HomeMy WebLinkAbout2012-08-07-10:00 AM-REGULAR SESSION5,1
e----
-3 P 1 : 13
BRAZOS COUNTY
BRYAN,TEXAS
NOTICE OF MEETING AND AGENDA
BRAZOS COUNTY COMMISSIONERS COURT
THE COMMISSIONERS COURT OF BRAZOS COUNTY WILL MEET IN
REGULAR SESSION ON AUGUST 7, 2012 AT 10:00 AM IN THE
COMMISSIONERS COURTROOM OF THE COUNTY ADMINISTRATION
BUILDING, 200 SOUTH TEXAS AVE., SUITE 106, BRYAN, TX 77803
1. Invocation and Pledge of Allegiance -
Chaplain G.H. Jones and Commissioner Mallard
2. Call for Citizen input and/or concerns.
Consider and take action on agenda items 3 - 11:
3, Request for out of state travel for Bart Benthul. Interim MPO Director, to travel to Bla Sky. MT to attend
the 13th Annual TRB "Tools of the Trade" Conference: dates of travel are September 12 -14.2012.
4, Request permission to enter private property owned by Robert and Mary Lowther located on Wheelock
Hall Road for the purpose of aradina back slope of ditch to achieve the desired ratio. Prolect will also
remove several trees for proper drainage of ditch. This work is being performed for the health. safety
pnd welfare of the general Public. Site is located in Precinct 2.
5. Consider and take action on Bryan Texas Utilities (BTUI cost estimate of 88.081.75 for the relocation of
approximately 480' of overhead electric line located on Old Reliance Road. This utility relocation would
allow Brazos County to safely load and unload materials from the Mathis Creek off -site storaae yard.
Site is located in Precinct 2.
6. Req est from Wellborn Special Utility District to construct a 40' road bore for 16" steel casino with 8"
water line in the right of way of Jones Road at its Intersection with Imperial Loop (Agaleland Business
Park). Site Is located in Precinct 4.
7. Tax Refund Applications for the following:
• a. Breanda S. Glowskl-overpayment-$794.13
• b. Wells Fargo Home Mortaaae-overpavement-8195.01
• c. HSBC-overpayment-$99.98
Vol. Pg, �J��
8. Commissioners Court minutes for the following dates:
• a. July 3. 2012 - Regular Meeting
• b. July 5 - August 3.2012 - Budget Workshop Sessions
• c. July 10. 2012 - Regular Meeting
• d. July 17, 2012 - Reaular Meeting
• e. July 18. 2012 - Workshop Session
• f. July 24.2012 - Regular Meeting
• a. July 31, 2012 - Regular Meeting
9. Budget Amendments.
Budaet Amendments FY 11/12 41.1 thru 41.8.
10. Personnel Change of Status.
Personnel Action Forms
11. Payment of Claims.
12, Acknowledgement of monthly reports submitted in July 2012.
13, Acknowledgement of the Brazos County Purchasing Department Update for July 22 - 28.2012
14. Sheriff's report on inmate population.
15. Announcement of interest items and possible future agenda topics.
16. Call for Citizen input and/or concerns.
17. Adjourn.
vol. /b4 pg. 15J,
PUBLIC COMMENTS
Public Comment during the Commission Meeting may be for all matters, both on and off the agenda, and be limited to four
minutes per person. Persons are invited to submit comments in writing on the agenda items and/or attend and make comment
at the Commission meeting. Members of the public are reminded that the Brazos County Commissioners Court is a
Constitutional Court, with both judicial and legislative powers, created under Article V, Section 1 and Section 18 of the Texas
Constitution. As a Constitutional Court, the Brazos County Commissioners Court also possesses the power to issue a
Contempt of Court Citation under Section 81.024 of the Texas Local Government Code. Accordingly, members of the public in
attendance at any Regular, Special and/or Emergency meeting of the Court shall conduct themselves with proper respect and
decorum in speaking to, and/or addressing the Court; in participating in public discussions before the Court; and in all actions in
the presence of the Court. Those members of the public who are inappropriately attired and/or who do not conduct themselves
in an orderly and appropriate manner will be ordered to leave the meeting. Refusal to abide by the Court's Order and/or
continued disruption of the meeting may result in a Contempt of Court Citation.
It is not the intention of the Brazos County Commissioners Court to provide a public forum for the demeaning of any individual
or group. Neither is it the intention of the Court to allow a member (or members) of the public to insult the honesty and/or
integrity of the Court, as a body, or any member or members of the Court, or County employees, individually or collectively.
Accordingly, profane, insulting or threatening language directed toward the Court and/or any person in the Court's presence
and/or racial, ethnic or gender slurs or epithets will not be tolerated. Violation of these rules may result in the following
sanctions:
1. cancellation of a speaker's time;
2. removal from the Commissioners Court;
3. a Contempt Citation; and/or
4. such other and/or criminal sanctions as may be authorized
under the Constitution, Statutes and Codes of the State of Texas.
The County Commissioners Court can deliberate or take action only if a matter has been listed on an agenda properly posted
prior to the meeting. During the public comment period, speakers may address matters not listed on the published agenda. The
Open Meeting Law does not expressly prohibit responses to public comments by the Commissioners Court. However,
responses from the County Judge or Commissioners to unlisted public comment topics could become deliberation on a matter
without notice to the public. To ensure the public has notice of all matters the Commissioners Court will consider, the County
Judge and/or Commissioners may choose not to respond to public comments, except to correct factual inaccuracies, recite
existing policy in response to an inquiry or to ask that a matter be listed on a future agenda. See Texas Open Meetings Act ?
551.042.
INVOCATION
Any invocation that may be offered before the official start of the Court meeting shall be to and for the benefit of the Court. The
views or beliefs expressed by the invocation speaker have not been previously reviewed or approved by the Court and do not
necessarily represent the religious beliefs or views of the Court in part or as a whole. No member of the community is required
to attend or participate in the invocation and such decision will have no impact on their right to actively participate in the
business of the Court.
The Commissioners Courtroom of the County Administration Building, 200 South Texas Ave., Suite 106, Bryan, TX 77803 is
wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive services must be made two
working days before the meeting. To make arrangements, please call (979) 361-4102.
Vol. I01l Pg. I53
BRAZOS COUNTY
BRYAN,TEXAS
MINUTES
August 7, 2012
BRAZOS COUNTY COMMISSIONERS COURT
REGULAR MEETING
Signature Paae.pdf
File Stamped Aaenda.pdf
ID Sian in sheet.pdf
A regular meeting of the Commissioners' Court of Brazos County, Texas was held in
the Brazos County Commissioners Courtroom in the Administration Building, 200
South Texas Avenue, in Bryan, Brazos County, Texas, beginning at 10:00 a.m. on
Tuesday, August 7, 2012 with the following members of the Court present:
Duane Peters, County Judge, Presiding;
Lloyd Wassermann, Commissioner of Precinct 1;
Sammy Catalena, Commissioner of Precinct 2;
Kenny Mallard, Commissioner of Precinct 3;
Irma Cauley, Commissioner of Precinct 4;
Karen McQueen, County Clerk.
The attached sheets contain the names of the citizens and officials that were in
attendance.
1. Invocation and Pledge of Allegiance -
Chaplain G.H. Jones and Commissioner Mallard
2. Call for Citizen input and/or concerns.
There was no citizen input.
Consider and take action on agenda items 3 - 11:
Vol.
Pg. 15 4
3. Request for out of state travel for Bart Benthul, Interim MPO Director, to travel to Big
Sky, MT to attend the 13th Annual TRB "Tools of the Trade" Conference; dates of travel
are September 12 - 14, 2012.
Item 3.pdf
Approved as submitted.
Motion: Approve , Moved by Commissioner LLoyd Wassermann, Seconded by
Commissioner Kenny Mallard. Passed. 5-0. Members voting Aye: Catalena , Cauley ,
Mallard , Peters , Wassermann .
4. Request permission to enter private property owned by Robert and Mary Lowther located
on Wheelock Hall Road for the purpose of grading back slope of ditch to achieve the
desired ratio. Project will also remove several trees for proper drainage of ditch. This
work is being performed for the health, safety and welfare of the general public. Site is
located in Precinct 2.
ID Item 4.Ddf
Approved as submitted.
Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by
Commissioner LLoyd Wassermann. Passed. 5-0. Members voting Aye: Catalena ,
Cauley , Mallard , Peters , Wassermann .
5. Consider and take action on Bryan Texas Utilities (BTU) cost estimate of $8,081.75 for
the relocation of approximately 480' of overhead electric line located on Old Reliance
Road. This utility relocation would allow Brazos County to safely load and unload
materials from the Mathis Creek off -site storage yard. Site is located in Precinct 2.
Item 5.pdf
Approved as submitted.
Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by
Commissioner Irma Cauley. Passed. 5-0. Members voting Aye: Catalena , Cauley ,
Mallard , Peters , Wassermann .
6. Request from Wellborn Special Utility District to construct a 40' road bore for 16" steel
casing with 8" water line in the right of way of Jones Road at its intersection with Imperial
Loop (Aggieland Business Park). Site is located in Precinct 4.
Item 6.pdf
Approved as submitted.
Motion: Approve , Moved by Commissioner Irma Cauley, Seconded by Commissioner
LLoyd Wassermann. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard ,
Peters , Wassermann .
7. Tax Refund Applications for the following:
Item 7.pdf
• a. Breanda S. Glowski-overpayment-$794.13
• b. Wells Fargo Home Mortgage-overpayement-$195.01
• c. HSBC-overpayment-$99.98
Motion: Approve , Moved by Commissioner LLoyd Wassermann, Seconded by
Commissioner Sammy Catalena. Passed. 5-0. Members voting Aye: Catalena , Cauley ,
Mallard , Peters , Wassermann .
Vol.
(.p
S
Pg.
8. Commissioners Court minutes for the following dates:
• a. July 3, 2012 - Regular Meeting
• b. July 5 - August 3, 2012 - Budget Workshop Sessions
• c. July 10, 2012 - Regular Meeting
• d. July 17, 2012 - Regular Meeting
• e. July 18, 2012 - Workshop Session
• f. July 24, 2012 - Regular Meeting
• g. July 31, 2012 - Regular Meeting
Motion: Approve , Moved by Commissioner LLoyd Wassermann, Seconded by
Commissioner Kenny Mallard. Passed. 5-0. Members voting Aye: Catalena , Cauley ,
Mallard , Peters , Wassermann .
9. Budget Amendments.
Budget Amendments FY 11/12 41.1 thru 41.8.
Item 9.pdf
41.1 Reallocate funds for Tax Assessor/Collector
41.2 Reallocate funds for Building Maintenance
41.3 Transfer funds from Contingency to 85th District Court
41.4 Reallocate funds for TJPC - State Aid (Juvenile)
41.5 Transfer funds from Contingency to Commissioner Court
41.6 Transfer funds from Non -Departmental to Sheriff -Jail
41.7 Transfer funds from Contingency to Court Support Criminal
41.8 Reallocate funds for Primary Election Services
Motion: Approve , Moved by Commissioner Sammy Catalena, Seconded by County
Judge Duane Peters. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard ,
Peters , Wassermann .
10. Personnel Change of Status.
Personnel Action Forms
Item 10.pdf
A copy of the personnel Change of Status Requests is attached.
Motion: Approve , Moved by Commissioner Irma Cauley, Seconded by Commissioner
Kenny Mallard. Passed. 5-0. Members voting Aye: Catalena , Cauley , Mallard , Peters
Wassermann .
11. Payment of Claims.
ID Claims Sheet.pdf
Lt BILL LIST 8.7.12.Ddf
7100718 through 7100938
Motion: Approve , Moved by Commissioner LLoyd Wassermann, Seconded by
Commissioner Sammy Catalena. Passed. 5-0. Members voting Aye: Catalena , Cauley ,
Mallard , Peters , Wassermann .
12. Acknowledgement of monthly reports submitted in July 2012.
Item 12.pdf
Vol.
tc.Lt
Agrilife Extension
County Clerk
District Clerk
Justice of the Peace Precinct 1
Justice of the Peace Precinct 2, Place 1
Justice of the Peace Precinct 2, Place 2
Justice of the Peace Precinct 3
Justice of the Peace Precinct 4
Constable, Precinct 1
Constable Precinct 2
Constable Precinct 3
Constable Precinct 4
Road & Bridge
Sheriff
13. Acknowledgement of the Brazos County Purchasing Department Update for July 22 - 28,
2012
Item 13.pdf
The Court acknowledged receipt of the Purchasing Department Weekly Update.
14. Sheriff's report on inmate population.
Sheriff Chris Kirk stated there were 555 inmates in jail, 40 have electronic monitors and
16 are pending for monitors.
15. Announcement of interest items and possible future agenda topics.
The County Judge announced that the Sheriff had received his 15 year pin from the
Lions Club. He then presented the pin to the Sheriff. Commissioner Catalena received
his 30 year pin some time ago.
16. Call for Citizen input and/or concerns.
There was no citizen input.
17. Adjourn.
vol. 1(0 `} pg. Is -7
The foregoing minutes of the Commissioners Court meeting held August 7, 2012 have
been examined and are approved in open Court this J I day of
&pth'
Duane Peters
County Judge
%eAr--", 2012, in Bryan, Brazos County, Texas .
Lloyd Wassermann
Commissioner, Precinct 1
Kenny Mallard
Commissioner, Precinct 2 Commissioner, Precinct 3
Irma Cauley
Commissioner, Preci
Attest:
a-4-4,--cfta
Karen ueen
latC--
County Clergy, )f
Vol 1 to Page
S 8'
COMMISSIONERS COURT MEETING
7.�
Date and Time
Name
Cie c CL1JLL
INciu
/6/7-e_it
QJI-vp-°
VchAif / //o L.)47
Vol.
Pg
O1
Organization/ Department
�au,vr� ez,.(.4
7-77
CeA,r7
)s9
COMMISSIONERS COURT MEETING
1,20/
Date and Time
Name
id/coM
Organization/Department
191_74-
4i2
Vol. '&4 pg.4 epo
BRAZOS COUNTY
COMMISSIONERS' COURT
ACTION FORM
DEPARTMENT: Road & Bridge
MEETING DATE: August 7, 2012
SUBJECT: Private Property Access
Request permission to enter privateproperty owned. by Robert and Mary Lowther
located on Wheelock Hall Road for the purpose of grading back slope of ditch to
achieve desired ratio. Project will also remove, several trees for proper ditch drainage.
This work is being performed for the health, safety and welfare of the general public.
Site is located in Precinct 2.
SUBMITTED BY:
Salvato
Ri t of Way Agent
APPROVED BY:
amrny atalena
Co ssioner Precinct 2
This request is APPROVED / DENIED ❑ by Commissioners' Court
Duane Peters, County Judge
Vol.
Date:
)(tog pg. Ho/ /
BRAZOS COUNTY
PRIVATE PROPERTY ACCESS FORM
E. Duane Peters
Brazos County Judge
Lloyd Wassermann
Commissioner Pct. 1
Sammy Catalena
Commissioner Pct: 2
Kenny Mallard
Commissioner Pct. 3
Irma Cauley
Commissioner Pct. 4
I. OWNER(S): Robert & Mary Lowther
II. ADDRESS: 105 N. Brown Street
Bryan, Texas 77802
R. Alan Munger, P.E.
County Engineer
Brazos County Road & Bridge Dept.
2617 Hwy 21 West '
Bryan, Texas 77803
Office: 979-822-2127
Fax: 979-775-0453
amunger@brazoscountytx.gov
III. LOCATION OF WORK: 8721 Wheelock Hall Road
R105332, Hefti Subdivision, Block 1, Lot 3, 6.977 acres
IV: DESCRIPTION OF WORK: Project will grade back slope of ditch onto private
property to achieve the desired ratio. With this grading work, several trees will
need to be removed for proper drainage of ditch.
Additional Comments:'
V. MAINTENANCE:. Yes No X
IF YES, ESTIMATE FREQUENCY OF MAINTENANCE': N/A
I (we) the undersigned owner(s) grantpermission to Brazos County the ability to access the
above mentioned private property for roadway maintenance purposes.
Owner's Signature:
R Alan Munger, P.E.
County Engineer
Vol.
Date: / /
Jo . Salvato
R ht of Way Agent
1(04 pg. � �a
f/ri(il'
JVe V. Salvato
Right of Way Agent
BRAZOS COUNTY
COMMISSIONERS' COURT
ACTION FORM
DEPARTMENT: Road & Bridge
MEETING DATE: August 7, 2012
SUBJECT: Utility Relocation — 1207R20980
Consider and take action on. Bryan Texas Utilities (BTU) cost estimate of $8,081.75
for the relocation of approximately 480' of overhead electric line located on Old
Reliance Road. This utility relocation would allow Brazos County to safely load and
unload materials form the Mathis Creek off -site storage yard. Site is located in
Precinct 2.
BTU will invoice Brazos County the actual "as built" expense of this utility relocation.
SUBMITTED BY: APPR • ED BY:
alena
Com : sioner Precinct .2
Thisrequest is I PPROVED / DENIED ❑ by Commissioners' Court
Vol.
Duane Peters, County Judge
DATE: e\rii
?g.
BRYAN TEXAS UTILITIES
THE ENERGY TO SERVE YOU SINCE 1919.
P.O. Box 1000
Bryan; TX 77805
. Phone: 979-821-5770
Fax: 979-821-5796
http://www.btutilities.com
July 10, 2012
Joe V. Salvato
Brazos County Road & Bridge
2617 W. Hwy 21
Bryan,. TX 77803
Re: Old Reliance Rd. — Mathis Creek Line Relocation
Mr. Salvato,
Investigation: 1207R20980
I have worked up an estimated cost to relocate approximately 480' of single phaseelectric line at the
Mathis Creek Storage Yard. The estimated cost for this relocation will be $8,081.75. Bryan Texas Utilities
will bill Brazos County on the actual "as built" expenses for this relocation.
If you decide to follow through With this project I will need a new electric easement as noted on the plans.
Please use your assigned investigation number to identify any correspondence you may have with our
office.
Sincerely,
Allen Kristof
BTU -Line Designer
979=821-5730
akristofObtutilities.com
via: email
Vol. ) log Pg. 1 10 Li
N N9 N ,N
N N"I 144
7 Auto 7 L
�N..��N
W 'J (� CA Wlp
>YO. L4NI`O 8 %W
NN' N QQ Q
W✓IF.VYI0C win WdIh
1Z0.W_&Lai O Q. R'<W
I El n
Y
N ryO NO
N 4:4A AA
< Ir� 34 2W
74W0 N
JIi/3-y `jN�.
l_
,-
NMI-; ►'I(Ic\. ►'ANA
x*01,;II^ NM10N 0,,..,.WSZ <<W gaW... ZataU
a in tn
CC
J
.O
us
z
Vol. / (40 �{ Pg.
Ito
8
2
Q
J
OI
a
YR
ON
m
2
0
U
In
O
N
N
n
IND
0I
Os
BRAZOS COUNTY
COMMISSIONERS' COURT ACTION FORM
•DEPA RTMENT Road and.Bridge NUMBER 56001000
DATE OF COURT MEETING:. August 7, 2012
ITEM: Request from Wellborn Special Utility District to construct a 40' road bore for 16" steel
casing with 8" water line in the right•of way of Jones Road at its intersection with Imperial Loop
(Aggieland Business Park). Site is located in Precinct 4.
SOURCE OF FUNDS: N/A
PRESENTATION:
REOUIREMENTS:
• No work.will be permitted betweenfront slope and/or back slope.
• No work shall be done within 3' .of driveway culverts measured from•outside culvert walls.
• All installation(s) shall be constructed.in designated utility easements,. if applicable. If no utility easement exists,
the installation(s) shall be 1) -Within 3-5' of and parallel to the right-of-way line and/or, 2) in the case of a road bore,
perpendicular to the right-of-way line.
• If clearing of brush, trees and other obstruction is necessary, it shall be the Applicant's responsibility to do so and to
remove all cleared brush, trees etc. from county right-of-way.
• All disturbed areas shall be compacted in 8" lifts. to 90% density ASTM-Test Method No. D-698; test shall be
conducted by an independent geotectinical testing firm; copies of all test results shall be furnished,to the office of
the Brazos County Engineer.
• .All disturbed areas will be seeded after completion of grading. _
• Construction shall be in strict conformance.to the latest Texas Manual of Uniform Traffic Control Devices for
Streets and Highways, published by the Texas Department of Transportation, and all other State and Federal laws
governing utility construction.
• Notification48•hours prior: to beginning work to meet withinspector from BrazosCounty at project site.
SUBMITTED BY:
R. Alan Munger,
County Engineer
CC2012-030
APPROVED BY-
ommissrb en r_Irma.
Precinct 4
This RequeAQproved red 0, by Commissioners' Court
Date:
Duane Peters, County Judge
Vol. 1 (o `i Pg. 1 ip le
REQUEST FOR PROPOSED INSTALLATION IN COUNTY RIGHT-OF-WAY
TO THE COMMISSIONERS' COURT OF BRAZOS COUNTY, TEXAS
BRAZOS COUNTY ADMINISTRATION
BRYAN, TEXAS 77803
Formal notice is hereby given that (applicant) Wellborn SUD proposes to place a (type)
Waterline within _ across ✓ the right-of-way of (road) Jones Road in Brazos County, Texas
as follows:
The location or description of the proposed installation is more fully shown by _ copies of the drawings attached to this notice.
I understand and agree that:
1. The County Engineer must be notified 72 hours prior to the beginning of construction in order that he, or his
designated inspector, may inspect the actual installation;
2. All damage to the roadways and right-of-way will be repaired to the original condition to the satisfaction of the
County Engineer;
3. Brazos County reserves the right to require Applicant to relocate or lower any such line at no cost to Brazos
County, should same become necessary due to widening or lowering, or other alteration of the roadway or right-
of-way;
4. Brazos County will in no way be responsible for any damage which might occur to any existing utility lines in the
right-of-way;
5. The line will be constructed and maintained on the County right-of-way in accordance with the Utility
Accommodation Policy which was adopted by the Texas Department of Transportation on May 29, 1989;
6. The line or lines will be constructed no less than twenty-four inches (24") lower than the lowest part of the
drainage or bar ditch and the drainage is to be considered at least two feet (2') below the center of the roadway;
7. All sites will be barricaded during the construction period.
Construction of this line will begin on or after the 9th
APPROVED BY COMMISIONERS' COURT:
Duane Peters, County Judge
Brazos County, Texas
day of August 2012
Address: P.O. Box 250
Wellborn, Texas 77881
Phone: 979-690-9799
Vol. I (o `i Pg. 1 in -1
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENT(S) FOR THE 2011-2012 BUDGET YEAR
NO. 11/12 41.1-41.8
•
On this the 7th day of August 2012 at a regular meeting of the Commissioners' Court, the following
members were present:
'A. Duane Peters, County Judge, Presiding
B. Lloyd Wassermann, Commissioner, Precinct 1
'C. Sammy Catalpa, Commissioner, Precinct 2
,D. Kenny Mallard, Commissioner, Precinct 3.
E. Irma Cauley, Commissioner; Precinct 4
'F. Karen McQueen, County Clerk
The following proceedings were held:
(THAT WHEREAS, on 7th day of August 2012 the Court heard and approved a budget amendment
for the 2011-2012 budget year for Brazos County, Texas; and
•WHEREAS, expenditure is necessary due to the necessity to meet unusual and unforeseen conditions
which could not be reasonably included in the original budget adopted 20 September 2011, the following
amendments) to the original budget are hereby authorized, as described on the attached page(s).
ADOPTED AND APPROVED this the 7th day of August 2012.
THE COMMISSIONERS COURT OF BRAZOS COUNTY, TEXAS.
-7)
Duane Peters, County Judge
Original: County Clerk's Office and
Attached to the original budget
Copies:, County Auditor
County Treasurer
County Budget, Officer
Commissioners' Court Minutes
Vol.
HO
Pg.
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 11/12 - 41.1
8/7/2012
FUND
DIV I
ACCT .
PROJ
DR/CR
ACCOUNT NAME
Increase
Decrease
0100
13000100
71500000
CR
Rental - Equipment
1,200.00
0100
13000100
67281000
DR
Equipment - Electronic
1,200.00
Tax Assessor/Collector
Reallocation of funds to purchase support equipment (mouse, USB Hub, power strip) for each E -Poll Book (quantity - 40).
Vol.
(04 Pg. 1(09
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 11/12 - 41.2
8/7/2012
FUND
0100
0100
DIV
ACCT
PROJ
DR/CR
ACCOUNT NAME
17000100
17000100
65050000
67286000
CR
DR
Building Maintenance
Equipment - Other
Increase
4,000.00
Decrease
4,000.00
Building Maintenance
Reallocation of funds to purchase a replacement Ice Machine in the Building Maintenance Shop.
--a- ,
Prepared:By: k' "rnnmi
4.
Date. ". "'- z' - •7/31%20:1�2i
vol. Pg. 1707
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 11/12 - 41.3
8/7/2012
FUND
DIV
ACCT
PROJ
DR/CR
ACCOUNT NAME
Increase
Decrease
0100
11001500
61130000
CR
General Fund Contingency
5,000.00
0100
22000100
61620000
DR
Subscriptions & Publications
5,000.00
General Fund Contingency & 85th District Court
Reallocation of funds to purchase u?dated
versions of Law Library Books.
Vol.
410.4 pg. 1-7
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 11/12-41.4
8/7/2012
FUND
DIVI.
. ACCT
.PROJ •
DR/CR
ACCOUNT NAME
Increase
Decrease
3000
' f
48046500.
DR
Grant - TJPC State Aid
11,349.20
3000
312100
61801000'
CR
Travel
1,908.20
3000
312100
67203000
CR
Minor Computer Hardware
4,277.00
3000
312100
80203000
CR
Computer Hardware
5,164.00
TJPC - State Aid (Juvenile)
Allocation of Amendment 4 to Grant A - State Aid for Technology/JCMS approved items.
vol. 1O Pg. ra
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 11/12 - 41.5
8/7/2012
FUND
0100
0100
DIV
11001500
11000100
ACCT
61130000
53310000
PROJ
DR/CR
CR
DR
ACCOUNT NAME
General Fund Contingency
Retiree Health Insurance
Increase
44,000.00
Decrease
44,000.00
General Fund Contingency & Commissioners CT Admin.
Reallocation of funds to cover Retiree Health Insurance for remainder of FY 12.
•.DepartmentAppsroVa
ounty'Judge APP_roval.., _ :''.... Date`
Vol. )(p4 f pg. 113
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 11/12 - 41.6
8/7/2012
FUND
DIV
ACCT
PROJ
DRICR
ACCOUNT NAME
Increase
Decrease
0100
11000500
61880000
CR
Utilities
65,000.00
0100
28002000
61880000
DR
Utilities
65,000.00
Non -Departmental & Sheriff - Jail
Reallocation of funds to cover Jail Utilities for remainder of FY 12.
Depairtment Approval
,..Counik44dgeApprtival-f
vol.Pg. 1 `i
't: • Date'
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 11/12 - 41.7
FUND
DIV
ACCT
PROJ
DR/CR
ACCOUNT NAME
Increase
Decrease
0100
11001500
' 61130000
CR
General Fund Contingency
350,000.00
0100
11010000
72210000
- DR
Crt Appt. Atty - Capital
350,000.00
General Fund Contingency & Court Support - Criminal
Reallocation of funds to cover Court Cost for remainder of FY 12.
Prepared B
;7131!2O12
Vol. •
Pg.
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 11/12 - 41.8
8/7/2012
FUND
3500
DIV
211200
ACCT
72590000
PROJ
DR/CR
CR
ACCOUNT NAME
Professional Fees - Other
Rental - Facility
Increase
Decrease
3500
211200
71502000
DR
820.00
820.00
Primary Election Services
Reallocation of funds to correct Budget Amendment 40.3. The funds are for polling place rental facilities.
vol. I (Jo LI pg.
BRAZOS COUNTY, TEXAS
BUDGET AMENDMENTS
No. 11/12 - 40.3
7/31/2012
FUND
DIV
ACCT
PROJ
DR/CR
ACCOUNT NAME
Increase
Decrease
0100
11001500
61130000
CR
General Fund Contingency
820.00
0100
91350000
DR
Transfer to Primary Elections
820.00
3500
49028000
DR
Transfer from General Fund
820.00
3500
211200
72590000
DR
Professional Fees - Other
820.00
General Fund Contingency and Primary Election Services
Reallocation of funds to support the Professional Fees - Other account in the amount of $820. Funds will be reimbursed by the Republican
and Democratic Party for the use of the voting machines during the elections.
P;epartiiienfApprova
vol. 1 to 4 Pg. I 1 1
PERSONNEL
CHANGE OF STATUS REQUESTS
Commissioner Court Date: August 07, 2012
Department Submitting Information: Human Resources
Purpose of Submissions: Consider and Take Action on Change Requests
Department Submitting
Request(s)
Employee Request
Applies To
Action Requested
Ag Extension
Schumann, Jessica New Hire
Weichert, Reagan Resignation
Road & Bridge
Patranella, Loretta Resignation
S.O.Jail
Approved in Commissioners' Court: Auqu
Daugherty, Ashley Promotion
Gab, Christine New Hire
Lovelady, Patricia Promotion
County Judge's or Commissioner's Signature:
(This Copy to be attached to minutes)
Vol.
Brazos County Purchasing Department
Weekly Update
7/27/12 — 8/02/12
Number of PO's Processed: 86
Requisitions Completed: 1
Capital Payments: 4
Projects In Progress
Construction
Courthouse:
Phase III
Currently working on detention area on 1st floor
o Floor finishes and painting
Currently working on mechanical yard in courtyard area
o Installing Chillers and generator
Elevator in progress
o Pouring slab in basement
o Installing framework
Bids/ RFP's/ RFQ's
RFQ for MPO
RFQ for Surveyor
RFQ for Tax Office Architect
Poly Jute
Inmate Telephone Services
Employee Insurance
Janitorial and Cleaning Supplies
Mail Services
Collection of Fines and Fees
Renewals
Delinquent Property Tax
Furniture Cleaning Contract
Lane Striping
Road Signs and Sign Posts
Vol. I to pg.
-Solicitation in progress
-Solicitation in progress
-SOQ's under eval.
-Dept. reviewing specs
-Currently open
-Evaluating responses
-Specs in Progress
-Specs in Progress
-Specs in Progress
-In Progress
-In progress
-In progress
-In Progress
Solicitation of Quotes
Benches for Magistrate Courtroom -Court Approval 7/24
A/V for Magistrate Courtroom -Solicitation in progress
Other
Auction
- Accepting items at this time
Purchasing Policy
- Reviewing and revising policy
Assets
- Working on period 10
Print Management
- 3 month printing analysis is complete. Results to follow.
Roof Replacement
- Working on proposal to write specifications
Appliance Policy
- Versions in progress for Court review
- Currently under review by Auditor's office
Radios for Bailiffs
- Currently working on scope
ACKNOWLEDGED
Duane Peters
County Judge
Date
vol. 169 4 pg. 1 g O