Loading...
HomeMy WebLinkAbout2015-03-10 10:00AM REGULAR MEETINGI ',,t E o F r� 1015 MAR _ q b A Ii: 31 N =t coV11' G N MTf,.of�Q,P BRAZOSCOUNTY BRYAN,TEXAS NOTICE OF MEETING AND AGENDA BRAZOS COUNTY COMMISSIONERS COURT THE COMMISSIONERS COURT OF BRAZOS COUNTY WILL MEET IN REGULAR SESSION ON MARCH 10, 2015 AT 10:00 AM IN THE COMMISSIONERS COURTROOM OF THE COUNTY ADMINISTRATION BUILDING, 200 SOUTH TEXAS AVE., SUITE 106, BRYAN, TX 77803 1. Invocation and Pledge of Allegiance - U.S. and Texas Flag - Chaplain G.H. Jones and Commissioner Wassermann 2. Call for Citizen input and/or concerns. Consider and take action on agenda items 3 - 24: 3. Resolution 15-006 in Support of the Proposal by Texas A&M University to Host a 2016 Presidential or Vice Presidential Debate. 4. Resolution 15 -007 supporting the legislative decision to create a County Court at Law 3 5. Out of state travel request for Sheriff Chris Kirk to attend the WSSA Annual Conference in Las Vegas, Nevada Dates of travel are March 22 -26, 2015. 6 Request from JP 2 for variance from the county's comp time policy to allow employees of JP 2 to carry forward excess hours of compensatory time earned until the last full pay period of the fiscal year. 7. Payment Authorization to Ray Criswell in the amount of $576.07 for cleaning supplies for the Brazos Center received invoice after purchase order was closed. 8. Authorization to substitute a vehicle for one Previously identified in the FY15 budget as a candidate for replacement 9. Amendment to 2015 -00 Rekey / Relock of Brazos County Buildings with Oak Security. 10. Approval of modification of previously approved agreement between Brazos County and DCS Information Systems. Vol. __ / - Pg._ % 11 . Approval of Requisition #00050533 to CDW Govemment in the amount of $627.59 for JP Pct 3 to use JP Tech. Funds to purchase to monitors and digital video cables. 12 Approval of the following requisitions for JP Pct 2 to use JP Tech Funds for the purchase of a Microsoft Surface Pro 3 and a MS Office License: • a. Reg. # 00050555 to Southem Computer Warehouse in the amount of $1,306.61 • b. Reg. # 00050556 to Software House Intemational in the amount of $328.20 13. The Final Plat of Tract No. 1R and Tract No. 2 Texas World Speedway 9.30 Acres: S. D. Smith Survey, A -210; Being a Minor Replat of Tract No. 1 Texas World Speedway Volume 3363, Page 197 (Official Records of Brazos County); College Station ETJ; Brazos County, Texas. Site is located in Precinct 1. 14, The Final Plat of Lots 1 & 2 Block 1 DMR Acres 6.329 Acres John Childress Survey. A -95: (College Station ETJ) Brazos County Texas. Site is located in Precinct 1. 15. Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Sand Creek Road 2,330 feet northwest of SH 21 Line will provide service to customer at 1492 Sand Creek Road Site is located in Precinct 2. 16. Request from Carrera Races Inc. for approval of a (1) lane closure on Old Reliance Road Sunday, Contingency Plan and Course Map. Site is located in Precinct 2. 17. The Replat of Lot 26R Block 3 Rivemtone Subdivision Phase Two; Volume 9451 Page 95 (Official Records of Brazos County) 2.191 Acres; John Austin League A -2• (Bryan ETJ) Brazos County Texas. Site is located in Precinct 2. 18. Approval of Treasurer Report for January 2015. 19. Tax Refund Applications for the following. • a. Prosperity Bank-overpayment- $110.09 • b. Oldham Baccus Investmentsrovemavment- $540.00 • c. RosenbaumSchoenvogel lnvestments-overpayment$6.28 • d. Douglas Fowler-overpayment-$11.98 • e. Dale Robertson-overpayment-$11.95 • f. Legacy Housing-overpayment-$193.49 • g Brooke Sevmouroverpayment$79.27 20. Budget Amendments. Budget Amendments FY 14/15 23.1-23.11 21. Personnel Change of Status. Personnel Action Forms 22. Payment of Claims. 23. Convene into the following Executive Sessions: a. Executive Session pursuant to Section 551.087 to discuss or deliberate economic development negotiations. b. Executive Session pursuant to Section 551.074 to discuss personnel matters. 24. Consider and possible action on the Executive Sessions. 25. Acknowledgement of the 2014 Racial Profile Report for the Sheriffs Office Pq 26. Acknowledgement of monthly reports submitted in February 2015. 27. Sheriffs report on inmate population. 28. Announcement of interest items and possible future agenda topics. 29. Call for Citizen input and /or concerns. 30. Adjourn. PUBLIC COMMENTS Public Comment during the Commission Meeting may be for all matters, both on and off the agenda, and be limited to four minutes per person. Persons are invited to submit comments in writing on the agenda items andlor attend and make comment at the Commission meeting. Members of the public are reminded that the Brazos County Commissioners Court is a Constitutional Court, with both judicial and legislative powers, created under Article V, Section 1 and Section 18 of the Texas Constitution. As a Constitutional Court, the Brazos County Commissioners Court also possesses the power to issue a Contempt of Court Citation under Section 81.024 of the Texas Local Government Code. Accordingly, members of the public in attendance at any Regular, Special and/or Emergency meeting of the Court shall conduct themselves with proper respect and decorum in speaking to, and /or addressing the Court; in participating in public discussions before the Court, and in all actions in the presence of the Court. Those members of the public who are inappropriately attired andlor who do not conduct themselves in an orderly and appropriate manner will be ordered to leave the meeting. Refusal to abide by the Court's Order and /or continued disruption of the meeting may result in a Contempt of Court Citation. It is not the intention of the Brazos County Commissioners Court to provide a public forum for the demeaning of any individual or group. Neither is it the intention of the Court to allow a member (or members) of the public to insult the honesty and/or integrity of the Court, as a body, or any member or members of the Court, or County employees, individually or collectively. Accordingly, profane, insulting or threatening language directed toward the Court and/or any person in the Court's presence and/or racial, ethnic or gentler slurs or epithets will not be tolerated. Violation of these rules may result in the following sanctions: 1. cancellation of a speakers time; 2. removal from the Commissioners Court; 3. a Contempt Citation; and /or 4. such other and/or criminal sanctions as may be authorized under the Constitution, Statutes and Codes of the State of Texas. The County Commissioners Court can deliberate or take action only If a matter has been listed on an agenda property posted prior to the meeting. During the public comment period, speakers may address matters not listed on the published agenda. The Open Meeting Law does not expressly prohibit responses to public comments by the Commissioners Court However, responses from the County Judge or Commissioners to unlisted public comment topics could become deliberation on a matter without notice to the public. To ensure the public has notice of all matters the Commissioners Court will consider, the County Judge and/or Commissioners may choose not to respond to public comments, except to correct factual inaccuracies, recite existing policy in response to an inquiry or to ask that a matter be listed on a future agenda. See Texas Open Meetings Act? 551.042. INVOCATION Any invocation that may be offered before the official start of the Court meeting shall be to and for the benefit of the Court The views or beliefs expressed by the invocation speaker have not been previously reviewed or approved by the Court and do not necessarily represent the religious beliefs or views of the Court in part or as a whole. No member of the community is required to attend or participate in the invocation and such decision will have no impact on their right to actively participate in the business of the Court. The Commissioners Courtroom of the County Administration Building, 200 South Texas Ave., Suite 106, Bryan, TX 77803 is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive services must be made two working days before the meeting. To make arrangements, please call (979) 361 -4102. Vol. Alt Pg. BRAZOS COUNTY BRYAN,TEXAS MINUTES March 10, 2015 BRAZOS COUNTY COMMISSIONERS COURT REGULAR MEETING D Signature Paoe.odf File Stamped AgendaodF 0 Sian in she .odf A regular meeting of the Commissioners' Court of Brazos County, Texas was held in the Brazos County Commissioners Courtroom in the Administration Building, 200 South Texas Avenue, in Bryan, Brazos County, Texas, beginning at 10:00 a.m. on Tuesday, March 10, 2015 with the following members of the Court present: Duane Peters, County Judge, Presiding, Lloyd Wassermann, Commissioner of Precinct 1, Absent; Sammy Catalena, Commissioner of Precinct 2, Kenny Mallard, Commissioner of Precinct 3; Irma Cauley, Commissioner of Precinct 4, Karen McQueen, County Clerk. The attached sheets contain the names of the citizens and officials that were in attendance. Invocation and Pledge of Allegiance - U.S. and Texas Flag - Chaplain G.H. Jones and Commissioner Wassermann Commissioner Catalena led the pledge in Commissioner Wassermann's absence. 2. Call for Citizen input and /or concerns. There was no citizen's input. Consider and take action on agenda items 3 - 24: 3. Resolution 15 -006 in Support of the Proposal by Texas A &M University to Host a 2016 Presidential or Vice Presidential Debate. 0 Item 3. Representatives from Texas A &M University thanked the Court for their support of the resolution. It was stated that a Presidential or Vice Presidential debate would strengthen the community as well as have an economic impact. A copy of the resolution is attached. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by County Judge Duane Peters. Passed. 4 -0. Members voting Aye: Catalena , Cauley , Mallard , Peters. Members Absent: Wassermann. 4. Resolution 15 -007 supporting the legislative decision to create a County Court at Law 3. ID Item 4. The County Judge announced that the deadline to submit the resolution for legislation is March 13, 2015. Commissioner Cauley requested a workshop be scheduled in the future to discuss details in the creation of this court. A copy of the resolution is attached. Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Kenny Mallard, Passed. 4 -0. Members voting Aye: Catalena, Cauley. Mallard , Peters. Members Absent: Wassermann. 5. Out of state travel request for Sheriff Chris Kirk to attend the WSSA Annual Conference in Las Vegas, Nevada. Dates of travel are March 22 -26, 2015. I0 nom, 5. Motion: Approve , Moved by Commissioner Irma Cauley, Seconded by Commissioner Kenny Mallard. Passed. 4 -0. Members voting Aye: Catalena , Cauley , Mallard , Peters. Members Absent: Wassermann. 6. Request from JP 2 for variance from the county's comp time policy to allow employees of JP 2 to carry forward excess hours of compensatory time earned until the last full pay period of the fiscal year. 0 Item 6. Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner Kenny Mallard. Passed. 4 -0. Members voting Aye: Catalena, Cauley , Mallard , Peters. Members Absent: Wassermann. Payment Authorization to Ray Criswell in the amount of $576.07 for cleaning supplies for the Brazos Center; received invoice after purchase order was closed. ID Item 7.odr Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Kenny Mallard. Passed. 4 -0. Members voting Aye: Catalena, Cauley, Mallard , Peters. Members Absent: Wassermann. 8. Authorization to substitute a vehicle for one previously identified in the FY15 budget as a candidate for replacement. D— Iten 8. Unit 203 will be replaced by Unit 133. Vol. Z / Pg. 0� Motion: Approve, Moved by Commissioner Kenny Mallard, Seconded by County Judge Duane Peters. Passed. 4 -0. Members voting Aye: Catalena, Cauley, Mallard , Peters. Members Absent: Wassermann. 9. Amendment to 2015 -40 Rekey / Relock of Brazos County Buildings with Oak Security. m Itan 9. A copy of the amendment to the contract is attached. Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by County Judge Duane Peters. Passed. 4 -0. Members voting Aye: Catalena , Cauley , Mallard , Peters. Members Absent: Wassermann. 10. Approval of modification of previously approved agreement between Brazos County and DCS Information Systems. Item 10.pdf A copy of the amended agreement is attached. Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by County Judge Duane Peters. Passed. 4 -0. Members voting Aye: Catalena , Cauley, Mallard , Peters. Members Absent: Wassermann. 11. Approval of Requisition #00050533 to CDW Government in the amount of $627.59 for JP Pct. 3 to use JP Tech. Funds to purchase to monitors and digital video cables. 0 Item 11.odf Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 4 -0. Members voting Aye: Catalena, Cauley , Mallard , Peters. Members Absent: Wassermann. 12. Approval of the following requisitions for JP Pct. 2 to use JP Tech Funds for the purchase of a Microsoft Surface Pro 3 and a MS Office License: • a. Req. # 00050555 to Southern Computer Warehouse in the amount of $1,306.61 • b. Req. # 00050556 to Software House International in the amount of $328.20 LID Item 12.pdf Commissioner Catalena moved to approve Requisition #00050555 only. Requisition #00050556 was not approved by the Court. Motion: Approve w/ Conditions , Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 4 -0. Members voting Aye: Catalena , Cauley , Mallard Peters. Members Absent: Wassermann. 13. The Final Plat of Tract No. 1 R and Tract No. 2 Texas World Speedway; 9.30 Acres, S. D. Smith Survey, A -210; Being a Minor Replat of Tract No. 1 Texas World Speedway; Volume 3363, Page 197 (Official Records of Brazos County); College Station ETJ; Brazos County, Texas. Site is located in Precinct 1. This item was removed from the agenda. Motion: Removed , Moved by Commissioner Irma Cauley, Seconded by County Judge Duane Peters. Passed. 4 -0. Members voting Aye: Catalena, Cauley, Mallard , Peters. Members Absent: Wassermann. Vol. '�-/fl pg. Z_ 14. The Final Plat of Lots 1 & 2, Block 1 DMR Acres; 6.329 Acres; John Childress Survey, A -95; (College Station ETJ) Brazos County, Texas. Site is located in Precinct 1. This item was removed from the agenda. Motion: Remove, Moved by Commissioner Irma Cauley, Seconded by Commissioner Kenny Mallard. Passed. 4 -0. Members voting Aye: Catalena, Cauley , Mallard , Peters. Members Absent: Wassermann. 15. Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Sand Creek Road 2,330 feet northwest of SH 21. Line will provide service to customer at 1492 Sand Creek Road. Site is located in Precinct 2. 0 Item 15.pdf Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 4 -0. Members voting Aye: Catalena , Cauley , Mallard , Peters. Members Absent: Wassermann. 16. Request from Carrera Races, Inc. for approval of a (1) lane closure on Old Reliance Road Sunday, March 29, 2015 from 8:00 a.m. to 1:00 p.m. for the Texas Wine Series Half Marathon and Vintage 5K race benefiting Still Creek Ranch. Event will be held at Messina Hof Winery & Resort. See attached Contingency Plan and Course Map. Site is located in Precinct 2. 0 Item 16.odf Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 4 -0. Members voting Aye: Catalena, Cauley , Mallard , Peters. Members Absent: Wassermann. 17. The Replat of Lot 26R, Block 3 Riverstone Subdivision Phase Two; Volume 9451, Page 95 (Official Records of Brazos County) 2.191 Acres; John Austin League, A -2; (Bryan ETJ) Brazos County, Texas. Site is located in Precinct 2. M) Item 17.pdf Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 4 -0. Members voting Aye: Catalena, Cauley, Mallard , Peters. Members Absent: Wassermann. 18. Approval of Treasurer Report for January 2015. f- Item 18.Ddf A copy of the Treasurer's Report is attached. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by County Judge Duane Peters. Passed. 4 -0. Members voting Aye: Catalena, Cauley , Mallard , Peters. Members Absent: Wassermann. 19. Tax Refund Applications for the following: • a. Prosperity Bank - overpayment - $110.09 • b. Oldham Baccus Investments - overpayment - $540.00 • c. Rosenbaum - Schoenvogel Investments - overpayment -$6.28 • d. Douglas Fowler- overpayment - $11.98 • e. Dale Robertson - overpayment - $11.95 Vol. d d Pg. ?v • f. Legacy Housing- overpayment - $193.49 • g. Brooke Seymour- overpayment - $79.27 0 Item 19.od Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 4 -0. Members voting Aye: Catalena , Cauley, Mallard , Peters. Members Absent: Wassermann. 20. Budget Amendments. Budget Amendments FY 14/15 23.1-23.11 0 1 t 20.odf 23.1 Reallocate funds for Juvenile Services. 23.2 Reallocate funds for Capital Projects. 23.3 To recognize a donation of DVD players to Juvenile Detention. 23.4 Reallocate funds for Capital Projects. 23.5 Reallocate funds for the Hotel Occupancy Tax Fund. 23.6 Reallocate funds for the Tax Office. 23.7 Reallocate funds for Juvenile Detention. 23.8 Transfer of funds from Contingency to the Tax Office. 23.9 Transfer of funds from Tax Office DDEA to Contingency. 23.10 Transfer of funds from Contingency to Court Support - Civil. 23.11 Transfer of funds from Courthouse Improvement to Tax Office. Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 4 -0. Members voting Aye: Catalena, Cauley , Mallard , Peters. Members Absent: Wassermann. 21. Personnel Change of Status. Personnel Action Forms @ Item 21. A copy of the Personnel Change of Status request is attached. Motion: Approve, Moved by Commissioner Irma Cauley, Seconded by County Judge Duane Peters. Passed. 4 -0. Members voting Aye: Catalena, Cauley , Mallard , Peters. Members Absent: Wassermann. 22. Payment of Claims. ��) Ciaim Shed.pdf in Sgn in shcet.pdf The Court approved claim numbers 7130534 through7130810. 23. Convene into the following Executive Sessions: • a. Executive Session pursuant to Section 551.087 to discuss or deliberate economic development negotiations. • b. Executive Session pursuant to Section 551.074 to discuss personnel matters. At this point, the County Judge announced the Court would consider items 25 through 29 and then recess the Regular Meeting to hold a Public Hearing scheduled for 10:30 a.m. Vol. �� _ Pq.__ Immediately following the Public Hearing, the Court will reconvene the Regular Meeting to convene into Executive Session. Having considered the previously noted agenda items and holding the Public Hearing, at 10:55 a.m. the County Judge stated that the Court would convene into Executive Session to a) discuss or deliberate economic development negotiations and b) to discuss personnel matters. The following individuals were asked to stay for the meeting for Executive Session a: Candy Gallego, Executive Assistant Bill Ballard, Civil Counsel Irene Jett, Budget Officer The following individuals were asked to stay for the meeting for Executive Session b. Candy Gallego, Executive Assistant Bill Ballard, Civil Counsel Jennifer Salazar, Human Resources Director 24. Consider and possible action on the Executive Sessions. a Itan 24aodf At 11:13 a.m. the County Judge announced the meeting open to the public. The following action took place: On motion by Commissioner Cauley, seconded by Commissioner Mallard, the Court voted unanimously to approve an economic agreement between Brazos County and Fuji Film Diosynth Biotechnologies for a 7 year cash incentive. A copy of the agreement is attached. Motion: Approve , Moved by Commissioner Irma Cauley, Seconded by Commissioner Kenny Mallard. Passed. 4 -0. Members voting Aye: Catalena, Cauley, Mallard , Peters. Members Absent: Wassermann. On motion by Commissioner Catalena, seconded by Commissioner Cauley, the Court voted unanimously to approve an adjustment to credited service and current service for a particular member of the TCDRS and authorized the payment of the County's contribution. Motion: Approve, Moved by Commissioner Sammy Catalena, Seconded by Commissioner Irma Cauley. Passed. 4 -0. Members voting Aye: Catalena , Cauley , Mallard , Peters. Members Absent: Wassermann. 25. Acknowledgement of the 2014 Racial Profile Report for the Sheriffs Office 01te 25.pdf The Court acknowledged receipt of the 2014 Racial Profiling Report for the Sheriffs Office. 26. Acknowledgement of monthly reports submitted in February 2015. 0 Iten26.odf The Court acknowledged receipt of the Extension Service reports submitted in February 2015 and acknowledged receipt of reports from the following County and Precinct Offices showing revenues collected and remitted to the County Treasurer: County Clerk District Clerk Justice of the Peace Precinct 1 Justice of the Peace Precinct 2, Place 1 Justice of the Peace Precinct 2, Place 2 Justice of the Peace Precinct 3 Justice of the Peace Precinct 4 Vol. ,/y pg. /e Constable Precinct 1 Constable Precinct 2 Constable Precinct 3 Constable Precinct 4 Road & Bridge Sheriff 27. Sheriffs report on inmate population. Sheriff, Chris Kirk stated there were 597 inmates in jail, 54 have electronic monitors, and 8 are pending for monitors. 28. Announcement of interest items and possible future agenda topics. There were no announcements. 29. Call for Citizen input and /or concerns. There was no citizen's input. 30. Adjourn. Vol. Vf pg. The foregoing minutes of the Commissioners Court meeting held March 10, 2015 have been examined and are approved in open Court this i y+" day of (� 2015, in Bryan, Brazos County, Texas. Duane Peters Lloyd Wassermarm County Judge ammy Catt na Conimissiolier, Precinct 2 Commissioner, Precinct 4 Attest: Commissioner, Precinct 1J Kenny Mall Commissioner—, Precinct 3 Vol. „1 If pg. 1,2— Pg I of Z BRAZOS COUNTY COMMISSIONER'S COURT D' • - _ Name (PLEASE PRINT) Organization (PLEASE PRINT) Uzi �-_ Vol. pg. 0 BRAZOS COUNTY COMMISSIONER'S COURT DAY OF 20 p,,oc2 AM/PM, Name (PLEASE PRINT) Kim t�40rl WM, /ft -aces We Alb I Organization (PLEA,SSE PRINT) V-ana&1* Pg?-bf A i ResoCution in Support of the ProposaCby Irexas A&M University to Aost a 2o16 PresidentiaCor Vice PresidenKaCDedate Whereas Texas A &M University, the first public institution of higher education in Texas, opened in 1876 under the Morrill Land -Grant Act, is now the 5a' largest university in the country with a student body of more than 62,000; and Whereas Texas A &M University remains committed to the values of its land -grant heritage by expanding educational access, outreach and service to people of all backgrounds in the community, the region, the state and the country; and Whereas Texas A &M University is one of a select group of national Tier One research universities to have land, sea and space-grant designations that help gamer research expenditures of more than $850 million; and Whereas Texas A&M University is helping to create multi- disciplinary solutions to the grand challenges facing the state, the nation and the world; as well as raise awareness of many of these pressing issues and stimulate interest in finding solutions; and Whereas Texas A &M University continues to maintain and uphold its core values of excellence, integrity, leadership, loyalty, respect and selfless service; as well as its purpose, which is to develop leaders of character dedicated to serving the public good; and Whereas Texas A &M University's commitment to public service contributed to the university being chosen as the home of the George Bush Presidential Library and Museum (which brings millions of visitors to the local community) and spawned the highly ranked Bush School of Government and Public Service; and Whereas Texas A &M University and the twin cities of Bryan/College Station have enjoyed a mutually beneficial relationship for generations; both cities have grown exponentially as Texas A &M has grown and each continues to develop and thrive as diverse, multi - ethnic environments, fostering a friendly and inclusive hometown for Aggie students, faculty and staff that far exceeds the average college town; and Whereas Texas A &M University engages with the state, region and community in a multitude of ways, through service learning projects, such as the largest one -day, student -run service project in the nation, The Big Event, as well as countless other service organizations; and through educational enrichment programs and summer camps from teacher education to STEM to 4 -H; and entertainment not just for Aggie students but for the entire community, through high - quality direct- from - Broadway shows to the many notable events and distinguished speakers who have Fyo _1— 1 z i _�-- P g - 15-006 3 addressed the university -- from former presidents to renowned scientists to civil rights leaders and numerous others; and Whereas Texas A &M University has also long recognized the demands of a global society and the necessity for global reach, maintaining a center in Costa Rica, facilities in Italy and Mexico and branch campuses in Galveston and Doha, Qatar (fully funded by Qatar Foundation) as well as nurturing a long history of international cooperation and collaboration to facilitate study abroad, global competence, international research partnerships such as the collaborative research grant program between Texas A &M and Mexico's CONACYT, and membership in such initiatives as The Confucius Institute to enhance Chinese language and culture at the university; all to enhance educational, cultural and research opportunities around the world and prepare students to live and compete in a global society; and Whereas Texas A &M University and other members of the Texas A &M University System based locally continue to increase their economic impact on the area; in 2013 the economic impact was $4.42 billion, an increase of almost $113 million from 2012 levels (based on the use of a standard 2.5 multiplier effect representing the number of times such generated dollars are typically spent and re -spent in the local economy); and Whereas Texas A &M University and the cities of Bryan/College Station and the Brazos Valley have partnered to mutual advantage on projects such as the agreement between the city of College Station regarding the expansion of Kyle Field; expenditures by visitors attending sporting events and other campus activities totaled an estimated $385 million, almost $8 million more than for the previous year. The estimated number of visitors totaled more than 1.3 million, with the average visitor from out -of -town staying 2.5 days in the local community. Therefore, be it RESOLVED that the cities of Bryan and College Station, Brazos County and the region known as the Brazos Valley, as well as the Bryan Independent School District and the College Station Independent School District join and fully support Texas A &M University in its bid to host a Presidential or Vice Presidential Debate. DATED this the 101" davi"arch, 2015. Duane Peters County Judge Commissioner Lloyd Wassermann ssi er Sammy Catalena Precinct 1 I sso r Commiss er Kenny allard Co i auley Precinct 3 Pre Vol. vY P 4� _ 15.006 Resolution County Court at Law 3 WHEREAS, Brazos County currently has two County Courts at Law; and WHEREAS, the population of Brazos County continues to rise increasing the case load of the existing courts; and WHEREAS, the Brazos County Commissioners Court recognizes that Brazos County has a future need to implement the formation of a new County Court at Law; and NOW, THEREFORE, the Brazos County Commissioners Court requests that State Representatives Kyle Kacal and John Raney support and file legislation in the 84th Legislative Session to grant Brazos County an additional County Court at Law. RESOLVED THIS I V * DAY OF WVI x'(',61 , 2015. Duane Peter Co ssioner Lloyd Wassermann Precinct 1 Co m ssinny Mall Precinct 3 15.007 ir' Fyo - Pg. 7— _ /. N Brazos County ° Purchasing Department v 200 SOUTH TEXAS AVE SUITE 352 BRYAN, TX 77803 PHONE (979) 361 -4290 FAX (979) 3614293 This Amendment is made pursuant to contract agreement of 2015 -40 Rekey/Relock of Brazos County Buildings executed by and between Brazos County and Oak Security on 12/23/14 C'Contract" ). It is mutually understood and agreed by both Brazos County and Oak Security that the Contract is hereby amended as follows: Amendment of Contract 2015 -40 Rekey/ Relock of Brazos County Buildings. Brazos County will withhold 10% retainage of each invoice submitted by the Contractor. Contractor shall provide a partial lien release of lien for each subcontractor prior to the next invoice payment being paid by Brazos County. All retainage will be paid at the end of the project, after all work has been completed and considered satisfactory by Brazos County. To the extent this Amendment conflicts with other terms of the Contract, this amendment shall control. All other terms and conditions that are not hereby amended are to remain in effect. A oved b Co issr n this --) day of March 015 by olding the position of &� C_ Vol. g d Pg. to Access Security Requirements for Reseller End -Users for FCRA and GLB SA Data The following information security controls are required to reduce unauthorized access to consumer. information. It is your (company provided access to Experian systems or data through DCS Information Systems, referred to as the "Company") responsibility to implement these controls. If you do not understand these requirements or need assistance, it is your responsibility to get an outside service provider to assist you. DCS Information Systems reserves the right to make changes to these Access Security Requirements without prior notification. The information provided herewith provides minimum baselines for information security. In accessing DCS Information System's services, Company agrees to follow these Experian security requirements. These requirements are applicable to all systems and devices used to access, transmit, process, or store Experian data: 1. Implement Strong Access Control Measures 1.1 All credentials such as User names /identifiers /account numbers (user IDs) and user passwords must be kept confidential and must not be disclosed to an unauthorized party. No one from DCS Information Systems will ever contact you and request your credentials. 1.2 If using third party or proprietary system to access DCS Information System's systems, ensure that the access must be preceded by authenticating users to the application and /or system (e.g. application based authentication, Active Directory, etc.) utilized for accessing DCS Information Systems data /systems. 1.3 If the third parry or third party software or proprietary system or software, used to access DCS Information Systems data /systems, is replaced or no longer in use, the passwords should be changed immediately. 1.4 Create a unique user ID for each user to enable individual authentication and accountability for access to DCS Information System's systems infrastructure. Each user of the system access software must also have a unique logon password. 1.5 User IDs and passwords shall only be assigned to authorized individuals based on least privilege necessary to perform Job responsibilities. 1.6 User IDs and passwords must not be shared, posted, or otherwise divulged in any manner. 1.7 Develop strong passwords that are: • .Not easily guessable.(i.e. your name or company name, repeating numbers and letters or consecutive numbers and letters) • Contain a minimum of eight (8) alphabetic and numeric characters for standard user, accounts • For Interactive sessions (i.e. non system -to- system) ensure that passwords /passwords are changed periodically (every 90 days is recommended) 1.8 Passwords (e.g. user /account password) must be changed immediately when: • Any system access software is replaced by another system access software or is no longer used • The hardware on which the software resides is upgraded, changed or disposed • Any suspicion of password being disclosed to an unauthorized party (see section 4.3 for reporting requirements) 1.9 Ensure that passwords are not transmitted, displayed or stored in clear text; protect all end user (e.g. internal and external) passwords using, for example, encryption or a cryptographic 10/2014 Public Page 1 of 10 Reseller ASR for End Users (draft) hashing algorithm also known as "one -way' encryption. When using encryption, ensure that strong encryption algorithm are utilized (e.g. AES 256 or above). 1.10 Implement password protected screensavers with a maximum fifteen (15) minute timeout to protect unattended workstations. Systems should be manually locked before being left unattended. 1.11 Active logins to credit information systems must be configured with a 30 minute inactive session timeout. 1.12 Ensure that personnel who are authorized access to credit information have a business need to access such information and understand these requirements to access such information are only for the permissible purposes listed in the Permissible Purpose Information section of the membership application. 1.13 Company must NOT install Peer -to -Peer file sharing software on systems used to access, transmit or store Experian data. 1.14 Ensure that Company employees do not access their own credit reports or those reports of any family member(s) or friend(s) unless it is in connection with a credit transaction or for another —-permissible purpose. - -I.---- - - — __ 1.15 Implement a process to terminate access rights immediately for users who access Experian credit information when those users are terminated or when they have a change In their job tasks and no longer require access to that credit information. 1.16 Implement a process to perform periodic user account reviews to validate whether access is needed as well as the privileges assigned. 1.17 Implement a process to periodically review user activities and account usage, ensure the user activities are consistent with the individual job responsibility, business need, and in line with contractual obligations. 1.18 Implement physical security controls to prevent unauthorized entry to Company's facility and access to systems used to obtain credit information. Ensure that access is controlled with badge readers, other systems, or devices including authorized lock and key. 2. Maintain a Vulnerability Management Program 2.1 Keep operating system(s), firewalls, routers, servers, personal computers (laptops and desktops) and all other systems current with appropriate system patches and updates. 2.2 Configure infrastructure such as frewalls, routers, servers, tablets, smart phones, personal computers (laptops and desktops), and similar components to Industry best security practices, including disabling unnecessary services or features, and removing or changing default passwords, IDs and sample files /programs, and enabling the most secure configuration features to avoid unnecessary risks. 2.3 Implement and follow current best security practices for computer virus detection scanning services and procedures: • Use, implement and maintain a current, commercially available anti -virus software on all systems, if applicable anti -virus technology exists. Anti -virus software deployed must be capable to detect, remove, and protect against all known types malicious software such as viruses, worms, spyware, adware, Trojans, and root -kits. • Ensure that all anti -virus software is current, actively running, and generating audit logs; ensure that anti -virus software is enabled for automatic updates and performs scans on a regular basis. 1012014 Public Page 2 of 10 Reseller ASR for End Users (draft) Vol. 9s, Pg. 'Z.e_-2 • If you suspect an actual or potential virus infecting a system, Immediately cease accessing the system and do not resume the inquiry process until the virus has been eliminated. 3. Protect Data 3.1 Develop and follow procedures to ensure that data is protected throughout its entire information lifecycle (from creation, transformation, use, storage and secure destruction) regardless of the media used to store the data (i.e., tape, disk, paper, etc.). 3.2 Experian data is classified Confidential and must be secured to in accordance with the requirements mentioned in this document at a minimum. 3.3 Procedures for transmission, disclosure, storage, destruction and any other information modalities or media should address all aspects of the Hecycle of the information. 3.4 Encrypt all Experian data and information when stored electronically on any system including but not limited to laptops, tablets, personal computers, servers, databases using strong -- encryption such AES 256 or above: — 3.5 Experian data must not be stored locally on smart tablets and smart phones such as iPads, !Phones, Android based devices, etc. 3.6 When using smart tablets or smart phones to access Experian data, ensure that such devices are protected via device pass -code. 3.7 Applications utilized to access Experian data via smart tablets or smart phones must protect data while in transmission such as SSL protection and /or use of VPN, etc. 3.8 Only open email attachments and links from trusted sources and after verifying legitimacy. 3.9 When no longer in use, ensure that hard -copy materials containing Experian data are crosscut shredded, incinerated, or pulped such that there Is reasonable assurance the hard -copy materials cannot be reconstructed. 3.10 When no longer in use, electronic media containing Experian data is rendered unrecoverable via a secure wipe program in accordance with industry- accepted standards for secure deletion, or otherwise physically destroying the media (for example, degaussing). 4. Maintain an Information Security Policy 4.1 Develop and follow a security plan to protect the confidentiality and Integrity of personal consumer information as required under the GLB Safeguards Rule. 4.2 Suitable to complexity and size of the organization, establish and publish information security and acceptable user policies identifying user responsibilities and addressing requirements in line with this document and applicable laws and regulations. 4.3 Establish processes and procedures for responding to security violations, unusual or suspicious events and similar incidents to limit damage or unauthorized access to information assets and to permit identification and prosecution of violators. If you believe Experian data may have been compromised, Immediately notify DCS Information Systems within twenty-four (24) hours or per agreed contractual notification timeline (see also Section 8). 4.4 The FACIA Disposal Rules requires that Company implement appropriate measures to dispose of any sensitive information related to consumer credit reports and records that will protect against unauthorized access or use of that information. 4.5 Implement and maintain ongoing mandatory security training and awareness sessions for all staff to underscore the importance of security in the organization. 4.6 When using third party service providers (e.g. application service providers) to access, transmit, store or process Experian data, ensure that service provider is compliant with the 1012014 Public Page 3 of 10 Reseller ASR for End Users (draft) Vol. Experian Independent Third Party Assessment (E13PA) program, and registered in Experian's list of compliant service providers. If the service provider is in the process of becoming compliant, It Is Company's responsibility to ensure the service provider is engaged with Experian and an exception is granted in writing. Approved certifications in lieu of E13PA can be found in the Glossary section. 5. Build and Maintain a Secure Network 5.1 Protect Internet connections with dedicated, industry- recognized firewalls that are configured and managed using industry best security practices. 5.2 Internal private Internet Protocol (IP) addresses must not be publicly accessible or natively routed to the Internet. Network address translation (NAT) technology should be used. 5.3 Administrative access to firewalls and servers must be performed through a secure internal wired connection only. 5.4 Any stand -alone computers that directly access the Internet must have a desktop firewall — deployed that is installed-and-configured to block unnecessary/unused- parts; services; and network traffic. 5.5 Change vendor defaults including but not limited to passwords, encryption keys, SNMP strings, and any other vendor defaults. 5.6 For wireless networks connected to or used for accessing or transmission of Experian data, ensure that networks are configured and firmware on wireless devices updated to support strong encryption (for example, IEEE 802.11i) for authentication and transmission over wireless networks. 5.7 When using service providers (e.g. software providers) to access DCS Information System's systems, access to third party tools /services must require multi -factor authentication. 6. Regularly Monitor and Test Networks 6.1 Perform regular tests on information systems (port scanning, virus scanning, internal /external vulnerability scanning). Ensure that issues identified via testing are remediated according to the issue severity (e.g. fix critical issues immediately, high severity in 15 days, etc.) 6.2 Ensure that audit trails are enabled and active for systems and applications used to access, store, process, or transmit Experian data; establish a process for linking all access to such systems and applications. Ensure that security policies and procedures are in place to review security logs on daily or weekly basis and thatfollow -up to exceptions is required. 6.3 Use current best practices to protect telecommunications systems and any computer system or network device(s) used to provide Services hereunder to access DCS Information System's systems and networks. These controls should be selected and implemented to reduce the risk of infiltration, hacking, access penetration or exposure to an unauthorized third party by: • protecting against Intrusions; • securing the computer systems and network devices; • and protecting against intrusions of operating systems or software. 7. Mobile and Cloud Technology 7.1 Storing Experian data on mobile devices is prohibited. Any exceptions must be obtained from Experian in writing; additional security requirements will apply. 1012014 Public Page 4 of 10 Reseller ASR for End Users (draft) Vol. � pg. „?�� 7.2 Mobile applications development must follow industry known secure software development standard practices such as OWASP and OWASP Mobile Security Project adhering to common controls and addressing top risks. 7.3 Mobile applications development processes must follow secure software assessment methodology which includes appropriate application security testing (for example: static, dynamic analysis, penetration testing) and ensuring vulnerabilities are remediated. 7.4 Mobility solution server /system should be hardened in accordance with Industry and vendor best practices such as Center for Internet Security (CIS) benchmarks, NIS, NSA, DISA and /or other. 7.5 Mobile applications and data shall be hosted on devices through a secure container separate from any personal applications and data. See details below. Under no circumstances is Experian data to be exchanged between secured and non - secured applications on the mobile device. 7.6 In case of non - consumer access, that is, commercial /business -to- business (1328) users accessing Experian data via mobile applications (internally developed or using a third party application); ensure that multi - factor authentication and /or-adaptive /risk = Based - authentication mechanisms are utilized to authenticate users to application. 7.7 When using cloud providers to access, transmit, store, or process Experian data ensure that: • Appropriate due diligence is conducted to maintain compliance with applicable laws and regulations and contractual obligations Cloud providers must have gone through independent audits and are compliant with one or more of the following standards, or a current equivalent as approved /recognized by Experian: o ISO 27001 o PCI DSS o E13PA o SSAE16- SOC2orSOO • FISMA • CAI / CCM assessment S. General 8.1 DCS Information Systems may from time to time audit the security mechanisms Company maintains to safeguard access to Experian Information, systems and electronic communications. Audits may include examination of systems security and associated administrative practices 8.2 In cases where the Company is accessing Experian information and systems via third party software, the Company agrees to make available to DCS Information Systems upon request, audit trail Information and management reports generated by the vendor software, regarding Company individual authorized users. 8.3 Company shall be responsible for and ensure that third party software, which accesses DCS Information System's Information systems, is secure, and protects this vendor software against unauthorized modification, copy and placement on systems which have not been authorized for its use. 8.4 Company shall conduct software development (for software which accesses DCS Information System's information systems; this applies to both in -house or outsourced software development) based on the following requirements: 8.4.1 Software development must follow industry known secure software development standard practices such as OWASP adhering to common controls and addressing top risks. 10/2014 Public Page 6 of 10 ResellerASR for End Users (draft) Vol. pg._.� _ BA.! Software dgvelopment processes must follow secure software assessment methodology -which Includes agproptiate bpplicedon sec0kfy'teAing (for example: static, dynamic analysis, penetration testing) and ensuringwlnerabllkiesore' remedlated. 8.43 Software solution server %sysfem should be 'hardened in accordarice with Industry' acid vendor best'practices-such aiCentef for Internet Security (CIS) bendhinarks,MS, NSA. ' 8S'Reasonbblgtctess to a(dit trail, reports:of systems utilized to access'DCSlnfomSatiod'SYstem's systems shall be made available to DSc, Information Systems upon request; for'exarriple during • ' breach:imrestigation of while perforrning'autild : 8.6 Data requests fro?! Comparry to DCS :In form ation Systems must include the IP address of the device from which the request originated; (i.e.; the requesting clients IP address), where. app(irabte. . . 8.7'COmpany shall report actual security viol8ilons or locidehtsthat impact Experian to, DCS I.riformation.5ystemswlthin twenty -four (Z4).hours or:per agreed contractual notiflcition•timeline, .: 7Com panyagrees4oprovidenotice 'toDCS' Information' Systefisofarf toniifinedaecurifjGbrea`ch"' that may involve data related to.1he cdntractual. Wa.tionship, to the: extent required uhder.and, in compil"ancewithapplicable: law: Telephone• riotlflcation.is.preferredat972- 422 -3.6 •Email' hotitication will be sent to "suodortgD'dcsinfosys.com. 8.$.Ccmpaoy acknowiedgesand agrees'Ehatthe Company (aj has received a copy of these. reijuirements, (b).has read. and.understanils company s obligations described in the requirements, (c) will communicate:the contentsaf. theapp licable:tequirementscontained herein, and any subsequent updates hereto, to ali'empioyees that shall h'aue access to DCS Information Systems .services; systems br data; and (d) will abide by the provisions of these requirements:wlw ,.. itcessing Experian. data. 8.9. Co- npanyLnderstands titatits use of DCS Informatton'Syifems rwetworkingand computing. " ..... resources may be monitored and audited by DCS InfprmatiogSystenis; without further notice. . 8:30:.:. Company'acknovuledges' and agreesthat it is responsible for,all activities of its emproyees) authorized users, and for assuring that inech'anisms to access DCS informetlon-Systems - services or data are secure and in compliance with its membership agreement.' 8.i1'. ',1/yhen ir'siog.third party'servlce providers to access;. transmit; or store Eiperiao.data,'additional . 'doOmentatiori may be required by.DC:S information Systerns. gecord Retentiop: Me:Fedenii Equal Credit OppoitunilyAct states that o credits must preserve'dll wrlite'nor,' ' "recorded information connected with an 'application jar 25 rn'onfhs In keeping.wlth, the ECOA, tkperlan. requires that you retain the. credit 6pplication and, if applicable; a purchase, 6greementfor.d peridd of trot less • : - '• thou25 mouths:. YVhen corjducNng aninyesggtordtcuJarlyfofloipg o conumecrplw alnt that your tornpariy.lnipermissibly accessed their cretlk report Eirper1an will contort you'and wlll request o copy of the ' original application signed by the consumer or, If applkable, d copy of the sales contract "UnderSectiain $21(a) (1),(A) of the.F.CRA, any person that violates anyof the provisions of the FORA maybe ' llable for a dill penalty ql not.mare than $3;500 per violation." 1072014 Public Page 6 of 10 12esellerA$R for End.Users (draft) • Vol.•. �/� Pg. .ZS� Internet Delivery Security Requirements In addition to the above, following requirements apply where Company and their employees or an authorized agent /s acting on behalf of the Company are provided access to DCS Information Systems provided services via Internet ( "Internet Access "). General requirements: 1. The Company shall designate in writing, an employee to be its Head Security Designate, to act as the primary interface with DCS Information Systems on systems access related matters. The Company's Head Security Designate will be responsible for establishing, administering and monitoring all Company employees' access to DCS Information Systems provided services which are delivered over the Internet ( "Internet access"), or approving and establishing Security Designates to perform such functions. 2. The Company's Head Security Designate or Security Designate shall in turn review all employee requests for Internet access approval. The Head Security Designate or its Security Designate shall determine the appropriate access to -each DCS Information Systems product based upon the legitimate basiness heeds — of each employee. DCS Information Systems shall reserve the right to terminate any accounts it deems a security threat to its systems and /or consumer data. 3. Unless automated means become available, the Company shall request employee's (Internet) user access via the Head Security Designate /Security Designate in writing, in the format approved by DCS Information Systems. Those employees approved by the Head Security Designate or Security Designate for Internet access ( "Authorized Users ") will be individually assigned unique access identification accounts ( "User ID ") and passwords /passphrases (this also applies to the unique Server -to -Server access IDs and passwords /passphrases). DCS Information Systems approval of requests for (Internet) access may be granted or withheld in its sole discretion. DCS Information Systems may add to or change its requirements for granting (Internet) access to the services at any time (including, without limitation, the imposition of fees relating to (Internet) access upon reasonable notice to Company), and reserves the right to change passwords /passphrases and to revoke any authorizations previously granted. Note: Partially completed forms and verbal requests will not be accepted. 4. An officer of the Company agrees to notify DCS Information Systems in writing immediately if it wishes to change or delete any employee as a Head Security Designate, Security Designate, or Authorized User; or if the identified Head Security Designate, Security Designate or Authorized User is terminated or otherwise loses his or her status as an Authorized User. Roles and Responsibilities 1. Company agrees to identify an employee it has designated to act on its behalf as a primary interface with DCS Information Systems on systems access related matters. This individual shall be identified as the "Head Security Designate." The Head Security Designate can further identify a Security Designate(s) to provide the day to day administration of the Authorized Users. Security Designate(s) must be an employee and a duly appointed representative of the Company and shall be available to interact with DCS Information Systems on information and product access, in accordance with these Experian Access Security Requirements for Reseller End - Users. The Head Security Designate Authorization Form must be signed by a duly authorized representative of the Company. Company's duly authorized representative (e.g. contracting officer, security manager, etc.) must authorize changes to Company's Head Security Designate. The Head Security Designate will submit all requests to create, change or lock Security Designate and /or Authorized User access accounts and permissions to DCS Information System's systems 1012014 Public Page 7 of 10 Reseller ASR for End Users (draft) Fvol-.2 / Pg..?6"J and information (via the Internet). Changes in Head Security Designate status (e.g. transfer or termination) are to be reported to DCS Information Systems immediately. 2. As a Client to DCS Information System's products and services via the Internet, the Head Security Designate is acting as the duly authorized representative of Company. 3. The Security Designate may be appointed by the Head Security Designate as the individual that the Company authorizes to act on behalf of the business in regards to DCS Information Systems product access control (e.g. request to add /change /remove access). The Company can opt to appoint more than one Security Designate (e.g. for backup purposes). The Company understands that the Security Designate(s) it appoints shall be someone who will generally be available during normal business hours and can liaise with DCS Information System's Security Administration group on information and product access matters. 4. The Head Designate shall be responsible for notifying their corresponding DCS Information Systems representative in a timely fashion of any Authorized User accounts (with their corresponding privileges and access to application and data) that are required to be terminated due to suspicion (or actual) threat of system compromise, unauthorized access to data and /or applications, or account inactivity. Designate 1. Must be an employee and duly appointed representative of Company, identified as an approval point for Company's Authorized Users. 2. Is responsible for the initial and on -going authentication and validation of Company's Authorized Users and must maintain current information about each (phone number, valid email address, etc.). 3. Is responsible for ensuring that proper privileges and permissions have been granted in alignment with Authorized User's job responsibilities. 4. Is responsible for ensuring that Company's Authorized Users are authorized to access DCS Information Systems products and services. 5. Must disable Authorized User ID if it becomes compromised or if the Authorized User's employment is terminated by Company. 6. Must immediately report any suspicious or questionable activity to DCS Information Systems regarding access to DCS Information System's products and services. 7. Shall immediately report changes in their Head Security Designate's status (e.g. transfer or termination) to DCS Information Systems. 8. Will provide first level support for inquiries about passwords /passphrases or IDs requested by your Authorized Users. 9. Shall be available to interact with DCS Information Systems when needed on any system or user related matters. 10/2014 Public Page 8 of 10 Reseller ASR for End Users (draft) .. _............ Vol. a2 �� Pg. �G Glossary Term Definition Computer Virus A Computer Virus is a self - replicating computer program that alters the way a computer operates, without the knowledge of the user. Atrue virus replicates and executes itself. While viruses can be destructive by destroying data, for example, some viruses are benign or merely annoying. Confidential Very sensitive information. Disclosure could adversely impact your company. Encryption Encryption is the process of obscuring information to make it unreadable without special knowledge. Firewall In computer science, a Firewall is a piece of hardware and /or software which functions in a networked environment to prevent unauthorized external access and some communications forbidden by the security policy, analogous to the function of Firewalls in building construction. The ultimate goal is to provide controlled connectivity between -- ` — zones of differing trust levels throudh the enforcement of a security policy and connectivity model based on the least privilege principle. Information (Or Data Ufecycle) is a management program that considers the value of the information Lifecycle being stored over a period of time, the cost of its storage, its need for availability for use by authorized users, and the period of time for which it must be retained. IP Address A unique number that devices use in order to Identify and communicate with each other on a computer network utilizing the Internet Protocol standard (IP). Any All participating network devices - including routers, computers, time - servers, printers, Internet fax machines, and some telephones - must have Its own unique IP address. Just as each street address and phone number uniquely identifies a building or telephone, an IP address can uniquely identify a specific computer or other network device on a network. It is important to keep your IP address secure as hackers can gain control of your devices and possibly launch an attack on other devices. Peer -to -Peer A type of communication found Ina system that uses layered protocols. Peer-to-Peer networking is the protocol often used for reproducing and distributing music without permission. Router A Router is a computer networking device that forwards data packets across a network via routing. A Router acts as a junction between two or more networks transferring data packets. Spyware Spyware refers to a broad category of malicious software designed to intercept or take partial control of a computer's operation without the consent of that machine's owner or user. In simpler terms, spyware is a type of program that watches what users do with their computer and then sends that information over the internet. Experian The Experian Independent 3rd Party Assessment is an annual assessment of an Experian Independent Third Reseller's ability to protect the information they purchase from Experian. Party Assessment E13PAs' requires an evaluation of a Reseller's information security by an independent Program assessor, based on requirements provided by Experian. E13PAO also establishes quarterly scans of networks for vulnerabilities. ISO 27001 /27002 IS 27001 is the specification for an ISMS, an Information Security Management System (it replaced the old BS7799 -2 standard) The ISO 27002 standard is the rename of the ISO 17799 standard, and is a code of practice for information security. It basically outlines hundreds of potential controls and control mechanisms, which may be implemented, in theory, subject to the guidance provided within ISO 27001. 1012014 Reseller ASR for End Users (draft) Public Page 9 of 10 Vol. Pg.__� . '10 PCI DSs The Payment Card Industry Data Security Standard (PCI DSS) is a proprietary information security standard for organizations that handle cardholder information for the major debit, credit, prepaid, e- purse, ATM, and POS cards. SSAE 16 SOC 2, Statement on Standards for Attestation Engagements (SSAE) No. 1 SOO SOC 2 Report on Controls Related to Security, Availability, Processing Integrity, Confidentiality, and Privacy. The SOC 3 Report , just like SOC 2, is based upon the same controls as SOC 2, the difference being that a SOC 3 Report does not detail the testing performed (it is meant to be used as marketing material). FISMA The Federal Information Security Management Act (FISMA) is United States legislation that defines a comprehensive framework to protect government information, operations and assets against natural or man -made threats. FISMA was signed into law part of the Electronic Government Act of 2002. CAI / CCM Cloud Security Alliance Consensus Assessments Initiative (CAI) was launched to perform research, create tools and create Industry partnerships to enable cloud computing - " —` — assessments. The Cloud Security Alliance Cloud Controls Matrix (CCM) is specifically designed to provide fundamental security principles to guide cloud vendors and to assist prospective cloud customers in assessing the overall security risk of a cloud provider. Signature Duane Peters, County Judge Print Name /Title 10/2014 Reseller ASR for End Users (draft) 3bo11s Date Brazos County Company Name Public Page 10 of 10 Vol. Pg. �� l BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT: Road & Bridge MEETING DATE: March 10, 2015 SUBJECT: Utility Permit — Wickson Creek Special Utility District Consider and take action on the Wickson Creek Special Utility District utility permit to construct a road bore for a 1 -inch water line crossing under Sand Creek Road 2,330 feet northwest of SH 21. Line will provide service to customer at 1492 Sand Creek Road. Site is located in Precinct 2. SUBMITTED BY: Darrell W. Kolwes Right of Way Agent This request APPROVED BY: /a:ni=tny atalena C ssioner Precinct 2 Commissioners' Court Duane County Judge DATE: Al 40f / S Vol. is APPLICATION FOR WATER UTILITY PERMIT DESIGNATING PLACEMENT OF UTILITY IN COUNTY RIGHT OF WAY TO: THE COUNTY ENGINEER OF BRAZOS COUNTY, TEXAS Pursuant to the Texas Utility Code, Section 181.024, comes now WICKSON CREEK SPECIAL UTILITY DISTRICT [company name], hereinafter referred to as "Company" a TEXAS UTILITY [state] Corporation, with authority to transact business in Texas, acting by and through its duly authorized representative, and hereby petitions the County Engineer for the right to lay, construct, maintain, repair and/or operate a gas facility under, over, across and/or along certain County Roads as shown on drawings and diagrams attached hereto and said location described as follows: Facility to Cross Road Road Name & Block Number ' Length of Cronin TYPE OF CONSTRUCTION CHECK ONE Bored Jacked Driven Cased SAND CREEK ROAD 60' X X Facility to Parallel County Road Within Right -Of -Way CONSTRUCTION TYPE I" Diameter Wall Thickness 11/2" Encasement Pipe Material Specification PVC Maximum Operation Pressure 80 PSI The location and description of the proposed installation and appurtenances must be fully shown on the attached detailed drawings. The Company shall commence actual construction/work in good faith within 60 days from the date of said permit and shall complete said construction /work within 1 working days. (COMPANY MUST FILL IN). If such construction is not begun by the 60" day, Company will be required to apply for a new permit. Company declares that prior to filing this application, it has ascertained the location of all existing utilities, both aerial and underground, and the filing of this application is prima facie evidence that the proposed installation will not conflict with any existing utility. A copy of this permit shall be kept at the job site any time work is being performed. It is expressly stipulated that this Permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or vest any property right in said holder. It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the County's right, title and interest in the land to be entered upon and used by the holder and the holder will at all times assume risk of and indemnify, defend and save harmless Brazos County from and against any and all loss, damages, cost or Vol. a �� pg. 30 expense arising in any manner on account of the exercise or attempted exercise by said holder of the aforesaid rights and privileges. Any deviation from these specifications must be approved by Brazos County Engineer's Office or its designated representative. Approval of County Engineer's Office may take as long as two weeks after complete application is received. Applicant agrees to comply with all rules of the County Commissioners and the County Engineer in . construction of said installation attached hereto as BRAZOS COUNTY DESIGN STANDARDS AND SAFETY PRECAUTION REQUIREMENTS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY and incorporated herein for reference. In the event Company fails to obtain a permit prior to the installation or does not install utilities in compliance with installation requirements set forth herein (Le. depth, location, etc), Company assumes all financial responsibility for damages and/or destruction of lines, cables, etc- based upon ifs failure to comply with Brazos County requirements. Applicant agrees that if Brazos County demonstrates a violation of the terms of this policy, Applicant stipulates that requisites for injunctive relief exist and that Brazos County is entitled to relief enjoining any conduct by applicant which is contrary to the policies. This permit is a revocable permit. Brazos County reserves the right to revoke this permit at any time, in the sole discretion of Brazos County, for interests of public health, safety or welfare, or for failure to repair any damages upon demand, or for any other reason deemed sufficient by Brazos County. In the event Compairy fails to comply with any or all of the requirements as set forth herein, the County may take such action as it deems appropriate to compel compliance. The County Engineer further retains the right to revoke this Permit by verbal notffwation to the Applicant/Company. Failure to obtain this permit and/or notify the County Engineer's Office within 24 hours of beeginning construction shall constitute grounds for job shutdown. By signing below, I certify that I am authorized to represent the Company listed below, and that the Company agrees to the conditions/provisions included in this permit. Wickson Creek Sperial istrict Comp an Name � 4 . rQ 1 - r.5. 1_) By- - L� Signature Title 8770 HWY 21 F, P n Pnx4756 Address Bryan my 778 City state Zip (979)589 -3030 Phone Number watson@wicksoncreek.com Email Vol. __ �� P9. _ _ WATER UTILITY APPROVAL Brazos County offers no objection to the proposed location of the utility in the County right of way as shown by accompanying drawings and notice dated -2 — aLq— Is except as noted below: EXCEPTIONS: (Month/Day/Year) �,� Brazos County Engineer W N s U) rn :::I 7u 00 S ff1 GO z 0 b � S O I- Q O M 6? O z O r O O S -i 4 V rn -i S !x� r O C7 O z O rn 0 O z U) 1 7u C C7 1 O z --I m rn ..—,. , -u. -1,.11 0 0 C O O h 9 MA -dO-1HUH 0 rn rn m Vol. p9• i� a s fi 0 r 9. r b' ifs m ci a 0 0 C O O h 9 MA -dO-1HUH 0 rn rn m Vol. p9• i� a s fi 0 r 9. Vol. _�� � - P9• `�� BRAZOS COUNTY ROADWAY SAFETY AND ROAD PRESERVATION STANDARDS FOR WORK CONDUCTED IN BRAZOS COUNTY RIGHTS OF WAY A. General Requirements I. Adequate drainage shall be maintained in ditches at all times. 2. Permittee will use best management practices (`BMP ") (EPA and TCEQ both provide lists of examples of BMPs) to minimize erosion and sedimentation resulting from the proposed installation. 3. The permittee shall take precautions to avoid damage to property. All County Right of Way and property shall be restored to its original condition, as far as practical, in the opinion of the County Engineer or appointed representative. 4. The construction and maintenance of such utility shall not interfere with the property or rights of a prior occupant. 5. Permittee shall not interfere with other utilities located in the right of way. In the event damages occur, permittee will be liable to the County or other utilities running through the right of way. 6. County Engineer shall determine whether or not permittee's plans shall inconvenience the public. If it is determined that inconvenience to the public exists, then the County Engineer will decide whether such project will be allowed or if an alternative exists so as not to inconvenience the public. B. Safety Requirements t. Proper traffic control measures must be put in place prior to beginning work and remain in place during the duration of the job. All traffic control measures must follow the Texas Manual of Uniform Traffic Control Devices ( TMUTCD). See Traffic Control Requirements below. 2. During construction, all safety regulations of the Texas Department of Transportation shall be observed. 3. Permittee must take such precautions and measures, including placing and displaying safety devices, as may be necessary, in order to safely conduct the public through the project area. Company shall provide flagmen, signs, signals or devices necessary to provide complete safety to the public. 4. Adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. 5. No cable, conduit and /or pole line shall be laid, constructed, maintained and /or repaired so as to constitute a danger or hazard of any kind to persons or vehicles using such road. Any poles placed in the Right of Way for future installation shall be placed at the back of the Right of Way. Exceptions may be approved by the County Engineer. C. Traffic Control Plan 1. A traffic control plan, pursuant to the TMUTCD or Engineered Traffic Control Plan must be provided for the following: a. Any construction (i.e. pit, excavation, hole) left open overnight, requires specific ni hg ttime traffic control measures pursuant to the TMUTCD; pg._✓ b. If construction is within ten (10) feet of the roadway; or c. Any work performed in the road right -of -way; 2. Plan must be attached to the permit and kept at the job site any time work is being performed. 3. Plan must set forth the time of completion for the job. D. Design Standards 1. All overhead installations shall conform to clearance standards of the Texas Department of Transportation and the pole be placed in the designated area for power specified as set forth in the Texas Utilities Code, Section 181.045. 2. Alt pole installation (including lighting) shall be placed at the backside of the Right of Way to ensure safety to the public. Any pole placed in violation of this requirement will be required to be moved to the appropriate location at the company's expense. Exceptions may be approved by the County Engineer. All underground installations shall (these are minimum depths — utility may place deeper): a. be placed at a minimum depth of forty-eight (48) inches below the top of the pavement; b. be at least thirty -six (36) inches below ditch flow line when installation is within the area measured from top of bank to top of bank; c. be at least forty -eight (48) inches below ditch flow line if low pressure gas or petroleum lines. For high pressure gas and petroleum lines, see High Pressure Pipelines requirements listed below; d. not be closer than ten (10) feet from the edge of pavement. Exceptions may apply in rights of way of less than 60 feet. 4. Water Lines: All water lines must be a minimum 36- inches below the ditch flow line and cased. Waterlines shall be cased if crossing under the roadway. 5. Utilities in all new developments that have 60 feet or greater of right of way shall be installed within designated locations based upon the type of utility. The locations shall be as follows: (measured from back of right -of -way). Power— 0 to 2 feet, nominally 1' Phone — 2 to 4 feet, nominally 3' Gas — 4 to 6 feet, nominally 5' Cable — 6 to 8 feet, nominally 7' 6. Utilities with less than 60 feet right -of -way in all new developments shall install the utility in a similar manner as referenced in No. 3 above; however, the County Engineer or its designated representative will provide final approval of each utility location. 7. The length of any trench to be opened in advance of the pipe, conduit or ducts may not be longer than 400' if left open over night or unattended. 8. Crossings under a county road shall: a. be bored or jacked. ABSOLUTELY NO OPEN CUTS WITHIN COUNTY ROAD PAVEMENT; b. be pressure grouted for the full length of the crossing if the annular space between pipe and casing and soil exceeds one (1) inch. Brazos County must be given 24 hours notice of pressure grouting operations and have the opportunity to have an inspector on site to observe pressure grouting operations; Pq Fir), c. TxDOT Standard Specification Item 476 shall be followed for all boring, jacking, tunneling and joints. 9. Bore Pits: a. no pits shall remain open longer than 2 days; b. all pits shall have proper traffic control measures in place. See Traffic Control Plan listed above, c. pits shall NOT be located within ten (10) feet from the edge of pavement without prior approval from the County Engineer or his representative; d. when pits are to remain open for more than g hours, due diligence will be used in protecting the spoil pile to prevent drainage problems; e. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity; f. based upon soil conditions, the County Engineer or his representative may require pits be placed further from the edge of road. 10. Any installation within ten (10) feet of edge of pavement shall meet the following: a. location must be approved by the County Engineer or his representative b. backfilled with cement stabilized material. c. based upon soil conditions, the County Engineer or his representative may require shoring to protect pavement integrity. d. all excess water and mud shall be removed from the trench prior to backfilling. Any backfill placed during a rainy period or at other times where excess water cannot be prevented from entering the trench will be considered TEMPORARY and shall be replaced with PERMANENT cement stabilized material as soon as weather permits; e. all disturbed base and pavement materials shall be removed and restored to the satisfaction of the County Engineer or his representatives. f. no side or lateral tamping to fill voids under the base and pavement materials is allowed. 11. Company must be careful to not jeopardize the slope or integrity of the shoulder of the road. In the event Company damages the slope, shoulder or any other portion of the right -of -way, Company will be responsible for repairing the damage and replacing the right -of -way to the condition it was prior to commencing construction. 12. Operation of construction and /or maintenance equipment on the traveled surface of any improved County road will not be permitted, except in an instance whereby the laying, construction, maintenance and /or repair of cables, conduits and/or pole lines cannot be accomplished by any other method and in this event all such equipment shall be of the rubber tire variety. Appropriate traffic control shall be provided meeting TMUTCD requirements. 13. In the event said construction and /or maintenance and /or repair requires Company to remove, cut or jeopardize any section of the road (asphalt, cement, road base, etc.), Company will be required to provide a performance bond or letter of credit securing necessary repairs. Said bond amount will be determined by the County Engineer. 14. The applicant shall submit a letter of "No Objection" from the Army Corps of Engineers for all designated wetlands and environmentally sensitive lands. E. Eneereency work 1. In the event Company is required to perform emergency services, that requires excavation in a County Right of Way, and unable to notify the County Engineer prior to conducting emergency repairs, Company Vol. _Ill pg._ 27 shall notify County Engineer within 24 hours of beginning construction /repairs. This will allow the County Engineer's Office an opportunity to inspect the site to ensure the integrity of the County Right of Way and traffic safety controls used. F. Repairs to existing facilities 1. Maintenance and/or repair to existing cables, conduits, and /or pole lines which require disturbance of the soil, shall not be performed until plans describing such maintenance and /or repair have been approved by the County Engineer or its designated representative and a permit has been obtained. G. Relocation oftailities I. When and if the County Engineer determines that it is necessary for the construction, repair, improvement, alteration or relocation of all or any portion of said road, any or all poles, wires, pipes, cables or other facilities and appurtenances authorized hereunder, shall be removed from said road, or reset or relocated thereon, as required by the County Engineer within a reasonable time as determined by the County Engineer and Utility Company, and at the expense of the Utility Company. H. Hielt Pressure Pipelines 1. All utility Permits for high pressure pipelines (generally 60 PSI or greater), whether pertaining to controlled access or non - controlled access installations, should contain the following additional information in the description of the permit. - diameter -wall thickness - material specification - minimum yield strength - maximum operation pressure of the pipeline 2. With the exception of the maximum operation pressure of the pipeline, this information is to be supplied for both the carrier pipe and the casing. 3. Assurance must also be given that the installation material and design meet the minimum Federal Safety Standards for Liquid and Gas Pipe Lines. Assurance must be provided on company letterhead and signed by an authorized representative of the company. 4. Petroleum Pipelines: Depth Type of Pipeline (below deepest ditch grade) Special Requirements Encased Pipe Less than 10' Must be covered with concrete pad at least 36" deep Encased Pipe Greater than 10' No concrete pad required Non -Cased Pipe Less than 10' Must be covered with concrete pad at least 48" deep Non -Cased Pipe Greater than 10' No concrete pad required Concrete pad shall be minimum of 3" thick and width shall be pipe diameter plus 18" minimum. 5. Under no circumstances will a pipeline be installed parallel to a County Road within the Right -of- Way. Transmission lines have been determined to be petroleum pipelines (which includes natural gas lines) and shall not be parallel to a County Road. 6. Natural Gas Distribution is a line that serves the final customer. Vol. i;,'-/ f Pg. 3 a Z g 9$j Ft "a sit 4 8 F IN Hill!, E F aj5 ¢sj o: § §E 4$ Ij$g09� p o w s � s3 C'eja rg �S gill iffis! 'a i$ �e ggg'e6b a g6 big, O p gggrj S "s�gr'ggj s 33 g 14 �- P§ 1 elk's �fr�aapg8tt$ �5 mph° gg�.r u- --- - --- -- -- ------ ���gl z � - w sa e g [ � vi �6 IwikP 2S §���P8§� ue ei w. 1 n6 4tfa8�$ «8R8sa�sS F -_ +roams • +wsn.uf s O O cc ,eonsus ' 's:a��sgaRaH S > '' w. A..n• r..[ ni w.a+u � t' ¢Y¢ S ==oo LEE? Es eif Z g 9$j Ft "a sit 4 8 F IN Hill!, E F aj5 ¢sj o: § §E 4$ Ij$g09� p o w s � s3 C'eja rg �S gill iffis! 'a i$ �e ggg'e6b a g6 big, O p gggrj S "s�gr'ggj s 33 g 14 �- P§ 1 elk's �fr�aapg8tt$ �5 mph° gg�.r u- --- - --- -- -- ------ ���gl z � - w sa e g [ � vi �6 .O[ ue ei w. 1 n6 +rosins +roams • +wsn.uf s O O cc ,eonsus +rosswf S > '' w. A..n• r..[ ni w.a+u � t' ¢Y¢ S ==oo LEE? Es eif i. i✓`°�'dE'l °i.�•��ioo e' wii ::.iEn'.e:.'i,°:w"'!a "o`.�»,.3 :i o'•.�l :ivi .. 8� w2 rwnuwo Vol. g•� w w � N J V O 2 � D N � O c d � a N V Y K O 3 W J = O N � N w C Z O H U L a CCa N u K 3 .O[ +rosins +roams ,eonsus +rosswf '' w. A..n• r..[ ni w.a+u 3 �-�g8 - t' S ==oo LEE? Es eif i. i✓`°�'dE'l °i.�•��ioo e' wii ::.iEn'.e:.'i,°:w"'!a "o`.�»,.3 :i o'•.�l :ivi .. 8� w2 rwnuwo Vol. g•� w w � N J V O 2 � D N � O c d � a N V Y K O 3 W J = O N � N w C Z O H U L a CCa N u K 3 BRAZOSCOUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridge DEPT. NUMBER 56001000 DATE OF COURT MEETING: March 10, 2015 ITEM: Consider and take action on request from Carrera Races, Inc. for approval of a (1) lane closure on Old Reliance Road Sunday, March 29, 2015 from 8:00 a.m. to 1:00 p.m. for the Texas Wine Series Half Marathon and Vintage 5K race benefiting Still Creek Ranch. Event will be held at Messina Hof Winery & Resort. See attached Contingency Plan and Course Man. Site is located in Precinct 2. SOURCE OF FUNDS: N/A NOTES: Event will require the use of only one lane with cones set the entire length of the route which will be manned by volunteer Course Marshals; County Sheriff Dept. personnel will be on hand to provide assistance. r Wr0 �I Wo R. Alan Munger, P.E County Engineer This Request is APPROVED BY: I my C Lena Commi ioner, Precinct 2 E. Duane Peters, 3�ia l5 ate Vol. _ g=l v Pg. e7D Court 1� i- .L.,sC1 ah:�:.,..M,...2 &,.?Sr»?,Ti.a ..:.. r3"Edr.'�..�� ^...�,.aA..'s:..:: !�:>. �r�.: ri rv, }.�v: ,. �..,._4 +. al.'�in�....::v.e•...d.'..:,.. �..._.'�_,varfi tARRETUA — a A C E S — February 3, 2014 To whom it may concern: Camara Races, Inc Is a premier race company focusing on creating awareness and opportunity for non - profit organizations. We will host an event, the Texas Wine Series Half Marathon and Vintage 5K race, on Sunday, March 29 benefiting Still Creek Ranch at Messina Hof Winery & Resort. We respectfully submit the following contingency plan for your review. Please contact us with questions. Thank you in advance for your consideration. Weather: rain, severe storms, etc 1. If bad weather is forecasted, will the event be canceled? If so, how will attendees be notified? Email notification is first followed by contact by phone. We will also post notifications of changes /cancellation due to inclement weather conditions on www.Facebook.com/rexasWineRuns and on the event website, www.TexasWIneSeries.com. Finally, Messina Hof has agreed to advise Incoming callers of the change /cancellation. 2. Develop a plan for sudden onset of severe weather. Where will people go and who is designated to assist in their successful arrival at the safe refuge place? Messina Hof has several buildings on their premises. We would use those buildings for refuge in the event of a sudden onset of severe weather. We will also advise the runners of this plan ahead of time in the Race Day Details electronic missive they will receive. We also use www.Facebook.com/rexasWineRuns as a means of communication as the majority of our runners receive the communication on their cell phones. 3. Is there an area of safe refuge in case of a tomado? In the event of a tornado watch/warning, we will adopt the TAMIL! Campus Safety & Emergency procedures. Their website states: "Tornado Watch — This means that tornadoes are possible. You should remain alert for approaching storms, watch the sky and stay tuned to NOAH Weather Radios, commercial radio or the local news for more information.; Tornado Warning —This means that a tornado has been sighted or Indicated by weather radar. You should take shelter immediately." We have permission to use the buildings on premises at Messina Hof and implement Instructions for Tornado as indicated at htti)://www,tamu.edu/emeraency/procedures/tornado.htmi We will also be happy to seek additional counsel upon request on this topic toward review and implementation. event if needed? ress and exact location of the area where needed. We er,detalls requested up to and Including staying on the Voi. -.�=__J�__ +'i[v T..4- ♦ (.rw -.E`dL r.n- .d. -s r.w ...w..L rsw ..P1'. e.,tl �. . -.._ ....v..� tARRERA — H A C E S- 7. If applicable, is there adequate shade to prevent heat stroke? Will water be provided? Water will be staged every 1.5 miles. The course has some shade and the temperatures on March 30 should be mild (between 63 and 82 degrees). Please see the historical data provided for vour reference: 8. Who will man barricades? Barricades will be enforced by a combination of Staff and Volunteers. 9. Who will work entry gates? Maintain egress and access? Brazos County Sheriff Department will be asked to provide assistance as needed. Security 10. If volunteers or private agencies provide security, will they have appropriate phone numbers for EMS, Fire and Police? Absolutely. All Volunteers and Staff will receive explicit details. 11. Provide communications equipment. Portable radios, cell phones, access to land lines. We will communicate by Cell phone and Walk!e- Talkie. Event Logistics 12. Where will there be a staging area for support staff? Messina Hof is allowing all areas to be staged on their property. 13. What time will the crowd be dispersed? The event will officially close at 1 pm. At this time, everything will be broken down and packed up. 14. Appoint one person to oversee and take responsibility for the event. Who? Where located? How to contact during event? Our Race Director is Virginia Lopez Rodriguez (fAMU Class'86 - whoop!) and Megan Bowen is our point -of- contact at Messina Hof Winery & Resort. Virginia's located in San Antonio, Texas and her contact info is: Virginia Lopez Rodriguez, President, Carrara Races, Inc, 1116 West Blanco Rd, San Antonio, Texas 78232, www.CarraraFtaces.com and www.TexasW!neSeries.com Office: 210.764.9900 Ext 4; Cell phone # during event is 210.764.8459. 15.,Remember to maintain fire lanes and access roads (20 ft clearance). Absolutely We wiil' be very respectful, of these v!as should they be in play for our event. Th� u again fob your consld @� n Qf our contingency plan. We look forward to next steps. NEW'. FO-1- zl t pg, �-2 Actual Average Record Temperature Mean Temperature 73 OF 65 OF Max Temperature 820F 75 °F 96 OF (1946) Min Temperature 63 OF 54 OF 132 OF (1926) 8. Who will man barricades? Barricades will be enforced by a combination of Staff and Volunteers. 9. Who will work entry gates? Maintain egress and access? Brazos County Sheriff Department will be asked to provide assistance as needed. Security 10. If volunteers or private agencies provide security, will they have appropriate phone numbers for EMS, Fire and Police? Absolutely. All Volunteers and Staff will receive explicit details. 11. Provide communications equipment. Portable radios, cell phones, access to land lines. We will communicate by Cell phone and Walk!e- Talkie. Event Logistics 12. Where will there be a staging area for support staff? Messina Hof is allowing all areas to be staged on their property. 13. What time will the crowd be dispersed? The event will officially close at 1 pm. At this time, everything will be broken down and packed up. 14. Appoint one person to oversee and take responsibility for the event. Who? Where located? How to contact during event? Our Race Director is Virginia Lopez Rodriguez (fAMU Class'86 - whoop!) and Megan Bowen is our point -of- contact at Messina Hof Winery & Resort. Virginia's located in San Antonio, Texas and her contact info is: Virginia Lopez Rodriguez, President, Carrara Races, Inc, 1116 West Blanco Rd, San Antonio, Texas 78232, www.CarraraFtaces.com and www.TexasW!neSeries.com Office: 210.764.9900 Ext 4; Cell phone # during event is 210.764.8459. 15.,Remember to maintain fire lanes and access roads (20 ft clearance). Absolutely We wiil' be very respectful, of these v!as should they be in play for our event. Th� u again fob your consld @� n Qf our contingency plan. We look forward to next steps. NEW'. FO-1- zl t pg, �-2 ED 0 8 ƒ- x. } 2, � � � ^ )> WO., M�A. 3 0 ID 0 0 [Vol. 00 �3 rD kE040 Vie 5's La CK> CD 0 0 § Dp 0 0 tri La 1�,/" z F, z d \ 00 �3 rD kE040 Vie 5's La CD CD M e @ cI> - # q ®� E ea� .. . . . . . . - � ® � fe �~ .0 § t � ° ¢ & \ ® ] �e \ e m . e | 0 U)0 �2 a £\I Vol. pg._�v4e/ a d _O Sa C m R i N B m 0 v , CID. >P• r 6 O O M O �. Z R H c td m i m y x tri td � y 00 ° z x p=j f q Oti N d O b (1) N 7 M °AC O s t)\\ ~ W u U Vol. �� _ p9 %�S� L1 v Fol. all Ps• s<7 I ® hi f7 z M M 51 - .. 0 H �+' I '� O ® M N M N M ' u1 off. ® s 0 o m qb. o M i 0 ID 0 Fol. all Ps• s<7 I b A 0 w 63 ti ( } ®, y;.. 0 0 �y o r ! z M `Jy y r I 0 j/ d m � o J a' ti rD ai rp C o e dir cn m m \ Vol. . V,I pg. /s, 4 BRAZOS COUNTY COMMISSIONERS' COURT ACTION FORM DEPARTMENT Road and Bridee DEPT. NUMBER 56001000 DATE OF COURT MEETING: March 10, 2015 ITEM: Consider and take action on the Replat of Lot 26R, Block 3 Riverstone Subdivision Phase Two; Volume 9451 Page 95 (Official Records of Brazos County) 2.191 Acres, John Austin League A -2• (Bryan ETJ) Brazos County Texas Site is located in Precinct 2. SOURCE OF FUNDS: N/A NOTES: • Prepared for: Grant Carrabba • Prepared by: Kerr Surveying, LLC SUBMITTED BY: ZZA P6. R. Alan Munger, County Engineer This Request is I_�]W:ZWNI 01111 •/i Anommisxser Sammy Catalena Precinct 2 refers, uounry juage Aolls Date Pq. S�J�� Application for Development Brazos County Subdivision and Development Regulations Brazos County Engineering Department 2617 Hwy 21 West, Bryan, Texas 77803 (979) 822 -2127 Office Use Only. Master Plan _ Final Plat _ Re -Plat 4 Amending Plat Property Description rr Road Location: u1Q14 jV2Y gPh6 C 0(7r + �mlm -1 TX `1190% Legal Description: Qt VP rZ{rn e, Pln Subdivision Description Subdivision Name: Y a Total number of lots: Total Acreage: Q Pro perty Owner Owner name(s): Current mailing Phone numbers; Applicant or Authorized Agent, Engineer or Surveyor Name and Address: (3yad VGerm )Aar✓ sov -UN rn i_eC 40IN.Te_ca5 Phone number(s): Ci-7q-Q(a S'- 31Q<_- Name and Address: Phone number(s): Application is for Residential ()o Mobile Home Park () Commercial ( ) Other ( ) is any of the property located in a Floodplain or Flood Hazard area? (ye Acknowledgment: The flood hazard boundary maps and other flood data used by Brazos County in evaluating flood hazards to proposed developments are considered reasonable and accurate for regulatory purposes and are based on the best available scientific and engineering data. On rare occasions greater floods can and will occur and flood heights may be increased by man -made or natural causes. Issuance of a Floodplain Permit in accordance with the Brazos County Flood Damage Prevention Ordinance does not imply that development outside the areas of special flood hazard will be free from flooding or flood damage. Issuance of a permit shall not create liability on the part of Banos County or any officer or employee of Brazos County in the event flooding or flood damage does occur. is part or all of the property within an ETJ of a City? ea Will any construction occur in TxDOT right -of -ways? N (yes/40 Application Check List: Copies of finished plat with corrections (if any): ❑ 9 copies to Brazos County ❑ One (1) copy to Brazos County Health Dept. ❑ One (1) copy to Brazos County 911 ❑ One (1) copy to local Water District or Company Letters of approval (to be sent by the approving institution directly to Brazos County Engineering): ❑ Letter from Brazos County Health Dept. - For onsite sewage evaluation. ❑ Letter from Brazos County 911 -For road names. ❑ Letter from Water District or Company. - Stating water availability, etc.. If property is within an ETJ of a city: ❑ Approval notification from appropriate city. Applicant attest that they have signed this application in the capacity designated, if any, and further attests that they have read docum nt and the statement contained herein and any attached are true and factual. All applicants are encoura to review the County Regulations prior to any plat submittal. It is understood that this application is is d or dated until all documents listed above are filed at the Brazos County Engineering O 1 pplicable blanks are filled in the application above. / <J 1L /c, Aoolicatffs Si¢ nature Date County Witness Date �f,l..� pg �Q Ave. 13N&n, -rV -11965 Engineer /Surveyor Check List for Plat Pre - Approval 1) Property located within a City Extra Territorial Jurisdiction (ETI), contact with that City is required before plat approval. 2) Drawn on 24" x 36" sheet to scale of 100' per inch or larger. If more than one sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. 3) Include the words; "MASTER DEVELOPMENT PLAN —NOT FOR RECORD" or "FINAL PLAT' or "RE -PLAT' or "AMENDING PLAT' in letters W' high. 4) Vicinity map which includes enough of surrounding area to show general location of subject property in relation to major roads and any city limits and county boundaries. No scale required but include north arrow. 5) Title Block with the following information: §1 Name and address of subdivider, recorded owner, planner, engineer and surveyor. Proposed name of Subdivision. (Subdivision name & street names will be approved through the Brazos County 911.) (Replan need to retain original subdivision name.) Date of preparation. (Include the date of any revisions on the plat.) la Engineer's scale in feet. 0 Total area intended to be developed. j)l Re -plat or Amending Plat, existing lot and block description or Abstract name and number. Q 6) North Arrow, 7) Location of any current city or county limit lines, if applicable. 9) Subdivision boundary indicated by heavy lines. Boundary must include all of parent tract. �L 9) Descriptions by metes and bounds of the subdivision which shall close within accepted land surveying standards. (Shown on drawing; not separate description) 10) Primary control points or descriptions and ties to such control points, to which, later, all dimensions, angles, bearings, block numbers, and similar data shall be referred. The plat shall be located with respect to a comer of the survey or tract, or an original comer of the original survey of which it is a part. 11) Name of contiguous subdivisions and names of owners of contiguous parcels of unsubdivided -land, and an indication whether or not contiguous properties are platted. 12) Location of the 100 Year Floodplain and Floodway, if applicable, according to the most recent available data. 13) Note the FEMA FIRM Map panel number and revision date on plat ❑ 14) Topographic information, including contours at two foot (2 ft.) intervals, Bowline elevation and flow direction. 15) Proposed drainage concept shown on plan, showing flow paths to primary system. Pg. _ 5'/ 16) Locate and Describe, with accurate dimensions, bearings or deflectipn angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves; show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision; for the following: Existing Proposed ❑ Streets: continuous or end in a cul -de -sac, stubbed out streets must end into a temp. turn around unless they are shorter that 100 feet. ❑ Public and private R.O.W. locations, width(s) and names. (All existing and proposed R.O. W.'s sufficient to meet County and City Regulations, if applicable.) ❑ Street offsets and/or intersection angles meet ordinance. RL ❑ Alleys ❑ Reserve tracts. Q] ❑ Well site locations. Y] 0 Pipelines: label company with volume and page. 0 Utility Services. (water, wastewater, electrical, natural gas, cable, phone, etc.) 91 0 Easements. ❑ Drainage Structures and improvements per engineering analysis. ❑ A number or letter to identify each lot or site and each block. 0 Public areas. Q 0 Other Public improvements, including but not limited to parks, schools and other public facilities. 0 17) All off -site easements for infrastructure construction must be shown on the final plat with a volume and page listed to indicate where the separate instrument easements were filed. Separate instrument easements must be filed prior or concurrently with final plat. ❑ 18) Proposed phasing. The Master Plan and each phase must be able to stand alone to meet ordinance requirements. Infrastructure costs should be separate for each phase of the subdivision. ❑ 19) Bring this check list with one copy of plat for pre - approval to meeting; date and time set by County Engineer or Planner: Meeting location set at County Engineering office. Brazos County Engineering Road & Bridge Department 2617 Hwy 21 West Bryan, Texas 77803 (979)822 -2127 Vol 0 pq.. oZ The State of Texas, County of BRAZOS We, the undersigned, as County Commissioners within and for Brazos County, and the Honorable Duane Peters, County Judge of Brazos County, constituting the entire Commissioners' Court of Brazos County, during a regular meeting of said Court have examined the foregoing report and have caused an order to be entered upon the Minutes of the Commissioners' Court of Brazos County approving said Report as presented and submitted as true and correct by Laura Taylor Davis, Treasurer of Brazos County, as provided for in the Revised Statutes of the State of Texas. (Texas Local Government Code, )14.026) Witness my hand this day of ,� C C� A.D. 2015 Karen McQueen ^� County Clerk, County of BRAZOS, State of Texas Examined and approved in open Commissioners' Court this 10-(1r' day of A bs5 r Lloyd Wassermann, Commissioner Precinct #1 'S-�my C7 1e na, Commissioner Precinct #2 Kenny Treasurer's Report for the MONTH JANUARY 2015 F Vol. Pg. 5 #3 Vol. pg. N, HMO MOM . . . . . . . . . . . . . . . . . . . . . . . A ..... OW i Z ~1$m ci PEW 2 m i i Ii m 8 C g, g G 3J I 6 WHOM MUMM 0AM-0 14 z 0 Zw, �1!11511191%01 11 IN i-I Mi -I 121mi. MR-RE ER iz -2111,11.1 Vol. pg. N, BRAZOS COUNTY, TEXAS BUDGET AMENDMENT(S) FOR THE 2014 -2015 BUDGET YEAR NO.14115 23.1-23.11 On this the 10th day of March 2015 at a regular meeting of the Commissioners' Court, the following members were present: A. Duane Peters, County Judge, Presiding B. Lloyd Wassermann, Commissioner, Precinct I C. Sammy Catalena, Commissioner, Precinct 2 D. Kenny Mallard, Commissioner, Precinct 3 E. Irma Cauley, Commissioner, Precinct 4 F. Karen McQueen, County Clerk The following proceedings were held: THAT WHEREAS, on 10th day of March 2015 the Court heard and approved a budget amendment for the 20142015 budget year for Brazos County, Texas; and WHEREAS, expenditure is necessary due to the necessity to meet unusual and unforeseen conditions which could not be reasonably included in the original budget adopted 9 September 2014, the following amendment(s) to the original budget are hereby authorized, as described on the attached page(s). ADOPTED AND APPROVED this the 10th day of March 2015. THE COMMISSIONERS COURT OF BRAZOS COUNTY, TEXAS. Duane Peters, County Original: County Clerk's Office and Attached to the original budget Vol. pg. .6,-r FA hands BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14115 - 23.1 3/10/2015 of funds to purchase a mini electric hot water heater for the restroom at the JJAEP whew them is no hot water availability to Vol. pg.-..-5-P" . BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14115 - 23.2 of funds to complete the bathroom renovations project at the Juvenile facility. Additional funding was approved on March 3, air p91 BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14115 - 23.3 3/10/2015 Recognize donation for four DVD players to be used in the Juvenile Detention Center. Donation was approved on March 3, 2015, during p9, '1j" BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14115 - 23.4 3110/2015 Vol. /!1 p9 9 KM ��Pmll IMMirs ip i :PMVM -m - Vol. /!1 p9 9 BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14115 - 23.5 Texas Tanker Ice Bins. F,7�/7jE- BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14115 - 23.6 V Pq. ! / BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14115 - 23.7 3110/2015 M BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14115 - 23.8 3/10/2015 W3 �Jjm contingency Immyr,51r, mof Miscellaneous Expend `DepaRment Approval BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14/15 - 23.9 VOI. (Y Pg. l 4z and BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14/15 - 23.10 Vol. 02 !i Pg. BRAZOS COUNTY, TEXAS BUDGET AMENDMENTS No. 14/15 - 23.11 3/10/2015 KM �� Bldg. Renov - Court House Courthousaingrovement and New Tax Offlce Building_ -- Office. Reallocation of funds to install irrigation systern at the new Tax Vol. pg. L 6 PERSONNEL CHANGE OF STATUS REQUESTS Commissioner Court Date: March 10, 2015 Department Submitting Information: Human Resources Purpose of Submissions: Consider and Take Action on Change Requests Department Submitting Employee Request Action Requested Request(s) Applies To District Attorney Sifuentez, Maritza New Hire Human Resources Sauseda, Monica Resignation Information Technology Ratcliffe, Bryce New Hire Juvenile Services Canales, Mayela Promotion Cendrick, Daniel Resignation Hurt, Eric Transfer Win Dept. Road and Bridge Galvan, Jimmy Termination Wallace, Lawrence New Hire Wiechkoske, Jr., Gregg New Hire S. 0. — Admin Anderson, Lyndsey Budget Change Emig, Greg Retirement Approved in Commissioners' Court: March 0 County Judge's or Commissioner's Signature: (This Copy to be attached to minutes) Vol. /rY pg. )i ... ECONOMIC ]?EVELOPMENT ?►GREEMENT BETWEEN BRAZOS COUNTY AND FUJIF104 pYOSYNTH BIOTECHNOLOGIES,TEXAS; LLC (FQRMERLY K"ON BIOTHERAPEUTICS, L.L.C.).:::.= ; .... This Economic Development Grant Agreement (this "Agreement's is entered into:by and between'BRAZOS COUNTY, a political subdivision of. the. State of Texas (hereinafterieferred to.... as: "COUNTY"),: and FUJIFILM DIOSYNTH BIOTECHNOLOGIES TEXAS;:LLC, a Texas Limited: Liability Conn an " ' p y (hereinafter re to as ..DEVELOPER :..: WHEREAS COUNTY is authorimd and empowered under TEXAS. L0cgr, GovERNmWT. cor'w' Chapter 3.81.and other applicable Texas laws pertaining to economic development. to make grants of public money to promote state and local,economic development and to stimulate business and. commercial activity in Brazos County} and, WHEREAS, COUNTY actively seeks economic development prospects in Brazos County thro partici ation in and establishment o£ an economic develo ment program; and P .... and,. _. . WHEREAS, COUNTY. desires to stimulate business and, commercial activity in the Research Valley BiocorridoF (hereiaafter referred to its the "Bioccjrridoi' ;and, WHEREAS;: op :December :8;: 201;4, DEVELOPER: :changed its :riatne from Kalon : Notherapeutics, LLC to FUJIFILM Diosynth Biotechnologies Texas;' LLC; and WHEREAS ,.,DEVELOPER.is developing pro perty; located within tlie:Bioeorridor: as..:: commercial .development for use. as. a research. and. manufacturing site ;. and, WHEREAS, COUNTY considers DEVELOPER to be a qualified economic development prospect that will ad&c.apital investment, and create new jobs in the community; arid, WHEREAS, in consideration of DEVELOPER's operation: of its business .within the Biocorridor and in accordance with the performance measures set forth herein,. COUNTY agrees to grant.to DEVELOPER Cash Incentives :" set out herein; and . WHEREAS, to ensure that the benefits COUNTY- provides under this. Agreement are utilized in a manner consistent with TEXAS: LocAL GovERNMENT.CODE, Chapter:381. and other law; DEVELOPER agrees to corrtply :with certain :.&nditions for receiving .those benefits, including conditions relating to property development, job creations and business operations; ands "' WHEREAS; as of December 31 2012 DEVELOPER had 31. full -time ein to ees and DEVELOPER'S calendar year 2012 payroll reported to the Texas; Workforce Commission for all fi#1 -time employees (some of whom:were hired during 2012):was $1.0 million; and, WHEREAS, in reliance ;on the incentives, proposal communicated to DEVELOPER by :.The Research Valley.Partnership, Inc., DEVELOPER has begun hiring new .full-time employees,.. and after the execution.of this Agreement will continue to add . new employees: in order to meet the . employment requirements of this Agreement. ..: Chapter 381 Agreement Brazos County and FUJIFILM Dyosynth Mot chnoloples Texas, LL0. February 5, 2016. :Page 1 Vol.:.: �� :..pg. NOW, TI;EREFORE, for and iu' consideration of the premises and:mutual covenants and : . promises hereinafter set forth, COUNTY and DEVELOOPER (each a "Party, oollecttvely, the " Parties' ) ,'represent and agree as: follows: Article I ..... , ; Definitions Wherever used in.this Agreement; the following terms shall have the meapiags ascribed to . them: "Affiliate'.' means 'any person or entity which directly or indirectly eontrois; is controlled by or is under, common control with teim Developer; during the ofsuch. control. 'A person or entity will be deemed to be "controlled" by any other person or entity if such other person br entity (a) 'possesses, directly of: iudirectly, power to' direct or cause the direction of the management of such person. or entity whether: by contractor otherwise,_ (b) 4as'direct or indirect ownership of at least fifty percent (50 %) of the voting, power of all .outstanding shares. entitled to vote at. a general election of 'directors of the person or entity or (c) has direct or indirect ownership of at least fifty . percent (50 %) of the equity interests inahe entity. "[1a se Year Taxable Value?. shall mean the Taxable. Value for: the Property for.theyear. in _.. whiff l.,this Agreement is.executed . . "Cash Incentive(s)" shall mean that amount paid each year by;COUNTY to DEVELOPER as a grantunder TExns:LOCAi, GOVIiRNMENT ConE, Chapter 381. Such amount shall be calculated based upon an annually reducing percentage. of the ad valorem taxes generated: by the Property, :.. Improvements and Tangible Personal Propertyduriegeach year of the Agreement. "Completion of Construction ': shall mean: (i) sub;stautial. completion :of the Improvements;; and ii) a final Certificate of occupancy has been issued for the improvements. "Effective Date" shall mean the date upon which this Agreement is fully executed by, all Paitres, unless the 'context indicates. otherwise. . "Tirst'Year of Gash Incentive(s)" shall mean the first ealendar year immediately following . the date of Completion' of.Construction: ' Hill Time Employee" of FTF! shall tnean any person: (i) who is an _ employee of . DEVELOPER or:an.Affiliate (excludingaeiriporary or seasonal: employees):whe is on the payroll'. in a budgeted: position and has an officially scheduled work week of thirty; -five (35) hours or more and who acciording to DEVELOPER or AffiliateCompany policy is entitled to full benefits as: a fiill tinpe'employee or (ii) who is an independent contractor engaged by DEVELOPER or an Affiliate td provide services su p portmg.$iocomdor operations and Who has received compensation from " DEVELOPER`or an Affiliate based on an avera geof ataeast thirty- five:(35) hours woriced.per:week for the two (2) months' ( preceding a date'on which PTEs are measured for purposes ofthis Agreement:: ".`FForceMajeure" shall mean any contingency or cause beyond the reasonable control of a - ..Party including, without limitation, acts of God of the public, . enemy, war, riot, ci vil commotion, - Chapter 381 Agreement. Braws County and FUJIFILM Dyosynth Biotechriologles Turns, LLC, February 5, 2015. : Page 2 ipsnrcection, adverse weather, government Or de facto governmental action ;(unless. caused by acts:::: or omissions of such Party), fires;, explosions or floods; strikes; slowdowns *or work stoppages. .. • . "Gross Payroll" shall mean the stun. of (A) the payroll: numbers that DEVELOPER or. in Affiliate.reports to'th'e Texas Workforce Commission quarterly for employees for. the four preceding - consecutive calendar quarters ending on of prior to a date, of measurement under this Agreement plus (B) the sum of the amounts:of nonemployeer compensation reported on Intemal : Revenue Service Forms .1099 issued: by DEVELOPER or:an.Affiliate to independent contractors who are.FM for services.rendered during the twelve preceding consecutive calendar months ending on of prior to a date of measurement under this Agreement "Improvements" shall mean the live virus vaccine facility and pandemic influenza facility to ' be constructed :on the Property* other ancillary:facilities such as reasonably required paging and landscaping more: f illy_described in the submittals filed by DEVELOPER with. the: City of College: ding permit(s), .... . . . . . Station, from time to time; to o . too a ........ ... . "Property" " � ' means the' real: property depicted in .ExWb1Y "A" not including 'any :'..: improvements constructed on such real: property. `` DEVELOPER" shall mean FUJIFILM Diosynth Biotechn6logies Texas, LLC ::.. . Premises" shall incan collectively, the Property and:lmprovements'following: construction thereof; but excluding the Tangible.Petsonal Property..: . `Tangible Personal Property shall mean. tangible 'personal. property, equipment and - :.:....... fixtures, - excluding inventory and'supplies, owned orleased by DEVELOPER that is4dded'to the -Improvements subsequent to the execution of this Agteement.. . "Taxable Value" means the appraised value as certified by tho Brazos Central Appraisal District:, of Tan :::::: •..... ilary.l'` of a given yeas..... ,.: 'Article II ........ ..... ....... . ' 'General Provisions .....:. ...... ..:.. ..... ... 2.1 All ofthe:above statements are hereby found to be true and are hereby approved and oopiedinto the.body of this Agreement as if copied in their entirety. 2.2 DEVELOPER owns or is under contract . to, own the Property;: which Property. is located within the' oiiy limits . of. the 'City. of.. College - Station. and within the Biocorridor DEVELOPER intends to cobshucXor cause to be constructed and to:, operate the Improvements on the PmPei?y 2.3 DEVELOPER shall, before August 25": of each calendar year that the Agreement is in effect.- certify in writing to. COUNTY that it is in compliance with each term of the Agreement. 2.4 The Property and the Improvements constructed' thereon at all times shall be used in the manner :that is consistent with the general :purposes of encouraging development or redevelopment within the Biocon idor. Chapter Ml Agreement. Brazos County and FUJIFILM Dyosynth Biotechmiogies Texas, LLC, February 5, 2015. .Page 3 - .... .. .. . . - Article III Gash Incentives Authorized Premises as long s DEVELOPER:. continues to g gecupy: and operate the :Premises, (ii) DEVELOPER without COUNTY, congerifmay transfer ownership of the Premises to an A„ gate; ' and (iii): DEVELOPER may: transfer ownership: of the Premises to a:.person that.COUNTY approves as an assig . n6eof this Agreement pursuant to Secti6n:9 ..8 of this Agreement. 3.6 The term of this Agreement shall begin on the Effective. Date and shall continue until December 3d" of the calendar year following the seventh (7a') anniversary date of the First Y of of Cash Inocatives ;, unless soonerterininated as provided herein. Article M. Improvements. , 4.1 DEVELOPER owns or is under contract to own the Property and intends to construct or cause: to be constructed thereon the improvements;, and locate Tangible Personal Property thereon. As.a condition precedent to: the initiation :;of DEVELOPER's:Cash Incentives puisuant to. this Agreement,. DEVELOPER agrees,. subject to events. of Force Ivlajetu'e,. to cause Completion of Construction of the Improvements to &dur no later than pecember 31, 2015, as. good and valuable consideration for this Agreement; and that all construction of the lmprovern" will be in accordance with.: all: applicable state: and local laws:. codes, and regulations (or valid waiver::.. thecot):. 4.3 Construction plans for. the Improvements: constructed on the Property will be filed . with the City of College Station, which shall be deemed to be incorporated by reference herein and made a part heieof for all purposes.: 4.4 DEVELOPER agrees fo maintain the ;Improvements during th$. term of this Agreement in accordance with all applicable state and local laws, codes, and regulations 4.5 COUNTY, its agents and ,employees shall have the right of access: to the Premises . . durin - wnstruction-to inspect the hnprovemems at reasonable times and with reasonable notice to DEVELOPER; and in accordance with visitor access and security policies of DEVELOPER; in order to. insyre that the con*uction of the improvements are in asblordance with this:Ag Bement and all applicable state and .local laws and regiila6ons.(or valid waiver3tiereof)... . Article V .. .... . Employment and Job Creation DEVELOPER agrees that-on or before 7arivary 1, 2018, and each year thereafterfor the team of this Agreement, DEVELOPER will employ no fewer than a total of-100 FTE's with a total Gross Payroll no less: than $6,000,060.: On or. before, August 25, 20.18, and August 25t- of each year thereafter;_ DEVELOPER shall deliver :to..COUNTY documentation, including,: but not limited to, Texas Workforce Commission quarterly reports, demonstrating thatDEVELOPER met thG otrployment and job. creation targets for.the preceding year. .Article VI' . Chapter 381 Agreement. Brazos County and FUJIFILM Dyosynth Blotechnologles Texas, LLC, February 5, 2015. .Page 5 i Vol. o? /:.:.: .Pg. %� Default enforceable and shall.;be:read as if the Parties intended at,all tones to delete said invalid section, subsection, paragraph, sentence; phrase or word. 7.3 Governing Law. This Agreeatmt shall be governed by the laws of the State of Texas without _regard to .ariy. conflict of law: rules:. Exclusive venue for. any action under. this. Agreement shall be the State District Court of Brazos County, Texas. The Parties agree to submit to.thepersonal and subjed matter jurisdiction of said court 7,4 .. Counterparts..Tlus Agreement may be executed in any.number ofeounterparts, each of which. shall be deemed an original • and constitute one and the same instrument. 7.5 Entire Agreement This Agreement embodies .the complete agreement of the Parties heieto, supmeding all oni or written previous and contemporary agreements between the Parties and relating to. the matt ers in this Agreement, and except a otherwise provided herein cannot be modified without written agreement of the Parties, to be attached to and made a part of this Agreement. 7.6. Recitals. The determinations recited-and declared in:thepr6e¢nblea to this Agreement . ...... are hereby incorporated: herein as part of this. Agreement.. 7.7 Exhibits. All exhibits to this Agreement are incorporated herein by reference :for all purposes wherever eference is made to the same.' . ..... 7.8.... . Assignment. This Agreement shall be binding on and. inure 6:the benefit. of the Parties to it.and their respeetive heiis, executors,: administrators, legal.representatives, successors 'and: permitted assigns.: This Agreement may not be assigned: by DEVELOPER without the prior written consent of COUNTY which consent, shall not be. unreasonably withheld, conditioned or . delayed. 7.9 Right of Offset. COUNTY may at its option, :offset any amounts! due and payable , under this Agreement a ' ten delft mcludin taxes lawfully. due to COUNTY fiom :... gi. gams ':..y (� . g.: ) Y:. . DEVELOP. ER;:regardless:.of:whether the atr►ount due arises pursuant to the terms of this .'Agreement or otherwiso:and regardless of whether or not the debt due COUNTY has been reduced: to judgment by.a cbuit; _provided, however (i).COUNTii shall _provide "DEVELOPER, notice ' within thirty (30) days of determining that any debt: s believed lawfully due to COUNTY: from DEWLOPER (ii) DEVELOPER shall have an opportunity to resolve or pay such debt to COUNTY within:thirty (30) days after receipt of notice:before any offset to amounts payable under this Agreement may occur; and (iii) DEVELOPER retains all rights to timely and "erly contest whether or in whatamount any debt is owed.to COUNTY, and COUNTY may hot offset any. asserted amount of'debt owed by DEVELOPER against amounts due and owing under this Agreement during any 'period during which DBYE]�OPEItrs timely and properly contesting whether such amount of debt is due and owing: 7.10 Amendruent. No amendment to this Agreement shall be :effective and binding unless and until it is reduced to writing and signed by duly authorized representatives of COUNTY and DEVELOPER.... . 7.11 Place' of.Performance..'Performance and. all matters related thereto shall be in Brazos County,'Texas, United States of Amenca. Chapter 381 Agreement. Brazos County and FUJI FILM Dyosynth Biotechnologies Texas, LLC, February 5, 2015. Page 7 7.12 Authoritvto Contract. Each Party has the full; power and authority to enter into and perform: this Agreement and the person signing this Agreement on behalf of each Party has been properly: authorized and empowered to enter : into this Agreement.. The, persons executing. this Agreement hereby represent that they have authorization to sign on behalf of their respective corporations. _ .. 7.13 No Debt: Under no circumstances shall the obligations of COUNTY hereunder be deemed to create: an debt within the :nieaning of any::constitutional or statutory provision;:: provided; however, COUNTY agrees during the, term of this Agreement to make a good faith effort to appropriate. funds:each iyear to pay amounts: under. this Agreement for the them ensuing,,, fiscal.year. 7.14: 'Waiver. Failure of any Party, at:any tinge, to enforce a provision of this:Agreement, shall: in no way constitute a waiver of that provisioii nor in any way affect the validity of this Agreement, any part Hereof, or the right of the Party thereafter to enforce each and every provision hereof. No term of this Agreement shall be deemed:waived or bread It unless the:waiver shall be in writing and signed by the Party-claimed-to have waived. Furthermore, any consent to or... . waiver of a breach will not constitute consent to or waiver of `or excuse of my.. other different or. : subskitentbreach. 7.15 Employment of Undocumented Workers: During the term of obis Agreement, .:DEVELOP R agrees riot to knowingly employ, any undocumented workers arid,: if convicted . of a ' .. violation under 8 U.S.C. $ection.'1324a (f), DEVELOPER shall repay to COUNTY a1l:Cash Incentives received under this Agreement as ofthe date of such violation within 1. 20 days after the date DEVELOPER: is :notified by COUNTY of such violation, plus interest: at the rate of 5%.; simple interest from the date of DEVELOPER'S receipt of the Cash liiceritives until repaid.: 7.16 Construction. The Parties: acknowledge that each Party and its, counsel have reviewed and revised this Contract and "that the normal rule df construction to the effect that any ambiguities. ate. to be resolved against the draftingl?arty shall not be employed in the interpretation of this Contract or any pmendments or exhibits hereto. [SIGNATURES TO FOLLOW ON THE NEXT: PAGE] FUJIFU M BjO.SYNTHBIOTECIJNOLOGIES BRAZOS'CQUNi'Y,:TEXAS TEXASLi Chapter 381 Agrea111ent Brazos County and FUJIFILM Dyosynth Biotechnologies Tesas, LLC, February 5, 2015. .Page Pg. Vol. 2 EXHIBIT "A" LEGAL DESCRIPTION OF PROPERTY Vol air P9•_Z� EXH I BIT "A" LEGAL DESCRIPTION OF PROPERTY METES AND BOUNDS DESCRIPTION OF A 12.45 ACRE TRACT J. H. JONES SURVEY, A -26 COLLEGE STATION, BRAZOS COUNTY, TEXAS METES AND BOUNDS DESCRIPTION OF ALL THAT CERTAIN TRACT OR PARCEL OF LAND LYING AND BEING SITUATED IN COLLEGE STATION, BRAZOS COUNTY, TEXAS. SAID TRACT BEING A PORTION OF THE REMAINDER OF A CALLED 417.85 ACRE TRACT AS DESCRIBED BY A DEED TO BRYAN COMMERCE AND DEVELOPMENT, INCORPORATED, RECORDED IN VOLUME 4023, PAGE 91 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS. SAID TRACT BEING MORE PARTICULARLY DESCRIBED BY METES AND BIDS AS FOLLOWS: COMMENCING AT A CONCRETE MONUMENT FOUND MARKING THE WEST CORNER OF A CALLED 11 .6 ACRE TRACT AS DESCRIBED BY A DEED TO LOVELESS ACRES, LC, RECORDED IN VOLUME ! 7004, PAGE 104 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS, AND AN INTERIOR EAST CORNER OF SAID REMAINDER OF 417.85 ACRE TRACT; THENCE: S 34" 24' 12" W THROUGH SAID REMAINDER OF 417.85 ACRE TRACT FOR A D.. ANCE OF 2225.78 FEET TO THE POINT OF BEGINNING OF THIS HEREIN DESCRIBED TRACT, FOR REFERENCEIA % INCH IRON PIPE FOUND ON THE NORTHWEST LINE OF A CALLED 3.50 ACRE TRACT AS DESCRIBED BY A DEED TO CHRIS DAILEY AND MARGARET DAILEY RECORDED IN VOLUME 6981, PAGE 232 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS, MARKING THE SOUTH CORNER OF A CALLED 4.8885 ACRE TRACT AS DESCRIBED BY A DEED TO TRADITIONS ACQUISITION PARTNERSHIP, LP, RECORDED IN VOLUME 10784, PAGE 260 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS, AND AN EASTERLY CORNER OF SAID REMAINDER OF 417.85 ACRE TRACT BEARS: N 830 02' 30" E FOR A DISTANCE OF 2374.31 FEET FROM WHICH ANOTHER '% INCH IRON PIPE FOUND ON THE SOUTHEAST LINE OF SAID REMAINDER OF 417.85 ACRE TRACT MARKING THE WEST CORNER OF SAID 3.50 ACRE TRACT BEARS: S 440 39'09" W FOR A DISTANCE OF 39.95 FEET; i THENCE: THROUGH SAID REMAINDER OF 417.85 ACRE TRACT FOR THE FOLLOWING CALLS: S 650 44' 10" E FOR A DISTANCE OF 137.18 FEET; N 700 37'49" E FOR A DISTANCE OF 71.58 FEET; S 710 35'47"E FOR A DISTANCE OF 130.27 FEET; S 490 04' 50" E FOR A DISTANCE OF 40.59 FEET; S 640 25' 29" E FOR A DISTANCE OF 110.79 FEET; S 28" 01'33" E FOR A DISTANCE OF 89.86 FEET; S 12° 04' 31" E FOR A DISTANCE OF 104.79 FEET; S 310 06' 30" E FOR A DISTANCE OF 81.86 FEET; S 410 51' 48" W FOR A DISTANCE OF 572.50 FEET; N 480 08' 12" W FOR A DISTANCE OF 104.00 FEET; S 410 51' 48" W FOR A DISTANCE OF 217.00 FEET; N 480 08' 12" W FOR A DISTANCE OF 575.00 FEET; N 410 51' 48" E FOR A DISTANCE OF 718.23 FEET TO THE POINT OF BEGINNING CONTAINING 1145 ACRES OF LAND, MORE OR LESS. BEARING SYSTEM SHOWN HEREIN IS BASED ON GRID NORTH AS ESTABLISHED FROM OPS OBSERVATION. BRAD KERR REGISTERED PROFESSIONAL LAND SURVEYOR No. 4502 Vol. pg,� .- - -- E BRAZOS COUNTY OFFICE OF THE SHERIFF MOTOR VEHICLE RACIAL PROFILING INFORMATION 2014 --------- - - -- TOTAL NUMBER OF TRAFFIC STOPS 3594 -------- -- -- �Numbar of motor vehicle stops resulting In an enforcement action: . ..... ------ 1; 11WICItation 121 Arrest only. =:both ---------- - J.- 1 4' 1167! TOTAL 14,11,14 and 17 must be equal) ;Race or hnldty:; 150iAfrIcan 14!Asian 7. 866 1 Caucasian 81 132 Hispanic Middle Eastern 1 101 6; Native American L 11: 11671TOTALA_i,11,14 and 17 must be equal) Raw or Ethnicity known prior to stop? 12: 30 Yes 1137 No 1 14, 116TTOTAL (4,11,14 and 17 must equal) J � Search conducted? IS! lWiYes iiill'No I _ _ i 17 11671TOTAL (4,11,14 and 17 must equal) ----FVVw search consented? , 98;yes 20! JA9jTOTAL (must equal line Duane Peters County Judge Vol.