HomeMy WebLinkAbout2011-03-01-2:30PM-WORKSHOP SESSIONBRAZOS COUNTY
BRYAN,TEXAS
BRAZOS COUNTY ADMINISTRATION BUILDING
BRAZOS COUNTY COMMISSIONERS COURT
THE COMMISSIONERS COURT OF BRAZOS COUNTY WILL MEET IN A
WORKSHOP SESSION ON TUESDAY, MARCH 1, 2011 AT 2:30 PM IN THE
COUNTY ADMINISTRATION BUILDING, 200 SOUTH TEXAS AVENUE, SUITE
106, BRYAN, TEXAS.
Agenda
1. Call to order.
2. Deployment and Integration of Surveillance Camera and Access Control Systems.
3. Adjourn.
The Brazos County 'Administration Building Is wheelchair accessible. Handicap parking spaces are available. Any request for sign interpretive
services must be made two working days before fhe meeting. To make arrangements. please call (979) 381 -4102.
Vol. 1 144 Pg.
FR [
_ I i.[i 18 P 12 12
a l„ Jet C114
BRAZOS COUNTY
BRYAN,TEXAS
MINUTES
March 1, 2011
BRAZOS COUNTY COMMISSIONERS COURT
WORKSHOP SESSION
Minutes
The Commissioners' Court of Brazos County, Texas met in a Workshop Session in the
Commissioners' Courtroom in the Brazos County Administration Building in Bryan, Brazos
County, Texas, beginning at 2:30 p.m. on Tuesday, March 1, 2011 with the following
members of the Court present:
Duane Peters, County Judge, Presiding;
Lloyd Wassermann, Commissioner of Precinct 1;
Sammy Catalena, Commissioner of Precinct 2;
Kenny Mallard, Commissioner of Precinct 3;
IrmaCauley, Commissioner of Precinct 4;
KarenMcQueen, County Clerk, Absent.
Attached is a list of the citizens and officials in attendance.
1. Deployment and Integration of Surveillance Camera and Access Control Systems.
OnSSI handout.pdf
The Commissioner's Court met to discuss the deployment and integration of surveillance
cameras and access control systems for the Courthouse and three other county
buildings. Eric Caldwell, Director of the Information Technology Department explained
the HIRSCH system that governs the buildings for security. This will be installed in the
Courthouse during renovations. There will be 70 cameras to do surveillance and record
any alarm, event or intrusion. The question he said, was "How do we best manage
this ? ". With a centralized control? Additional training will be needed. The IT department
along with Building Maintenance have not had sufficient training. Plus they will need
Vol. l-g L1 Pg. a
certification to install the systems. He then introduced Doug Smith with HIRSCH and
Ellen Dollaker with OnSSI who each described their product and features. Mr. Smith
discussed the Hirsch Electronic Velocity software while Ms. Dollaker discussed the
OnSSI integration that can log on to multiple servers to access different cameras.
Mr. Caldwell suggested bringing in an integrator to help them accomplish this.
2. Adjourn.
Vol.
y� Pg.
3
The foregoing minutes of the Commissioners Court Workshop
Session held March 1, 2011 have been examined and are
approved in open Court this the � Z day of
,2011, in Bryan, Brazos County, Texas.
Duane Peters
County Judge
Y_�ne
•!mmy Ca -lena
Commis loner, Precinct 2
Commissioner, Prec
Attest;
Karen McQueen
County Clerk
Vol ILO Page
' L4 J/.t; 42.1 4-A.r
Lloyd Wassermann
Commissioner, Precinct 1
Kenny Mallard
Commissioner, Precinct 3
Name
C,eic. CaLNJEd. it
T //a 4 do,ecc at
► a rezo C i S 7 r
J 3
Sll €h al l a cj«' Do SS /
' - C��'l 111 Wl
J-an So S
I3 ! L L e grAt.lK S
COMMISSIONERS COURT MEETING
Vol. �— P g .
3/// — . '.7®,1/C.
Date and Time
Organization /Department
rt eT2oOG;
(3_ C.f d-
iseso
/fie
fl / r mact v
is a
cp
5
Isc /,
Lsco
/ fr /z
COMMISSIONERS COURT MEETING
()Li d-t-L, , 70 / /Zo ii
Da a and Time
Name
P RssumN7 QAMAC*trIP -d
17a►v,i () LW
i■ of
2'64 14) h
Joky, L-ybk
iaat
A,k, ),
vol. ILf p 6
Organization /Department