinerfest - 11/14/15 and 11/15/15. 7. Request from the District Attorney's Office for the following personnel changes effective December 5 2015 This change will increase the District Attorney's FY 16 budget in the amount of $10.015.00. 91 • Increase the Assistant DA Class Code 0415 Position 11, Group NA Step NA, Biweekly Rate of $2.671.76 to Biweekly Rate of $3.053.44, Pay Code 013 Vol. Pg__ 123 - g, Consider and take action on the proposed Reimbursement Agreement between Brazos County and the BVCOG for the radio tower license agreement between BVCOG and Bryan Broadcasting. 10. Approval to issue a county diners club credit card to Sheriffs Office employee Garrett House with a credit limit of $1.000.00 for travel purposes. 11. Change order to purchase order #16000673 to Austin Environmental in the amount of $8.010 for additional asbestos that was found for Phase V of courthouse. 12. Permission to advertise bid # 2016-022 Tree Trimming and Removal Services. 13. Renewal of contract for Uniform Rental 2016441R with Aramark Uniforms. 14. Permission to advertise RFP # 2016.144, Courthouse Renovation- Phase V. 15. Approval of evaluation committee for RFP # 2016-144 Courthouse Renovation- Phase V: • a. Judge Peters • b. Gary Arnold • c. Irene Jeff • d. Brian Baker • e. Legal (non-voting) • f. Purchasing (non-voting) • g• Fred Patterson (non-voting) 16. Precinct 1. 17, Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Forsthoff Road 1.425 feet northeast of FM 2038. Line will provide service to customer at 10999 Forsthoff Road. Site is located in Precinct 2. 16. Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 4 -inch water line crossing under Old Reliance Road 800 feet northeast of Reliance Church Road. Site is located in Precinct 2. 19. Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Riley Road 200 feet southeast of FM 1179. Line will provide service to customer at 6986 Riley Road. Site is located in Precinct 2. 20, Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Reed Lane 0.6 mile northwest of Dilly Shaw Tap Road. Line will provide service to customer at 2162 Reed Lane. Site is located in Precinct 2. 21. Consider and take action on the Wickson Creek Special Utility District utility pernit to construct a road bore for a 1 -inch water line crossing under Weedon Loop 1,160 feet southwest of Treebrook Lane. Line will provide service to customer at 9114 Weedon Loop. Site is located in Precinct 2. 22. The Reviat of Lot 27R Block 3 Riverstone Subdivision Phase Two: Volume 12596, Page 258 (Official County. Texas. Site is located in Precinct 2. 23. Budget Amendments. Budget Amendments FY 14/15 57.1 - 57.5 Budget Amendments FY 15116 7.1 - 7.8 24. Personnel Change of Status. Personnel Action Forns Vol. ;? 119 Pg,- �� C-/ 25. Payment of Claims, 26. Acknowledgement of the monthly reports submitted in October 2015 27, Acknowledgement of the submission of the FY 2015 Chapter 59 Asset Forfeiture Report for the Sherifrs Office. 28, Acknowledgement of the submission of the FY 2015 Chapter 59 Asset Forfeiture Report for Constable Pct. 1. 29, Acknowledgement of the submission of the FY 2015 Chapter 59 Asset Forfeiture Report for Constable Pct. 4. 30. Sheriffs Report on Inmate Population. 31. Announcement of interest items and possible future agenda topics. 32. Call for Citizen input and/or concerns. 33. Adjourn. Vol. C� 1 9 Pg. /� 5 PUBLIC COMMENTS Public Comment during the Commission Meeting may be for all matters, both on and off the agenda, and be limited to four minutes per person. Persons are invited to submit comments in wilting an the agenda items and/or attend and make comment at the Commission meeting. Members of the public are reminded that the Brazos County Commissioners Court is a Constitutional Court, with both judicial and legislative powers, created under Article V, Section 1 and Section 18 of the Texas Constitution. As a Constitutional Court, the Brazos County Commissioners Court also possesses the power to issue a Contempt of Court Citation under Section 81.024 of the Texas Local Government Code. Accordingly, members of the public in attendance at any Regular, Special and/or Emergency meeting of the Court shall conduct themselves with proper respect and decorum in speaking to, andlor addressing the Court; in participating in public discussions before the Court/ and in all actions in the presence of the Court. Those members of the public who are inappropriately attired and/or who do not conduct themselves in an orderly and appropriate manner will be ordered to leave the meeting. Refusal to abide by the Court's Order andlor continued disruption of the meeting may result in a Contempt of Court Citation. It is not the intention of the Brazos County Commissioners Court to provide a public Forum for the demeaning of any individual or group. Neither is it the intention of the Court to allow a member (or members) of the public to insult the honesty andlor integrity of the Court, as a body, or any member or members of the Court, or County employees, individually or collectively. Accordingly, profane, insulting or threatening language directed toward the Court and/or any person in the Court's presence and/or racial, ethnic or gender slurs or eotmets will not be tolerated. Violation of these rules may result in the following sanctions: 1. cancellation of a speakers time; 2. removal from the Commissioners Court; 3. a Contempt Citation; and/or 4. such other andlor criminal sanctions as may be authorized under the Constitution, Statutes and Codes of the State of Texas. The County Commissioners Court can deliberate or take action only if a matter has been listed on an agenda property posted prior to the meeting. During the public comment period, speakers may address matters not listed on the published agenda. The Open Meeting Law does not expressly prohibit responses to public comments by the Commissioners Court. However, responses from the County Judge or Commissioners to unlisted public comment topics could become deliberation on a matter without notice to the public. To ensure the public has notice of all matters the Commissioners Court will consider, the County Judge and/or Commissioners may choose not to respond to public comments, except to correct factual inaccuracies, recite existing policy in response to an inquiry or to ask that a matter be listed on a future agenda. See Texas Open Meetings Act 1 551.042. INVOCATION Any invocation that may be offered before the official start of the Court meeting shall be to and for the benefit of the Court. The views or beliefs expressed by the invocation speaker have not been previously reviewed or approved by the Court and do not necessarily represent the religious beliefs or views of the Court in part or as a whole. No member of the community is required to attend or participate in the invocation and such decision will have no impact on their right to actively participate in the business of the Court The Commissioners Courtroom of the County Administration Building, 200 South Texas Ave., Suite 106, Bryan, TX 77803 is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive services must be made two working days before the meeting. To make arrangements, please call (979) 3614102. Vol. Pg.; -� BRAZOSCOUNTY BRYAN,TEXAS MINUTES November 10, 2015 BRAZOS COUNTY COMMISSIONERS COURT REGULAR MEETING 0 Signature Page.pdf 92 File Stamped Agenda.pdf G Sign in sheet.pdf A regular meeting of the Commissioners' Court of Brazos County, Texas was held in the Brazos County Commissioners Courtroom in the Administration Building, 200 South Texas Avenue, in Bryan, Brazos County, Texas, beginning at 10:00 a.m. on Tuesday, November 10, 2015 with the following members of the Court present: Duane Peters, County Judge, Presiding; Lloyd Wassermann, Commissioner of Precinct 1; Sammy Catalena, Commissioner of Precinct 2; Kenny Mallard, Commissioner of Precinct 3; Irma Cauley, Commissioner of Precinct 4; Karen McQueen, County Clerk. The attached sheets contain the names of the citizens and officials that were in attendance. Invocation and Pledge of Allegiance - U.S. and Texas Flag - Chaplain G.H. Jones and Judge Peters 2. Call for Citizen input and/or concerns. There was no citizen's input. Consider and take action on agenda items 3 - 25: 3. Appointment of the following to the Blinn College Board of Trustees; term of appointments is Vol. c Pg. December 1, 2015 - November 30, 2017. . a. Nancy Berry . b. Ann Horton e Item 3.odf Motion: Approve , Moved by Commissioner Irma Cauley, Seconded by Commissioner Kenny Mallard. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann. 4. Nomination of Duane Peters to serve on the Board of Directors of Brazos Transit District. IG Item 4.0 Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner LLoyd Wassermann. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters, Wassermann. 5. Request to perform US Army Special Operations military training Unconventional Warfare Exercise 16 in Brazos County. 2 Item 5.odf Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by County Judge Duane Peters. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann . 6. Approval and signature for the Non -Profit Organization Application for Brazos County Inmate Work Crew Labor to help with the Aggieland Humane Society Weinerfest - 11/14/15 and 11/15/15. e Item 6.odf Motion: Approve, Moved by Commissioner LLoyd Wassermann, Seconded by Commissioner Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters, Wassermann. Request from the District Attorney's Office for the following personnel changes effective December 5, 2015. This change will increase the District Attorney's FY 16 budget in the amount of $10,015.00. . Increase the Assistant DA, Class Code 0415 Position 11, Group NA Step NA, Biweekly Rate of $2,671.76 to Biweekly Rate of $3,053.44, Pay Code 013 12 Item TO The position of Appellate Assistant District Attorney was added during the Budget Hearings with the assumption that the employee would not have previous experience, however the person hired for this position has significant appellate experience. Motion: Approve. Moved by Commissioner Irma Cauley, Seconded by Commissioner Sammy Catalena. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters Wassermann. 8. Request approval on the Capital Improvement Program for Fiscal Years 2016-2020. TR Item 8.odf A copy of the program is attached. Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner Vol. _c� Pg. a Kenny Mallard. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters Wassermann. 9. Consider and take action on the proposed Reimbursement Agreement between Brazos County and the BVCOG for the radio tower license agreement between BVCOG and Bryan Broadcasting. IR Item 9.pdf Commissioner Mallard explained the need for the additional tower. Judge Peters agreed saying this additional tower would be helpful to Law Enforcement in Brazos County and the surrounding counties. Motion: Approve , Moved by Commissioner Kenny Mallard, Seconded by Commissioner Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley, Mallard , Peters, Wassermann. 10. Approval to issue a county diners club credit card to Sheriffs Office employee Garrett House with a credit limit of $1,000.00 for travel purposes. IR Item 10.pdf Motion: Approve , Moved by Commissioner LLoyd Wassermann, Seconded by Commissioner Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters, Wassermann. 11. Change order to purchase order #16000673 to Austin Environmental in the amount of $8,010 for additional asbestos that was found for Phase V of courthouse. 0- Item Modf A copy of the change order is attached. Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters, Wassermann . 12. Permission to advertise bid # 2016-022 Tree Trimming and Removal Services. Item 12.pdf Motion: Approve , Moved by Commissioner LLoyd Wassermann, Seconded by Commissioner Sammy Catalena. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann. 13. Renewal of contract for Uniform Rental 2016-141 R with Aramark Uniforms. 0 Item 13.pdf A copy of the renewal of contract is attached. Motion: Approve , Moved by Commissioner Irma Cauley, Seconded by Commissioner Sammy Catalena. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann . 14. Permission to advertise RPP # 2016-144, Courthouse Renovation- Phase V. ® Item 14.0 Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner Kenny Mallard. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann. 15. Approval of evaluation committee for RFP # 2016-144, Courthouse Renovation- Phase V: . a. Judge Peters . b. Gary Arnold . c. Irene Jett Vol. _-� Pg• �/ ! - . d. Brian Baker . e. Legal (non-voting) . f. Purchasing (non-voting) . g. Fred Patterson (non-voting) 0 Item 15.odf Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner LLoyd Wassermann. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters, Wassermann. 16. Consider and take action on the Wellborn Special Utility District utility permit to construct a road bore for a 8 -inch water line crossing under Clay Pit Road 150 feet Southwest of Stousland Road. Line improvements are being made for service to Cedar Rock Addition on Clay Pit Road. Site is located in Precinct 1. IU Item 16.pdf Motion: Approve , Moved by Commissioner LLoyd Wassermann, Seconded by Commissioner Sammy Catalena. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters, Wassermann. 17. Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Forsthoff Road 1,425 feet northeast of FM 2038. Line will provide service to customer at 10999 Forsthoff Road. Site is located in Precinct 2. 11-t Item 17.odf Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters, Wassermann. 18. Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 4 -inch water line crossing under Old Reliance Road 800 feet northeast of Reliance Church Road. Site is located in Precinct 2. m Item 18.odf Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner LLoyd Wassermann. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann. 19. Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Riley Road 200 feet southeast of FM 1179. Line will provide service to customer at 6986 Riley Road. Site is located in Precinct 2. IM Item 19.pdf Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner Kenny Mallard. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann. 20. Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Reed Lane 0.6 mile northwest of Dilly Shaw Tap Road. Line will provide service to customer at 2162 Reed Lane. Site is located in Precinct 2. 0 Item 20.odf Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner LLoyd Wassermann. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann. 21. Consider and take action on the Wickson Creek Special Utility District utility permit to construct FVol. Pg. /3C� a road bore for a 1 -inch water line crossing under Weedon Loop 1,160 feet southwest of Treebrook Lane. Line will provide service to customer at 9114 Weedon Loop. Site is located in Precinct 2. LU Item 21.0f Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann. 22. The Replat of Lot 27R, Block 3 Riverstone Subdivision Phase Two; Volume 12596, Page 258 (Official Records of Brazos County) & Lot 28, Block 3 Riverstone Subdivision Phase Two; Volume 9322, Page 190 (Official Records of Brazos County); 2.124 Acres; John Austin League, A-2; (Bryan ETJ) Brazos County, Texas. Site is located in Precinct 2. IM Item 22.ndf Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner LLoyd Wassermann. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters, Wassermann. 23. Budget Amendments. Budget Amendments FY 14/15 57.1 - 57.5 [U Item 23 - FY 14 15 Amendments.odf 57.1 Reallocate funds for Jail Administration. 57.2 Transfer of funds from Jail Administration to Jail Medical Clinic. 57.3 Reallocate funds for Jail Medical Clinic. 57.4 Transfer of funds from DDEA to Tax Office Building. 57.5 Reallocate funds for Jail Administration. Budget Amendments FY 15/16 7.1 - 7.8 [M Item 23 - FY 15 16 Amendments.odf 7.1 Reallocate funds for Records Management. 7.2 Reallocate funds for Fleet Maintenance Building. 7.3 Reallocate funds for Fleet Maintenance Services. 7.4 Transfer of funds from General Fund Contingency to Departmental DDEA. 7.5 Reallocate funds for General Capital Projects - Purchasing. 7.6 Reallocate funds for General Capital Projects - Jail. 7.7 Reallocate funds for Emergency Management. 7.8 Transfer funds from General Fund Contingency to Information Technologies. Motion: Approve , Moved by Commissioner Irma Cauley, Seconded by Commissioner Kenny Mallard. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann. 24. Personnel Change of Status. Personnel Action Forms M-- Item 24.)d A copy of the Personnel Change of Status requests is attached. Motion: Approve , Moved by Commissioner Irma Cauley, Seconded by Commissioner LLoyd Wassermann. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann. 25. Payment of Claims. m BILL LIST 11.10.15.pdf 2 Claims Sheet.pdf 7138611-7138802 Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner LLoyd Wassermann. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters , Wassermann. 26. Acknowledgement of the monthly reports submitted in October 2015. Ut Item 26.pdf The Court acknowledged receipt of the Extension Service reports submitted in October 2015 and acknowledged receipt of reports from the following County and Precinct Offices showing revenues collected and remitted to the County Treasurer: County Clerk District Clerk Justice of the Peace Precinct 1 Justice of the Peace Precinct 2 Justice of the Peace Precinct 3 Justice of the Peace Precinct 4 Constable Precinct 1 Constable Precinct 2 Constable Precinct 3 Constable Precinct 4 Road & Bridge Sheriff 27. Acknowledgement of the submission of the FY 2015 Chapter 59 Asset Forfeiture Report for the Sheriffs Office. 0 Item 27.pdf The Court acknowledged receipt of the FY 2015 Chapter 59 Asset Forfeiture Report for the Sheriffs Office. A copy is attached. 28. Acknowledgement of the submission of the FY 2015 Chapter 59 Asset Forfeiture Report for Constable Pct. 1. 0 Item 28.pdf The Court acknowledged receipt of the FY 2015 Chapter 59 Asset Forfeiture Report for Constable, Precinct 1. A copy is attached. 29. Acknowledgement of the submission of the FY 2015 Chapter 59 Asset Forfeiture Report for Constable Pct. 4. IM Item 29.pdf The Court acknowledged receipt of the FY 2015 Chapter 59 Asset Forfeiture Report for Constable, Precinct 4. A copy is attached. 30. Sheriffs Report on Inmate Population. Sheriff Chris Kirk stated there were 597 inmates in jail, 71 have electronic monitors and 16 are pending for monitors. 31. Announcement of interest items and possible future agenda topics. There were no announcements. 32. Call for Citizen input and/or concerns. Chaplain Jones announced that his birthday is Wednesday, November 11, 2015. Commissioner Wassermann thanked Chaplain Jones for visiting his wife, son, and himself during their recent hospital stays. Judge Peters also thanked Chaplain Jones for his 34 years of service as Chaplain for the Sheriffs Office and service to the Court. Commissioner Catalena announced that the County Employee Chili Luncheon will be on Thursday, November 12, 2015 at 11:30 a.m. to 1:30 p.m. at the Brazos Center. 33. Adjourn. E-- The foregoing minutes of the Commissioners Court meeting held November 10, 2015 have been examined and are approved in open Court this day of 2015, in Bryan, Brazos County, Texas. Duaneeters Lloyd(Wassermann County Judge Commissioner, Precinct 1 Sammy Catal a Kenny Mall`ar Commissio r, Precinct 2 Commissioner, Precinct 3 Commissioner, Precinct 4 Attest: Vol. T y _ Pg. /.3�q BRAZOS COUNTY COMMISSIONER'S COURT —QDAY Name PRLNT) 20L5- Organization 0LS Organization (PLF.A.SE PRINT) Vol. rPg. /- 5� , 20IL BRAZOS COUNTY COMMISSIONER'S COURT Name PRD\TT> i e Organization Vol. ;? �,- 9 . Pg. /3� O a CL F a 0 w i.i Z Vol. pg /.3% ` F 5 z S r Z Qrlun � k ni CC z tl , R F F' E tl N U T 002 5d ov,a" wx tl F tl � w x w O a CL F a 0 w i.i Z Vol. pg /.3% ` F 5 �w='FcC Z O a CL F a 0 w i.i Z Vol. pg /.3% ` w O a G VOI. . pq9 0 � ,yn 0 m a Z v O N U o O 0 T m y� O Z O O O O n N v .o: a C1� N N' O O z z � o c mss• ro � L � ' MAP a a � w O a G VOI. . pq9 0 0 0 0 m a P O O o O 0 T m y� O Z O O O O n N v .o: a C1� N N' O O z z � o N ' T a � ' MAP w O a G VOI. . pq9 F a P O O O VI F Z CC.aF`=C w O a G VOI. . pq9 I BRYAN BROADCASTING RADIO TOWER LEASE REIMBURSEMENT AGREEMENT This Radio Tower Lease Reimbursement Agreement ("Agreement") is between BRAZOS COUNTY (hereinafter "County") and the BRAZOS VALLEY COUNCIL OF GOVERNMENTS (hereinafter "BVCOG"). The purpose of the Agreement is to provide for the reimbursement of lease fees and utilities fees incurred by BVCOG as a result of their administration of the Tower Site License Agreement ("Tower License") between BRYAN BROADCASTING CORPORATION, a Delaware corporation ("Licensor"), and the BRAZOS VALLEY COUNCIL OF GOVERNMENTS ("Licensee") (Attached as Attachment "A"). RATES FOR REIMBURSEMENT The County agrees to reimburse the cost of the administration of the Tower License. These cost include: from and after December 3, 2015 ("Commencement Date"), the County shall pay BVCOG Two Thousand Nine Hundred Forty Dollars ($ 2,940.00) per quarter ("License Fee") for the 2016 fiscal year in quarterly installments, provided, however, that the License Fees shall increase annually during the term of the License, effective as of each anniversary of the Commencement Date, by an amount equal to three percent (3%) per annum above the amount of the License. Additionally, the County agrees to pay BVCOG Three Hundred Sixty Dollars ($ 360.00) per quarter ("Utilities Fee') for the 2016 fiscal year in quarterly installments. RESPONSIBILITIES OF BVCOG For and in consideration of the funding provided by the County, the BVCOG agrees to administer the Tower License pursuant to all laws and regulations of the United States and the State of Texas in the best interest of the County. TERM This Agreement is for one (1) year, from October 1, 2015 until September 30, 2016. CANCELLATION This Agreement may be cancelled by either of the parties hereto upon sixty (60) days written notice. Page 1 Vol. .. Pg. z� AUDIT BVCOG agrees that County, or its designated representative, shall have the right to review and to copy any records and supporting documentation pertaining to the performance of this Agreement. BVCOG agrees to maintain such records for possible audit for a minimum of three (3) years after the termination date of this Agreement, unless a longer period of records retention is stipulated. BVCOG agrees to allow the auditor(s) access to such records during normal business hours and to allow interviews of any employees who might reasonably have information related to such records. BVCOG agrees that County, or its designated representative, shall further have the right to review and to copy any records and supporting documentation for prior years in which County provided funds to the BVCOG under prior Agreements. Any audit will be conducted by County personnel or an independent third party, as determined by the Brazos County Commissioners Court. If the Brazos County Commissioners Court determines that the audit will be conducted by an independent third party, all costs and expenses associated with said audit will be solely paid for by County. During said audit, BVCOG shall require that a management letter be prepared by auditor. The management letter shall identify issues not required to be disclosed in the annual financial report but shall state any concerns and suggestions noted during the audit. Annual financial statements (audited if available) are available to the Brazos County upon request within six (6) months of completion. INDEMNITY Any monetary loss suffered by the County from mistake, fraud or other conditions can be recovered from the BVCOG only to the extent of available insurance. AMENDMENT This Agreement shall be automatically amended by the amendments made to the Act by the State Legislature. In all other respects, this Agreement may be modified, amended, altered or extended only by a written amendment signed by the parties. GOVERNING LAW This Agreement shall be executed in and shall be governed by the laws of the State of Texas. Venue shall be in Brazos County, Texas. FURTHER ASSURANCES Each party hereto agrees to perform any further acts and to execute and deliver any further documents, which may be necessary to carry out the provisions of this Agreement. _ Page 2 E .2Vol.._ � pg, 6261- FORCE MAJEURE Neither party shall be liable for any failure or delay in performance under this Agreement (other than for delay in the payment of money due and payable hereunder) to the extent said failures or delays are proximately caused by causes beyond that party's reasonable control and occurring without its fault or negligence, including, without limitation, failure of suppliers, subcontractors, and software providers, phone and internet service providers, carriers, or other parties to substantially meet its performance obligations under this Agreement, provided that, as a condition to the claim of nonliability, the party experiencing the difficulty shall give the other prompt written notice, with full details following the occurrence of the cause relied upon and an expected date when obligations under this Agreement will be resumed. SEVERABILITY If any clause or provision hereof is invalid, unenforceable or illegal under present or future laws, or held to be invalid by a court of competent jurisdiction, the validity and enforceability of the remaining provisions or portions hereof shall not be affected. ENTIRE AGREEMENT This Agreement contains the entire agreement between the parties. There are no representations, agreements, arrangements or understandings, oral or written, between or among the parties hereto, relating to the subject matter of the Agreement, which are not fully expressed herein. FISCAL FUNDING Notwithstanding any provisions contained herein, the obligations of the County under this Agreement are expressly contingent upon the availability of funding for each item or obligation contained herein for the term of the Agreement and any extension thereto. BVCOG, or any other person or entity directly or indirectly employed by the BVCOG or any other person or entity to whom the BVCOG may be liable to, shall have no right of action against the County in the event the county is unable to fulfill its obligations under this Agreement as a result of lack of sufficient funding for any item or obligation from any source utilized to fund this Agreement or failure to budget or authorize funding for this Agreement during the current or future fiscal years. In the event that the County is unable to fulfill its obligations under this Agreement as a result of lack of sufficient funding, or if funds become unavailable, the County may, in its sole discretion, provide funds from a separate source or may, in its sole discretion, terminate this Agreement by written notice to the BVCOG at the earliest possible time under the circumstances. Page 3 Vol. Pg, /SL/- EFFECTIVE the 1 ' day ofo' Q�&-, 2015 BRAZOS COUNTY By: I)/0 /> Judge Duane Peters BRAZOS VALLEY COUNCIL OF GOVERNEMENTS By: Date Michael Parks, Assistant Executive Director -----On Behalf of ----- Tom Wilkinson, Executive Director -- ----- Page AUSTIN ENVIRONMENTAL, INC. P.O:"Bdx 3725" Bryan, Texas 77805-3725 979-778-2699 pdehlinger@austinenv.com REVISED -Asbestos Consulting Services Proposal Date: September 25, 2015 Project Name: Brazos County Courthouse Location: 200 East Wm. J. Bryan Parkway, Bryan, Texas Project Contact: Charles Wendt Telephone No.: 979.775-7400 cwendt@co.brazos.tx.us Description of Services: Perform asbestos project design, asbestos project management and asbestos air monitoring for Phase 5 of the Brazos County Courthouse Renovation Project in Bryan, Texas. Austin Environmental Inc., will provide asbestos project design with bid documents, asbestos air monitoring and asbestos project management to comply with the Texas Asbestos Health Protection Rules TAC 295. 34 and the National Emissions Standards for Hazardous Air Pollutants (NESHAP) 40 CFR Part 61, subpart M. OSHA asbestos regulations. PROPERTY OWNER/OPERATOR IDENTIFICATION: Name: Commissioners Court -Brazos County Address: 200 S. Texas Ave., Bryan, Texas 77802 Attention: Charles Wendt INVOICING: Asbestos Project Design/Bid Documents Nine hundred fifty dollars and no/100.......................................$950.00 Asbestos air monitoring/Project Management Per 8 Hour Day Four hundred fifty dollars and no/100 .......................$450.00/Per 8 Hour Day Estimate 6 hrs/day for the duration of the project depending on the Asbestos Abatement Contractors work schedule. Abatement should not exceed 41 days. Fifty-five ($55.00) dollars per hour over 8 hour work day. ** Should the asbestos abatement contractor take more than the 41 working days, Brazos County will be billed for an additional air monitoring day. Price includes normal working hours and days. 7am-6pm Monday thru Friday. — -- —" "-- _- Asbestos Abatement Report Two hundred fifty dollars and no/100...............................$250.00 Per report Austin Environmental Inc, Excludes the following from the Proposal: 1. DSHS asbestos fees to be paid by Brazos County. 2. Replacement Cost. 3. Asbestos Contractor Occupational Safety and Health Personal Monitoring. 4. Removal/Disposal of hazardous materials. Vol. T Pg. ��_� September 25,-2015 Page 2 5. Inspection/ Testing of Hazardous materials outside the scope of work (ie., mercury vapor, mold, indoor air quality, PCB's, radon, etc.,) 6. ACM or ACBM hidden or enclosed in building materials that are not removed until construction activities. Destructive sampling will be minimized due to the occupancy of the building. RACM, Category I and Category 2 nonfriable asbestos containing materials may exist in wall cavities, behind brick, roofing materials and isolated in crawlspaces and confined spaces. Austin Environmental Inc., proposes to do the work for a price not to exceed: Twenty four thousand nine hundred ten dollars and 00/100 ...................$24,910.00** Austin Environmental Inc.,/Paul B. Dehlinger fee is based on the scope of work described in the proposal. If the proposal is accepted please indicate with signature below and return proposal. Proposal is valid for a period not to exceed 30 days. Accepted by: Date V I 14; Vol. p9, /�� Brazos County Purchasing Department .200 SOUTH TEXAS AVE SUITE 352 BRYAN, TX 77803 PHONE(979) 3614290 FAX (979).361-4293 October 14, 2015 Drew Fontaine Aramark Uniforms 10110 Cash Road Stafford, TX 77477 Attn: Drew Fontaine Re. Renewal ofContraetfor Unifprtcc Recital 1016-14IR Phone: 281-883-9084 Fax: Emai l: drew,fontaine@uni Corr i.aramark.com Brazos,County would like toexercisethe renewal option for Uniform Rentals=prrvlously known as 2674-191? and 2012-15. All terms, conditions, shall remain the same.. After Commissioner's Court approval, the renewal will start March 1, 2016 through February.28, 2018. To accept the renewal option, please fill out the information and sign below. Return the signed document by mail to cnorlon@countybmzostx.gov or fix to: (979) 361.4293. Please then submit the original signed documents and an updated Certificate of Insurance by mail to the address listed above. Please return acceptance as soon as possible. If you have any questions, Imay be:reached at (979) 361.4291. ComactName; �—d nrkL Telephone: �! 4 4-i� E) E -Mail: CG M - ;)?7— Ifc)7 Dtune Peters, County Judge 11( Dare Vol. Pg._/ 13 -Unifar-rn Re-nte-d ------------- - 2016-141 R Previously known as 2014-19R and 2012-15 March 1, 2016 - February 28, 2018 k'ti j. Holdings LP -G-&Ki' "ge rvlces,�" Aramark- ms UNIFORMS Shirt: Poplin,polyester, cotton blend w/ High Visibility Striping - Mans $4.73 $3.50 $2.35 Shirt: Poplin,polyester, cotton blend w/ High Visibility Striping - Womens $4.73 No Bid $2.35 Shirt:Poplin, polyester, cotton blend $2.09 $2.42 $2.50 Shirt: Poplin, 100% cotton, long sleeve $3.30 $3.60 $3.00 Shirt: Poplin, 100% cotton, High Visibilty Striping $5.50 $4.95 $3.00 Parts: Pleated, polyester, wool blend $3.63 $3.00 $2.50 Pants: Jeans, denim, 100% cotton $3.46 $3.00 $3.25 Pants: Jeans, denim, 100% cotton Womer $3.46 $3.00 $2.50 Pants: Non pleated pants, polyester cotta r $3.30 $2.43 $2.50 Pants: Coveralls $4.95 $5.00 $1.00 SMOCK $4.84 $1,75 $100 LAB COATS $2.75 4425 $3.75 JACKETS $5.94 $0.50 $0.40 ENVIRONMENTAL CHARGE 5% of weekly invoice $6.95 $0.00 SIZE CHANGE $13.75 $2.00 $0.00 PATCH SEWING12 PATCHES $1.25 No Bid $1.00 MOP HEADSIcost per head 24" Dry Mop Head w/handle $0.64 $0.71 $1,00 1 36" Dry Mop Head w1ha dle $0.95 $0.92 $1.15 Wet Mop with handle $1.11 $1.06 $2.25 FLAT ENTRANCE MATS 3 x 4 Mats $2.25 $1.50 $1.50 4 x 6 Mats $2.75 $2.30 $3.50 3 x 10 Mats $3.25 $3.25 $4.50 UNIFORM CONTROL SYSTEM Scanned Garments Scanned Garments Lockers I DELIVERY CHARGE PER MILE $0.00 $0.00 MINIMUM DELIVERY CHARGE $35.00 $25.00 -$0.00 $0.00 i Delivery of New Uniforms with in - Days 5-7 Days after Order is placed 28 Days after Order is placed 7 Days after Order is placed EMERGENCYCHARGE $0.00 $0.00 $0.00 ENVIRONMENTAL FUEL CHARGE 5% $0.00 $6.00 1 OTHER CHARGES NOT LISTED $0.00 $0.00 $000 lUniforms Recamolend Award Aptve ,byr-o ss;M&Zj �rtonthis-lc Y of 0" 2015 by` ding the position c %.n" I - -7T-- 01 17 CP9 Brazos_C_ounty Purchasing Department 200 S. TX AVE., SUITE 352 BRYAN, TX 77803 PHONE (979) 361-4290 FAX (979) 361-4293 BRAZOS COUNTY BID/RFP/RFQ DOCUMENTATION SHEET The Purchasing Department would like to request Commissioner's Court approval to advertise and go out for proposals on the following: DATE: November 4. 2015 BID NUMBER: REQUEST FOR PROPOSAL NUMBER: 2016-144 REQUEST FOR QUALIFICATIONS NUMBER: TITLE: Courthouse Renovation- Phase V REQUESTING APPROVAL SIGNATURE: DATE APPROVED: Count Judge i� �lo�lh iq - _ _.-------BRAZOS COUNTY ----- COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: November 10, 2015 SUBJECT: Utility Permit — Wellborn Special Utility District Consider and take action on the Wellborn Special Utility District utility permit to construct a road bore for a 8 -inch water line crossing under Clay Pit Road 150 feet Southwest of Stousland Road. Line improvements are being made for service to Cedar Rock Addition on Clay Pit Road. Site is located in Precinct 1. SUBMITTED BY: Darrell W. Kolwes Right of Way Agent This request is ACKNOWLEDGED BY: Lloyd tasscrinann Commissioner Precinct 1 Duane Peters, County Judge DATE: '�7 Vol. _ pg�-/ Z/ nmissioners' Court APPLICATION FOR WATER UTILITY PERtMIT DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS Pursuant to the Texas Utility Code, Section 181.024, comes now WELLBORN SPECIAL UTILITY DISTRICT [company name], hereinafter referred to as "Company" a Texas [state] Corporation, with authority to transact business in Texas, acting by and through its duly authorized representative, and hereby petitions the County Engineer for the right to lay, construct, maintain, repair and/or operate a gas facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached hereto and said location described as follows: Facilitv to Cross Road Length of TYPE, OF CONSTRUCTION Road Name & Block Number Crossing CHECK ONE) Bored Jacked Driven Cased CLAY PIT ROAD 5600) 40 ft. X X X Facilitv to Parallel County Road Within Rieht-Of-Way Road Name and Block Number From To Depth Distance CONSTRUCTION TYPE 8" (ALT 10") Diameter 0.25" Wall Thickness 16" (ALT I8") Steel Encasement Pipe Material Specification SDR 18 PVC Maximum Operation Pressure 125 PSI The location and description of the proposed installation and appurtenances must be fully shown on the attached detailed drawings. The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and shall complete said construction /work within 60 working days. (COMPANY MUST FILL Irk. If such construction is not begun by the 60'h day, Company will be required to apply for a new permit. Company declares that prior to filing this application, it has ascertained the location of all existing utilities, both aerial and underground, and the filing of this application is prima facie evidence that the proposed installation will not conflict with any existing utility. A copy of this permit shall be kept at thejob site any time work is being performed. It is expressly stipulated that this Permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or vest any property right in said holder. It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the County's right, title and interest in the land to be entered upon and used by the holder and the holder will at all times assume risk of and indemnify, defend and save harmless Brazos County from and against any and all loss, damages, cost or Vol. aZ r pg. /`�/� expense arising in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights and privileges. - Any deviation from these specifications must be approved by Brazos County Engineer's Office or its designated representative. Approval of County Engineer's Office may take as long as two weeks after complete application is received. Applicant agrees to comply with all rules of the County Commissioners and the County Engineer in construction of said installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated herein for reference. In the event Company fails to obtain a permit prior to the installation or does not install utilities in compliance with installation requirements set forth herein (i.e. depth, location, etc), Company assumes all financial responsibilityfor damages and/or destruction of lines, cables, etc. based upon its failure to comply with Brazos County requirements. Applicant agrees that if Brazos County demonstrates a violation of the terms of this policy, Applicant stipulates that requisites for injunctive relief exist and that Brazos County is entitled to relief enjoining any conduct by applicant which is contrary to the policies. This permit is a revocable permit. Brazos County reserves the right to revoke this permit at any time, in the sole discretion of Brazos County, for interests ofpublic health, safety or welfare, or for failure to repair any damages upon demand, or for any other reason deemed sufficient by Brazos County. %e the event Company fails to comply with any or all of the requirements as set forth herein, the County may take such action as it deems appropriate to compel compliance. The County Engineer further retains the right to revoke this Permit by verbal notification to the ApplicamlCompany. Failure to obtain this permit and/or notify the County Engineer's Office within 24 hours of beginning construction shall constitute grounds for job shutdown. By signing below, I certify that I am authorized to represent the Company listed below, and that the Company agrees to the conditions/provisions included in this permit. WELLBORN SUD TECHNICAL CONTACT: WINN PROFESSIONAL ENGINEERS WALTER T. WINN, JR., P.E. P.O. BOX 2727 LONGVIEW, TX 75606 (903) 553-0500 TWINN@WINNPEC.COM Company Name ST PHEN CAST By: �J � Signature GENERAL MANAGER Title 4118 GREENS PRAIRIE RD. Address WELLBORN TX 77881 City (979)690-9799 State Zip Phone Number WSUD.SC@VERIZON.NET Email VOL 2 pg. /S� WATER UTILITY APPROVAL Brazos County -offers no objection to -the proposed location -of the utility in the County right "of way as' shown -by accompanying drawings and notice dated t5- except as noted below: EXCEPTIONS: (Month/Day/Year) � b. w, 4v Brazos County Engineer VOL �_� �_ Pg � . �Lr y ��, yam `{•'ry pa N tit v.� xt x n P t S �W X. t h r a ct �y f 9.t ir�l s� t'•.. c Mfi w ` l r s F s J S� F t `D Y/ r- J� d:. r . �Lr y ��, yam `{•'ry pa N tit v.� xt x n P t S �W X. t h r a ct �y f 9.t ir�l s� t'•.. c Mfi w ` l r s F s J S� F t P:\PROJECTS\14—WE\ROAD CROSSING\CLAY PIT RD.DWG I Vol, z pg.%S 1 STATE PLANE COORINATE N = 10,167,426.2 E = 3,568,317.9 \� 9X O 50 10" (ALT. 12") SDR18 // o� RESTRAINED Z RAINED JOINT PVC + SCALE: 1 "=50' `p•�pO / 2 3 �i / PP >< 1< 0ci 0 G G. Ap I o pX fr. LOCATION `� J BORE & INSTALL 40 L.F. w� OF 16" (ALT. 18") STEEL CASING �e ' ,"•a., ° . 1 ' S VICINITY MAP (N.T.S.) 280 ( EXISTING GRADE 280 ` 275 L'L ; T. VdlKIN, 1R, 275 41 412IJ $ STEEL—/.-.., CASING 1`s ''✓ 'S V�1 w Ci fs 270 00 J O O �0 vl 270 I O f0 N N N ! +0 O D 00 addax i F- L(1 N N N N WELLBORN SLD SHEET i.9°5-553,5W CEDAR ROCK ADDITION CLAY PIT ROAD 1 WINN FaoFEs ENGINEERS r.vm-ss,.osss w o w w.wrmI LINE IMPROVEMENTS ROAD CROSSING OF AND PCO Fm Fi.ma raa,a CONSTRUCTORS. LLC I 1 I P:\PROJECTS\14—WE\ROAD CROSSING\CLAY PIT RD.DWG I Vol, z pg.%S 1 TEMPORARY TRAFFIC CONTROL-PLAN-- CLAY ONTROL PLAN -_CLAY PIT RD WATER LINE CROSSING BRAZOS COUNTY This temporary traffic control plan is to be implemented by the construction contractor (Contractor) for the water line crossing of Clay Pit Rd 150 feet southwest of Stousland Rd in Brazos County, Texas. This plan is intended to comply with the Texas Manual of Uniform Traffic Control Devices (MUTCD) published by the Texas Department of Transportation (TxDOT). The Contractor is expected to obtain a copy of this manual or make use of the MUTCD postings on the TxDOT website (www.dot.state.tx.us/business/manuals publications.htm). The work will include boring from fence line to fence line beneath the roadway and open excavation outside the fence line. Thus, all work will be in accordance with the conditions described in the MUTCD under Typical Application 1 — Work Beyond the Shoulder. One sign with the legend "UTILITY WORK AHEAD" (MUTCD Sign CW21- 7) shall be installed on both approaching sides of the roadway 500' from the location of the crossing as shown in the attached MUTCD Figure 61-1-1. Vol. _-� , Ng. / 5J- Figure 6H-1. Work Beyond the Shoulder (TA -1) ®TT I x i *�4wi'DA&D ANE Note: See Table 611-2 for the meaning of symbols. Pos1e�1 "%-Sign Shea S3.aoags UPH tFeet U0 or LESS 20 35 60 40 240 45 320 504.0 55 SCO C3 G00 65 Too TO 6Go Typical Application 1 611-J I ry 71- � a � P 9. /J Y� ...-- BRAZOS-COUNTY-ROADW-A-Y-SAFETY AND ROAD-- - -- - - PRESERVATION STANDARDS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY A. General Requirements 1. Adequate drainage shall be maintained in ditches at all times. 2. Permittee will use best management practices (`BMP'') (EPA and TCEQ both provide lists of examples of BMPs) to minimize erosion and sedimentation resulting from the proposed installation. 3. The permittee shall take precautions to avoid damage to property. All County Right of Way and property shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or appointed representative. 4. The construction and maintenance of such utility shall not interfere with the property or rights of a prior occupant. 5. Permittee shall not interfere with other utilities located in the right of way. In the event damages occur, permittee will be liable to the County or other utilities running through the right of way. 6. County Engineer shall determine whether or not permittee's plans shall inconvenience the public. If it is determined that inconvenience to the public exists, then the County Engineer will decide whether such project will be allowed or if an alternative exists so as not to inconvenience the public. B. Safety Regrtiremertts I . Proper traffic control measures must be put in place prior to beginning work and remain in place during the duration of thejob. All traffic control measures must follow the Texas Manual of Uniform Traffic Control Devices (TMUTCD). See Traffic Control Requirements below. 2. During construction, all safety regulations of the Texas Department of Transportation shall be observed. J. Permittee must take such precautions and measures, including placing and displaying safety devices, as may be necessary, in order to safely conduct the public through the project area. Company shall provide flagmen, signs, signals or devices necessary to provide complete safety to the public. 4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. 5. No cable, conduit and/or pole line shall be laid, constructed, maintained and/or repaired so as to constitute a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved by the County Engineer, I C. Traffic Control Plan I I. A traffic control plan, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided for the following: a. Any construction (i.e. pit, excavation, hole) left open overnight, requires specific niehttime traffic control measures pursuant to the TMUTCD; Vol. o� TJ pg. b. If construction -is within -ten -(-10) feet of the roadway; or-- - - - c. Any work performed in the road right-of-way; 2. Plan must be attached to the permit and kept at thejob site any time work is being performed. 3. Plan must set forth the time of completion for thejob. D. Design Standards 1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation and the pole be placed in the designated area for power specified as set forth in the Texas Utilities Code, Section 181.015. 2. All pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure safety to the public. Any pole placed in violation of this requirement will be required to be moved to the appropriate location at the company's expense. Exceptions may be approved by the County Engineer. All underground installations shall (these are minimum depths - utility may place deeper): a. be placed at a minimum depth of forty-eight (48) inches below the top of the pavement; b. be at least thirty-six (36) inches below ditch flow line when installation is within the area measured from top of bank to top of bank; c. be at least forty-eight (48) inches below ditch flow line if low pressure gas or petroleum lines. For high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below; d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of way of less than 60 feet. 4. Water Lines: All water lines must be a minimum 36 -inches below the ditch flow line and cased. Waterlines shall be cased if crossing under the roadway. 5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within designated locations based upon the type of utility. The locations shall be as follows: (measured from back of right-of-way). Power- 0 to 2 feet, nominally I' Phone - 2 to 4 feet, nominally 3' Gas - 4 to 6 feet, nominally 5' Cable - 6 to 8 feet, nominally T 6. Utilities with less than 60 feet right-of-way in all new developments shall install the utility in a similar manner as referenced in No. 3 above; however, the County Engineer or its designated representative will provide final approval of each utility location. 7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longer than 400' if left open over night or unattended. Crossings under a county road shall: a. be bored or jacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT: b. be pressure grouted for the full length of the crossing if the annular space between pipe and casing and soil exceeds one (1) inch. Brazos County must be given 24 hours notice of pressure groutingi operations and have the opportunity to have an inspector on site to observe pressure grouting 1 operations; P Vol. 9 . /� -c. -Tx-DOT-Standard-Specification Item 476 shall be -followed -for -all -boring jacking; tunneling and joints. - Bore Pits: a. no pits shall remain open longer than 2 days; b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above. c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from the County Engineer or his representative; d. when pits are to remain open for more than 8 hours, due diligence will be used in protecting the spoil pile to prevent drainage problems; e. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity; f. based upon soil conditions, the County Engineer or his representative may require pits be placed further from the edge of road. 10. Any installation within ten (10) feet of edge of pavement shall meet the following: a. location must be approved by the County Engineer or his representative b. backfilled with cement stabilized material. c. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity. d. all excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed during a rainy period or at other times where excess water cannot be prevented from entering the trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized material as soon as weather permits; e. all disturbed base and pavement materials shall be removed and restored to the satisfaction of the County Engineer or his representatives. f. no side or lateral tamping to fill voids under the base and pavement materials is allowed. 11. Company must be careful to notjeopardize the slope or integrity of the shoulder of the road. In the event Company damages the slope, shoulder or any other portion of the right-of-way, Company will be responsible for repairing the damage and replacing the right-of-way to the condition it was prior to commencing construction. 12. Operation of construction and/or maintenance equipment on the traveled surface of any improved County road will not be permitted, except in an instance whereby the laying, construction, maintenance and/or repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided meeting TMUTCD requirements. 13. In the event said construction and/or maintenance and/or repair requires Company to remove, out or jeopardize any section of the road (asphalt, cement, road base, etc.), Company will be required to provide a performance bond or letter of credit securing necessary repairs. Said bond amount will be determined by the County Engineer. 14. The applicant shall submit a letter of "No Objection" from the Army Corps of Engineers for all designated wetlands and environmentally sensitive lands. E. Emerzency work 1. In the event Company is required to perform emergency services, that requires excavation in a County Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Company ___ shall _ngti-fy_County_Engineer_within 24 hoursofbeginning construction/repairs.- ThisauiI]-allow-the----- -- - - County Engineer's Office an opportunity to inspect the site to ensure the integrity of the County Right of Way and traffic safety controls used. F. Repairs to existin; facilities 1. Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the soil, shall not be performed until plans describing such maintenance and/or repair have been approved by the County Engineer or its designated representative and a permit has been obtained. G. Relocation oftailities 1. When and if the County Engineer determines that it is necessary for the construction, repair, improvement, alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or other facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated thereon, as required by the County Engineer within a reasonable time as determined by the County Engineer and Utility Company, and at the expense of the Utility Company. H. Hiah Pressure Pipelines L All utility Penn its for high pressure pipelines (generally 60 PSI or greater), whether pertaining to controlled access or non -controlled access installations, should contain the following additional information in the description of the permit. -diameter -wall thickness -material specification -minimum yield strength -maximum operation pressure of the pipeline 2. With the exception of the maximum operation pressure of the pipeline, this information is to be supplied for both the carrier pipe and the casing. 3. Assurance must also be given that the installation material and design meet the minimum Federal Safety Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed by an authorized representative of the company. 4. Petroleum Pipelines: Depth Type of Pipeline (below deepest ditch rade) Special Requirements Encased Pipe Less than 10' Must be covered with concrete pad at leash 36" deep Encased Pipe Greater than 10' No concrete pad required Non -Cased Pipe Less than 10' Must be covered with concrete pad at least 48" deep Non -Cased Pipe Greater than 10' No concrete pad required Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum' I Under no circumstances will a pipeline be installed parallel to a County Road within the Right -of - Way. Transmission lines have been determined to he petroleum pipelines (which includes natural gas lines) and shall not be parallel to a County Road. 6. Natural Gas Distribution is a line that serves the final customer. __ _ os So - �l w° s S^BA O m NN Ta • ..°I�. o t _ _ _ _ _ _ _ _ _ = _ _ _ _ _ a_ _ W d J • 2 w W � �sVI.WC CpAos Npl.n4C � e c GgeR rr v -y gg I .gig@ y i � �� GGG E��o X •F.B I�33fi J O a @ B y` �6BL6 reN 8a 0 RSR Wg ♦♦ X84 «6=a «--E2BRy 558 0 6C a8 b° -- oP -c---- �s�= .pinryC •�al^aK �5 §a "ba=7Pgb�:g hg.«Si by4y.° �' CON ypp }� E3 fire r,�eR^mR wigs �p€x b &g bPMe -a—ter. °gcg`s �.R �.nn 8tl8n • . gg$ os So - �l w° s S^BA O m NN Ta • ..°I�. o t _ _ _ _ _ _ _ _ _ = _ _ _ _ _ a_ _ W d J • 2 w W � �sVI.WC CpAos Npl.n4C � e c GgeR rr v -y gg I .gig@ y i � �� GGG E��o X •F.B I�33fi J O a @ B y` l �_d85.5^ -°Co 6'6y. 3� Sic 8a 0 Wg ♦♦ X84 «6=a «--E2BRy 558 0 6C �s�= .pinryC I •�al^aK �5 §a "ba=7Pgb�:g hg.«Si by4y.° �' CON ypp }� E3 wigs b °gcg`s • . os So - �l w° s S^BA O m NN Ta • ..°I�. o t _ _ _ _ _ _ _ _ _ = _ _ _ _ _ a_ _ W d J • 2 w W � �sVI.WC CpAos Npl.n4C � e c GgeR rr v -y .gig@ y l .pinryC I •�al^aK wigs MJC ' ow+os• 3goE- P=fki...° ...°"w.• ,us°�..a:.° I� VOL _a Pg, BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: November 10, 2015 SUBJECT: Utility Permit — Wickson Creek Special Utility District Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Forsthoff Road 1,425 feet northeast of FM 2038. Line will provide service to customer at 10999 Forsthoff Road. Site is located in Precinct 2. SUBMITTED BY: (z), " t' & L Darrell W. Kolwes Right of Way Agent This request is Sammy Precinct 2 by Commissioners' Court Duane Peters, County judge DATE: i < c) APPLICATION FOR WATER UTILITY PERMIT DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY TO: TKE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS Pursuant to the Texas Utility Code, Section 181.024, comes now WICKSON CREEK SPECIAL UTILITY DISTRICT [company name], hereinafter referred to as "Company" a TEXAS UTILffY [stalej Corporation, with authority to transact business in Texas, acting by and through its duly authorized representative, and hereby petitions the County Engineer for the right to lay, construct, maintain, repair and/or operate a gas facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached hereto and said location described as follows: Facilitv to Cross Road Length of TYPE OF CONSTRUCTION Road Name & Block Number Crossin¢CHECK ONE Bored Jacked Driven Cased Forsthoff Road 40' X X Facilitv to Parallel County Road Within Right-Of-Wav Road Name and Block Number From To Depth Distance CONSTRUCTION TYPE l" Diameter Wall Thickness I '/z" Encasement Pipe Material Specification PVC Maximum Operation Pressure 80 PSI The location and description of the proposed installation and appurtenances must be fully shown on the attached detailed drawings. The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and shall complete said construction /work within I working days. (COMPANY MUST FILL IN). If such construction is not begun by the 601h day, Company will be required to apply for a new permit. Company declares that prior to filing this application, it has ascertained the location of all existing utilities, both aerial and underground, and the filing of this application is prima facie evidence that the proposed installation will not conflict with any existing utility. I A copy of this permit shall be kept at thejob site any time work is being performed. It is expressly stipulated that this Permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or vest any property right in said holder. It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the County's right, title and interest in the land to be entered upon and used by the holder and the holder will at all times assume risk of and indemnify, defend and save harmless Brazos County from and against any and all loss, damages, cost or Fol _ expense arising in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights and privileges. Any deviation from these specifications must be approved by Brazos County Engineer's Office or its designated representative. Approval of County Engineer's Office may take as long as two weeks after complete application is received. Applicant agrees to comply with all rules of the County Commissioners and the County Engineer in construction of said installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated herein for reference. In the event Company fails to obtain apermitprior to the installation or floes not install utilities in compliance with installation requirements set fo th herein (i.e. depth, location, etc), Company assumes all financial responsibility for damages andlor destraction oflines, cables, etc. based upon its failure to comply with Brazos Comity requirements. Applicant agrees that if Brazos County demonstrates a violation of the terms of this policy, Applicant stipulates that requisites for inja active relief exist and that Brazos County is entitled to relief enjoining any conduct by applicant which is contrary to the policies. This permit is a revocable permit Brazos County reserves the right to revoke this permit at any time, in the sole discretion of Brazos County, for interests of public health, safety or welfare, o' for failrre to repair any damages upon demand, or for any other reason deemed sufficient by Brazos Comity. In the event Company fails to comply with any or all of the requirements as set foth herein, the Cormty may take such action as it deems appropriate to compel compliahce�The Comity Engineer, further retah s the right to revoke___, this Permit by verbal notification to the Applicant/Company. Failure to obtain this permit and/or notify the Cotnnty Engineer's Office within 24 hours of beginning construction shall constitute grounds for job shutdown. By signing below, I certify that I am authorized to represent the Company listed below, and that the Company agrees to the conditions/provisions included in this permit. Wickson Creek Special Utility District Compri Name Signature General Manager Title P.O. Box 4756 Address Bryan, TX 77805 City State Zip (979) 589-3030 Phone Number watson@wicksoncreek.com Email: Eos. -2L _ Pg -- WATER UTILITY APPROVAL Brazos County offers no objection to the proposed location of the utility in the County right of way as shown by accompanying drawings and notice dated %0—ag — /-S- except as noted below: EXCEPTIONS: Mwc (Month/Day/Year) (Q, -u 4v, Brazos County Engineer Fvc) — 04 _ pg•_/__ �� (PI R / % / NI mmC�I ,aw / / ƒ /K � « i Vol, e pg.14� \ � S VOL d, - pg BRAZOS COUNTY ROADWAY SAFETY AND ROAD PRESERVATION STANDARDS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY A. General Requirements I. Adequate drainage shall be maintained in ditches at all times. 2. Permittee will use best management practices ("BMP") (EPA and TCEQ both provide lists of examples of B:MPs) to minimize erosion and sedimentation resulting from the proposed installation. 3. The permittee shall take precautions to avoid damage to property. All County Right of Way and property shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or appointed representative. 4. The construction and maintenance of such utility shall not interfere with the property or rights of a prior occupant. 5. Permittee shall not interfere with other utilities located in the right of way. In the event damages occur, permittee will be liable to the County or other utilities running through the right of way. 6. County Engineer shall determine whether or not permittee's plans shall inconvenience the public. If it is determined that inconvenience to the public exists, then the County Engineer will decide whether such project will be allowed or if an alternative exists so as not to inconvenience the public. B. --Safety-Requirements _ _.._. .. 1. Proper traffic control measures must be put in place prior to beginning work and remain in place during the duration of thejob. All traffic control measures must follow the Texas Manual of Uniform Traffic Control Devices (TMUTCD). Sec Traffic Control Requirements below. 2. During construction, all safety regulations of the Texas Department of Transportation shall be observed. 3. Permittee must take such precautions and measures, including placing and displaying safety devices, as maybe necessary, in order to safely conduct the public through the project area. Company shall, provide flagmen, signs, signals or devices necessary to provide complete safety to the public. 4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. 5. No cable, conduit and/or pole line shall be laid, constructed, maintained and/or repaired so as to constitute a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved by the County Engineer. I C. Traffic Control Plan i 1. A traffic control plan, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided for the following: a. Any construction (i.e. pit, excavation, hole) left open overnight, requires specific nighttime traffic control measures pursuant to the TMUTCD; Vol. �/, pg..��� b. If construction is within ten( 10) feet of the roadway; or c. Any work performed in the road right-of-way; 2. Plan must be attached to the permit and kept at thejob site any time work is beine performed. 3. Plan must set forth the time of completion for thejob. D. Desien Standards 1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation and the pole be placed in the designated area for power specified as set forth in the Texas Utilities Code, Section 181.04.1. 2. All pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure safety to the public. Any pole placed in violation of this requirement will be required to be moved to the appropriate location at the company's expense. Exceptions may be approved by the County Engineer. 3. All underground installations shall (these are minimum depths— utility in ay place deeper): a. be placed at a minimum depth of forty-eight (48) inches below the top of the pavement; b. be at least thirty-six (36) inches below ditch flow line when installation is within the area measured from top of bank to top of bank; c. be at least forty-eight (48) inches below ditch flow line if low pressure gas or petroleum lines. For high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below; d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of way of less than 60 feet. 4. Water Lines: All water lines must be a minimum 36 -inches below the ditch flow line and cased. Waterlines shall be cased if crossing under the roadway. 5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within designated locations based upon the type of utility. The locations shall be as follows: (measured from back of right-of-way). Power — 0 to 2 feet, nominally 1' Phone — 2 to 4 feet, nominally 3' Gas — 4 to 6 feet, nominally 5' Cable -6 to 8 feet, nominally 7' 6. Utilities with less than 60 feet right-of-way in all new developments shall install the utility in a similar manner as referenced in No. 3 above; however, the County Engineer or its designated representative will provide final approval of each utility location. 7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longer than 400' if left open over night or unattended. 8. Crossings under a county road shall: a. be bored or jacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT; b. be pressure grouted for the full length of the crossing ijthe annular space between pipe and casing and soil exceeds one (1) inch. Brazos County must be given 24 hours notice of pressure grouting operations and have the opportunity to have an inspector on site to observe pressure grouting operations; Vol. _. pg. ��/� c. TxDOT Standard Specification Item 476 shall be followed for all boring, jacking, tunnel ing aindjoints. 9. Bore Pits: a. no pits shall remain open longer than 2 days; b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above. c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from the County Engineer or his representative; d. when pits are to remain open for more than 8 hours, due diligence will be used in protecting the spoil pile to prevent drainage problems; e. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity; y f. based upon soil conditions, the County Engineer or his representative may require pits be placed further from the edge of road. 10. Any installation within ten (I0) feet of edge of pavement shall meet the following: a. location must be approved by the County Engineer or his representative b. backfilled with cement stabilized material. c. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity. d. all excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed during a rainy period or at other times where excess water cannot be prevented from entering the trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized material as soon as weather permits; e. all disturbed base and pavement materials shall be removed and restored to the satisfaction of the County Engineer or his representatives. -f. no side of lateral tamping to'fill'voids under the base and pavement materials is allowed. 11. Company must be careful to notjeopardize the slope or integrity of the shoulder of the road. In the event Company damages the slope, shoulder or any other portion of the right-of-way, Company will be responsible for repairing the damage and replacing the right-of-way to the condition it was prior to commencing construction. 12. Operation of construction and/or maintenance equipment on the traveled surface of any improved County road will not be permitted, except in an instance whereby the laying, construction, maintenance and/or repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided meeting TMUTCD requirements. 13. In the event said construction and/or maintenance and/or repair requires Company to remove, cut or jeopardize any section of the road (asphalt, cement, road base, etc.), Company will be required to provide a performance bond or letter of credit securing necessary repairs. Said bond amount will be determined by the County Engineer. 14. The applicant shall submit a tetter of "No Objection" from the Army Corps of Engineers for all designated wetlands and environmentally sensitive lands. E. Enteraencv work 1. In the event Company is required to perform emergency services, that requires excavation in a County Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Company �� vol. _a �_pg. 170 shall notify County Engineer within 24 hours of beginning construction/repairs. This will allow the County Engineer's Office an opportunity to inspect the site to ensure the integrity of the County Right of Way and traffic safety controls used. ' F. Repairs to eristin_ facilities 1. Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the soil, shall not be performed until plans describing such maintenance and/or repair have been approved by the County Engineer or its designated representative and a permit has been obtained. G. Relocation of utilities 1. When and if the County Engineer determines that it is necessary for the construction, repair, improvement, alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or other facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated thereon, as required by the County Engineer within a reasonable time as determined by the County Engineer and Utility Company, and at the expense of the Utility Company. H. High Pressure Pipelines 1. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining to controlled access or non -controlled access installations, should contain the following additional information in the description of the permit. -diameter -wall thickness -material specification -minimum yield strength -maximum operation pressure of the pipeline 2. With the exception of the maximum operation pressure of the pipeline, this information is to be supplied for both the carrier pipe and the casing. I 3. Assurance must also be given that the installation material and design meet the minimum Federal Safety Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed by an authorized representative of the company. 4. Petroleum Pipelines Depth Tvpe of Pipeline (below deepest ditch grade) Special Requirements Encased Pipe Less than 10' Must be covered with concrete pad at least 36" deep Encased Pipe Greaterthan 10' No concrete pad required Non -Cased Pipe Less than 10' Must be covered with concrete pad at least 48" deep Non -Cased Pipe Greater than 10' No concrete pad required I Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum. 5. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -1 ,of - Way. Transmission lines have been determined to be petroleum pipelines (which includes natral gas lines) and shall not be parallel to a County Road. I 6. Natural Gas Distribution is a line that serves the final customer. Vol. _�� fig, /%/ :eg niu" &_aasC„_fie ♦ gS� saE� a �5 ��g g'P � : � Q aQ Pg. N �2 NJ Re�R'8$8'S Upt ��H _e1€_" Pg "35 Eg 'S bge SB-- - 8Eb-p5. a €a 5- uj a92 a=.g- _-Gb �S "E �«1S e9 oa �R6�S�nn::S�Se� z a- 2 ¢ "RIM b �aZa Cp_6a�a6 =aa���'ss's'sd's's a� {_&B� 6PA �bHo SS�k �� W Z tzi, F YR �� bC`. ♦ gS� saE� a �5 ��g g'P � : � Q aQ Pg. N �2 s.00 .oai may.--eaeasyso. Upt ��H _e1€_" Pg "35 Eg 'S re a €a 5- uj a92 a=.g- _-Gb �S "E �«1S e9 oa h' z a- 2 ¢ "RIM b Cp_6a�a6 a� {_&B� 6PA �bHo SS�k �� W Z tzi, 88 yy b � sakEsFE E6�-8$E'Sb -g�' �68"b' 66 Sk$b_ •6662 Sha'g�S^ c� ^evs cbSB - s»ir�s 585yy�8 - F ¢ ':.s1 a'OE u>u os s. Y��2 ^o9 :.e F- - �C•£ 4 sw wws --------- --'—' „ ---------------'—'—' ,w n+aa a a Pg. Vol. s.00 .oai may.--eaeasyso. Ux� I I ^evs cbSB - s»ir�s 585yy�8 - F ¢ ':.s1 a'OE u>u os s. Y��2 ^o9 :.e F- - �C•£ 4 sw wws i ,w n+aa a a Pg. Vol. lWJmtits”"i'A:ei`°«:'2a°o:°�.`...�'o�'>.��S:P�°`:=:I�.•. Pg. Vol. COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: November 10, 2015 SUBJECT: Utility Permit — Wickson Creek Special Utility District Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 4 -inch water line crossing under Old Reliance Road 800 feet northeast of Reliance Church Road. Site is located in Precinct 2. SUBMITTED BY: Darrell W. Kolwes Right of Way Agent This request is ACKNOWLEDGED BY: anon Catalena Corfdiiissioner Precinct 2 by Commissioners' Court, Duane Peters, County Judge DATE: l`—I w ; DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS Pursuant to the Texas Utility Code, Section 181.024, comes now WICKSON CREEK SPECIAL UTILITY DISTRICT [company name], hereinafter referred to as "Company" a TEXAS UTILITY [state] Corporation, with authority to transact business in Texas, acting by and through its duly authorized representative, and hereby petitions the County Engineer for the right to lay, construct, maintain, repair and/or operate a gas facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached hereto and said location described as follows: Facility to Cross Road Length of TYPE OF CONSTRUCTION Road Name & Block Number Crossing (CHECK ONE) Bored Jacked Driven Cased OLD RELIANCE ROAD 60' X X Facility to Parallel Countv Road Within Right-Of-Wav Road Name and Block Number From To Depth Distance I CONSTRUCTION TYPE 4" Diameter Wall Thickness 6" Encasement Pipe Material Specification PVC Maximum Operation Pressure 80 PSI The location and description of the proposed installation and appurtenances must be fully shown on the attached detailed drawings. The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and shall complete said construction /work within 1 working days. (COMPANY MUST FILL IN). If such construction is not begun by the 60'h day, Company will be required to apply for a new permit. Company declares that prior to filing this application, it has ascertained the location of all existing utilities, both aerial and underground, and the filing of this application is prima facie evidence that the proposed installation will not conflict with any existing utility. A copy of this permit shall be kept at the job site any time work is being performed. I It is expressly stipulated that this Permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or vest any property right in said holder. i It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the County's right, title and interest in the land to be entered upon and used by the holder and the holder will at all times assume risk of and indemnify, defend and save harmless Brazos County from and against any and all loss, damages, cost or Vol. �a Pg. /%v expense arising in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights and privileges. Any deviation from these specifications must be approved by Brazos County Engineer's Office or its designated representative. Approval of County Engineer's Office may take as long as two weeks after complete application is received. Applicant agrees to comply with all rules of the County Commissioners and the County Engineer in construction of said installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated herein for reference. In the event Company fails to obtain a permit prior to the installation or does not install utilities in compliance with installation requirements set forth Herein (i.e. depth, location, etc), Company assmnes all financial responsibility for damages aiWor destruction of lines, cables, etc. based upon its faihnre to comply with Brazos County requirements. Applicant agrees that if Brazos County demonstrates a violation of the terms of this policy, Applicant stipulates that requisites for injunctive relief exist and that Brazos County is entitled to relief enjoining any conduct by applicant which is contrary to the policies. This permit is a revocable permit Brazos County reserves the right to revoke this permit at any time, in the sole discretion of Brazos County, for interests ofpublic health, safety or welfare, or for failure to repair any damages upon dennand, or for any other reason deenned sufficient by BraZOS County. In the event Company fails to comply with any or all of the requirements as set forth herein, the County may take such action as it deems appropriate to compel compliance. The County Engineer fra4her retains the right to revoke this Permit by verbal notification to the Applicant/Coniparny. Failure to obtain this permit and/or notify the County Engineer's Office within 24 hours of beginning construction shall constitute grounds for job shutdown. By signing below, I certify that I am authorized to represent the Company listed below, and that the Company agrees to the conditions/provisions included in this permit. WICKSON CREEK SPECIAL UTILITY DISTRICT Coi Name t L /I TS�i By: Signature GENERL MANAGER Title P.O. BOX 4756 Address _BRYAN,TX 77805 City State Zip (979)589-3030 Phone Number watson@wicksoncreek.com Email Vol. c� _, pg.. � pp Brazos County offers no objection to the proposed location of the utility in the County right of way as shown by accompanying drawings and notice dated I0- P S except as noted below: (Month/Day/Year) EXCEPTIONS: /11 otic �,- Brazos County Engineer Vol, _ r�'� pg. % %C vj- G 9 ? j ? / A \/ R�Yw.H ,U Vol �pg./// & § \ 6 { — - — 2— / — 0 % .\.0 m \\/ \ \_\ 6 \ / \ \ � \ \ \ \ \ \ j % \ \ § � \ \ m m \ \ m \ \.0 \ \ 9 \ / - \ \ \ F- m \ / 7 \ � / \ m vj- G 9 ? j ? / A \/ R�Yw.H ,U Vol �pg./// & § \ 6 { w: h.L"' 'aye# .,a�hXrw' f ;L 'S'] 1'`-y�hN�""�6•L +c R ce +vF"rI+1:..*mac` — Y gj oil A�'-�ni,'+6_ to - SIM Kg not KIM Y? O O A&Vi r i y ' , • 4.21 w4 45` r � � PIZ tx 11 s `=f r s rt 777 u x low"' + Magns, VOW: Vol. - Pg, 1 BRAZOS COUNTY -ROADWAY -SAFETY AND ROAD - PRESERVATION STANDARDS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY A. General Requirements I. Adequate drainage shall be maintained in ditches at all times. 2. Permittee will use best management practices ("BMP'') (EPA and TCEQ both provide lists of examples of BMPs) to minimize erosion and sedimentation resulting from the proposed installation. 3. The permittee shall take precautions to avoid damage to property. All County Right of Way and property shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or appointed representative. 4. The construction and maintenance of such utility shall not interfere with the property or rights ofia prior occupant. 5. Permittee shall not interfere with other utilities located in the right of way. In the event damages,occur, permittee will be liable to the County or other utilities running through the right of way. G. County Engineer shall determine whether or not permittee's plans shall inconvenience the public. If it is determined that inconvenience to the public exists, then the County Engineer will decide whether such project will be allowed or if an alternative exists so as not to inconvenience the public. i B. Safety Requirements 1. Proper traffic control measures must be put in place prior to beginning work and remain in placejduring the duration of the job. All traffic control measures must follow the Texas Manual of Uniform Traffic Control Devices (TMUTCD). See Traffic Control Requirements below. 2. During construction, all safety regulations of the Texas Department of Transportation shall be observed. I 3. Permittee must take such precautions and measures, including placing and displaying safety, devices, as may be necessary, in order to safely conduct the public through the project area. Company shall (provide flagmen, signs, signals or devices necessary to provide complete safety to the public. i 4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. I S. No cable, conduit and/or pole line shall be laid, constructed, maintained and/or repaired so as to constitute a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved by the County Engineer. C. Traffic Control Plan 1. A traffic control plats, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided for the following: I a. Any construction (i.e. pit, excavation, hole) left open overnight, requires specific nighttime traffic control measures pursuant to the TMUTCD; 1 i Vol. =c �� pg.-/ % I b.- If construction is within ten -(10) feet of the roadway, -or - c. An; work performed in the road right-of-way; 2. Plan must be attached to the Penn it and kept at the job site any time work is being performed. 3. Plan must set forth the time of completion for thejob. D. Desien Standards I 1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation and the pole be placed in the designated area for power specified as set forth in the Texas Utilities Code, Section 181.045. 2. All pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure safety to the public. Any pole placed in violation of this requirement will be required to be moved to the appropriate location at the company's expense. Exceptions may be approved by the County Engineer. All underground installations shall (these are minimum depths — utility may place deeper): a. be placed at a minimum depth of forty-eight (48) inches below the top of the pavement; b. be at least thirty-six (36) inches below ditch flow line when installation is within the area measured from top of bank to top of bank; c. be at least forty-eight (48) inches below ditch flow line if low pressure gas or petroleum lines,. For high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below; d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of way of less than 60 feet. 4. Water Lines: All water lines must be a minimum 36 -inches below the ditch flow line and cased.'; Waterlines shall be cased if crossing under the roadway. I 5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within designated locations based upon the type of utility. The locations shall be as follows: (measured'from back of right-of-way). Power— 0 to 2 feet, nominally 1' Phone — 2 to 4 feet, nominally 3' Gas — 4 to 6 feet, nominally 5' Cable — 6 to 8 feet, nominally 7' 6. Utilities with less than 60 feet right-of-way in all new developments shall install the utility in a similar manner as referenced in No. 3 above; however, the County Engineer or its designated representative will provide final approval of each utility location. 7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longer than 400' if left open over night or unattended. 8. Crossings under a county road shall: a. be bored orjacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT; b. be pressure grouted for the full length of the crossing ijthe annular space between pipe and casing and soil exceeds one (1) inch. Brazos County must be given 24 hours notice of pressure grouting operations and have the opportunity to have an inspector on site to observe pressure grouting operations; Col. Tz_� F'g. �-El C.-- TxDOT-Standard Specification -Item -476 shall be followed for all boring, jack Bore Pits: a. no pits shall remain open longer than 2 days; b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above. c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from the County Engineer or his representative; d. when pits are to remain open for more than 8 hours, due diligence will be used in protecting the spoil pile to prevent drainage problems; e. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity; f. based upon soil conditions, the County Engineer or his representative may require pits be placed further from the edge of road. 10. Any installation within ten (10) feet of edge of pavement shall meet the following: a. location must be approved by the County Engineer or his representative b. backfilled with cement stabilized material. c. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity. d. all excess water and mud shall be removed from the trench prior to backfilling. Any backfill) placed during a rainy period or at other times where excess water cannot be prevented from entering the trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized material as soon as weather permits; I e. all disturbed base and pavement materials shall be removed and restored to the satisfaction of the County Engineer or his representatives. IF no side or lateral tamping to fill voids under the base and pavement materials is allowed. 11. Company must be careful to not jeopardize the slope or integrity of the shoulder of the road. In the event Company damages the slope, shoulder or any other portion of the right-of-way, Company will be responsible for repairing the damage and replacing the right -of --way to the condition it was prior to commencing construction. 12. Operation of construction and/or maintenance equipment on the traveled surface of any improved County road will not be permitted, except in an instance whereby the laying, construction, maintenance and/or repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided meeting TMUTCD requirements. 13. In the event said construction and/or maintenance and/or repair requires Company to remove, cut or jeopardize any section of the road (asphalt, cement, road base, etc.), Company will be required to provide a performance bond or letter of credit securing necessary repairs. Said bond amount will be deteI ined by the County Engineer. 14. The applicant shall submit a letter of "No Objection' from the Army Corps of Engineers for all designated wetlands and environmentally sensitive lands. E. Emenzencv work 1. In the event Company is required to perform emergency services, that requires excavation in a CI unty Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Company Vol. -2- Pg.-Lss —� shall-notify-CountyEngineer within -24 -hours -of beginning construction/repairs This will allow'the-- County Engineers Office an opportunity to inspect the site to ensure the integrity of the CountyRight of Way and traffic safety controls used. R Repairs to e_xistine facilities 1. Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the soil, shall not be performed until plans describing such maintenance and/or repair have been approved by the County Engineer or its designated representative and a permit has been obtained. G. Relocation of utilities I . When and if the County Engineer determines that it is necessary for the construction, repair, improvement, alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or other facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated thereon, as required by the County Engineer within a reasonable time as determined by the County Engineer and Utility Company, and at the expense of the Utility Company. H. Hieh Pressure Pipelines 1. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining to controlled access or non -controlled access installations, should contain the following additional information in the description of the permit. -diameter -wall thickness -material specification -minimum yield strength -maximum operation pressure of the pipeline 2. With the exception of the maximum operation pressure of the pipeline, this information is to be supplied for both the carrier pipe and the casing. I 3. Assurance must also be given that the installation material and design meet the minimum Federal Safety Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed by an authorized representative of the company. 4. Petroleum Pipelines: Depth Tvpe of Pipeline (below deepest ditch grade) Special Requirements Encased Pipe Less than 10' Must be covered with concrete pad at least 36" deep Encased Pipe Greater than 10' No concrete pad required Non -Cased Pipe Less than 10' Must be covered with concrete pad at least 48" deep Non -Cased Pipe Greater than 10' No concrete pad required I Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum! 5. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -df - Way. Transmission lines have been determined to be petroleum pipelines (which includes natural gas lines) and shall not be parallel to a County Road. 6. Natural Gas Distribution is a line that serves the final customer. Vol. pg. 8fg SEgP-- - - - - - - 0 Wr09 x) • S _ y Yf �a=S rolnry9 Shu � nSs$r:a� °PINS a c�9�M a ss„RN„eA§tl 8' ' �o..cl F�= s�xse Iwv os. w F "xt 5�5� ootb''F �8 gcfi IN 65�� T2s d��ptl_ _'bfi �fi8�SgC LL x Hsi {5 yy �_ q '�8hdd-99 pyyp $$�{{-5bbC k�tl6yP e�0 beet uB� � W A-gaN Eba �P p�e'6�3�66C Cfi� d-------------------- 2 j> t.PIPPVt g C9�3 lLylbVs � O � w•os $b �y1 '92 eeggVg 'a:s% _ .`•.I.oG�.c �g��„-°�So'g F �o "RF 3 s';6 arta= V�oS b1a r e Q e$ Sin:di w7x74ii i v�+rL d iM::d ' ' iw. Fa aoi s M.a twt/w w � rer wltwPe Nlua+uiMtr.nslw�v.�V o+wu n.N el>��e.' el Vl .e rinwiiu Y3nIn15ra Vol. —� . p9• ,U w 0 Wr09 x) • S _ y Yf �a=S rolnry9 � � � °PINS a a ' �o..cl uEH Iwv os. Sin:di w7x74ii i v�+rL d iM::d ' ' iw. Fa aoi s M.a twt/w w � rer wltwPe Nlua+uiMtr.nslw�v.�V o+wu n.N el>��e.' el Vl .e rinwiiu Y3nIn15ra Vol. —� . p9• ,U w -- --- BRAZOS-COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: November 10, 2015 SUBJECT: Utility Permit —Wickson Creek Special Utility District Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Riley Road 200 feet southeast of FM 1179. Line will provide service to customer at 6986 Riley Road. Site is located in Precinct 2. SUBMITTED BY: ACKN WLEDGED BY: (Z)'o L,� j Darrell W. Kolwes TUF14y Cata na Right of Way Agent Commissi ner Precinct 2 This request is PROVED / ❑ DENIED b Commissioners' Court Duane Peters, County Judge DATE: [t 1 1 D (1 Vol. — � �/ 9, 0 --- _----APPLICATION _EOR WATER UTILITYPFERMIT DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY i TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS Pursuant to the Texas Utility Code, Section 181.024, comes now WICKSON CREEK SPECIAL UTILITY DISTRICT [company name], hereinafter referred to as "Company" a TEXAS UTILITY [state] Corporation, with authority to transact business in Texas, acting by and through its duly i authorized representative, and hereby petitions the County Engineer for the right to lay, construct, maintain, repair and/or operate a gas facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached hereto and said location described as follows: Facility to Cross Road Length of TYPE OF CONSTRUCTION Road Name & Block Number Crossing CHECK ONE Bored Jacked Driven Cased Riley Road 60' X X Facility to Parallel Countv Road Within Right -Of -Way Road Name and Block Number From To Depth Distance i CONSTRUCTION TYPE I" Diameter Wall Thickness 1 1/2" Encasement Pipe Material Specification PVC Maximum Operation Pressure 80 PSI i The location and description of the proposed installation and appurtenances must be fully shown on the attached detailed drawings. The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and shall complete said construction /work within 1 working days. (COMPANY MUST FILL IN). If such construction is not begun by the 606' day, Company will be required to apply for a new permit. I Company declares that prior to filing this application, it has ascertained the location of all existing utilities; both aerial and underground, and the filing of this application is prima facie evidence that the proposed installation will not conflict with any existing utility. A copy of this permit shall be kept at thejob site any time work is being performed. It is expressly stipulated that this Permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or vest any property right in said holder. It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the County's right, title and interest in the land to be entered upon and used by the holder and the holder will at all timesiassume risk of and indemnify, defend and save harmless Brazos County from and against any and all loss, damages, cast or lvo_,:� ,x' expense arising in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights and privileges. Any deviation from these specifications must be approved by Brazos County Engineer's Office or its designated representative. Approval of County Engineer's Office may take as long as two weeks after complete application is received Applicant agrees to comply with all rules of the County Cormnissioners and the County Engineer in construction of said installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated herein for reference. In the event Company fails to obtain a peronit prior to the installation or does riot install utilities in compliance with installation requirements set forth herein (i.e. depth, location, etc), Company assumes all financial responsibility for dmnages andlor destruction of lines, cables, etc. baser! upon its failure to comply with Brazos County requirements. Applicant agrees that if Brazos Comity demonstrates a violation of the terms of this policy, Applicant stipulates that requisites jar injunctive relief exist and that Brazos County is entitled to relief enjoining any conduct by applicant which is contrary to the policies. This permit is a revocable permit Brazos County reserves the right to revoke this permit at any time,', in the sole discretion of Brazos County, for interests of public health, safety or welfare, or for failure to repair ahy damages upon demand, or for any other reason deemed sufficient by Brazos County. In the event Company fails to comply with any or all of the requirements as set forth herein, the County nmy take such action as it deems appropriate to counpel compliance. The CountyEngineer furtlierr retains the right to revoke this Permit by verbal notification to the Applica tlCompany. Failure to obtain this permit andlor notify the County Engineer's Office within 24 hogs of beginning construction shall constitute grounds for job shutdown. I By signing below, I certify that I am authorized to represent the Company listed below, and that the Company agrees to the conditions/provisions included in this permit. WICKSON CREEK SPECIAL UTILITY DISTRICT Company Name KENT�WIYUSON/ Signature _GEMPRAT MANAGER Title P.O. BOX 4756 Address �nnvANMX._ 77805 City State Zip (979) 589-3030 Phone Number watson@wicksoncreek.com Email Vol. �2 e -Pg - �� WA-T-ER-UT-TY--TY_AP_P-ROVAL _ I Brazos County offers no objection to the proposed location of the utility in the County right of way as' shown by accompanying drawings and notice dated —/ `i� —15 except as noted below: EXCEPTIONS: (Month/Day/Year) Brazos County Engineer Vol. c � � ¥ % a Wal � 11 \ , & / n� Co rem »z\§ /a\ \ /JG \ G»m \ 7^/ j m < o / \ / P j o k \ \ \ 2 / M c g y Q / \ 7 / j \ / s \ \ \ / 2 - m I } \ / _ r - ƒ q § \ \ / \ / \ / F- f \ � / \ _ \ \ -n % / / \ \ E ? \ / g \ C. 7- _ \ \ r 2 / > c � � ¥ % a Wal � 11 \ , VOL 7� 9 .y/J & / j s - ƒ q f \ � VOL 7� 9 .y/J Vol -��y . pg, j 0 7 , r. Vol -��y . pg, j 0 7 , BRAZOS-COUNTY-ROADWAY--SAFETY-AND-ROAD - - --- --- i - PRESERVATION STANDARDS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY A. General Reguiremerrts 1. Adequate drainage shall be maintained in ditches at all times. i 2. Permittee will use best management practices ("BMP") (EPA and TCEQ both provide lists of examples of BMPs) to minimize erosion and sedimentation resulting from the proposed installation. 3. The permittee shall take precautions to avoid damage to property. All County Right of Way and property shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or appointed representative. 4. The construction and maintenance of such utility shall not interfere with the property or rights of�a prior occupant. 5. Permittee shall not interfere with other utilities located in the right of way. In the event damages',eccur, permittee will be liable to the County or other utilities running through the right of way. 6. County Engineer shall determine whether or not permittee's plans shall inconvenience the public! If it is determined that inconvenience to the public exists, then the County Engineer will decide whether such project will be allowed or if an alternative exists so as not to inconvenience the public. B. Safety Requirements I 1. Proper traffic control measures must be put in place prior to beginning work and remain in place during the duration of the job. All traffic control measures must follow the Texas Manual of Uniform Traffic Control Devices (TMUTCD). See Traffic Control Requirements below. 2. During construction, all safety regulations of the Texas Department of Transportation shall be observed. i 3. Permittee must take such precautions and measures, including placing and displaying safety devices, as may be necessary, in order to safely conduct the public through the project area. Company shall :p rovide flagmen, signs, signals or devices necessary to provide complete safety to the public. 4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. 5. No cable, conduit and/or pole Line shall be laid, constructed, maintained and/or repaired so as to constitute a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved by the County Engineer. C. TralTe Control Plan 1. A traffic control plan, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided for the following: a. Any construction (i.e. pit, excavation, hole) left open overnight, requires specific niehttime t.affic control measures pursuant to the TMUTCD; i b:- If construction- is within ten (10) feet of the roadway; or c. Any work performed in the road right-of-way; 2. Plan must be attached to the permit and kept at thejob site any time work is being performed. 3. Plan must set forth the time of completion for the job. D. Design Standards 1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation and the pole be placed in the designated area for power specified as set forth in the Teras Utilities Code, Section 181.045. 2. All pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure safety to the public. Any pole placed in violation of this requirement will be required to be moved to the appropriate location at the company's expense. Exceptions may be approved by the County Engineer. 3. All underground installations shall (these are minimum depths—utility may place deeper): a. be placed at a minimum depth of forty-eight (48) inches below the top of the pavement; b. be at least thirty-six (36) inches below ditch flow line when installation is within the area measured from top of bank to top of bank; c. be at least forty-eight (48) inches below ditch flow line if low pressure gas or petroleum lines!. For high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below; d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of, way of less than 60 feet. 4. Water Lines: All water lines must be a minimum 36 -inches below the ditch flow line and cased. Waterlines shall be cased if crossing under the roadway. 5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within designated locations based upon the type of utility. The locations shall be as follows: (measured from back of right-of-way). i i Power — 0 to 2 feet, nominally 1' Phone — 2 to 4 feet, nominally 3' Gas — 4 to 6 feet, nominally 5' Cable -6 to 8 feet, nominally 7' 6. Utilities with less than 60 feet right-of-way in all new developments shall install the utility in a similar manner as referenced in No. 3 above; however, the County Engineer or its designated representative will provide final approval of each utility location. 7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longer than 400' if left open over night or unattended. 8. Crossings under a county road shall: a. be bored or jacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT; b. be pressure grouted for the full length of the crossing if the annular space between pipe and ci sing and soil exceeds one (1) inch. Brazos County must be given 24 (tours notice of pressure grouting operations and have the opportunity to have an inspector on site to observe pressure grouting operations; 0 I Vol. c. TxDOT Standard Specification Item 476 shail be followed for all boring;jacking; tunnelingand joints. I 9. Bore Pits: a. no pits shall remain open longer than 2 days; b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above. c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from the County Engineer or his representative; d. when pits are to remain open for more than 8 hours, due diligence will be used in protecting the spoil pile to prevent drainage problems; e. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity; f. based upon soil conditions, the County Engineer or his representative may require pits be placed further from the edge of road. 10. Any installation within ten (10) feet of edge of pavement shall meet the following: a. location must be approved by the County Engineer or his representative b. backfilled with cement stabilized material. c. based upon soil conditions, the County Engineer or his representative may require shoring to; protect pavement integrity. i d. all excess water and mud shall be removed from the trench prior to backfilling. Any backfilllplaced during a rainy period or at other times where excess water cannot be prevented from entering the trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized material as soon as weather permits; e. all disturbed base and pavement materials shall be removed and restored to the satisfaction of the County Engineer or his representatives. f. no side or lateral tamping to fill voids under the base and pavement materials is allowed. i 11. Company must be careful to not jeopardize the slope or integrity of the shoulder of the road. In the event Company damages the slope, shoulder or any other portion of the right-of-way, Company will be responsible for repairing the damage and replacing the right-of-way to the condition it was prior fo commencing construction. 12. Operation of construction and/or maintenance equipment on the traveled surface of any improved County road will not be permitted, except in an instance whereby the laying, construction, maintenance and/or repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided meeting TMUTCD requirements. 13. In the event said construction and/or maintenance and/or repair requires Company to remove, cut or jeopardize any section of the road (asphalt, cement, road base, etc.), Company will be required te' provide a performance bond or letter of credit securing necessary repairs. Said bond amount will be determined by the County Engineer. 14. The applicant shall submit a letter of "No Objection" from the Army Corps of Engineers for all designated wetlands and environmentally sensitive lands. E. Emergency work I. In the event Company is required to perform emergency services, that requires excavation in a Cormty Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Company Vol. _ o� r, ' Pg.: ���� shall notify County Engineer within 24 hours of beginning construction/repairs. This will allow the County Engineer's Office an opportunity to inspect the site to ensure the integrity of the County Right of Way and traffic safety controls used. F. Repairs to existing facilities i 1. Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the soil, shall not be performed until plans describing such maintenance and/or repair have been approved by the County Engineer or its designated representative and a permit has been obtained. G. Relocation of utilities When and if the County Engineer determines that it is necessary for the construction, repair, improvement, alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or other facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated thereon, as required by the County Engineer within a reasonable time as determined by the County Engineer and Utility Company, and at the expense of the Utility Company. H. Hieh Pressure Pipelines 1. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining to' controlled access or non -controlled access installations, should contain the following additional information in the description of the permit. I -diameter -wall thickness -material specification -minimum yield strength -maximum operation pressure of the pipeline 2. With the exception of the maximum operation pressure of the pipeline, this information is to be supplied for both the carrier pipe and the casing. 3. Assurance must also be given that the installation material and design meet the minimum Federal Safety Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed by an authorized representative of the company. 4. Petroleum Pipelines Depth Tvpe of Pipeline (below deepest ditch erade) Special Requirements ! I Encased Pipe Less than 10' Must be covered with concrete pad at least 36" deep Encased Pipe Greater than 10' No concrete pad required Non -Cased Pipe Less than 10' Must be covered with concrete pad at least 48" deep Non -Cased Pipe Greater than 10' No concrete pad required i Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum I 5. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -of - Way. Transmission lines have been determined to be petroleum pipelines (which includes natural gas lines) and shall not be parallel to a County Road. 5. Natural Gas Distribution is a line that serves the final customer. Vol. o Pg, //c agzo �y Gg�e R3S �8 �$So 8Y_o} __p___nn.n ills6BR ..rSs$ -MMR1. g86x ne$$o oS&RN 3 ti J EE e3 C U € a .eergszastg g E P faa § $5c � scS 8k5� oRb $•.F$� ;ir $BF= 'Ulm «n.ia. .b -Poly ----'---'--- a b s .. F .DD. .Doi -1 o l•--aseTvo D T c/� uo. of �o.. lin ''•4E +rol�a6 • o .mi•ws O o •—�D—v � Vl C ~ H C S N .euro ins &gs ^g^ b a Y .a rio E7s.� BmcQ��uh65i e' C9•� a i «$ sg •ODI ,aC •✓a I g 1 f/IfaT A, T ? O Ulm O ,oc 2 C .wmow • •v"�h$a ` • �roI�VS e � o of V O o J� y/ '✓ fl U y �ea1nWT V 6 � 4 � x `% 2 E `• sc n % � w. c .. vm .IX S naafi �KIrcY4 • Y i • .WI^T6 O <1 G .Wl.v'IS �eal�aJT V W � A c e N U wr"A6: o„'�°.lo•`°.+iieai w �M.1�nsn..i, .n'Sa e'.we4i0..ee`:�`a'ze.::iu°i°'w° new �mm�as�D VOL �� pg. //7a 20 COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: November 10, 2015 SUBJECT: Utility Permit — Wickson Creek Special Utility District Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch crater line crossing under Reed Lane 0.6 mile northwest of Dilly Shaw Tap Road. Line will provide service to customer at 2162 Reed Lane. Site is located in Precinct 2. SUBMITTED BY: ACKNOWLEDGED BY: Q o,Atc Darrell W. Kotwes qScommtni alena Right of Way Agent oner Precinct 2 This request is AP OV LrD / 0 DENIED by Commissioners' Duane Peters, County u ge DATE: it 11d14 DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS Pursuant to the Texas Utility Code, Section 181.024, comes now WICKSON CREEK SPECIAL UTILITY DISTRICT [company name], hereinafter referred to as "Company" a TEXAS UTILITY [state] Corporation, with authority to transact business in Texas, acting by and through its duly; authorized representative, and hereby petitions the County Engineer for the right to lay, construct, maintain, repair and/or operate a gas facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached hereto and said location described as follows: Facility to Cross Road Length of TYPE OF CONSTRUCTION Road Name & Block Number Crossing (CHECK ONE Bored lacked Driven Cased REED LANE 60' X X Facility to Parallel County Road Within Right-OfWav Road Name and Block Number From To Depth Distance CONSTRUCTION TYPE P, Diameter Wau 'rhickness 1 1/2" Encasement Pipe Material Specification PVC Maximum Operation Pressure 80 PSI The location and description of the proposed installation and appurtenances must be fully shown on the attached detailed drawings. The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and shall complete said construction /work within 1 working days. (COMPANY MUST FILL IN). If such construction is not begun by the 60ih day, Company will be required to apply for a new permit. Company declares that prior to filing this application, it has ascertained the location of all existing utilities) both aerial and underground, and the filing of this application is prima facie evidence that the proposed installation will not conflict with any existing utility. A copy of this permit shall be kept at the job site any time work is being performed. It is expressly stipulated that this Permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or vest any property right in said holder. It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the County's right, title and interest in the land to be entered upon and used by the holder and the holder will at all times assume risk of and indemnify, defend and save harmless Brazos County from and against any and all loss, damages, cost or E � Pg ;rise ansmg in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights privileges. Any deviation from these specifications must be approved by Brazos County Engineer's Office or its designated representative. Approval of County Engineer's Office may take as long as two weeks after complete application is received Applicant agrees to comply with all rules of the County Commissioners and the County Engineer in construction of said installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated herein for reference. In the event Company jails to obtain a permit prior to the installation or does not install utilities in compliance with installation requirements set forth herein (i.e. depth, location, etc), Company assunnes all financial responsibilityfor rlarnages ancUor destruction of lines, cables, etc. based upon its failure to comply with Brazos County requirements. Applicant agrees that if Brazos County demonstrates a violation of the terms of this policy, Applicant stipulates that requisites for injunctive relief exist and that Brazos County is entitled to relief enjoining any conduct by applicant which is contrary to the policies. This permit is a revocable permit Brazos County reserves the right to revoke this permit at any time, in the sole discretion of Brazos County, jo• interests of public health, safety or welfare, or for failure to repair any damages upon demand, or for any other reason deemed sufficient by Brazos County. In the event Conpany jails to comply with any or all of the requirements as set forth herein, the County may take such action as it deems appropriate to compel compliance. The County Engineer further retains the right to revoke this Permit by verbal notification to the Applicant'Compay. Failure to obtain this permit and/or notify the County Engineer's Office within 24 hours of beginning construction shall constitute grounds for job shutdown. By signing below, I certify that I am authorized to represent the Company listed below, and that the Company agrees to the conditions/provisions included in this permit. WICKSON CREEK SUD Company Name TICE By. Signature GENERAL MANAGER Title P0. BOX 4756 Address BgygN mx 77A05 City State Zip (979)589-3030 Phone Number _wafson@wicksoncreek.com Email E-01- Kq:i . WATER_ UTSLLCY_APPRO V_AL Brazos County offers no objection to the proposed location of the utility in the County right of way as shown by accompanying drawings and notice dated 1 a — I� — (� except as noted below: EXCEPTIONS: (Month/Day/Year) A,1 Brazos County Engineer I Vol. _ol pg. /y� w LA - \ — \ e \ / \ \ / //0 ^ / ~\ / / } § Q _\ \ / \ \ / \ \ � ® / / 0 § \ / \ » / Z \ \ / \ \ \ g \ \ \ ƒ 9 _ r 2 / / CD - \ \ Fn /\71 - / / \ \ — { / / \ \ ) 2 / / \ \ » _ w LA - \ — \ e / \ \ / \ ^ / / / � , -- - — -- Vol. pg - 3 BRAZOS COUNTY ROADWAY SAFETY AND ROAD PRESERVATION STANDARDS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY A. Genera! Reguirententr I . Adequate drainage shall be maintained in ditches at all times. 2. Permittee will use best management practices (BMP") (EPA and TCEQ both provide lists of examples of BMPs) to minimize erosion and sedimentation resulting from the proposed installation. j. The permittee shall take precautions to avoid damage to property. All County Right of Way and property shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or appointed representative. 4. The construction and maintenance of such utility shall not interfere with the property or rights of prior occupant. 5. Permittee shall not interfere with other utilities located in the right of way. In the event damages,occur, permittee will be liable to the County or other utilities running through the right of way. 6. County Engineer shall determine whether or not permittee's plans shall inconvenience the public'. If it is determined that inconvenience to the public exists, then the County Engineer will decide whether such project will be allowed or if an alternative exists so as not to inconvenience the public. B. Safety Requirements i 1. Proper traffic control measures must be put in place prior to beginning work and remain in place during the duration of the job. All traffic control measures must follow the Texas Manual of Uniform Traffic Control Devices (TMUTCD). See Traffic Control Requirements below. 2. During construction, all safety regulations of the Texas Department of Transportation shall be obI served. j. Permittee must take such precautions and measures, including placing and displaying safety devices, as may be necessary, in order to safely conduct the public through the project area. Company shall provide flagmen, signs, signals or devices necessary to provide complete safety to the public. I 4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. I 5. No cable, conduit and/or pole line shall be laid, constructed, maintained and/or repaired so as to constitute a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved by the County Engineer. C. Traffic Control Plan 1. A traffic control plan, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided for the following: a. Any construction (Le, pit, excavation, hole) left open overnight, requires specific nighttime traffic control measures pursuant to the TMUTCD; d/ Vol. _� pg. b. If construction is within ten (10) feet of the roadway; or c. Any work performed in the road right-of-way; 2. Plan must be attached to the permit and kept at the job site any time work is being performed. 3. Plan must set forth the time of completion for thejob. D. Design Standards i 1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation and the pole be placed in the designated area for power specified as set forth in the Texas Utilities Cade, Section 181.O45. 2. All pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure safety to the public. Any pole placed in violation of this requirement will be required to be moved to the appropriate location at the company's expense. Exceptions may be approved by the County Eng i neer. I 3. All underground installations shall (these are minimum depths — utility may place deeper): a, be placed at a minimum depth of forty-eight (48) inches below the top of the pavement; b. be at least thirty-six (36) inches below ditch flow line when installation is within the area measured from top of bank to top of bank; c. be at least forty-eight (48) inches below ditch flow line if low pressure gas or petroleum lines. For high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below; d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of way of less than 60 feet. I 4. Water Lines: All water lines must be a minimum 36 -inches below the ditch flow line and cased.) Waterlines shall be cased if crossing under the roadway. I 5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within designated locations based upon the type of utility. The locations shall be as follows: (measured ftom back of right-of-way). i Power— 0 to 2 feet, nominally I' Phone — 2 to 4 feet, nominally 3' Gas — 4 to 6 feet, nominally 5' Cable -6 to 8 feet, nominally 7' 6. Utilities with less than 60 feet right -of --way in all new developments shall install the utility in a sii milar manner as referenced in No. 3 above; however, the County Engineer or its designated representative will provide final approval of each utility location. 1 7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longerlthan 400' if left open over night or unattended. I 8. Crossings under a county road shall: a. be bored orjacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT; b. he pressure grouted for the full length of the crossing if the annular space between pipe and casing and soil exceeds one (1) inch. Brazos County must be given 24 hours notice of pressure grouting operations and have the opportunity to have an inspector on site to observe pressure grouting operations; I Vol. _a Pg. 6� TxDOT Standard Specification -Item 476 shall be followed for all boringjacking, tunneling and joints. 9. Bore Pits: a. no pits shall remain open longer than 2 days; b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above. c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from the County Engineer or his representative; d. when pits are to remain open for more than 8 hours, due diligence will be used in protecting the spoil pile to prevent drainage problems; e. based upon soil conditions, the County Engineer or his representative may requite shoring to protect pavement integrity; f. based upon soil conditions, the County Engineer or his representative may require pits be placed further from the edge of road. 10. Any installation within ten (10) feet of edge of pavement shall meet the following: a. location must be approved by the County Engineer or his representative b. backfilled with cement stabilized material. c. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity. d. all excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed during a rainy period or at other times where excess water cannot be prevented from entering the trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized material as soon as weather permits; e, all disturbed base and pavement materials shall be removed and restored to the satisfaction of the County Engineer or his representatives. f. no side or lateral tamping to fill voids under the base and pavement materials is allowed. 11. Company must be careful to not jeopardize the slope or integrity of the shoulder of the road. Inthe event Company damages the slope, shoulder or any other portion of the right-of-way, Company will be responsible for repairing the damage and replacing the right-of-way to the condition it was prior to commencing construction. 12. Operation of construction and/or maintenance equipment on the traveled surface of any improved County road will not be permitted, except in an instance whereby the laying, construction, maintenance and/or repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided meeting TMUTCD requirements. 13. In the event said construction and/or maintenance and/or repair requires Company to remove, c jeopardize any section of the road (asphalt, cement, road base, etc.), Company will be required a performance bond or letter of credit securing necessary repairs. Said bond amount will be de the County Engineer. 14. The applicant shall submit a letter of "No Objection' from the Army Corps of Engineers for all designated wetlands and environmentally sensitive lands. E. Emereenev work I. In the event Company is required to perform emergency services, that requires excavation in a C Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Vol. _� pg,d� or provide pined by shall notify County. Engineer within24hours of beginning construction/repairs. This will allow the County Engineers Office an opportunity to inspect the site to ensure the integrity of the County Right of Way and traffic safety controls used. F. Repairs to existine facilities 1. Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the soil, shall not be performed until plans describing such maintenance and/or repair have been approved by the County Engineer or its designated representative and a permit has been obtained. G. Relocation of utilities I I. When and if the County Engineer determines that it is necessary for the construction, repair, improvement, alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or Ether facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated thereon, as required by the County Engineer within a reasonable time as determined by the Couniv Engineer and Utility Company, and at the expense of the Utility Company. FI. Hieh Pressure Pipelines i 1. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining to controlled access or non -controlled access installations, should contain the following additional information in the description of the permit. I -diameter -wall thickness -material specification -minimum yield strength -maximum operation pressure of the pipeline 2. With the exception of the maximum operation pressure of the pipeline, this information is to be for both the carrier pipe and the casing. 3. Assurance must also be given that the installation material and design meet the minimum Fede Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead by an authorized representative of the company. 4. Petroleum Pipelines: 0 Depth Type of Pipeline (below deepest ditch grade) Special Requirements Safely I signed Encased Pipe Less than 10' Must be covered with concrete pad at least 36" deep Encased Pipe Greater than 10' No concrete pad required j Non -Cased Pipe Less than 10' Must be covered with concrete pad at least 48" deep Non -Cased Pipe Greater than 10' No concrete pad required I Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -if. Way. Transmission lines have been determined to be petroleum pipelines (which includes natural gas lines) and shall not be parallel to a County Road. Natural Gas Distribution is a line that serves the final.customer. — Vol.-- •"k SRI k�B � �bP q$NNa:.00ro g Mt �AI;;-* �6g;,g r�uceuo$oo g b---------- —l Ilk �rwPRe$r�o NVO I §i a� , g.a&geRB$8s" fix= N SRI k�B � a g Mt �AI;;-* W NVO I §i a� , gp�ES% 6 fiF a`-zb6 fix= pg55 z 4n Ec:y4gR g£Fg85@@@Q@@@Qgg �B ��aQ��g F Bb`S gB 6� SSc'� 3h5 88 4 �3FTE�3R 6. S yp_e null .(sn-YO-{spltl � �G +»Ir�ous • �}1- �� • ..Daws I 05-0 8gS$aan6F: .^8 iv>w os x{ x a i of a Pg,_ Vol- . � 21 COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: November 10, 2015 SUBJECT: Utility Perrnit — Wickson Creek Special Utility District Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Weedon Loop 1,160 feet southwest of Treebrook Lane. Line will provide service to customer at 9114 Weedon Loop. Site is located in Precinct 2. SUBMITTED BY: ACKN WLEDGED BY: Darrell W. Kolwesy Ca ena Right of Way Agent Commis oner Precinct 2 This request is 1E��1?PR�OVED /- )E.IED by Commissioners' Court', Duane Peters, County Judge DATE.: A 11 i%'f� Vol. DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS Pursuant to the Texas Utility Code, Section 181.024, comes now WICKSON CREEK SPECIAL UTILITY DISTRICT [company name], hereinafter referred to as "Company" a TEXAS UTILITY [state] Corporation, with authority to transact business in Texas, acting by and through its duly authorized representative, and hereby petitions the County Engineer for the right to lay, construct, maintain, repair an&or operate a gas facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached hereto and said location described as follows: Facility to Cross Road Length of TYPE OF CONSTRUCTION Road Name &Block NumberCrossing (CHECK ONE Bored Jacked Driven Cased WEEDON LOOP 50' X X Road Name and Facilitv to Parallel County Road Within Right-Of-Wav From CONSTRUCTION TYPE F, Diameter Wall Thickness 11/2" Encasement Pipe Material Specification Maximum Operation Pressure 80 PSI I The location and description of the proposed installation and appurtenances mast be fully shown on the attached detailed drawings. I The Company shall commence actual construction/work in good faith within 60 days from the date of < shall complete said construction /work within I working days. (COMPANY MUST FILL construction is not begun by the 60`n day, Company will be required to apply for a new permit. Company declares that prior to filing this application, it has ascertained the location of all existing util and underground, and the filing of this application is prima facie evidence that the proposed inst� conflict with any existing utility. A copy of this permit shall be kept at the job site any time work is being performed. It is expressly stipulated that this Permit is a license for permissive use only and that the placing of f public property pursuant to this permit shall not operate to create or vest any property right in said holder. It is understood and agreed that the rights and privileges herein set out are granted only to the extent of right, title and interest in the land to be entered upon and used by the holder and the holder will at all time of and indemnify, defend and save harmless Brazos Countyfrom and against any and all loss, dam I/ Vol. _ =pg. o � I permit and 4 If such both aerial m will not upon to County's assume risk >es, cost or expense arising in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights and privileges. I Any deviation from these specifications must be approved by Brazos County Engineer's Office or its designated representative. I Approval of County Engineer's Office may take as long as two weeks after complete application is received. Applicant agrees to comply with all rules of the County Commissioners and the County Engineer in construction of said installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated herein for reference. In the event Company jails to obtain a permit prior to the installation or does not install utilities in co ipliance with installation requirements set forth herein (i.e. depth, location, etc), Company assumes all financial respolnsibility for dannages and/or destruction of lines, cables, etc. based upon itsfailure to comply with Brazos County re juirennents. I Applicant agrees that if Brazos County demonstrates a violation of the terms of this policy, Applicant stipulates that requisites for injunctive relief exist and that Brazos County is entitled to relief enjoining any conduct by applicant which is contrary to the policies. This permit is a revocable permit. Brazos County reserves the right to revoke this permit at any time, in the sole discretion of Brazos County, for interests of public health, safety or welfare, or for failure to repair airy damages upon demand, or for any other reason deemed sufficient by Brazos County. In the event Connpany fails to comply with airy or all of the requirements as set forth herein, the Counity may take such action as it deenns appropriate to compel compliance. The County Engineer farther retains the right to revoke this Permit by verbal notification to the Applicant/Conpany. Failure to obtain tris permit an(Yor notify the County Engineer's Office within 24 hours of beginning I onstruction shall constitute6groundsforjobshutdown. By signing below, I certify that I am authorized to represent the Company listed below, and that the Com any agrees to the conditions/provisions included in this permit. WICKSON CREEK SPECIAL UTILITY DISTRICT Company Name j By: @—�X Signature GENERAL MANAGER Title P.o.Box 4756 Address Bryan, TX 77805 City State Zip (979) 589=3030 Phone Number watson@wicksoncreek.com Email Vol. _. ... Pg. — -- WA-T-ER-UTILITY–AP-PRUVAL —= Brazos County offers no objection to the proposed location of the utility in the County right of way asi shown by accompanying drawings and notice dated %0 –aa ' except as noted below: EXCEPTIONS: e (Month/Day/Year) 'Al Brazos County Engineer Vol. Pg. _� / / / m g / » Q AbTUI-A Ho. ■ ;|/ rt { Vol. j-2!-1. Pg..--2:Ll--. .. . ... ......... —ism, CD ILL CD Vol. j-2!-1. Pg..--2:Ll--. .. . ... ......... —ism, CD CD 0 U > 0 F— Z w F7L 0 < < 2: C:) 0 Vol. j-2!-1. Pg..--2:Ll--. .. . ... ......... —ism, Vol. j-2!-1. Pg..--2:Ll--. .. . ... ......... Vol. j-2!-1. Pg..--2:Ll--. BRAZOS COUNTY ROADWAY SAFETY AND ROAD PRESERVATION STANDARDS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGI3TS OF WAY A. General Requirements I . Adequate drainage shall be maintained in ditches at all times. i 2. Permittee will use best management practices (BMP") (EPA and TCEQ both provide lists of examples of 13MPs) to minimize erosion and sedimentation resulting from the proposed installation. 3. The permittee shall take precautions to avoid damage to property. All County Right of Way and property shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or appointed representative. 4. The construction and maintenance of such utility shall not interfere with the property or rights of a prior occupant. 5. Permittee shall not interfere with other utilities located in the right of way. In the event damagesloccur, permittee will be liable to the County or other utilities running through the right of way. 6. County Engineer shall determine whether or not permittee's plans shall inconvenience the public! If it is determined that inconvenience to the public exists, then the County Engineer will decide whether such project will be allowed or if an alternative exists so as not to inconvenience the public. B. Safety Requirements C. 1. Proper traffic control measures must be put in place prior to beginning work and remain in place the duration of the job. All traffic control measures must follow the Texas Manual of Uniform T Control Devices (TMUTCD). See Traffic Control Requirements below. 2. During construction, all safety regulations of the "Texas Department of Transportation shall be 3. Permittee must take such precautions and measures, including placing and displaying safety dev may be necessary, in order to safely conduct the public through the project area. Company shall flagmen, signs, signals or devices necessary to provide complete safety to the public. 4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. 5. No cable, conduit and/or pole line shall be laid, constructed, maintained and/or repaired so as to constitute a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved by the County Engineer. Traffic Control Plan 1. A traffic control plan, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided for the following: a. Any construction (i.e. pit, excavation, hole) left open overnight, requires specific nighttime traffic control measures pursuant to the TMUTCD; Vol. Pg���� b. If construction is within ten (10) feet of the roadway; or c. Any work performed in the road right-of-way; 2. Plan must be attached to the permit and kept at thejob site any time work is being performed. 3. Plan must set forth the time of completion for thejob. D. Desi_u Standards 1. All overhead installations shall conform to clearance standards of the Texas Department of Transportatii and the pole be placed in the designated area for power specified as set forth in the Texas UtiliiW Code, Section 181.04.5. 2. All pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure safety to the public. Any pole placed in violation of this requirement will be required to be moved to the appropriate location at the company's expense. Exceptions may be approved by the County Engineer, J. All underground installations shall (these are minimum depths— utility may place deeper): a. be placed at a minimum depth of forty-eight (48) inches below the top of the pavement; b. be at least thirty-six (36) inches below ditch flow line when installation is within the area measured from top of bank to top of bank; c. be at least forty-eight (48) inches below ditch flow line if low pressure gas or petroleum linesi. For high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below; d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of way of less than 60 feet. 4. Water Lines: All water lines must be a minimum 36 -inches below the ditch flow line and cased. Waterlines shall be cased if crossing under the roadway. 5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within designated locations based upon the type of utility. The locations shall be as follows: (measured from back of right-of-way). Power — 0 to 2 feet, nominally 1 ` Phone —2 to 4 feet, nominally 3' Gas — 4 to 6 feet, nominally 5' Cable — 6 to 8 feet, nominally 7' I 6. Utilities with less than 60 feet right-of-way in all new developments shall install the utility in a similar manner as referenced in No. 3 above; however, the County Engineer or its designated representat've will provide final approval of each utility location. 7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longer than 400' if left open over night or unattended. S. Crossings under a county road shall: a. be bored orjacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT; b. be pressure grouted for the full length of the crossing if the annular space between pipe and ci sing and soil exceeds one (1) inch. Brazos County must be given 24 hours notice of pressure grouting: operations and have the opportunity to have an inspector on site to observe pressure grouting! operations; Vol-=) 2 if pg._,�- l✓7 c. TxDOT Standard Specification Item 476 shall be followed for all boring,jackine, tunnelins and joints. 9. Bore Pits: a. no pits shall remain open longer than 2 days; b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above. c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from the County Engineer or his representative; d. when pits are to remain open for more than 8 hours, due diligence will be used in protecting the spoil pile to prevent drainage problems; e. based upon soil conditions, the County Engineer or his representative may require shoring tolprotect pavement integrity; f. based upon soil conditions, the County Engineer or his representative may require pits be placed further from the edge of road. i 10. Any installation within ten (10) feet of edge of pavement shall meet the following: a. location must be approved by the County Engineer or his representative b. backfilled with cement stabilized material. c. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity. d. all excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed during a rainy period or at other times where excess water cannot be prevented from entering the trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized material as soon as weather permits; e. all disturbed base and pavement materials shall be removed and restored to the satisfaction of the County Engineer or his representatives. f. no side or lateral tamping to fill voids under the base and pavement materials is allowed. 11. Company must be careful to not jeopardize the slope or integrity of the shoulder of the road. In the event Company damages the slope, shoulder or any other portion of the right-of-way, Company will be responsible for repairing the damage and replacing the right-of-way to the condition it was prior to commencing construction. i 12. Operation of construction and/or maintenance equipment on the traveled surface of any improved County road will not be permitted, except in an instance whereby the laying, construction, maintenance and/or repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided meeting TMUTCD requirements. I 13. In the event said construction and/or maintenance and/or repair requires Company to remove, i jeopardize any section of the road (asphalt, cement, road base, etc.), Company will be required a performance bond or letter of credit securing necessary repairs. Said bond amount will be de the County Engineer. 14. The applicant shall submit a letter of "No Objection' from the Army Corps of Engineers for all designated wetlands and environmentally sensitive lands. F. Emereencn work 1. In the event Company is required to perform emergency services, that requires excavation in a C Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Vol. -a Pg. or provide mined by pany shall notify County Engineer within 24 hours of beginning construction/repairs. This will allow the County Engineers Office an opportunity to inspect the site to ensure the integrity ofthe County Right of Way and traffic safety controls used. R Repairs to eristine facilities I . Maintenance and/or repair to existing cables, conduits, and/or pole lines which require disturbance of the soil, shall not be performed until plans describing such maintenance and/or repair have been approved by the County Engineer or its designated representative and a permit has been obtained. i G. Relocation ofutilities 1. When and if the County Engineer determines that it is necessary for the construction, repair, impI rovement, alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or other facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated thereon, as required by the County Engineer within a reasonable time as determined by the County Engineer and Utility Company, and at the expense of the Utility Company. H. Hielt Pressure Pipelines I. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining' controlled access or non -controlled access installations, should contain the following additional information in the description of the permit. -diameter -wall thickness -material specification -minimum yield strength -maximum operation pressure of the pipeline 2. With the exception of the maximum operation pressure of the pipeline, this information is to be for both the carrier pipe and the casing. 3. Assurance must also be given that the installation material and design meet the minimum Federal Safety Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed by an authorized representative of the company. I 4. Petroleum Pipelines: Depth Twe of Pipeline (below deepest ditch grade) Special Requirements Encased Pipe Less than 10' Must be covered with concrete pad at least 36" deep Encased Pipe Greater than 10' No concrete pad required Non -Cased Pipe Less than 10' Must be covered with concrete pad at leasi 48" deep Non -Cased Pipe Greater than 10' No concrete pad required I Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum.I 5. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -of - I Way. Transmission lines have been determined to be petroleum pipelines (which includes natural gas lines) and shall not be parallel to a County Road. 6. Natural Gas Distribution is a line that serves the final customer. I Vol. _,�2,Pg, -H § $§ �'8 •"' BSP Y�` €�� P vE ISM a �' zn--- t85 4Ld �s Jo o S J s' U @fl e g ��68 b6 •�, vi$N 2 .1 ~ S— 60 gSgF s£ycy''g e§ o 55 � �^ f6of $gg �§E�e Sgb�aF$ h -g5 s gnsF F U �i� B8 'a a gr E2"282 —E'P o't5-5a F£°g2— pp8—E'Y�5 — R^ cult Fen-10-�W ltl I Y�z p • � ��� :jOY'°s o 5 0o R � ul uv s N � o_ TTI cull02 t— C 2 j reals �5.£ p•. Fein 'e �: we os >o O � 2 N _ � a i � .uveas yam ows F- a e N � We o^ Y ag Ir ro1,W5 � wlnoK O O N � Z O mas V W � � 6 j ewe os .. ego y. I sc� .ei � 1 E•e�8 2 ,3 a �,....a,.....o.. ,,,.. .e..mti! `.'.N'.:m.,aiA°.oi °� 1• < Ii wiv .3i.o :;"wa�:,e a w,�.°.,16`"1'.;'.".. Vol _a a pg § $§ �'8 •"' BSP Y�` €�� P vE �d n� OJ.. O X v �' zn--- t85 4Ld �s Jo o S J s' U @fl e @=<< S au 2 .1 ~ S— 60 gSgF s£ycy''g 55 � �^ f6of $gg �§E�e Sgb�aF$ h -g5 s gnsF F U �i� ty gr E2"282 —E'P o't5-5a F£°g2— pp8—E'Y�5 — g�a sgs k 6 , -e �.ng o giiHax P,€a R^ cult Fen-10-�W ltl I Y�z p • � ��� :jOY'°s o 5 0o R � ul uv s N � o_ TTI cull02 t— C 2 j reals �5.£ p•. Fein 'e �: we os >o O � 2 N _ � a i � .uveas yam ows F- a e N � We o^ Y ag Ir ro1,W5 � wlnoK O O N � Z O mas V W � � 6 j ewe os .. ego y. I sc� .ei � 1 E•e�8 2 ,3 a �,....a,.....o.. ,,,.. .e..mti! `.'.N'.:m.,aiA°.oi °� 1• < Ii wiv .3i.o :;"wa�:,e a w,�.°.,16`"1'.;'.".. Vol _a a pg BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridge DEPT. NUMBER 56001000 DATE OF COURT MEETING: November 10, 2015 ITEM: located in Precinct 2. SOURCE OF FUNDS: N/A NOTES: • Prepared for: Grant Carrabba • Prepared by: Civil Engineer Consultants SUBMITTED BY: ,I, R R. Alan Munger, P. . County Engineer This Request is I: Sammy Catalena Precinct i ��o lis Date AP(aut:auuu for uevetopmeDt Office Use Only. Brazos County Subdivision and Development Regulations Brazos County Engineering Department 2617 Hwy 21 West, Bryan, Texas 77903 (979) 922-2127 Master Plan_ Final Plat_ Re -Plat ♦ Amending Plat _ Property Description Road Location: aWmeeroc-n Legal Description: L&,na.m t.n as A.M. sma. vn T"AM. A � c...ry Subdivision Description Subdivision Name: Alwnbn.SC16 wPhTw Total number of lots: r Total Acreage: 1124.. Property Owner Ownername(s) owu.ca .w- o na. a a.mro Moore- axe Current mailing address: w..mo.aau e>guAct arm4. rx neer-moma-avo n..x e.mcwrt en.n rz neae^ Phone numberfs): e.�am.vnn.awl-um..vam ram Applicant or Authorized Agent, Engineer or Surveyor ) Name and Address: C'iramire.naac....Ww-siv..nMM-4m1sTOM Arosunoaery...rn o2 Phone number(s): Name and Address: Phone numberfs): Application is for Residential (e) Mobile Home Park () Commercial ( ) Other ( ) Is any of the property located in a Floodplain or Flood Hazard area? No (yes/no) Acknowledgment: The flood hazard boundary maps and other food data used by Brazos County in evaluating flood hazards to proposed developments are considered reasonable and accurate for regulatory purposes end are based an the best available seier and engineering data On rare occasions greater foods can and will occur and flood heights may be increased by man-made or r canes. Issuance of Floodplain Permit in accordance with the Brazos County Flood Damage Prevention Ordinance does not in that development outside the areas of special food hazard will be free from flooding or flood damage. Issuance of a pemsit shal. create liability on the part of Brazos County or any officer or employee of Brazos County in the event flooding of flood damage occur. Is part or all of the property within an ETJ of a City? Yes (yes/no) Will any construction occur in TxDOT right-of-ways? - No (yes/no) Application Check List: Copies of finished plat with corrections (if any): ❑ 9 copies to Brazos County ❑ One (1) copy to Brazos County Health Dept. ❑ One (1) copy to Brazos County 911 ❑ One (1) copy to local Water District or Company Letters of approval (to be sent by the approving institution directly to Brazos County Engineering): ❑ Letter from Brazos County Health Dept — For onsite sewage evaluation. ❑ Letter from Brazos County 911— For road names. ❑ Letter from Water District orCompany. —Stating water availability, etc:. If property is within an ETJ of a city: ❑ Approval notification from appropriate city. Applicant attest that they have signed this application in the capacity designated, if any, and further attest that they have read document and the statement contained herein and any attached are true and factual. A' applicants are encouraged to review the County Regulations prior to any plat submittal. It4s understood tl this application is not finished or dated until all documents listed above are riled at the Brazos County Engineen f$ce a a cep lice blanks are felted in the application above Applicants Signature Date County Witness Date VOL _o Pg._ ��- )3 BRAZOS COUNTY, TEXAS BUDGET AMENDMENT(S) FOR THE 2014-2015 BUDGET YEAR NO. 14/15 57.1— 57.5 On this the 10th day of November 2015 at a regular meeting of the Commissioners' Court; the following members were present: A. Duane Peters, County Judge, Presiding B. Lloyd Wassermann, Commissioner, Precinct 1 C. Sammy Catalena, Commissioner, Precinct 2 D. Kenny Mallard, Commissioner, Precinct 3 E. Irma Cauley, Commissioner, Precinct 4 F. Karen McQueen, County Clerk The following proceedings were held: THAT WHEREAS, on 10th day of November 2015 the Court heard and approved a budget amendment for the 2014-2015 budget year for Brazos County, Texas; and I WHEREAS, expenditure is necessary due to the necessity to meet unusual and unforeseen conditions i which could not be reasonably included in the original budget adopted 9 September 2014, the following amendment(s) to the original budget are hereby authorized, as described on the attached page(s). ADOPTED AND APPROVED this the 10th day of November 2015. THE CONEMSSykWJB5COURT OF BRAZOS COUNTY, TEXAS. In Duane Peters, County Original: County Clerk's Office and Attached to the original budget Vol. -d!a --- Pg Vol. BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14115. 57.2 1111 n/2n15 FUND DIV ACCT PROJ DR/CR ACCOUNT NAME Increase Decrease 0100 28002000 53300000 CR Employee Health Insurance ! 27,365.77 0100 28003000 61395000 CR Inmate -Health Care 15,268.98 0100 28003000 51200000 DR Sal - Dept Heads 42,633.75 0100 28003000 53100000 DR Social Security 1.00 Jail and Jail Medical Clinic Reallocation of funds to cover pa o11 in the proper account for FY 15 for the Medical Director's Salary. i I e e , Approva ... nntn Date �. Vol. _a_ _g: pg,_ �- BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14/15 - 57.3 Vol. _ L_ Pg _��- BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14115 - 57.4 11/10/2015 FUND DIV ACCT PROJ DR/CR ACCOUNT NAME Increase Decrease 4312 63000710 59100000 CR DDEA 259,854.17 4312 63000910 80100000 DR Buildings 259,854.17 I CO 2012 To reallocate budget from DDEA to building line item for Tax Office building. Ajoumal entry will be made after the budget amendment is approved so that the fund can be pro erly closed. I =,Date 11/4/2015 Fail _ pg' GOU FUN BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14115 - 57.5 l/1 of funds to cover for the work completed on the SCAAP Grant in FY 15. nnmi Date %11i4�2016� Vol, —�—a� Pg. `� BRAZOS COUNTY, TEXAS BUDGET AMENDMENT(S) FOR THE 2015-2016 BUDGET YEAR NO. 15/16 7.1-7.8 1 On this the 10th day of November 2015 at a regular meeting of the Commissioners' Court,'the following members were present: A. Duane Peters, County Judge, Presiding B. Lloyd Wassermann, Commissioner, Precinct 1 C. Sammy Catalena, Commissioner, Precinct 2 D. Kenny Mallard, Commissioner, Precinct 3 E. Irma Cauley, Commissioner, Precinct 4 F. Karen McQueen, County Clerk The following proceedings were held -- THAT WHEREAS, on 10th day of November 2015 the Court heard and approved a amendment for the 2014-2015 budget year for Brazos County, Texas; and WHEREAS, expenditure is necessary due to the necessityto meet unusual and which could not be reasonably included in the original budget adopted 8 September 2015, the amendment(s) to the original budget are hereby authorized, as described on the attached page(s). ADOPTED AND APPROVED this the 10th day of November 2015. THE CONBUSSIONERS COURT OF BRAZOS COUNTY, TEXAS. (:Z:By: Duane Peters, County Judge Original: County Clerk's Office and Attached to the original budget BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 15/16 - 7.1 Vol. BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS A L. 4 G N G_ 71 BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 15/16 - 7.4 11 r1 n/zn 15 FUND DIV ACCT PROJ DRICRI ACCOUNT NAME Increase Decrease 0100 11001500 61130000 CR Contingency '151,168.29 0100 11200200 59100000 DR DDEA - Collections 2,082.67 0100 12000100 59100000 DR DDEA -Coun Treasurer 1,077.47 0100 12500100 59100000 DR DDEA - Risk Management 2,995.91 0100 15000100 59100000 DR DDEA - Human Resources 848.39 0100 16500100 59100000 DR DDEA - Purchasing 282.74 0100 17000100 59100000 DR DDEA- Facilities Services 11,156.59 0100 18000100 59100000 DR DDEA - Comity Attomey 0100 19000100 59100000 DR DDEA - District Attorney 0100 20000100 59100000 DR DDEA - District Clerk Admin 0100 20010000 59100000 DR DDEA - District Clerk - Ju Services 0100 21000100 59100000 DR DDEA -Coun Clerk 5 1 g6,763.28 0100 22000100 59100000 DR DDEA - 85th District Court 0100 22100100 59100000 DR DDEA - 272nd District Court 0100 22200100 59100000 DR DDEA - 361st District Court 80100 22500100 59100000 DR DDEA - Juvenile Court Referee 0100 23000100 59100000 DR DDEA - CCL #1 Admin 4,470.74 0100 23100100 59100000 DR DDEA - CCL #2 Admin 1,195.561 0100 24101100 59100000 DR DDEA - JP Pct. #1 20,35639 0100 24301100 59100000 DR DDEA - JP Pct. #3 15,818.52 0100 30301100 59100000 DR DDEA - Constable Pct. 43 48.67 0100 ! 31000100 59100000 DR DDEA - Juvenile 15,135.10 0100 35500100 59100000 DR DDEA - Emergency Management 18,551.79 ! 0100 37000100 59100000 DR IDDEA - Ag. Ext. 74.50 General Fund Contingency and Departmental DDEA To reallocate the DDEA balances from Fiscal Year 2015 to departments with carry over funds. I i nnm� /4/2015 Vol. _o_a _ Pg. aa. VOA• -,2-r;LZ. P9, BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 15116 - 7.6 11001500 nnm -1,1/5/20 51 BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No.15/16 - 7.7 11/10/2015 E Vol. __'; No Sheriff's Office — Administration Sheriff's Office — Jail iviaranez, raui Z)tep Stone, Elizabeth Step I Stumpf, Michael Step I Barratt, Jerry PERSONNEL Gunn, Zachary i Harris, Demarnae CHANGE OF STATUS REQUESTS Hemphill, Erma Step In Commissioner Court Date: November 10, 2015 Ivey, Zachary Step In Department Submitting Information: Human Resources Step In Purpose of Submissions: Consider and Take Action on Change Requests Department Submitting Employee Request Action Requested Request(s) Applies To District Attorney Johnson, Melva New Hire Juvenile Services — TJPC - State Aid Richter, Amanda Resignation Sheriff's Office — Administration Sheriff's Office — Jail iviaranez, raui Z)tep Stone, Elizabeth Step I Stumpf, Michael Step I Barratt, Jerry Step In Gunn, Zachary Step In Harris, Demarnae Step In Hemphill, Erma Step In Hutchinson, Holli Step In Ivey, Zachary Step In O'Brien, Austin Step In Approved in Commissioners' Court: November 10, 2015 County Judge's or Commissioner's Signature: (This Copy to be attached to minutes) / - I Vol, _� a �_ i'g._aJz 24 d Vol. _ _ J—_-Pya , § \ ) k vr-2,2 15L, pg. 123'( `2\ / j\ » §k\\! ) | {! l.,.± k !){ y { ) {z VA rp(# a !, |! !} ). ƒ .! t! A { vr-2,2 15L, pg. 123'( `2\ §k\\! ) l.,.± k !){ y ) ƒ .! t! A { © !\) )i( / \E Q)\f 0 4!° ¥ A. z 2 ]+ «« vr-2,2 15L, pg. 123'( 11/312015 HighShariff.com Mail- Texas Attorney General- confirmation of Submission for Your Chapter 59 Asset Chris Kirk <chrisk aeaaaaaaa Texas Attorney General - Confirmation of Submission for Your Chapter 59 Asset Forfeiture Report 1 message Chapter 59 Audit Report <chapter59auditreport@texasattorneygeneral.gov> Tue, Nov 3, 2015 �t 11:22 AM To: "chriskirk@highsheriff.com" <chriskirk@highsheriff.com> Dear Sheriff Kirk, Your Chapter 59 Audit Report has been successfully submitted. To view or print your report, login to the Chapter 59 Asset Forfeiture Reporting Portal at texasattomeygeneral.gov/. Your report is located in the View or Amend Submitted Reports tab. Thank you, Chapter 59 Audit Report Customer Support httpsJfmall.gwgle.com/mail/L 1MUi=291kmm26a3l73a&view=pi&search=inbox&th=160ce5f0&kAa86e&siml=150ce5fDM4886a Vol .._a a . Dg,_ /,�. 1/1 FY 2015 CHAPTER 59 ASSET FORFEITURE REPORT BY LAW ENFORCEMENT AGENCY Agency Brazos County Sheriffs Dept. Mailing Address 1700 Hwy. 21 West City Bryan State TX Zip 77803 Phone Number (979) 3614992 Fiscal Begining Month September Fiscal Ending Month August Fiscal Year 2015 NOTE: PLEASE ROUND ALL FIGURES TO NEAREST WHOLE DOLLAR I. SEIZED FUNDS PURSUANT TO CHAPTER 59 A) Beginning Balance: $0.00 8) Seizures During Reporting Period: 1) Amount seized and retained in your agencys custody $0.00 2) Amount seized and transferred to the District Attorney pending forfeiture $988.0 3) Total Seizures $988.00 C) Interest Earned on Seized Funds During Reporting Period: $0.00 D) Amount Returned to Defendants/Respondents: $0.00 E) Amount Transferred to Forfeiture Account $0.00 F) Other Reconciliation hems: $0.00 Description G) Ending Balance II. FORFEITED FUNDS AND OTHER COURT AWARDS PURSUANT TO CHAPTER 59 A) Beginning Balance: $21,578.00 B) Amount Forfeited to and Received by Reporting $0.00 Agency (Including Interest) During Reporting Period: C) Interest Eamed.on Forfeited Funds During $56.00 Reporting Period: D) Amount Awarded Pursuant to 59.022: $0.00 E) Amount Awarded Pursuant to 59.023: $0.00 F) Proceeds Received by Your Agency From Sale of $430.00 Forfeited Property; G) Amount Returned to Crime Victims: $0.00 H) Other Reconciliation Items: $0.00 Description: Vol. _a� Pg. �z Paye 1 of 1) Total expenditures of Forfeited Funds During Reporting Period: J) Ending Balance: III. OTHER PROPERTY A) MOTOR VEHICLES (Include cars, motorcycles, tractor trailers,etc.) 1) Seized: 0 2) Forfeited to Agency: 0 3) Returned to Defendants/Respondents: 0 4) Put Into use by Agency: 0 B) REAL PROPERTY (Count each parcel seized as one Item) 1) Seized: 0 2) Forfeited to Agency: 0 3) Returned to Defendants/Respondents: 0 4) Put Into use by Agency: 0 C) COMPUTERS (Include computer amd attached system components,such as printers and monitors, as one Item) 1) Seized: 0 2) Forfeited to Agency: 0 3) Returned to Defendants/Respondents: 0 4) Put into use by Agency: 0 D) FIREARMS (Include only firearms seized for forfeiture under Chapter 59. Do not Include weapons disposed under Chapter 18) 1) Seized: 0 2) Forfeited to Agency: 0 3) Returned to Defendants/Respondents: 0 4) Put into use by Agency: 0I E) Other Property Description Seized Forfeited to Agency Returned to Put into use by Agency DefendenlslRespondenls 0 0 0 0 IV,FORFEITED PROPERTY RECEIVED FROM ANOTHER AGENCY A) Motor Vehicles: B) Real Property: C) Computers: D) Firearms: E) Other. V. FORFEITED PROPERTY TRANSFERRED OR LOANED TO ANOTHER AGENCY I Page 2 of 7 FO, az Pg'-= - A) Motor Vehicles: B) Real Property: C) Computers: D) Firearms: E) Other: VLEXPENDITURES A) SALARIES 1) Increase of Salary,Expense or Allowance for Employees (Salary Supplements): 2) Salary Budgeted Solely From Forfeited Funds: 3) Number of Employees Paid Using Forfeiture Funds: 4) TOTAL SALARIES PAID OUT OF CHAPTER 59 FUNDS: B) OVERTIME 1) For Employees Budgeted by Governing Body: 2) For Employees Budgeted Solely out of Forfeiture Funds: 3) Number of Employees Paid Using Forfeiture Funds: 4) TOTAL OVERTTIME PAID OUT OF CHAPTER 59 FUNDS: C) EQUIPMENT 1)Vehicles: $0.00 2) Computers: $0.00 3) Firearms, Protective Body Armor, Personal $1,190.00 Equipment: 4) Furniture: $0.00 5) Software: $0.00 6) Maintenance Costs: $0.00 7) Uniforms: $0.00 8) K9 Related Costs: $0.00 9)Other: $0.00 Description: 10) TOTAL EQUIPMENT PURCHASED WITH CHAPTER 59 FUNDS: D) SUPPLIES 0 0 0 0 0 0 0 190.00 3 of 7 1) Office Supplies: $0.00 2) Mobile Phone and Data $0.00 Account Fees: 3) Internet: $0.00 4) Other: $0.00 Description: 5) TOTAL SUPPLIES PURCHASED WITH CHAPTER 59 FUNDS: E) Travel 1)In State Travel a) Transportation: b) Meals & Lodging: C) Mileage: d) Incidental Expenses: e) Total In State Travel: 2) Out of State Travel a) Transpodalion: b) Meals & Lodging: C) Mileage: d) Incidental Expenses: e) Total Out of Stale Travel: 3) TOTAL TRAVEL PAID OUT OF CHAPTER 59 FUNDS Total Travel Paid Out of Chapter 59 Funds: F) TRAINING 1) Fees (Conferences, $0.00 Seminars): 2) Materials (Books, CDs, $0.00 Videos, etc.): 3) Other: $0.00 Description: 4) TOTAL TRAINING PAID OUT OF CHAPTER 59 FUNDS: G) INVESTIGATIVE COSTS P9._o��... I Page 4 of 1) Informant Costs: $0.00 2) Buy Money: $0.00 3) Lab Expenses: $0.00 4) Other: $0.00 Description: $0.00 5) TOTAL INVESTIGATIVE COSTS PAID OUT OF CHAPTER 59 FUNDS: H) PREVENTION /TREATMENT PROGRAMS! FINANCIAL ASSISTANCE / DONATIONS 1) Tolal Prevention/Treatment Programs (pursuant to 59.06 (d-3(6), (h), 2) Total Financial Assistance (pursuant to Articles 59,06 (n) and (o) ): 3) Total Donations (pursuant to Articles 59.06 (d-2)): 4) TOTAL PREVENTIONITREATMENT PROGRAMS/FINANCIAL ASSISTANCEIDONATIONS (pursuant to Articles 59.06 (d-3(6)).(h),G),(n),(o), (d-2)): 1) FACILITY COSTS 1) Building Purchase: $0.00 2) Lease Payments: $0.00 3) Remodeling: $0.00 4) Maintenance Costs: $0.00 5) Utilities: $0.00 6) Other: $0.00 Description: 7) TOTAL FACILITY COSTS PAID OUT OF CHAPTER 59 FUNDS: J) MISCELLANEOUS FEES 1) Court Costs: $0.00 2) Filing Fees: $0.00 3)Insurance: $0.00 4) Witness Fees (including $0.00 travel and security): 5) Audit Costs and Fees (including audit $0.00 preparagon and professional fees) 6) Other. $0.00 5 of 7 Description: 7) TOTAL MISCELLANEOUS FEES PAID OUT OF CHAPTER 59 FUNDS: K) PAID TO STATE TREASURY / GENERAL FUND/ HEALTH & HUMAN SEVICES COMMISSION 1) Total paid to Stale Treasury due to lack of local agreement pursuant to 69.06 (c): 2) Total paid to State Treasury due to participating In task force not established In accordance with 59.06 (q)(1): 3) Total paid to General Fund pursuant to 59.06 (C•3) (c) (Texas Department of Public Safety only): 4)Total forfeiture funds transferred to the Health and Human Services Commission pursuant to 59.06 (p): 5) TOTAL PAID TO STATE TREASURY/ GENERAL FUND/ HEALTH & HUMAN SERVICES COMMISSION OUT OF CHAPTER 59 FUNDS: L) TOTAL PAID TO COOPERATING AGENCY(IES) PURSUANT TO LOCAL AGREEMENT TOTAL PAID TO COOPERATING AGENCY(IES) PURSUANT TO LOCAL AGREEMENT: M) TOTAL OTHER EXPENSES PAID OUT OF CHAPTER 59 FUNDS WHICH ARE NOT ACCOUNTED FOR IN PREVIOUS TOTAL OTHER EXPENSES PAID OUT OF CHAPTER 59 FUNDS WHICH ARE NOT $0,00 ACCOUNTED FOR IN PREVIOUS CATEGORIES: Description: N) TOTAL EXPENDITURES TOTAL EXPENDITURES: AUDITOR/ TREASURER/ACCOUNTING PROFESSIONAL/PREPARER CERTIFICATION By pressing "Save" below using your email address and password account access, and pursuant to the terms of service, you certify that you swear of affirm that the Commissioners Court, City Council or Head of Agency(If no governing body) has requested that you conduct the audit requlired by Article 59.06 of the Code of Criminal Procedure and that upon diligent inspection of all relevant documents and supporting materials, you pelieve that the information contained in this report is true and correct to the best of your Knowledge. AUDITOR/ TREASURER/ ACCOUNTING PROFESSIONAL/ Katie Butler PREPARER SIGNATURE: TITLE: County Auditor HEAD OF AGENCY CERTIFICATION By pressing "submit' below using your email address and password account access, and pursuant to the terms of service you swear or affirm, under Vol 4 _ FSC :�� Page 6 of 7 penalty of perjury, that you have accounted for the seizure, forfeiture, receipt, and specific expenditure of all proceeds and property subjeot to Chapter 59 of the Code of Criminal Procedure, and that upon diligent Inspection of all relevant documents and supporting materials,this aset forfeiture report is true and correct and contains all information required by Article 59.06 of the Code of Criminal Procedure. You further sweai affirm that, to the best of your knowledge, all expenditures reported herein were lawful and proper, and made In accordance with Texas la r. HEAD OF AGENCY Christopher C. Kirk SIGNATURE: TfTLE: Sheriff DATE: 11/312015 Comments Paige 7 of 7 NOTE PLEASE ROUND ALL FIGURES TO NEAREST WHOLE DOLLAR FY 2015 1 SEIZED FUNDS PURSUANT TO CHAPTER 59 CHAPTER 59 ASSET FORFEITURE REPORT A) Begnnmg Balance BY LAW ENFORCEMENT AGENCY Agency Brazos County Constable Precmd 1 Meng Address 12845 FM 2154 Slate 140 Cdy College Steuart state TX ZIP 77845 Phone Number (979) 695-0030 Ftsrat Segwng March September Fusel Ending Month August F=W Year 2015 NOTE PLEASE ROUND ALL FIGURES TO NEAREST WHOLE DOLLAR SO 00 1 SEIZED FUNDS PURSUANT TO CHAPTER 59 A) Begnnmg Balance $000 8) Som Dromg Repomng Period E8 00 1) Amount sacred and reamed in your agency's custody 9000 2) Amount sexed and bansterted to 010 Desnct Attorney pending fortedlae 9000 3) Total Semaes $000 C) Interest Earned on SoJaed Funds During Reportng Period $000 D) Amount Returned to DerendantslRespondents $000 E) Amount Transferred to Forfeiture A count $000 F) Other Reconciliation Items 9000 Desmpeon G) Endmg Balance 9000 II FORFEITED FUNDS AND OTHER COURT AWARDS PURSUANT TO CHAPTER 59 A) BegM(Umg Bab= 5311700 B) Amount Forfaded to and Recehed by Reporting SO 00 d$000 Reportng Ped Agency (Including interest) DunPen C) Interest Earned on Forfeded Funds During Reporurg Pend E8 00 D) Amount Awarded Pursuant to 59 022 $0 00 E) Amount Awarded Pursuant to 59 023 $000 F) Proceeds Recented try Your Agency From Sale of $000 Forfeited PmpmV G) Amount Retuned to (rune Victims 9000 H) Other RemtoLabon Items 9000 Desa(dw Vol. �� � ,. P -� � Page 1 of7 0 Tops emend nes of Forfeited Funds Ourtng Reporting Period SO 00 I -0 Ending BaWwe $3 125 00 111 OTHER PROPERTY A) MOTOR VEHICLES (Include mrs motorcycles tractor trallers etc.) 1) Sewed O 2) Forfeited to Agency 0 3) Returned to DetendartalResyondems 0 I 4) Put Into usa by Agency 0 B) REAL PROPERTY (Count each parcel seized as one Item) 1) Se sit 0 2) Fmfetpd to Agency 0 3) Retuned to Defendan0(Respoadem9 0 6) Put into use by Agency 0 C) COMPUTERS (Include damputer amd attached systern components such m pdntm and mondors as one Item) 1) Seized 0 2) FOAeted to Agency O 3) Returned to Defendanu Respondents 0 a) Pm erto use by Agency 0 D) FIREARMS (Include only firearms seined for fodertum under Chapter 59 Do not Include weapons disposed under Chapter 18) 1) Seaod 0 2) Forfeited to Agemy 0 3) Returned ed ro Defendants Respondents 0 d) Put into use by Agany a E) Otha Property Description Seeed Fodeited to Agency Returned to Put Into use by Agency DefendantslRespondaro 0 0 0 0 N FORFEITED PROPERTY RECEIVED FROM ANOTHER AGENCY A) Motor Vehicles 0 B) Real Property 0 C) Cornputem 0 0) Faearms 0 E) Omer 0 V FORFEITED PROPERTY TRANSFERRED OR LOANED TO ANOTHER AGENCY A) Motor Vehicles q / 0 Vol. _a a Pg. Page 2 of 7 B) Real Prol" 0 C) Computers 0 D) Firearms 0 E) Other 0 N EYPENDDURES A) SALARIES 1) Increase of Salary Expense or Allowance for Employers (Salary Supplements) $000 2) Salary Budgeted Soley From Forlated Funds $000 3) Number of Employees Paid Usmg Forfature Funds 0 4) TOTAL SALARIES PAID OUT OF CHAPTER 59 FUNDS 10 00 B) OVERTIME 1) For Employees Budgeted by Governing Body $000 2) For Employees Budgeted Solely out of Forfemoa Funds $000 3) Number of Employees Pad Using Fodeilure Funds 0 4) TOTAL OVERT tME PAID OUT OF CHAPTER 59 FUNDS 3000 C) EQUIPMENT 1)Vehcles $000 2) Computer; $000 3) Firearms Protective Boy Amin Personal 5000 Equipment 4)Furniture $000 5)So0vram 5000 6) Ma lerunce Costs $000 7)Uruforms $000 6) K9 Related Casts $000 9)Other $000 10) TOTAL EQUIPMENT PURCHASED WITH CHAPTER 59 FUNDS $000 D)SUPPUES 1) o6+m supplies s0 oo Page 3 of 7 vii. _a f�_ Pg..1Z� 2) Mobile Phone and Data 00 Accost Fees 3) Internet 5000 4) O&W $000 Descvlpbon 5) TOTAL SUPPLIES PURCHASED WITH CHAPTER 59 FUNDS $000 E)Travel 1) In State Travel 8) Trersportaoon $000 b) Meals 8 Lodging $000 C) Mileage $000 d) Incidental E)iprnses $000 e) Total In State Travel $000 2) Out of State Travel a) Transportation $000 b) Meals & Lodging $000 C) Mileage $000 d) Incidental F)ipenses $000 e) Total Out of State Travel $000 3) TOTAL TRAVEL PAID OUT OF CHAPTER 59 FUNDS Total Travel Palo Out of Chapter 59 Funds $000 F) TRAINING 1) Fees (Conlefencas 5000 Seminars) 2) Materials (13001m CDs $000 Videos etc) 3) Other- $000 Desorption 4) TOTAL TRAINING PAID OUT OF CRAFTER 59 FUNDS $000 G) INVESTIGATIVE COSTS (7 Page 4 of 7 Vol. __a__a_� Pg•_1 1) intorrnant costs $000 2) Buy M—T $D 00 3) Lab Fgense . $000 4)Othw $000 oesmpaon E000 5) TOTAL INVESTIGATIVE COSTS PAD OUT OF CHAPTER 59 FUNDS $000 H) PREVENTION / TREATMENT PROGRAMS / FINANCIAL ASSISTANCE / DONATIONS 1) Total PrevenuONTnmtrnent Progranns (pursuant to 59 D6 (d3(6) (h) ())) $c 00 2) Total Finance[ Asscanw (pur=m to Arbdes 59 06 (n) and (o)) $000 3) Tata) Donau m (pursuant to Articles 59 06 (6-2)) $000 4) TOTAL PREVENTIONRREATMENT PROGRAMSIFINANCLAL ASSISTANCEIDONATIONS (pursuant to Amdes 59 08 $000 (d-3(6)) (h) nj (n) (o) (d-2)) E000 I) FACILITY COSTS 1)Su" purchase $000 2) LaM, Payments $000 3) Remode5ng $000 4) Maint a Costs $000 5)Utedfes $000 6)Other $000 7) TOTAL FACILITY COSTS PAID OUT OF CHAPTER 59 FUNDS $000 J) MISCELLANEOUS FEES 1) Court Casts $000 2) Fang Fees EO DO 3)Insurance $000 4) WM= Fees &Xtuduhg $000 travel and secmty) 5) Audit Costs and Fees Qndudmg audit $000 paparation arid prohswlw hes) 61 Omer $000 Desorption Vol. _� pg,_,-,� L//C Page5of7 7) TOTAL MISCELLANEOUS FEES PAID OUT OF CHAPTER 59 FUNDS K) PAID TO STATE TREASURY / GENERAL FUND / HEALTH & HUMAN SEVICES COMMISSION 1) Tata) paid to State Treasury due to lade of local agreement pur win to 59 06 (c) $000 2) Total paid to Stale Treasury due to partidpabng in task furze not established in acoordanre with 59 06 (q)(1) $000 3) Total paid to General Fund pursuard to 59 06 (63) (e) (Terms Oeparonent of Public Safety onty) $000 a)Toml forialh" Aunds transferred to the HeaOh and Human Sauces CCrrunuasiat pursuant to 59 06 (p) $000 5) TOTAL PAID TO STATE TREASURY; GENERAL FUNDI HEALTH 8 HUMAN SERVICES COMMISSION OUT OF CHAPTER 59 FUNDS Sam L) TOTAL PAID TO COOPERATING AGENCY(IES) PURSUANT TO LOCAL AGREEMENT TOTAL PAID TO COOPERATING AGENCY(IES) PURSUANT TO LOCAL AGREEMENT $0 00 M) TOTAL OTHER EXPENSES PAID OUT OF CHAPTER 59 FUNDS WHICH ARE NOT ACCOUNTED FOR IN PREVIOUS CATEGORIES TOTAL OTHER EXPENSES PAID OUT OF CHAPTER 59 FUNDS WHICH ARE NOT $000 ACOOUNTEDFORIN PREVIOUS CATEGORIES rr.07-7�' N) TOTAL EXPENDITURES TOTAL EXPENDITURES $000 AUDITOR/ TREASURER/ACCOUNTING PROFESS CERTIFICATION BY Praswwg Sava below using your mail address and password account ii a and pursuant to the toms at semcs you oerbfy that you kaeara affirm Nat the ComrNsaoners CourL Qty Council or Head of Agency(if no governing body) has requested that you oondutt the audit by Amda 59 06 of the Cade of Criminal Procedure and Nat upon rO nim ingmdlon of 80 movant documents and wpporbng matanals you behew that the adoenabon omrtavied in this report is true and Carred to the best of yota Knowledge AUDITOR/ TREASURER/ ACCOUNTING PROFESSIONAU Kate Buller PREPARER SIGNATURE TITLE County Auditor HEAD OF AGENCY CERTIFICATION By pressrig'SuturuC below using your email address and password eceamt aeoss and pursuant to the terras of wwm you swear or b under peuWry, of pequry that you have acoaumed for the semae tvrMuaae raeiA and specific expenditure of all proceeds and prupeny simlew t Fvo, . pg. �� Page 6 of 7 Chapter 59 of Ste Code of Crtmmal Procedure and that upon NAgerd mspedlon of al relevant documents and supporbM matenats thus asset forfarture report is true and aomw and owrtams a9 Infomtabon required by Arode 59 06 of the Code of Cnmmal Prooedrae You hatter swear affirm Dat, to the best of your Iaovdedge all orglertditures reported herein were lawhd and proper and made or accordance wear Texas law HEAD OF AGENCY Jeff W Reeves SIGNATURE TITLE Constable DATE 1113/2015 Comments Page 7 of 7 FY 2015 CHAPTER 59.06(1) CERTIFICATION Did your agency receive proceeds or property pursuant to Chapter 59 of the Code of Criminal Procedure this fiscal year? NO Did your agency expend any Chapter 59 funds this fiscal year? NO Does your agency have a balance of Chapter 59 funds this fiscal year? NO Agency Name Mailing Address city State Zip Phone Number Agency Fiscal Beginning Month Brazos County Constable Precinct 4 300 E. 26th St., Suite 470 Bryan TX 77803 (979)361-4266 October Agency Fiscal Ending Month September Fiscal Year 2015 HEAD OF AGENCY CERTIFICATION By pressing "Submit" below using your email address and password account access, and pursuant to the terms of service you swear or affirm, under penalty of perjury, that you have accounted for the seizu 1, forfeiture, receipt, and specific expenditure of all proceeds and property subject to Chapter 59 of the dode of Criminal Procedure, and that upon diligent inspection of all relevant documents and supporting materials, this asset forfeiture report is true and correct and contains all information required by Article 59.06 of the Lode of Criminal Procedure. HEAD OF AGENCY SIGNATURE: Isaac Butler, Jr. TITLE: Constable DATE: 11/4/2015 Comments Vol-